{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:March 24, 2014  
                              NUCLEAR REGULATORY COMMISSION
                                                REGION IV
Mr. Eric Olson  
                                          1600 E. LAMAR BLVD.
   Site Vice President  
                                        ARLINGTON, TX 76011-4511
Entergy Operations, Inc.  
                                          March 24, 2014
Mr. Eric Olson
River Bend Station  
   Site Vice President
5485 US Highway 61N  
Entergy Operations, Inc.
St. Francisville, LA 70775  
River Bend Station
5485 US Highway 61N
SUBJECT:  
St. Francisville, LA 70775
RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN  
SUBJECT:       RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN
BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR  
                BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR
INFORMATION  
                INFORMATION
Dear Mr. Olson:
Dear Mr. Olson:  
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at
the River Bend Station. A seven person team will perform this inspection using NRC Inspection
On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at  
Procedure 71111.21, Component Design Bases Inspection.
the River Bend Station. A seven person team will perform this inspection using NRC Inspection  
The inspection focuses on components and operator actions that have high risk and low design
Procedure 71111.21, Component Design Bases Inspection.  
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
The inspection focuses on components and operator actions that have high risk and low design  
operating experience issues will also be selected for review.
margins. The samples reviewed during this inspection will be identified during an information  
The inspection will include an information gathering site visit by the team leader and a senior
gathering visit and during the subsequent in-office preparation week. In addition, a number of  
reactor analyst, and three weeks of onsite inspection by the team. The inspection team will
operating experience issues will also be selected for review.
consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of
the members will focus on engineering and one on operations. The current inspection schedule
The inspection will include an information gathering site visit by the team leader and a senior  
is as follows:
reactor analyst, and three weeks of onsite inspection by the team. The inspection team will  
        Onsite Information Gathering Visit: July 8, 2014
consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of  
        Preparation Week: July 14-18, 2014
the members will focus on engineering and one on operations. The current inspection schedule  
        Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014
is as follows:  
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant systems, components, and operator actions. The team leader will also
Onsite Information Gathering Visit: July 8, 2014  
request a tour of the plant with members of your operations staff and probabilistic safety
Preparation Week: July 14-18, 2014  
assessment staff. During the onsite weeks, several days of time will be needed on the plant-
Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014  
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified
The purpose of the information gathering visit is to meet with members of your staff to identify  
during the inspection, including interviews with engineering managers, engineers, and
potential risk-significant systems, components, and operator actions. The team leader will also  
probabilistic safety assessment staff.
request a tour of the plant with members of your operations staff and probabilistic safety  
assessment staff. During the onsite weeks, several days of time will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified  
during the inspection, including interviews with engineering managers, engineers, and  
probabilistic safety assessment staff.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX  76011-4511


