ML14085A250: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 24, 2014 | ||
Mr. Eric Olson | |||
Site Vice President | |||
Entergy Operations, Inc. | |||
Mr. Eric Olson | River Bend Station | ||
Site Vice President | 5485 US Highway 61N | ||
Entergy Operations, Inc. | St. Francisville, LA 70775 | ||
River Bend Station | |||
5485 US Highway 61N | SUBJECT: | ||
St. Francisville, LA 70775 | RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN | ||
SUBJECT: | BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR | ||
INFORMATION | |||
Dear Mr. Olson: | Dear Mr. Olson: | ||
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at | |||
the River Bend Station. A seven person team will perform this inspection using NRC Inspection | On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at | ||
Procedure 71111.21, Component Design Bases Inspection. | the River Bend Station. A seven person team will perform this inspection using NRC Inspection | ||
The inspection focuses on components and operator actions that have high risk and low design | Procedure 71111.21, Component Design Bases Inspection. | ||
margins. The samples reviewed during this inspection will be identified during an information | |||
gathering visit and during the subsequent in-office preparation week. In addition, a number of | The inspection focuses on components and operator actions that have high risk and low design | ||
operating experience issues will also be selected for review. | margins. The samples reviewed during this inspection will be identified during an information | ||
The inspection will include an information gathering site visit by the team leader and a senior | gathering visit and during the subsequent in-office preparation week. In addition, a number of | ||
reactor analyst, and three weeks of onsite inspection by the team. The inspection team will | operating experience issues will also be selected for review. | ||
consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of | |||
the members will focus on engineering and one on operations. The current inspection schedule | The inspection will include an information gathering site visit by the team leader and a senior | ||
is as follows: | reactor analyst, and three weeks of onsite inspection by the team. The inspection team will | ||
consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of | |||
the members will focus on engineering and one on operations. The current inspection schedule | |||
is as follows: | |||
The purpose of the information gathering visit is to meet with members of your staff to identify | |||
potential risk-significant systems, components, and operator actions. The team leader will also | Onsite Information Gathering Visit: July 8, 2014 | ||
request a tour of the plant with members of your operations staff and probabilistic safety | Preparation Week: July 14-18, 2014 | ||
assessment staff. During the onsite weeks, several days of time will be needed on the plant- | Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014 | ||
referenced simulator in order to facilitate the development of operator action-based scenarios. | |||
Additional information and documentation needed to support the inspection will be identified | The purpose of the information gathering visit is to meet with members of your staff to identify | ||
during the inspection, including interviews with engineering managers, engineers, and | potential risk-significant systems, components, and operator actions. The team leader will also | ||
probabilistic safety assessment staff. | request a tour of the plant with members of your operations staff and probabilistic safety | ||
assessment staff. During the onsite weeks, several days of time will be needed on the plant- | |||
referenced simulator in order to facilitate the development of operator action-based scenarios. | |||
Additional information and documentation needed to support the inspection will be identified | |||
during the inspection, including interviews with engineering managers, engineers, and | |||
probabilistic safety assessment staff. | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD. | |||
ARLINGTON, TX 76011-4511 | |||
E. Olson | E. Olson | ||
Our experience with these inspections has shown that they are extremely resource intensive, | - 2 - | ||
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact | |||
on the site and to ensure a productive inspection, we have enclosed a request for information | |||
needed for the inspection. The request has been divided into three groups. The first group lists | |||
information necessary for the information gathering visit and for general preparation. This | Our experience with these inspections has shown that they are extremely resource intensive, | ||
information should be available to the regional office no later than June 23, 2014. Insofar as | both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact | ||
possible, this information should be provided electronically to the team leader. Since the | on the site and to ensure a productive inspection, we have enclosed a request for information | ||
