LaSalle County Station Draft Supplemental EIS Docket Number:   (n/a)
LaSalle County Station Draft Supplemental EIS Docket Number:
Location:         Ottawa, Illinois Date:             Tuesday, March 22, 2016 Work Order No.:   NRC-2254                         Pages 1-39 NEAL R. GROSS AND CO., INC.
(n/a)
Location:
Ottawa, Illinois Date:
Tuesday, March 22, 2016 Work Order No.:
NRC-2254 Pages 1-39 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433
Washington, D.C. 20005 (202) 234-4433


1 1                    UNITED STATES OF AMERICA 2                  NUCLEAR REGULATORY COMMISSION 3                                + + + + +
1 UNITED STATES OF AMERICA 1
4                      LaSALLE COUNTY STATION 5                DRAFT SUPPLEMENTAL EIS (DSEIS) 6                            PUBLIC MEETING 7                                + + + + +
NUCLEAR REGULATORY COMMISSION 2
8                                 TUESDAY 9                            MARCH 22, 2016 10                                + + + + +
+ + + + +
11 12 13 14                  The Public Meeting was convened at the 15 LaSalle County Emergency Management Agency, Emergency 16 Operations       Center,       711     East     Etna Road, Ottawa, 17 Illinois at 7:00 p.m., David Drucker, Facilitator, 18 presiding.
3 LaSALLE COUNTY STATION 4
19 20 PRESENT:
DRAFT SUPPLEMENTAL EIS (DSEIS) 5 PUBLIC MEETING 6
21            DAVID DRUCKER, Facilitator and Presenter 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
+ + + + +
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
7 TUESDAY 8
MARCH 22, 2016 9
+ + + + +
10 11 12 13 The Public Meeting was convened at the 14 LaSalle County Emergency Management Agency, Emergency 15 Operations Center, 711 East Etna Road, Ottawa, 16 Illinois at 7:00 p.m., David Drucker, Facilitator, 17 presiding.
18 19 PRESENT:
20 DAVID DRUCKER, Facilitator and Presenter 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


2 1                      P R O C E E D I N G S 2                  MR. DRUCKER:         Good evening.         Thanks for 3 coming out tonight.           Im David Drucker with the U.S.
2 P R O C E E D I N G S 1
4 Nuclear Regulatory Commission, and Im --
MR. DRUCKER: Good evening. Thanks for 2
5                  THE OPERATOR: Mr. Drucker, I have to join 6 you to the main conference.               Im sorry.       One moment.
coming out tonight. Im David Drucker with the U.S.
7                  MR. DRUCKER:         Sure.
3 Nuclear Regulatory Commission, and Im --
8                  THE OPERATOR:         Welcome, and thank you for 9 standing by.         At this time, all participants are on 10 listening mode. During our Q&A session, you may press 11 *1 on your touch tone phone if you would like to ask 12 a question. Todays conference is being recorded. If 13 you have any objections, you may disconnect at this 14 time.       Now Id like to turn the meeting over to Mr.
4 THE OPERATOR: Mr. Drucker, I have to join 5
15 David Drucker, so you may begin.
you to the main conference. Im sorry. One moment.
16                   MR. DRUCKER:         Thank you, India.           This is 17 David       Drucker.     Im   work     for     Nuclear   Regulatory 18 Commission.         Im     the     project         manager   for         the 19 environmental review of the LaSalle County Station 20 license renewal application.                 Hereafter, I will refer 21 to the Nuclear Regulatory Commission as the NRC.
6 MR. DRUCKER: Sure.
22                  There are two primary purposes for this 23 meeting. The first purpose is to discuss the contents 24 of this document that Im holding up, the draft 25 supplemental         environmental         impact       statement       for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 THE OPERATOR: Welcome, and thank you for 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
standing by. At this time, all participants are on 9
listening mode. During our Q&A session, you may press 10
*1 on your touch tone phone if you would like to ask 11 a question. Todays conference is being recorded. If 12 you have any objections, you may disconnect at this 13 time. Now Id like to turn the meeting over to Mr.
14 David Drucker, so you may begin.
15 16 17 18 19 20 MR. DRUCKER: Thank you, India. This is David Drucker. Im work for Nuclear Regulatory Commission.
Im the project manager for the environmental review of the LaSalle County Station license renewal application. Hereafter, I will refer to the Nuclear Regulatory Commission as the NRC.
21 There are two primary purposes for this 22 meeting. The first purpose is to discuss the contents 23 of this document that Im holding up, the draft 24 supplemental environmental impact statement for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


3 1 license renewal of LaSalle County Station. Hereafter, 2 I will refer to this document as the draft SEIS. SEIS 3 stands         for   Supplemental           Environmental           Impact 4 Statement.
3 license renewal of LaSalle County Station. Hereafter, 1
5                    The second purpose of this meeting is to 6 obtain comments on the draft SEIS.                       This meeting is 7 available by teleconference and, India, I just want to 8 make sure.         Can you ask the folks on the line, or 9 actually, folks on the line, can you hear me? Because 10 Im speaking at a distance from the speakerphone.
I will refer to this document as the draft SEIS. SEIS 2
11                    THE OPERATOR:         Everyone, your lines are 12 now open, and you can respond.
stands for Supplemental Environmental Impact 3
13                   MR. MAHERAS:         David,       this   is   Steve 14 Maheras, and I can hear you just fine.
Statement.
15                   MR. DRUCKER:         Okay.       Good, if one person 16 can     hear   me,   the     rest     of   you       all   can   hear       me.
4 The second purpose of this meeting is to 5
17 Before going further, I want to introduce NRC staff 18 here tonight.           Stu Sheldon is an NRC Region III 19 license renewal inspector, and Robert Ruiz is the 20 senior resident at the plant.
obtain comments on the draft SEIS. This meeting is 6
21                   Id also like to point out that on the 22 phone we have or will have a few NRC staff folks.                             My 23 supervisor,         Jim     Danna       is     the       chief   of       the 24 environmental review and project management branch.
available by teleconference and, India, I just want to 7
25 Michele Moser is the technical reviewer for aquatic NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
make sure. Can you ask the folks on the line, or 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
actually, folks on the line, can you hear me? Because 9
Im speaking at a distance from the speakerphone.
10 THE OPERATOR: Everyone, your lines are 11 now open, and you can respond.
12 13 MR. MAHERAS: David, this is Steve Maheras, and I can hear you just fine.
14 15 16 17 18 19 MR. DRUCKER: Okay. Good, if one person can hear me, the rest of you all can hear me.
Before going further, I want to introduce NRC staff here tonight. Stu Sheldon is an NRC Region III license renewal inspector, and Robert Ruiz is the senior resident at the plant.
20 21 22 23 24 Id also like to point out that on the phone we have or will have a few NRC staff folks. My supervisor, Jim Danna is the chief of the environmental review and project management branch.
Michele Moser is the technical reviewer for aquatic 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


4 1 resources.
4 resources.
2             Kevin   Folk   is   the     technical       reviewer       for 3 service water resources.               Bill Ford is the technical 4 reviewer for ground water.               And you hear earlier Steve 5 Maharris       is   the   consultant       from     Pacific Northwest 6 Laboratories for the high burn-up fuel section.
1 2
7                    Next, Id like to cover a few details 8 about this meeting.               Exelon applied to the NRC to 9 renew       the   operating     licenses       for   LaSalle   County 10 Station units one and two for an additional 20 years.
3 4
11 The NRC is reviewing that application, and will use 12 the results of that review to decide whether to renew 13 the licenses.
5 Kevin Folk is the technical reviewer for service water resources. Bill Ford is the technical reviewer for ground water. And you hear earlier Steve Maharris is the consultant from Pacific Northwest Laboratories for the high burn-up fuel section.
14                    Tonight I will tell you the preliminary 15 results of the environmental review.                       These results 16 are documented in the draft SEIS. And I will also ask 17 for your comments on the draft SEIS.                         The meeting 18 tonight will, essentially, have four parts.                               The 19 introduction is the part that were doing now.
6 Next, Id like to cover a few details 7
20                   In the second part I will discuss the 21 review process and the preliminary findings of the 22 review. Copies of this presentation are on the table 23 by     the     door   and   Stu   Sheldon,         it   looks   like       he 24 handed out copies to everyone here.
about this meeting. Exelon applied to the NRC to 8
25                    The next portion will be an opportunity to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
renew the operating licenses for LaSalle County 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
Station units one and two for an additional 20 years.
10 The NRC is reviewing that application, and will use 11 the results of that review to decide whether to renew 12 the licenses.
13 Tonight I will tell you the preliminary 14 results of the environmental review. These results 15 are documented in the draft SEIS. And I will also ask 16 for your comments on the draft SEIS. The meeting 17 tonight will, essentially, have four parts. The 18 introduction is the part that were doing now.
19 20 21 22 23 In the second part I will discuss the review process and the preliminary findings of the review. Copies of this presentation are on the table by the door and Stu Sheldon, it looks like he handed out copies to everyone here.
24 The next portion will be an opportunity to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


5 1 ask questions about the material presented, and I will 2 answer those questions.               And finally, the NRC staff 3 will listen to your comments about the draft SEIS.
5 ask questions about the material presented, and I will 1
4 Note that the NRC will listen during this time.                         We 5 generally wont respond to what youre saying here in 6 the     meeting.     Instead,       we   will     prepare written 7 responses to your comments that will be published as 8 a part of the final SEIS.
answer those questions. And finally, the NRC staff 2
9                  Please note that this meeting is being 10 recorded,; a transcribers sitting right up here in 11 front.         And hes doing that to produce a written 12 record of whats said at this meeting.                   In order for 13 the transcript to be accurate, please comply with the 14 following.
will listen to your comments about the draft SEIS.
15                  First, please silence your phones and any 16 other personal electronics you have with you.                   If you 17 must accept a call during this meeting, please step 18 outside       into   the     lobby     so     the   other meeting 19 participants can hear the proceedings and so your 20 phone ringing, nor your conversation is recorded.
3 Note that the NRC will listen during this time. We 4
21                  When you speak, please use a microphone.
generally wont respond to what youre saying here in 5
22 And Ill bring it around for the question and answer 23 period to you guys.             Thats how we will ensure that 24 what you say is recorded.               When you speak, identify 25 who you are and, if you represent a group, what group NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
the meeting. Instead, we will prepare written 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
responses to your comments that will be published as 7
a part of the final SEIS.
8 Please note that this meeting is being 9
recorded,; a transcribers sitting right up here in 10 front. And hes doing that to produce a written 11 record of whats said at this meeting. In order for 12 the transcript to be accurate, please comply with the 13 following.
14 First, please silence your phones and any 15 other personal electronics you have with you. If you 16 must accept a call during this meeting, please step 17 outside into the lobby so the other meeting 18 participants can hear the proceedings and so your 19 phone ringing, nor your conversation is recorded.
20 When you speak, please use a microphone.
21 And Ill bring it around for the question and answer 22 period to you guys. Thats how we will ensure that 23 what you say is recorded. When you speak, identify 24 who you are and, if you represent a group, what group 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


6 1 you represent.     Also, if you have an uncommon name or 2 if your name has an unusual spelling, please spell 3 your name.     And to ensure the recording is clear, 4 please dont hold side conversations, and do not 5 interrupt the speaker.           Thank you.
6 you represent. Also, if you have an uncommon name or 1
6               When you signed in tonight, you may have 7 noted yellow cards, like the one Im holding up, on 8 the table.     Several of you have already filled them 9 out, and thats to be a speaker.                   So if you want to 10 speak, let me know.             Ill bring a card around to 11 you, and you can fill that out now.
if your name has an unusual spelling, please spell 2
12                When we get to the public comment portion 13 of this evening, I will give each public commenter 14 three minutes to speak.             And then, after everyones 15 had a chance to speak, we can, if you havent finished 16 your comments, you can certainly have more time.                       So 17 far I only have four folks who are signed up to speak.
your name. And to ensure the recording is clear, 3
18 19               Also on the table outside is a stack of 20 public meeting feedback forms.                 Please fill one out 21 and provide it to me or leave it on the table, or you 22 can drop it in the mail; its postage free.                           Your 23 assessment     of   this     meeting         tonight   will       help 24 improve future meetings.
please dont hold side conversations, and do not 4
25                And finally, for those who dont know, the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
interrupt the speaker. Thank you.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
5 6
7 8
9 10 When you signed in tonight, you may have noted yellow cards, like the one Im holding up, on the table. Several of you have already filled them out, and thats to be a speaker. So if you want to speak, let me know. Ill bring a card around to you, and you can fill that out now.
11 When we get to the public comment portion 12 of this evening, I will give each public commenter 13 three minutes to speak. And then, after everyones 14 had a chance to speak, we can, if you havent finished 15 your comments, you can certainly have more time. So 16 far I only have four folks who are signed up to speak.
17 18 19 20 21 22 23 Also on the table outside is a stack of public meeting feedback forms. Please fill one out and provide it to me or leave it on the table, or you can drop it in the mail; its postage free. Your assessment of this meeting tonight will help improve future meetings.
24 And finally, for those who dont know, the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


7 1 restrooms are out the hallway to the left.                     Emergency 2 exit is out the hallway to the right. And security is 3 located at the LaSalle County Sheriffs Office.                         Its 4 just       across   the   parking       lot,     if   we should     need 5 security.
7 restrooms are out the hallway to the left. Emergency 1
6                   Okay, do you have any questions on this 7 brief introduction before I go any further, and start 8 discussing         the   environmental             review?         No - ok 9 then.
exit is out the hallway to the right. And security is 2
10                   Im   going       to     start       discussing         the 11 environmental review and preliminary results from the 12 draft SEIS.       First, I would like to emphasize that the 13 environmental review is not yet complete.                     I hope the 14 information provided in this presentation will help 15 you understand what weve done so far, and the role 16 you can play in helping to make sure that the final 17 environmental         impact     statement           is   accurate       and 18 complete.
located at the LaSalle County Sheriffs Office. Its 3
19                  Id like to start off by briefly going 20 over the agenda for this portion of my speech.                       First 21 of all, Ill comment on the NRCs regulatory role, 22 then Ill provide the preliminary findings of our 23 environmental review, and then I will present the 24 current       schedule       for     the       remainder     of       the 25 environmental review, and tell you how you can submit NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
just across the parking lot, if we should need 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
security.
5 6
7 8
Okay, do you have any questions on this brief introduction before I go any further, and start discussing the environmental review?
No - ok then.
9 10 11 12 13 14 15 16 17 Im going to start discussing the environmental review and preliminary results from the draft SEIS. First, I would like to emphasize that the environmental review is not yet complete. I hope the information provided in this presentation will help you understand what weve done so far, and the role you can play in helping to make sure that the final environmental impact statement is accurate and complete.
18 Id like to start off by briefly going 19 over the agenda for this portion of my speech. First 20 of all, Ill comment on the NRCs regulatory role, 21 then Ill provide the preliminary findings of our 22 environmental review, and then I will present the 23 current schedule for the remainder of the 24 environmental review, and tell you how you can submit 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


8 1 comments outside of this meeting.
8 comments outside of this meeting.
2                    At the end of the presentation, there will 3 be time for questions and answers on the comments of 4 my briefing and, most importantly, time for you to 5 present your comments on the draft SEIS.
1 At the end of the presentation, there will 2
6                    The   NRC     was     established       to regulate 7 civilian         use   of     nuclear       materials,     including 8 facilities producing electric power. The NRC conducts 9 license renewal reviews for plants whose owners wish 10 to operate them beyond their initial license period.
be time for questions and answers on the comments of 3
11 12                    NRC license renewal reviews address safety 13 issues related to managing the affects of aging and 14 environmental issues related to an additional 20 years 15 of operation.         In all aspects of the NRC regulation, 16 our     mission     is   three-fold.             To   ensure adequate 17 protection of the public health and safety, to promote 18 common         defense   and     security,       and   to protect     the 19 environment.
my briefing and, most importantly, time for you to 4
20                   Our   environmental           review   looks   at     the 21 potential site-specific impacts of license renewal of 22 the     LaSalle     County     Stations       Units   1 and   2.         A 23 generic         environmental       impact       statement,   or   GEIS, 24 examines the possible environmental impacts that could 25 occur as a result of renewing licenses of individual NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
present your comments on the draft SEIS.
(202) 234-4433             WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 The NRC was established to regulate 6
civilian use of nuclear materials, including 7
facilities producing electric power. The NRC conducts 8
license renewal reviews for plants whose owners wish 9
to operate them beyond their initial license period.
10 11 NRC license renewal reviews address safety 12 issues related to managing the affects of aging and 13 environmental issues related to an additional 20 years 14 of operation. In all aspects of the NRC regulation, 15 our mission is three-fold. To ensure adequate 16 protection of the public health and safety, to promote 17 common defense and security, and to protect the 18 environment.
19 20 21 22 23 24 Our environmental review looks at the potential site-specific impacts of license renewal of the LaSalle County Stations Units 1 and 2. A generic environmental impact statement, or GEIS, examines the possible environmental impacts that could occur as a result of renewing licenses of individual 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


9 1 nuclear power plants.
9 nuclear power plants.
2                     The           GEIS               describes             the 3 significance of these potential impacts. The analysis 4 in the GEIS pertains to operating power reactors. For 5 each       type     or   environmental             impact,   the     GEIS 6 establishes generic findings, covering as many plants 7 as possible.
1 2
8                     For some environmental issues, the GEIS 9 found that a generic evaluation was not sufficient, 10 and that a plant-specific analysis was required.                             The 11 2013       revision     to   the   GEIS     is     sitting here on the 12 table; these three volumes.                   The GEIS was originally 13 done in 1996.             It contains more information than 14 these three volumes, and there was an addendum in 15 1999.
3 4
16                     This   gives     you   an     idea   of the   effort 17 that       went   in   to   looking     at     nuclear     power   plants 18 across         the     country,           and       determining         which 19 impacts,           environmental impacts, were generic, and 20 which require site-specific analysis.
5 6
21                    The site-specific findings for the LaSalle 22 County         Station   are     contained         in   the draft     SEIS 23 published in February, 2016.                   This document contains 24 analyses of all possible site-specific issues, as well 25 as     a   review   of   issues       covered       by the GEIS,       to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The GEIS describes the significance of these potential impacts. The analysis in the GEIS pertains to operating power reactors. For each type or environmental
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
: impact, the GEIS establishes generic findings, covering as many plants as possible.
7 8
9 10 11 12 13 For some environmental issues, the GEIS found that a generic evaluation was not sufficient, and that a plant-specific analysis was required. The 2013 revision to the GEIS is sitting here on the table; these three volumes. The GEIS was originally done in 1996. It contains more information than these three volumes, and there was an addendum in 14 1999.
15 16 17 18 19 This gives you an idea of the effort that went in to looking at nuclear power plants across the
: country, and determining which
: impacts, environmental impacts, were generic, and which require site-specific analysis.
20 The site-specific findings for the LaSalle 21 County Station are contained in the draft SEIS 22 published in February, 2016. This document contains 23 analyses of all possible site-specific issues, as well 24 as a review of issues covered by the GEIS, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


10 1 determine whether the conclusions in the GEIS are valid 2 for LaSalle County Station.
1 10 determine whether the conclusions in the GEIS are valid for LaSalle County Station.
3                     In   this     process,       the     NRC staff     also 4 reviews         environmental         impacts         of   potential     power 5 generation alternatives to license renewal.
2 3
6                    Finally,       I   want     to     mention   that       on 7 March 10th of last year, March 10th of last year, 8 I     was     here   conducting         the     environmental       scoping 9 meetings.           During     those     meetings       and the   scoping 10 period,         the   NRC     collected       comments     that   informed 11 the       scope     of   the     environmental         review.         Those 12 comments, and the NRC responses to those comments, 13 are found in the scoping summary report.
4 5
14                     Hard copies and CDs of the scoping summary 15 report are available on the table by the door.                             And 16 also, that same CD that has the scoping summary report 17 contains a copy of the draft SEIS.                         Please feel free 18 to take a copy of the CD.
6 7
19                     For each environmental issue identified an 20 impact level is assigned.                       The NRCs standard of 21 significance for impacts was established using the 22 White         House     counsel       on     environmental         quality 23 terminology for significant.                       The NRC established 24 three levels of significance for potential impacts, 25 small, moderate and large, as defined on the slide.
In this process, the NRC staff also reviews environmental impacts of potential power generation alternatives to license renewal.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Finally, I want to mention that on March 10th of last year, March 10th of last year, I was here conducting the environmental scoping meetings.
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 9
10 11 12 During those meetings and the scoping period, the NRC collected comments that informed the scope of the environmental review. Those comments, and the NRC responses to those comments, are found in the scoping summary report.
13 14 15 16 17 Hard copies and CDs of the scoping summary report are available on the table by the door. And also, that same CD that has the scoping summary report contains a copy of the draft SEIS. Please feel free to take a copy of the CD.
18 19 20 21 22 23 24 For each environmental issue identified an impact level is assigned. The NRCs standard of significance for impacts was established using the White House counsel on environmental quality terminology for significant. The NRC established three levels of significance for potential impacts, small, moderate and large, as defined on the slide.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


11 1                For a small impact, the effects are not 2 detectible or are so minor that they will neither 3 destabilize       nor     noticeable       alter     any important 4 attribute of the resource. For a moderate impact, the 5 effects are sufficient to alter noticeably, but not 6 destabilize important attributes of the resource. And 7 for a large impact, the effects are clearly noticeable 8 and       are sufficient       to     destabilize         important 9 attributes of the resource.
11 For a small impact, the effects are not 1
10                While these impact level designations are 11 used for most of the resource areas that we looked at 12 in the draft SEIS, there are three areas that have 13 their own impact level designations.                   And these are 14 discussed on the next slide.
detectible or are so minor that they will neither 2
15                So for special status species, the impact 16 significance determination language comes from the 17 Endangered Species Act.             And choices to describe the 18 impacts are no effect, may affect but not likely to 19 adversely affect, and may affect and is likely to 20 adversely affect.
destabilize nor noticeable alter any important 3
21                For cultural and historic resources, the 22 National Historic Preservation Act requires Federal 23 agencies to consider the effects of their undertakings 24 on     historic   properties.           And     for environmental 25 justice, under Executive Order 12898, Federal agencies NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
attribute of the resource. For a moderate impact, the 4
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
effects are sufficient to alter noticeably, but not 5
destabilize important attributes of the resource. And 6
for a large impact, the effects are clearly noticeable 7
and are sufficient to destabilize important 8
attributes of the resource.
9 While these impact level designations are 10 used for most of the resource areas that we looked at 11 in the draft SEIS, there are three areas that have 12 their own impact level designations. And these are 13 discussed on the next slide.
14 So for special status species, the impact 15 significance determination language comes from the 16 Endangered Species Act. And choices to describe the 17 impacts are no effect, may affect but not likely to 18 adversely affect, and may affect and is likely to 19 adversely affect.
20 For cultural and historic resources, the 21 National Historic Preservation Act requires Federal 22 agencies to consider the effects of their undertakings 23 on historic properties. And for environmental 24 justice, under Executive Order 12898, Federal agencies 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


12 1 are       responsible       for   identifying         and   addressing 2 disproportionately high and adverse human health and 3 environmental         impacts     on     minority       and low-income 4 populations.
12 are responsible for identifying and addressing 1
5                    This   slide     lists     the     issues the     NRC 6 reviewed for the continued operation of the LaSalle 7 County Station during the proposed license renewal 8 period.         So in this one slide, this is basically a 9 very quick summary of what you would find in that 10 larger document, the draft SEIS.
disproportionately high and adverse human health and 2
11                    For all issues, except aquatic resources, 12 the impacts of license renewal were found to be small, 13 which means the effects are not detectible, or are so 14 minor         that   they     will     neither       destabilize       nor 15 noticeably         alter   any   important         attribute   of     the 16 resource.
environmental impacts on minority and low-income 3
17                    Thermal impacts would be small for aquatic 18 resources in the Illinois River, and small for aquatic 19 resources in the cooling pond, except for gizzard and 20 threadfin shad.           Gizzard and threadfin shad would 21 experience moderate thermal impacts in the cooling 22 pond.
populations.
23                    The NRC staff also considered cumulative 24 impacts.         Cumulative impacts are the effects on the 25 environment from other past, present and reasonably NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
4 This slide lists the issues the NRC 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
reviewed for the continued operation of the LaSalle 6
County Station during the proposed license renewal 7
period. So in this one slide, this is basically a 8
very quick summary of what you would find in that 9
larger document, the draft SEIS.
10 For all issues, except aquatic resources, 11 the impacts of license renewal were found to be small, 12 which means the effects are not detectible, or are so 13 minor that they will neither destabilize nor 14 noticeably alter any important attribute of the 15 resource.
16 Thermal impacts would be small for aquatic 17 resources in the Illinois River, and small for aquatic 18 resources in the cooling pond, except for gizzard and 19 threadfin shad. Gizzard and threadfin shad would 20 experience moderate thermal impacts in the cooling 21 pond.
22 The NRC staff also considered cumulative 23 impacts. Cumulative impacts are the effects on the 24 environment from other past, present and reasonably 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


13 1 foreseeable future human actions, other than LaSalle 2 County         Station.     The     effects       not   only   included 3 operation of LaSalle County Station, but also impacts 4 unrelated to LaSalle, such as future urbanization, 5 other energy producing facilities in the area and 6 climate change.
13 foreseeable future human actions, other than LaSalle 1
7                    The analysis considers potential impacts 8 through the end of the current license term, as well 9 as the 20-year license renewal term.                       The NRC staff 10 determined         that most     cumulative           impacts would       be 11 small, and the analysis is provided in section 4.16 of 12 the draft SEIS.
County Station. The effects not only included 2
13                    The     National Environmental Policy Act 14 mandates that each environmental impact statement 15 consider alternatives to any proposed major Federal 16 action.         A major step for determining whether license 17 renewal is reasonable or not is comparing the likely 18 impacts of continued operation of a nuclear plant with 19 the likely impacts of alternatives means of power 20 generation.
operation of LaSalle County Station, but also impacts 3
21                    Alternatives must provide an option that 22 allows for power generation capability beyond the term 23 of the current nuclear power plant operating license 24 to meet future system generation needs.                     In the draft 25 SEIS, NRC staff initially considered 17 different NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
unrelated to LaSalle, such as future urbanization, 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
other energy producing facilities in the area and 5
climate change.
6 The analysis considers potential impacts 7
through the end of the current license term, as well 8
as the 20-year license renewal term. The NRC staff 9
determined that most cumulative impacts would be 10 small, and the analysis is provided in section 4.16 of 11 the draft SEIS.
12 The National Environmental Policy Act 13 mandates that each environmental impact statement 14 consider alternatives to any proposed major Federal 15 action. A major step for determining whether license 16 renewal is reasonable or not is comparing the likely 17 impacts of continued operation of a nuclear plant with 18 the likely impacts of alternatives means of power 19 generation.
20 Alternatives must provide an option that 21 allows for power generation capability beyond the term 22 of the current nuclear power plant operating license 23 to meet future system generation needs. In the draft 24 SEIS, NRC staff initially considered 17 different 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


14 1 alternatives, and then we narrowed those 17 down to 2 five, and looked at those five in detail.
14 alternatives, and then we narrowed those 17 down to 1
3                Additionally, the NRC staff considered 4 what would happen if no action is taken and LaSalle 5 shuts down at the end of its current licenses without 6 a specific replacement alternative.                 This alternative 7 would not provide power generation capacity nor would 8 it meet the needs currently met by LaSalle.
five, and looked at those five in detail.
9                The NRCs preliminary conclusion is that 10 the environmental impacts of renewal of the operating 11 licenses for LaSalle would be smaller than those 12 feasible       and   commercially         viable     alternatives.
2 Additionally, the NRC staff considered 3
13 Continued operation would have smaller environmental 14 impacts in almost all areas. The staff concluded that 15 continued operation of the existing LaSalle County 16 Station is the environmentally preferred alternative.
what would happen if no action is taken and LaSalle 4
17 18                Based on review of likely environmental 19 impacts from license renewal, as well as potential 20 environmental     impacts     of     alternatives     to   license 21 renewal, the NRC staffs preliminary recommendation in 22 the draft SEIS is that the adverse environmental 23 impacts of license renewal for LaSalle County Station 24 are not great enough to deny the option of license 25 renewal for energy planning decision makers. And that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
shuts down at the end of its current licenses without 5
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
a specific replacement alternative. This alternative 6
would not provide power generation capacity nor would 7
it meet the needs currently met by LaSalle.
8 The NRCs preliminary conclusion is that 9
the environmental impacts of renewal of the operating 10 licenses for LaSalle would be smaller than those 11 feasible and commercially viable alternatives.
12 Continued operation would have smaller environmental 13 impacts in almost all areas. The staff concluded that 14 continued operation of the existing LaSalle County 15 Station is the environmentally preferred alternative.
16 17 Based on review of likely environmental 18 impacts from license renewal, as well as potential 19 environmental impacts of alternatives to license 20 renewal, the NRC staffs preliminary recommendation in 21 the draft SEIS is that the adverse environmental 22 impacts of license renewal for LaSalle County Station 23 are not great enough to deny the option of license 24 renewal for energy planning decision makers. And that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


15 1 preliminary conclusion shows up several places in the 2 draft       SEIS,   but   chapter       five     is   the conclusion 3 chapter.
15 preliminary conclusion shows up several places in the 1
4                    I would like to re-emphasize that the 5 environmental         review     is   not   yet     complete.       Your 6 comments tonight, and all written comments received by 7 the end of the comment period on April 4th, will be 8 considered by the NRC staff as we develop the final 9 SEIS, which we currently plan to issue in August of 10 2016.
draft SEIS, but chapter five is the conclusion 2
11                    Those comments that are within the scope 12 of     the     environmental       review     and     provide new     and 13 significant information can help change the staffs 14 findings.         The final SEIS will contain the staffs 15 final recommendation on the acceptability of license 16 renewal based on the work weve already performed and 17 any new and significant information we receive in the 18 form of comments during the comment period.                       I just 19 want to emphasize that the comment period closes on 20 April 4th, the second to the last line here on this 21 slide.
chapter.
22                   As   many     of     you       know,   I   am       the 23 primary         contact     for     the     environmental       review, 24 and       Jeff   Mitchell is the primary contact for the 25 safety review, and our information is on the handouts that I provided NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 I would like to re-emphasize that the 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
environmental review is not yet complete. Your 5
comments tonight, and all written comments received by 6
the end of the comment period on April 4th, will be 7
considered by the NRC staff as we develop the final 8
SEIS, which we currently plan to issue in August of 9
2016.
10 Those comments that are within the scope 11 of the environmental review and provide new and 12 significant information can help change the staffs 13 findings. The final SEIS will contain the staffs 14 final recommendation on the acceptability of license 15 renewal based on the work weve already performed and 16 any new and significant information we receive in the 17 form of comments during the comment period. I just 18 want to emphasize that the comment period closes on 19 April 4th, the second to the last line here on this 20 slide.
21 22 23 24 As many of you
: know, I
am the primary contact for the environmental
: review, and Jeff Mitchell is the primary contact for the safety review, and our information is on the handouts that I provided 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


