ML14143A037: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML14143A037 | | number = ML14143A037 | ||
| issue date = 05/28/2014 | | issue date = 05/28/2014 | ||
| title = Overview of | | title = Overview of NRCs License Termination Rule | ||
| author name = Johnson R | | author name = Johnson R | ||
| author affiliation = NRC/FSME/DWMEP/DURLD/SPB | | author affiliation = NRC/FSME/DWMEP/DURLD/SPB | ||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OVERVIEW OF NRCS LICENSE TERMINATION RULE Presentation at the West Valley Quarterly Public Meeting May 28, 2014 Robert L. Johnson 1 | {{#Wiki_filter:OVERVIEW OF NRCS LICENSE TERMINATION RULE TERMINATION RULE Presentation at the West Valley Quarterly Public Meeting May 28, 2014 Robert L. Johnson 1 | ||
REGULATIONS AND GUIDANCE | REGULATIONS AND GUIDANCE | ||
* Regulations: | * Regulations: 10 CFR 20 Subpart E (License Termination g | ||
p | |||
( | |||
Rule (LTR)) | |||
* Statements of Consideration (SOC) for LTR | * Statements of Consideration (SOC) for LTR | ||
* Guidance: Consolidated Decommissioning Guidance, NUREG-1757, Vol. 1, 2, and 3 | * Guidance: Consolidated Decommissioning Guidance, NUREG-1757, Vol. 1, 2, and 3 | ||
* Commission | * Commissions West Valley Policy Statement (WVPS) | ||
* Commission s West Valley Policy Statement (WVPS) | |||
* Commissions Orders regarding Shieldalloy o CLI-11-12 and CLI-13-06 o Only for 10 CFR 20.1403(a) 2 | * Commissions Orders regarding Shieldalloy o CLI-11-12 and CLI-13-06 o Only for 10 CFR 20.1403(a) 2 | ||
LTR STATEMENT OF CONSIDERATIONS (SOC) | LTR STATEMENT OF CONSIDERATIONS (SOC) | ||
CONSIDERATIONS (SOC) | |||
Source of extensive informationrationale for provisions, t | |||
t responses to comments Commission preference for unrestricted release Recognition that there may be cases where achieving unrestricted release would not be reasonable (e g where cost unrestricted release would not be reasonable (e.g., where cost would be excessive) | |||
Flexibility | |||
- Consistent set of criteria for the range of facilities and site Consistent set of criteria for the range of facilities and site conditions | |||
- License termination approaches available: unrestricted release, restricted release, alternate criteria Li d | |||
i i | |||
i th d f ti d | |||
- Licensee proposes decommissioning methods for meeting dose criteria | |||
- NUREG-1757, Vol. 2, Rev.1, Section 2 3 | |||
GENERAL PROVISIONS, UNRESTRICTED RELEASE | GENERAL PROVISIONS, UNRESTRICTED RELEASE UNRESTRICTED RELEASE | ||
* General provisions p | * General provisions p | ||
- 10 CFR 20.1401 | |||
- 1000 year compliance period | |||
- DOE/NYSERDA EIS should analyze beyond 1000 yr DOE/NYSERDA EIS should analyze beyond 1000 yr (WVPS SOC) | |||
* Unrestricted release license termination | * Unrestricted release license termination 10 CFR 20 1402 | ||
- 10 CFR 20.1402 | |||
- 25 mrem/yr and ALARA | |||
* Licensee could | * Licensee could propose both unrestricted and p | ||
p restricted release for different portions of the site 4 | |||
RESTRICTED RELEASE ELIGIBILITY | RESTRICTED RELEASE ELIGIBILITY ELIGIBILITY | ||
* 10 CFR 20.1403(a) | * 10 CFR 20.1403(a) | ||
( ) | |||
* Purpose | * Purpose | ||
- Initial eligibility for restricted releasenot approval Screen out sites that should be removing | |||
- Screen out sites that should be removing contamination to achieve unrestricted release | |||