inspection will be concentrated on high risk/low margin components, calculations associated | needed for the inspection. The request has been divided into three groups. The first group lists | ||
with your list of high risk components should be available to review during the information | information necessary for the information gathering visit and for general preparation. This | ||
gathering visit to assist in our selection of components based on available design margin. | information should be available to the regional office no later than June 23, 2014. Insofar as | ||
The second group of documents requested are those items that the team will need access to | possible, this information should be provided electronically to the team leader. Since the | ||
during the preparation week in order to finalize the samples to be inspected. The third group | inspection will be concentrated on high risk/low margin components, calculations associated | ||
lists information necessary to aid the inspection team in tracking issues identified as a result of | with your list of high risk components should be available to review during the information | ||
the inspection. It is requested that this information be provided to the lead inspector as the | gathering visit to assist in our selection of components based on available design margin. | ||
information is generated during the inspection. Additional requests by inspectors will be made | |||
throughout all three onsite weeks for specific documents needed to complete the review of that | The second group of documents requested are those items that the team will need access to | ||
component/selection. It is important that all of these documents are up to date and complete in | during the preparation week in order to finalize the samples to be inspected. The third group | ||
order to minimize the number of additional documents requested during the preparation and/or | lists information necessary to aid the inspection team in tracking issues identified as a result of | ||
the onsite portions of the inspection. In order to facilitate the inspection, we request that a | the inspection. It is requested that this information be provided to the lead inspector as the | ||
contact individual be assigned to each inspector to ensure information requests, questions, and | information is generated during the inspection. Additional requests by inspectors will be made | ||
concerns are addressed in a timely manner. | throughout all three onsite weeks for specific documents needed to complete the review of that | ||
The lead inspector for this inspection is Gerond A. George. We understand that our licensing | component/selection. It is important that all of these documents are up to date and complete in | ||
engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the | order to minimize the number of additional documents requested during the preparation and/or | ||
inspection or the requested materials, please contact the lead inspector by telephone at | the onsite portions of the inspection. In order to facilitate the inspection, we request that a | ||
817-200-1562 or by e-mail at Gerond.George@nrc.gov. | contact individual be assigned to each inspector to ensure information requests, questions, and | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | concerns are addressed in a timely manner. | ||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the Publicly Available Records (PARS) component of NRCs document system (ADAMS). | The lead inspector for this inspection is Gerond A. George. We understand that our licensing | ||
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the | engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the | ||
Public Electronic Reading Room). | inspection or the requested materials, please contact the lead inspector by telephone at | ||
817-200-1562 or by e-mail at Gerond.George@nrc.gov. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | |||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the Publicly Available Records (PARS) component of NRCs document system (ADAMS). | |||
Docket: 50-548 | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the | ||
License: NPF-47 | Public Electronic Reading Room). | ||
Enclosure: Component Design Bases Inspection Request for Information | |||
Electronic Distribution to River Bend Station | Sincerely, | ||
/RA/ | |||
Thomas R. Farnholtz, Chief | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket: 50-548 | |||
License: NPF-47 | |||
Enclosure: Component Design Bases Inspection Request for Information | |||
Electronic Distribution to River Bend Station | |||
E. Olson | E. Olson | ||
Electronic distribution by RIV: | - 3 - | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | Electronic distribution by RIV: | ||
DRP Deputy Director (Troy.Pruett@nrc.gov) | Regional Administrator (Marc.Dapas@nrc.gov) | ||
Acting DRS Director (Jeff.Clark@nrc.gov) | Deputy Regional Administrator (Steven.Reynolds@nrc.gov) | ||
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov) | DRP Director (Kriss.Kennedy@nrc.gov) | ||