16 1 you tonight, our contact information.                   Copies of the 2 draft SEIS are available on CD on the table near the 3 door.       In addition, the library shown on this slide 4 has a copy available, current copy available for 5 review.
16 you tonight, our contact information. Copies of the 1
6                    You can also find electronic copies of the 7 draft SEIS, along with other information about the 8 LaSalle County Station license renewal review online 9 at     the     website   shown.         And     finally, additional 10 information can also be obtained by contacting the 11 representatives of NRCs Region III office of public 12 affairs, as shown on the slide.
draft SEIS are available on CD on the table near the 2
13                    NRC staff will address written comments in 14 the same way we address spoken comments received 15 today.         You can submit written comments either online 16 or     via     conventional     manner.           To submit   written 17 comments online, visit the website regulations.gov and 18 search for docket ID NRC-2014-0268.                       If you have 19 written comments today, you may give them to me or any 20 other member of the NRC staff.
door. In addition, the library shown on this slide 3
21                    Please note that if you provide verbal 22 comments tonight, you dont need to submit them in 23 writing since your verbal comments are part of the 24 transcribed record, and they will be responded to. So 25 this concludes my formal presentation.
has a copy available, current copy available for 4
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
review.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 You can also find electronic copies of the 6
draft SEIS, along with other information about the 7
LaSalle County Station license renewal review online 8
at the website shown. And finally, additional 9
information can also be obtained by contacting the 10 representatives of NRCs Region III office of public 11 affairs, as shown on the slide.
12 NRC staff will address written comments in 13 the same way we address spoken comments received 14 today. You can submit written comments either online 15 or via conventional manner. To submit written 16 comments online, visit the website regulations.gov and 17 search for docket ID NRC-2014-0268. If you have 18 written comments today, you may give them to me or any 19 other member of the NRC staff.
20 Please note that if you provide verbal 21 comments tonight, you dont need to submit them in 22 writing since your verbal comments are part of the 23 transcribed record, and they will be responded to. So 24 this concludes my formal presentation.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


17 1                   So now we enter the question and answer 2 portion of our meeting.                   This portion is distinct 3 from       the   comment     portion.           I   will   now   answer 4 questions specific to the material that I presented 5 here       tonight.     I'd     like     to     begin   with questions 6 those on the phone.             Operator?
17 1
7                    THE OPERATOR:         Yes.
2 3
8                    MR. DRUCKER:         If theres anyone on the 9 phone       that   has   questions       about     the   material       I 10 presented, can you please go ahead and let them ask 11 their questions one at a time, and Ill do my best to 12 answer them.
4 5
13                    THE OPERATOR:         Certainly.       If you would 14 like to as a question on the phone line, please press 15 *1 and record your name when prompted.                       Please make 16 sure your phone is not muted when you record your 17 name.         Once again, thats *1 and record your name.
So now we enter the question and answer portion of our meeting. This portion is distinct from the comment portion. I will now answer questions specific to the material that I presented here tonight. I'd like to begin with questions those on the phone. Operator?
18 One moment for our first question.                     And no questions 19 have come in.
6 THE OPERATOR: Yes.
20                   MR. DRUCKER:         Okay Operator, thank you.
7 MR. DRUCKER: If theres anyone on the 8
21 Most of the folks here in the room have been a part of 22 the license renewal process.                   Theyre familiar with 23 the scoping process we did last year.                     But I just want 24 to emphasize, for anyone whos listening, that you 25 know, this is not a hearing.                   This is a public NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
phone that has questions about the material I 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
presented, can you please go ahead and let them ask 10 their questions one at a time, and Ill do my best to 11 answer them.
12 THE OPERATOR: Certainly. If you would 13 like to as a question on the phone line, please press 14
*1 and record your name when prompted. Please make 15 sure your phone is not muted when you record your 16 name. Once again, thats *1 and record your name.
17 One moment for our first question. And no questions 18 have come in.
19 20 21 22 23 24 MR. DRUCKER: Okay Operator, thank you.
Most of the folks here in the room have been a part of the license renewal process. Theyre familiar with the scoping process we did last year. But I just want to emphasize, for anyone whos listening, that you know, this is not a hearing. This is a public 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


18 1 meeting.
18 meeting.
2                   And the goal of this meeting is two-way 3 communication; for me to provide information about the 4 environmental impact statement that weve been working 5 on and have developed, and then to receive comment on 6 that document.         So I am looking for questions on the 7 material I presented.
1 2
8                  With that, Im going to go to questions.
3 4
9 Does anyone have any questions about the material I 10 presented       here   in     the   room?         If there   are     no 11 questions, I just want to --
5 6
12                   MS. SNYDER:       I have a question.
And the goal of this meeting is two-way communication; for me to provide information about the environmental impact statement that weve been working on and have developed, and then to receive comment on that document. So I am looking for questions on the material I presented.
13                  MR. DRUCKER:         Gail, go ahead.
7 With that, Im going to go to questions.
14                  MS. SNYDER: My first question is you said 15 this is a public meeting.                 Theres not really many 16 members of the public here, so Im just wondering what 17 does the NRC do to promote this?                     I find it hard to 18 believe in an area where theres thousands of people 19 who could be impacted by this decision that nobodys 20 shown       up, no   elected       officials,         unless   theres 21 something       here   I   dont     know       about.     Im     just 22  wondering, you know, why theres such a poor turnout.
8 Does anyone have any questions about the material I 9
23                    MR. DRUCKER:         Good question.       Certainly, 24 certainly, let me answer that first; your first part 25 of the question was how do we advertise, basically, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
presented here in the room? If there are no 10 questions, I just want to --
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
11 12 13 MS. SNYDER: I have a question.
MR. DRUCKER: Gail, go ahead.
MS. SNYDER: My first question is you said 14 15 16 17 18 19 20 21 22 23 24 this is a public meeting. Theres not really many members of the public here, so Im just wondering what does the NRC do to promote this? I find it hard to believe in an area where theres thousands of people who could be impacted by this decision that nobodys shown up, no elected officials, unless theres something here I dont know about. Im just wondering, you know, why theres such a poor turnout.
MR. DRUCKER: Good question. Certainly, certainly, let me answer that first; your first part of the question was how do we advertise, basically, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


19 1 this public.           This meeting is advertised through many 2 means.         The first place that its advertised is we put 3 out       a     Federal     Register       notice,       the   NRC     does, 4 announcing the meeting.
1 2
5                     And   then     the     Environmental       Protection 6 Agency,         it publishes         a   Federal       Register       notice 7 that       announces the release of the draft SEIS, and 8 then       how   to   contact       me   if   youre       interested         in 9 learning more about that.                     So theres two Federal 10 Register notices that go out.
3 19 this public. This meeting is advertised through many means. The first place that its advertised is we put out a Federal Register notice, the NRC does, announcing the meeting.
11                    The     Nuclear         Regulatory         Commissions 12 website also has actually several places where we talk 13 about the meeting.             We have a public meeting web page 14 that speaks to all the meetings that we have. We have 15 a license renewal web page that talks about this 16 meeting.         Theres also the regular LaSalle operating 17 license web page, which also points to my license 18 renewal web page.             So theres those web pages.
4 5
19                     We   also     have     advertisements       in     local 20 newspapers.           I   can     get   those       for you   if   youre 21 interested.             But   we   did     advertise       in the     local 22 newspapers, announcing this meeting.                       I also reached 23 out to everyone who attended the scoping meetings last 24 year through e-mail and or letter.
6 7
25                    I either sent them a hard copy of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 9
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
And then the Environmental Protection Agency, it publishes a Federal Register notice that announces the release of the draft SEIS, and then how to contact me if youre interested in learning more about that. So theres two Federal Register notices that go out.
10 The Nuclear Regulatory Commissions 11 website also has actually several places where we talk 12 about the meeting. We have a public meeting web page 13 that speaks to all the meetings that we have. We have 14 a license renewal web page that talks about this 15 meeting. Theres also the regular LaSalle operating 16 license web page, which also points to my license 17 renewal web page. So theres those web pages.
18 19 20 21 22 23 We also have advertisements in local newspapers. I can get those for you if youre interested. But we did advertise in the local newspapers, announcing this meeting. I also reached out to everyone who attended the scoping meetings last year through e-mail and or letter.
24 I either sent them a hard copy of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


20 1 draft SEIS, along with a copy of the Federal Register 2 notice, which provided the information on when and 3 where this meeting would be held.                     Either hard copy, 4 or I provided them a CD of the draft SEIS.
20 draft SEIS, along with a copy of the Federal Register 1
5                    Off the top of my head, I actually used to 6 carry a list of all different ways that we advertised 7 the meetings; off the top of my head, thats how we do 8 it.       There were e-mails, too.               For example, e-mail 9 reminders I sent out to the EPA via Region V folks so 10 they may be on the phone tonight.
notice, which provided the information on when and 2
11                   So those are the basic ways.             If I missed 12 anything, and my boss is listening feel free to chime 13 in, Jim, and let me know what I missed.                     But those are 14 the major ways.             Oh, another way; the fliers.                     I 15 asked the resident inspector to post fliers locally 16 around.
where this meeting would be held. Either hard copy, 3
17                    Good question and, yeah, sometimes we get 18 a big turnout at these meetings, and sometimes we 19 dont.         Personally, I was at one down in Mississippi, 20 Grand Gulf.         There were a few flakes of snow, and the 21 Governor basically told everyone to stay in.                         And I 22 flew own with my boss at the time, and we had no 23 trouble.         There was no snow on the roads; didnt 24 understand what the problem was.                     But it was a local 25 thing.
or I provided them a CD of the draft SEIS.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
4 Off the top of my head, I actually used to 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
carry a list of all different ways that we advertised 6
the meetings; off the top of my head, thats how we do 7
it. There were e-mails, too. For example, e-mail 8
reminders I sent out to the EPA via Region V folks so 9
they may be on the phone tonight.
10 11 12 13 14 15 So those are the basic ways. If I missed anything, and my boss is listening feel free to chime in, Jim, and let me know what I missed. But those are the major ways. Oh, another way; the fliers. I asked the resident inspector to post fliers locally around.
16 Good question and, yeah, sometimes we get 17 a big turnout at these meetings, and sometimes we 18 dont. Personally, I was at one down in Mississippi, 19 Grand Gulf. There were a few flakes of snow, and the 20 Governor basically told everyone to stay in. And I 21 flew own with my boss at the time, and we had no 22 trouble. There was no snow on the roads; didnt 23 understand what the problem was. But it was a local 24 thing.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


21 1                I was paying attention to the news this 2 morning, and I heard the terrible, terrible news of 3 what was going on in Belgium, but I doubt that that 4 somehow would impact people showing up here.                 I did 5 read the local paper to see there were a couple other 6 meetings.
21 I was paying attention to the news this 1
7               There was a board of education meeting in 8 one of the schools, but I didnt think it would impact 9 attendance at this meeting.             And I did work with the 10 folks at the plant, and I worked with our resident 11 inspector trying to pick a night that wasnt busy with 12 other activities.       I do believe we have at least one 13 elected official here with us tonight.             Mr. Walsh?
morning, and I heard the terrible, terrible news of 2
14               MR. WALSH: Yes, Im a member of the 15 LaSalle County board.
what was going on in Belgium, but I doubt that that 3
16               MR. DRUCKER:         OK, thanks.
somehow would impact people showing up here. I did 4
17                MR. WALSH:         Chair of legislative 18 rules.
read the local paper to see there were a couple other 5
19               MR. DRUCKER:         Great.
meetings.
20                MR. WALSH:       County board member. MR.
6 7
21                DRUCKER:       Good question.       Any other 22 questions from folks in the room?
8 9
23                MS. SNYDER:       I have more questions.
10 11 12 There was a board of education meeting in one of the schools, but I didnt think it would impact attendance at this meeting. And I did work with the folks at the plant, and I worked with our resident inspector trying to pick a night that wasnt busy with other activities. I do believe we have at least one elected official here with us tonight. Mr. Walsh?
24                MR. DRUCKER:         Please.
13 14 MR. WALSH: Yes, Im a member of the LaSalle County board.
25                MS. SNYDER:         Slide number 10, which is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 16 MR. DRUCKER: OK, thanks.
(202) 234-4433       WASHINGTON, D.C. 20005-3701       (202) 234-4433
MR. WALSH: Chair of legislative 17 rules.
18 19 20 MR. DRUCKER: Great.
MR. WALSH: County board member. MR.
DRUCKER: Good question. Any other 21 questions from folks in the room?
22 MS. SNYDER: I have more questions.
23 MR. DRUCKER: Please.
24 MS. SNYDER: Slide number 10, which is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


22 1 titled environmental review of LaSalle County Station 2 has the resources areas and the impacts listed.                               On 3 the bottom it says waste management, and the impact is 4 small.         And Im just wondering can you define what 5 waste management is in this?
22 titled environmental review of LaSalle County Station 1
6                   MR. DRUCKER:             Yes,       thats     a     great 7 question.         The answer to your question is contained 8 in     the     draft   SEIS     that     we     are     discussing       this 9 evening.             And     theres         a     section       on     waste 10 management.         That section is located in Chapter 4.
has the resources areas and the impacts listed. On 2
11 Bear with me just for a moment, and I will flip to 12 it.       Its section 4. --
the bottom it says waste management, and the impact is 3
13                    MS. SNYDER:           Does it refer to nuclear 14 waste, or is it waste from the plant, other than?
small. And Im just wondering can you define what 4
15                   MR. DRUCKER:           Section 4.13 of the draft 16 SEIS       discusses,       the     spent     fuel       produced     by     the 17 plant, both onsite storage and offsite radiological 18 impacts.         This     section       also       discusses       low     level 19 waste storage and disposal, mixed waste storage, and 20 non-radioactive           waste     storage.             So   this     is     the 21 section that does cover the spent nuclear fuel.
waste management is in this?
22                   So theres a total of five issues that 23 are     looked     at   in     this     section.         In   a   different 24 section,         Section     4.15.1,       that       section     discusses 25 issues related to the uranium fuel cycle.                         But spent NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
5 6
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
7 8
9 10 11 MR.
DRUCKER:
: Yes, thats a
great question. The answer to your question is contained in the draft SEIS that we are discussing this evening.
And theres a
section on waste management. That section is located in Chapter 4.
Bear with me just for a moment, and I will flip to it. Its section 4. --
12 MS. SNYDER: Does it refer to nuclear 13 waste, or is it waste from the plant, other than?
14 15 16 17 18 19 20 MR. DRUCKER: Section 4.13 of the draft SEIS discusses, the spent fuel produced by the plant, both onsite storage and offsite radiological impacts.
This section also discusses low level waste storage and disposal, mixed waste storage, and non-radioactive waste storage. So this is the section that does cover the spent nuclear fuel.
21 22 23 24 So theres a total of five issues that are looked at in this section. In a different section, Section 4.15.1, that section discusses issues related to the uranium fuel cycle. But spent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


23 1 is at the plant is talked about in Section 4.13.
23 is at the plant is talked about in Section 4.13.
2                MS. SNYDER:       And when you say the impact 3 is small, do you mean that its small in comparison to 4 whats already there, or that 20 years of additional 5 waste will have a small impact?
1 MS. SNYDER: And when you say the impact 2
6                MR. DRUCKER:       Yeah, this is, this section 7 is talking to 20 years of additional operation.
is small, do you mean that its small in comparison to 3
8                MS. SNYDER:       The small impact.
whats already there, or that 20 years of additional 4
9                MR. DRUCKER:         Yes.
waste will have a small impact?
10                MS. SNYDER:       I have another question.
5 MR. DRUCKER: Yeah, this is, this section 6
11                MR. DRUCKER:         Please.
is talking to 20 years of additional operation.
12                MS. SNYDER:           I dont want to hog the 13 questions. Slide number 12, alternatives; and youre 14 talking about citing alternatives and the criteria 15 required to replace the energy.               If you nuclear plant 16 had shut down, you said something about what would 17 happen if the nuclear plant shut down, and you found 18 that there wouldnt be an alternative power source 19 that would replace that power.
7 MS. SNYDER: The small impact.
20                And I was just wondering if you had, or 21 the committee had, whoever drafted this, whatever 22 group drafted it had looked at the report from the 23 State of Illinois?       There were a number of agencies; 24 there was a bill, HR, a resolution, HR1146, which was 25 looking at nuclear power in the state.
8 MR. DRUCKER: Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MS. SNYDER: I have another question.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
10 MR. DRUCKER: Please.
11 MS. SNYDER: I dont want to hog the 12 questions. Slide number 12, alternatives; and youre 13 talking about citing alternatives and the criteria 14 required to replace the energy. If you nuclear plant 15 had shut down, you said something about what would 16 happen if the nuclear plant shut down, and you found 17 that there wouldnt be an alternative power source 18 that would replace that power.
19 And I was just wondering if you had, or 20 the committee had, whoever drafted this, whatever 21 group drafted it had looked at the report from the 22 State of Illinois? There were a number of agencies; 23 there was a bill, HR, a resolution, HR1146, which was 24 looking at nuclear power in the state.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


24 1                  And state agencies drafted a report, and 2 they came out with the opposite finding of what youre 3 saying.       So maybe we will e-mail that report to you.
24 And state agencies drafted a report, and 1
4 I think that would be informative to what their 5 position is, is not the same as your conclusion.
they came out with the opposite finding of what youre 2
6                  MR. DRUCKER:         OK, thank you.
saying. So maybe we will e-mail that report to you.
7                  MS. SNYDER:       And thats a state study by 8 state agencies.
3 I think that would be informative to what their 4
9                  MR. DRUCKER:         All right.     I appreciate 10 that very much.         Thanks, Gail.         Okay, if there are no 11 other questions, then were going to move right along 12 to the comment portion of tonights meeting.                   And as 13 I stated at the beginning, primarily the NRC staff 14 will be listening, and we will respond to any comments 15 in written form in the final SEIS.
position is, is not the same as your conclusion.
16                  So let me go to the operator.             India, is 17 there anyone on the phone that wants to provide a 18 comment?
5 MR. DRUCKER: OK, thank you.
19                  THE OPERATOR:         If you do have comments, 20 please press *1 and record your name when prompted.
6 MS. SNYDER: And thats a state study by 7
21 Once again, thats *1 -- and no comments have come in 22 over the phone.
state agencies.
23                  MR. DRUCKER:       Thank you.     Thank you, very 24 much.
8 MR. DRUCKER: All right. I appreciate 9
25                  THE OPERATOR:         Youre welcome.
that very much. Thanks, Gail. Okay, if there are no 10 other questions, then were going to move right along 11 to the comment portion of tonights meeting. And as 12 I stated at the beginning, primarily the NRC staff 13 will be listening, and we will respond to any comments 14 in written form in the final SEIS.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 So let me go to the operator. India, is 16 there anyone on the phone that wants to provide a 17 comment?
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
18 THE OPERATOR: If you do have comments, 19 please press *1 and record your name when prompted.
20 Once again, thats *1 -- and no comments have come in 21 over the phone.
22 MR. DRUCKER: Thank you. Thank you, very 23 much.
24 THE OPERATOR: Youre welcome.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


25 1                   MR. DRUCKER:         Okay, I have yellow cards 2 from three, from four folks.                   Ill shuffle them and 3 pull       them out   randomly.           I     hope it   does       not 4 matter to any of you.             I would appreciate, would the 5 speakers come up to the front here, and you can use 6 this microphone. Gail, are you available first?
25 1
7                  MS. SNYDER:       Sure.
2 3
8                  MR. DRUCKER: And the next speaker will be 9 Doug OBrien, so Doug if you want to prepare yourself 10 and move up to the front to save some time.                   In fact, 11 theres only four of you.             Itll be Gail, Doug, Steve 12 and Tom.
4 5
13                  MS. SNYDER:         I dont know if this makes 14 your life easier.
MR. DRUCKER: Okay, I have yellow cards from three, from four folks. Ill shuffle them and pull them out randomly. I hope it does not matter to any of you. I would appreciate, would the speakers come up to the front here, and you can use this microphone. Gail, are you available first?
15                  AUDIENCE MEMBER:         Oh great, thank you.
6 MS. SNYDER: Sure.
16                  MS. SNYDER:         Good evening.         My name is 17 Gail Snyder, and Im here representing Nuclear Energy 18 Information Service.           I serve as the president of the 19 board.         Our comments tonight are really directed, 20 maybe, not specifically at environmental issues, but 21 the licensing renewal.
7 MR. DRUCKER: And the next speaker will be 8
22                  And one of our first comments is that the 23 analysis of socioeconomic impacts are incomplete.                         No 24 analysis of impacts for early or unexpected closures 25 were       considered   or   provided.           The   Exelon   safety NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Doug OBrien, so Doug if you want to prepare yourself 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
and move up to the front to save some time. In fact, 10 theres only four of you. Itll be Gail, Doug, Steve 11 and Tom.
12 MS. SNYDER: I dont know if this makes 13 your life easier.
14 AUDIENCE MEMBER: Oh great, thank you.
15 MS. SNYDER: Good evening. My name is 16 Gail Snyder, and Im here representing Nuclear Energy 17 Information Service. I serve as the president of the 18 board. Our comments tonight are really directed, 19 maybe, not specifically at environmental issues, but 20 the licensing renewal.
21 And one of our first comments is that the 22 analysis of socioeconomic impacts are incomplete. No 23 analysis of impacts for early or unexpected closures 24 were considered or provided. The Exelon safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


26 1 evaluation report documents a significant tax impact 2 for the presence of the LaSalle County Station, yet 3 only addresses the positive impacts.
26 evaluation report documents a significant tax impact 1
4                    No mention or analysis of negative impacts 5 resulting from a abrupt planned or unexpected early 6 closure         of   LaSalle     is   presented.           This     is     a 7 significant omission, particularly in light of Exelon 8 Corporations         threat     of     two   years     ago to     close 9 reactors in Illinois on economic grounds.
for the presence of the LaSalle County Station, yet 2
10                    According     to     the   Exelon     SER,   LaSalle 11 represents a sizeable portion of the county total tax 12 base.         It also accounts for large portions of the 13 school districts adjusted property tax levy.                         These 14 are       not     insignificant         amounts.         Their     abrupt 15 disappearance         would     wreak     economic       havoc   on     the 16 affected governmental and essential service entities 17 ability to operate, just as Exelons predecessor, 18 ComEd, did to the community of Zion in 1997, when they 19 unilaterally closed the Zion reactors.
only addresses the positive impacts.
20                    The   SER   either     fails     to recognize       or 21 mention at all some of the possible events that could 22 result         in such   a   closure       situation,     such     as     an 23 unexpected major accident resulting in immediate and, 24 presumably, premature closing, NRC-ordered shutdown, 25 Exelon unilateral decision to close the plant on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 No mention or analysis of negative impacts 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
resulting from a abrupt planned or unexpected early 5
closure of LaSalle is presented. This is a 6
significant omission, particularly in light of Exelon 7
Corporations threat of two years ago to close 8
reactors in Illinois on economic grounds.
9 According to the Exelon SER, LaSalle 10 represents a sizeable portion of the county total tax 11 base. It also accounts for large portions of the 12 school districts adjusted property tax levy. These 13 are not insignificant amounts.
Their abrupt 14 disappearance would wreak economic havoc on the 15 affected governmental and essential service entities 16 ability to operate, just as Exelons predecessor, 17 ComEd, did to the community of Zion in 1997, when they 18 unilaterally closed the Zion reactors.
19 The SER either fails to recognize or 20 mention at all some of the possible events that could 21 result in such a closure situation, such as an 22 unexpected major accident resulting in immediate and, 23 presumably, premature closing, NRC-ordered shutdown, 24 Exelon unilateral decision to close the plant on 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


27 1 economic       or   other     grounds,     as     it did   in   Zion, 2 resulting in an immediate loss of about 55 percent of 3 Zions tax base.
27 economic or other grounds, as it did in Zion, 1
4                  Devaluation through sale has occurred at 5 the Clinton Station, resulting in enormous loss of the 6 tax       base,   eventual     old     age,       license   expiration 7 closure, which is the outcome of -- and I would add, 8 in light of whats happening in Brussels today, and 9 the fact that theyve shut down their nuclear reactors 10 and     cant   provide     security,       terrorism     is   also       a 11 possible way that a nuclear reactor could shut down 12 unexpectedly.
resulting in an immediate loss of about 55 percent of 2
13                  Exelons being a business will certainly 14 make the calculations it made when it closed Zion and 15 decided that LaSalle should continue to operate.                           In 16 this omission, the SER makes the same mistake the U.S.
Zions tax base.
17 Government       made   when     it   invaded       Iraq. No     exit 18 strategy.           To     simply       assume       that   the     only 19 socioeconomic effects of LaSalles presence will be 20 positive ones is simply irrational.
3 Devaluation through sale has occurred at 4
21                  Our recommendation:               Planning for some 22 kind of eventual closure must be made long before it 23 happens to minimize economic and service disruptions 24 to the entities whose tax bases will be affected.
the Clinton Station, resulting in enormous loss of the 5
25 Debate about the license extension serves as a good NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
tax base, eventual old age, license expiration 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
closure, which is the outcome of -- and I would add, 7
in light of whats happening in Brussels today, and 8
the fact that theyve shut down their nuclear reactors 9
and cant provide security, terrorism is also a 10 possible way that a nuclear reactor could shut down 11 unexpectedly.
12 Exelons being a business will certainly 13 make the calculations it made when it closed Zion and 14 decided that LaSalle should continue to operate. In 15 this omission, the SER makes the same mistake the U.S.
16 Government made when it invaded Iraq. No exit 17 strategy.
To simply assume that the only 18 socioeconomic effects of LaSalles presence will be 19 positive ones is simply irrational.
20 Our recommendation: Planning for some 21 kind of eventual closure must be made long before it 22 happens to minimize economic and service disruptions 23 to the entities whose tax bases will be affected.
24 Debate about the license extension serves as a good 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


28 1 reminder of this fact, and an opportunity to take 2 action.
28 reminder of this fact, and an opportunity to take 1
3                  We recommend that dependent government and 4 tax entities begin formal negotiations with Exelon to 5 establish an escrow of mitigation funds based on some 6 mutually agreeable assessment and payment structure so 7 that       dependent   entities       will     have some   kind       of 8 temporary funds available to soften the economic blow 9 or     closure   and   not   radically         disrupt   essential 10 services.
action.
11                  Our second comment, which is shorter, is 12 the inadequate attention paid to water availability at 13 the LaSalle Nuclear Power Plant under potential future 14 climate disruption conditions. Historically, LaSalle 15 Nuclear Power Plant has been one of the Illinois 16 reactor sites most sensitive to water availability 17 under severe drought conditions; for example, 1998, 18 2005, 2006.
2 We recommend that dependent government and 3
19                  Its siting on a portion of the Illinois 20 River network that is shallower than other parts has 21 brought the reactors close to mandatory shutdowns to 22 stay       within   EPA   regulatory         limits   for   thermal 23 pollution during extreme droughts on more than one 24 occasion over the past two decades.
tax entities begin formal negotiations with Exelon to 4
25                  Forecast for the future of Illinoiss NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
establish an escrow of mitigation funds based on some 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
mutually agreeable assessment and payment structure so 6
that dependent entities will have some kind of 7
temporary funds available to soften the economic blow 8
or closure and not radically disrupt essential 9
services.
10 Our second comment, which is shorter, is 11 the inadequate attention paid to water availability at 12 the LaSalle Nuclear Power Plant under potential future 13 climate disruption conditions. Historically, LaSalle 14 Nuclear Power Plant has been one of the Illinois 15 reactor sites most sensitive to water availability 16 under severe drought conditions; for example, 1998, 17 2005, 2006.
18 Its siting on a portion of the Illinois 19 River network that is shallower than other parts has 20 brought the reactors close to mandatory shutdowns to 21 stay within EPA regulatory limits for thermal 22 pollution during extreme droughts on more than one 23 occasion over the past two decades.
24 Forecast for the future of Illinoiss 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


29 1 climate       over   the   next     few   decades     indicate       it 2 approaching that of current day west Texas. This will 3 have severe impacts on the aquatic system in the area, 4 and on the availability of water for intake and 5 discharge at LaSalle.
29 climate over the next few decades indicate it 1
6                  A   more     thorough         re-examination         of 7 LaSalles ability to safely operate, obtain sufficient 8 cooling water, and not thermally and radiologically 9 damage the local aquatic ecosystem is in order in this 10 re-licensing proceeding.               Thank you.
approaching that of current day west Texas. This will 2
11                  MR. DRUCKER:         The next speaker is Doug 12 OBrien from the Illinois Clean Energy Coalition.
have severe impacts on the aquatic system in the area, 3
13                  MR. OBRIEN:       Thank you.       My name is Doug 14 OBrien.         Im   with     the     Illinois     Clean   Energy 15 Coalition, and this is another one in a long number of 16 these hearings or events that Ive been to, talking 17 about a lot of the positive impacts that Illinoiss 18 nuclear generating stations have had on the economy.
and on the availability of water for intake and 4
19 20                  Its ironic that Im following somebody 21 who       came   up   and     posited       these     impacts,     these 22 beneficial impacts and somehow turned them into a 23 negative.       And I think that its also a little bit 24 insulting to the intelligence of local officials here 25 and around Illinois to assume that they dont have the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
discharge at LaSalle.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
5 A
more thorough re-examination of 6
LaSalles ability to safely operate, obtain sufficient 7
cooling water, and not thermally and radiologically 8
damage the local aquatic ecosystem is in order in this 9
re-licensing proceeding. Thank you.
10 MR. DRUCKER: The next speaker is Doug 11 OBrien from the Illinois Clean Energy Coalition.
12 MR. OBRIEN: Thank you. My name is Doug 13 OBrien. Im with the Illinois Clean Energy 14 Coalition, and this is another one in a long number of 15 these hearings or events that Ive been to, talking 16 about a lot of the positive impacts that Illinoiss 17 nuclear generating stations have had on the economy.
18 19 Its ironic that Im following somebody 20 who came up and posited these impacts, these 21 beneficial impacts and somehow turned them into a 22 negative. And I think that its also a little bit 23 insulting to the intelligence of local officials here 24 and around Illinois to assume that they dont have the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


