{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION III
REGION III  
                                    2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                          LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                            July 14, 2016
July 14, 2016  
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
Mr. Bryan C. Hanson  
President and CNO, Exelon Nuclear
Senior VP, Exelon Generation Company, LLC  
4300 Winfield Road
President and CNO, Exelon Nuclear  
Warrenville, IL 60555
4300 Winfield Road  
SUBJECT: BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL
Warrenville, IL 60555  
              HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;
SUBJECT: BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL  
              INSPECTION REPORT 05000454/2016004; 05000455/2016004
HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;  
Dear Mr. Hanson:
INSPECTION REPORT 05000454/2016004; 05000455/2016004  
On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
Dear Mr. Hanson:  
of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This
On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion  
inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.
of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This  
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.  
inspection, we have enclosed a request for documents needed for the inspection. The
In order to minimize the impact that the inspection has on the site and to ensure a productive  
documents have been divided into three groups.
inspection, we have enclosed a request for documents needed for the inspection. The  
The first group lists information necessary for our initial inspection scoping activities. This
documents have been divided into three groups.  
information should be available to the lead inspector no later than August 30, 2016. By
The first group lists information necessary for our initial inspection scoping activities. This  
September 9, 2016, the inspector will communicate the initial selected set of approximately
information should be available to the lead inspector no later than August 30, 2016. By  
1 - 2 risk-significant heat exchangers.
September 9, 2016, the inspector will communicate the initial selected set of approximately  
The second group is needed to support our in-office preparation activities. This set of
1 - 2 risk-significant heat exchangers.  
documents, including the calculations associated with the selected heat exchangers, should be
The second group is needed to support our in-office preparation activities. This set of  
available at the Regional Office no later than October 13, 2016. This information should be
documents, including the calculations associated with the selected heat exchangers, should be  
separated for each selected component, especially if provided electronically (e.g., folder with
available at the Regional Office no later than October 13, 2016. This information should be  
component name that includes calculations, condition reports, maintenance history, etc).
separated for each selected component, especially if provided electronically (e.g., folder with  
During the in-office preparation activities, the inspector may identify additional information
component name that includes calculations, condition reports, maintenance history, etc).
needed to support the inspection.
During the in-office preparation activities, the inspector may identify additional information  
The last group includes the additional information above as well as plant specific reference
needed to support the inspection.  
material. This information should be available onsite to the inspector on October 24, 2016.
The last group includes the additional information above as well as plant specific reference  
It is also requested that corrective action documents and/or questions developed during the
material. This information should be available onsite to the inspector on October 24, 2016.
inspection be provided to the inspector as the documents are generated.
It is also requested that corrective action documents and/or questions developed during the  
All requested documents are to be for the time period from the onsite inspection period back
inspection be provided to the inspector as the documents are generated.  
to the documents that were provided in response to the previous Heat Sink Performance
All requested documents are to be for the time period from the onsite inspection period back  
Inspection. If no activities were accomplished in that time period, then the request applies to
to the documents that were provided in response to the previous Heat Sink Performance  
the last applicable document in the previous time period. It is important that these documents
Inspection. If no activities were accomplished in that time period, then the request applies to  
be as complete as possible, in order to minimize the number of documents requested during
the last applicable document in the previous time period. It is important that these documents  
the preparation week or during the onsite inspection.
be as complete as possible, in order to minimize the number of documents requested during  
the preparation week or during the onsite inspection.  


B. Hanson                                       -2-
B. Hanson  
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
-2-  
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing  
about the inspection or the material requested in the enclosure, please contact the lead
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions  
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.
about the inspection or the material requested in the enclosure, please contact the lead  
This letter does not contain new or amended information collection requirements subject
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
This letter does not contain new or amended information collection requirements subject  
collection requirements were approved by the Office of Management and Budget, Control
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
collection requirements were approved by the Office of Management and Budget, Control  
to respond to, a request for information or an information collection requirement unless the
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required  
requesting document displays a currently valid Office of Management and Budget Control
to respond to, a request for information or an information collection requirement unless the  
Number.
requesting document displays a currently valid Office of Management and Budget Control  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Number.  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
of this letter and its enclosure will be available electronically for public inspection in the NRCs  
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's  
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible  
Reading Room).
