ML16081A393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ENE RGV Donald W. Gregoire
{{#Wiki_filter:ENERGV Donald W. Gregoire
        \                                                                         P.O. Box 968, PE2O J -
\\
N0RIHWESI                                                   eire@enerqwest.com March 21, 2016                                                          10 CFR 50.54(w)(3)
P.O. Box 968, PE2O J - N0RIHWESI eire@enerqwest.com 10 CFR 50.54(w)(3)
G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON ANNUAL REPORTING REQUIREMENT
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON - ANNUAL REPORTING REQUIREMENT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:
Insurer/Insurance Policy Title                     Policy       Limits Number NEIL     Primary Property and Decontamination Liability         P1 5-073     $1 .50 Billion NEIL     Decontamination Liability, Decommissioning Liability and Excess Property                         Xl 5-056     $1 .25 Billion NEIL     Accidental Outage                                     El 5-056     $0.49 Billion Total Nuclear Property Insurance                   $3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
Insurer/Insurance Policy Title Policy Limits Number NEIL Primary Property and Decontamination Liability P1 5-073
espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:     NRC Region IV Administrator                 CD Sonoda BPN1 399 NRC NRR Project Manager                     WA Horin Winston & Strawn NRC Sr. Resident Inspector 988C
$1.50 Billion NEIL Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056
$1.25 Billion NEIL Accidental Outage El 5-056
$0.49 Billion Total Nuclear Property Insurance
$3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:
NRC Region IV Administrator CD Sonoda BPN1 399 NRC NRR Project Manager WA Horin
- Winston & Strawn NRC Sr. Resident Inspector - 988C March 21, 2016


ENE RGV Donald W. Gregoire
ENERGV Donald W. Gregoire
        \                                                                         P.O. Box 968, PE2O J -
\\
N0RIHWESI                                                   eire@enerqwest.com March 21, 2016                                                          10 CFR 50.54(w)(3)
P.O. Box 968, PE2O J - N0RIHWESI eire@enerqwest.com 10 CFR 50.54(w)(3)
G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON ANNUAL REPORTING REQUIREMENT
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON - ANNUAL REPORTING REQUIREMENT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:
In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:
Insurer/Insurance Policy Title                     Policy       Limits Number NEIL     Primary Property and Decontamination Liability         P1 5-073     $1 .50 Billion NEIL     Decontamination Liability, Decommissioning Liability and Excess Property                         Xl 5-056     $1 .25 Billion NEIL     Accidental Outage                                     El 5-056     $0.49 Billion Total Nuclear Property Insurance                   $3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
Insurer/Insurance Policy Title Policy Limits Number NEIL Primary Property and Decontamination Liability P1 5-073
espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:     NRC Region IV Administrator                 CD Sonoda BPN1 399 NRC NRR Project Manager                     WA Horin Winston & Strawn NRC Sr. Resident Inspector 988C
$1.50 Billion NEIL Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056
                                    -}}
$1.25 Billion NEIL Accidental Outage El 5-056
$0.49 Billion Total Nuclear Property Insurance
$3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:
NRC Region IV Administrator CD Sonoda BPN1 399 NRC NRR Project Manager WA Horin
- Winston & Strawn NRC Sr. Resident Inspector - 988C March 21, 2016}}

Latest revision as of 02:19, 10 January 2025

Level of Financial Protection, Annual Reporting Requirement
ML16081A393
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/21/2016
From: Gregoire D
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16081A393 (1)


Text

ENERGV Donald W. Gregoire

\\

P.O. Box 968, PE2O J - N0RIHWESI eire@enerqwest.com 10 CFR 50.54(w)(3)

G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON - ANNUAL REPORTING REQUIREMENT

Dear Sir or Madam:

In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:

Insurer/Insurance Policy Title Policy Limits Number NEIL Primary Property and Decontamination Liability P1 5-073

$1.50 Billion NEIL Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056

$1.25 Billion NEIL Accidental Outage El 5-056

$0.49 Billion Total Nuclear Property Insurance

$3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.

espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:

NRC Region IV Administrator CD Sonoda BPN1 399 NRC NRR Project Manager WA Horin

- Winston & Strawn NRC Sr. Resident Inspector - 988C March 21, 2016

ENERGV Donald W. Gregoire

\\

P.O. Box 968, PE2O J - N0RIHWESI eire@enerqwest.com 10 CFR 50.54(w)(3)

G02-1 6-053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTON - ANNUAL REPORTING REQUIREMENT

Dear Sir or Madam:

In accordance with the 1 0 CFR 50.54(w)(3) requirement to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:

Insurer/Insurance Policy Title Policy Limits Number NEIL Primary Property and Decontamination Liability P1 5-073

$1.50 Billion NEIL Decontamination Liability, Decommissioning Liability and Excess Property Xl 5-056

$1.25 Billion NEIL Accidental Outage El 5-056

$0.49 Billion Total Nuclear Property Insurance

$3.24 Billion There are no new commitments being made to the NRC by this letter. Should you have any questions, please call D. M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.

espec u y DW Gregoire Manager, Regulatory Affairs and Performance Improvement cc:

NRC Region IV Administrator CD Sonoda BPN1 399 NRC NRR Project Manager WA Horin

- Winston & Strawn NRC Sr. Resident Inspector - 988C March 21, 2016