30 1 sense to plan for the future.                   And I know that many 2 local       governments     do   just     that.       They   do     it 3 vigilantly, and they do it effectively.
30 sense to plan for the future. And I know that many 1
4                  But I wanted to talk a little bit about 5 the environmental impacts, the positive environmental 6 impacts of the plant.               As the initial NRC reports 7 shows, the overall impacts when it comes to energy 8 generation are positive. That the alternative sources 9 for energy generation in Illinois would create more 10 negative impacts environmentally, particularly in the 11 area of CO2 emissions, as its critically important 12 that we always consider the beneficial impact of 13 Illinoiss nuclear fleet on CO2 emissions here in 14 Illinois.
local governments do just that. They do it 2
15                  The   Illinois       Clean       Energy Coalitions 16 study in 2014 showed that Illinoiss nuclear fleet 17 prevents the emission of over 92 million tons of CO2 18 annually.       Now this is a significant contributor to 19 global climate change, and something that we can do in 20 preserving and protecting our nuclear fleet that will 21 have a real, immediate, ongoing positive impact on our 22 environment.
vigilantly, and they do it effectively.
23                  Now, other sources of clean energy are 24 vital to our future, as well. But the simple truth is 25 we cannot quickly or easily replace nuclear generation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 But I wanted to talk a little bit about 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
the environmental impacts, the positive environmental 5
impacts of the plant. As the initial NRC reports 6
shows, the overall impacts when it comes to energy 7
generation are positive. That the alternative sources 8
for energy generation in Illinois would create more 9
negative impacts environmentally, particularly in the 10 area of CO2 emissions, as its critically important 11 that we always consider the beneficial impact of 12 Illinoiss nuclear fleet on CO2 emissions here in 13 Illinois.
14 The Illinois Clean Energy Coalitions 15 study in 2014 showed that Illinoiss nuclear fleet 16 prevents the emission of over 92 million tons of CO2 17 annually. Now this is a significant contributor to 18 global climate change, and something that we can do in 19 preserving and protecting our nuclear fleet that will 20 have a real, immediate, ongoing positive impact on our 21 environment.
22 Now, other sources of clean energy are 23 vital to our future, as well. But the simple truth is 24 we cannot quickly or easily replace nuclear generation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


31 1 with other clean sources.               And a nuclear plant like 2 LaSalle would require, for example, thousands of new 3 wind turbines to replace its electricity generation.
31 with other clean sources. And a nuclear plant like 1
4 5                  And we still cant rely on wind 24/7, nor 6 on solar 24/7.         And the process of siting these wind 7 farms, the capital and the permitting that is needed 8 to begin operating them is daunting. So losing any of 9 Illinoiss nuclear plants would leave us with no 10 short-term alternative but to increase our use of 11 fossil fuels and move us in the wrong direction.
LaSalle would require, for example, thousands of new 2
12                  Additionally, I think its important to 13 note that its vital for the NRC and our national 14 government to continue to push forward with practical 15 waste       storage solutions       that     will allow for     the 16 continued safe and secure storage of spent fuel, while 17 we wait for the Federal government to put aside 18 politics and live up to the commitment it made years 19 ago to establish a nationwide solution for spent fuel 20 storage.
wind turbines to replace its electricity generation.
21                  In the meantime, plants like LaSalles 22 spent fuel is expertly handled, never having produced 23 any impact to the surrounding ecosystem.                   And while 24 the plants and the NRC have managed a laudable short-25 term solution, we have to continue to push for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
And we still cant rely on wind 24/7, nor 5
on solar 24/7. And the process of siting these wind 6
farms, the capital and the permitting that is needed 7
to begin operating them is daunting. So losing any of 8
Illinoiss nuclear plants would leave us with no 9
short-term alternative but to increase our use of 10 fossil fuels and move us in the wrong direction.
11 Additionally, I think its important to 12 note that its vital for the NRC and our national 13 government to continue to push forward with practical 14 waste storage solutions that will allow for the 15 continued safe and secure storage of spent fuel, while 16 we wait for the Federal government to put aside 17 politics and live up to the commitment it made years 18 ago to establish a nationwide solution for spent fuel 19 storage.
20 In the meantime, plants like LaSalles 21 spent fuel is expertly handled, never having produced 22 any impact to the surrounding ecosystem. And while 23 the plants and the NRC have managed a laudable short-24 term solution, we have to continue to push for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


32 1 permanent solution promised by our government.
32 permanent solution promised by our government.
2                    So I think, in conclusion, the Illinois 3 Clean       Energy Coalition       applauds         the   NRC and     its 4 findings.         We believe that its accurate in showing 5 the LaSalle Station, like other stations across the 6 state, has a positive impact on the environment moving 7 forward here in Illinois.               Thank you.
1 So I think, in conclusion, the Illinois 2
8                    MR. DRUCKER:         Steve Buck is next.
Clean Energy Coalition applauds the NRC and its 3
9                    MR. BUCK:     Good evening.           Im Steve Buck.
findings. We believe that its accurate in showing 4
10 Im an engineer at LaSalle Station.                       I just recently 11 started back in August.               I am a resident of Ottawa, 12 Illinois, and Im a former Eagle Scout, originally 13 from       Crystal     Lake,     Illinois.             So   environmental 14 stewardship is something that is very much a part of 15 my character.         Its something that I developed early 16 on in my youth, and I still continue it to this day as 17 an adult.
the LaSalle Station, like other stations across the 5
18                    Id like to share a couple key points of 19 how LaSalle Station is trying to be an environmental 20 steward itself through our activities to help conserve 21 the environment and leave the environment at least in 22 the best, the same condition, if not better condition 23 than we came in.
state, has a positive impact on the environment moving 6
24                    We had recently installed, last year, a 25 couple of charging stations for electrical vehicles.
forward here in Illinois. Thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MR. DRUCKER: Steve Buck is next.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 MR. BUCK: Good evening. Im Steve Buck.
9 Im an engineer at LaSalle Station. I just recently 10 started back in August. I am a resident of Ottawa, 11 Illinois, and Im a former Eagle Scout, originally 12 from Crystal Lake, Illinois. So environmental 13 stewardship is something that is very much a part of 14 my character. Its something that I developed early 15 on in my youth, and I still continue it to this day as 16 an adult.
17 Id like to share a couple key points of 18 how LaSalle Station is trying to be an environmental 19 steward itself through our activities to help conserve 20 the environment and leave the environment at least in 21 the best, the same condition, if not better condition 22 than we came in.
23 We had recently installed, last year, a 24 couple of charging stations for electrical vehicles.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


33 1 So theres four charging ports available, which saved 2 about 1,300 pounds of greenhouse gas emissions for any 3 of     our     workers   who     chose     to     use their electric 4 vehicles instead of a carbon-producing combustion 5 engine vehicle.
33 So theres four charging ports available, which saved 1
6                    We   have     an   annual       station earth     day 7 activity every year. Some of those include electronic 8 waste recycling programs where we collect electronic 9 waste. And we typically give out green gifts to those 10 who participate to bring in their electronics for 11 recycling as a thank you for looking out for that so 12 that we dont throw electronics just simply into 13 landfills.
about 1,300 pounds of greenhouse gas emissions for any 2
14                    Theres been a big push for LED lighting 15 upgrades, both inside the plant and outside, most 16 noticeably in the parking lot.                     The LED lights were 17 replaced.         They should last about seven to 10 years 18 out in the conditions outside in the parking lot.
of our workers who chose to use their electric 3
19 And were noticing that theres reduced electricity 20 usage for those, longer life span, and weve been 21 doing studies at other places inside the plant where 22 we can utilize LED lighting.
vehicles instead of a carbon-producing combustion 4
23                    We are members of the Wildlife Habitat 24 Council         certification.                 We     have   achieved 25 re-certification last year for our efforts.                     We have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
engine vehicle.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 We have an annual station earth day 6
activity every year. Some of those include electronic 7
waste recycling programs where we collect electronic 8
waste. And we typically give out green gifts to those 9
who participate to bring in their electronics for 10 recycling as a thank you for looking out for that so 11 that we dont throw electronics just simply into 12 landfills.
13 Theres been a big push for LED lighting 14 upgrades, both inside the plant and outside, most 15 noticeably in the parking lot. The LED lights were 16 replaced. They should last about seven to 10 years 17 out in the conditions outside in the parking lot.
18 And were noticing that theres reduced electricity 19 usage for those, longer life span, and weve been 20 doing studies at other places inside the plant where 21 we can utilize LED lighting.
22 We are members of the Wildlife Habitat 23 Council certification.
We have achieved 24 re-certification last year for our efforts. We have 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


34 1 many projects around the site, such as bat boxes, Uber 2 boxes, and activities with the fish hatchery in the 3 lake.
34 many projects around the site, such as bat boxes, Uber 1
4                    Our   North       American         Young Generation 5 Nuclear, its a youth group primarily of those who are 6 new     to   the nuclear     industry,       which   I am   a   site 7 director         at   LaSalle         Station;         we have         an 8 adopt-a-highway program for about a two-mile stretch 9 near the facility.           And during the summer months, the 10 warmer months, we do a highway clean-up where we go 11 both sides of the highway, and just pick up any trash, 12 litter that might be on the side of the road.
boxes, and activities with the fish hatchery in the 2
13                    We have a Gabby Green educational program 14 that goes out to our elementary schools.                     We discuss 15 energy conservation, resource conservation.                     We talk 16 about limited use of our water in certain situations, 17 turning the lights off when we go to the rooms.                       Some 18 very simple concepts for young children to understand 19 so that they can be environmental conscious starting 20 at a young age.
lake.
21                    We are starting to develop a program with 22 Boy Scouts of America.               As I said, Im a Boy Scout, 23 and this is something thats just starting to develop 24 in the last month.           Developing programs with the Boy 25 Scouts to help encourage them with their environmental NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 Our North American Young Generation 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
Nuclear, its a youth group primarily of those who are 5
new to the nuclear industry, which I am a site 6
director at LaSalle Station; we have an 7
adopt-a-highway program for about a two-mile stretch 8
near the facility. And during the summer months, the 9
warmer months, we do a highway clean-up where we go 10 both sides of the highway, and just pick up any trash, 11 litter that might be on the side of the road.
12 We have a Gabby Green educational program 13 that goes out to our elementary schools. We discuss 14 energy conservation, resource conservation. We talk 15 about limited use of our water in certain situations, 16 turning the lights off when we go to the rooms. Some 17 very simple concepts for young children to understand 18 so that they can be environmental conscious starting 19 at a young age.
20 We are starting to develop a program with 21 Boy Scouts of America. As I said, Im a Boy Scout, 22 and this is something thats just starting to develop 23 in the last month. Developing programs with the Boy 24 Scouts to help encourage them with their environmental 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


35 1 practices, some of their merit badges and their rank 2 advancements         and     helping     them       live   up to     that 3 environmental stewardship themselves.
35 practices, some of their merit badges and their rank 1
4                    We also are firm supporters of the Who 5 Haven,         which   is   wildlife       rehabilitation       center, 6 primarily for birds of prey, where we collect food for 7 those animals and also participate in bird releases, 8 releasing them back into the environment.
advancements and helping them live up to that 2
9                    MR. DRUCKER:         Thanks.       The final speaker 10 from the cards, wheres Tom, Tom Jackson?
environmental stewardship themselves.
11                    MR. JACKSON: Good evening. My names Tom 12 Jackson.         Im site superintendent at Illini State 13 Park, Marseilles fish and wildlife area in LaSalle.
3 We also are firm supporters of the Who 4
14 I work for the Department of Natural Resources, and 15 the IDNR currently has a lease through 2025 with 16 Exelon to manage the wildlife area and the fishing 17 opportunities.
Haven, which is wildlife rehabilitation center, 5
18                    LaSalle Lake is a fish and wildlife area, 19 along with a public fishing area.                     Were open to the 20 public from March 15th to October 15th every year for 21 fishing, providing many varieties of fish species, 22 including hybrid striped bass, large and small mouth 23 bass, crappie, blue gill and catfish.
primarily for birds of prey, where we collect food for 6
24                    In the months from October 15th through 25 March 15th of every year, the site is closed to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
those animals and also participate in bird releases, 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
releasing them back into the environment.
8 MR. DRUCKER: Thanks. The final speaker 9
from the cards, wheres Tom, Tom Jackson?
10 MR. JACKSON: Good evening. My names Tom 11 Jackson. Im site superintendent at Illini State 12 Park, Marseilles fish and wildlife area in LaSalle.
13 I work for the Department of Natural Resources, and 14 the IDNR currently has a lease through 2025 with 15 Exelon to manage the wildlife area and the fishing 16 opportunities.
17 LaSalle Lake is a fish and wildlife area, 18 along with a public fishing area. Were open to the 19 public from March 15th to October 15th every year for 20 fishing, providing many varieties of fish species, 21 including hybrid striped bass, large and small mouth 22 bass, crappie, blue gill and catfish.
23 In the months from October 15th through 24 March 15th of every year, the site is closed to the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


36 1 public, and provides a wildlife area for waterfowl 2 migrating through the area.               IDNR works closely with 3 Exelon to provide a great recreational opportunity to 4 local resident and visitors from throughout the state 5 and even surrounding states.
36 public, and provides a wildlife area for waterfowl 1
6                  LaSalle     Lake     provides       good   wildlife 7 habitat for the waterfowl, as mentioned before, and 8 provides good fishing and outdoor recreation for the 9 community.       It also provides good economic benefits, 10 visitors to the area.
migrating through the area. IDNR works closely with 2
11                  In my time as site superintendent, Exelon 12 management         has   made       themselves       available         and 13 supportive in our efforts to provide site visitors 14 with access to the lake, and a rewarding experience 15 while       visiting the     site.       I     thank   you   for     the 16 opportunity to speak on behalf of LaSalle Lake fish 17 and     wildlife   area     and     the   Department     of   Nature 18 Resources.
Exelon to provide a great recreational opportunity to 3
19                  MR. DRUCKER: Okay, if theres no one else 20 here or on the phone who has comments, and there 21 doesnt appear to be, I want to thank everyone who 22 provided --
local resident and visitors from throughout the state 4
23                  MS. BOUDART:         I have a comment.
and even surrounding states.
24                  MR. DRUCKER:         Oh.
5 LaSalle Lake provides good wildlife 6
25                  MS. BOUDART:         May I make a comment?
habitat for the waterfowl, as mentioned before, and 7
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
provides good fishing and outdoor recreation for the 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
community. It also provides good economic benefits, 9
visitors to the area.
10 In my time as site superintendent, Exelon 11 management has made themselves available and 12 supportive in our efforts to provide site visitors 13 with access to the lake, and a rewarding experience 14 while visiting the site. I thank you for the 15 opportunity to speak on behalf of LaSalle Lake fish 16 and wildlife area and the Department of Nature 17 Resources.
18 MR. DRUCKER: Okay, if theres no one else 19 here or on the phone who has comments, and there 20 doesnt appear to be, I want to thank everyone who 21 provided --
22 MS. BOUDART: I have a comment.
23 MR. DRUCKER: Oh.
24 MS. BOUDART: May I make a comment?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


37 1                MR. DRUCKER:         Absolutely.
37 MR. DRUCKER: Absolutely.
2                MS. BOUDART:         Okay.
1 MS. BOUDART: Okay.
3                MR. DRUCKER: Is it easier for me to bring 4 you the microphone there?
2 MR. DRUCKER: Is it easier for me to bring 3
5                MS. BOUDART:       Well, if you can so I think 6 I can speak loud enough.           The person who spoke first, 7 who are you?     Either the purple shirt or the white 8 striped shirt.     Anyway, let me see --
you the microphone there?
9                MR. DRUCKER:         Can you tell us your name.
4 MS. BOUDART: Well, if you can so I think 5
10                MS. BOUDART:         Oh yeah, my name is Jan 11 Boudart, and Im with the Nuclear Energy Information 12 Service, and somebody, I guess I didnt get, yeah, I 13 asked, Doug OBrien, the Clean Energy Coalition.                 Is 14 that you?
I can speak loud enough. The person who spoke first, 6
15                Well, I was very interested in the fact 16 that you said that until our government keeps its 17 promise to take care of the high level nuclear waste, 18 its being handled very efficiently and not being 19 allowed to harm anyone.         And, in fact, your statement 20 was never having produced any impact from the high 21 level nuclear waste.
who are you? Either the purple shirt or the white 7
22                And I think this is something that, rather 23 than say that I, well, I personally dont believe 24 that, but I cant prove that its wrong.             Also, you 25 cant prove that its right.
striped shirt. Anyway, let me see --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 MR. DRUCKER: Can you tell us your name.
(202) 234-4433       WASHINGTON, D.C. 20005-3701     (202) 234-4433
9 MS. BOUDART: Oh yeah, my name is Jan 10 Boudart, and Im with the Nuclear Energy Information 11 Service, and somebody, I guess I didnt get, yeah, I 12 asked, Doug OBrien, the Clean Energy Coalition. Is 13 that you?
14 Well, I was very interested in the fact 15 that you said that until our government keeps its 16 promise to take care of the high level nuclear waste, 17 its being handled very efficiently and not being 18 allowed to harm anyone. And, in fact, your statement 19 was never having produced any impact from the high 20 level nuclear waste.
21 And I think this is something that, rather 22 than say that I, well, I personally dont believe 23 that, but I cant prove that its wrong. Also, you 24 cant prove that its right.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


38 1                Recently,         the       Nuclear     Regulatory 2 Commission decided not to conduct health studies of 3 the impacts of the power plants around the United 4 States. And without those studies, you cant say that 5 there is no impact, and you cannot say that there is 6 an impact because there is no study.
38
7                So to come up with the statement that this 8 activity of taking care of the high level nuclear 9 waste never produced any impact is a statement that is 10 not supported.     If I were to say well, I know it has 11 produced an impact, that would also be an unsupported 12 statement.     There has been no study to find out 13 whether or not there is an impact.                 And I think that 14 kind of a positive statement really exposes the feet 15 of clay.
: Recently, the Nuclear Regulatory 1
16                MR. DRUCKER:       Thank you, and Im going to 17 ask you could just fill out a card for me, just with 18 your name and e-mail address.               All right, thank you 19 all. Do we have any other comments from anyone on the 20 phone?
Commission decided not to conduct health studies of 2
21                THE OPERATOR:         If you would like to have 22 a comment or question, please press *1 an record your 23 name when prompted.           Thank you.           No questions or 24 comments have come in.
the impacts of the power plants around the United 3
25                MR. DRUCKER:       Okay, thank you.       Thanks to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
States. And without those studies, you cant say that 4
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
there is no impact, and you cannot say that there is 5
an impact because there is no study.
6 So to come up with the statement that this 7
activity of taking care of the high level nuclear 8
waste never produced any impact is a statement that is 9
not supported. If I were to say well, I know it has 10 produced an impact, that would also be an unsupported 11 statement. There has been no study to find out 12 whether or not there is an impact. And I think that 13 kind of a positive statement really exposes the feet 14 of clay.
15 MR. DRUCKER: Thank you, and Im going to 16 ask you could just fill out a card for me, just with 17 your name and e-mail address. All right, thank you 18 all. Do we have any other comments from anyone on the 19 phone?
20 THE OPERATOR: If you would like to have 21 a comment or question, please press *1 an record your 22 name when prompted. Thank you. No questions or 23 comments have come in.
24 MR. DRUCKER: Okay, thank you. Thanks to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


39 1 everyone who provided comments during this meeting, 2 because       that   information       exchange       is what     this 3 meetings all about.           Also, thanks to all of you for 4 giving the speakers your time and attention.
39 everyone who provided comments during this meeting, 1
5                  And I want to thank Connie Brooks whos 6 actually across the hallway there and Fred Moore who 7 work here for the use of LaSalle County emergency 8 operations center.           And finally on the table, if you 9 want to, please pick up a meeting feedback form if you 10 havent already, and either return it to me or any 11 other staff member.             Feel free to mail it in.                 And 12 with that, this meeting is concluded.
because that information exchange is what this 2
13                  Im going to stick around.             If anyone had 14 any questions and wants to talk to me one-on-one, Im 15 happy to stick around and do that.                   So thank you all, 16 again, for coming out tonight.
meetings all about. Also, thanks to all of you for 3
17                  THE   OPERATOR:           This       concludes     your 18 conference, and you may disconnect.                   Once again, your 19 conference has ended, and you may disconnect.
giving the speakers your time and attention.
20                  (Whereupon,       at   8:00       p.m., the   above-21 mentioned public hearing was concluded.)
4 And I want to thank Connie Brooks whos 5
22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
actually across the hallway there and Fred Moore who 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
work here for the use of LaSalle County emergency 7
operations center. And finally on the table, if you 8
want to, please pick up a meeting feedback form if you 9
havent already, and either return it to me or any 10 other staff member. Feel free to mail it in. And 11 with that, this meeting is concluded.
12 Im going to stick around. If anyone had 13 any questions and wants to talk to me one-on-one, Im 14 happy to stick around and do that. So thank you all, 15 again, for coming out tonight.
16 THE OPERATOR: This concludes your 17 conference, and you may disconnect. Once again, your 18 conference has ended, and you may disconnect.
19 (Whereupon, at 8:00 p.m., the above-20 mentioned public hearing was concluded.)
21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION
Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION


==Title:==
==Title:==
LaSalle County Station Draft Supplemental EIS Docket Number:   (n/a)
LaSalle County Station Draft Supplemental EIS Docket Number:
Location:         Ottawa, Illinois Date:             Tuesday, March 22, 2016 Work Order No.:   NRC-2254                         Pages 1-39 NEAL R. GROSS AND CO., INC.
(n/a)
Location:
Ottawa, Illinois Date:
Tuesday, March 22, 2016 Work Order No.:
NRC-2254 Pages 1-39 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433
Washington, D.C. 20005 (202) 234-4433


1 1                    UNITED STATES OF AMERICA 2                  NUCLEAR REGULATORY COMMISSION 3                                + + + + +
1 UNITED STATES OF AMERICA 1
4                      LaSALLE COUNTY STATION 5                DRAFT SUPPLEMENTAL EIS (DSEIS) 6                            PUBLIC MEETING 7                                + + + + +
NUCLEAR REGULATORY COMMISSION 2
8                                 TUESDAY 9                            MARCH 22, 2016 10                                + + + + +
+ + + + +
11 12 13 14                  The Public Meeting was convened at the 15 LaSalle County Emergency Management Agency, Emergency 16 Operations       Center,       711     East     Etna Road, Ottawa, 17 Illinois at 7:00 p.m., David Drucker, Facilitator, 18 presiding.
3 LaSALLE COUNTY STATION 4
19 20 PRESENT:
DRAFT SUPPLEMENTAL EIS (DSEIS) 5 PUBLIC MEETING 6
21            DAVID DRUCKER, Facilitator and Presenter 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
+ + + + +
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
7 TUESDAY 8
MARCH 22, 2016 9
+ + + + +
10 11 12 13 The Public Meeting was convened at the 14 LaSalle County Emergency Management Agency, Emergency 15 Operations Center, 711 East Etna Road, Ottawa, 16 Illinois at 7:00 p.m., David Drucker, Facilitator, 17 presiding.
18 19 PRESENT:
20 DAVID DRUCKER, Facilitator and Presenter 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


2 1                      P R O C E E D I N G S 2                  MR. DRUCKER:         Good evening.         Thanks for 3 coming out tonight.           Im David Drucker with the U.S.
2 P R O C E E D I N G S 1
4 Nuclear Regulatory Commission, and Im --
MR. DRUCKER: Good evening. Thanks for 2
5                  THE OPERATOR: Mr. Drucker, I have to join 6 you to the main conference.               Im sorry.       One moment.
coming out tonight. Im David Drucker with the U.S.
7                  MR. DRUCKER:         Sure.
3 Nuclear Regulatory Commission, and Im --
8                  THE OPERATOR:         Welcome, and thank you for 9 standing by.         At this time, all participants are on 10 listening mode. During our Q&A session, you may press 11 *1 on your touch tone phone if you would like to ask 12 a question. Todays conference is being recorded. If 13 you have any objections, you may disconnect at this 14 time.       Now Id like to turn the meeting over to Mr.
4 THE OPERATOR: Mr. Drucker, I have to join 5
15 David Drucker, so you may begin.
you to the main conference. Im sorry. One moment.
16                   MR. DRUCKER:         Thank you, India.           This is 17 David       Drucker.     Im   work     for     Nuclear   Regulatory 18 Commission.         Im     the     project         manager   for         the 19 environmental review of the LaSalle County Station 20 license renewal application.                 Hereafter, I will refer 21 to the Nuclear Regulatory Commission as the NRC.
6 MR. DRUCKER: Sure.
22                  There are two primary purposes for this 23 meeting. The first purpose is to discuss the contents 24 of this document that Im holding up, the draft 25 supplemental         environmental         impact       statement       for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 THE OPERATOR: Welcome, and thank you for 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
standing by. At this time, all participants are on 9
listening mode. During our Q&A session, you may press 10
*1 on your touch tone phone if you would like to ask 11 a question. Todays conference is being recorded. If 12 you have any objections, you may disconnect at this 13 time. Now Id like to turn the meeting over to Mr.
14 David Drucker, so you may begin.
15 16 17 18 19 20 MR. DRUCKER: Thank you, India. This is David Drucker. Im work for Nuclear Regulatory Commission.
Im the project manager for the environmental review of the LaSalle County Station license renewal application. Hereafter, I will refer to the Nuclear Regulatory Commission as the NRC.
21 There are two primary purposes for this 22 meeting. The first purpose is to discuss the contents 23 of this document that Im holding up, the draft 24 supplemental environmental impact statement for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


3 1 license renewal of LaSalle County Station. Hereafter, 2 I will refer to this document as the draft SEIS. SEIS 3 stands         for   Supplemental           Environmental           Impact 4 Statement.
3 license renewal of LaSalle County Station. Hereafter, 1
5                    The second purpose of this meeting is to 6 obtain comments on the draft SEIS.                       This meeting is 7 available by teleconference and, India, I just want to 8 make sure.         Can you ask the folks on the line, or 9 actually, folks on the line, can you hear me? Because 10 Im speaking at a distance from the speakerphone.
I will refer to this document as the draft SEIS. SEIS 2
11                    THE OPERATOR:         Everyone, your lines are 12 now open, and you can respond.
stands for Supplemental Environmental Impact 3
13                   MR. MAHERAS:         David,       this   is   Steve 14 Maheras, and I can hear you just fine.
Statement.
15                   MR. DRUCKER:         Okay.       Good, if one person 16 can     hear   me,   the     rest     of   you       all   can   hear       me.
4 The second purpose of this meeting is to 5
17 Before going further, I want to introduce NRC staff 18 here tonight.           Stu Sheldon is an NRC Region III 19 license renewal inspector, and Robert Ruiz is the 20 senior resident at the plant.
obtain comments on the draft SEIS. This meeting is 6
21                   Id also like to point out that on the 22 phone we have or will have a few NRC staff folks.                             My 23 supervisor,         Jim     Danna       is     the       chief   of       the 24 environmental review and project management branch.
available by teleconference and, India, I just want to 7
25 Michele Moser is the technical reviewer for aquatic NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
make sure. Can you ask the folks on the line, or 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
actually, folks on the line, can you hear me? Because 9
Im speaking at a distance from the speakerphone.
10 THE OPERATOR: Everyone, your lines are 11 now open, and you can respond.
12 13 MR. MAHERAS: David, this is Steve Maheras, and I can hear you just fine.
14 15 16 17 18 19 MR. DRUCKER: Okay. Good, if one person can hear me, the rest of you all can hear me.
Before going further, I want to introduce NRC staff here tonight. Stu Sheldon is an NRC Region III license renewal inspector, and Robert Ruiz is the senior resident at the plant.
20 21 22 23 24 Id also like to point out that on the phone we have or will have a few NRC staff folks. My supervisor, Jim Danna is the chief of the environmental review and project management branch.
Michele Moser is the technical reviewer for aquatic 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


4 1 resources.
4 resources.
2             Kevin   Folk   is   the     technical       reviewer       for 3 service water resources.               Bill Ford is the technical 4 reviewer for ground water.               And you hear earlier Steve 5 Maharris       is   the   consultant       from     Pacific Northwest 6 Laboratories for the high burn-up fuel section.
1 2
7                    Next, Id like to cover a few details 8 about this meeting.               Exelon applied to the NRC to 9 renew       the   operating     licenses       for   LaSalle   County 10 Station units one and two for an additional 20 years.
3 4
11 The NRC is reviewing that application, and will use 12 the results of that review to decide whether to renew 13 the licenses.
5 Kevin Folk is the technical reviewer for service water resources. Bill Ford is the technical reviewer for ground water. And you hear earlier Steve Maharris is the consultant from Pacific Northwest Laboratories for the high burn-up fuel section.
14                    Tonight I will tell you the preliminary 15 results of the environmental review.                       These results 16 are documented in the draft SEIS. And I will also ask 17 for your comments on the draft SEIS.                         The meeting 18 tonight will, essentially, have four parts.                               The 19 introduction is the part that were doing now.
6 Next, Id like to cover a few details 7
20                   In the second part I will discuss the 21 review process and the preliminary findings of the 22 review. Copies of this presentation are on the table 23 by     the     door   and   Stu   Sheldon,         it   looks   like       he 24 handed out copies to everyone here.
about this meeting. Exelon applied to the NRC to 8
25                    The next portion will be an opportunity to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
renew the operating licenses for LaSalle County 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
Station units one and two for an additional 20 years.
10 The NRC is reviewing that application, and will use 11 the results of that review to decide whether to renew 12 the licenses.
13 Tonight I will tell you the preliminary 14 results of the environmental review. These results 15 are documented in the draft SEIS. And I will also ask 16 for your comments on the draft SEIS. The meeting 17 tonight will, essentially, have four parts. The 18 introduction is the part that were doing now.
19 20 21 22 23 In the second part I will discuss the review process and the preliminary findings of the review. Copies of this presentation are on the table by the door and Stu Sheldon, it looks like he handed out copies to everyone here.
24 The next portion will be an opportunity to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