E. Olson                                         -2-
E. Olson  
Our experience with these inspections has shown that they are extremely resource intensive,
- 2 -  
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
Our experience with these inspections has shown that they are extremely resource intensive,  
information should be available to the regional office no later than June 23, 2014. Insofar as
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact  
possible, this information should be provided electronically to the team leader. Since the
on the site and to ensure a productive inspection, we have enclosed a request for information  
inspection will be concentrated on high risk/low margin components, calculations associated
needed for the inspection. The request has been divided into three groups. The first group lists  
with your list of high risk components should be available to review during the information
information necessary for the information gathering visit and for general preparation. This  
gathering visit to assist in our selection of components based on available design margin.
information should be available to the regional office no later than June 23, 2014. Insofar as  
The second group of documents requested are those items that the team will need access to
possible, this information should be provided electronically to the team leader. Since the  
during the preparation week in order to finalize the samples to be inspected. The third group
inspection will be concentrated on high risk/low margin components, calculations associated  
lists information necessary to aid the inspection team in tracking issues identified as a result of
with your list of high risk components should be available to review during the information  
the inspection. It is requested that this information be provided to the lead inspector as the
gathering visit to assist in our selection of components based on available design margin.
information is generated during the inspection. Additional requests by inspectors will be made
throughout all three onsite weeks for specific documents needed to complete the review of that
The second group of documents requested are those items that the team will need access to  
component/selection. It is important that all of these documents are up to date and complete in
during the preparation week in order to finalize the samples to be inspected. The third group  
order to minimize the number of additional documents requested during the preparation and/or
lists information necessary to aid the inspection team in tracking issues identified as a result of  
the onsite portions of the inspection. In order to facilitate the inspection, we request that a
the inspection. It is requested that this information be provided to the lead inspector as the  
contact individual be assigned to each inspector to ensure information requests, questions, and
information is generated during the inspection. Additional requests by inspectors will be made  
concerns are addressed in a timely manner.
throughout all three onsite weeks for specific documents needed to complete the review of that  
The lead inspector for this inspection is Gerond A. George. We understand that our licensing
component/selection. It is important that all of these documents are up to date and complete in  
engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the
order to minimize the number of additional documents requested during the preparation and/or  
inspection or the requested materials, please contact the lead inspector by telephone at
the onsite portions of the inspection. In order to facilitate the inspection, we request that a  
817-200-1562 or by e-mail at Gerond.George@nrc.gov.
contact individual be assigned to each inspector to ensure information requests, questions, and  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
concerns are addressed in a timely manner.  
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
The lead inspector for this inspection is Gerond A. George. We understand that our licensing  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the  
Public Electronic Reading Room).
inspection or the requested materials, please contact the lead inspector by telephone at  
                                                Sincerely,
817-200-1562 or by e-mail at Gerond.George@nrc.gov.
                                                /RA/
                                                Thomas R. Farnholtz, Chief
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
                                                Engineering Branch 1
made available electronically for public inspection in the NRC Public Document Room or from  
                                                Division of Reactor Safety
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
Docket: 50-548
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the  
License: NPF-47
Public Electronic Reading Room).  
Enclosure: Component Design Bases Inspection Request for Information
Electronic Distribution to River Bend Station
Sincerely,  
/RA/  
Thomas R. Farnholtz, Chief  
Engineering Branch 1  
Division of Reactor Safety  
Docket: 50-548  
License: NPF-47  
Enclosure: Component Design Bases Inspection Request for Information  
Electronic Distribution to River Bend Station  


E. Olson                                       -3-
E. Olson  
Electronic distribution by RIV:
- 3 -  
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Electronic distribution by RIV:  
DRP Deputy Director (Troy.Pruett@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)  
Acting DRS Director (Jeff.Clark@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)  
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)  
Senior Resident Inspector (Grant.Larkin@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)  
Resident Inspector (Andy.Barrett@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)  
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)  
Branch Chief, DRP/C (Don.Allen@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)  
Senior Project Engineer (Ray.Azua@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)  
Project Engineer (Paul.Nizov@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)  
Project Engineer (Michael.Langelier@nrc.gov)
Branch Chief, DRP/C (Don.Allen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Senior Project Engineer (Ray.Azua@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Engineer (Paul.Nizov@nrc.gov)  
Project Manager (Alan.Wang@nrc.gov)
Project Engineer (Michael.Langelier@nrc.gov)  
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)  
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)  
R:\_REACTORS\RBS\2014\RBS2014007-RFI-GAG.pdf                     ML14085A250
Technical Support Assistant (Loretta.Williams@nrc.gov)  
  SUNSI Review                     Non-Sensitive       Publicly Available
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
  Initials:                            Sensitive            Non-Publicly Available
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)  
RI:EB1                           C:EB1
  GGeorge                           TFarnholtz
  /RA/                             /RA/
  3/14/14                           3/24/14
OFFICIAL RECORD COPY                         T-Telephone  E-Email             F-Fax
R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf  
ML14085A250  
SUNSI Review  
Initials:
Non-Sensitive  
Sensitive
Publicly Available  
  Non-Publicly Available  
RI:EB1  
C:EB1  
   
