{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                              REGION IV
REGION IV  
                                          1600 E LAMAR BLVD
1600 E LAMAR BLVD  
                                        ARLINGTON, TX 76011-4511
ARLINGTON, TX 76011-4511  
                                        September 11, 2014
Rafael Flores, Senior Vice President
September 11, 2014  
   and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Rafael Flores, Senior Vice President  
Comanche Peak Nuclear Power Plant
   and Chief Nuclear Officer  
P.O. Box 1002
Attention: Regulatory Affairs  
Glen Rose, TX 76043
Luminant Generation Company LLC  
SUBJECT:         COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
Comanche Peak Nuclear Power Plant  
                NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION
P.O. Box 1002  
                05000445/2015301; 05000446/2015301
Glen Rose, TX 76043  
Dear Mr. Flores:
In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator
and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were
SUBJECT:  
made for the administration of a retake licensing examination at Comanche Peak Nuclear Power
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -  
Plant, Units 1 and 2, during the week of February 9, 2015.
NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION  
As agreed during the telephone conversation, your staff will prepare the retake examination
05000445/2015301; 05000446/2015301  
(written examination for two reactor operator applicants) based on the guidelines in
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,
Dear Mr. Flores:  
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any
In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator  
changes that might be necessary before the examinations are administered.
and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were  
To meet the above schedule, it will be necessary for your staff to furnish the examination
made for the administration of a retake licensing examination at Comanche Peak Nuclear Power  
outlines by November 24, 2014. The written examination and supporting reference materials
Plant, Units 1 and 2, during the week of February 9, 2015.  
identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
As agreed during the telephone conversation, your staff will prepare the retake examination  
representative of the facility licensee shall approve the outlines, examinations, and tests before
(written examination for two reactor operator applicants) based on the guidelines in
they are submitted to the NRC for review and approval. All materials shall be complete and
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,  
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant  
information in your response be contained in a separate enclosure and appropriately marked.
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any  
Any delay in receiving the required examinations and reference materials, or the submittal of
changes that might be necessary before the examinations are administered.  
inadequate or incomplete materials, may cause the examinations to be rescheduled.
To meet the above schedule, it will be necessary for your staff to furnish the examination  
outlines by November 24, 2014. The written examination and supporting reference materials  
identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,  
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
representative of the facility licensee shall approve the outlines, examinations, and tests before  
they are submitted to the NRC for review and approval. All materials shall be complete and  
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards  
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examinations and reference materials, or the submittal of  
inadequate or incomplete materials, may cause the examinations to be rescheduled.  


R. Flores                                     -2-
R. Flores  
In order to conduct the requested written examination, it will be necessary for your staff to
-2-  
provide adequate space and accommodations in accordance with ES-402. In addition,
In order to conduct the requested written examination, it will be necessary for your staff to  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
provide adequate space and accommodations in accordance with ES-402. In addition,  
effect while the written examination is being administered.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in  
To permit timely NRC review and evaluation, your staff should submit preliminary operator
effect while the written examination is being administered.  
license applications [Office of Management and Budget (OMB) approval number 3150-0090],
medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB
To permit timely NRC review and evaluation, your staff should submit preliminary operator  
approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training
license applications [Office of Management and Budget (OMB) approval number 3150-0090],  
has been completed should be submitted by January 26, 2015. If the final signed applications
medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB  
are not received by that date, a postponement may be necessary.
approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training  
This letter contains information collections that are subject to the Paperwork Reduction Act of
has been completed should be submitted by January 26, 2015. If the final signed applications  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
are not received by that date, a postponement may be necessary.  
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
This letter contains information collections that are subject to the Paperwork Reduction Act of  
for reviewing instructions, gathering and maintaining the data needed, and completing and
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
reviewing the collection of information. Send comments regarding this burden estimate or any
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for  
other aspect of these information collections, including suggestions for reducing the burden, to
this collection of information is estimated to average 50 hours per response, including the time  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
for reviewing instructions, gathering and maintaining the data needed, and completing and  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
reviewing the collection of information. Send comments regarding this burden estimate or any  
INFOCOLLECTS@NRC.GOV.
other aspect of these information collections, including suggestions for reducing the burden, to  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
information collection, unless it displays a currently valid OMB control number.
Commission, Washington, DC 20555-0001, or by Internet electronic mail to  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
INFOCOLLECTS@NRC.GOV.
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
Documents Access and Management System (ADAMS). ADAMS is accessible from the
information collection, unless it displays a currently valid OMB control number.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRCs Public Document  
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide  
Documents Access and Management System (ADAMS). ADAMS is accessible from the  
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and  
guidelines referenced in this letter. If you have any questions regarding the NRCs examination  
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-
procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-
1159.
1159.  
                                                Sincerely,
                                                /RA/
                                                Vincent Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Dockets: 50-445; 50-446
Licenses: NPF-87; NPF-89
Sincerely,
/RA/  
Vincent Gaddy, Chief  
Operations Branch  
Division of Reactor Safety  
Dockets:   50-445; 50-446  
Licenses: NPF-87; NPF-89  


ML14254A076
ML14254A076
}}
}}

Latest revision as of 17:02, 10 January 2025

Notification of NRC Retake Operator Licensing Examination 05000445/2015301, 05000446/2015301
ML14254A076
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/11/2014
From: Vincent Gaddy
Division of Reactor Safety IV
To: Flores R
Luminant Generation Co
Gaddy V
References
IR-2015-301
Download: ML14254A076 (3)


See also: IR 05000445/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

September 11, 2014

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC RETAKE OPERATOR LICENSING EXAMINATION

05000445/2015301; 05000446/2015301

Dear Mr. Flores:

In a telephone conversation on September 10, 2014, between Messrs. Gary Struble, Simulator

and Licensing Examination Manager, and Sean Hedger, Chief Examiner, arrangements were

made for the administration of a retake licensing examination at Comanche Peak Nuclear Power

Plant, Units 1 and 2, during the week of February 9, 2015.

As agreed during the telephone conversation, your staff will prepare the retake examination

(written examination for two reactor operator applicants) based on the guidelines in

NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,

Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant

Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any

changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by November 24, 2014. The written examination and supporting reference materials

identified in Attachment 3 to ES-201 will be due by December 22, 2014. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards

information in your response be contained in a separate enclosure and appropriately marked.

Any delay in receiving the required examinations and reference materials, or the submittal of

inadequate or incomplete materials, may cause the examinations to be rescheduled.

R. Flores

-2-

In order to conduct the requested written examination, it will be necessary for your staff to

provide adequate space and accommodations in accordance with ES-402. In addition,

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator

license applications [Office of Management and Budget (OMB) approval number 3150-0090],

medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB

approval number 3150-0090) by January 5, 2015. Signed applications certifying that all training

has been completed should be submitted by January 26, 2015. If the final signed applications

are not received by that date, a postponement may be necessary.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Hedger at 817-200-1556, or myself at 817-200-

1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

ML14254A076