5 1 ask questions about the material presented, and I will 2 answer those questions.               And finally, the NRC staff 3 will listen to your comments about the draft SEIS.
5 ask questions about the material presented, and I will 1
4 Note that the NRC will listen during this time.                         We 5 generally wont respond to what youre saying here in 6 the     meeting.     Instead,       we   will     prepare written 7 responses to your comments that will be published as 8 a part of the final SEIS.
answer those questions. And finally, the NRC staff 2
9                  Please note that this meeting is being 10 recorded,; a transcribers sitting right up here in 11 front.         And hes doing that to produce a written 12 record of whats said at this meeting.                   In order for 13 the transcript to be accurate, please comply with the 14 following.
will listen to your comments about the draft SEIS.
15                  First, please silence your phones and any 16 other personal electronics you have with you.                   If you 17 must accept a call during this meeting, please step 18 outside       into   the     lobby     so     the   other meeting 19 participants can hear the proceedings and so your 20 phone ringing, nor your conversation is recorded.
3 Note that the NRC will listen during this time. We 4
21                  When you speak, please use a microphone.
generally wont respond to what youre saying here in 5
22 And Ill bring it around for the question and answer 23 period to you guys.             Thats how we will ensure that 24 what you say is recorded.               When you speak, identify 25 who you are and, if you represent a group, what group NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
the meeting. Instead, we will prepare written 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
responses to your comments that will be published as 7
a part of the final SEIS.
8 Please note that this meeting is being 9
recorded,; a transcribers sitting right up here in 10 front. And hes doing that to produce a written 11 record of whats said at this meeting. In order for 12 the transcript to be accurate, please comply with the 13 following.
14 First, please silence your phones and any 15 other personal electronics you have with you. If you 16 must accept a call during this meeting, please step 17 outside into the lobby so the other meeting 18 participants can hear the proceedings and so your 19 phone ringing, nor your conversation is recorded.
20 When you speak, please use a microphone.
21 And Ill bring it around for the question and answer 22 period to you guys. Thats how we will ensure that 23 what you say is recorded. When you speak, identify 24 who you are and, if you represent a group, what group 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


6 1 you represent.     Also, if you have an uncommon name or 2 if your name has an unusual spelling, please spell 3 your name.     And to ensure the recording is clear, 4 please dont hold side conversations, and do not 5 interrupt the speaker.           Thank you.
6 you represent. Also, if you have an uncommon name or 1
6               When you signed in tonight, you may have 7 noted yellow cards, like the one Im holding up, on 8 the table.     Several of you have already filled them 9 out, and thats to be a speaker.                   So if you want to 10 speak, let me know.             Ill bring a card around to 11 you, and you can fill that out now.
if your name has an unusual spelling, please spell 2
12                When we get to the public comment portion 13 of this evening, I will give each public commenter 14 three minutes to speak.             And then, after everyones 15 had a chance to speak, we can, if you havent finished 16 your comments, you can certainly have more time.                       So 17 far I only have four folks who are signed up to speak.
your name. And to ensure the recording is clear, 3
18 19               Also on the table outside is a stack of 20 public meeting feedback forms.                 Please fill one out 21 and provide it to me or leave it on the table, or you 22 can drop it in the mail; its postage free.                           Your 23 assessment     of   this     meeting         tonight   will       help 24 improve future meetings.
please dont hold side conversations, and do not 4
25                And finally, for those who dont know, the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
interrupt the speaker. Thank you.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
5 6
7 8
9 10 When you signed in tonight, you may have noted yellow cards, like the one Im holding up, on the table. Several of you have already filled them out, and thats to be a speaker. So if you want to speak, let me know. Ill bring a card around to you, and you can fill that out now.
11 When we get to the public comment portion 12 of this evening, I will give each public commenter 13 three minutes to speak. And then, after everyones 14 had a chance to speak, we can, if you havent finished 15 your comments, you can certainly have more time. So 16 far I only have four folks who are signed up to speak.
17 18 19 20 21 22 23 Also on the table outside is a stack of public meeting feedback forms. Please fill one out and provide it to me or leave it on the table, or you can drop it in the mail; its postage free. Your assessment of this meeting tonight will help improve future meetings.
24 And finally, for those who dont know, the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


7 1 restrooms are out the hallway to the left.                     Emergency 2 exit is out the hallway to the right. And security is 3 located at the LaSalle County Sheriffs Office.                         Its 4 just       across   the   parking       lot,     if   we should     need 5 security.
7 restrooms are out the hallway to the left. Emergency 1
6                   Okay, do you have any questions on this 7 brief introduction before I go any further, and start 8 discussing         the   environmental             review?         No - ok 9 then.
exit is out the hallway to the right. And security is 2
10                   Im   going       to     start       discussing         the 11 environmental review and preliminary results from the 12 draft SEIS.       First, I would like to emphasize that the 13 environmental review is not yet complete.                     I hope the 14 information provided in this presentation will help 15 you understand what weve done so far, and the role 16 you can play in helping to make sure that the final 17 environmental         impact     statement           is   accurate       and 18 complete.
located at the LaSalle County Sheriffs Office. Its 3
19                  Id like to start off by briefly going 20 over the agenda for this portion of my speech.                       First 21 of all, Ill comment on the NRCs regulatory role, 22 then Ill provide the preliminary findings of our 23 environmental review, and then I will present the 24 current       schedule       for     the       remainder     of       the 25 environmental review, and tell you how you can submit NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
just across the parking lot, if we should need 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
security.
5 6
7 8
Okay, do you have any questions on this brief introduction before I go any further, and start discussing the environmental review?
No - ok then.
9 10 11 12 13 14 15 16 17 Im going to start discussing the environmental review and preliminary results from the draft SEIS. First, I would like to emphasize that the environmental review is not yet complete. I hope the information provided in this presentation will help you understand what weve done so far, and the role you can play in helping to make sure that the final environmental impact statement is accurate and complete.
18 Id like to start off by briefly going 19 over the agenda for this portion of my speech. First 20 of all, Ill comment on the NRCs regulatory role, 21 then Ill provide the preliminary findings of our 22 environmental review, and then I will present the 23 current schedule for the remainder of the 24 environmental review, and tell you how you can submit 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


8 1 comments outside of this meeting.
8 comments outside of this meeting.
2                    At the end of the presentation, there will 3 be time for questions and answers on the comments of 4 my briefing and, most importantly, time for you to 5 present your comments on the draft SEIS.
1 At the end of the presentation, there will 2
6                    The   NRC     was     established       to regulate 7 civilian         use   of     nuclear       materials,     including 8 facilities producing electric power. The NRC conducts 9 license renewal reviews for plants whose owners wish 10 to operate them beyond their initial license period.
be time for questions and answers on the comments of 3
11 12                    NRC license renewal reviews address safety 13 issues related to managing the affects of aging and 14 environmental issues related to an additional 20 years 15 of operation.         In all aspects of the NRC regulation, 16 our     mission     is   three-fold.             To   ensure adequate 17 protection of the public health and safety, to promote 18 common         defense   and     security,       and   to protect     the 19 environment.
my briefing and, most importantly, time for you to 4
20                   Our   environmental           review   looks   at     the 21 potential site-specific impacts of license renewal of 22 the     LaSalle     County     Stations       Units   1 and   2.         A 23 generic         environmental       impact       statement,   or   GEIS, 24 examines the possible environmental impacts that could 25 occur as a result of renewing licenses of individual NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
present your comments on the draft SEIS.
(202) 234-4433             WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 The NRC was established to regulate 6
civilian use of nuclear materials, including 7
facilities producing electric power. The NRC conducts 8
license renewal reviews for plants whose owners wish 9
to operate them beyond their initial license period.
10 11 NRC license renewal reviews address safety 12 issues related to managing the affects of aging and 13 environmental issues related to an additional 20 years 14 of operation. In all aspects of the NRC regulation, 15 our mission is three-fold. To ensure adequate 16 protection of the public health and safety, to promote 17 common defense and security, and to protect the 18 environment.
19 20 21 22 23 24 Our environmental review looks at the potential site-specific impacts of license renewal of the LaSalle County Stations Units 1 and 2. A generic environmental impact statement, or GEIS, examines the possible environmental impacts that could occur as a result of renewing licenses of individual 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


9 1 nuclear power plants.
9 nuclear power plants.
2                     The           GEIS               describes             the 3 significance of these potential impacts. The analysis 4 in the GEIS pertains to operating power reactors. For 5 each       type     or   environmental             impact,   the     GEIS 6 establishes generic findings, covering as many plants 7 as possible.
1 2
8                     For some environmental issues, the GEIS 9 found that a generic evaluation was not sufficient, 10 and that a plant-specific analysis was required.                             The 11 2013       revision     to   the   GEIS     is     sitting here on the 12 table; these three volumes.                   The GEIS was originally 13 done in 1996.             It contains more information than 14 these three volumes, and there was an addendum in 15 1999.
3 4
16                     This   gives     you   an     idea   of the   effort 17 that       went   in   to   looking     at     nuclear     power   plants 18 across         the     country,           and       determining         which 19 impacts,           environmental impacts, were generic, and 20 which require site-specific analysis.
5 6
21                    The site-specific findings for the LaSalle 22 County         Station   are     contained         in   the draft     SEIS 23 published in February, 2016.                   This document contains 24 analyses of all possible site-specific issues, as well 25 as     a   review   of   issues       covered       by the GEIS,       to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The GEIS describes the significance of these potential impacts. The analysis in the GEIS pertains to operating power reactors. For each type or environmental
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
: impact, the GEIS establishes generic findings, covering as many plants as possible.
7 8
9 10 11 12 13 For some environmental issues, the GEIS found that a generic evaluation was not sufficient, and that a plant-specific analysis was required. The 2013 revision to the GEIS is sitting here on the table; these three volumes. The GEIS was originally done in 1996. It contains more information than these three volumes, and there was an addendum in 14 1999.
15 16 17 18 19 This gives you an idea of the effort that went in to looking at nuclear power plants across the
: country, and determining which
: impacts, environmental impacts, were generic, and which require site-specific analysis.
20 The site-specific findings for the LaSalle 21 County Station are contained in the draft SEIS 22 published in February, 2016. This document contains 23 analyses of all possible site-specific issues, as well 24 as a review of issues covered by the GEIS, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


10 1 determine whether the conclusions in the GEIS are valid 2 for LaSalle County Station.
1 10 determine whether the conclusions in the GEIS are valid for LaSalle County Station.
3                     In   this     process,       the     NRC staff     also 4 reviews         environmental         impacts         of   potential     power 5 generation alternatives to license renewal.
2 3
6                    Finally,       I   want     to     mention   that       on 7 March 10th of last year, March 10th of last year, 8 I     was     here   conducting         the     environmental       scoping 9 meetings.           During     those     meetings       and the   scoping 10 period,         the   NRC     collected       comments     that   informed 11 the       scope     of   the     environmental         review.         Those 12 comments, and the NRC responses to those comments, 13 are found in the scoping summary report.
4 5
14                     Hard copies and CDs of the scoping summary 15 report are available on the table by the door.                             And 16 also, that same CD that has the scoping summary report 17 contains a copy of the draft SEIS.                         Please feel free 18 to take a copy of the CD.
6 7
19                     For each environmental issue identified an 20 impact level is assigned.                       The NRCs standard of 21 significance for impacts was established using the 22 White         House     counsel       on     environmental         quality 23 terminology for significant.                       The NRC established 24 three levels of significance for potential impacts, 25 small, moderate and large, as defined on the slide.
In this process, the NRC staff also reviews environmental impacts of potential power generation alternatives to license renewal.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Finally, I want to mention that on March 10th of last year, March 10th of last year, I was here conducting the environmental scoping meetings.
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 9
10 11 12 During those meetings and the scoping period, the NRC collected comments that informed the scope of the environmental review. Those comments, and the NRC responses to those comments, are found in the scoping summary report.
13 14 15 16 17 Hard copies and CDs of the scoping summary report are available on the table by the door. And also, that same CD that has the scoping summary report contains a copy of the draft SEIS. Please feel free to take a copy of the CD.
18 19 20 21 22 23 24 For each environmental issue identified an impact level is assigned. The NRCs standard of significance for impacts was established using the White House counsel on environmental quality terminology for significant. The NRC established three levels of significance for potential impacts, small, moderate and large, as defined on the slide.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


11 1                For a small impact, the effects are not 2 detectible or are so minor that they will neither 3 destabilize       nor     noticeable       alter     any important 4 attribute of the resource. For a moderate impact, the 5 effects are sufficient to alter noticeably, but not 6 destabilize important attributes of the resource. And 7 for a large impact, the effects are clearly noticeable 8 and       are sufficient       to     destabilize         important 9 attributes of the resource.
11 For a small impact, the effects are not 1
10                While these impact level designations are 11 used for most of the resource areas that we looked at 12 in the draft SEIS, there are three areas that have 13 their own impact level designations.                   And these are 14 discussed on the next slide.
detectible or are so minor that they will neither 2
15                So for special status species, the impact 16 significance determination language comes from the 17 Endangered Species Act.             And choices to describe the 18 impacts are no effect, may affect but not likely to 19 adversely affect, and may affect and is likely to 20 adversely affect.
destabilize nor noticeable alter any important 3
21                For cultural and historic resources, the 22 National Historic Preservation Act requires Federal 23 agencies to consider the effects of their undertakings 24 on     historic   properties.           And     for environmental 25 justice, under Executive Order 12898, Federal agencies NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
attribute of the resource. For a moderate impact, the 4
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
effects are sufficient to alter noticeably, but not 5
destabilize important attributes of the resource. And 6
for a large impact, the effects are clearly noticeable 7
and are sufficient to destabilize important 8
attributes of the resource.
9 While these impact level designations are 10 used for most of the resource areas that we looked at 11 in the draft SEIS, there are three areas that have 12 their own impact level designations. And these are 13 discussed on the next slide.
14 So for special status species, the impact 15 significance determination language comes from the 16 Endangered Species Act. And choices to describe the 17 impacts are no effect, may affect but not likely to 18 adversely affect, and may affect and is likely to 19 adversely affect.
20 For cultural and historic resources, the 21 National Historic Preservation Act requires Federal 22 agencies to consider the effects of their undertakings 23 on historic properties. And for environmental 24 justice, under Executive Order 12898, Federal agencies 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


12 1 are       responsible       for   identifying         and   addressing 2 disproportionately high and adverse human health and 3 environmental         impacts     on     minority       and low-income 4 populations.
12 are responsible for identifying and addressing 1
5                    This   slide     lists     the     issues the     NRC 6 reviewed for the continued operation of the LaSalle 7 County Station during the proposed license renewal 8 period.         So in this one slide, this is basically a 9 very quick summary of what you would find in that 10 larger document, the draft SEIS.
disproportionately high and adverse human health and 2
11                    For all issues, except aquatic resources, 12 the impacts of license renewal were found to be small, 13 which means the effects are not detectible, or are so 14 minor         that   they     will     neither       destabilize       nor 15 noticeably         alter   any   important         attribute   of     the 16 resource.
environmental impacts on minority and low-income 3
17                    Thermal impacts would be small for aquatic 18 resources in the Illinois River, and small for aquatic 19 resources in the cooling pond, except for gizzard and 20 threadfin shad.           Gizzard and threadfin shad would 21 experience moderate thermal impacts in the cooling 22 pond.
populations.
23                    The NRC staff also considered cumulative 24 impacts.         Cumulative impacts are the effects on the 25 environment from other past, present and reasonably NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
4 This slide lists the issues the NRC 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
reviewed for the continued operation of the LaSalle 6
County Station during the proposed license renewal 7
period. So in this one slide, this is basically a 8
very quick summary of what you would find in that 9
larger document, the draft SEIS.
10 For all issues, except aquatic resources, 11 the impacts of license renewal were found to be small, 12 which means the effects are not detectible, or are so 13 minor that they will neither destabilize nor 14 noticeably alter any important attribute of the 15 resource.
16 Thermal impacts would be small for aquatic 17 resources in the Illinois River, and small for aquatic 18 resources in the cooling pond, except for gizzard and 19 threadfin shad. Gizzard and threadfin shad would 20 experience moderate thermal impacts in the cooling 21 pond.
22 The NRC staff also considered cumulative 23 impacts. Cumulative impacts are the effects on the 24 environment from other past, present and reasonably 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


13 1 foreseeable future human actions, other than LaSalle 2 County         Station.     The     effects       not   only   included 3 operation of LaSalle County Station, but also impacts 4 unrelated to LaSalle, such as future urbanization, 5 other energy producing facilities in the area and 6 climate change.
13 foreseeable future human actions, other than LaSalle 1
7                    The analysis considers potential impacts 8 through the end of the current license term, as well 9 as the 20-year license renewal term.                       The NRC staff 10 determined         that most     cumulative           impacts would       be 11 small, and the analysis is provided in section 4.16 of 12 the draft SEIS.
County Station. The effects not only included 2
13                    The     National Environmental Policy Act 14 mandates that each environmental impact statement 15 consider alternatives to any proposed major Federal 16 action.         A major step for determining whether license 17 renewal is reasonable or not is comparing the likely 18 impacts of continued operation of a nuclear plant with 19 the likely impacts of alternatives means of power 20 generation.
operation of LaSalle County Station, but also impacts 3
21                    Alternatives must provide an option that 22 allows for power generation capability beyond the term 23 of the current nuclear power plant operating license 24 to meet future system generation needs.                     In the draft 25 SEIS, NRC staff initially considered 17 different NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
unrelated to LaSalle, such as future urbanization, 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
other energy producing facilities in the area and 5
climate change.
6 The analysis considers potential impacts 7
through the end of the current license term, as well 8
as the 20-year license renewal term. The NRC staff 9
determined that most cumulative impacts would be 10 small, and the analysis is provided in section 4.16 of 11 the draft SEIS.
12 The National Environmental Policy Act 13 mandates that each environmental impact statement 14 consider alternatives to any proposed major Federal 15 action. A major step for determining whether license 16 renewal is reasonable or not is comparing the likely 17 impacts of continued operation of a nuclear plant with 18 the likely impacts of alternatives means of power 19 generation.
20 Alternatives must provide an option that 21 allows for power generation capability beyond the term 22 of the current nuclear power plant operating license 23 to meet future system generation needs. In the draft 24 SEIS, NRC staff initially considered 17 different 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


14 1 alternatives, and then we narrowed those 17 down to 2 five, and looked at those five in detail.
14 alternatives, and then we narrowed those 17 down to 1
3                Additionally, the NRC staff considered 4 what would happen if no action is taken and LaSalle 5 shuts down at the end of its current licenses without 6 a specific replacement alternative.                 This alternative 7 would not provide power generation capacity nor would 8 it meet the needs currently met by LaSalle.
five, and looked at those five in detail.
9                The NRCs preliminary conclusion is that 10 the environmental impacts of renewal of the operating 11 licenses for LaSalle would be smaller than those 12 feasible       and   commercially         viable     alternatives.
2 Additionally, the NRC staff considered 3
13 Continued operation would have smaller environmental 14 impacts in almost all areas. The staff concluded that 15 continued operation of the existing LaSalle County 16 Station is the environmentally preferred alternative.
what would happen if no action is taken and LaSalle 4
17 18                Based on review of likely environmental 19 impacts from license renewal, as well as potential 20 environmental     impacts     of     alternatives     to   license 21 renewal, the NRC staffs preliminary recommendation in 22 the draft SEIS is that the adverse environmental 23 impacts of license renewal for LaSalle County Station 24 are not great enough to deny the option of license 25 renewal for energy planning decision makers. And that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
shuts down at the end of its current licenses without 5
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
a specific replacement alternative. This alternative 6
would not provide power generation capacity nor would 7
it meet the needs currently met by LaSalle.
8 The NRCs preliminary conclusion is that 9
the environmental impacts of renewal of the operating 10 licenses for LaSalle would be smaller than those 11 feasible and commercially viable alternatives.
12 Continued operation would have smaller environmental 13 impacts in almost all areas. The staff concluded that 14 continued operation of the existing LaSalle County 15 Station is the environmentally preferred alternative.
16 17 Based on review of likely environmental 18 impacts from license renewal, as well as potential 19 environmental impacts of alternatives to license 20 renewal, the NRC staffs preliminary recommendation in 21 the draft SEIS is that the adverse environmental 22 impacts of license renewal for LaSalle County Station 23 are not great enough to deny the option of license 24 renewal for energy planning decision makers. And that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


15 1 preliminary conclusion shows up several places in the 2 draft       SEIS,   but   chapter       five     is   the conclusion 3 chapter.
15 preliminary conclusion shows up several places in the 1
4                    I would like to re-emphasize that the 5 environmental         review     is   not   yet     complete.       Your 6 comments tonight, and all written comments received by 7 the end of the comment period on April 4th, will be 8 considered by the NRC staff as we develop the final 9 SEIS, which we currently plan to issue in August of 10 2016.
draft SEIS, but chapter five is the conclusion 2
11                    Those comments that are within the scope 12 of     the     environmental       review     and     provide new     and 13 significant information can help change the staffs 14 findings.         The final SEIS will contain the staffs 15 final recommendation on the acceptability of license 16 renewal based on the work weve already performed and 17 any new and significant information we receive in the 18 form of comments during the comment period.                       I just 19 want to emphasize that the comment period closes on 20 April 4th, the second to the last line here on this 21 slide.
chapter.
22                   As   many     of     you       know,   I   am       the 23 primary         contact     for     the     environmental       review, 24 and       Jeff   Mitchell is the primary contact for the 25 safety review, and our information is on the handouts that I provided NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 I would like to re-emphasize that the 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
environmental review is not yet complete. Your 5
comments tonight, and all written comments received by 6
the end of the comment period on April 4th, will be 7
considered by the NRC staff as we develop the final 8
SEIS, which we currently plan to issue in August of 9
2016.
10 Those comments that are within the scope 11 of the environmental review and provide new and 12 significant information can help change the staffs 13 findings. The final SEIS will contain the staffs 14 final recommendation on the acceptability of license 15 renewal based on the work weve already performed and 16 any new and significant information we receive in the 17 form of comments during the comment period. I just 18 want to emphasize that the comment period closes on 19 April 4th, the second to the last line here on this 20 slide.
21 22 23 24 As many of you
: know, I
am the primary contact for the environmental
: review, and Jeff Mitchell is the primary contact for the safety review, and our information is on the handouts that I provided 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


16 1 you tonight, our contact information.                   Copies of the 2 draft SEIS are available on CD on the table near the 3 door.       In addition, the library shown on this slide 4 has a copy available, current copy available for 5 review.
16 you tonight, our contact information. Copies of the 1
6                    You can also find electronic copies of the 7 draft SEIS, along with other information about the 8 LaSalle County Station license renewal review online 9 at     the     website   shown.         And     finally, additional 10 information can also be obtained by contacting the 11 representatives of NRCs Region III office of public 12 affairs, as shown on the slide.
draft SEIS are available on CD on the table near the 2
13                    NRC staff will address written comments in 14 the same way we address spoken comments received 15 today.         You can submit written comments either online 16 or     via     conventional     manner.           To submit   written 17 comments online, visit the website regulations.gov and 18 search for docket ID NRC-2014-0268.                       If you have 19 written comments today, you may give them to me or any 20 other member of the NRC staff.
door. In addition, the library shown on this slide 3
21                    Please note that if you provide verbal 22 comments tonight, you dont need to submit them in 23 writing since your verbal comments are part of the 24 transcribed record, and they will be responded to. So 25 this concludes my formal presentation.
has a copy available, current copy available for 4
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
review.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 You can also find electronic copies of the 6
draft SEIS, along with other information about the 7
LaSalle County Station license renewal review online 8
at the website shown. And finally, additional 9
information can also be obtained by contacting the 10 representatives of NRCs Region III office of public 11 affairs, as shown on the slide.
12 NRC staff will address written comments in 13 the same way we address spoken comments received 14 today. You can submit written comments either online 15 or via conventional manner. To submit written 16 comments online, visit the website regulations.gov and 17 search for docket ID NRC-2014-0268. If you have 18 written comments today, you may give them to me or any 19 other member of the NRC staff.
20 Please note that if you provide verbal 21 comments tonight, you dont need to submit them in 22 writing since your verbal comments are part of the 23 transcribed record, and they will be responded to. So 24 this concludes my formal presentation.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


17 1                   So now we enter the question and answer 2 portion of our meeting.                   This portion is distinct 3 from       the   comment     portion.           I   will   now   answer 4 questions specific to the material that I presented 5 here       tonight.     I'd     like     to     begin   with questions 6 those on the phone.             Operator?
17 1
7                    THE OPERATOR:         Yes.
2 3
8                    MR. DRUCKER:         If theres anyone on the 9 phone       that   has   questions       about     the   material       I 10 presented, can you please go ahead and let them ask 11 their questions one at a time, and Ill do my best to 12 answer them.
4 5
13                    THE OPERATOR:         Certainly.       If you would 14 like to as a question on the phone line, please press 15 *1 and record your name when prompted.                       Please make 16 sure your phone is not muted when you record your 17 name.         Once again, thats *1 and record your name.
So now we enter the question and answer portion of our meeting. This portion is distinct from the comment portion. I will now answer questions specific to the material that I presented here tonight. I'd like to begin with questions those on the phone. Operator?
18 One moment for our first question.                     And no questions 19 have come in.
6 THE OPERATOR: Yes.
20                   MR. DRUCKER:         Okay Operator, thank you.
7 MR. DRUCKER: If theres anyone on the 8
21 Most of the folks here in the room have been a part of 22 the license renewal process.                   Theyre familiar with 23 the scoping process we did last year.                     But I just want 24 to emphasize, for anyone whos listening, that you 25 know, this is not a hearing.                   This is a public NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
phone that has questions about the material I 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
presented, can you please go ahead and let them ask 10 their questions one at a time, and Ill do my best to 11 answer them.
12 THE OPERATOR: Certainly. If you would 13 like to as a question on the phone line, please press 14
*1 and record your name when prompted. Please make 15 sure your phone is not muted when you record your 16 name. Once again, thats *1 and record your name.
17 One moment for our first question. And no questions 18 have come in.
19 20 21 22 23 24 MR. DRUCKER: Okay Operator, thank you.
Most of the folks here in the room have been a part of the license renewal process. Theyre familiar with the scoping process we did last year. But I just want to emphasize, for anyone whos listening, that you know, this is not a hearing. This is a public 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


18 1 meeting.
18 meeting.
2                   And the goal of this meeting is two-way 3 communication; for me to provide information about the 4 environmental impact statement that weve been working 5 on and have developed, and then to receive comment on 6 that document.         So I am looking for questions on the 7 material I presented.
1 2
8                  With that, Im going to go to questions.
3 4
9 Does anyone have any questions about the material I 10 presented       here   in     the   room?         If there   are     no 11 questions, I just want to --
5 6
12                   MS. SNYDER:       I have a question.
And the goal of this meeting is two-way communication; for me to provide information about the environmental impact statement that weve been working on and have developed, and then to receive comment on that document. So I am looking for questions on the material I presented.
13                  MR. DRUCKER:         Gail, go ahead.
7 With that, Im going to go to questions.
14                  MS. SNYDER: My first question is you said 15 this is a public meeting.                 Theres not really many 16 members of the public here, so Im just wondering what 17 does the NRC do to promote this?                     I find it hard to 18 believe in an area where theres thousands of people 19 who could be impacted by this decision that nobodys 20 shown       up, no   elected       officials,         unless   theres 21 something       here   I   dont     know       about.     Im     just 22  wondering, you know, why theres such a poor turnout.
8 Does anyone have any questions about the material I 9
23                    MR. DRUCKER:         Good question.       Certainly, 24 certainly, let me answer that first; your first part 25 of the question was how do we advertise, basically, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
presented here in the room? If there are no 10 questions, I just want to --
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
11 12 13 MS. SNYDER: I have a question.
MR. DRUCKER: Gail, go ahead.
MS. SNYDER: My first question is you said 14 15 16 17 18 19 20 21 22 23 24 this is a public meeting. Theres not really many members of the public here, so Im just wondering what does the NRC do to promote this? I find it hard to believe in an area where theres thousands of people who could be impacted by this decision that nobodys shown up, no elected officials, unless theres something here I dont know about. Im just wondering, you know, why theres such a poor turnout.
MR. DRUCKER: Good question. Certainly, certainly, let me answer that first; your first part of the question was how do we advertise, basically, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


19 1 this public.           This meeting is advertised through many 2 means.         The first place that its advertised is we put 3 out       a     Federal     Register       notice,       the   NRC     does, 4 announcing the meeting.
1 2
5                     And   then     the     Environmental       Protection 6 Agency,         it publishes         a   Federal       Register       notice 7 that       announces the release of the draft SEIS, and 8 then       how   to   contact       me   if   youre       interested         in 9 learning more about that.                     So theres two Federal 10 Register notices that go out.
3 19 this public. This meeting is advertised through many means. The first place that its advertised is we put out a Federal Register notice, the NRC does, announcing the meeting.
11                    The     Nuclear         Regulatory         Commissions 12 website also has actually several places where we talk 13 about the meeting.             We have a public meeting web page 14 that speaks to all the meetings that we have. We have 15 a license renewal web page that talks about this 16 meeting.         Theres also the regular LaSalle operating 17 license web page, which also points to my license 18 renewal web page.             So theres those web pages.
4 5
19                     We   also     have     advertisements       in     local 20 newspapers.           I   can     get   those       for you   if   youre 21 interested.             But   we   did     advertise       in the     local 22 newspapers, announcing this meeting.                       I also reached 23 out to everyone who attended the scoping meetings last 24 year through e-mail and or letter.
6 7
25                    I either sent them a hard copy of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 9
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
And then the Environmental Protection Agency, it publishes a Federal Register notice that announces the release of the draft SEIS, and then how to contact me if youre interested in learning more about that. So theres two Federal Register notices that go out.
10 The Nuclear Regulatory Commissions 11 website also has actually several places where we talk 12 about the meeting. We have a public meeting web page 13 that speaks to all the meetings that we have. We have 14 a license renewal web page that talks about this 15 meeting. Theres also the regular LaSalle operating 16 license web page, which also points to my license 17 renewal web page. So theres those web pages.
18 19 20 21 22 23 We also have advertisements in local newspapers. I can get those for you if youre interested. But we did advertise in the local newspapers, announcing this meeting. I also reached out to everyone who attended the scoping meetings last year through e-mail and or letter.
24 I either sent them a hard copy of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