Senior Resident Inspector (Grant.Larkin@nrc.gov) | DRP Deputy Director (Troy.Pruett@nrc.gov) | ||
Resident Inspector (Andy.Barrett@nrc.gov) | Acting DRS Director (Jeff.Clark@nrc.gov) | ||
RBS Administrative Assistant (Lisa.Day@nrc.gov) | Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov) | ||
Branch Chief, DRP/C (Don.Allen@nrc.gov) | Senior Resident Inspector (Grant.Larkin@nrc.gov) | ||
Senior Project Engineer (Ray.Azua@nrc.gov) | Resident Inspector (Andy.Barrett@nrc.gov) | ||
Project Engineer (Paul.Nizov@nrc.gov) | RBS Administrative Assistant (Lisa.Day@nrc.gov) | ||
Project Engineer (Michael.Langelier@nrc.gov) | Branch Chief, DRP/C (Don.Allen@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Senior Project Engineer (Ray.Azua@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Project Engineer (Paul.Nizov@nrc.gov) | ||
Project Manager (Alan.Wang@nrc.gov) | Project Engineer (Michael.Langelier@nrc.gov) | ||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) | Project Manager (Alan.Wang@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
R:\_REACTORS\RBS\2014\RBS2014007-RFI-GAG.pdf | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov) | |||
GGeorge | |||
/RA/ | |||
3/14/14 | |||
OFFICIAL RECORD COPY | |||
R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf | |||
ML14085A250 | |||
SUNSI Review | |||
Initials: | |||
Non-Sensitive | |||
Sensitive | |||
Publicly Available | |||
Non-Publicly Available | |||
RI:EB1 | |||
C:EB1 | |||
GGeorge | |||
TFarnholtz | |||
/RA/ | |||
/RA/ | |||
3/14/14 | |||
3/24/14 | |||
OFFICIAL RECORD COPY | |||
T-Telephone | |||
E-Email | |||
F-Fax | |||
- 1 - | |||
Inspection Report: | Enclosure | ||
Information Gathering Dates: | |||
Inspection Dates: | Initial Request for Information | ||
Component Design Bases Inspection | |||
Inspection Procedure: | River Bend Station | ||
Lead Inspector: | |||
I. | Inspection Report: | ||
05000548/2014007 | |||
Information Gathering Dates: | |||
July 8, 2014 | |||
Inspection Dates: | |||
July 21-25, 2014; August 4-8, 2014; and August 18-22, | |||
2014 | |||
Inspection Procedure: | |||
IP 71111.21, Component Design Bases Inspection | |||
Lead Inspector: | |||
Gerond A. George, Senior Reactor Inspector | |||
I. | |||
Information Requested Prior to Information Gathering Visit (July 8, 2014) | |||
The following information (Section I of this enclosure) should be sent to the Region IV | |||
office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the | |||
attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items | |||
to be selected for a final list following the information gathering visit. The inspection | |||
team will finalize the selected list during the prep week using the additional documents | |||
requested in Section II of this enclosure. The specific items selected from the lists shall | |||
be available and ready for review on the day indicated in this request. *Please provide | |||
requested documentation electronically in pdf files, Excel, or other searchable formats, | |||
if possible. The information should contain descriptive names, and be indexed and | |||
hyperlinked to facilitate ease of use. Information in "lists" should contain enough | |||
information to be easily understood by someone who has knowledge of boiling water | |||
reactor technology. If requested documents are large and only hard copy formats are | |||
available, please inform the inspector(s), and provide subject documentation during the | |||
first day of the onsite inspection. | |||
1. An excel spreadsheet of equipment basic events (with definitions) including | |||
importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely | |||
(FV) from your internal events probabilistic risk assessment (PRA). Include basic | |||
events with RAW value of 1.3 or greater. | |||
2. Provide a list of the top 500 cut-sets from your PRA. | |||
3. Copies of PRA system notebooks, and the latest PRA summary document. | |||
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator | |||
actions from your site specific PSA sorted by RAW and FV. Provide copies of your | |||
human reliability worksheets for these items. | |||
5. List of procedures used to accomplish operator actions associated with the basic | |||
events in your PRA. | |||
6. A list of all time-critical operator actions in procedures. | |||
7. If you have an external events or fire PSA model, provide the information requested | |||
in items 1-4 for external events and fire. | |||
- 2 - | |||
Enclosure | |||
8. Any pre-existing evaluation or list of components and associated calculations with | |||
low design margins, (i.e., pumps closest to the design limit for flow or pressure, | |||
diesel generator close to design required output, heat exchangers close to rated | |||
design heat removal, etc.). | |||
9. List of high risk maintenance rule systems/components and functions; based on | |||
engineering or expert panel judgment. | |||
10. Structure, system, and components in the Maintenance Rule (a)(1) category. | |||
11. Site top 10 issues list. | |||
12. A list of operating experience evaluations for the last 3 years. | |||
II. Information Requested to be Available on First Day of Preparation Week | |||
