{{#Wiki_filter: | {{#Wiki_filter:No*WMI*ac. s~,* | ||
EDF-3124-0004, | NWMI-201 6-RAI-001 Rev. 0 Appendix B - | ||
EDF-3124-0004, Calculation for the Determination of Fugitive Dust During Construction Activities from Construction Equipment B-i | |||
Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124 | Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124 | ||
==Title:== | ==Title:== | ||
NWMI Environmental | NWMI Environmental Report Project 4Portage TEM-9002 09/29/09 Rev. 0 | ||
TEM-9(X02 09I29/09 | TEM-9(X02 09I29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 1 of 5 | ||
: 2. ProjectfTask: | : 2. | ||
: 1. Portage Project No.: | ProjectfTask: | ||
NWMI Environmental Report | |||
: 1. Portage Project No.: | |||
3124 | |||
: 3. DCN # | : 3. DCN # | ||
4. | 4. | ||
| Line 34: | Line 38: | ||
==Title:== | ==Title:== | ||
Calculation for the Determination of Fugitive Dust during Constnuction Activities | Calculation for the Determination of Fugitive Dust during Constnuction Activities | ||
: 5. NPH PCor SDC:N/A | : 5. NPH PCor SDC:N/A | ||
: 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air | *1 | ||
: 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-10 and PM-2.5 was estimated for the project. The results are presented in this document. | |||
8 Distribution: (Portage, Inc.) | 8 Distribution: (Portage, Inc.) | ||
: 9. Review (R) and Approval (A) Signaures aPrinte | : 9. Review (R) and Approval (A) Signaures aPrinte Naniel: | ||
Author/Design Agent | Author/Design Agent A | ||
Independent Review | Gary MeManus 2/3/15,__ | ||
Independent Review R | |||
Project Manager R/A John Belier | |||
/////2/3/15 Registered Professional Engineer's Stamp (if required) | |||
*[] | |||
N/A | |||
TEM-9002 | TEM-9002 ENGINEERING DESIGN FILE EDF-3124-0004 09/29109 Rev. 1 Rev. 0 Page 2 of 5 Introduction and Purpose To determine particulate emissions during construction of the Northwest Medical Isotopes, LLC (NWMI) | ||
Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors,the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document. | Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document. | ||
Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation. | Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation. | ||
E = Ax EF x (1-ER/100) where: | E = Ax EF x (1-ER/100) where: | ||
E | E | ||
A | = | ||
EF | Emissions (pound [lb]) | ||
ER | A | ||
= Activity (lb, tons, vehicle, miles traveled) | |||
EF | |||
= | |||
Emission factor (lb/hour [hr], tons, vehicle miles traveled) | |||
ER | |||
= | |||
Overall emission reduction efficiency, percentage (0 unless control factors are used) | |||
Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved. | Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved. | ||
Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing | Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing 1 | ||
Loading earth haulers from front loaders | 100 N/IA' N/IA' Laigerhalesfoexaaos1 120: | ||
b Tonnage based on excavation of 9,000 cubic yards (yd3 ) (EDF-3124-000l, Estimate of | 1o,8... | ||
Loading earth haulers from front loaders 1 | |||
60 10,886 b 12,000 b Compacting 1 | |||
80 N/A' N/A' Moto grading 1 | |||
80N/Ac | |||
/A a Fugitive dust calculations are based on hours of operation. | |||
b Tonnage based on excavation of 9,000 cubic yards (yd3) (EDF-3124-000l, Estimate of Excavation for the NWMI Radioisotope Production Facility) and a swell factor of 25 percent and density of 1.27 grams (g)/cubic centimeter (cm 3). | |||
SFugitive dust calculation based on vehicle miles traveled. | SFugitive dust calculation based on vehicle miles traveled. | ||
N/A | N/A | ||
= | |||
not applicable. | |||
Other assumptions include the following. | Other assumptions include the following. | ||
Silt content: 25 percent Scaling factor (k) for particle size from AP-42 Mean wind speed (miles [mi]/hour [hr]): 8.86 mi/hr Material moisture content: 20 percent Mean vehicle speed: 2.5 mi/hr Vehicle miles traveled is assumed to be = 2.5 mi/hr x 80 hr =200 miles | |||