20 1 draft SEIS, along with a copy of the Federal Register 2 notice, which provided the information on when and 3 where this meeting would be held.                     Either hard copy, 4 or I provided them a CD of the draft SEIS.
20 draft SEIS, along with a copy of the Federal Register 1
5                    Off the top of my head, I actually used to 6 carry a list of all different ways that we advertised 7 the meetings; off the top of my head, thats how we do 8 it.       There were e-mails, too.               For example, e-mail 9 reminders I sent out to the EPA via Region V folks so 10 they may be on the phone tonight.
notice, which provided the information on when and 2
11                   So those are the basic ways.             If I missed 12 anything, and my boss is listening feel free to chime 13 in, Jim, and let me know what I missed.                     But those are 14 the major ways.             Oh, another way; the fliers.                     I 15 asked the resident inspector to post fliers locally 16 around.
where this meeting would be held. Either hard copy, 3
17                    Good question and, yeah, sometimes we get 18 a big turnout at these meetings, and sometimes we 19 dont.         Personally, I was at one down in Mississippi, 20 Grand Gulf.         There were a few flakes of snow, and the 21 Governor basically told everyone to stay in.                         And I 22 flew own with my boss at the time, and we had no 23 trouble.         There was no snow on the roads; didnt 24 understand what the problem was.                     But it was a local 25 thing.
or I provided them a CD of the draft SEIS.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
4 Off the top of my head, I actually used to 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
carry a list of all different ways that we advertised 6
the meetings; off the top of my head, thats how we do 7
it. There were e-mails, too. For example, e-mail 8
reminders I sent out to the EPA via Region V folks so 9
they may be on the phone tonight.
10 11 12 13 14 15 So those are the basic ways. If I missed anything, and my boss is listening feel free to chime in, Jim, and let me know what I missed. But those are the major ways. Oh, another way; the fliers. I asked the resident inspector to post fliers locally around.
16 Good question and, yeah, sometimes we get 17 a big turnout at these meetings, and sometimes we 18 dont. Personally, I was at one down in Mississippi, 19 Grand Gulf. There were a few flakes of snow, and the 20 Governor basically told everyone to stay in. And I 21 flew own with my boss at the time, and we had no 22 trouble. There was no snow on the roads; didnt 23 understand what the problem was. But it was a local 24 thing.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


21 1                I was paying attention to the news this 2 morning, and I heard the terrible, terrible news of 3 what was going on in Belgium, but I doubt that that 4 somehow would impact people showing up here.                 I did 5 read the local paper to see there were a couple other 6 meetings.
21 I was paying attention to the news this 1
7               There was a board of education meeting in 8 one of the schools, but I didnt think it would impact 9 attendance at this meeting.             And I did work with the 10 folks at the plant, and I worked with our resident 11 inspector trying to pick a night that wasnt busy with 12 other activities.       I do believe we have at least one 13 elected official here with us tonight.             Mr. Walsh?
morning, and I heard the terrible, terrible news of 2
14               MR. WALSH: Yes, Im a member of the 15 LaSalle County board.
what was going on in Belgium, but I doubt that that 3
16               MR. DRUCKER:         OK, thanks.
somehow would impact people showing up here. I did 4
17                MR. WALSH:         Chair of legislative 18 rules.
read the local paper to see there were a couple other 5
19               MR. DRUCKER:         Great.
meetings.
20                MR. WALSH:       County board member. MR.
6 7
21                DRUCKER:       Good question.       Any other 22 questions from folks in the room?
8 9
23                MS. SNYDER:       I have more questions.
10 11 12 There was a board of education meeting in one of the schools, but I didnt think it would impact attendance at this meeting. And I did work with the folks at the plant, and I worked with our resident inspector trying to pick a night that wasnt busy with other activities. I do believe we have at least one elected official here with us tonight. Mr. Walsh?
24                MR. DRUCKER:         Please.
13 14 MR. WALSH: Yes, Im a member of the LaSalle County board.
25                MS. SNYDER:         Slide number 10, which is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 16 MR. DRUCKER: OK, thanks.
(202) 234-4433       WASHINGTON, D.C. 20005-3701       (202) 234-4433
MR. WALSH: Chair of legislative 17 rules.
18 19 20 MR. DRUCKER: Great.
MR. WALSH: County board member. MR.
DRUCKER: Good question. Any other 21 questions from folks in the room?
22 MS. SNYDER: I have more questions.
23 MR. DRUCKER: Please.
24 MS. SNYDER: Slide number 10, which is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


22 1 titled environmental review of LaSalle County Station 2 has the resources areas and the impacts listed.                               On 3 the bottom it says waste management, and the impact is 4 small.         And Im just wondering can you define what 5 waste management is in this?
22 titled environmental review of LaSalle County Station 1
6                   MR. DRUCKER:             Yes,       thats     a     great 7 question.         The answer to your question is contained 8 in     the     draft   SEIS     that     we     are     discussing       this 9 evening.             And     theres         a     section       on     waste 10 management.         That section is located in Chapter 4.
has the resources areas and the impacts listed. On 2
11 Bear with me just for a moment, and I will flip to 12 it.       Its section 4. --
the bottom it says waste management, and the impact is 3
13                    MS. SNYDER:           Does it refer to nuclear 14 waste, or is it waste from the plant, other than?
small. And Im just wondering can you define what 4
15                   MR. DRUCKER:           Section 4.13 of the draft 16 SEIS       discusses,       the     spent     fuel       produced     by     the 17 plant, both onsite storage and offsite radiological 18 impacts.         This     section       also       discusses       low     level 19 waste storage and disposal, mixed waste storage, and 20 non-radioactive           waste     storage.             So   this     is     the 21 section that does cover the spent nuclear fuel.
waste management is in this?
22                   So theres a total of five issues that 23 are     looked     at   in     this     section.         In   a   different 24 section,         Section     4.15.1,       that       section     discusses 25 issues related to the uranium fuel cycle.                         But spent NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
5 6
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
7 8
9 10 11 MR.
DRUCKER:
: Yes, thats a
great question. The answer to your question is contained in the draft SEIS that we are discussing this evening.
And theres a
section on waste management. That section is located in Chapter 4.
Bear with me just for a moment, and I will flip to it. Its section 4. --
12 MS. SNYDER: Does it refer to nuclear 13 waste, or is it waste from the plant, other than?
14 15 16 17 18 19 20 MR. DRUCKER: Section 4.13 of the draft SEIS discusses, the spent fuel produced by the plant, both onsite storage and offsite radiological impacts.
This section also discusses low level waste storage and disposal, mixed waste storage, and non-radioactive waste storage. So this is the section that does cover the spent nuclear fuel.
21 22 23 24 So theres a total of five issues that are looked at in this section. In a different section, Section 4.15.1, that section discusses issues related to the uranium fuel cycle. But spent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


23 1 is at the plant is talked about in Section 4.13.
23 is at the plant is talked about in Section 4.13.
2                MS. SNYDER:       And when you say the impact 3 is small, do you mean that its small in comparison to 4 whats already there, or that 20 years of additional 5 waste will have a small impact?
1 MS. SNYDER: And when you say the impact 2
6                MR. DRUCKER:       Yeah, this is, this section 7 is talking to 20 years of additional operation.
is small, do you mean that its small in comparison to 3
8                MS. SNYDER:       The small impact.
whats already there, or that 20 years of additional 4
9                MR. DRUCKER:         Yes.
waste will have a small impact?
10                MS. SNYDER:       I have another question.
5 MR. DRUCKER: Yeah, this is, this section 6
11                MR. DRUCKER:         Please.
is talking to 20 years of additional operation.
12                MS. SNYDER:           I dont want to hog the 13 questions. Slide number 12, alternatives; and youre 14 talking about citing alternatives and the criteria 15 required to replace the energy.               If you nuclear plant 16 had shut down, you said something about what would 17 happen if the nuclear plant shut down, and you found 18 that there wouldnt be an alternative power source 19 that would replace that power.
7 MS. SNYDER: The small impact.
20                And I was just wondering if you had, or 21 the committee had, whoever drafted this, whatever 22 group drafted it had looked at the report from the 23 State of Illinois?       There were a number of agencies; 24 there was a bill, HR, a resolution, HR1146, which was 25 looking at nuclear power in the state.
8 MR. DRUCKER: Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MS. SNYDER: I have another question.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
10 MR. DRUCKER: Please.
11 MS. SNYDER: I dont want to hog the 12 questions. Slide number 12, alternatives; and youre 13 talking about citing alternatives and the criteria 14 required to replace the energy. If you nuclear plant 15 had shut down, you said something about what would 16 happen if the nuclear plant shut down, and you found 17 that there wouldnt be an alternative power source 18 that would replace that power.
19 And I was just wondering if you had, or 20 the committee had, whoever drafted this, whatever 21 group drafted it had looked at the report from the 22 State of Illinois? There were a number of agencies; 23 there was a bill, HR, a resolution, HR1146, which was 24 looking at nuclear power in the state.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


24 1                  And state agencies drafted a report, and 2 they came out with the opposite finding of what youre 3 saying.       So maybe we will e-mail that report to you.
24 And state agencies drafted a report, and 1
4 I think that would be informative to what their 5 position is, is not the same as your conclusion.
they came out with the opposite finding of what youre 2
6                  MR. DRUCKER:         OK, thank you.
saying. So maybe we will e-mail that report to you.
7                  MS. SNYDER:       And thats a state study by 8 state agencies.
3 I think that would be informative to what their 4
9                  MR. DRUCKER:         All right.     I appreciate 10 that very much.         Thanks, Gail.         Okay, if there are no 11 other questions, then were going to move right along 12 to the comment portion of tonights meeting.                   And as 13 I stated at the beginning, primarily the NRC staff 14 will be listening, and we will respond to any comments 15 in written form in the final SEIS.
position is, is not the same as your conclusion.
16                  So let me go to the operator.             India, is 17 there anyone on the phone that wants to provide a 18 comment?
5 MR. DRUCKER: OK, thank you.
19                  THE OPERATOR:         If you do have comments, 20 please press *1 and record your name when prompted.
6 MS. SNYDER: And thats a state study by 7
21 Once again, thats *1 -- and no comments have come in 22 over the phone.
state agencies.
23                  MR. DRUCKER:       Thank you.     Thank you, very 24 much.
8 MR. DRUCKER: All right. I appreciate 9
25                  THE OPERATOR:         Youre welcome.
that very much. Thanks, Gail. Okay, if there are no 10 other questions, then were going to move right along 11 to the comment portion of tonights meeting. And as 12 I stated at the beginning, primarily the NRC staff 13 will be listening, and we will respond to any comments 14 in written form in the final SEIS.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 So let me go to the operator. India, is 16 there anyone on the phone that wants to provide a 17 comment?
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
18 THE OPERATOR: If you do have comments, 19 please press *1 and record your name when prompted.
20 Once again, thats *1 -- and no comments have come in 21 over the phone.
22 MR. DRUCKER: Thank you. Thank you, very 23 much.
24 THE OPERATOR: Youre welcome.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


25 1                   MR. DRUCKER:         Okay, I have yellow cards 2 from three, from four folks.                   Ill shuffle them and 3 pull       them out   randomly.           I     hope it   does       not 4 matter to any of you.             I would appreciate, would the 5 speakers come up to the front here, and you can use 6 this microphone. Gail, are you available first?
25 1
7                  MS. SNYDER:       Sure.
2 3
8                  MR. DRUCKER: And the next speaker will be 9 Doug OBrien, so Doug if you want to prepare yourself 10 and move up to the front to save some time.                   In fact, 11 theres only four of you.             Itll be Gail, Doug, Steve 12 and Tom.
4 5
13                  MS. SNYDER:         I dont know if this makes 14 your life easier.
MR. DRUCKER: Okay, I have yellow cards from three, from four folks. Ill shuffle them and pull them out randomly. I hope it does not matter to any of you. I would appreciate, would the speakers come up to the front here, and you can use this microphone. Gail, are you available first?
15                  AUDIENCE MEMBER:         Oh great, thank you.
6 MS. SNYDER: Sure.
16                  MS. SNYDER:         Good evening.         My name is 17 Gail Snyder, and Im here representing Nuclear Energy 18 Information Service.           I serve as the president of the 19 board.         Our comments tonight are really directed, 20 maybe, not specifically at environmental issues, but 21 the licensing renewal.
7 MR. DRUCKER: And the next speaker will be 8
22                  And one of our first comments is that the 23 analysis of socioeconomic impacts are incomplete.                         No 24 analysis of impacts for early or unexpected closures 25 were       considered   or   provided.           The   Exelon   safety NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Doug OBrien, so Doug if you want to prepare yourself 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
and move up to the front to save some time. In fact, 10 theres only four of you. Itll be Gail, Doug, Steve 11 and Tom.
12 MS. SNYDER: I dont know if this makes 13 your life easier.
14 AUDIENCE MEMBER: Oh great, thank you.
15 MS. SNYDER: Good evening. My name is 16 Gail Snyder, and Im here representing Nuclear Energy 17 Information Service. I serve as the president of the 18 board. Our comments tonight are really directed, 19 maybe, not specifically at environmental issues, but 20 the licensing renewal.
21 And one of our first comments is that the 22 analysis of socioeconomic impacts are incomplete. No 23 analysis of impacts for early or unexpected closures 24 were considered or provided. The Exelon safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


26 1 evaluation report documents a significant tax impact 2 for the presence of the LaSalle County Station, yet 3 only addresses the positive impacts.
26 evaluation report documents a significant tax impact 1
4                    No mention or analysis of negative impacts 5 resulting from a abrupt planned or unexpected early 6 closure         of   LaSalle     is   presented.           This     is     a 7 significant omission, particularly in light of Exelon 8 Corporations         threat     of     two   years     ago to     close 9 reactors in Illinois on economic grounds.
for the presence of the LaSalle County Station, yet 2
10                    According     to     the   Exelon     SER,   LaSalle 11 represents a sizeable portion of the county total tax 12 base.         It also accounts for large portions of the 13 school districts adjusted property tax levy.                         These 14 are       not     insignificant         amounts.         Their     abrupt 15 disappearance         would     wreak     economic       havoc   on     the 16 affected governmental and essential service entities 17 ability to operate, just as Exelons predecessor, 18 ComEd, did to the community of Zion in 1997, when they 19 unilaterally closed the Zion reactors.
only addresses the positive impacts.
20                    The   SER   either     fails     to recognize       or 21 mention at all some of the possible events that could 22 result         in such   a   closure       situation,     such     as     an 23 unexpected major accident resulting in immediate and, 24 presumably, premature closing, NRC-ordered shutdown, 25 Exelon unilateral decision to close the plant on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 No mention or analysis of negative impacts 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
resulting from a abrupt planned or unexpected early 5
closure of LaSalle is presented. This is a 6
significant omission, particularly in light of Exelon 7
Corporations threat of two years ago to close 8
reactors in Illinois on economic grounds.
9 According to the Exelon SER, LaSalle 10 represents a sizeable portion of the county total tax 11 base. It also accounts for large portions of the 12 school districts adjusted property tax levy. These 13 are not insignificant amounts.
Their abrupt 14 disappearance would wreak economic havoc on the 15 affected governmental and essential service entities 16 ability to operate, just as Exelons predecessor, 17 ComEd, did to the community of Zion in 1997, when they 18 unilaterally closed the Zion reactors.
19 The SER either fails to recognize or 20 mention at all some of the possible events that could 21 result in such a closure situation, such as an 22 unexpected major accident resulting in immediate and, 23 presumably, premature closing, NRC-ordered shutdown, 24 Exelon unilateral decision to close the plant on 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


27 1 economic       or   other     grounds,     as     it did   in   Zion, 2 resulting in an immediate loss of about 55 percent of 3 Zions tax base.
27 economic or other grounds, as it did in Zion, 1
4                  Devaluation through sale has occurred at 5 the Clinton Station, resulting in enormous loss of the 6 tax       base,   eventual     old     age,       license   expiration 7 closure, which is the outcome of -- and I would add, 8 in light of whats happening in Brussels today, and 9 the fact that theyve shut down their nuclear reactors 10 and     cant   provide     security,       terrorism     is   also       a 11 possible way that a nuclear reactor could shut down 12 unexpectedly.
resulting in an immediate loss of about 55 percent of 2
13                  Exelons being a business will certainly 14 make the calculations it made when it closed Zion and 15 decided that LaSalle should continue to operate.                           In 16 this omission, the SER makes the same mistake the U.S.
Zions tax base.
17 Government       made   when     it   invaded       Iraq. No     exit 18 strategy.           To     simply       assume       that   the     only 19 socioeconomic effects of LaSalles presence will be 20 positive ones is simply irrational.
3 Devaluation through sale has occurred at 4
21                  Our recommendation:               Planning for some 22 kind of eventual closure must be made long before it 23 happens to minimize economic and service disruptions 24 to the entities whose tax bases will be affected.
the Clinton Station, resulting in enormous loss of the 5
25 Debate about the license extension serves as a good NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
tax base, eventual old age, license expiration 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
closure, which is the outcome of -- and I would add, 7
in light of whats happening in Brussels today, and 8
the fact that theyve shut down their nuclear reactors 9
and cant provide security, terrorism is also a 10 possible way that a nuclear reactor could shut down 11 unexpectedly.
12 Exelons being a business will certainly 13 make the calculations it made when it closed Zion and 14 decided that LaSalle should continue to operate. In 15 this omission, the SER makes the same mistake the U.S.
16 Government made when it invaded Iraq. No exit 17 strategy.
To simply assume that the only 18 socioeconomic effects of LaSalles presence will be 19 positive ones is simply irrational.
20 Our recommendation: Planning for some 21 kind of eventual closure must be made long before it 22 happens to minimize economic and service disruptions 23 to the entities whose tax bases will be affected.
24 Debate about the license extension serves as a good 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


28 1 reminder of this fact, and an opportunity to take 2 action.
28 reminder of this fact, and an opportunity to take 1
3                  We recommend that dependent government and 4 tax entities begin formal negotiations with Exelon to 5 establish an escrow of mitigation funds based on some 6 mutually agreeable assessment and payment structure so 7 that       dependent   entities       will     have some   kind       of 8 temporary funds available to soften the economic blow 9 or     closure   and   not   radically         disrupt   essential 10 services.
action.
11                  Our second comment, which is shorter, is 12 the inadequate attention paid to water availability at 13 the LaSalle Nuclear Power Plant under potential future 14 climate disruption conditions. Historically, LaSalle 15 Nuclear Power Plant has been one of the Illinois 16 reactor sites most sensitive to water availability 17 under severe drought conditions; for example, 1998, 18 2005, 2006.
2 We recommend that dependent government and 3
19                  Its siting on a portion of the Illinois 20 River network that is shallower than other parts has 21 brought the reactors close to mandatory shutdowns to 22 stay       within   EPA   regulatory         limits   for   thermal 23 pollution during extreme droughts on more than one 24 occasion over the past two decades.
tax entities begin formal negotiations with Exelon to 4
25                  Forecast for the future of Illinoiss NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
establish an escrow of mitigation funds based on some 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
mutually agreeable assessment and payment structure so 6
that dependent entities will have some kind of 7
temporary funds available to soften the economic blow 8
or closure and not radically disrupt essential 9
services.
10 Our second comment, which is shorter, is 11 the inadequate attention paid to water availability at 12 the LaSalle Nuclear Power Plant under potential future 13 climate disruption conditions. Historically, LaSalle 14 Nuclear Power Plant has been one of the Illinois 15 reactor sites most sensitive to water availability 16 under severe drought conditions; for example, 1998, 17 2005, 2006.
18 Its siting on a portion of the Illinois 19 River network that is shallower than other parts has 20 brought the reactors close to mandatory shutdowns to 21 stay within EPA regulatory limits for thermal 22 pollution during extreme droughts on more than one 23 occasion over the past two decades.
24 Forecast for the future of Illinoiss 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


29 1 climate       over   the   next     few   decades     indicate       it 2 approaching that of current day west Texas. This will 3 have severe impacts on the aquatic system in the area, 4 and on the availability of water for intake and 5 discharge at LaSalle.
29 climate over the next few decades indicate it 1
6                  A   more     thorough         re-examination         of 7 LaSalles ability to safely operate, obtain sufficient 8 cooling water, and not thermally and radiologically 9 damage the local aquatic ecosystem is in order in this 10 re-licensing proceeding.               Thank you.
approaching that of current day west Texas. This will 2
11                  MR. DRUCKER:         The next speaker is Doug 12 OBrien from the Illinois Clean Energy Coalition.
have severe impacts on the aquatic system in the area, 3
13                  MR. OBRIEN:       Thank you.       My name is Doug 14 OBrien.         Im   with     the     Illinois     Clean   Energy 15 Coalition, and this is another one in a long number of 16 these hearings or events that Ive been to, talking 17 about a lot of the positive impacts that Illinoiss 18 nuclear generating stations have had on the economy.
and on the availability of water for intake and 4
19 20                  Its ironic that Im following somebody 21 who       came   up   and     posited       these     impacts,     these 22 beneficial impacts and somehow turned them into a 23 negative.       And I think that its also a little bit 24 insulting to the intelligence of local officials here 25 and around Illinois to assume that they dont have the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
discharge at LaSalle.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
5 A
more thorough re-examination of 6
LaSalles ability to safely operate, obtain sufficient 7
cooling water, and not thermally and radiologically 8
damage the local aquatic ecosystem is in order in this 9
re-licensing proceeding. Thank you.
10 MR. DRUCKER: The next speaker is Doug 11 OBrien from the Illinois Clean Energy Coalition.
12 MR. OBRIEN: Thank you. My name is Doug 13 OBrien. Im with the Illinois Clean Energy 14 Coalition, and this is another one in a long number of 15 these hearings or events that Ive been to, talking 16 about a lot of the positive impacts that Illinoiss 17 nuclear generating stations have had on the economy.
18 19 Its ironic that Im following somebody 20 who came up and posited these impacts, these 21 beneficial impacts and somehow turned them into a 22 negative. And I think that its also a little bit 23 insulting to the intelligence of local officials here 24 and around Illinois to assume that they dont have the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


30 1 sense to plan for the future.                   And I know that many 2 local       governments     do   just     that.       They   do     it 3 vigilantly, and they do it effectively.
30 sense to plan for the future. And I know that many 1
4                  But I wanted to talk a little bit about 5 the environmental impacts, the positive environmental 6 impacts of the plant.               As the initial NRC reports 7 shows, the overall impacts when it comes to energy 8 generation are positive. That the alternative sources 9 for energy generation in Illinois would create more 10 negative impacts environmentally, particularly in the 11 area of CO2 emissions, as its critically important 12 that we always consider the beneficial impact of 13 Illinoiss nuclear fleet on CO2 emissions here in 14 Illinois.
local governments do just that. They do it 2
15                  The   Illinois       Clean       Energy Coalitions 16 study in 2014 showed that Illinoiss nuclear fleet 17 prevents the emission of over 92 million tons of CO2 18 annually.       Now this is a significant contributor to 19 global climate change, and something that we can do in 20 preserving and protecting our nuclear fleet that will 21 have a real, immediate, ongoing positive impact on our 22 environment.
vigilantly, and they do it effectively.
23                  Now, other sources of clean energy are 24 vital to our future, as well. But the simple truth is 25 we cannot quickly or easily replace nuclear generation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 But I wanted to talk a little bit about 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
the environmental impacts, the positive environmental 5
impacts of the plant. As the initial NRC reports 6
shows, the overall impacts when it comes to energy 7
generation are positive. That the alternative sources 8
for energy generation in Illinois would create more 9
negative impacts environmentally, particularly in the 10 area of CO2 emissions, as its critically important 11 that we always consider the beneficial impact of 12 Illinoiss nuclear fleet on CO2 emissions here in 13 Illinois.
14 The Illinois Clean Energy Coalitions 15 study in 2014 showed that Illinoiss nuclear fleet 16 prevents the emission of over 92 million tons of CO2 17 annually. Now this is a significant contributor to 18 global climate change, and something that we can do in 19 preserving and protecting our nuclear fleet that will 20 have a real, immediate, ongoing positive impact on our 21 environment.
22 Now, other sources of clean energy are 23 vital to our future, as well. But the simple truth is 24 we cannot quickly or easily replace nuclear generation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


31 1 with other clean sources.               And a nuclear plant like 2 LaSalle would require, for example, thousands of new 3 wind turbines to replace its electricity generation.
31 with other clean sources. And a nuclear plant like 1
4 5                  And we still cant rely on wind 24/7, nor 6 on solar 24/7.         And the process of siting these wind 7 farms, the capital and the permitting that is needed 8 to begin operating them is daunting. So losing any of 9 Illinoiss nuclear plants would leave us with no 10 short-term alternative but to increase our use of 11 fossil fuels and move us in the wrong direction.
LaSalle would require, for example, thousands of new 2
12                  Additionally, I think its important to 13 note that its vital for the NRC and our national 14 government to continue to push forward with practical 15 waste       storage solutions       that     will allow for     the 16 continued safe and secure storage of spent fuel, while 17 we wait for the Federal government to put aside 18 politics and live up to the commitment it made years 19 ago to establish a nationwide solution for spent fuel 20 storage.
wind turbines to replace its electricity generation.
21                  In the meantime, plants like LaSalles 22 spent fuel is expertly handled, never having produced 23 any impact to the surrounding ecosystem.                   And while 24 the plants and the NRC have managed a laudable short-25 term solution, we have to continue to push for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
And we still cant rely on wind 24/7, nor 5
on solar 24/7. And the process of siting these wind 6
farms, the capital and the permitting that is needed 7
to begin operating them is daunting. So losing any of 8
Illinoiss nuclear plants would leave us with no 9
short-term alternative but to increase our use of 10 fossil fuels and move us in the wrong direction.
11 Additionally, I think its important to 12 note that its vital for the NRC and our national 13 government to continue to push forward with practical 14 waste storage solutions that will allow for the 15 continued safe and secure storage of spent fuel, while 16 we wait for the Federal government to put aside 17 politics and live up to the commitment it made years 18 ago to establish a nationwide solution for spent fuel 19 storage.
20 In the meantime, plants like LaSalles 21 spent fuel is expertly handled, never having produced 22 any impact to the surrounding ecosystem. And while 23 the plants and the NRC have managed a laudable short-24 term solution, we have to continue to push for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


32 1 permanent solution promised by our government.
32 permanent solution promised by our government.
2                    So I think, in conclusion, the Illinois 3 Clean       Energy Coalition       applauds         the   NRC and     its 4 findings.         We believe that its accurate in showing 5 the LaSalle Station, like other stations across the 6 state, has a positive impact on the environment moving 7 forward here in Illinois.               Thank you.
1 So I think, in conclusion, the Illinois 2
8                    MR. DRUCKER:         Steve Buck is next.
Clean Energy Coalition applauds the NRC and its 3
9                    MR. BUCK:     Good evening.           Im Steve Buck.
findings. We believe that its accurate in showing 4
10 Im an engineer at LaSalle Station.                       I just recently 11 started back in August.               I am a resident of Ottawa, 12 Illinois, and Im a former Eagle Scout, originally 13 from       Crystal     Lake,     Illinois.             So   environmental 14 stewardship is something that is very much a part of 15 my character.         Its something that I developed early 16 on in my youth, and I still continue it to this day as 17 an adult.
the LaSalle Station, like other stations across the 5
18                    Id like to share a couple key points of 19 how LaSalle Station is trying to be an environmental 20 steward itself through our activities to help conserve 21 the environment and leave the environment at least in 22 the best, the same condition, if not better condition 23 than we came in.
state, has a positive impact on the environment moving 6
24                    We had recently installed, last year, a 25 couple of charging stations for electrical vehicles.
forward here in Illinois. Thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MR. DRUCKER: Steve Buck is next.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 MR. BUCK: Good evening. Im Steve Buck.
9 Im an engineer at LaSalle Station. I just recently 10 started back in August. I am a resident of Ottawa, 11 Illinois, and Im a former Eagle Scout, originally 12 from Crystal Lake, Illinois. So environmental 13 stewardship is something that is very much a part of 14 my character. Its something that I developed early 15 on in my youth, and I still continue it to this day as 16 an adult.
17 Id like to share a couple key points of 18 how LaSalle Station is trying to be an environmental 19 steward itself through our activities to help conserve 20 the environment and leave the environment at least in 21 the best, the same condition, if not better condition 22 than we came in.
23 We had recently installed, last year, a 24 couple of charging stations for electrical vehicles.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


33 1 So theres four charging ports available, which saved 2 about 1,300 pounds of greenhouse gas emissions for any 3 of     our     workers   who     chose     to     use their electric 4 vehicles instead of a carbon-producing combustion 5 engine vehicle.
33 So theres four charging ports available, which saved 1
6                    We   have     an   annual       station earth     day 7 activity every year. Some of those include electronic 8 waste recycling programs where we collect electronic 9 waste. And we typically give out green gifts to those 10 who participate to bring in their electronics for 11 recycling as a thank you for looking out for that so 12 that we dont throw electronics just simply into 13 landfills.
about 1,300 pounds of greenhouse gas emissions for any 2
14                    Theres been a big push for LED lighting 15 upgrades, both inside the plant and outside, most 16 noticeably in the parking lot.                     The LED lights were 17 replaced.         They should last about seven to 10 years 18 out in the conditions outside in the parking lot.
of our workers who chose to use their electric 3
19 And were noticing that theres reduced electricity 20 usage for those, longer life span, and weve been 21 doing studies at other places inside the plant where 22 we can utilize LED lighting.
vehicles instead of a carbon-producing combustion 4
23                    We are members of the Wildlife Habitat 24 Council         certification.                 We     have   achieved 25 re-certification last year for our efforts.                     We have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
engine vehicle.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
5 We have an annual station earth day 6
activity every year. Some of those include electronic 7
waste recycling programs where we collect electronic 8
waste. And we typically give out green gifts to those 9
who participate to bring in their electronics for 10 recycling as a thank you for looking out for that so 11 that we dont throw electronics just simply into 12 landfills.
13 Theres been a big push for LED lighting 14 upgrades, both inside the plant and outside, most 15 noticeably in the parking lot. The LED lights were 16 replaced. They should last about seven to 10 years 17 out in the conditions outside in the parking lot.
18 And were noticing that theres reduced electricity 19 usage for those, longer life span, and weve been 20 doing studies at other places inside the plant where 21 we can utilize LED lighting.
22 We are members of the Wildlife Habitat 23 Council certification.
We have achieved 24 re-certification last year for our efforts. We have 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


34 1 many projects around the site, such as bat boxes, Uber 2 boxes, and activities with the fish hatchery in the 3 lake.
34 many projects around the site, such as bat boxes, Uber 1
4                    Our   North       American         Young Generation 5 Nuclear, its a youth group primarily of those who are 6 new     to   the nuclear     industry,       which   I am   a   site 7 director         at   LaSalle         Station;         we have         an 8 adopt-a-highway program for about a two-mile stretch 9 near the facility.           And during the summer months, the 10 warmer months, we do a highway clean-up where we go 11 both sides of the highway, and just pick up any trash, 12 litter that might be on the side of the road.
boxes, and activities with the fish hatchery in the 2
13                    We have a Gabby Green educational program 14 that goes out to our elementary schools.                     We discuss 15 energy conservation, resource conservation.                     We talk 16 about limited use of our water in certain situations, 17 turning the lights off when we go to the rooms.                       Some 18 very simple concepts for young children to understand 19 so that they can be environmental conscious starting 20 at a young age.
lake.
21                    We are starting to develop a program with 22 Boy Scouts of America.               As I said, Im a Boy Scout, 23 and this is something thats just starting to develop 24 in the last month.           Developing programs with the Boy 25 Scouts to help encourage them with their environmental NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
3 Our North American Young Generation 4
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
Nuclear, its a youth group primarily of those who are 5
new to the nuclear industry, which I am a site 6
director at LaSalle Station; we have an 7
adopt-a-highway program for about a two-mile stretch 8
near the facility. And during the summer months, the 9
warmer months, we do a highway clean-up where we go 10 both sides of the highway, and just pick up any trash, 11 litter that might be on the side of the road.
12 We have a Gabby Green educational program 13 that goes out to our elementary schools. We discuss 14 energy conservation, resource conservation. We talk 15 about limited use of our water in certain situations, 16 turning the lights off when we go to the rooms. Some 17 very simple concepts for young children to understand 18 so that they can be environmental conscious starting 19 at a young age.
20 We are starting to develop a program with 21 Boy Scouts of America. As I said, Im a Boy Scout, 22 and this is something thats just starting to develop 23 in the last month. Developing programs with the Boy 24 Scouts to help encourage them with their environmental 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


35 1 practices, some of their merit badges and their rank 2 advancements         and     helping     them       live   up to     that 3 environmental stewardship themselves.
35 practices, some of their merit badges and their rank 1
4                    We also are firm supporters of the Who 5 Haven,         which   is   wildlife       rehabilitation       center, 6 primarily for birds of prey, where we collect food for 7 those animals and also participate in bird releases, 8 releasing them back into the environment.
advancements and helping them live up to that 2
9                    MR. DRUCKER:         Thanks.       The final speaker 10 from the cards, wheres Tom, Tom Jackson?
environmental stewardship themselves.
11                    MR. JACKSON: Good evening. My names Tom 12 Jackson.         Im site superintendent at Illini State 13 Park, Marseilles fish and wildlife area in LaSalle.
3 We also are firm supporters of the Who 4
14 I work for the Department of Natural Resources, and 15 the IDNR currently has a lease through 2025 with 16 Exelon to manage the wildlife area and the fishing 17 opportunities.
Haven, which is wildlife rehabilitation center, 5
18                    LaSalle Lake is a fish and wildlife area, 19 along with a public fishing area.                     Were open to the 20 public from March 15th to October 15th every year for 21 fishing, providing many varieties of fish species, 22 including hybrid striped bass, large and small mouth 23 bass, crappie, blue gill and catfish.
primarily for birds of prey, where we collect food for 6
24                    In the months from October 15th through 25 March 15th of every year, the site is closed to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
those animals and also participate in bird releases, 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
releasing them back into the environment.
8 MR. DRUCKER: Thanks. The final speaker 9
from the cards, wheres Tom, Tom Jackson?
10 MR. JACKSON: Good evening. My names Tom 11 Jackson. Im site superintendent at Illini State 12 Park, Marseilles fish and wildlife area in LaSalle.
13 I work for the Department of Natural Resources, and 14 the IDNR currently has a lease through 2025 with 15 Exelon to manage the wildlife area and the fishing 16 opportunities.
17 LaSalle Lake is a fish and wildlife area, 18 along with a public fishing area. Were open to the 19 public from March 15th to October 15th every year for 20 fishing, providing many varieties of fish species, 21 including hybrid striped bass, large and small mouth 22 bass, crappie, blue gill and catfish.
23 In the months from October 15th through 24 March 15th of every year, the site is closed to the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


36 1 public, and provides a wildlife area for waterfowl 2 migrating through the area.               IDNR works closely with 3 Exelon to provide a great recreational opportunity to 4 local resident and visitors from throughout the state 5 and even surrounding states.
36 public, and provides a wildlife area for waterfowl 1
6                  LaSalle     Lake     provides       good   wildlife 7 habitat for the waterfowl, as mentioned before, and 8 provides good fishing and outdoor recreation for the 9 community.       It also provides good economic benefits, 10 visitors to the area.
migrating through the area. IDNR works closely with 2
11                  In my time as site superintendent, Exelon 12 management         has   made       themselves       available         and 13 supportive in our efforts to provide site visitors 14 with access to the lake, and a rewarding experience 15 while       visiting the     site.       I     thank   you   for     the 16 opportunity to speak on behalf of LaSalle Lake fish 17 and     wildlife   area     and     the   Department     of   Nature 18 Resources.
Exelon to provide a great recreational opportunity to 3
19                  MR. DRUCKER: Okay, if theres no one else 20 here or on the phone who has comments, and there 21 doesnt appear to be, I want to thank everyone who 22 provided --
local resident and visitors from throughout the state 4
23                  MS. BOUDART:         I have a comment.
and even surrounding states.
24                  MR. DRUCKER:         Oh.
5 LaSalle Lake provides good wildlife 6
25                  MS. BOUDART:         May I make a comment?
habitat for the waterfowl, as mentioned before, and 7
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
provides good fishing and outdoor recreation for the 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
community. It also provides good economic benefits, 9
visitors to the area.
10 In my time as site superintendent, Exelon 11 management has made themselves available and 12 supportive in our efforts to provide site visitors 13 with access to the lake, and a rewarding experience 14 while visiting the site. I thank you for the 15 opportunity to speak on behalf of LaSalle Lake fish 16 and wildlife area and the Department of Nature 17 Resources.
18 MR. DRUCKER: Okay, if theres no one else 19 here or on the phone who has comments, and there 20 doesnt appear to be, I want to thank everyone who 21 provided --
22 MS. BOUDART: I have a comment.
23 MR. DRUCKER: Oh.
24 MS. BOUDART: May I make a comment?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


37 1                MR. DRUCKER:         Absolutely.
37 MR. DRUCKER: Absolutely.
2                MS. BOUDART:         Okay.
1 MS. BOUDART: Okay.
3                MR. DRUCKER: Is it easier for me to bring 4 you the microphone there?
2 MR. DRUCKER: Is it easier for me to bring 3
5                MS. BOUDART:       Well, if you can so I think 6 I can speak loud enough.           The person who spoke first, 7 who are you?     Either the purple shirt or the white 8 striped shirt.     Anyway, let me see --
you the microphone there?
9                MR. DRUCKER:         Can you tell us your name.
4 MS. BOUDART: Well, if you can so I think 5
10                MS. BOUDART:         Oh yeah, my name is Jan 11 Boudart, and Im with the Nuclear Energy Information 12 Service, and somebody, I guess I didnt get, yeah, I 13 asked, Doug OBrien, the Clean Energy Coalition.                 Is 14 that you?
I can speak loud enough. The person who spoke first, 6
15                Well, I was very interested in the fact 16 that you said that until our government keeps its 17 promise to take care of the high level nuclear waste, 18 its being handled very efficiently and not being 19 allowed to harm anyone.         And, in fact, your statement 20 was never having produced any impact from the high 21 level nuclear waste.
who are you? Either the purple shirt or the white 7
22                And I think this is something that, rather 23 than say that I, well, I personally dont believe 24 that, but I cant prove that its wrong.             Also, you 25 cant prove that its right.
striped shirt. Anyway, let me see --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 MR. DRUCKER: Can you tell us your name.
(202) 234-4433       WASHINGTON, D.C. 20005-3701     (202) 234-4433
9 MS. BOUDART: Oh yeah, my name is Jan 10 Boudart, and Im with the Nuclear Energy Information 11 Service, and somebody, I guess I didnt get, yeah, I 12 asked, Doug OBrien, the Clean Energy Coalition. Is 13 that you?
14 Well, I was very interested in the fact 15 that you said that until our government keeps its 16 promise to take care of the high level nuclear waste, 17 its being handled very efficiently and not being 18 allowed to harm anyone. And, in fact, your statement 19 was never having produced any impact from the high 20 level nuclear waste.
21 And I think this is something that, rather 22 than say that I, well, I personally dont believe 23 that, but I cant prove that its wrong. Also, you 24 cant prove that its right.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


38 1                Recently,         the       Nuclear     Regulatory 2 Commission decided not to conduct health studies of 3 the impacts of the power plants around the United 4 States. And without those studies, you cant say that 5 there is no impact, and you cannot say that there is 6 an impact because there is no study.
38
7                So to come up with the statement that this 8 activity of taking care of the high level nuclear 9 waste never produced any impact is a statement that is 10 not supported.     If I were to say well, I know it has 11 produced an impact, that would also be an unsupported 12 statement.     There has been no study to find out 13 whether or not there is an impact.                 And I think that 14 kind of a positive statement really exposes the feet 15 of clay.
: Recently, the Nuclear Regulatory 1
16                MR. DRUCKER:       Thank you, and Im going to 17 ask you could just fill out a card for me, just with 18 your name and e-mail address.               All right, thank you 19 all. Do we have any other comments from anyone on the 20 phone?
Commission decided not to conduct health studies of 2
21                THE OPERATOR:         If you would like to have 22 a comment or question, please press *1 an record your 23 name when prompted.           Thank you.           No questions or 24 comments have come in.
the impacts of the power plants around the United 3
25                MR. DRUCKER:       Okay, thank you.       Thanks to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
States. And without those studies, you cant say that 4
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
there is no impact, and you cannot say that there is 5
an impact because there is no study.
6 So to come up with the statement that this 7
activity of taking care of the high level nuclear 8
waste never produced any impact is a statement that is 9
not supported. If I were to say well, I know it has 10 produced an impact, that would also be an unsupported 11 statement. There has been no study to find out 12 whether or not there is an impact. And I think that 13 kind of a positive statement really exposes the feet 14 of clay.
15 MR. DRUCKER: Thank you, and Im going to 16 ask you could just fill out a card for me, just with 17 your name and e-mail address. All right, thank you 18 all. Do we have any other comments from anyone on the 19 phone?
20 THE OPERATOR: If you would like to have 21 a comment or question, please press *1 an record your 22 name when prompted. Thank you. No questions or 23 comments have come in.
24 MR. DRUCKER: Okay, thank you. Thanks to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


39 1 everyone who provided comments during this meeting, 2 because       that   information       exchange       is what     this 3 meetings all about.           Also, thanks to all of you for 4 giving the speakers your time and attention.
39 everyone who provided comments during this meeting, 1
5                  And I want to thank Connie Brooks whos 6 actually across the hallway there and Fred Moore who 7 work here for the use of LaSalle County emergency 8 operations center.           And finally on the table, if you 9 want to, please pick up a meeting feedback form if you 10 havent already, and either return it to me or any 11 other staff member.             Feel free to mail it in.                 And 12 with that, this meeting is concluded.
because that information exchange is what this 2
13                  Im going to stick around.             If anyone had 14 any questions and wants to talk to me one-on-one, Im 15 happy to stick around and do that.                   So thank you all, 16 again, for coming out tonight.
meetings all about. Also, thanks to all of you for 3
17                  THE   OPERATOR:           This       concludes     your 18 conference, and you may disconnect.                   Once again, your 19 conference has ended, and you may disconnect.
giving the speakers your time and attention.
20                  (Whereupon,       at   8:00       p.m., the   above-21 mentioned public hearing was concluded.)
4 And I want to thank Connie Brooks whos 5
22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
actually across the hallway there and Fred Moore who 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433}}
work here for the use of LaSalle County emergency 7
operations center. And finally on the table, if you 8
want to, please pick up a meeting feedback form if you 9
havent already, and either return it to me or any 10 other staff member. Feel free to mail it in. And 11 with that, this meeting is concluded.
12 Im going to stick around. If anyone had 13 any questions and wants to talk to me one-on-one, Im 14 happy to stick around and do that. So thank you all, 15 again, for coming out tonight.
16 THE OPERATOR: This concludes your 17 conference, and you may disconnect. Once again, your 18 conference has ended, and you may disconnect.
19 (Whereupon, at 8:00 p.m., the above-20 mentioned public hearing was concluded.)
21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433}}

Latest revision as of 01:52, 10 January 2025

Transcript of LaSalle Draft Supplemental EIS, Public Meeting March 22, 2016, Pages 1-39
ML16091A441
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/22/2016
From:
NRC/OCM
To:
References
NRC-2254
Download: ML16091A441 (40)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

LaSalle County Station Draft Supplemental EIS Docket Number:

(n/a)

Location:

Ottawa, Illinois Date:

Tuesday, March 22, 2016 Work Order No.:

NRC-2254 Pages 1-39 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION 2

+ + + + +

3 LaSALLE COUNTY STATION 4

DRAFT SUPPLEMENTAL EIS (DSEIS) 5 PUBLIC MEETING 6

+ + + + +

7 TUESDAY 8

MARCH 22, 2016 9

+ + + + +

10 11 12 13 The Public Meeting was convened at the 14 LaSalle County Emergency Management Agency, Emergency 15 Operations Center, 711 East Etna Road, Ottawa, 16 Illinois at 7:00 p.m., David Drucker, Facilitator, 17 presiding.

18 19 PRESENT:

20 DAVID DRUCKER, Facilitator and Presenter 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

2 P R O C E E D I N G S 1

MR. DRUCKER: Good evening. Thanks for 2

coming out tonight. Im David Drucker with the U.S.

3 Nuclear Regulatory Commission, and Im --

4 THE OPERATOR: Mr. Drucker, I have to join 5

you to the main conference. Im sorry. One moment.

6 MR. DRUCKER: Sure.

7 THE OPERATOR: Welcome, and thank you for 8

standing by. At this time, all participants are on 9

listening mode. During our Q&A session, you may press 10

  • 1 on your touch tone phone if you would like to ask 11 a question. Todays conference is being recorded. If 12 you have any objections, you may disconnect at this 13 time. Now Id like to turn the meeting over to Mr.

14 David Drucker, so you may begin.

15 16 17 18 19 20 MR. DRUCKER: Thank you, India. This is David Drucker. Im work for Nuclear Regulatory Commission.

Im the project manager for the environmental review of the LaSalle County Station license renewal application. Hereafter, I will refer to the Nuclear Regulatory Commission as the NRC.

21 There are two primary purposes for this 22 meeting. The first purpose is to discuss the contents 23 of this document that Im holding up, the draft 24 supplemental environmental impact statement for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

3 license renewal of LaSalle County Station. Hereafter, 1

I will refer to this document as the draft SEIS. SEIS 2

stands for Supplemental Environmental Impact 3

Statement.

4 The second purpose of this meeting is to 5

obtain comments on the draft SEIS. This meeting is 6

available by teleconference and, India, I just want to 7

make sure. Can you ask the folks on the line, or 8

actually, folks on the line, can you hear me? Because 9

Im speaking at a distance from the speakerphone.

10 THE OPERATOR: Everyone, your lines are 11 now open, and you can respond.

12 13 MR. MAHERAS: David, this is Steve Maheras, and I can hear you just fine.

14 15 16 17 18 19 MR. DRUCKER: Okay. Good, if one person can hear me, the rest of you all can hear me.

Before going further, I want to introduce NRC staff here tonight. Stu Sheldon is an NRC Region III license renewal inspector, and Robert Ruiz is the senior resident at the plant.

20 21 22 23 24 Id also like to point out that on the phone we have or will have a few NRC staff folks. My supervisor, Jim Danna is the chief of the environmental review and project management branch.

Michele Moser is the technical reviewer for aquatic 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

4 resources.

1 2

3 4

5 Kevin Folk is the technical reviewer for service water resources. Bill Ford is the technical reviewer for ground water. And you hear earlier Steve Maharris is the consultant from Pacific Northwest Laboratories for the high burn-up fuel section.

6 Next, Id like to cover a few details 7

about this meeting. Exelon applied to the NRC to 8

renew the operating licenses for LaSalle County 9

Station units one and two for an additional 20 years.

10 The NRC is reviewing that application, and will use 11 the results of that review to decide whether to renew 12 the licenses.

13 Tonight I will tell you the preliminary 14 results of the environmental review. These results 15 are documented in the draft SEIS. And I will also ask 16 for your comments on the draft SEIS. The meeting 17 tonight will, essentially, have four parts. The 18 introduction is the part that were doing now.

19 20 21 22 23 In the second part I will discuss the review process and the preliminary findings of the review. Copies of this presentation are on the table by the door and Stu Sheldon, it looks like he handed out copies to everyone here.

24 The next portion will be an opportunity to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

5 ask questions about the material presented, and I will 1

answer those questions. And finally, the NRC staff 2

will listen to your comments about the draft SEIS.

3 Note that the NRC will listen during this time. We 4

generally wont respond to what youre saying here in 5

the meeting. Instead, we will prepare written 6

responses to your comments that will be published as 7

a part of the final SEIS.

8 Please note that this meeting is being 9

recorded,; a transcribers sitting right up here in 10 front. And hes doing that to produce a written 11 record of whats said at this meeting. In order for 12 the transcript to be accurate, please comply with the 13 following.

14 First, please silence your phones and any 15 other personal electronics you have with you. If you 16 must accept a call during this meeting, please step 17 outside into the lobby so the other meeting 18 participants can hear the proceedings and so your 19 phone ringing, nor your conversation is recorded.

20 When you speak, please use a microphone.

21 And Ill bring it around for the question and answer 22 period to you guys. Thats how we will ensure that 23 what you say is recorded. When you speak, identify 24 who you are and, if you represent a group, what group 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

6 you represent. Also, if you have an uncommon name or 1

if your name has an unusual spelling, please spell 2

your name. And to ensure the recording is clear, 3

please dont hold side conversations, and do not 4

interrupt the speaker. Thank you.

5 6

7 8

9 10 When you signed in tonight, you may have noted yellow cards, like the one Im holding up, on the table. Several of you have already filled them out, and thats to be a speaker. So if you want to speak, let me know. Ill bring a card around to you, and you can fill that out now.

11 When we get to the public comment portion 12 of this evening, I will give each public commenter 13 three minutes to speak. And then, after everyones 14 had a chance to speak, we can, if you havent finished 15 your comments, you can certainly have more time. So 16 far I only have four folks who are signed up to speak.

17 18 19 20 21 22 23 Also on the table outside is a stack of public meeting feedback forms. Please fill one out and provide it to me or leave it on the table, or you can drop it in the mail; its postage free. Your assessment of this meeting tonight will help improve future meetings.

24 And finally, for those who dont know, the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

7 restrooms are out the hallway to the left. Emergency 1

exit is out the hallway to the right. And security is 2

located at the LaSalle County Sheriffs Office. Its 3

just across the parking lot, if we should need 4

security.

5 6

7 8

Okay, do you have any questions on this brief introduction before I go any further, and start discussing the environmental review?

No - ok then.

9 10 11 12 13 14 15 16 17 Im going to start discussing the environmental review and preliminary results from the draft SEIS. First, I would like to emphasize that the environmental review is not yet complete. I hope the information provided in this presentation will help you understand what weve done so far, and the role you can play in helping to make sure that the final environmental impact statement is accurate and complete.

18 Id like to start off by briefly going 19 over the agenda for this portion of my speech. First 20 of all, Ill comment on the NRCs regulatory role, 21 then Ill provide the preliminary findings of our 22 environmental review, and then I will present the 23 current schedule for the remainder of the 24 environmental review, and tell you how you can submit 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

8 comments outside of this meeting.

1 At the end of the presentation, there will 2

be time for questions and answers on the comments of 3

my briefing and, most importantly, time for you to 4

present your comments on the draft SEIS.

5 The NRC was established to regulate 6

civilian use of nuclear materials, including 7

facilities producing electric power. The NRC conducts 8

license renewal reviews for plants whose owners wish 9

to operate them beyond their initial license period.

10 11 NRC license renewal reviews address safety 12 issues related to managing the affects of aging and 13 environmental issues related to an additional 20 years 14 of operation. In all aspects of the NRC regulation, 15 our mission is three-fold. To ensure adequate 16 protection of the public health and safety, to promote 17 common defense and security, and to protect the 18 environment.

19 20 21 22 23 24 Our environmental review looks at the potential site-specific impacts of license renewal of the LaSalle County Stations Units 1 and 2. A generic environmental impact statement, or GEIS, examines the possible environmental impacts that could occur as a result of renewing licenses of individual 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

9 nuclear power plants.

1 2

3 4

5 6

The GEIS describes the significance of these potential impacts. The analysis in the GEIS pertains to operating power reactors. For each type or environmental

impact, the GEIS establishes generic findings, covering as many plants as possible.

7 8

9 10 11 12 13 For some environmental issues, the GEIS found that a generic evaluation was not sufficient, and that a plant-specific analysis was required. The 2013 revision to the GEIS is sitting here on the table; these three volumes. The GEIS was originally done in 1996. It contains more information than these three volumes, and there was an addendum in 14 1999.

15 16 17 18 19 This gives you an idea of the effort that went in to looking at nuclear power plants across the

country, and determining which
impacts, environmental impacts, were generic, and which require site-specific analysis.

20 The site-specific findings for the LaSalle 21 County Station are contained in the draft SEIS 22 published in February, 2016. This document contains 23 analyses of all possible site-specific issues, as well 24 as a review of issues covered by the GEIS, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 10 determine whether the conclusions in the GEIS are valid for LaSalle County Station.

2 3

4 5

6 7

In this process, the NRC staff also reviews environmental impacts of potential power generation alternatives to license renewal.

Finally, I want to mention that on March 10th of last year, March 10th of last year, I was here conducting the environmental scoping meetings.

8 9

10 11 12 During those meetings and the scoping period, the NRC collected comments that informed the scope of the environmental review. Those comments, and the NRC responses to those comments, are found in the scoping summary report.

13 14 15 16 17 Hard copies and CDs of the scoping summary report are available on the table by the door. And also, that same CD that has the scoping summary report contains a copy of the draft SEIS. Please feel free to take a copy of the CD.

18 19 20 21 22 23 24 For each environmental issue identified an impact level is assigned. The NRCs standard of significance for impacts was established using the White House counsel on environmental quality terminology for significant. The NRC established three levels of significance for potential impacts, small, moderate and large, as defined on the slide.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

11 For a small impact, the effects are not 1

detectible or are so minor that they will neither 2

destabilize nor noticeable alter any important 3

attribute of the resource. For a moderate impact, the 4

effects are sufficient to alter noticeably, but not 5

destabilize important attributes of the resource. And 6

for a large impact, the effects are clearly noticeable 7

and are sufficient to destabilize important 8

attributes of the resource.

9 While these impact level designations are 10 used for most of the resource areas that we looked at 11 in the draft SEIS, there are three areas that have 12 their own impact level designations. And these are 13 discussed on the next slide.

14 So for special status species, the impact 15 significance determination language comes from the 16 Endangered Species Act. And choices to describe the 17 impacts are no effect, may affect but not likely to 18 adversely affect, and may affect and is likely to 19 adversely affect.

20 For cultural and historic resources, the 21 National Historic Preservation Act requires Federal 22 agencies to consider the effects of their undertakings 23 on historic properties. And for environmental 24 justice, under Executive Order 12898, Federal agencies 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

12 are responsible for identifying and addressing 1

disproportionately high and adverse human health and 2

environmental impacts on minority and low-income 3

populations.

4 This slide lists the issues the NRC 5

reviewed for the continued operation of the LaSalle 6

County Station during the proposed license renewal 7

period. So in this one slide, this is basically a 8

very quick summary of what you would find in that 9

larger document, the draft SEIS.

10 For all issues, except aquatic resources, 11 the impacts of license renewal were found to be small, 12 which means the effects are not detectible, or are so 13 minor that they will neither destabilize nor 14 noticeably alter any important attribute of the 15 resource.

16 Thermal impacts would be small for aquatic 17 resources in the Illinois River, and small for aquatic 18 resources in the cooling pond, except for gizzard and 19 threadfin shad. Gizzard and threadfin shad would 20 experience moderate thermal impacts in the cooling 21 pond.

22 The NRC staff also considered cumulative 23 impacts. Cumulative impacts are the effects on the 24 environment from other past, present and reasonably 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

13 foreseeable future human actions, other than LaSalle 1

County Station. The effects not only included 2

operation of LaSalle County Station, but also impacts 3

unrelated to LaSalle, such as future urbanization, 4

other energy producing facilities in the area and 5

climate change.

6 The analysis considers potential impacts 7

through the end of the current license term, as well 8

as the 20-year license renewal term. The NRC staff 9

determined that most cumulative impacts would be 10 small, and the analysis is provided in section 4.16 of 11 the draft SEIS.

12 The National Environmental Policy Act 13 mandates that each environmental impact statement 14 consider alternatives to any proposed major Federal 15 action. A major step for determining whether license 16 renewal is reasonable or not is comparing the likely 17 impacts of continued operation of a nuclear plant with 18 the likely impacts of alternatives means of power 19 generation.

20 Alternatives must provide an option that 21 allows for power generation capability beyond the term 22 of the current nuclear power plant operating license 23 to meet future system generation needs. In the draft 24 SEIS, NRC staff initially considered 17 different 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 alternatives, and then we narrowed those 17 down to 1

five, and looked at those five in detail.

2 Additionally, the NRC staff considered 3

what would happen if no action is taken and LaSalle 4

shuts down at the end of its current licenses without 5

a specific replacement alternative. This alternative 6

would not provide power generation capacity nor would 7

it meet the needs currently met by LaSalle.

8 The NRCs preliminary conclusion is that 9

the environmental impacts of renewal of the operating 10 licenses for LaSalle would be smaller than those 11 feasible and commercially viable alternatives.

12 Continued operation would have smaller environmental 13 impacts in almost all areas. The staff concluded that 14 continued operation of the existing LaSalle County 15 Station is the environmentally preferred alternative.

16 17 Based on review of likely environmental 18 impacts from license renewal, as well as potential 19 environmental impacts of alternatives to license 20 renewal, the NRC staffs preliminary recommendation in 21 the draft SEIS is that the adverse environmental 22 impacts of license renewal for LaSalle County Station 23 are not great enough to deny the option of license 24 renewal for energy planning decision makers. And that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

15 preliminary conclusion shows up several places in the 1

draft SEIS, but chapter five is the conclusion 2

chapter.

3 I would like to re-emphasize that the 4

environmental review is not yet complete. Your 5

comments tonight, and all written comments received by 6

the end of the comment period on April 4th, will be 7

considered by the NRC staff as we develop the final 8

SEIS, which we currently plan to issue in August of 9

2016.

10 Those comments that are within the scope 11 of the environmental review and provide new and 12 significant information can help change the staffs 13 findings. The final SEIS will contain the staffs 14 final recommendation on the acceptability of license 15 renewal based on the work weve already performed and 16 any new and significant information we receive in the 17 form of comments during the comment period. I just 18 want to emphasize that the comment period closes on 19 April 4th, the second to the last line here on this 20 slide.

21 22 23 24 As many of you

know, I

am the primary contact for the environmental

review, and Jeff Mitchell is the primary contact for the safety review, and our information is on the handouts that I provided 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

16 you tonight, our contact information. Copies of the 1

draft SEIS are available on CD on the table near the 2

door. In addition, the library shown on this slide 3

has a copy available, current copy available for 4

review.

5 You can also find electronic copies of the 6

draft SEIS, along with other information about the 7

LaSalle County Station license renewal review online 8

at the website shown. And finally, additional 9

information can also be obtained by contacting the 10 representatives of NRCs Region III office of public 11 affairs, as shown on the slide.

12 NRC staff will address written comments in 13 the same way we address spoken comments received 14 today. You can submit written comments either online 15 or via conventional manner. To submit written 16 comments online, visit the website regulations.gov and 17 search for docket ID NRC-2014-0268. If you have 18 written comments today, you may give them to me or any 19 other member of the NRC staff.

20 Please note that if you provide verbal 21 comments tonight, you dont need to submit them in 22 writing since your verbal comments are part of the 23 transcribed record, and they will be responded to. So 24 this concludes my formal presentation.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

17 1

2 3

4 5

So now we enter the question and answer portion of our meeting. This portion is distinct from the comment portion. I will now answer questions specific to the material that I presented here tonight. I'd like to begin with questions those on the phone. Operator?

6 THE OPERATOR: Yes.

7 MR. DRUCKER: If theres anyone on the 8

phone that has questions about the material I 9

presented, can you please go ahead and let them ask 10 their questions one at a time, and Ill do my best to 11 answer them.

12 THE OPERATOR: Certainly. If you would 13 like to as a question on the phone line, please press 14

  • 1 and record your name when prompted. Please make 15 sure your phone is not muted when you record your 16 name. Once again, thats *1 and record your name.

17 One moment for our first question. And no questions 18 have come in.

19 20 21 22 23 24 MR. DRUCKER: Okay Operator, thank you.

Most of the folks here in the room have been a part of the license renewal process. Theyre familiar with the scoping process we did last year. But I just want to emphasize, for anyone whos listening, that you know, this is not a hearing. This is a public 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

18 meeting.

1 2

3 4

5 6

And the goal of this meeting is two-way communication; for me to provide information about the environmental impact statement that weve been working on and have developed, and then to receive comment on that document. So I am looking for questions on the material I presented.

7 With that, Im going to go to questions.

8 Does anyone have any questions about the material I 9

presented here in the room? If there are no 10 questions, I just want to --

11 12 13 MS. SNYDER: I have a question.

MR. DRUCKER: Gail, go ahead.

MS. SNYDER: My first question is you said 14 15 16 17 18 19 20 21 22 23 24 this is a public meeting. Theres not really many members of the public here, so Im just wondering what does the NRC do to promote this? I find it hard to believe in an area where theres thousands of people who could be impacted by this decision that nobodys shown up, no elected officials, unless theres something here I dont know about. Im just wondering, you know, why theres such a poor turnout.

MR. DRUCKER: Good question. Certainly, certainly, let me answer that first; your first part of the question was how do we advertise, basically, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 2

3 19 this public. This meeting is advertised through many means. The first place that its advertised is we put out a Federal Register notice, the NRC does, announcing the meeting.

4 5

6 7

8 9

And then the Environmental Protection Agency, it publishes a Federal Register notice that announces the release of the draft SEIS, and then how to contact me if youre interested in learning more about that. So theres two Federal Register notices that go out.

10 The Nuclear Regulatory Commissions 11 website also has actually several places where we talk 12 about the meeting. We have a public meeting web page 13 that speaks to all the meetings that we have. We have 14 a license renewal web page that talks about this 15 meeting. Theres also the regular LaSalle operating 16 license web page, which also points to my license 17 renewal web page. So theres those web pages.

18 19 20 21 22 23 We also have advertisements in local newspapers. I can get those for you if youre interested. But we did advertise in the local newspapers, announcing this meeting. I also reached out to everyone who attended the scoping meetings last year through e-mail and or letter.

24 I either sent them a hard copy of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

20 draft SEIS, along with a copy of the Federal Register 1

notice, which provided the information on when and 2

where this meeting would be held. Either hard copy, 3

or I provided them a CD of the draft SEIS.

4 Off the top of my head, I actually used to 5

carry a list of all different ways that we advertised 6

the meetings; off the top of my head, thats how we do 7

it. There were e-mails, too. For example, e-mail 8

reminders I sent out to the EPA via Region V folks so 9

they may be on the phone tonight.

10 11 12 13 14 15 So those are the basic ways. If I missed anything, and my boss is listening feel free to chime in, Jim, and let me know what I missed. But those are the major ways. Oh, another way; the fliers. I asked the resident inspector to post fliers locally around.

16 Good question and, yeah, sometimes we get 17 a big turnout at these meetings, and sometimes we 18 dont. Personally, I was at one down in Mississippi, 19 Grand Gulf. There were a few flakes of snow, and the 20 Governor basically told everyone to stay in. And I 21 flew own with my boss at the time, and we had no 22 trouble. There was no snow on the roads; didnt 23 understand what the problem was. But it was a local 24 thing.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

21 I was paying attention to the news this 1

morning, and I heard the terrible, terrible news of 2

what was going on in Belgium, but I doubt that that 3

somehow would impact people showing up here. I did 4

read the local paper to see there were a couple other 5

meetings.

6 7

8 9

10 11 12 There was a board of education meeting in one of the schools, but I didnt think it would impact attendance at this meeting. And I did work with the folks at the plant, and I worked with our resident inspector trying to pick a night that wasnt busy with other activities. I do believe we have at least one elected official here with us tonight. Mr. Walsh?

13 14 MR. WALSH: Yes, Im a member of the LaSalle County board.

15 16 MR. DRUCKER: OK, thanks.

MR. WALSH: Chair of legislative 17 rules.

18 19 20 MR. DRUCKER: Great.

MR. WALSH: County board member. MR.

DRUCKER: Good question. Any other 21 questions from folks in the room?

22 MS. SNYDER: I have more questions.

23 MR. DRUCKER: Please.

24 MS. SNYDER: Slide number 10, which is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

22 titled environmental review of LaSalle County Station 1

has the resources areas and the impacts listed. On 2

the bottom it says waste management, and the impact is 3

small. And Im just wondering can you define what 4

waste management is in this?

5 6

7 8

9 10 11 MR.

DRUCKER:

Yes, thats a

great question. The answer to your question is contained in the draft SEIS that we are discussing this evening.

And theres a

section on waste management. That section is located in Chapter 4.

Bear with me just for a moment, and I will flip to it. Its section 4. --

12 MS. SNYDER: Does it refer to nuclear 13 waste, or is it waste from the plant, other than?

14 15 16 17 18 19 20 MR. DRUCKER: Section 4.13 of the draft SEIS discusses, the spent fuel produced by the plant, both onsite storage and offsite radiological impacts.

This section also discusses low level waste storage and disposal, mixed waste storage, and non-radioactive waste storage. So this is the section that does cover the spent nuclear fuel.

21 22 23 24 So theres a total of five issues that are looked at in this section. In a different section, Section 4.15.1, that section discusses issues related to the uranium fuel cycle. But spent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

23 is at the plant is talked about in Section 4.13.

1 MS. SNYDER: And when you say the impact 2

is small, do you mean that its small in comparison to 3

whats already there, or that 20 years of additional 4

waste will have a small impact?

5 MR. DRUCKER: Yeah, this is, this section 6

is talking to 20 years of additional operation.

7 MS. SNYDER: The small impact.

8 MR. DRUCKER: Yes.

9 MS. SNYDER: I have another question.

10 MR. DRUCKER: Please.

11 MS. SNYDER: I dont want to hog the 12 questions. Slide number 12, alternatives; and youre 13 talking about citing alternatives and the criteria 14 required to replace the energy. If you nuclear plant 15 had shut down, you said something about what would 16 happen if the nuclear plant shut down, and you found 17 that there wouldnt be an alternative power source 18 that would replace that power.

19 And I was just wondering if you had, or 20 the committee had, whoever drafted this, whatever 21 group drafted it had looked at the report from the 22 State of Illinois? There were a number of agencies; 23 there was a bill, HR, a resolution, HR1146, which was 24 looking at nuclear power in the state.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

24 And state agencies drafted a report, and 1

they came out with the opposite finding of what youre 2

saying. So maybe we will e-mail that report to you.

3 I think that would be informative to what their 4

position is, is not the same as your conclusion.

5 MR. DRUCKER: OK, thank you.

6 MS. SNYDER: And thats a state study by 7

state agencies.

8 MR. DRUCKER: All right. I appreciate 9

that very much. Thanks, Gail. Okay, if there are no 10 other questions, then were going to move right along 11 to the comment portion of tonights meeting. And as 12 I stated at the beginning, primarily the NRC staff 13 will be listening, and we will respond to any comments 14 in written form in the final SEIS.

15 So let me go to the operator. India, is 16 there anyone on the phone that wants to provide a 17 comment?

18 THE OPERATOR: If you do have comments, 19 please press *1 and record your name when prompted.

20 Once again, thats *1 -- and no comments have come in 21 over the phone.

22 MR. DRUCKER: Thank you. Thank you, very 23 much.

24 THE OPERATOR: Youre welcome.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

25 1

2 3

4 5

MR. DRUCKER: Okay, I have yellow cards from three, from four folks. Ill shuffle them and pull them out randomly. I hope it does not matter to any of you. I would appreciate, would the speakers come up to the front here, and you can use this microphone. Gail, are you available first?

6 MS. SNYDER: Sure.

7 MR. DRUCKER: And the next speaker will be 8

Doug OBrien, so Doug if you want to prepare yourself 9

and move up to the front to save some time. In fact, 10 theres only four of you. Itll be Gail, Doug, Steve 11 and Tom.

12 MS. SNYDER: I dont know if this makes 13 your life easier.

14 AUDIENCE MEMBER: Oh great, thank you.

15 MS. SNYDER: Good evening. My name is 16 Gail Snyder, and Im here representing Nuclear Energy 17 Information Service. I serve as the president of the 18 board. Our comments tonight are really directed, 19 maybe, not specifically at environmental issues, but 20 the licensing renewal.

21 And one of our first comments is that the 22 analysis of socioeconomic impacts are incomplete. No 23 analysis of impacts for early or unexpected closures 24 were considered or provided. The Exelon safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

26 evaluation report documents a significant tax impact 1

for the presence of the LaSalle County Station, yet 2

only addresses the positive impacts.

3 No mention or analysis of negative impacts 4

resulting from a abrupt planned or unexpected early 5

closure of LaSalle is presented. This is a 6

significant omission, particularly in light of Exelon 7

Corporations threat of two years ago to close 8

reactors in Illinois on economic grounds.

9 According to the Exelon SER, LaSalle 10 represents a sizeable portion of the county total tax 11 base. It also accounts for large portions of the 12 school districts adjusted property tax levy. These 13 are not insignificant amounts.

Their abrupt 14 disappearance would wreak economic havoc on the 15 affected governmental and essential service entities 16 ability to operate, just as Exelons predecessor, 17 ComEd, did to the community of Zion in 1997, when they 18 unilaterally closed the Zion reactors.

19 The SER either fails to recognize or 20 mention at all some of the possible events that could 21 result in such a closure situation, such as an 22 unexpected major accident resulting in immediate and, 23 presumably, premature closing, NRC-ordered shutdown, 24 Exelon unilateral decision to close the plant on 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

27 economic or other grounds, as it did in Zion, 1

resulting in an immediate loss of about 55 percent of 2

Zions tax base.

3 Devaluation through sale has occurred at 4

the Clinton Station, resulting in enormous loss of the 5

tax base, eventual old age, license expiration 6

closure, which is the outcome of -- and I would add, 7

in light of whats happening in Brussels today, and 8

the fact that theyve shut down their nuclear reactors 9

and cant provide security, terrorism is also a 10 possible way that a nuclear reactor could shut down 11 unexpectedly.

12 Exelons being a business will certainly 13 make the calculations it made when it closed Zion and 14 decided that LaSalle should continue to operate. In 15 this omission, the SER makes the same mistake the U.S.

16 Government made when it invaded Iraq. No exit 17 strategy.

To simply assume that the only 18 socioeconomic effects of LaSalles presence will be 19 positive ones is simply irrational.

20 Our recommendation: Planning for some 21 kind of eventual closure must be made long before it 22 happens to minimize economic and service disruptions 23 to the entities whose tax bases will be affected.

24 Debate about the license extension serves as a good 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

28 reminder of this fact, and an opportunity to take 1

action.

2 We recommend that dependent government and 3

tax entities begin formal negotiations with Exelon to 4

establish an escrow of mitigation funds based on some 5

mutually agreeable assessment and payment structure so 6

that dependent entities will have some kind of 7

temporary funds available to soften the economic blow 8

or closure and not radically disrupt essential 9

services.

10 Our second comment, which is shorter, is 11 the inadequate attention paid to water availability at 12 the LaSalle Nuclear Power Plant under potential future 13 climate disruption conditions. Historically, LaSalle 14 Nuclear Power Plant has been one of the Illinois 15 reactor sites most sensitive to water availability 16 under severe drought conditions; for example, 1998, 17 2005, 2006.

18 Its siting on a portion of the Illinois 19 River network that is shallower than other parts has 20 brought the reactors close to mandatory shutdowns to 21 stay within EPA regulatory limits for thermal 22 pollution during extreme droughts on more than one 23 occasion over the past two decades.

24 Forecast for the future of Illinoiss 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 climate over the next few decades indicate it 1

approaching that of current day west Texas. This will 2

have severe impacts on the aquatic system in the area, 3

and on the availability of water for intake and 4

discharge at LaSalle.

5 A

more thorough re-examination of 6

LaSalles ability to safely operate, obtain sufficient 7

cooling water, and not thermally and radiologically 8

damage the local aquatic ecosystem is in order in this 9

re-licensing proceeding. Thank you.

10 MR. DRUCKER: The next speaker is Doug 11 OBrien from the Illinois Clean Energy Coalition.

12 MR. OBRIEN: Thank you. My name is Doug 13 OBrien. Im with the Illinois Clean Energy 14 Coalition, and this is another one in a long number of 15 these hearings or events that Ive been to, talking 16 about a lot of the positive impacts that Illinoiss 17 nuclear generating stations have had on the economy.

18 19 Its ironic that Im following somebody 20 who came up and posited these impacts, these 21 beneficial impacts and somehow turned them into a 22 negative. And I think that its also a little bit 23 insulting to the intelligence of local officials here 24 and around Illinois to assume that they dont have the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

30 sense to plan for the future. And I know that many 1

local governments do just that. They do it 2

vigilantly, and they do it effectively.

3 But I wanted to talk a little bit about 4

the environmental impacts, the positive environmental 5

impacts of the plant. As the initial NRC reports 6

shows, the overall impacts when it comes to energy 7

generation are positive. That the alternative sources 8

for energy generation in Illinois would create more 9

negative impacts environmentally, particularly in the 10 area of CO2 emissions, as its critically important 11 that we always consider the beneficial impact of 12 Illinoiss nuclear fleet on CO2 emissions here in 13 Illinois.

14 The Illinois Clean Energy Coalitions 15 study in 2014 showed that Illinoiss nuclear fleet 16 prevents the emission of over 92 million tons of CO2 17 annually. Now this is a significant contributor to 18 global climate change, and something that we can do in 19 preserving and protecting our nuclear fleet that will 20 have a real, immediate, ongoing positive impact on our 21 environment.

22 Now, other sources of clean energy are 23 vital to our future, as well. But the simple truth is 24 we cannot quickly or easily replace nuclear generation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

31 with other clean sources. And a nuclear plant like 1

LaSalle would require, for example, thousands of new 2

wind turbines to replace its electricity generation.

3 4

And we still cant rely on wind 24/7, nor 5

on solar 24/7. And the process of siting these wind 6

farms, the capital and the permitting that is needed 7

to begin operating them is daunting. So losing any of 8

Illinoiss nuclear plants would leave us with no 9

short-term alternative but to increase our use of 10 fossil fuels and move us in the wrong direction.

11 Additionally, I think its important to 12 note that its vital for the NRC and our national 13 government to continue to push forward with practical 14 waste storage solutions that will allow for the 15 continued safe and secure storage of spent fuel, while 16 we wait for the Federal government to put aside 17 politics and live up to the commitment it made years 18 ago to establish a nationwide solution for spent fuel 19 storage.

20 In the meantime, plants like LaSalles 21 spent fuel is expertly handled, never having produced 22 any impact to the surrounding ecosystem. And while 23 the plants and the NRC have managed a laudable short-24 term solution, we have to continue to push for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

32 permanent solution promised by our government.

1 So I think, in conclusion, the Illinois 2

Clean Energy Coalition applauds the NRC and its 3

findings. We believe that its accurate in showing 4

the LaSalle Station, like other stations across the 5

state, has a positive impact on the environment moving 6

forward here in Illinois. Thank you.

7 MR. DRUCKER: Steve Buck is next.

8 MR. BUCK: Good evening. Im Steve Buck.

9 Im an engineer at LaSalle Station. I just recently 10 started back in August. I am a resident of Ottawa, 11 Illinois, and Im a former Eagle Scout, originally 12 from Crystal Lake, Illinois. So environmental 13 stewardship is something that is very much a part of 14 my character. Its something that I developed early 15 on in my youth, and I still continue it to this day as 16 an adult.

17 Id like to share a couple key points of 18 how LaSalle Station is trying to be an environmental 19 steward itself through our activities to help conserve 20 the environment and leave the environment at least in 21 the best, the same condition, if not better condition 22 than we came in.

23 We had recently installed, last year, a 24 couple of charging stations for electrical vehicles.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

33 So theres four charging ports available, which saved 1

about 1,300 pounds of greenhouse gas emissions for any 2

of our workers who chose to use their electric 3

vehicles instead of a carbon-producing combustion 4

engine vehicle.

5 We have an annual station earth day 6

activity every year. Some of those include electronic 7

waste recycling programs where we collect electronic 8

waste. And we typically give out green gifts to those 9

who participate to bring in their electronics for 10 recycling as a thank you for looking out for that so 11 that we dont throw electronics just simply into 12 landfills.

13 Theres been a big push for LED lighting 14 upgrades, both inside the plant and outside, most 15 noticeably in the parking lot. The LED lights were 16 replaced. They should last about seven to 10 years 17 out in the conditions outside in the parking lot.

18 And were noticing that theres reduced electricity 19 usage for those, longer life span, and weve been 20 doing studies at other places inside the plant where 21 we can utilize LED lighting.

22 We are members of the Wildlife Habitat 23 Council certification.

We have achieved 24 re-certification last year for our efforts. We have 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

34 many projects around the site, such as bat boxes, Uber 1

boxes, and activities with the fish hatchery in the 2

lake.

3 Our North American Young Generation 4

Nuclear, its a youth group primarily of those who are 5

new to the nuclear industry, which I am a site 6

director at LaSalle Station; we have an 7

adopt-a-highway program for about a two-mile stretch 8

near the facility. And during the summer months, the 9

warmer months, we do a highway clean-up where we go 10 both sides of the highway, and just pick up any trash, 11 litter that might be on the side of the road.

12 We have a Gabby Green educational program 13 that goes out to our elementary schools. We discuss 14 energy conservation, resource conservation. We talk 15 about limited use of our water in certain situations, 16 turning the lights off when we go to the rooms. Some 17 very simple concepts for young children to understand 18 so that they can be environmental conscious starting 19 at a young age.

20 We are starting to develop a program with 21 Boy Scouts of America. As I said, Im a Boy Scout, 22 and this is something thats just starting to develop 23 in the last month. Developing programs with the Boy 24 Scouts to help encourage them with their environmental 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

35 practices, some of their merit badges and their rank 1

advancements and helping them live up to that 2

environmental stewardship themselves.

3 We also are firm supporters of the Who 4

Haven, which is wildlife rehabilitation center, 5

primarily for birds of prey, where we collect food for 6

those animals and also participate in bird releases, 7

releasing them back into the environment.

8 MR. DRUCKER: Thanks. The final speaker 9

from the cards, wheres Tom, Tom Jackson?

10 MR. JACKSON: Good evening. My names Tom 11 Jackson. Im site superintendent at Illini State 12 Park, Marseilles fish and wildlife area in LaSalle.

13 I work for the Department of Natural Resources, and 14 the IDNR currently has a lease through 2025 with 15 Exelon to manage the wildlife area and the fishing 16 opportunities.

17 LaSalle Lake is a fish and wildlife area, 18 along with a public fishing area. Were open to the 19 public from March 15th to October 15th every year for 20 fishing, providing many varieties of fish species, 21 including hybrid striped bass, large and small mouth 22 bass, crappie, blue gill and catfish.

23 In the months from October 15th through 24 March 15th of every year, the site is closed to the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

36 public, and provides a wildlife area for waterfowl 1

migrating through the area. IDNR works closely with 2

Exelon to provide a great recreational opportunity to 3

local resident and visitors from throughout the state 4

and even surrounding states.

5 LaSalle Lake provides good wildlife 6

habitat for the waterfowl, as mentioned before, and 7

provides good fishing and outdoor recreation for the 8

community. It also provides good economic benefits, 9

visitors to the area.

10 In my time as site superintendent, Exelon 11 management has made themselves available and 12 supportive in our efforts to provide site visitors 13 with access to the lake, and a rewarding experience 14 while visiting the site. I thank you for the 15 opportunity to speak on behalf of LaSalle Lake fish 16 and wildlife area and the Department of Nature 17 Resources.

18 MR. DRUCKER: Okay, if theres no one else 19 here or on the phone who has comments, and there 20 doesnt appear to be, I want to thank everyone who 21 provided --

22 MS. BOUDART: I have a comment.

23 MR. DRUCKER: Oh.

24 MS. BOUDART: May I make a comment?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

37 MR. DRUCKER: Absolutely.

1 MS. BOUDART: Okay.

2 MR. DRUCKER: Is it easier for me to bring 3

you the microphone there?

4 MS. BOUDART: Well, if you can so I think 5

I can speak loud enough. The person who spoke first, 6

who are you? Either the purple shirt or the white 7

striped shirt. Anyway, let me see --

8 MR. DRUCKER: Can you tell us your name.

9 MS. BOUDART: Oh yeah, my name is Jan 10 Boudart, and Im with the Nuclear Energy Information 11 Service, and somebody, I guess I didnt get, yeah, I 12 asked, Doug OBrien, the Clean Energy Coalition. Is 13 that you?

14 Well, I was very interested in the fact 15 that you said that until our government keeps its 16 promise to take care of the high level nuclear waste, 17 its being handled very efficiently and not being 18 allowed to harm anyone. And, in fact, your statement 19 was never having produced any impact from the high 20 level nuclear waste.

21 And I think this is something that, rather 22 than say that I, well, I personally dont believe 23 that, but I cant prove that its wrong. Also, you 24 cant prove that its right.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

38

Recently, the Nuclear Regulatory 1

Commission decided not to conduct health studies of 2

the impacts of the power plants around the United 3

States. And without those studies, you cant say that 4

there is no impact, and you cannot say that there is 5

an impact because there is no study.

6 So to come up with the statement that this 7

activity of taking care of the high level nuclear 8

waste never produced any impact is a statement that is 9

not supported. If I were to say well, I know it has 10 produced an impact, that would also be an unsupported 11 statement. There has been no study to find out 12 whether or not there is an impact. And I think that 13 kind of a positive statement really exposes the feet 14 of clay.

15 MR. DRUCKER: Thank you, and Im going to 16 ask you could just fill out a card for me, just with 17 your name and e-mail address. All right, thank you 18 all. Do we have any other comments from anyone on the 19 phone?

20 THE OPERATOR: If you would like to have 21 a comment or question, please press *1 an record your 22 name when prompted. Thank you. No questions or 23 comments have come in.

24 MR. DRUCKER: Okay, thank you. Thanks to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

39 everyone who provided comments during this meeting, 1

because that information exchange is what this 2

meetings all about. Also, thanks to all of you for 3

giving the speakers your time and attention.

4 And I want to thank Connie Brooks whos 5

actually across the hallway there and Fred Moore who 6

work here for the use of LaSalle County emergency 7

operations center. And finally on the table, if you 8

want to, please pick up a meeting feedback form if you 9

havent already, and either return it to me or any 10 other staff member. Feel free to mail it in. And 11 with that, this meeting is concluded.

12 Im going to stick around. If anyone had 13 any questions and wants to talk to me one-on-one, Im 14 happy to stick around and do that. So thank you all, 15 again, for coming out tonight.

16 THE OPERATOR: This concludes your 17 conference, and you may disconnect. Once again, your 18 conference has ended, and you may disconnect.

19 (Whereupon, at 8:00 p.m., the above-20 mentioned public hearing was concluded.)

21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

LaSalle County Station Draft Supplemental EIS Docket Number:

(n/a)

Location:

Ottawa, Illinois Date:

Tuesday, March 22, 2016 Work Order No.:

NRC-2254 Pages 1-39 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

1 UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION 2

+ + + + +

3 LaSALLE COUNTY STATION 4

DRAFT SUPPLEMENTAL EIS (DSEIS) 5 PUBLIC MEETING 6

+ + + + +

7 TUESDAY 8

MARCH 22, 2016 9

+ + + + +

10 11 12 13 The Public Meeting was convened at the 14 LaSalle County Emergency Management Agency, Emergency 15 Operations Center, 711 East Etna Road, Ottawa, 16 Illinois at 7:00 p.m., David Drucker, Facilitator, 17 presiding.

18 19 PRESENT:

20 DAVID DRUCKER, Facilitator and Presenter 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

2 P R O C E E D I N G S 1

MR. DRUCKER: Good evening. Thanks for 2

coming out tonight. Im David Drucker with the U.S.

3 Nuclear Regulatory Commission, and Im --

4 THE OPERATOR: Mr. Drucker, I have to join 5

you to the main conference. Im sorry. One moment.

6 MR. DRUCKER: Sure.

7 THE OPERATOR: Welcome, and thank you for 8

standing by. At this time, all participants are on 9

listening mode. During our Q&A session, you may press 10

  • 1 on your touch tone phone if you would like to ask 11 a question. Todays conference is being recorded. If 12 you have any objections, you may disconnect at this 13 time. Now Id like to turn the meeting over to Mr.

14 David Drucker, so you may begin.

15 16 17 18 19 20 MR. DRUCKER: Thank you, India. This is David Drucker. Im work for Nuclear Regulatory Commission.

Im the project manager for the environmental review of the LaSalle County Station license renewal application. Hereafter, I will refer to the Nuclear Regulatory Commission as the NRC.

21 There are two primary purposes for this 22 meeting. The first purpose is to discuss the contents 23 of this document that Im holding up, the draft 24 supplemental environmental impact statement for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

3 license renewal of LaSalle County Station. Hereafter, 1

I will refer to this document as the draft SEIS. SEIS 2

stands for Supplemental Environmental Impact 3

Statement.

4 The second purpose of this meeting is to 5

obtain comments on the draft SEIS. This meeting is 6

available by teleconference and, India, I just want to 7

make sure. Can you ask the folks on the line, or 8

actually, folks on the line, can you hear me? Because 9

Im speaking at a distance from the speakerphone.

10 THE OPERATOR: Everyone, your lines are 11 now open, and you can respond.

12 13 MR. MAHERAS: David, this is Steve Maheras, and I can hear you just fine.

14 15 16 17 18 19 MR. DRUCKER: Okay. Good, if one person can hear me, the rest of you all can hear me.

Before going further, I want to introduce NRC staff here tonight. Stu Sheldon is an NRC Region III license renewal inspector, and Robert Ruiz is the senior resident at the plant.

20 21 22 23 24 Id also like to point out that on the phone we have or will have a few NRC staff folks. My supervisor, Jim Danna is the chief of the environmental review and project management branch.

Michele Moser is the technical reviewer for aquatic 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

4 resources.

1 2

3 4

5 Kevin Folk is the technical reviewer for service water resources. Bill Ford is the technical reviewer for ground water. And you hear earlier Steve Maharris is the consultant from Pacific Northwest Laboratories for the high burn-up fuel section.

6 Next, Id like to cover a few details 7

about this meeting. Exelon applied to the NRC to 8

renew the operating licenses for LaSalle County 9

Station units one and two for an additional 20 years.

10 The NRC is reviewing that application, and will use 11 the results of that review to decide whether to renew 12 the licenses.

13 Tonight I will tell you the preliminary 14 results of the environmental review. These results 15 are documented in the draft SEIS. And I will also ask 16 for your comments on the draft SEIS. The meeting 17 tonight will, essentially, have four parts. The 18 introduction is the part that were doing now.

19 20 21 22 23 In the second part I will discuss the review process and the preliminary findings of the review. Copies of this presentation are on the table by the door and Stu Sheldon, it looks like he handed out copies to everyone here.

24 The next portion will be an opportunity to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

5 ask questions about the material presented, and I will 1

answer those questions. And finally, the NRC staff 2

will listen to your comments about the draft SEIS.

3 Note that the NRC will listen during this time. We 4

generally wont respond to what youre saying here in 5

the meeting. Instead, we will prepare written 6

responses to your comments that will be published as 7

a part of the final SEIS.

8 Please note that this meeting is being 9

recorded,; a transcribers sitting right up here in 10 front. And hes doing that to produce a written 11 record of whats said at this meeting. In order for 12 the transcript to be accurate, please comply with the 13 following.

14 First, please silence your phones and any 15 other personal electronics you have with you. If you 16 must accept a call during this meeting, please step 17 outside into the lobby so the other meeting 18 participants can hear the proceedings and so your 19 phone ringing, nor your conversation is recorded.

20 When you speak, please use a microphone.

21 And Ill bring it around for the question and answer 22 period to you guys. Thats how we will ensure that 23 what you say is recorded. When you speak, identify 24 who you are and, if you represent a group, what group 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

6 you represent. Also, if you have an uncommon name or 1

if your name has an unusual spelling, please spell 2

your name. And to ensure the recording is clear, 3

please dont hold side conversations, and do not 4

interrupt the speaker. Thank you.

5 6

7 8

9 10 When you signed in tonight, you may have noted yellow cards, like the one Im holding up, on the table. Several of you have already filled them out, and thats to be a speaker. So if you want to speak, let me know. Ill bring a card around to you, and you can fill that out now.

11 When we get to the public comment portion 12 of this evening, I will give each public commenter 13 three minutes to speak. And then, after everyones 14 had a chance to speak, we can, if you havent finished 15 your comments, you can certainly have more time. So 16 far I only have four folks who are signed up to speak.

17 18 19 20 21 22 23 Also on the table outside is a stack of public meeting feedback forms. Please fill one out and provide it to me or leave it on the table, or you can drop it in the mail; its postage free. Your assessment of this meeting tonight will help improve future meetings.

24 And finally, for those who dont know, the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

7 restrooms are out the hallway to the left. Emergency 1

exit is out the hallway to the right. And security is 2

located at the LaSalle County Sheriffs Office. Its 3

just across the parking lot, if we should need 4

security.

5 6

7 8

Okay, do you have any questions on this brief introduction before I go any further, and start discussing the environmental review?

No - ok then.

9 10 11 12 13 14 15 16 17 Im going to start discussing the environmental review and preliminary results from the draft SEIS. First, I would like to emphasize that the environmental review is not yet complete. I hope the information provided in this presentation will help you understand what weve done so far, and the role you can play in helping to make sure that the final environmental impact statement is accurate and complete.

18 Id like to start off by briefly going 19 over the agenda for this portion of my speech. First 20 of all, Ill comment on the NRCs regulatory role, 21 then Ill provide the preliminary findings of our 22 environmental review, and then I will present the 23 current schedule for the remainder of the 24 environmental review, and tell you how you can submit 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

8 comments outside of this meeting.

1 At the end of the presentation, there will 2

be time for questions and answers on the comments of 3

my briefing and, most importantly, time for you to 4

present your comments on the draft SEIS.

5 The NRC was established to regulate 6

civilian use of nuclear materials, including 7

facilities producing electric power. The NRC conducts 8

license renewal reviews for plants whose owners wish 9

to operate them beyond their initial license period.

10 11 NRC license renewal reviews address safety 12 issues related to managing the affects of aging and 13 environmental issues related to an additional 20 years 14 of operation. In all aspects of the NRC regulation, 15 our mission is three-fold. To ensure adequate 16 protection of the public health and safety, to promote 17 common defense and security, and to protect the 18 environment.

19 20 21 22 23 24 Our environmental review looks at the potential site-specific impacts of license renewal of the LaSalle County Stations Units 1 and 2. A generic environmental impact statement, or GEIS, examines the possible environmental impacts that could occur as a result of renewing licenses of individual 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

9 nuclear power plants.

1 2

3 4

5 6

The GEIS describes the significance of these potential impacts. The analysis in the GEIS pertains to operating power reactors. For each type or environmental

impact, the GEIS establishes generic findings, covering as many plants as possible.

7 8

9 10 11 12 13 For some environmental issues, the GEIS found that a generic evaluation was not sufficient, and that a plant-specific analysis was required. The 2013 revision to the GEIS is sitting here on the table; these three volumes. The GEIS was originally done in 1996. It contains more information than these three volumes, and there was an addendum in 14 1999.

15 16 17 18 19 This gives you an idea of the effort that went in to looking at nuclear power plants across the

country, and determining which
impacts, environmental impacts, were generic, and which require site-specific analysis.

20 The site-specific findings for the LaSalle 21 County Station are contained in the draft SEIS 22 published in February, 2016. This document contains 23 analyses of all possible site-specific issues, as well 24 as a review of issues covered by the GEIS, to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 10 determine whether the conclusions in the GEIS are valid for LaSalle County Station.

