{{#Wiki_filter:4 DUKE | {{#Wiki_filter:4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission | ||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016. | |||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator | Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants. | ||
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated | As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete. | ||
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial | |||
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | ||
Director | Director Nuc Org Effectiveness | ||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: | ||
Document Control Desk (wlo Enclosure) | |||
NRC Resident Inspector, HBRSEP (w/o Enclosure) | NRC Resident Inspector, HBRSEP (w/o Enclosure) | ||
Mr. Victor McCree, NRC, Region II (w/o Enclosure) | Mr. Victor McCree, NRC, Region II (w/o Enclosure) | ||
| Line 32: | Line 33: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
DUKE | DUKE David S. Hoffman H. B. Robinson Steam ENERGYa Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: | ||
A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016. | |||
In accordance with the guidelines in Revision 10 of NUREG-1 021, | As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete. | ||
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES- | If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | ||
If you have any questions concerning this matter, please contact Mr. | |||
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | ||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: | ||
Document Control Desk (w/o Enclosure) | |||
NRC Resident Inspector, HBRSEP (wlo Enclosure) | NRC Resident Inspector, HBRSEP (wlo Enclosure) | ||
NRC Regional Administrator, Region II (w/o Enclosure) | NRC Regional Administrator, Region II (w/o Enclosure) | ||
| Line 47: | Line 50: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
..-+/-Y IDeNILflABL..... | |||
R. Michael Glover | R. Michael Glover | ||
( | ( | ||
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | DUKE H. B. Robinson Steam Q | ||
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Electric Plant Unit 2 EL1ERGY5 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is | Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
and Mr. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
Daniel Bacon, NRC Region II, arrangements were made to administer the license | In response to NRC {{letter dated|date=September 3, 2015|text=letter dated September 3, 2015}}, Duke Energy Progress, Inc., is submitting preliminary Personal Qualification Statement | ||
Duke Energy Progress, Inc. requests that the information in the attachments be | - Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The {{letter dated|date=September 3, 2015|text=September 3, 2015 letter}} requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. | ||
If you have any questions concerning this matter, please contact Richard Hightower, | Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No.2, beginning February 1,2016. | ||
Sincerely, vV(c R. Michael Glover Site Vice President | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Richard Hightower, Manager | |||
Nuclear Regulatory Affairs at (843) 857-1329. | |||
Sincerely, vV(c R. Michael Glover Site Vice President RMG/cac | |||
*ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | |||
DEC 21 2015 | DEC 21 2015 | ||
Ptn86INrIFiAR1E- | Ptn86INrIFiAR1E-tNroflMMtON--wm1HGI-uNBER-10 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: | ||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: | List of Scheduled Applicants Attachment II: Personal Qualification Statement | ||
- Licensee (NRC Form 398) | |||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: | |||
Document Control Desk (w/o Attachments) | |||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments) | Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments) | ||
Mr. G. J. McCoy, NRC, Region II | Mr. G. J. McCoy, NRC, Region II | ||
*ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1NRMAToN tHoID-uNoEw1-o-en 2.300 Upon removal of Attachment, this letter is decontrolled. | |||
Upon removal of Attachment, this letter is decontrolled. | |||
f | f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to the {{letter dated|date=September 3, 2015|text=letter dated September 3, 2015}}, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement | |||
- Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, | Sincerely, | ||
: a. | : a. iJ (_ | ||
R. Michael Glover Site Vice President RMG/cac Attahmentz-t8-thrs-tettui,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
Site Vice President RMG/cac Attahmentz-t8-thrs-tettui ,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
JAN 75 2018 | JAN 75 2018 | ||
PERBONAt*1ENT1EMBEE- | PERBONAt*1ENT1EMBEE-INfOflMATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | ||
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | List of Scheduled Applicants II. | ||
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | Personal Qualification Statement | ||
- Licensee (NRC Form 398) | |||
Ill. | |||
Certification of Medical Examination by Facility Licensee (NRC Form 396) | |||
==Enclosure:== | ==Enclosure:== | ||
NRC | NRC Medical Professional Only letters c: | ||
Document Control Desk (wlo Attachments and Enclosure) | |||
NRC Resident Inspector (w/o Attachments and Enclosure) | NRC Resident Inspector (w/o Attachments and Enclosure) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | ||
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | ||
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | AttaGhment&to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION | ||
- WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f | T1t*Btt INFORMATION - WITI IIDUtI9EW+O-OfR f | ||
DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN16-0004 JAN 272016 9 | Serial: RNP-RN16-0004 JAN 272016 9 | ||
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement | |||
- Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, 4Jtt | Sincerely, 4Jtt %N-_ | ||