TEM-9002 | TEM-9002 09/29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 3 of 5 Emission factors: Emission factors equations were obtained from AP-42, Section 13.2.5 and Section 11.9 (updated 1998). The specific equation used is noted for each operation as a footnote. The equations used for each activity are shown in Table 2. The emission fa~ctor is obtained by multiplying the results of the emission factor equation by the appropriate scaling factor. | ||
Table 2. Emission Factors Equations | Table 2. Emission Factors Equations 9 | ||
9 S. | |||
: 9. | |||
S | |||
~* | |||
Motor grading8 | S S | ||
0.- | |||
S Bulldozing8 c2ompacting 8 ¸-* | |||
Motor grading8 excavatorsb' Loading earth haulers from front loadersb Ulanglf tralfrom 0i.3 (Mj)1.4 0.040 (s) 25 0.051 (s)2° k(0.0032).*(U/5)l. 3/(M/2)1.4 (0 0032Y'(U/5)1*(/2' 0.75 | |||
* EF<_IS 0.75 EF 5, 0.6 | |||
* E< | |||
0.35 0.105* EFTsp 0.031 | |||
* EFTn, 0.053 Ib/lir lb/VMT lb/ton i!03!5, | |||
:0.053 lb/ton i i r | |||
i I'i | |||
*n EF k | |||
M s | |||
a AP-42, Section 11.9, Table 11.9-I for bulldozing overburd~en. | |||
b AP-42, Section 13.2.4.3, Equation #1. | |||
cAP-42, Section 11.9, Table 11.9-1 for grading. | cAP-42, Section 11.9, Table 11.9-1 for grading. | ||
= | |||
emission factor. | |||
S | |||
=mean vehicle speed (mi/br). | |||
= | |||
scaling factor for particle size. | |||
TSP | |||
= | |||
total suspended particulate. | |||
=material moisture content (%) | |||
U | |||
= | |||
mean wind spe (mi/br). | |||
= silt content (%). | |||
VMT | |||
=vehicle miles traveled. | |||
Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8. | Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8. | ||
Table 3. Bulldozing (100 hours) | Table 3. Bulldozing (100 hours) | ||
EF_<i0um = 1.0 (0.25)' 5 (0.75) | EF_<i0um = 1.0 (0.25)' 5 (0.75) | ||
(0.20)'4 8.92E-_ | (0.20)'4 8.92E-_ | ||
* 100 hr 9.19E-01 lb/hr | l/h Total lb_<i0* =EF<zi0um | ||
* 100 hr EFTotemission factor. | |||
9.19E-01 lb/hr 9.19E+01 lb EF | |||
= emission factor. | |||
TEM-9002 | TEM-9002 09129109 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 4 of 5 Table 4. Compacting (80 hours) | ||
EF_<ioum | EF_<ioum = 1.0 (0.25)l's (0.75) | ||
(0.20)' " | (0.20)' " | ||
9.19E-01 lb/hr | 9.19E-01 lb/hr Tolal | ||
*Tota 1b05~ | |||
= EFi7~ *80'/1V~ | |||
ff.35E+0l lb EF | hr ff.35E+0l lb EF | ||
= | |||
emission factor. | |||
Table 5. Motor Grading (80 hours at 2.5 miles/hour) | Table 5. Motor Grading (80 hours at 2.5 miles/hour) | ||
I~b | I~b i | ||
EF<ioum = 0.0 15(0.25)2(0.6) | |||
Total Ib_<1o0 | |||
= EF<1oum(2.5)(80) 1E.01 lb/V-MT | |||
:3.8E a ~1031(0~,O5lXO,259~(0.031) | |||
Total lb<z~u EF~2s(2~5)(80) 1.23E-02 2.45E+00 Ib/VMT lb EF | |||
= | |||
emission factor. | |||
VMT | |||
= | |||
vehicle miles traveled. | |||
Table 6. Loading of Earth Haulers from Excavators (12,000 tons) | Table 6. Loading of Earth Haulers from Excavators (12,000 tons) | ||
F_1m= 0.35"(0.0032)*(U/5)I3s | F_1m= 0.35"(0.0032)*(U/5)I3s lb/ton (M/2)' 4 5.2-2l/ton Total lb<l~n = EF<ic*w. | ||
* I 8.96E-03 lb/ton Total | * I EF | ||
1.08E+02 lb EF | = | ||
emission factor. | |||
8.96E-03 lb/ton Total E~25~m 1.08E+02 lb EF emission factor. | |||
TEM-9002 | TEM-9002 ENGINEERING DESIGN FILE EDF-31 24-0004 09I/29/9 Rev. 1 Rev. 0 Page 5 of 5 Table 7. Loading of Earth Haulers from Front Loaders (12,000tons) | ||
EF<O=m- 0.35"(0.0032)*(O15)1I | EF<O=m- 0.35"(0.0032)*(O15)1I I b/ton (M/2)14 | ||
~5.92E,02 lb/ton Total lb.1 co* = EF_<iopx *12,000 I II I= | |||
8.96E-03 lb/ton Total lb*:sm | 0.53 '0. O 2)(I3). | ||
l 8.96E-03 lb/ton Total lb*:sm EF~2.= | |||
* 12,0000 1.08E+02 lb EF | |||
=emission factor. | |||
Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages) | Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages) | ||
EF1*= 0.35"(0.0032)*(U/5)l 3 | EF1*= 0.35"(0.0032)*(U/5)l 3 lb/ton (M/2)'.4 Total lb_<io* = EF_<io | ||
* 24,000 8.96E-03 lb/ton 2.15E+02 lb EF | * 24,000 8.96E-03 lb/ton 2.15E+02 lb EF | ||
= | |||
emission factor. | |||
The total particulate emissions are listed in Table 9. | The total particulate emissions are listed in Table 9. | ||