2 3

4 5

6 7

In this process, the NRC staff also reviews environmental impacts of potential power generation alternatives to license renewal.

Finally, I want to mention that on March 10th of last year, March 10th of last year, I was here conducting the environmental scoping meetings.

8 9

10 11 12 During those meetings and the scoping period, the NRC collected comments that informed the scope of the environmental review. Those comments, and the NRC responses to those comments, are found in the scoping summary report.

13 14 15 16 17 Hard copies and CDs of the scoping summary report are available on the table by the door. And also, that same CD that has the scoping summary report contains a copy of the draft SEIS. Please feel free to take a copy of the CD.

18 19 20 21 22 23 24 For each environmental issue identified an impact level is assigned. The NRCs standard of significance for impacts was established using the White House counsel on environmental quality terminology for significant. The NRC established three levels of significance for potential impacts, small, moderate and large, as defined on the slide.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

11 For a small impact, the effects are not 1

detectible or are so minor that they will neither 2

destabilize nor noticeable alter any important 3

attribute of the resource. For a moderate impact, the 4

effects are sufficient to alter noticeably, but not 5

destabilize important attributes of the resource. And 6

for a large impact, the effects are clearly noticeable 7

and are sufficient to destabilize important 8

attributes of the resource.

9 While these impact level designations are 10 used for most of the resource areas that we looked at 11 in the draft SEIS, there are three areas that have 12 their own impact level designations. And these are 13 discussed on the next slide.

14 So for special status species, the impact 15 significance determination language comes from the 16 Endangered Species Act. And choices to describe the 17 impacts are no effect, may affect but not likely to 18 adversely affect, and may affect and is likely to 19 adversely affect.

20 For cultural and historic resources, the 21 National Historic Preservation Act requires Federal 22 agencies to consider the effects of their undertakings 23 on historic properties. And for environmental 24 justice, under Executive Order 12898, Federal agencies 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

12 are responsible for identifying and addressing 1

disproportionately high and adverse human health and 2

environmental impacts on minority and low-income 3

populations.

4 This slide lists the issues the NRC 5

reviewed for the continued operation of the LaSalle 6

County Station during the proposed license renewal 7

period. So in this one slide, this is basically a 8

very quick summary of what you would find in that 9

larger document, the draft SEIS.

10 For all issues, except aquatic resources, 11 the impacts of license renewal were found to be small, 12 which means the effects are not detectible, or are so 13 minor that they will neither destabilize nor 14 noticeably alter any important attribute of the 15 resource.

16 Thermal impacts would be small for aquatic 17 resources in the Illinois River, and small for aquatic 18 resources in the cooling pond, except for gizzard and 19 threadfin shad. Gizzard and threadfin shad would 20 experience moderate thermal impacts in the cooling 21 pond.

22 The NRC staff also considered cumulative 23 impacts. Cumulative impacts are the effects on the 24 environment from other past, present and reasonably 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

13 foreseeable future human actions, other than LaSalle 1

County Station. The effects not only included 2

operation of LaSalle County Station, but also impacts 3

unrelated to LaSalle, such as future urbanization, 4

other energy producing facilities in the area and 5

climate change.

6 The analysis considers potential impacts 7

through the end of the current license term, as well 8

as the 20-year license renewal term. The NRC staff 9

determined that most cumulative impacts would be 10 small, and the analysis is provided in section 4.16 of 11 the draft SEIS.

12 The National Environmental Policy Act 13 mandates that each environmental impact statement 14 consider alternatives to any proposed major Federal 15 action. A major step for determining whether license 16 renewal is reasonable or not is comparing the likely 17 impacts of continued operation of a nuclear plant with 18 the likely impacts of alternatives means of power 19 generation.

20 Alternatives must provide an option that 21 allows for power generation capability beyond the term 22 of the current nuclear power plant operating license 23 to meet future system generation needs. In the draft 24 SEIS, NRC staff initially considered 17 different 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 alternatives, and then we narrowed those 17 down to 1

five, and looked at those five in detail.

2 Additionally, the NRC staff considered 3

what would happen if no action is taken and LaSalle 4

shuts down at the end of its current licenses without 5

a specific replacement alternative. This alternative 6

would not provide power generation capacity nor would 7

it meet the needs currently met by LaSalle.

8 The NRCs preliminary conclusion is that 9

the environmental impacts of renewal of the operating 10 licenses for LaSalle would be smaller than those 11 feasible and commercially viable alternatives.

12 Continued operation would have smaller environmental 13 impacts in almost all areas. The staff concluded that 14 continued operation of the existing LaSalle County 15 Station is the environmentally preferred alternative.

16 17 Based on review of likely environmental 18 impacts from license renewal, as well as potential 19 environmental impacts of alternatives to license 20 renewal, the NRC staffs preliminary recommendation in 21 the draft SEIS is that the adverse environmental 22 impacts of license renewal for LaSalle County Station 23 are not great enough to deny the option of license 24 renewal for energy planning decision makers. And that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

15 preliminary conclusion shows up several places in the 1

draft SEIS, but chapter five is the conclusion 2

chapter.

3 I would like to re-emphasize that the 4

environmental review is not yet complete. Your 5

comments tonight, and all written comments received by 6

the end of the comment period on April 4th, will be 7

considered by the NRC staff as we develop the final 8

SEIS, which we currently plan to issue in August of 9

2016.

10 Those comments that are within the scope 11 of the environmental review and provide new and 12 significant information can help change the staffs 13 findings. The final SEIS will contain the staffs 14 final recommendation on the acceptability of license 15 renewal based on the work weve already performed and 16 any new and significant information we receive in the 17 form of comments during the comment period. I just 18 want to emphasize that the comment period closes on 19 April 4th, the second to the last line here on this 20 slide.

21 22 23 24 As many of you

know, I

am the primary contact for the environmental

review, and Jeff Mitchell is the primary contact for the safety review, and our information is on the handouts that I provided 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

16 you tonight, our contact information. Copies of the 1

draft SEIS are available on CD on the table near the 2

door. In addition, the library shown on this slide 3

has a copy available, current copy available for 4

review.

5 You can also find electronic copies of the 6

draft SEIS, along with other information about the 7

LaSalle County Station license renewal review online 8

at the website shown. And finally, additional 9

information can also be obtained by contacting the 10 representatives of NRCs Region III office of public 11 affairs, as shown on the slide.

12 NRC staff will address written comments in 13 the same way we address spoken comments received 14 today. You can submit written comments either online 15 or via conventional manner. To submit written 16 comments online, visit the website regulations.gov and 17 search for docket ID NRC-2014-0268. If you have 18 written comments today, you may give them to me or any 19 other member of the NRC staff.

20 Please note that if you provide verbal 21 comments tonight, you dont need to submit them in 22 writing since your verbal comments are part of the 23 transcribed record, and they will be responded to. So 24 this concludes my formal presentation.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

17 1

2 3

4 5

So now we enter the question and answer portion of our meeting. This portion is distinct from the comment portion. I will now answer questions specific to the material that I presented here tonight. I'd like to begin with questions those on the phone. Operator?

6 THE OPERATOR: Yes.

7 MR. DRUCKER: If theres anyone on the 8

phone that has questions about the material I 9

presented, can you please go ahead and let them ask 10 their questions one at a time, and Ill do my best to 11 answer them.

12 THE OPERATOR: Certainly. If you would 13 like to as a question on the phone line, please press 14

  • 1 and record your name when prompted. Please make 15 sure your phone is not muted when you record your 16 name. Once again, thats *1 and record your name.

17 One moment for our first question. And no questions 18 have come in.

19 20 21 22 23 24 MR. DRUCKER: Okay Operator, thank you.

Most of the folks here in the room have been a part of the license renewal process. Theyre familiar with the scoping process we did last year. But I just want to emphasize, for anyone whos listening, that you know, this is not a hearing. This is a public 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

18 meeting.

1 2

3 4

5 6

And the goal of this meeting is two-way communication; for me to provide information about the environmental impact statement that weve been working on and have developed, and then to receive comment on that document. So I am looking for questions on the material I presented.

7 With that, Im going to go to questions.

8 Does anyone have any questions about the material I 9

presented here in the room? If there are no 10 questions, I just want to --

11 12 13 MS. SNYDER: I have a question.

MR. DRUCKER: Gail, go ahead.

MS. SNYDER: My first question is you said 14 15 16 17 18 19 20 21 22 23 24 this is a public meeting. Theres not really many members of the public here, so Im just wondering what does the NRC do to promote this? I find it hard to believe in an area where theres thousands of people who could be impacted by this decision that nobodys shown up, no elected officials, unless theres something here I dont know about. Im just wondering, you know, why theres such a poor turnout.

MR. DRUCKER: Good question. Certainly, certainly, let me answer that first; your first part of the question was how do we advertise, basically, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

1 2

3 19 this public. This meeting is advertised through many means. The first place that its advertised is we put out a Federal Register notice, the NRC does, announcing the meeting.

4 5

6 7

8 9

And then the Environmental Protection Agency, it publishes a Federal Register notice that announces the release of the draft SEIS, and then how to contact me if youre interested in learning more about that. So theres two Federal Register notices that go out.

10 The Nuclear Regulatory Commissions 11 website also has actually several places where we talk 12 about the meeting. We have a public meeting web page 13 that speaks to all the meetings that we have. We have 14 a license renewal web page that talks about this 15 meeting. Theres also the regular LaSalle operating 16 license web page, which also points to my license 17 renewal web page. So theres those web pages.

18 19 20 21 22 23 We also have advertisements in local newspapers. I can get those for you if youre interested. But we did advertise in the local newspapers, announcing this meeting. I also reached out to everyone who attended the scoping meetings last year through e-mail and or letter.

24 I either sent them a hard copy of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

20 draft SEIS, along with a copy of the Federal Register 1

notice, which provided the information on when and 2

where this meeting would be held. Either hard copy, 3

or I provided them a CD of the draft SEIS.

4 Off the top of my head, I actually used to 5

carry a list of all different ways that we advertised 6

the meetings; off the top of my head, thats how we do 7

it. There were e-mails, too. For example, e-mail 8

reminders I sent out to the EPA via Region V folks so 9

they may be on the phone tonight.

10 11 12 13 14 15 So those are the basic ways. If I missed anything, and my boss is listening feel free to chime in, Jim, and let me know what I missed. But those are the major ways. Oh, another way; the fliers. I asked the resident inspector to post fliers locally around.

16 Good question and, yeah, sometimes we get 17 a big turnout at these meetings, and sometimes we 18 dont. Personally, I was at one down in Mississippi, 19 Grand Gulf. There were a few flakes of snow, and the 20 Governor basically told everyone to stay in. And I 21 flew own with my boss at the time, and we had no 22 trouble. There was no snow on the roads; didnt 23 understand what the problem was. But it was a local 24 thing.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

21 I was paying attention to the news this 1

morning, and I heard the terrible, terrible news of 2

what was going on in Belgium, but I doubt that that 3

somehow would impact people showing up here. I did 4

read the local paper to see there were a couple other 5

meetings.

6 7

8 9

10 11 12 There was a board of education meeting in one of the schools, but I didnt think it would impact attendance at this meeting. And I did work with the folks at the plant, and I worked with our resident inspector trying to pick a night that wasnt busy with other activities. I do believe we have at least one elected official here with us tonight. Mr. Walsh?

13 14 MR. WALSH: Yes, Im a member of the LaSalle County board.

15 16 MR. DRUCKER: OK, thanks.

MR. WALSH: Chair of legislative 17 rules.

18 19 20 MR. DRUCKER: Great.

MR. WALSH: County board member. MR.

DRUCKER: Good question. Any other 21 questions from folks in the room?

22 MS. SNYDER: I have more questions.

23 MR. DRUCKER: Please.

24 MS. SNYDER: Slide number 10, which is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

22 titled environmental review of LaSalle County Station 1

has the resources areas and the impacts listed. On 2

the bottom it says waste management, and the impact is 3

small. And Im just wondering can you define what 4

waste management is in this?

5 6

7 8

9 10 11 MR.

DRUCKER:

Yes, thats a

great question. The answer to your question is contained in the draft SEIS that we are discussing this evening.

And theres a

section on waste management. That section is located in Chapter 4.

Bear with me just for a moment, and I will flip to it. Its section 4. --

12 MS. SNYDER: Does it refer to nuclear 13 waste, or is it waste from the plant, other than?

14 15 16 17 18 19 20 MR. DRUCKER: Section 4.13 of the draft SEIS discusses, the spent fuel produced by the plant, both onsite storage and offsite radiological impacts.

This section also discusses low level waste storage and disposal, mixed waste storage, and non-radioactive waste storage. So this is the section that does cover the spent nuclear fuel.

21 22 23 24 So theres a total of five issues that are looked at in this section. In a different section, Section 4.15.1, that section discusses issues related to the uranium fuel cycle. But spent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

23 is at the plant is talked about in Section 4.13.

1 MS. SNYDER: And when you say the impact 2

is small, do you mean that its small in comparison to 3

whats already there, or that 20 years of additional 4

waste will have a small impact?

5 MR. DRUCKER: Yeah, this is, this section 6

is talking to 20 years of additional operation.

7 MS. SNYDER: The small impact.

8 MR. DRUCKER: Yes.

9 MS. SNYDER: I have another question.

10 MR. DRUCKER: Please.

11 MS. SNYDER: I dont want to hog the 12 questions. Slide number 12, alternatives; and youre 13 talking about citing alternatives and the criteria 14 required to replace the energy. If you nuclear plant 15 had shut down, you said something about what would 16 happen if the nuclear plant shut down, and you found 17 that there wouldnt be an alternative power source 18 that would replace that power.

19 And I was just wondering if you had, or 20 the committee had, whoever drafted this, whatever 21 group drafted it had looked at the report from the 22 State of Illinois? There were a number of agencies; 23 there was a bill, HR, a resolution, HR1146, which was 24 looking at nuclear power in the state.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

24 And state agencies drafted a report, and 1

they came out with the opposite finding of what youre 2

saying. So maybe we will e-mail that report to you.

3 I think that would be informative to what their 4

position is, is not the same as your conclusion.

5 MR. DRUCKER: OK, thank you.

6 MS. SNYDER: And thats a state study by 7

state agencies.

8 MR. DRUCKER: All right. I appreciate 9

that very much. Thanks, Gail. Okay, if there are no 10 other questions, then were going to move right along 11 to the comment portion of tonights meeting. And as 12 I stated at the beginning, primarily the NRC staff 13 will be listening, and we will respond to any comments 14 in written form in the final SEIS.

15 So let me go to the operator. India, is 16 there anyone on the phone that wants to provide a 17 comment?

18 THE OPERATOR: If you do have comments, 19 please press *1 and record your name when prompted.

20 Once again, thats *1 -- and no comments have come in 21 over the phone.

22 MR. DRUCKER: Thank you. Thank you, very 23 much.

24 THE OPERATOR: Youre welcome.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

25 1

2 3

4 5

MR. DRUCKER: Okay, I have yellow cards from three, from four folks. Ill shuffle them and pull them out randomly. I hope it does not matter to any of you. I would appreciate, would the speakers come up to the front here, and you can use this microphone. Gail, are you available first?

6 MS. SNYDER: Sure.

7 MR. DRUCKER: And the next speaker will be 8

Doug OBrien, so Doug if you want to prepare yourself 9

and move up to the front to save some time. In fact, 10 theres only four of you. Itll be Gail, Doug, Steve 11 and Tom.

12 MS. SNYDER: I dont know if this makes 13 your life easier.

14 AUDIENCE MEMBER: Oh great, thank you.

15 MS. SNYDER: Good evening. My name is 16 Gail Snyder, and Im here representing Nuclear Energy 17 Information Service. I serve as the president of the 18 board. Our comments tonight are really directed, 19 maybe, not specifically at environmental issues, but 20 the licensing renewal.

21 And one of our first comments is that the 22 analysis of socioeconomic impacts are incomplete. No 23 analysis of impacts for early or unexpected closures 24 were considered or provided. The Exelon safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

26 evaluation report documents a significant tax impact 1

for the presence of the LaSalle County Station, yet 2

only addresses the positive impacts.

3 No mention or analysis of negative impacts 4

resulting from a abrupt planned or unexpected early 5

closure of LaSalle is presented. This is a 6

significant omission, particularly in light of Exelon 7

Corporations threat of two years ago to close 8

reactors in Illinois on economic grounds.

9 According to the Exelon SER, LaSalle 10 represents a sizeable portion of the county total tax 11 base. It also accounts for large portions of the 12 school districts adjusted property tax levy. These 13 are not insignificant amounts.

Their abrupt 14 disappearance would wreak economic havoc on the 15 affected governmental and essential service entities 16 ability to operate, just as Exelons predecessor, 17 ComEd, did to the community of Zion in 1997, when they 18 unilaterally closed the Zion reactors.

19 The SER either fails to recognize or 20 mention at all some of the possible events that could 21 result in such a closure situation, such as an 22 unexpected major accident resulting in immediate and, 23 presumably, premature closing, NRC-ordered shutdown, 24 Exelon unilateral decision to close the plant on 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

27 economic or other grounds, as it did in Zion, 1

resulting in an immediate loss of about 55 percent of 2

Zions tax base.

3 Devaluation through sale has occurred at 4

the Clinton Station, resulting in enormous loss of the 5

tax base, eventual old age, license expiration 6

closure, which is the outcome of -- and I would add, 7

in light of whats happening in Brussels today, and 8

the fact that theyve shut down their nuclear reactors 9

and cant provide security, terrorism is also a 10 possible way that a nuclear reactor could shut down 11 unexpectedly.

12 Exelons being a business will certainly 13 make the calculations it made when it closed Zion and 14 decided that LaSalle should continue to operate. In 15 this omission, the SER makes the same mistake the U.S.

16 Government made when it invaded Iraq. No exit 17 strategy.

To simply assume that the only 18 socioeconomic effects of LaSalles presence will be 19 positive ones is simply irrational.

20 Our recommendation: Planning for some 21 kind of eventual closure must be made long before it 22 happens to minimize economic and service disruptions 23 to the entities whose tax bases will be affected.

24 Debate about the license extension serves as a good 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

28 reminder of this fact, and an opportunity to take 1

action.

2 We recommend that dependent government and 3

tax entities begin formal negotiations with Exelon to 4

establish an escrow of mitigation funds based on some 5

mutually agreeable assessment and payment structure so 6

that dependent entities will have some kind of 7

temporary funds available to soften the economic blow 8

or closure and not radically disrupt essential 9

services.

10 Our second comment, which is shorter, is 11 the inadequate attention paid to water availability at 12 the LaSalle Nuclear Power Plant under potential future 13 climate disruption conditions. Historically, LaSalle 14 Nuclear Power Plant has been one of the Illinois 15 reactor sites most sensitive to water availability 16 under severe drought conditions; for example, 1998, 17 2005, 2006.

18 Its siting on a portion of the Illinois 19 River network that is shallower than other parts has 20 brought the reactors close to mandatory shutdowns to 21 stay within EPA regulatory limits for thermal 22 pollution during extreme droughts on more than one 23 occasion over the past two decades.

24 Forecast for the future of Illinoiss 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 climate over the next few decades indicate it 1

approaching that of current day west Texas. This will 2

have severe impacts on the aquatic system in the area, 3

and on the availability of water for intake and 4

discharge at LaSalle.

5 A

more thorough re-examination of 6

LaSalles ability to safely operate, obtain sufficient 7

cooling water, and not thermally and radiologically 8

damage the local aquatic ecosystem is in order in this 9

re-licensing proceeding. Thank you.

10 MR. DRUCKER: The next speaker is Doug 11 OBrien from the Illinois Clean Energy Coalition.

12 MR. OBRIEN: Thank you. My name is Doug 13 OBrien. Im with the Illinois Clean Energy 14 Coalition, and this is another one in a long number of 15 these hearings or events that Ive been to, talking 16 about a lot of the positive impacts that Illinoiss 17 nuclear generating stations have had on the economy.

18 19 Its ironic that Im following somebody 20 who came up and posited these impacts, these 21 beneficial impacts and somehow turned them into a 22 negative. And I think that its also a little bit 23 insulting to the intelligence of local officials here 24 and around Illinois to assume that they dont have the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

30 sense to plan for the future. And I know that many 1

local governments do just that. They do it 2

vigilantly, and they do it effectively.

3 But I wanted to talk a little bit about 4

the environmental impacts, the positive environmental 5

impacts of the plant. As the initial NRC reports 6

shows, the overall impacts when it comes to energy 7

generation are positive. That the alternative sources 8

for energy generation in Illinois would create more 9

negative impacts environmentally, particularly in the 10 area of CO2 emissions, as its critically important 11 that we always consider the beneficial impact of 12 Illinoiss nuclear fleet on CO2 emissions here in 13 Illinois.

14 The Illinois Clean Energy Coalitions 15 study in 2014 showed that Illinoiss nuclear fleet 16 prevents the emission of over 92 million tons of CO2 17 annually. Now this is a significant contributor to 18 global climate change, and something that we can do in 19 preserving and protecting our nuclear fleet that will 20 have a real, immediate, ongoing positive impact on our 21 environment.

22 Now, other sources of clean energy are 23 vital to our future, as well. But the simple truth is 24 we cannot quickly or easily replace nuclear generation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

31 with other clean sources. And a nuclear plant like 1

LaSalle would require, for example, thousands of new 2

wind turbines to replace its electricity generation.

3 4

And we still cant rely on wind 24/7, nor 5

on solar 24/7. And the process of siting these wind 6

farms, the capital and the permitting that is needed 7

to begin operating them is daunting. So losing any of 8

Illinoiss nuclear plants would leave us with no 9

short-term alternative but to increase our use of 10 fossil fuels and move us in the wrong direction.

11 Additionally, I think its important to 12 note that its vital for the NRC and our national 13 government to continue to push forward with practical 14 waste storage solutions that will allow for the 15 continued safe and secure storage of spent fuel, while 16 we wait for the Federal government to put aside 17 politics and live up to the commitment it made years 18 ago to establish a nationwide solution for spent fuel 19 storage.

20 In the meantime, plants like LaSalles 21 spent fuel is expertly handled, never having produced 22 any impact to the surrounding ecosystem. And while 23 the plants and the NRC have managed a laudable short-24 term solution, we have to continue to push for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

32 permanent solution promised by our government.

1 So I think, in conclusion, the Illinois 2

Clean Energy Coalition applauds the NRC and its 3

findings. We believe that its accurate in showing 4

the LaSalle Station, like other stations across the 5

state, has a positive impact on the environment moving 6

forward here in Illinois. Thank you.

7 MR. DRUCKER: Steve Buck is next.

8 MR. BUCK: Good evening. Im Steve Buck.

9 Im an engineer at LaSalle Station. I just recently 10 started back in August. I am a resident of Ottawa, 11 Illinois, and Im a former Eagle Scout, originally 12 from Crystal Lake, Illinois. So environmental 13 stewardship is something that is very much a part of 14 my character. Its something that I developed early 15 on in my youth, and I still continue it to this day as 16 an adult.

17 Id like to share a couple key points of 18 how LaSalle Station is trying to be an environmental 19 steward itself through our activities to help conserve 20 the environment and leave the environment at least in 21 the best, the same condition, if not better condition 22 than we came in.

23 We had recently installed, last year, a 24 couple of charging stations for electrical vehicles.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

33 So theres four charging ports available, which saved 1

about 1,300 pounds of greenhouse gas emissions for any 2

of our workers who chose to use their electric 3

vehicles instead of a carbon-producing combustion 4

engine vehicle.

5 We have an annual station earth day 6

activity every year. Some of those include electronic 7

waste recycling programs where we collect electronic 8

waste. And we typically give out green gifts to those 9

who participate to bring in their electronics for 10 recycling as a thank you for looking out for that so 11 that we dont throw electronics just simply into 12 landfills.

13 Theres been a big push for LED lighting 14 upgrades, both inside the plant and outside, most 15 noticeably in the parking lot. The LED lights were 16 replaced. They should last about seven to 10 years 17 out in the conditions outside in the parking lot.

18 And were noticing that theres reduced electricity 19 usage for those, longer life span, and weve been 20 doing studies at other places inside the plant where 21 we can utilize LED lighting.

22 We are members of the Wildlife Habitat 23 Council certification.

We have achieved 24 re-certification last year for our efforts. We have 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

34 many projects around the site, such as bat boxes, Uber 1

boxes, and activities with the fish hatchery in the 2

lake.

3 Our North American Young Generation 4

Nuclear, its a youth group primarily of those who are 5

new to the nuclear industry, which I am a site 6

director at LaSalle Station; we have an 7

adopt-a-highway program for about a two-mile stretch 8

near the facility. And during the summer months, the 9

warmer months, we do a highway clean-up where we go 10 both sides of the highway, and just pick up any trash, 11 litter that might be on the side of the road.

12 We have a Gabby Green educational program 13 that goes out to our elementary schools. We discuss 14 energy conservation, resource conservation. We talk 15 about limited use of our water in certain situations, 16 turning the lights off when we go to the rooms. Some 17 very simple concepts for young children to understand 18 so that they can be environmental conscious starting 19 at a young age.

20 We are starting to develop a program with 21 Boy Scouts of America. As I said, Im a Boy Scout, 22 and this is something thats just starting to develop 23 in the last month. Developing programs with the Boy 24 Scouts to help encourage them with their environmental 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

35 practices, some of their merit badges and their rank 1

advancements and helping them live up to that 2

environmental stewardship themselves.

3 We also are firm supporters of the Who 4

Haven, which is wildlife rehabilitation center, 5

primarily for birds of prey, where we collect food for 6

those animals and also participate in bird releases, 7

releasing them back into the environment.

8 MR. DRUCKER: Thanks. The final speaker 9

from the cards, wheres Tom, Tom Jackson?

10 MR. JACKSON: Good evening. My names Tom 11 Jackson. Im site superintendent at Illini State 12 Park, Marseilles fish and wildlife area in LaSalle.

13 I work for the Department of Natural Resources, and 14 the IDNR currently has a lease through 2025 with 15 Exelon to manage the wildlife area and the fishing 16 opportunities.

17 LaSalle Lake is a fish and wildlife area, 18 along with a public fishing area. Were open to the 19 public from March 15th to October 15th every year for 20 fishing, providing many varieties of fish species, 21 including hybrid striped bass, large and small mouth 22 bass, crappie, blue gill and catfish.

23 In the months from October 15th through 24 March 15th of every year, the site is closed to the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

36 public, and provides a wildlife area for waterfowl 1

migrating through the area. IDNR works closely with 2

Exelon to provide a great recreational opportunity to 3

local resident and visitors from throughout the state 4

and even surrounding states.

5 LaSalle Lake provides good wildlife 6

habitat for the waterfowl, as mentioned before, and 7

provides good fishing and outdoor recreation for the 8

community. It also provides good economic benefits, 9

visitors to the area.

10 In my time as site superintendent, Exelon 11 management has made themselves available and 12 supportive in our efforts to provide site visitors 13 with access to the lake, and a rewarding experience 14 while visiting the site. I thank you for the 15 opportunity to speak on behalf of LaSalle Lake fish 16 and wildlife area and the Department of Nature 17 Resources.

18 MR. DRUCKER: Okay, if theres no one else 19 here or on the phone who has comments, and there 20 doesnt appear to be, I want to thank everyone who 21 provided --

22 MS. BOUDART: I have a comment.

23 MR. DRUCKER: Oh.

24 MS. BOUDART: May I make a comment?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

37 MR. DRUCKER: Absolutely.

1 MS. BOUDART: Okay.

2 MR. DRUCKER: Is it easier for me to bring 3

you the microphone there?

4 MS. BOUDART: Well, if you can so I think 5

I can speak loud enough. The person who spoke first, 6

who are you? Either the purple shirt or the white 7

striped shirt. Anyway, let me see --

8 MR. DRUCKER: Can you tell us your name.

9 MS. BOUDART: Oh yeah, my name is Jan 10 Boudart, and Im with the Nuclear Energy Information 11 Service, and somebody, I guess I didnt get, yeah, I 12 asked, Doug OBrien, the Clean Energy Coalition. Is 13 that you?

14 Well, I was very interested in the fact 15 that you said that until our government keeps its 16 promise to take care of the high level nuclear waste, 17 its being handled very efficiently and not being 18 allowed to harm anyone. And, in fact, your statement 19 was never having produced any impact from the high 20 level nuclear waste.

21 And I think this is something that, rather 22 than say that I, well, I personally dont believe 23 that, but I cant prove that its wrong. Also, you 24 cant prove that its right.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

38

Recently, the Nuclear Regulatory 1

Commission decided not to conduct health studies of 2

the impacts of the power plants around the United 3

States. And without those studies, you cant say that 4

there is no impact, and you cannot say that there is 5

an impact because there is no study.

6 So to come up with the statement that this 7

activity of taking care of the high level nuclear 8

waste never produced any impact is a statement that is 9

not supported. If I were to say well, I know it has 10 produced an impact, that would also be an unsupported 11 statement. There has been no study to find out 12 whether or not there is an impact. And I think that 13 kind of a positive statement really exposes the feet 14 of clay.

15 MR. DRUCKER: Thank you, and Im going to 16 ask you could just fill out a card for me, just with 17 your name and e-mail address. All right, thank you 18 all. Do we have any other comments from anyone on the 19 phone?

20 THE OPERATOR: If you would like to have 21 a comment or question, please press *1 an record your 22 name when prompted. Thank you. No questions or 23 comments have come in.

24 MR. DRUCKER: Okay, thank you. Thanks to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

39 everyone who provided comments during this meeting, 1

because that information exchange is what this 2

meetings all about. Also, thanks to all of you for 3

giving the speakers your time and attention.

4 And I want to thank Connie Brooks whos 5

actually across the hallway there and Fred Moore who 6

work here for the use of LaSalle County emergency 7

operations center. And finally on the table, if you 8

want to, please pick up a meeting feedback form if you 9

havent already, and either return it to me or any 10 other staff member. Feel free to mail it in. And 11 with that, this meeting is concluded.

12 Im going to stick around. If anyone had 13 any questions and wants to talk to me one-on-one, Im 14 happy to stick around and do that. So thank you all, 15 again, for coming out tonight.

16 THE OPERATOR: This concludes your 17 conference, and you may disconnect. Once again, your 18 conference has ended, and you may disconnect.

19 (Whereupon, at 8:00 p.m., the above-20 mentioned public hearing was concluded.)