{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                            REGION IV
REGION IV  
                                      1600 E. LAMAR BLVD.
1600 E. LAMAR BLVD.  
                                  ARLINGTON, TX 76011-4511
ARLINGTON, TX 76011-4511  
                                          March 25, 2016
March 25, 2016  
EA-16-018
EA-16-018  
Mr. Adam C. Heflin, President
Mr. Adam C. Heflin, President  
and Chief Executive Officer
and Chief Executive Officer  
Attention: Regulatory Affairs
Attention: Regulatory Affairs  
Wolf Creek Nuclear Operating Corporation
Wolf Creek Nuclear Operating Corporation  
P.O. Box 411
P.O. Box 411  
Burlington, KS 66839
Burlington, KS 66839  
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO  
            NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)
NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)  
Dear Mr. Heflin:
Dear Mr. Heflin:  
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek  
Nuclear Operating Corporations failure, in the case of a significant condition adverse to quality,
Nuclear Operating Corporations failure, in the case of a significant condition adverse to quality,  
to assure that the cause of the condition was determined and corrective action taken to preclude
to assure that the cause of the condition was determined and corrective action taken to preclude  
repetition as required by 10 CFR Part 50 Appendix B, Criterion XVI, Corrective Action. The
repetition as required by 10 CFR Part 50 Appendix B, Criterion XVI, Corrective Action. The  
Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054),
Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054),  
required you to respond in writing within 30 days. You responded by letter dated March 10,
required you to respond in writing within 30 days. You responded by letter dated March 10,  
2016, (ML16076A358).
2016, (ML16076A358).  
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We  
will review your corrective actions during a future inspection.
will review your corrective actions during a future inspection.  
In accordance with 10 CFR 2.390 of the NRC's "Agencys Rules of Practice and Procedure," a
In accordance with 10 CFR 2.390 of the NRC's "Agencys Rules of Practice and Procedure," a  
copy of this letter will be made available electronically for public inspection in the NRC Public
copy of this letter will be made available electronically for public inspection in the NRC Public  
Document Room or from the NRCs Agencywide Documents Access Management System
Document Room or from the NRCs Agencywide Documents Access Management System  
(ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-
(ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
rm/adams.html (the Public Electronic Reading Room).  
                                              Sincerely,
Sincerely,  
                                              /RA/
/RA/  
                                              Nick Taylor, Chief
Nick Taylor, Chief  
                                              Project Branch B
Project Branch B  
                                              Division of Reactor Projects
Division of Reactor Projects  
Docket No: 50-482
Docket No:   50-482  
License No: NPF-42
License No: NPF-42


Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016
Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016  
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO
SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO  
            NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)
NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)  
DISTRIBUTION:
DISTRIBUTION:  
Regional Administrator (Marc.Dapas@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)  
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)  
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
Senior Resident Inspector (Douglas.Dodson@nrc.gov)
Senior Resident Inspector (Douglas.Dodson@nrc.gov)  
Resident Inspector (Fabian.Thomas@nrc.gov)
Resident Inspector (Fabian.Thomas@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Project Manager (Fred.Lyon@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Teresa.Clark@nrc.gov)
RIV/ETA: OEDO (Teresa.Clark@nrc.gov)  
    ADAMS ACCESSION NUMBER: ML16085A060
SUNSI Review
  SUNSI Review        ADAMS:               Sensitive       Non-Publicly Available
By: NHT
  By: NHT                Yes  No          Non-Sensitive    Publicly Available
ADAMS:  
  OFFICE           RIV/DRP/B           RIV/DRP/B
Yes      No
NAME             MHay               NTaylor
Sensitive  
SIGNATURE       /RA/               /RA/
Non-Sensitive
DATE             3/24/16             3/25/16
  Non-Publicly Available
  Publicly Available
OFFICE  
RIV/DRP/B  
RIV/DRP/B  
NAME  
MHay  
NTaylor  
SIGNATURE  
/RA/  
/RA/  
DATE  
3/24/16  
3/25/16  
ADAMS ACCESSION NUMBER:  ML16085A060
}}
}}

Latest revision as of 02:15, 10 January 2025

Response to Notice of Violation (NRC IR 05000482/2015004)
ML16085A060
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/25/2016
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
nick taylor
References
EA-16-018 IR 2015004
Download: ML16085A060 (2)


See also: IR 05000482/2015004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

March 25, 2016

EA-16-018

Mr. Adam C. Heflin, President

and Chief Executive Officer

Attention: Regulatory Affairs

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO

NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)

Dear Mr. Heflin:

On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) cited Wolf Creek

Nuclear Operating Corporations failure, in the case of a significant condition adverse to quality,

to assure that the cause of the condition was determined and corrective action taken to preclude

repetition as required by 10 CFR Part 50 Appendix B, Criterion XVI, Corrective Action. The

Notice of Violation, enclosed with Inspection Report 05000482/2015004 (ML16043A054),

required you to respond in writing within 30 days. You responded by letter dated March 10,

2016, (ML16076A358).

We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We

will review your corrective actions during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Agencys Rules of Practice and Procedure," a

copy of this letter will be made available electronically for public inspection in the NRC Public

Document Room or from the NRCs Agencywide Documents Access Management System

(ADAMS), which is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Nick Taylor, Chief

Project Branch B

Division of Reactor Projects

Docket No: 50-482

License No: NPF-42

Letter to Mr. Adam Heflin from Mr. Nick Taylor dated March 25, 2016

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - RESPONSE TO

NOTICE OF VIOLATION (NRC INSPECTION REPORT 05000482/2015004)

DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Senior Resident Inspector (Douglas.Dodson@nrc.gov)

Resident Inspector (Fabian.Thomas@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Teresa.Clark@nrc.gov)

SUNSI Review

By: NHT

ADAMS:

Yes No

Sensitive

Non-Sensitive

Non-Publicly Available

Publicly Available

OFFICE

RIV/DRP/B

RIV/DRP/B

NAME

MHay

NTaylor

SIGNATURE

/RA/

/RA/

DATE

3/24/16

3/25/16

ADAMS ACCESSION NUMBER: ML16085A060