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic  
                                                Sincerely,
Reading Room).  
                                                /RA/
Sincerely,  
                                                Andrew Dunlop, Senior Reactor Engineer
                                                Engineering Branch 2
/RA/  
                                                Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
Andrew Dunlop, Senior Reactor Engineer  
Enclosure:
Engineering Branch 2  
   Triennial Heat Sink Performance Inspection
Division of Reactor Safety
    Document Request
Docket Nos. 50-454; 50-455  
cc: Distribution via LISTSERV
License Nos. NPF-37; NPF-66  
Enclosure:  
   Triennial Heat Sink Performance Inspection  
  Document Request  
cc: Distribution via LISTSERV  


      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
Inspection Report:           05000454/2016004; 05000455/2016004
Enclosure
Inspection Dates:             October 24 - 28, 2016;
Inspection Report:  
Inspection Procedure:         IP 71111.07, Heat Sink Performance
05000454/2016004; 05000455/2016004  
Lead Inspector:               Andrew Dunlop, DRS
Inspection Dates:  
                              630-829-9726
October 24 - 28, 2016;  
                              Andrew.Dunlop@nrc.gov
Inspection Procedure:  
I.     Information Requested By August 30, 2016:
IP 71111.07, Heat Sink Performance  
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Lead Inspector:  
          Safety-Related Equipment, heat exchangers in order of risk significance.
Andrew Dunlop, DRS
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
630-829-9726  
          exchanger.
Andrew.Dunlop@nrc.gov  
      3. List of Corrective Action Program documents (with a short description) associated
I.  
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
Information Requested By August 30, 2016:  
          exchanger testing, for the previous 3 years.
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
Safety-Related Equipment, heat exchangers in order of risk significance.  
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
          GL 89-13 heat exchangers.
exchanger.  
      6. List of engineering-related operator workarounds (with a short description)
3. List of Corrective Action Program documents (with a short description) associated  
          associated with GL 89-13 heat exchangers that were in place within the last 3 years.
with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat  
      7. List of permanent and temporary modifications (with a short description) associated
exchanger testing, for the previous 3 years.  
          with GL 89-13 heat exchangers for the last 3 years.
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.  
II.   Information Requested By October 13, 2016:
5. Last two System Health Report(s) and maintenance rule system notebooks for all the  
      1. Copies of the GL 89-13 responses.
GL 89-13 heat exchangers.  
      2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the
6. List of engineering-related operator workarounds (with a short description)  
          GL 89-13 Heat Exchanger Program.
associated with GL 89-13 heat exchangers that were in place within the last 3 years.  
      3. Copies of procedures developed to implement the recommendations of GL 89-13
7. List of permanent and temporary modifications (with a short description) associated  
          (e.g. the GL 89-13 Heat Exchanger Program description).
with GL 89-13 heat exchangers for the last 3 years.  
      4. Copies of the selected Corrective Action Program documents.
II.  
      5. For the specific heat exchangers selected:
Information Requested By October 13, 2016:
          a. Copies of the UFSAR sections applicable for each heat exchanger.
1. Copies of the GL 89-13 responses.
                                                                                        Enclosure
2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the  
GL 89-13 Heat Exchanger Program.  
3. Copies of procedures developed to implement the recommendations of GL 89-13  
(e.g. the GL 89-13 Heat Exchanger Program description).
4. Copies of the selected Corrective Action Program documents.  
5. For the specific heat exchangers selected:  
a. Copies of the UFSAR sections applicable for each heat exchanger.  