Table 9. Total Particulate Releases from Construction Activities Bulldozing | Table 9. Total Particulate Releases from Construction Activities Bulldozing 8.9E+01 9.2E+01 Lodigof* ea...h haulers 11m exca-vators | ||
Total release (Ib) | : 7. lE+02 l.IE-+02 Loading of earth haulers from front loaders 7.1lE+02 1.1lE+02 Unladn of fill material 11m eat haulers 1.4E+03 2.E0 Compacting 7.1E+01 7.4E-t01 otrgaig3E+l2.5E+00) | ||
References EDF-3 124-0001l, Estimate of | Total release (Ib) 3.0E+03 6.0E+02 a Final numbers have been adjusted to significant figures. | ||
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, | References EDF-3 124-0001l, Estimate of Excavation for the NWMIlRadioisotope Production Facility, Rev. 3, Portage, Inc., Idaho Falls, Idaho, February 2, 2015. | ||
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, Stationary Point and Area Sources, Fifth Edition, U.S. Environmental Protection Agency, Washington, D.C., January 1995. | |||
No*WMI*ac. s~,* | |||
EDF-3124-0004, | NWMI-201 6-RAI-001 Rev. 0 Appendix B - | ||
EDF-3124-0004, Calculation for the Determination of Fugitive Dust During Construction Activities from Construction Equipment B-i | |||
Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124 | Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124 | ||
==Title:== | ==Title:== | ||
NWMI Environmental | NWMI Environmental Report Project 4Portage TEM-9002 09/29/09 Rev. 0 | ||
TEM-9(X02 09I29/09 | TEM-9(X02 09I29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 1 of 5 | ||
: 2. ProjectfTask: | : 2. | ||
: 1. Portage Project No.: | ProjectfTask: | ||
NWMI Environmental Report | |||
: 1. Portage Project No.: | |||
3124 | |||
: 3. DCN # | : 3. DCN # | ||
4. | 4. | ||
| Line 129: | Line 196: | ||
==Title:== | ==Title:== | ||
Calculation for the Determination of Fugitive Dust during Constnuction Activities | Calculation for the Determination of Fugitive Dust during Constnuction Activities | ||
: 5. NPH PCor SDC:N/A | : 5. NPH PCor SDC:N/A | ||
: 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air | *1 | ||
: 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-10 and PM-2.5 was estimated for the project. The results are presented in this document. | |||
8 Distribution: (Portage, Inc.) | 8 Distribution: (Portage, Inc.) | ||
: 9. Review (R) and Approval (A) Signaures aPrinte | : 9. Review (R) and Approval (A) Signaures aPrinte Naniel: | ||
Author/Design Agent | Author/Design Agent A | ||
Independent Review | Gary MeManus 2/3/15,__ | ||
Independent Review R | |||
Project Manager R/A John Belier | |||
/////2/3/15 Registered Professional Engineer's Stamp (if required) | |||
*[] | |||
N/A | |||
TEM-9002 | TEM-9002 ENGINEERING DESIGN FILE EDF-3124-0004 09/29109 Rev. 1 Rev. 0 Page 2 of 5 Introduction and Purpose To determine particulate emissions during construction of the Northwest Medical Isotopes, LLC (NWMI) | ||
Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors,the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document. | Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document. | ||
Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation. | Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation. | ||
E = Ax EF x (1-ER/100) where: | E = Ax EF x (1-ER/100) where: | ||
E | E | ||
A | = | ||
EF | Emissions (pound [lb]) | ||
ER | A | ||
= Activity (lb, tons, vehicle, miles traveled) | |||
EF | |||
= | |||
Emission factor (lb/hour [hr], tons, vehicle miles traveled) | |||
ER | |||
= | |||
Overall emission reduction efficiency, percentage (0 unless control factors are used) | |||
Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved. | Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved. | ||
Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing | Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing 1 | ||
Loading earth haulers from front loaders | 100 N/IA' N/IA' Laigerhalesfoexaaos1 120: | ||
b Tonnage based on excavation of 9,000 cubic yards (yd3 ) (EDF-3124-000l, Estimate of | 1o,8... | ||
Loading earth haulers from front loaders 1 | |||
