IR 05000528/2014402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ember 2, 2014
{{#Wiki_filter:September 2, 2014


==SUBJECT:==
==SUBJECT:==
Line 30: Line 30:
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.


Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Thus due to the security-related information contained in this correspondence, and  
 
UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION IV==
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).


Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Please contact me at (817) 200-1527 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/
/RA/  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-528; 50-529; 50-530 License Nos.: NPF-41; NPF-51; NPF-74 Enclosure:
 
Inspection Plan ML14245A435 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: RGN-002 By: MHaire  Yes No Non-Publicly Available Sensitive MD 3.4 Non-Public A.3 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
DATE 8/29/2014 Letter to Randall from Mark S. Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2014402, 05000529/2014402, AND 05000530/2014402)
 
Docket Nos.: 50-528; 50-529; 50-530 License Nos.: NPF-41; NPF-51; NPF-74  
 
Enclosure:
Inspection Plan  
 
ML14245A435 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 MD 3.4 Non-Public A.3 OFFICE C:PSB1  
 
NAME MHaire/dch  
 
SIGNATURE  
/RA/  
 
DATE 8/29/2014 Letter to Randall from Mark S. Haire, dated September 2, 2014  
 
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2014402, 05000529/2014402, AND 05000530/2014402)  
 
Electronic Distribution by RIV w/enclosure:
Electronic Distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Senior Resident Inspector (Tony.Brown@nrc.gov)
Senior Resident Inspector (Tony.Brown@nrc.gov)  
 
Electronic Distribution by RIV w/o enclosure:
Electronic Distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)

Latest revision as of 17:10, 10 January 2025

Non-Public Security Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (NRC Physical Security Inspection Report Numbers 05000528/2014402, 05000529/2014402, and 05000530/2014402)
ML14245A435
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/02/2014
From: Mark Haire
Plant Support Branch-1
To: Edington R
Arizona Public Service Co
References
IR-2014-402
Download: ML14245A435 (4)


Text

September 2, 2014

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2014402, 05000529/2014402, AND 05000530/2014402)

Dear Mr. Edington:

On August 13, 2014, the NRC completed its mid-cycle performance review of Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos.: 50-528; 50-529; 50-530 License Nos.: NPF-41; NPF-51; NPF-74

Enclosure:

Inspection Plan

ML14245A435 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 MD 3.4 Non-Public A.3 OFFICE C:PSB1

NAME MHaire/dch

SIGNATURE

/RA/

DATE 8/29/2014 Letter to Randall from Mark S. Haire, dated September 2, 2014

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000528/2014402, 05000529/2014402, AND 05000530/2014402)

Electronic Distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Senior Resident Inspector (Tony.Brown@nrc.gov)

Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (David.You@nrc.gov)

Resident Inspector (Dustin.Reinert@nrc.gov)

Administrative Assistant (Kirsten.Claar@nrc.gov)

Branch Chief, DRP/D (James.Drake@nrc.gov)

Senior Project Engineer, DRP/A (Bob.Hagar@nrc.gov)

Project Engineer, DRP/A (Brian.Parks@nrc.gov)

Project Engineer, DRP/A (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Jennivine.Rankin@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

ROPreports