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | ||
-Pfl6ONALY IDiNWt*BEE-I NFORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled. | |||
irTitwiiIJil | irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl | ||
- Wri fJ JI4IJTF7 U Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | |||
Personal Qualification Statement Licensee (NRC Form 398) | Personal Qualification Statement | ||
II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | - Licensee (NRC Form 398) | ||
C: | II. | ||
Certification of Medical Examination by Facility Licensee (NRC Form 396) | |||
C: | |||
Document Control Desk (wlo Attachments) | |||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments) | ||
| Line 112: | Line 133: | ||
10 R 239O Upon removal of Attachment, this letter is decontrolled. | 10 R 239O Upon removal of Attachment, this letter is decontrolled. | ||
UNDEII4O -eFR 2ee f | |||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1.a, as listed below, are enclosed. | |||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | Enclosure A: | ||
Enclosure | Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: | ||
Enclosure G: | Master examinations and answer keys Submitted Electronically Enclosure C: | ||
Questions asked by applicants during exam Enclosure D: | |||
Written examination seating chart Enclosure E: | |||
Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: | |||
Form ES-201-3, Examination Security Agreement (preliminary) | |||
Enclosure G: | |||
Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | |||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled. | ne4QurGLto Upon removal of Enclosures, this letter is decontrolled. | ||
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: | |||
Nuclear Operations Training at (843) 339-3889. | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: | |||
Document Control Desk (w/o Enclosures) | |||
NRC Resident Inspector (wlo Enclosures) | NRC Resident Inspector (wlo Enclosures) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures) | ||
-Enee& | |||
A4DENT[fl*BE MATION- WFH LD-INDEfl-- | A4DENT[fl*BE MATION-WFH LD-INDEfl-- | ||
Upon removal of Enclosures, this letter is decontrolled. | Upon removal of Enclosures, this letter is decontrolled. | ||
I I I%PI | I I I%PI I II I II Ifl fl I l hUm I II | ||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
SW I I I II *WI SJII.I 5 1W I I I a.W,W f | |||
DUKE R. Michael Glover H. B. Robinson Steam EL\\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric | |||
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs. | : Plant, Unit No. | ||
2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs. | |||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
This document contains no new Regulatory Commitments. | This document contains no new Regulatory Commitments. | ||
If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889. | If you have any questions concerning this matter, please contact Terry Giese, Manager | ||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: | |||
Nuclear Operations Training at (843) 339-3889. | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: | |||
Document Control Desk (w/o Enclosures) | |||
NRC Resident Inspector (w/o Enclosures) | NRC Resident Inspector (w/o Enclosures) | ||
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures) | Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures) | ||
Enclosures to this letter contain ERONALI | Enclosures to this letter contain ERONALI ID ALINrOawo*- WIThHOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled. | ||
4 DUKE | 4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission | ||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016. | |||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator | Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants. | ||
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated | As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete. | ||
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial | |||
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | ||
Director | Director Nuc Org Effectiveness | ||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: | ||
Document Control Desk (wlo Enclosure) | |||
NRC Resident Inspector, HBRSEP (w/o Enclosure) | NRC Resident Inspector, HBRSEP (w/o Enclosure) | ||
Mr. Victor McCree, NRC, Region II (w/o Enclosure) | Mr. Victor McCree, NRC, Region II (w/o Enclosure) | ||
| Line 161: | Line 202: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
DUKE | DUKE David S. Hoffman H. B. Robinson Steam ENERGYa Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: | ||
A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016. | |||
In accordance with the guidelines in Revision 10 of NUREG-1 021, | As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete. | ||
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES- | If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516. | ||
If you have any questions concerning this matter, please contact Mr. | |||
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | ||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: | ||
Document Control Desk (w/o Enclosure) | |||
NRC Resident Inspector, HBRSEP (wlo Enclosure) | NRC Resident Inspector, HBRSEP (wlo Enclosure) | ||
NRC Regional Administrator, Region II (w/o Enclosure) | NRC Regional Administrator, Region II (w/o Enclosure) | ||
| Line 176: | Line 219: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
..-+/-Y IDeNILflABL..... | |||
R. Michael Glover | R. Michael Glover | ||
( | ( | ||
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | DUKE H. B. Robinson Steam Q | ||
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Electric Plant Unit 2 EL1ERGY5 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is | Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
and Mr. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
Daniel Bacon, NRC Region II, arrangements were made to administer the license | In response to NRC {{letter dated|date=September 3, 2015|text=letter dated September 3, 2015}}, Duke Energy Progress, Inc., is submitting preliminary Personal Qualification Statement | ||