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
    b. Copy of system description and design basis document for the heat exchangers
2
        (as applicable).
b. Copy of system description and design basis document for the heat exchangers  
    c. Provide a list of calculations (with a short description) which currently apply to
(as applicable).  
        each heat exchanger.
c. Provide a list of calculations (with a short description) which currently apply to  
              i. establish the limiting design basis heat load required to be removed by
each heat exchanger.  
                  each of these heat exchangers;
i. establish the limiting design basis heat load required to be removed by  
              ii. demonstrate the heat exchangers capacity to remove the limiting heat
each of these heat exchangers;  
                  load;
ii. demonstrate the heat exchangers capacity to remove the limiting heat  
            iii. correlate surveillance testing and/or inspection results from these heat
load;  
                  exchangers with design basis heat removal capability (e.g., basis for
iii. correlate surveillance testing and/or inspection results from these heat  
                  surveillance test and/or inspection acceptance criteria);
exchangers with design basis heat removal capability (e.g., basis for  
            iv. evaluate the potential for water hammer in each heat exchanger or
surveillance test and/or inspection acceptance criteria);  
                  associated piping; and
iv. evaluate the potential for water hammer in each heat exchanger or  
              v. evaluate excessive tube vibration in each heat exchanger.
associated piping; and
    d. Copy of any operability determinations or other documentation of degradation
v. evaluate excessive tube vibration in each heat exchanger.  
        associated with the heat exchangers or the systems that support the operation
d. Copy of any operability determinations or other documentation of degradation  
        for the selected heat exchangers.
associated with the heat exchangers or the systems that support the operation  
    e. Copy of the construction code, Design Specification, heat exchanger data
for the selected heat exchangers.  
        sheets, and vendor documents including component drawings applicable for the
e. Copy of the construction code, Design Specification, heat exchanger data  
        heat exchangers.
sheets, and vendor documents including component drawings applicable for the  
    f. Copies of normal, abnormal, and emergency operating procedures associated
heat exchangers.  
        with the selected heat exchangers.
f. Copies of normal, abnormal, and emergency operating procedures associated  
6. For the Ultimate Heat Sink (UHS) and the safety-related service water system
with the selected heat exchangers.  
    (or equivalent):
6. For the Ultimate Heat Sink (UHS) and the safety-related service water system  
    a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)
(or equivalent):  
        sections.
a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)  
    b. Copy of system description and design basis document (as applicable).
sections.  
    c. Copy of any operability determinations or other documentation of degradation
b. Copy of system description and design basis document (as applicable).  
        associated with the UHS and the safety-related service water system.
c. Copy of any operability determinations or other documentation of degradation  
    d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
associated with the UHS and the safety-related service water system.  
        states the maximum cooling water system inlet temperature limit that still allows
d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that  
        full licensed power operation of the nuclear reactor.
states the maximum cooling water system inlet temperature limit that still allows  
    e. Copy of system description and design basis document (as applicable).
full licensed power operation of the nuclear reactor.  
    f. Copy of the construction code and Design Specification.
e. Copy of system description and design basis document (as applicable).  
                                            2
f. Copy of the construction code and Design Specification.  


    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
          g. Copies of normal, abnormal, and emergency operating procedures associated
3
              with the UHS and safety-related service water systems including procedures for
g. Copies of normal, abnormal, and emergency operating procedures associated  
              loss of these systems.
with the UHS and safety-related service water systems including procedures for  
          h. Copies of corrective action documents associated with waterhammer or hydraulic
loss of these systems.  
              transients in the service water system since the last Heat Sink Inspection.
h. Copies of corrective action documents associated with waterhammer or hydraulic  
          i. If available, provide an electronic copy of piping and instrumentation diagrams for
transients in the service water system since the last Heat Sink Inspection.  
              the service water system, including the intake structure.
i.  
          j. Provide a list of calculations (with a short description), which currently apply to
If available, provide an electronic copy of piping and instrumentation diagrams for  
              UHS and safety-related service water system.
the service water system, including the intake structure.  
          k. Provide a list of instruments (with a short description) associated with automatic
j.  
              or alarm functions for the safety-related service water system and/or UHS.