60 10,886 b 12,000 b Compacting 1 | |||
80 N/A' N/A' Moto grading 1 | |||
80N/Ac | |||
/A a Fugitive dust calculations are based on hours of operation. | |||
b Tonnage based on excavation of 9,000 cubic yards (yd3) (EDF-3124-000l, Estimate of Excavation for the NWMI Radioisotope Production Facility) and a swell factor of 25 percent and density of 1.27 grams (g)/cubic centimeter (cm 3). | |||
SFugitive dust calculation based on vehicle miles traveled. | SFugitive dust calculation based on vehicle miles traveled. | ||
N/A | N/A | ||
= | |||
not applicable. | |||
Other assumptions include the following. | Other assumptions include the following. | ||
Silt content: 25 percent Scaling factor (k) for particle size from AP-42 Mean wind speed (miles [mi]/hour [hr]): 8.86 mi/hr Material moisture content: 20 percent Mean vehicle speed: 2.5 mi/hr Vehicle miles traveled is assumed to be = 2.5 mi/hr x 80 hr =200 miles | |||
TEM-9002 | TEM-9002 09/29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 3 of 5 Emission factors: Emission factors equations were obtained from AP-42, Section 13.2.5 and Section 11.9 (updated 1998). The specific equation used is noted for each operation as a footnote. The equations used for each activity are shown in Table 2. The emission fa~ctor is obtained by multiplying the results of the emission factor equation by the appropriate scaling factor. | ||
Table 2. Emission Factors Equations | Table 2. Emission Factors Equations 9 | ||
9 S. | |||
: 9. | |||
S | |||
~* | |||
Motor grading8 | S S | ||
0.- | |||
S Bulldozing8 c2ompacting 8 ¸-* | |||
Motor grading8 excavatorsb' Loading earth haulers from front loadersb Ulanglf tralfrom 0i.3 (Mj)1.4 0.040 (s) 25 0.051 (s)2° k(0.0032).*(U/5)l. 3/(M/2)1.4 (0 0032Y'(U/5)1*(/2' 0.75 | |||
* EF<_IS 0.75 EF 5, 0.6 | |||
* E< | |||
0.35 0.105* EFTsp 0.031 | |||
* EFTn, 0.053 Ib/lir lb/VMT lb/ton i!03!5, | |||
:0.053 lb/ton i i r | |||
i I'i | |||
*n EF k | |||
M s | |||
a AP-42, Section 11.9, Table 11.9-I for bulldozing overburd~en. | |||
b AP-42, Section 13.2.4.3, Equation #1. | |||
cAP-42, Section 11.9, Table 11.9-1 for grading. | cAP-42, Section 11.9, Table 11.9-1 for grading. | ||
= | |||
emission factor. | |||
S | |||
=mean vehicle speed (mi/br). | |||
= | |||
scaling factor for particle size. | |||
TSP | |||
= | |||
total suspended particulate. | |||
=material moisture content (%) | |||
U | |||
= | |||
mean wind spe (mi/br). | |||
= silt content (%). | |||
VMT | |||
=vehicle miles traveled. | |||
Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8. | Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8. | ||
Table 3. Bulldozing (100 hours) | Table 3. Bulldozing (100 hours) | ||
EF_<i0um = 1.0 (0.25)' 5 (0.75) | EF_<i0um = 1.0 (0.25)' 5 (0.75) | ||
(0.20)'4 8.92E-_ | (0.20)'4 8.92E-_ | ||
* 100 hr 9.19E-01 lb/hr | l/h Total lb_<i0* =EF<zi0um | ||
* 100 hr EFTotemission factor. | |||
9.19E-01 lb/hr 9.19E+01 lb EF | |||
= emission factor. | |||
TEM-9002 | TEM-9002 09129109 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 4 of 5 Table 4. Compacting (80 hours) | ||
EF_<ioum | EF_<ioum = 1.0 (0.25)l's (0.75) | ||
(0.20)' " | (0.20)' " | ||
9.19E-01 lb/hr | 9.19E-01 lb/hr Tolal | ||
*Tota 1b05~ | |||
= EFi7~ *80'/1V~ | |||
ff.35E+0l lb EF | hr ff.35E+0l lb EF | ||
= | |||
emission factor. | |||
Table 5. Motor Grading (80 hours at 2.5 miles/hour) | Table 5. Motor Grading (80 hours at 2.5 miles/hour) | ||
I~b | I~b i | ||
EF<ioum = 0.0 15(0.25)2(0.6) | |||
Total Ib_<1o0 | |||
= EF<1oum(2.5)(80) 1E.01 lb/V-MT | |||
:3.8E a ~1031(0~,O5lXO,259~(0.031) | |||
Total lb<z~u EF~2s(2~5)(80) 1.23E-02 2.45E+00 Ib/VMT lb EF | |||
= | |||
emission factor. | |||
VMT | |||
= | |||
vehicle miles traveled. | |||
Table 6. Loading of Earth Haulers from Excavators (12,000 tons) | Table 6. Loading of Earth Haulers from Excavators (12,000 tons) | ||
F_1m= 0.35"(0.0032)*(U/5)I3s | F_1m= 0.35"(0.0032)*(U/5)I3s lb/ton (M/2)' 4 5.2-2l/ton Total lb<l~n = EF<ic*w. | ||
* I 8.96E-03 lb/ton Total | * I EF | ||
1.08E+02 lb EF | = | ||
emission factor. | |||
8.96E-03 lb/ton Total E~25~m 1.08E+02 lb EF emission factor. | |||