Duke Energy Progress, Inc. requests that the information in the attachments be | - Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The {{letter dated|date=September 3, 2015|text=September 3, 2015 letter}} requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. | ||
If you have any questions concerning this matter, please contact Richard Hightower, | Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No.2, beginning February 1,2016. | ||
Sincerely, vV(c R. Michael Glover Site Vice President | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Richard Hightower, Manager | |||
Nuclear Regulatory Affairs at (843) 857-1329. | |||
Sincerely, vV(c R. Michael Glover Site Vice President RMG/cac | |||
*ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | |||
DEC 21 2015 | DEC 21 2015 | ||
Ptn86INrIFiAR1E- | Ptn86INrIFiAR1E-tNroflMMtON--wm1HGI-uNBER-10 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: | ||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: | List of Scheduled Applicants Attachment II: Personal Qualification Statement | ||
- Licensee (NRC Form 398) | |||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: | |||
Document Control Desk (w/o Attachments) | |||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments) | Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments) | ||
Mr. G. J. McCoy, NRC, Region II | Mr. G. J. McCoy, NRC, Region II | ||
*ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1NRMAToN tHoID-uNoEw1-o-en 2.300 Upon removal of Attachment, this letter is decontrolled. | |||
Upon removal of Attachment, this letter is decontrolled. | |||
f | f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to the {{letter dated|date=September 3, 2015|text=letter dated September 3, 2015}}, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement | |||
- Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, | Sincerely, | ||
: a. | : a. iJ (_ | ||
R. Michael Glover Site Vice President RMG/cac Attahmentz-t8-thrs-tettui,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
Site Vice President RMG/cac Attahmentz-t8-thrs-tettui ,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
JAN 75 2018 | JAN 75 2018 | ||
PERBONAt*1ENT1EMBEE- | PERBONAt*1ENT1EMBEE-INfOflMATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | ||
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | List of Scheduled Applicants II. | ||
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | Personal Qualification Statement | ||
- Licensee (NRC Form 398) | |||
Ill. | |||
Certification of Medical Examination by Facility Licensee (NRC Form 396) | |||
==Enclosure:== | ==Enclosure:== | ||
NRC | NRC Medical Professional Only letters c: | ||
Document Control Desk (wlo Attachments and Enclosure) | |||
NRC Resident Inspector (w/o Attachments and Enclosure) | NRC Resident Inspector (w/o Attachments and Enclosure) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | ||
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | ||
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | AttaGhment&to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION | ||
- WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | |||
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f | T1t*Btt INFORMATION - WITI IIDUtI9EW+O-OfR f | ||
DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN16-0004 JAN 272016 9 | Serial: RNP-RN16-0004 JAN 272016 9 | ||
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | Regional Administrator, Region II U. S. Nuclear Regulatory Commission | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement | |||
- Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, 4Jtt | Sincerely, 4Jtt %N-_ | ||
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | ||
-Pfl6ONALY IDiNWt*BEE-I NFORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled. | |||
irTitwiiIJil | irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl | ||
- Wri fJ JI4IJTF7 U Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | |||
Personal Qualification Statement Licensee (NRC Form 398) | Personal Qualification Statement | ||
II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | - Licensee (NRC Form 398) | ||
C: | II. | ||
Certification of Medical Examination by Facility Licensee (NRC Form 396) | |||
C: | |||
Document Control Desk (wlo Attachments) | |||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments) | ||
| Line 241: | Line 302: | ||
10 R 239O Upon removal of Attachment, this letter is decontrolled. | 10 R 239O Upon removal of Attachment, this letter is decontrolled. | ||
UNDEII4O -eFR 2ee f | |||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1.a, as listed below, are enclosed. | |||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | Enclosure A: | ||
Enclosure | Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: | ||
Enclosure G: | Master examinations and answer keys Submitted Electronically Enclosure C: | ||
Questions asked by applicants during exam Enclosure D: | |||
Written examination seating chart Enclosure E: | |||
Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: | |||
Form ES-201-3, Examination Security Agreement (preliminary) | |||
Enclosure G: | |||
Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | |||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled. | ne4QurGLto Upon removal of Enclosures, this letter is decontrolled. | ||
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: | |||
Nuclear Operations Training at (843) 339-3889. | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: | |||
Document Control Desk (w/o Enclosures) | |||
NRC Resident Inspector (wlo Enclosures) | NRC Resident Inspector (wlo Enclosures) | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures) | ||
-Enee& | |||
A4DENT[fl*BE MATION- WFH LD-INDEfl-- | A4DENT[fl*BE MATION-WFH LD-INDEfl-- | ||
Upon removal of Enclosures, this letter is decontrolled. | Upon removal of Enclosures, this letter is decontrolled. | ||
I I I%PI | I I I%PI I II I II Ifl fl I l hUm I II | ||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
SW I I I II *WI SJII.I 5 1W I I I a.W,W f | |||