* A site would be eligible if | * A site would be eligible if further reductions in residual radioactivity necessary to comply with the residual radioactivity necessary to comply with the provisions of 20.1402 | ||
- would result in net public or environmental harm or | |||
- were not being made because the residual levels associated with restricted conditions are ALARA. | |||
5 | 5 | ||
RESTRICTED RELEASE ELIGIBILITY (CONT | RESTRICTED RELEASE ELIGIBILITY (CONT ) | ||
ELIGIBILITY (CONT.) | |||
Commissions Orders regarding Shieldalloy | |||
- Series of Shieldalloy lawsuits with associated Court and Commission actions | |||
- Explain original meaning of provision and clarifies the analysis is limited to further removal of residual radioactivity limited to further removal of residual radioactivity | |||
- Not a comparison of individual doses of restricted and unrestricted release and selection of the lowest dose | |||
- Cost benefit analyses following NUREG-1757, Appendix N | |||
* Costs/benefits of further removal of residual radioactive material from levels proposed to remain onsite to the unrestricted release level | * Costs/benefits of further removal of residual radioactive material from levels proposed to remain onsite to the unrestricted release level | ||
* Net public harm analysis (costs of harm to people and environment compared to benefits, e.g., collective dose averted dollar value) | * Net public harm analysis (costs of harm to people and environment compared to benefits, e.g., collective dose averted dollar value) | ||
* ALARA (total costs compared to benefits, | ALARA (total costs compared to benefits e g collecti e dose a erted | ||
* ALARA (total costs compared to benefits, e.g., collective dose averted dollar value) 6 | |||
RESTRICTED RELEASE INSTITUTIONAL CONTROLS (ICs) | RESTRICTED RELEASE INSTITUTIONAL CONTROLS (ICs) | ||
* 10 CFR 20.1403 (b) | INSTITUTIONAL CONTROLS (ICs) | ||
* 10 CFR 20.1403 (b) | |||
( ) | |||
* Guidance in NUREG-1757, Vol. 1, Rev. 2 | * Guidance in NUREG-1757, Vol. 1, Rev. 2 | ||
* Legally enforceable ICs to restrict future site use | * Legally enforceable ICs to restrict future site use | ||
* Durable ICs | * Durable ICs | ||
- For higher risk sites (100-500 mrem/yr or > 100 yr half life | |||
- State or Federal government ownership/control | |||
- State or Federal government ownership/control | |||
* Five-year reviews | * Five-year reviews | ||
* Independent | * Independent third party/government entity backup p | ||
p y g y | |||
p | |||
* NRC retains authority to take action if ICs fail (SOC) 7 | * NRC retains authority to take action if ICs fail (SOC) 7 | ||
RESTRICTED RELEASE ENGINEERED BARRIERS (EBs) | RESTRICTED RELEASE ENGINEERED BARRIERS (EBs) | ||
* EBs to mitigate | ENGINEERED BARRIERS (EBs) | ||
* EBs to mitigate EBs to mitigate | |||
- Human intrusion | |||
g | - Adverse natural processes (e.g., erosion) p | ||
( | |||
g | |||
) | |||
- Release and transport of radionuclides | |||
* Contribute to meeting dose criteria; no prescriptive LTR requirements | * Contribute to meeting dose criteria; no prescriptive LTR requirements | ||
* EBs are not ICs and are assumed to degrade rather than immediately and totally fail for the IC fail dose criteria 8 | * EBs are not ICs and are assumed to degrade rather than immediately and totally fail for the IC fail dose criteria 8 | ||
RESTRICED RELEASE FINANCIAL ASSURANCE | RESTRICED RELEASE FINANCIAL ASSURANCE ASSURANCE | ||
- 10 CFR 20.1403(c) | - 10 CFR 20.1403(c) 10 CFR 20.1403(c) | ||