Provide a list of calculations (with a short description), which currently apply to  
          l. Provide a list of any design change (with a short description) performed on the
UHS and safety-related service water system.  
              UHS or safety-related service water system since the last heat sink performance
k. Provide a list of instruments (with a short description) associated with automatic  
              inspection.
or alarm functions for the safety-related service water system and/or UHS.  
      7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related
l.  
          plant heat exchanger to be performed during the on-site portion of the inspection.
Provide a list of any design change (with a short description) performed on the  
III. Information Requested to be Available on First Day of Inspection, October 24, 2016:
UHS or safety-related service water system since the last heat sink performance  
      1. For the specific heat exchangers selected.
inspection.  
          a. Copy of the calculation which correlates surveillance testing results from these
7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related  
              heat exchangers with design basis heat removal capability (e.g., basis for
plant heat exchanger to be performed during the on-site portion of the inspection.  
              surveillance test acceptance criteria
III.  
          b. Copies of the two most recent completed tests and evaluation data confirming
Information Requested to be Available on First Day of Inspection, October 24, 2016:  
              thermal performance for those heat exchangers which are performance tested.
1. For the specific heat exchangers selected.
          c. Documentation and procedures that identify the types, accuracy, and location of
a. Copy of the calculation which correlates surveillance testing results from these  
              any special instrumentation used for the two most recently completed thermal
heat exchangers with design basis heat removal capability (e.g., basis for  
              performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
surveillance test acceptance criteria  
              instruments or temperature instruments). Include calibration records for the
b. Copies of the two most recent completed tests and evaluation data confirming  
              instruments used during these tests.
thermal performance for those heat exchangers which are performance tested.  
          d. Information regarding any alarms which monitor on-line performance.
c. Documentation and procedures that identify the types, accuracy, and location of  
          e. Copy of the document describing the inspection results of each heat exchanger.
any special instrumentation used for the two most recently completed thermal  
          f. The cleaning and inspection maintenance schedule for each heat exchanger for
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
              the next 5 years.
instruments or temperature instruments). Include calibration records for the  
          g. Copy of the design specification and heat exchanger data sheets for each heat
instruments used during these tests.  
              exchanger.
d. Information regarding any alarms which monitor on-line performance.  
          h. Copy of the vendor manuals including component drawings for each heat
e. Copy of the document describing the inspection results of each heat exchanger.    
              exchanger.
f. The cleaning and inspection maintenance schedule for each heat exchanger for  
                                                  3
the next 5 years.  
g. Copy of the design specification and heat exchanger data sheets for each heat  
exchanger.  
h. Copy of the vendor manuals including component drawings for each heat  
exchanger.  


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
    i. Copy of the calculation which establishes the limiting (maximum) design basis
4
        heat load which is required to be removed by each of these heat exchangers.
i.  
    j. Copy of the operating procedure that ensures that the maximum cooling water
Copy of the calculation which establishes the limiting (maximum) design basis  
        system inlet temperature limit is not exceeded.
heat load which is required to be removed by each of these heat exchangers.  
    k. Copy of the calculations or documents which evaluate the potential for water
j.  
        hammer in each heat exchanger or associated piping.
Copy of the operating procedure that ensures that the maximum cooling water  
    l. Copy of the calculations that evaluate excessive tube vibration in each heat
system inlet temperature limit is not exceeded.  
        exchanger and the documents that describe the controls that prevent heat
k. Copy of the calculations or documents which evaluate the potential for water  
        exchanger degradation due to excessive flow induced vibration during operation.
hammer in each heat exchanger or associated piping.  
    m. Copy of the periodic flow testing at or near maximum design flow.
l.  
    n. Copy of the document which identifies the current number of tubes in service for
Copy of the calculations that evaluate excessive tube vibration in each heat  
        each heat exchanger and the supporting calculation which establishes the
exchanger and the documents that describe the controls that prevent heat  
        maximum number of tubes which can be plugged in each heat exchanger.
exchanger degradation due to excessive flow induced vibration during operation.  