DUKE R. Michael Glover H. B. Robinson Steam EL\\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission | |||
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric | |||
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs. | : Plant, Unit No. | ||
2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs. | |||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
This document contains no new Regulatory Commitments. | This document contains no new Regulatory Commitments. | ||
If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889. | If you have any questions concerning this matter, please contact Terry Giese, Manager | ||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: | |||
Nuclear Operations Training at (843) 339-3889. | |||
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: | |||
Document Control Desk (w/o Enclosures) | |||
NRC Resident Inspector (w/o Enclosures) | NRC Resident Inspector (w/o Enclosures) | ||
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures) | Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures) | ||
Enclosures to this letter contain ERONALI | Enclosures to this letter contain ERONALI ID ALINrOawo*- WIThHOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled.}} | ||
Latest revision as of 00:28, 10 January 2025
| ML16125A079 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/27/2016 |
| From: | Hoffman D Division of Reactor Safety II |
| To: | Daniel Bacon Duke Energy Progress |
| References | |
| 50-261/OL-16-301 | |
| Download: ML16125A079 (13) | |
Text
4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016.
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C:
Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
DUKE David S. Hoffman H. B. Robinson Steam ENERGYa Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial:
A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016.
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C:
Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (wlo Enclosure)
NRC Regional Administrator, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (wlo Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
..-+/-Y IDeNILflABL.....
R. Michael Glover
(
DUKE H. B. Robinson Steam Q
Electric Plant Unit 2 EL1ERGY5 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting preliminary Personal Qualification Statement
- Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr.
Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No.2, beginning February 1,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Richard Hightower, Manager
Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, vV(c R. Michael Glover Site Vice President RMG/cac
- ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled.
DEC 21 2015
Ptn86INrIFiAR1E-tNroflMMtON--wm1HGI-uNBER-10 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I:
List of Scheduled Applicants Attachment II: Personal Qualification Statement
- Licensee (NRC Form 398)
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:
Document Control Desk (w/o Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments)
Mr. G. J. McCoy, NRC, Region II
- ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1NRMAToN tHoID-uNoEw1-o-en 2.300 Upon removal of Attachment, this letter is decontrolled.
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement
- Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely,
- a. iJ (_
R. Michael Glover Site Vice President RMG/cac Attahmentz-t8-thrs-tettui,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled.
JAN 75 2018
PERBONAt*1ENT1EMBEE-INfOflMATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments:
List of Scheduled Applicants II.
Personal Qualification Statement
- Licensee (NRC Form 398)
Ill.
Certification of Medical Examination by Facility Licensee (NRC Form 396)
Enclosure:
NRC Medical Professional Only letters c:
Document Control Desk (wlo Attachments and Enclosure)
NRC Resident Inspector (w/o Attachments and Enclosure)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure)
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure)
AttaGhment&to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION
- WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled.
T1t*Btt INFORMATION - WITI IIDUtI9EW+O-OfR f
DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN16-0004 JAN 272016 9
Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement
- Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator.
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely, 4Jtt %N-_
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi-
-Pfl6ONALY IDiNWt*BEE-I NFORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled.
irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl
- Wri fJ JI4IJTF7 U Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments:
Personal Qualification Statement
- Licensee (NRC Form 398)
II.
Certification of Medical Examination by Facility Licensee (NRC Form 396)
C:
Document Control Desk (wlo Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments)
Mr. G. J. McCoy, NRC, Region II kttehicnts1o thl3 Icttor-,
10 R 239O Upon removal of Attachment, this letter is decontrolled.
UNDEII4O -eFR 2ee f
DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION
Dear Mr. Guthrie:
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1.a, as listed below, are enclosed.
Enclosure A:
Original examination answer sheets, two clean copies and examination cover sheets Enclosure B:
Master examinations and answer keys Submitted Electronically Enclosure C:
Questions asked by applicants during exam Enclosure D:
Written examination seating chart Enclosure E:
Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F:
Form ES-201-3, Examination Security Agreement (preliminary)
Enclosure G:
Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled.
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager
Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c:
Document Control Desk (w/o Enclosures)
NRC Resident Inspector (wlo Enclosures)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures)
-Enee&
A4DENT[fl*BE MATION-WFH LD-INDEfl--
Upon removal of Enclosures, this letter is decontrolled.