- NUREG-1757, Vol. 3 | - NUREG-1757, Vol. 3 | ||
==Purpose:== | ==Purpose:== | ||
enables independent third party party, including a government custodian, to assume and carryout | enables independent third party | ||
==Purpose:== | |||
enables independent third party, including a government custodian, to assume and carryout responsibilities for controls and y | |||
p maintenance | |||
- Requirements for amounts and mechanisms (e.g., government entity statement of intent) 9 | - Requirements for amounts and mechanisms (e.g., government entity statement of intent) 9 | ||
RESTRICTED RELEASE ADVICE FROM AFFECTED PARTIES | RESTRICTED RELEASE ADVICE FROM AFFECTED PARTIES FROM AFFECTED PARTIES | ||
* 10 CFR 20.1403 (d) | * 10 CFR 20.1403 (d) 10 CFR 20.1403 (d) | ||
* NUREG- 1757 Vol. 1 | * NUREG-1757 Vol. 1 | ||
* Seek advice from affected parties on specific questions | * Seek advice from affected parties on specific Seek advice from affected parties on specific questions incorporate as appropriate incorporate as appropriate, | ||
* Provide a publicly available summary of discussions, and document advice in the d scuss o s, a d docu e t ad ce t e decommissioning plan 10 | |||
* Provide a publicly available summary of discussions, d | |||
decommissioning plan 10 | |||
RESTRICTED RELEASE DOSE CRITERIA | RESTRICTED RELEASE DOSE CRITERIA CRITERIA | ||
* 10 CFR 20.1403 | * 10 CFR 20.1403 (b) and (e) | ||
( ) | |||
( ) | |||
* NUREG-1757, Vol. 2 | * NUREG-1757, Vol. 2 | ||
* ICs in effect: 25 mrem/yr plus ALARA | * ICs in effect: 25 mrem/yr plus ALARA | ||
* If ICs no longer in effect ( | * If ICs no longer in effect (dose caps) | ||
o | * If ICs no longer in effect ( dose caps ) | ||
o Assumption of immediate and total failure o ALARA o 100 mrem/yr or o 100 mrem/yr or o 500 mrem/yr Further reductions in residual radioactivity necessary to comply with 100 mrem/yr are not technically achievable, prohibitively y | |||
y | |||
, p y | |||
expensive, or would result in net public or environmental harm o If ICs fail NRC retains authority to take action (SOC) 11 | |||
RESTRICTED RELEASE ALTERNATE CRITERIA | RESTRICTED RELEASE ALTERNATE CRITERIA ALTERNATE CRITERIA Alternate criteria license termination | ||
- 10 CFR 20.1404 | |||
- NUREG-1757, Vol. 1; Rev. 2 | |||
- Alleviates the need for exemptions for exceeding doses listed below (SOC) below (SOC) | |||
- Exceed 25 mrem/yr (1402, 1403(b), 1403(d)(1)(i)(A)) | |||
- Not to exceed 100 mrem/yr from all man-made sources | |||
- Restrictions required per 1403; reduce doses to ALARA Restrictions required per 1403; reduce doses to ALARA | |||
- Commission approval after considering public and EPA comments Exemptions | |||
- Consider granting exemptions | |||
- WVPS: if LTR compliance is technically impractical or prohibitively expensive, but maintain protection 12 | |||
NO LICENSE TERMINATION | NO LICENSE TERMINATION | ||
* | * Keep under license p | ||
- SOC: Alternative to license termination if requirements cannot be met WVPS: long term or perpetual license where LTR | |||
- WVPS: long-term or perpetual license where LTR requirements are technical impractical or prohibitively expensive NUREG 1757 Vol 1; Rev 2 Section 17 7 and | |||
- NUREG-1757, Vol. 1; Rev. 2, Section 17.7 and Appendix M | |||
* Possession only license for long-term control approved by Commission | * Possession only license for long-term control approved by Commission by Commission | ||
* Last resort (e.g., if independent third party requirement is not met) 13 | * Last resort (e.g., if independent third party requirement is not met) 13 | ||
RESTRICTED RELEASE CONCLUSION | RESTRICTED RELEASE CONCLUSION CONCLUSION | ||
* A system of controls to ensure safety | * A system of controls to ensure safety A system of controls to ensure safety | ||
- 25 mrem/yr with restrictions | |||
- Legally enforceable and durable ICs | |||
- EBs designed for site | |||
- Monitoring and maintenance; 5-year rechecks | |||
- Independent third party/government backup to site owner/custodian | |||
- Financial assurance for third party Financial assurance for third party | |||
- Dose caps if ICs fail: safety net | |||
- Remain licensed, if needed 14}} | |||
Latest revision as of 20:35, 10 January 2025
| ML14143A037 | |
| Person / Time | |
|---|---|
| Site: | West Valley Demonstration Project, P00M-032 |
| Issue date: | 05/28/2014 |
| From: | Rachel Johnson NRC/FSME/DWMEP/DURLD/SPB |
| To: | |
| Shared Package | |
| ML14143A059 | List: |
| References | |
| Download: ML14143A037 (14) | |
Text
OVERVIEW OF NRCS LICENSE TERMINATION RULE TERMINATION RULE Presentation at the West Valley Quarterly Public Meeting May 28, 2014 Robert L. Johnson 1
REGULATIONS AND GUIDANCE
- Regulations: 10 CFR 20 Subpart E (License Termination g
p
(
Rule (LTR))
- Guidance: Consolidated Decommissioning Guidance, NUREG-1757, Vol. 1, 2, and 3
- Commissions West Valley Policy Statement (WVPS)
- Commission s West Valley Policy Statement (WVPS)
- Commissions Orders regarding Shieldalloy o CLI-11-12 and CLI-13-06 o Only for 10 CFR 20.1403(a) 2
LTR STATEMENT OF CONSIDERATIONS (SOC)
CONSIDERATIONS (SOC)
Source of extensive informationrationale for provisions, t
t responses to comments Commission preference for unrestricted release Recognition that there may be cases where achieving unrestricted release would not be reasonable (e g where cost unrestricted release would not be reasonable (e.g., where cost would be excessive)
Flexibility
- Consistent set of criteria for the range of facilities and site Consistent set of criteria for the range of facilities and site conditions
- License termination approaches available: unrestricted release, restricted release, alternate criteria Li d
i i
i th d f ti d
- Licensee proposes decommissioning methods for meeting dose criteria
- NUREG-1757, Vol. 2, Rev.1, Section 2 3
GENERAL PROVISIONS, UNRESTRICTED RELEASE UNRESTRICTED RELEASE
- General provisions p
- 1000 year compliance period
- DOE/NYSERDA EIS should analyze beyond 1000 yr DOE/NYSERDA EIS should analyze beyond 1000 yr (WVPS SOC)
- Unrestricted release license termination 10 CFR 20 1402
- 25 mrem/yr and ALARA
- Licensee could propose both unrestricted and p
p restricted release for different portions of the site 4
RESTRICTED RELEASE ELIGIBILITY ELIGIBILITY
( )
- Purpose
- Initial eligibility for restricted releasenot approval Screen out sites that should be removing
- Screen out sites that should be removing contamination to achieve unrestricted release
- A site would be eligible if further reductions in residual radioactivity necessary to comply with the residual radioactivity necessary to comply with the provisions of 20.1402
- would result in net public or environmental harm or
- were not being made because the residual levels associated with restricted conditions are ALARA.
5
RESTRICTED RELEASE ELIGIBILITY (CONT )
ELIGIBILITY (CONT.)
Commissions Orders regarding Shieldalloy
- Series of Shieldalloy lawsuits with associated Court and Commission actions
- Explain original meaning of provision and clarifies the analysis is limited to further removal of residual radioactivity limited to further removal of residual radioactivity
- Not a comparison of individual doses of restricted and unrestricted release and selection of the lowest dose
- Cost benefit analyses following NUREG-1757, Appendix N
- Costs/benefits of further removal of residual radioactive material from levels proposed to remain onsite to the unrestricted release level
- Net public harm analysis (costs of harm to people and environment compared to benefits, e.g., collective dose averted dollar value)
ALARA (total costs compared to benefits e g collecti e dose a erted
- ALARA (total costs compared to benefits, e.g., collective dose averted dollar value) 6
RESTRICTED RELEASE INSTITUTIONAL CONTROLS (ICs)
INSTITUTIONAL CONTROLS (ICs)
( )
- Guidance in NUREG-1757, Vol. 1, Rev. 2
- Legally enforceable ICs to restrict future site use
- Durable ICs
- For higher risk sites (100-500 mrem/yr or > 100 yr half life
- State or Federal government ownership/control
- State or Federal government ownership/control
- Five-year reviews
- Independent third party/government entity backup p
p y g y
p
RESTRICTED RELEASE ENGINEERED BARRIERS (EBs)
ENGINEERED BARRIERS (EBs)
- EBs to mitigate EBs to mitigate
- Human intrusion
- Adverse natural processes (e.g., erosion) p
(
g
)
- Release and transport of radionuclides
- Contribute to meeting dose criteria; no prescriptive LTR requirements
- EBs are not ICs and are assumed to degrade rather than immediately and totally fail for the IC fail dose criteria 8
RESTRICED RELEASE FINANCIAL ASSURANCE ASSURANCE
- 10 CFR 20.1403(c) 10 CFR 20.1403(c)
- NUREG-1757, Vol. 3
Purpose:
enables independent third party
Purpose:
enables independent third party, including a government custodian, to assume and carryout responsibilities for controls and y
p maintenance
- Requirements for amounts and mechanisms (e.g., government entity statement of intent) 9
RESTRICTED RELEASE ADVICE FROM AFFECTED PARTIES FROM AFFECTED PARTIES
- 10 CFR 20.1403 (d) 10 CFR 20.1403 (d)
- NUREG-1757 Vol. 1
- Seek advice from affected parties on specific Seek advice from affected parties on specific questions incorporate as appropriate incorporate as appropriate,
- Provide a publicly available summary of discussions, and document advice in the d scuss o s, a d docu e t ad ce t e decommissioning plan 10
RESTRICTED RELEASE DOSE CRITERIA CRITERIA
- 10 CFR 20.1403 (b) and (e)
( )
( )
- NUREG-1757, Vol. 2
- If ICs no longer in effect (dose caps)
- If ICs no longer in effect ( dose caps )
o Assumption of immediate and total failure o ALARA o 100 mrem/yr or o 100 mrem/yr or o 500 mrem/yr Further reductions in residual radioactivity necessary to comply with 100 mrem/yr are not technically achievable, prohibitively y
y
, p y
expensive, or would result in net public or environmental harm o If ICs fail NRC retains authority to take action (SOC) 11
RESTRICTED RELEASE ALTERNATE CRITERIA ALTERNATE CRITERIA Alternate criteria license termination
- NUREG-1757, Vol. 1; Rev. 2
- Alleviates the need for exemptions for exceeding doses listed below (SOC) below (SOC)
- Exceed 25 mrem/yr (1402, 1403(b), 1403(d)(1)(i)(A))
- Not to exceed 100 mrem/yr from all man-made sources
- Restrictions required per 1403; reduce doses to ALARA Restrictions required per 1403; reduce doses to ALARA
- Commission approval after considering public and EPA comments Exemptions
- Consider granting exemptions
- WVPS: if LTR compliance is technically impractical or prohibitively expensive, but maintain protection 12
NO LICENSE TERMINATION
- Keep under license p
- SOC: Alternative to license termination if requirements cannot be met WVPS: long term or perpetual license where LTR
- WVPS: long-term or perpetual license where LTR requirements are technical impractical or prohibitively expensive NUREG 1757 Vol 1; Rev 2 Section 17 7 and
- NUREG-1757, Vol. 1; Rev. 2, Section 17.7 and Appendix M
- Possession only license for long-term control approved by Commission by Commission
- Last resort (e.g., if independent third party requirement is not met) 13
RESTRICTED RELEASE CONCLUSION CONCLUSION
- A system of controls to ensure safety A system of controls to ensure safety
- 25 mrem/yr with restrictions
- Legally enforceable and durable ICs
- EBs designed for site
- Monitoring and maintenance; 5-year rechecks
- Independent third party/government backup to site owner/custodian
- Financial assurance for third party Financial assurance for third party
- Dose caps if ICs fail: safety net
- Remain licensed, if needed 14