13. List of any common-cause failure evaluation of components in the last 5 years. | |||
14. List of root cause evaluations associated with component failures or design issues | |||
initiated/completed in the last 3 years. | |||
15. A list of permanent and temporary modifications for the previous 3 years. | |||
16. List of current operator work arounds/burdens. | |||
17. A copy of any internal/external self-assessments and associated corrective action | |||
documents generated in preparation for the inspection. | |||
18. A copy of engineering/operations related audits completed in the last 2 years. | |||
19. Current management and engineering organizational charts. | |||
20. List of licensee contacts for the inspection team with pager or phone numbers. | |||
II. | |||
Information Requested to be Available on First Day of Preparation Week | |||
(July 14, 2014) | |||
1. An electronic copy of the Design Bases Documents for the selected components. | |||
2. An electronic copy of the System Health notebooks for the selected components. | |||
3. List of condition reports (corrective action documents) associated with each of the | |||
selected components for the last 5 years. | |||
4. The corrective maintenance history associated with each of the selected components | |||
for the last 5 years. | |||
5. Copies of calculations associated with each of the selected components (if not | |||
previously provided), excluding data files. Please review the calculations and also | |||
provide copies of reference material (such as drawings, engineering requests, and | |||
vendor letters). | |||
6. Copies of operability evaluations associated with each of the selected components | |||
and plans for restoring operability, if applicable. | |||
- 3 - | |||
Enclosure | |||
7. Copies of selected operator work-around evaluations associated with each of the | |||
selected components and plans for resolution, if applicable. | |||
8. Lists of any open temporary modifications associated with each of the selected | |||
components, if applicable. | |||
9. Trend data on the selected electrical/mechanical components performance for last 3 | |||
years (for example, pumps performance including in-service testing, other vibration | |||
monitoring, oil sample results, etc., as applicable). | |||
10. List of motor operated valves (MOVs) in the program, design margin and risk | |||
ranking. | |||
11. List of air operated valves (AOVs) in the valve program, design and risk ranking. | |||
III. Information Requested to be provided throughout the inspection. | |||
12. Mechanical piping drawings for: | |||
* | |||
Engineered safety features | |||
* | |||
Emergency core cooling systems | |||
* | |||
Emergency diesel generators | |||
13. Electrical one-line drawings for: | |||
* | |||
Offsite power/switchyard supplies | |||
* | |||
Normal AC power systems | |||
* | |||
Emergency AC/DC power systems including | |||
* | |||
120VAC power, and | |||
* | |||
125VDC/24VDC safety class systems | |||
III. | |||
Information Requested to be provided throughout the inspection. | |||
1. Copies of any corrective action documents generated as a result of the teams | |||
questions or queries during this inspection. | |||
2. Copies of the list of questions submitted by the team members and the | |||
status/resolution of the information requested (provide daily during the inspection to | |||
each team member). | |||
3. Reference materials (available electronically and as needed during all onsite weeks): | |||
* | |||
General set of plant drawings | |||
* | |||
IPE/IPEEE/PRA report | |||
* | |||
Procurement documents for components selected | |||
* | |||
Plant procedures (normal, abnormal, emergency, surveillance, etc.) | |||
* | |||
Technical Specifications | |||
* | |||
Updated Final Safety Analysis Report | |||
* | |||
Vendor manuals | |||
Inspector Contact Information: | |||
Gerond A. George | |||
Senior Reactor Inspector | - 4 - | ||
(817)200-1562 | Enclosure | ||
Gerond.George@nrc.gov | |||
Mailing Address: | Inspector Contact Information: | ||
U.S. NRC, Region IV | |||
Attn: Gerond A. George | Gerond A. George | ||
1600 East Lamar Blvd. | Senior Reactor Inspector | ||
(817)200-1562 | |||
Gerond.George@nrc.gov | |||
Mailing Address: | |||
U.S. NRC, Region IV | |||
Attn: Gerond A. George | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4511 | Arlington, TX 76011-4511 | ||
}} | }} | ||
Latest revision as of 22:29, 10 January 2025
| ML14085A250 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 03/24/2014 |
| From: | Thomas Farnholtz Region 4 Engineering Branch 1 |
| To: | Olson E Entergy Operations |
| G. George | |
| References | |
| IR-14-007 | |
| Download: ML14085A250 (7) | |
See also: IR 05000458/2014007
Text
March 24, 2014
Mr. Eric Olson
Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN
BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR
INFORMATION
Dear Mr. Olson:
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at
the River Bend Station. A seven person team will perform this inspection using NRC Inspection
Procedure 71111.21, Component Design Bases Inspection.