TEM-9002 | TEM-9002 ENGINEERING DESIGN FILE EDF-31 24-0004 09I/29/9 Rev. 1 Rev. 0 Page 5 of 5 Table 7. Loading of Earth Haulers from Front Loaders (12,000tons) | ||
EF<O=m- 0.35"(0.0032)*(O15)1I | EF<O=m- 0.35"(0.0032)*(O15)1I I b/ton (M/2)14 | ||
~5.92E,02 lb/ton Total lb.1 co* = EF_<iopx *12,000 I II I= | |||
8.96E-03 lb/ton Total lb*:sm | 0.53 '0. O 2)(I3). | ||
l 8.96E-03 lb/ton Total lb*:sm EF~2.= | |||
* 12,0000 1.08E+02 lb EF | |||
=emission factor. | |||
Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages) | Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages) | ||
EF1*= 0.35"(0.0032)*(U/5)l 3 | EF1*= 0.35"(0.0032)*(U/5)l 3 lb/ton (M/2)'.4 Total lb_<io* = EF_<io | ||
* 24,000 8.96E-03 lb/ton 2.15E+02 lb EF | * 24,000 8.96E-03 lb/ton 2.15E+02 lb EF | ||
= | |||
emission factor. | |||
The total particulate emissions are listed in Table 9. | The total particulate emissions are listed in Table 9. | ||
Table 9. Total Particulate Releases from Construction Activities Bulldozing | Table 9. Total Particulate Releases from Construction Activities Bulldozing 8.9E+01 9.2E+01 Lodigof* ea...h haulers 11m exca-vators | ||
Total release (Ib) | : 7. lE+02 l.IE-+02 Loading of earth haulers from front loaders 7.1lE+02 1.1lE+02 Unladn of fill material 11m eat haulers 1.4E+03 2.E0 Compacting 7.1E+01 7.4E-t01 otrgaig3E+l2.5E+00) | ||
References EDF-3 124-0001l, Estimate of | Total release (Ib) 3.0E+03 6.0E+02 a Final numbers have been adjusted to significant figures. | ||
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, | References EDF-3 124-0001l, Estimate of Excavation for the NWMIlRadioisotope Production Facility, Rev. 3, Portage, Inc., Idaho Falls, Idaho, February 2, 2015. | ||
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, Stationary Point and Area Sources, Fifth Edition, U.S. Environmental Protection Agency, Washington, D.C., January 1995.}} | |||
Latest revision as of 03:11, 10 January 2025
| ML16053A207 | |
| Person / Time | |
|---|---|
| Site: | Northwest Medical Isotopes |
| Issue date: | 02/03/2015 |
| From: | Mcmanus G Northwest Medical Isotopes, Portage |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16053A221 | List: |
| References | |
| NWMI-LTR-2016-002 EDF-3124-0004, NWMI-2016-RAI-001, Rev. 0 | |
| Download: ML16053A207 (7) | |
Text
No*WMI*ac. s~,*
NWMI-201 6-RAI-001 Rev. 0 Appendix B -
EDF-3124-0004, Calculation for the Determination of Fugitive Dust During Construction Activities from Construction Equipment B-i
Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124
Title:
NWMI Environmental Report Project 4Portage TEM-9002 09/29/09 Rev. 0
TEM-9(X02 09I29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 1 of 5
- 2.
ProjectfTask:
NWMI Environmental Report
- 1. Portage Project No.:
3124
- 3. DCN #
4.
Title:
Calculation for the Determination of Fugitive Dust during Constnuction Activities
- 5. NPH PCor SDC:N/A
- 1
- 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-10 and PM-2.5 was estimated for the project. The results are presented in this document.
8 Distribution: (Portage, Inc.)
- 9. Review (R) and Approval (A) Signaures aPrinte Naniel:
Author/Design Agent A
Gary MeManus 2/3/15,__
Independent Review R
Project Manager R/A John Belier
/////2/3/15 Registered Professional Engineer's Stamp (if required)
- []
N/A
TEM-9002 ENGINEERING DESIGN FILE EDF-3124-0004 09/29109 Rev. 1 Rev. 0 Page 2 of 5 Introduction and Purpose To determine particulate emissions during construction of the Northwest Medical Isotopes, LLC (NWMI)
Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document.
Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation.
E = Ax EF x (1-ER/100) where:
E
=
Emissions (pound [lb])
A
= Activity (lb, tons, vehicle, miles traveled)
EF
=
Emission factor (lb/hour [hr], tons, vehicle miles traveled)
ER
=
Overall emission reduction efficiency, percentage (0 unless control factors are used)
Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved.
Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing 1
100 N/IA' N/IA' Laigerhalesfoexaaos1 120:
1o,8...