I I I%PI I II I II Ifl fl I l hUm I II
SW I I I II *WI SJII.I 5 1W I I I a.W,W f
DUKE R. Michael Glover H. B. Robinson Steam EL\\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP
Dear Mr. Guthrie:
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric
- Plant, Unit No.
2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
This document contains no new Regulatory Commitments.
If you have any questions concerning this matter, please contact Terry Giese, Manager
Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c:
Document Control Desk (w/o Enclosures)
NRC Resident Inspector (w/o Enclosures)
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures)
Enclosures to this letter contain ERONALI ID ALINrOawo*- WIThHOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled.
4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclosed outlines for examinations scheduled to begin the week of February 1, 2016.
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated authorized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operator Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C:
Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
DUKE David S. Hoffman H. B. Robinson Steam ENERGYa Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial:
A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016.
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-201, Examination Security and Integrity Considerations, please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C:
Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (wlo Enclosure)
NRC Regional Administrator, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (wlo Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
..-+/-Y IDeNILflABL.....
R. Michael Glover
(
DUKE H. B. Robinson Steam Q
Electric Plant Unit 2 EL1ERGY5 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting preliminary Personal Qualification Statement
- Licensee (i.e., NRC Form 398) and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr.
Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No.2, beginning February 1,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Richard Hightower, Manager
Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, vV(c R. Michael Glover Site Vice President RMG/cac
- ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled.
DEC 21 2015
Ptn86INrIFiAR1E-tNroflMMtON--wm1HGI-uNBER-10 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I:
List of Scheduled Applicants Attachment II: Personal Qualification Statement
- Licensee (NRC Form 398)
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c:
Document Control Desk (w/o Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments)
Mr. G. J. McCoy, NRC, Region II
- ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1NRMAToN tHoID-uNoEw1-o-en 2.300 Upon removal of Attachment, this letter is decontrolled.
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement
- Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely,
- a. iJ (_
R. Michael Glover Site Vice President RMG/cac Attahmentz-t8-thrs-tettui,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled.
JAN 75 2018
PERBONAt*1ENT1EMBEE-INfOflMATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments:
List of Scheduled Applicants II.
Personal Qualification Statement
- Licensee (NRC Form 398)
Ill.
Certification of Medical Examination by Facility Licensee (NRC Form 396)
Enclosure:
NRC Medical Professional Only letters c:
Document Control Desk (wlo Attachments and Enclosure)
NRC Resident Inspector (w/o Attachments and Enclosure)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure)
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure)
AttaGhment&to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION
- WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled.
T1t*Btt INFORMATION - WITI IIDUtI9EW+O-OfR f
DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN16-0004 JAN 272016 9
Regional Administrator, Region II U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement
- Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator.
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely, 4Jtt %N-_
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi-
-Pfl6ONALY IDiNWt*BEE-I NFORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled.
irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl
- Wri fJ JI4IJTF7 U Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments:
Personal Qualification Statement
- Licensee (NRC Form 398)
II.
Certification of Medical Examination by Facility Licensee (NRC Form 396)
C:
Document Control Desk (wlo Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments)
Mr. G. J. McCoy, NRC, Region II kttehicnts1o thl3 Icttor-,
10 R 239O Upon removal of Attachment, this letter is decontrolled.
UNDEII4O -eFR 2ee f
DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION
Dear Mr. Guthrie:
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1.a, as listed below, are enclosed.
Enclosure A:
Original examination answer sheets, two clean copies and examination cover sheets Enclosure B:
Master examinations and answer keys Submitted Electronically Enclosure C:
Questions asked by applicants during exam Enclosure D:
Written examination seating chart Enclosure E:
Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F:
Form ES-201-3, Examination Security Agreement (preliminary)
Enclosure G:
Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled.
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager
Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c:
Document Control Desk (w/o Enclosures)
NRC Resident Inspector (wlo Enclosures)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures)
-Enee&
A4DENT[fl*BE MATION-WFH LD-INDEfl--
Upon removal of Enclosures, this letter is decontrolled.
I I I%PI I II I II Ifl fl I l hUm I II
SW I I I II *WI SJII.I 5 1W I I I a.W,W f
DUKE R. Michael Glover H. B. Robinson Steam EL\\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission
- Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP
Dear Mr. Guthrie:
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric
- Plant, Unit No.
2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
This document contains no new Regulatory Commitments.
If you have any questions concerning this matter, please contact Terry Giese, Manager
Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c:
Document Control Desk (w/o Enclosures)
NRC Resident Inspector (w/o Enclosures)
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures)
Enclosures to this letter contain ERONALI ID ALINrOawo*- WIThHOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled.