IR 05000333/2015008: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:November 6, 2015 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 36: | Line 36: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
ML15314A159 SUNSI Review Non-Sensitive | Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects | ||
Docket No. | |||
50-333 License No. | |||
DPR-59 | |||
cc: | |||
Distribution via ListServ | |||
ML15314A159 | |||
SUNSI Review | |||
Non-Sensitive Sensitive | |||
Publicly Available | |||
Non-Publicly Available OFFICE RI/DRP RI/DRP | |||
NAME MDraxton/MSD GDentel/GTD | |||
DATE 10/29/15 11/6/15 | |||
}} | }} | ||
Latest revision as of 06:37, 10 January 2025
| ML15314A159 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 11/06/2015 |
| From: | Glenn Dentel Reactor Projects Branch 2 |
| To: | Brian Sullivan Entergy Nuclear Northeast |
| Dentel G | |
| References | |
| IR 2015008 | |
| Download: ML15314A159 (3) | |
Text
November 6, 2015
SUBJECT:
ASSESSMENT FOLLOW-UP LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2015008)
Dear Mr. Sullivan:
On November 6, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed its quarterly review of performance at the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The review included performance indicators (PI) and inspection results. This letter informs you of the NRCs assessment of your facility and supplements, but does not supersede, the mid-cycle letter issued on September 1, 2015.
The Unplanned Power Changes per 7,000 Critical Hours PI exceeded the Green-to-White threshold value in the fourth quarter of 2012. In the fourth quarter of 2014, the NRC completed a review of the White PI using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area." The results of this inspection were documented in the fourth quarter integrated inspection report 05000333/2014005, dated February 6, 2015 (ADAMS Accession No. ML15037A280). The NRC concluded that the corrective actions taken were adequate to preclude repetition of the unplanned power changes and were sufficient to meet the inspection objectives.
The NRCs review of FitzPatricks performance identified that the Unplanned Power Changes per 7,000 Critical Hours PI returned to the nominal, expected range (i.e., Green) in the third quarter of 2015. Therefore, all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e.,
Green). Accordingly, per the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, FitzPatrick transitioned to the Licensee Response Column (Column 1) of the NRC Reactor Oversight Process Action Matrix, effective October 1, 2015.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Glenn T. Dentel, Chief Reactor Projects Branch 2 Division of Reactor Projects
Docket No.
50-333 License No.
cc:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP
NAME MDraxton/MSD GDentel/GTD
DATE 10/29/15 11/6/15