Loading earth haulers from front loaders 1
60 10,886 b 12,000 b Compacting 1
80 N/A' N/A' Moto grading 1
80N/Ac
/A a Fugitive dust calculations are based on hours of operation.
b Tonnage based on excavation of 9,000 cubic yards (yd3) (EDF-3124-000l, Estimate of Excavation for the NWMI Radioisotope Production Facility) and a swell factor of 25 percent and density of 1.27 grams (g)/cubic centimeter (cm 3).
SFugitive dust calculation based on vehicle miles traveled.
N/A
=
not applicable.
Other assumptions include the following.
Silt content: 25 percent Scaling factor (k) for particle size from AP-42 Mean wind speed (miles [mi]/hour [hr]): 8.86 mi/hr Material moisture content: 20 percent Mean vehicle speed: 2.5 mi/hr Vehicle miles traveled is assumed to be = 2.5 mi/hr x 80 hr =200 miles
TEM-9002 09/29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 3 of 5 Emission factors: Emission factors equations were obtained from AP-42, Section 13.2.5 and Section 11.9 (updated 1998). The specific equation used is noted for each operation as a footnote. The equations used for each activity are shown in Table 2. The emission fa~ctor is obtained by multiplying the results of the emission factor equation by the appropriate scaling factor.
Table 2. Emission Factors Equations 9
9 S.
- 9.
S
~*
S S
0.-
S Bulldozing8 c2ompacting 8 ¸-*
Motor grading8 excavatorsb' Loading earth haulers from front loadersb Ulanglf tralfrom 0i.3 (Mj)1.4 0.040 (s) 25 0.051 (s)2° k(0.0032).*(U/5)l. 3/(M/2)1.4 (0 0032Y'(U/5)1*(/2' 0.75
- EF<_IS 0.75 EF 5, 0.6
- E<
0.35 0.105* EFTsp 0.031
- EFTn, 0.053 Ib/lir lb/VMT lb/ton i!03!5,
- 0.053 lb/ton i i r
i I'i
- n EF k
M s
a AP-42, Section 11.9, Table 11.9-I for bulldozing overburd~en.
b AP-42, Section 13.2.4.3, Equation #1.
cAP-42, Section 11.9, Table 11.9-1 for grading.
=
emission factor.
S
=mean vehicle speed (mi/br).
=
scaling factor for particle size.
=
total suspended particulate.
=material moisture content (%)
U
=
mean wind spe (mi/br).
= silt content (%).
VMT
=vehicle miles traveled.
Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8.
Table 3. Bulldozing (100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />)
EF_<i0um = 1.0 (0.25)' 5 (0.75)
(0.20)'4 8.92E-_
l/h Total lb_<i0* =EF<zi0um
- 100 hr EFTotemission factor.
9.19E-01 lb/hr 9.19E+01 lb EF
= emission factor.
TEM-9002 09129109 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 4 of 5 Table 4. Compacting (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)
EF_<ioum = 1.0 (0.25)l's (0.75)
(0.20)' "
9.19E-01 lb/hr Tolal
- Tota 1b05~
= EFi7~ *80'/1V~
hr ff.35E+0l lb EF
=
emission factor.
Table 5. Motor Grading (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> at 2.5 miles/hour)
I~b i
EF<ioum = 0.0 15(0.25)2(0.6)
Total Ib_<1o0
= EF<1oum(2.5)(80) 1E.01 lb/V-MT
- 3.8E a ~1031(0~,O5lXO,259~(0.031)
Total lb<z~u EF~2s(2~5)(80) 1.23E-02 2.45E+00 Ib/VMT lb EF
=
emission factor.
VMT
=
vehicle miles traveled.
Table 6. Loading of Earth Haulers from Excavators (12,000 tons)
F_1m= 0.35"(0.0032)*(U/5)I3s lb/ton (M/2)' 4 5.2-2l/ton Total lb<l~n = EF<ic*w.
- I EF
=
emission factor.
8.96E-03 lb/ton Total E~25~m 1.08E+02 lb EF emission factor.
TEM-9002 ENGINEERING DESIGN FILE EDF-31 24-0004 09I/29/9 Rev. 1 Rev. 0 Page 5 of 5 Table 7. Loading of Earth Haulers from Front Loaders (12,000tons)
EF<O=m- 0.35"(0.0032)*(O15)1I I b/ton (M/2)14
~5.92E,02 lb/ton Total lb.1 co* = EF_<iopx *12,000 I II I=
0.53 '0. O 2)(I3).
l 8.96E-03 lb/ton Total lb*:sm EF~2.=
- 12,0000 1.08E+02 lb EF
=emission factor.
Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages)
EF1*= 0.35"(0.0032)*(U/5)l 3 lb/ton (M/2)'.4 Total lb_<io* = EF_<io
- 24,000 8.96E-03 lb/ton 2.15E+02 lb EF
=
emission factor.
The total particulate emissions are listed in Table 9.
Table 9. Total Particulate Releases from Construction Activities Bulldozing 8.9E+01 9.2E+01 Lodigof* ea...h haulers 11m exca-vators
- 7. lE+02 l.IE-+02 Loading of earth haulers from front loaders 7.1lE+02 1.1lE+02 Unladn of fill material 11m eat haulers 1.4E+03 2.E0 Compacting 7.1E+01 7.4E-t01 otrgaig3E+l2.5E+00)
Total release (Ib) 3.0E+03 6.0E+02 a Final numbers have been adjusted to significant figures.
References EDF-3 124-0001l, Estimate of Excavation for the NWMIlRadioisotope Production Facility, Rev. 3, Portage, Inc., Idaho Falls, Idaho, February 2, 2015.
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, Stationary Point and Area Sources, Fifth Edition, U.S. Environmental Protection Agency, Washington, D.C., January 1995.
No*WMI*ac. s~,*
NWMI-201 6-RAI-001 Rev. 0 Appendix B -
EDF-3124-0004, Calculation for the Determination of Fugitive Dust During Construction Activities from Construction Equipment B-i
Document ID: EDF-3124-0004 Revision ID: 1 Effective Date: February 3, 2015 Engineering Design File Calculation for the Determination of Fugitive Dust during Construction Activities From Construction Equipment Portage Project No.: 3124
Title:
NWMI Environmental Report Project 4Portage TEM-9002 09/29/09 Rev. 0
TEM-9(X02 09I29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 1 of 5
- 2.
ProjectfTask:
NWMI Environmental Report
- 1. Portage Project No.:
3124
- 3. DCN #
4.
Title:
Calculation for the Determination of Fugitive Dust during Constnuction Activities
- 5. NPH PCor SDC:N/A
- 1
- 6. SSC Safety Category: N/A 7 Summary: To determine particulate emissions during construction, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-10 and PM-2.5 was estimated for the project. The results are presented in this document.
8 Distribution: (Portage, Inc.)
- 9. Review (R) and Approval (A) Signaures aPrinte Naniel:
Author/Design Agent A
Gary MeManus 2/3/15,__
Independent Review R
Project Manager R/A John Belier
/////2/3/15 Registered Professional Engineer's Stamp (if required)
- []
N/A
TEM-9002 ENGINEERING DESIGN FILE EDF-3124-0004 09/29109 Rev. 1 Rev. 0 Page 2 of 5 Introduction and Purpose To determine particulate emissions during construction of the Northwest Medical Isotopes, LLC (NWMI)
Radioisotope Production Facility, the types and number of equipment, time operated, and material moved was estimated. Using these estimates and equations developed in the U.S. Environmental Protection Agency (EPA) AP-42, Compilation of Air Pollutant Emission Factors, the amount of PM-i10 and PM-2.5 was estimated for the RPF project. The results are presented in this document.
Methodology Earthmoving activities involve operation of heavy construction equipment on exposed soil. The methods for calculating fugitive dust emissions for earthmoving activities are outlined in AP-42, Section 13.2.5 (updated 2006). Emissions were calculated based on the following equation.
E = Ax EF x (1-ER/100) where:
E
=
Emissions (pound [lb])
A
= Activity (lb, tons, vehicle, miles traveled)
EF
=
Emission factor (lb/hour [hr], tons, vehicle miles traveled)
ER
=
Overall emission reduction efficiency, percentage (0 unless control factors are used)
Assumptions Table I provides assumptions used in the fugitive dust calculations. The assumptions include the type of activities performed, the number of units performing the activities, the number of hours of the activities, and the amount of material moved.
Table 1. Construct Activities for Fugitive Dust Calculations Bulldozing 1
100 N/IA' N/IA' Laigerhalesfoexaaos1 120:
1o,8...
Loading earth haulers from front loaders 1
60 10,886 b 12,000 b Compacting 1
80 N/A' N/A' Moto grading 1
80N/Ac
/A a Fugitive dust calculations are based on hours of operation.
b Tonnage based on excavation of 9,000 cubic yards (yd3) (EDF-3124-000l, Estimate of Excavation for the NWMI Radioisotope Production Facility) and a swell factor of 25 percent and density of 1.27 grams (g)/cubic centimeter (cm 3).
SFugitive dust calculation based on vehicle miles traveled.
N/A
=
not applicable.
Other assumptions include the following.
Silt content: 25 percent Scaling factor (k) for particle size from AP-42 Mean wind speed (miles [mi]/hour [hr]): 8.86 mi/hr Material moisture content: 20 percent Mean vehicle speed: 2.5 mi/hr Vehicle miles traveled is assumed to be = 2.5 mi/hr x 80 hr =200 miles
TEM-9002 09/29/09 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 3 of 5 Emission factors: Emission factors equations were obtained from AP-42, Section 13.2.5 and Section 11.9 (updated 1998). The specific equation used is noted for each operation as a footnote. The equations used for each activity are shown in Table 2. The emission fa~ctor is obtained by multiplying the results of the emission factor equation by the appropriate scaling factor.