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and three weeks of onsite inspection by the team. The inspection team will
consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of
the members will focus on engineering and one on operations. The current inspection schedule
is as follows:
Onsite Information Gathering Visit: July 8, 2014
Preparation Week: July 14-18, 2014
Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant systems, components, and operator actions. The team leader will also
request a tour of the plant with members of your operations staff and probabilistic safety
assessment staff. During the onsite weeks, several days of time will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified
during the inspection, including interviews with engineering managers, engineers, and
probabilistic safety assessment staff.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
E. Olson
- 2 -
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than June 23, 2014. Insofar as
possible, this information should be provided electronically to the team leader. Since the
inspection will be concentrated on high risk/low margin components, calculations associated
with your list of high risk components should be available to review during the information
gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested are those items that the team will need access to
during the preparation week in order to finalize the samples to be inspected. The third group
lists information necessary to aid the inspection team in tracking issues identified as a result of
the inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. Additional requests by inspectors will be made
throughout all three onsite weeks for specific documents needed to complete the review of that
component/selection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the onsite portions of the inspection. In order to facilitate the inspection, we request that a
contact individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Gerond A. George. We understand that our licensing
engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the
inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1562 or by e-mail at Gerond.George@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-548
License: NPF-47
Enclosure: Component Design Bases Inspection Request for Information
Electronic Distribution to River Bend Station
E. Olson
- 3 -
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Branch Chief, DRP/C (Don.Allen@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)
Project Engineer (Paul.Nizov@nrc.gov)
Project Engineer (Michael.Langelier@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf
SUNSI Review
Initials:
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
RI:EB1
C:EB1
GGeorge
TFarnholtz
/RA/
/RA/
3/14/14
3/24/14
OFFICIAL RECORD COPY
T-Telephone
E-Email
F-Fax
- 1 -
Enclosure
Initial Request for Information
Component Design Bases Inspection
River Bend Station
Inspection Report: 05000548/2014007
Information Gathering Dates:
July 8, 2014
Inspection Dates:
July 21-25, 2014; August 4-8, 2014; and August 18-22,
2014
Inspection Procedure:
IP 71111.21, Component Design Bases Inspection
Lead Inspector:
Gerond A. George, Senior Reactor Inspector
I.
Information Requested Prior to Information Gathering Visit (July 8, 2014)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the
attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items
to be selected for a final list following the information gathering visit. The inspection
team will finalize the selected list during the prep week using the additional documents
requested in Section II of this enclosure. The specific items selected from the lists shall
be available and ready for review on the day indicated in this request. *Please provide
requested documentation electronically in pdf files, Excel, or other searchable formats,
if possible. The information should contain descriptive names, and be indexed and
hyperlinked to facilitate ease of use. Information in "lists" should contain enough
information to be easily understood by someone who has knowledge of boiling water
reactor technology. If requested documents are large and only hard copy formats are
available, please inform the inspector(s), and provide subject documentation during the
first day of the onsite inspection.
1. An excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely
(FV) from your internal events probabilistic risk assessment (PRA). Include basic
events with RAW value of 1.3 or greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA system notebooks, and the latest PRA summary document.
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator
actions from your site specific PSA sorted by RAW and FV. Provide copies of your
human reliability worksheets for these items.
5. List of procedures used to accomplish operator actions associated with the basic
events in your PRA.
6. A list of all time-critical operator actions in procedures.
7. If you have an external events or fire PSA model, provide the information requested
in items 1-4 for external events and fire.
- 2 -
Enclosure
8. Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal, etc.).
9. List of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
10. Structure, system, and components in the Maintenance Rule (a)(1) category.
11. Site top 10 issues list.
12. A list of operating experience evaluations for the last 3 years.
13. List of any common-cause failure evaluation of components in the last 5 years.
14. List of root cause evaluations associated with component failures or design issues
initiated/completed in the last 3 years.
15. A list of permanent and temporary modifications for the previous 3 years.
16. List of current operator work arounds/burdens.
17. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
18. A copy of engineering/operations related audits completed in the last 2 years.
19. Current management and engineering organizational charts.
20. List of licensee contacts for the inspection team with pager or phone numbers.
II.
Information Requested to be Available on First Day of Preparation Week
(July 14, 2014)
1. An electronic copy of the Design Bases Documents for the selected components.
2. An electronic copy of the System Health notebooks for the selected components.
3. List of condition reports (corrective action documents) associated with each of the
selected components for the last 5 years.
4. The corrective maintenance history associated with each of the selected components
for the last 5 years.
5. Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and also
provide copies of reference material (such as drawings, engineering requests, and
vendor letters).
6. Copies of operability evaluations associated with each of the selected components
and plans for restoring operability, if applicable.
- 3 -
Enclosure
7. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
8. Lists of any open temporary modifications associated with each of the selected
components, if applicable.
9. Trend data on the selected electrical/mechanical components performance for last 3
years (for example, pumps performance including in-service testing, other vibration
monitoring, oil sample results, etc., as applicable).
10. List of motor operated valves (MOVs) in the program, design margin and risk
ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Mechanical piping drawings for:
Engineered safety features
Emergency core cooling systems
13. Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal AC power systems
Emergency AC/DC power systems including
120VAC power, and
125VDC/24VDC safety class systems
III.
Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
3. Reference materials (available electronically and as needed during all onsite weeks):
General set of plant drawings
IPE/IPEEE/PRA report
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
- 4 -
Enclosure
Inspector Contact Information:
Gerond A. George
Senior Reactor Inspector
(817)200-1562
Gerond.George@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4511