GGeorge  
TFarnholtz  
   
/RA/  
/RA/  
   
3/14/14  
3/24/14  
OFFICIAL RECORD COPY
T-Telephone   
E-Email  
F-Fax  


                                  Initial Request for Information
                              Component Design Bases Inspection
                                          River Bend Station
- 1 -
Inspection Report:                       05000548/2014007
Enclosure
Information Gathering Dates:             July 8, 2014
Inspection Dates:                       July 21-25, 2014; August 4-8, 2014; and August 18-22,
Initial Request for Information  
                                        2014
Component Design Bases Inspection  
Inspection Procedure:                   IP 71111.21, Component Design Bases Inspection
River Bend Station  
Lead Inspector:                         Gerond A. George, Senior Reactor Inspector
I.     Information Requested Prior to Information Gathering Visit (July 8, 2014)
Inspection Report:
      The following information (Section I of this enclosure) should be sent to the Region IV
05000548/2014007
      office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the
      attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items
Information Gathering Dates:
      to be selected for a final list following the information gathering visit. The inspection
July 8, 2014  
      team will finalize the selected list during the prep week using the additional documents
      requested in Section II of this enclosure. The specific items selected from the lists shall
Inspection Dates:  
      be available and ready for review on the day indicated in this request. *Please provide
July 21-25, 2014; August 4-8, 2014; and August 18-22,  
      requested documentation electronically in pdf files, Excel, or other searchable formats,
2014  
      if possible. The information should contain descriptive names, and be indexed and
      hyperlinked to facilitate ease of use. Information in "lists" should contain enough
Inspection Procedure:  
      information to be easily understood by someone who has knowledge of boiling water
IP 71111.21, Component Design Bases Inspection  
      reactor technology. If requested documents are large and only hard copy formats are
      available, please inform the inspector(s), and provide subject documentation during the
Lead Inspector:  
      first day of the onsite inspection.
      1. An excel spreadsheet of equipment basic events (with definitions) including
            importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely
Gerond A. George, Senior Reactor Inspector  
            (FV) from your internal events probabilistic risk assessment (PRA). Include basic
            events with RAW value of 1.3 or greater.
      2. Provide a list of the top 500 cut-sets from your PRA.
I.  
      3. Copies of PRA system notebooks, and the latest PRA summary document.
Information Requested Prior to Information Gathering Visit (July 8, 2014)
      4. An excel spreadsheet of PRA human action basic events or risk ranking of operator
            actions from your site specific PSA sorted by RAW and FV. Provide copies of your
The following information (Section I of this enclosure) should be sent to the Region IV  
            human reliability worksheets for these items.
office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the  
      5. List of procedures used to accomplish operator actions associated with the basic
attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items  
            events in your PRA.
to be selected for a final list following the information gathering visit. The inspection  
      6. A list of all time-critical operator actions in procedures.
team will finalize the selected list during the prep week using the additional documents  
      7. If you have an external events or fire PSA model, provide the information requested
requested in Section II of this enclosure. The specific items selected from the lists shall  
            in items 1-4 for external events and fire.
be available and ready for review on the day indicated in this request. *Please provide  
                                                  -1-                                    Enclosure
requested documentation electronically in pdf files, Excel, or other searchable formats,  
if possible. The information should contain descriptive names, and be indexed and  
hyperlinked to facilitate ease of use. Information in "lists" should contain enough  
information to be easily understood by someone who has knowledge of boiling water  
reactor technology. If requested documents are large and only hard copy formats are  
available, please inform the inspector(s), and provide subject documentation during the  
first day of the onsite inspection.
1. An excel spreadsheet of equipment basic events (with definitions) including  
importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely  
(FV) from your internal events probabilistic risk assessment (PRA). Include basic  
events with RAW value of 1.3 or greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA system notebooks, and the latest PRA summary document.  
4. An excel spreadsheet of PRA human action basic events or risk ranking of operator  
actions from your site specific PSA sorted by RAW and FV. Provide copies of your  
human reliability worksheets for these items.
5. List of procedures used to accomplish operator actions associated with the basic  
events in your PRA.  
6. A list of all time-critical operator actions in procedures.  
7. If you have an external events or fire PSA model, provide the information requested  
in items 1-4 for external events and fire.  


    8. Any pre-existing evaluation or list of components and associated calculations with
        low design margins, (i.e., pumps closest to the design limit for flow or pressure,
        diesel generator close to design required output, heat exchangers close to rated
- 2 -
        design heat removal, etc.).
Enclosure
    9. List of high risk maintenance rule systems/components and functions; based on
        engineering or expert panel judgment.
    10. Structure, system, and components in the Maintenance Rule (a)(1) category.
8. Any pre-existing evaluation or list of components and associated calculations with  
    11. Site top 10 issues list.
low design margins, (i.e., pumps closest to the design limit for flow or pressure,  
    12. A list of operating experience evaluations for the last 3 years.
diesel generator close to design required output, heat exchangers close to rated  
    13. List of any common-cause failure evaluation of components in the last 5 years.
design heat removal, etc.).  
    14. List of root cause evaluations associated with component failures or design issues
        initiated/completed in the last 3 years.
9. List of high risk maintenance rule systems/components and functions; based on  
    15. A list of permanent and temporary modifications for the previous 3 years.
engineering or expert panel judgment.  
    16. List of current operator work arounds/burdens.
    17. A copy of any internal/external self-assessments and associated corrective action
10. Structure, system, and components in the Maintenance Rule (a)(1) category.  
        documents generated in preparation for the inspection.
    18. A copy of engineering/operations related audits completed in the last 2 years.
11. Site top 10 issues list.  
    19. Current management and engineering organizational charts.
    20. List of licensee contacts for the inspection team with pager or phone numbers.
12. A list of operating experience evaluations for the last 3 years.
II. Information Requested to be Available on First Day of Preparation Week
    (July 14, 2014)
13. List of any common-cause failure evaluation of components in the last 5 years.  
    1. An electronic copy of the Design Bases Documents for the selected components.
    2. An electronic copy of the System Health notebooks for the selected components.
14. List of root cause evaluations associated with component failures or design issues  
    3. List of condition reports (corrective action documents) associated with each of the
initiated/completed in the last 3 years.
        selected components for the last 5 years.
    4. The corrective maintenance history associated with each of the selected components
15. A list of permanent and temporary modifications for the previous 3 years.
        for the last 5 years.
    5. Copies of calculations associated with each of the selected components (if not
16. List of current operator work arounds/burdens.  
        previously provided), excluding data files. Please review the calculations and also
        provide copies of reference material (such as drawings, engineering requests, and
17. A copy of any internal/external self-assessments and associated corrective action  
        vendor letters).
documents generated in preparation for the inspection.
    6. Copies of operability evaluations associated with each of the selected components
        and plans for restoring operability, if applicable.
18. A copy of engineering/operations related audits completed in the last 2 years.  
                                              -2-                                    Enclosure
19. Current management and engineering organizational charts.
20. List of licensee contacts for the inspection team with pager or phone numbers.  
II.  
Information Requested to be Available on First Day of Preparation Week  
(July 14, 2014)  
1. An electronic copy of the Design Bases Documents for the selected components.  
2. An electronic copy of the System Health notebooks for the selected components.  
3. List of condition reports (corrective action documents) associated with each of the  
selected components for the last 5 years.  
4. The corrective maintenance history associated with each of the selected components  
for the last 5 years.
5. Copies of calculations associated with each of the selected components (if not  
previously provided), excluding data files. Please review the calculations and also  
provide copies of reference material (such as drawings, engineering requests, and  
vendor letters).  
6. Copies of operability evaluations associated with each of the selected components  
and plans for restoring operability, if applicable.


    7. Copies of selected operator work-around evaluations associated with each of the
        selected components and plans for resolution, if applicable.
    8. Lists of any open temporary modifications associated with each of the selected
- 3 -
        components, if applicable.
Enclosure
    9. Trend data on the selected electrical/mechanical components performance for last 3
        years (for example, pumps performance including in-service testing, other vibration
        monitoring, oil sample results, etc., as applicable).
7. Copies of selected operator work-around evaluations associated with each of the  
    10. List of motor operated valves (MOVs) in the program, design margin and risk
selected components and plans for resolution, if applicable.  
        ranking.
    11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
8. Lists of any open temporary modifications associated with each of the selected  
    12. Mechanical piping drawings for:
components, if applicable.  
        *   Engineered safety features
        *   Emergency core cooling systems
9. Trend data on the selected electrical/mechanical components performance for last 3  
        *   Emergency diesel generators
years (for example, pumps performance including in-service testing, other vibration  
    13. Electrical one-line drawings for:
monitoring, oil sample results, etc., as applicable).  
        *   Offsite power/switchyard supplies
        *   Normal AC power systems
10. List of motor operated valves (MOVs) in the program, design margin and risk  
        *   Emergency AC/DC power systems including
ranking.  
        *   120VAC power, and
        *   125VDC/24VDC safety class systems
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.  
III. Information Requested to be provided throughout the inspection.
    1. Copies of any corrective action documents generated as a result of the teams
12. Mechanical piping drawings for:  
        questions or queries during this inspection.
    2. Copies of the list of questions submitted by the team members and the
*  
        status/resolution of the information requested (provide daily during the inspection to
Engineered safety features  
        each team member).
*  
    3. Reference materials (available electronically and as needed during all onsite weeks):
Emergency core cooling systems  
        *   General set of plant drawings
*  
        *   IPE/IPEEE/PRA report
Emergency diesel generators  
        *   Procurement documents for components selected
        *   Plant procedures (normal, abnormal, emergency, surveillance, etc.)
13. Electrical one-line drawings for:  
        *   Technical Specifications
 
        *   Updated Final Safety Analysis Report
*  
        *   Vendor manuals
Offsite power/switchyard supplies  
                                              -3-                                    Enclosure
*  
Normal AC power systems  
*  
Emergency AC/DC power systems including  
*  
120VAC power, and  
*  
125VDC/24VDC safety class systems  
III.  
Information Requested to be provided throughout the inspection.  
1. Copies of any corrective action documents generated as a result of the teams  
questions or queries during this inspection.  
2. Copies of the list of questions submitted by the team members and the  
status/resolution of the information requested (provide daily during the inspection to  
each team member).  
3. Reference materials (available electronically and as needed during all onsite weeks):  
*  
General set of plant drawings  
*  
IPE/IPEEE/PRA report  
*  
Procurement documents for components selected  
*  
Plant procedures (normal, abnormal, emergency, surveillance, etc.)  
*  
Technical Specifications  
*  
Updated Final Safety Analysis Report  
*  
Vendor manuals  


Inspector Contact Information:
Gerond A. George
Senior Reactor Inspector
- 4 -
(817)200-1562
Enclosure
Gerond.George@nrc.gov
Mailing Address:
Inspector Contact Information:  
U.S. NRC, Region IV
Attn: Gerond A. George
Gerond A. George  
1600 East Lamar Blvd.
Senior Reactor Inspector  
(817)200-1562  
Gerond.George@nrc.gov  
Mailing Address:  
U.S. NRC, Region IV  
Attn: Gerond A. George  
1600 East Lamar Blvd.  
Arlington, TX 76011-4511
Arlington, TX 76011-4511
                              -4- Enclosure
}}
}}

Latest revision as of 22:29, 10 January 2025

Notification of NRC Component Design Bases Inspection (05000458/2014007) and Initial Request for Information
ML14085A250
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/24/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Olson E
Entergy Operations
G. George
References
IR-14-007
Download: ML14085A250 (7)


See also: IR 05000458/2014007

Text

March 24, 2014

Mr. Eric Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF NRC COMPONENT DESIGN

BASES INSPECTION (05000458/2014007) AND INITIAL REQUEST FOR

INFORMATION

Dear Mr. Olson:

On July 8, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at

the River Bend Station. A seven person team will perform this inspection using NRC Inspection

Procedure 71111.21, Component Design Bases Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and three weeks of onsite inspection by the team. The inspection team will

consist of seven members; a team leader, four NRC inspectors, and two contractors. Five of

the members will focus on engineering and one on operations. The current inspection schedule

is as follows:

Onsite Information Gathering Visit: July 8, 2014

Preparation Week: July 14-18, 2014

Onsite Weeks: July 21-25, 2014; August 4-8, 2014; and August 18-22, 2014

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant systems, components, and operator actions. The team leader will also

request a tour of the plant with members of your operations staff and probabilistic safety

assessment staff. During the onsite weeks, several days of time will be needed on the plant-

referenced simulator in order to facilitate the development of operator action-based scenarios.

Additional information and documentation needed to support the inspection will be identified

during the inspection, including interviews with engineering managers, engineers, and

probabilistic safety assessment staff.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

E. Olson

- 2 -

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than June 23, 2014. Insofar as

possible, this information should be provided electronically to the team leader. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested are those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout all three onsite weeks for specific documents needed to complete the review of that

component/selection. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Gerond A. George. We understand that our licensing

engineer contact for this inspection is Kristi Huffstatler. If there are any questions about the

inspection or the requested materials, please contact the lead inspector by telephone at

817-200-1562 or by e-mail at Gerond.George@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-548

License: NPF-47

Enclosure: Component Design Bases Inspection Request for Information

Electronic Distribution to River Bend Station

E. Olson

- 3 -

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Jeff.Clark@nrc.gov)

Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Branch Chief, DRP/C (Don.Allen@nrc.gov)

Senior Project Engineer (Ray.Azua@nrc.gov)

Project Engineer (Paul.Nizov@nrc.gov)

Project Engineer (Michael.Langelier@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)

R:\\_REACTORS\\RBS\\2014\\RBS2014007-RFI-GAG.pdf

ML14085A250

SUNSI Review

Initials:

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

RI:EB1

C:EB1

GGeorge

TFarnholtz

/RA/

/RA/

3/14/14

3/24/14

OFFICIAL RECORD COPY

T-Telephone

E-Email

F-Fax

- 1 -

Enclosure

Initial Request for Information

Component Design Bases Inspection

River Bend Station

Inspection Report: 05000548/2014007

Information Gathering Dates:

July 8, 2014

Inspection Dates:

July 21-25, 2014; August 4-8, 2014; and August 18-22,

2014

Inspection Procedure:

IP 71111.21, Component Design Bases Inspection

Lead Inspector:

Gerond A. George, Senior Reactor Inspector

I.

Information Requested Prior to Information Gathering Visit (July 8, 2014)

The following information (Section I of this enclosure) should be sent to the Region IV

office in hard copy or electronic format (compact disc or Certrec IMS preferred), to the

attention of Gerond A. George, by June 23, 2014, to facilitate the reduction in the items

to be selected for a final list following the information gathering visit. The inspection

team will finalize the selected list during the prep week using the additional documents

requested in Section II of this enclosure. The specific items selected from the lists shall

be available and ready for review on the day indicated in this request. *Please provide

requested documentation electronically in pdf files, Excel, or other searchable formats,

if possible. The information should contain descriptive names, and be indexed and

hyperlinked to facilitate ease of use. Information in "lists" should contain enough

information to be easily understood by someone who has knowledge of boiling water

reactor technology. If requested documents are large and only hard copy formats are

available, please inform the inspector(s), and provide subject documentation during the

first day of the onsite inspection.

1. An excel spreadsheet of equipment basic events (with definitions) including

importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely

(FV) from your internal events probabilistic risk assessment (PRA). Include basic

events with RAW value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator

actions from your site specific PSA sorted by RAW and FV. Provide copies of your

human reliability worksheets for these items.

5. List of procedures used to accomplish operator actions associated with the basic

events in your PRA.

6. A list of all time-critical operator actions in procedures.

7. If you have an external events or fire PSA model, provide the information requested

in items 1-4 for external events and fire.

- 2 -

Enclosure

8. Any pre-existing evaluation or list of components and associated calculations with

low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated

design heat removal, etc.).

9. List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment.

10. Structure, system, and components in the Maintenance Rule (a)(1) category.

11. Site top 10 issues list.

12. A list of operating experience evaluations for the last 3 years.

13. List of any common-cause failure evaluation of components in the last 5 years.

14. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 3 years.

15. A list of permanent and temporary modifications for the previous 3 years.

16. List of current operator work arounds/burdens.

17. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

18. A copy of engineering/operations related audits completed in the last 2 years.

19. Current management and engineering organizational charts.

20. List of licensee contacts for the inspection team with pager or phone numbers.

II.

Information Requested to be Available on First Day of Preparation Week

(July 14, 2014)

1. An electronic copy of the Design Bases Documents for the selected components.

2. An electronic copy of the System Health notebooks for the selected components.

3. List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

4. The corrective maintenance history associated with each of the selected components

for the last 5 years.

5. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and also

provide copies of reference material (such as drawings, engineering requests, and

vendor letters).

6. Copies of operability evaluations associated with each of the selected components

and plans for restoring operability, if applicable.

- 3 -

Enclosure

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Lists of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for last 3

years (for example, pumps performance including in-service testing, other vibration

monitoring, oil sample results, etc., as applicable).

10. List of motor operated valves (MOVs) in the program, design margin and risk

ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk ranking.

12. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling systems

Emergency diesel generators

13. Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal AC power systems

Emergency AC/DC power systems including

120VAC power, and

125VDC/24VDC safety class systems

III.

Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection to

each team member).

3. Reference materials (available electronically and as needed during all onsite weeks):

General set of plant drawings

IPE/IPEEE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

- 4 -

Enclosure

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

(817)200-1562

Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond A. George

1600 East Lamar Blvd.

Arlington, TX 76011-4511