Table 2. Emission Factors Equations 9
9 S.
- 9.
S
~*
S S
0.-
S Bulldozing8 c2ompacting 8 ¸-*
Motor grading8 excavatorsb' Loading earth haulers from front loadersb Ulanglf tralfrom 0i.3 (Mj)1.4 0.040 (s) 25 0.051 (s)2° k(0.0032).*(U/5)l. 3/(M/2)1.4 (0 0032Y'(U/5)1*(/2' 0.75
- EF<_IS 0.75 EF 5, 0.6
- E<
0.35 0.105* EFTsp 0.031
- EFTn, 0.053 Ib/lir lb/VMT lb/ton i!03!5,
- 0.053 lb/ton i i r
i I'i
- n EF k
M s
a AP-42, Section 11.9, Table 11.9-I for bulldozing overburd~en.
b AP-42, Section 13.2.4.3, Equation #1.
cAP-42, Section 11.9, Table 11.9-1 for grading.
=
emission factor.
S
=mean vehicle speed (mi/br).
=
scaling factor for particle size.
=
total suspended particulate.
=material moisture content (%)
U
=
mean wind spe (mi/br).
= silt content (%).
VMT
=vehicle miles traveled.
Using the above equations, the following releases for each operation were calculated and are shown in Table 3 through Table 8.
Table 3. Bulldozing (100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />)
EF_<i0um = 1.0 (0.25)' 5 (0.75)
(0.20)'4 8.92E-_
l/h Total lb_<i0* =EF<zi0um
- 100 hr EFTotemission factor.
9.19E-01 lb/hr 9.19E+01 lb EF
= emission factor.
TEM-9002 09129109 Rev. 0 ENGINEERING DESIGN FILE EDF-31 24-0004 Rev. 1 Page 4 of 5 Table 4. Compacting (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />)
EF_<ioum = 1.0 (0.25)l's (0.75)
(0.20)' "
9.19E-01 lb/hr Tolal
- Tota 1b05~
= EFi7~ *80'/1V~
hr ff.35E+0l lb EF
=
emission factor.
Table 5. Motor Grading (80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> at 2.5 miles/hour)
I~b i
EF<ioum = 0.0 15(0.25)2(0.6)
Total Ib_<1o0
= EF<1oum(2.5)(80) 1E.01 lb/V-MT
- 3.8E a ~1031(0~,O5lXO,259~(0.031)
Total lb<z~u EF~2s(2~5)(80) 1.23E-02 2.45E+00 Ib/VMT lb EF
=
emission factor.
VMT
=
vehicle miles traveled.
Table 6. Loading of Earth Haulers from Excavators (12,000 tons)
F_1m= 0.35"(0.0032)*(U/5)I3s lb/ton (M/2)' 4 5.2-2l/ton Total lb<l~n = EF<ic*w.
- I EF
=
emission factor.
8.96E-03 lb/ton Total E~25~m 1.08E+02 lb EF emission factor.
TEM-9002 ENGINEERING DESIGN FILE EDF-31 24-0004 09I/29/9 Rev. 1 Rev. 0 Page 5 of 5 Table 7. Loading of Earth Haulers from Front Loaders (12,000tons)
EF<O=m- 0.35"(0.0032)*(O15)1I I b/ton (M/2)14
~5.92E,02 lb/ton Total lb.1 co* = EF_<iopx *12,000 I II I=
0.53 '0. O 2)(I3).
l 8.96E-03 lb/ton Total lb*:sm EF~2.=
- 12,0000 1.08E+02 lb EF
=emission factor.
Table 8. Unloading of Fill Material from Earth Haulers (24,00 tons) (2 pages)
EF1*= 0.35"(0.0032)*(U/5)l 3 lb/ton (M/2)'.4 Total lb_<io* = EF_<io
- 24,000 8.96E-03 lb/ton 2.15E+02 lb EF
=
emission factor.
The total particulate emissions are listed in Table 9.
Table 9. Total Particulate Releases from Construction Activities Bulldozing 8.9E+01 9.2E+01 Lodigof* ea...h haulers 11m exca-vators
- 7. lE+02 l.IE-+02 Loading of earth haulers from front loaders 7.1lE+02 1.1lE+02 Unladn of fill material 11m eat haulers 1.4E+03 2.E0 Compacting 7.1E+01 7.4E-t01 otrgaig3E+l2.5E+00)
Total release (Ib) 3.0E+03 6.0E+02 a Final numbers have been adjusted to significant figures.
References EDF-3 124-0001l, Estimate of Excavation for the NWMIlRadioisotope Production Facility, Rev. 3, Portage, Inc., Idaho Falls, Idaho, February 2, 2015.
EPA AP-42, Compilation of Air Pollutant Emission Factors, Volume 1, Stationary Point and Area Sources, Fifth Edition, U.S. Environmental Protection Agency, Washington, D.C., January 1995.