    o. Copy of the document establishing the repair criteria (plugging limit) for degraded
m. Copy of the periodic flow testing at or near maximum design flow.    
        tubes which are identified in each heat exchanger.
n. Copy of the document which identifies the current number of tubes in service for  
    p. Copies of the documents that verify the structural integrity of the heat exchanger
each heat exchanger and the supporting calculation which establishes the  
        (e.g. eddy current summary sheets, ultrasonic testing results, and visual
maximum number of tubes which can be plugged in each heat exchanger.  
        inspection results).
o. Copy of the document establishing the repair criteria (plugging limit) for degraded  
    q. Copies of those documents that describe the methods taken to control water
tubes which are identified in each heat exchanger.  
        chemistry in the heat exchangers.
p. Copies of the documents that verify the structural integrity of the heat exchanger  
2. For the review of the operation of the safety-related service water system
(e.g. eddy current summary sheets, ultrasonic testing results, and visual  
    (or equivalent) and the UHS:
inspection results).  
    a. Copies of any design change performed on the UHS in last 3 years.
q. Copies of those documents that describe the methods taken to control water  
    b. Copies of any design change performed on the safety-related service water
chemistry in the heat exchangers.  
        system in last 3 years.
2. For the review of the operation of the safety-related service water system  
    c. Copies of procedures for a loss of UHS.
(or equivalent) and the UHS:  
    d. Copies of procedures for a loss of service water system.
a. Copies of any design change performed on the UHS in last 3 years.  
    e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,
b. Copies of any design change performed on the safety-related service water  
        dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp)
system in last 3 years.    
        in last 3 years.
c. Copies of procedures for a loss of UHS.  
    f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.
d. Copies of procedures for a loss of service water system.  
        Also, provide copies of the associated results for the last 3 years.
e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,  
    g. Copies of documents associated with the monitoring of pump performance for
dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp)  
        potential strong-pump vs. weak-pump interaction.
in last 3 years.  
                                          4
f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.
Also, provide copies of the associated results for the last 3 years.  
g. Copies of documents associated with the monitoring of pump performance for  
potential strong-pump vs. weak-pump interaction.  


        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
        3. For the review associated with the system walkdown of the service water intake
5
            structure:
3. For the review associated with the system walkdown of the service water intake  
            a. Copies of corrective maintenance for the last 6 years associated with service
structure:  
                water strainers, traveling screens and trash racks.
a. Copies of corrective maintenance for the last 6 years associated with service  
            b. Copies of the last two inspections and/or surveillances associated with service
water strainers, traveling screens and trash racks.  
                water strainers, traveling screens and trash racks.
b. Copies of the last two inspections and/or surveillances associated with service  
            c. List of preventive maintenance, including frequency, associated with service
water strainers, traveling screens and trash racks.  
                water strainers, traveling screens and trash racks.
c. List of preventive maintenance, including frequency, associated with service  
            d. Copies of abnormal procedures for the traveling screens and service water
water strainers, traveling screens and trash racks.  
                strainers.
d. Copies of abnormal procedures for the traveling screens and service water  
            e. Copies of the last two inspections and/or surveillances documenting that
strainers.
                component mounts have not excessively degraded (i.e., due to corrosion). For
e. Copies of the last two inspections and/or surveillances documenting that  
                example, inspections for the mounts for the, Service water pumps, service water
component mounts have not excessively degraded (i.e., due to corrosion). For  
                strainers, traveling screens and trash racks.
example, inspections for the mounts for the, Service water pumps, service water  
            f. Copies of the documents associated with the monitoring, trending, and
strainers, traveling screens and trash racks.  
                remediation of silt accumulation at the service water pump bay.
f. Copies of the documents associated with the monitoring, trending, and  
            g. Copies of surveillance procedures and testing results for the last performed on
remediation of silt accumulation at the service water pump bay.  
                the service water pump bay water level instruments.
g. Copies of surveillance procedures and testing results for the last performed on  
            h. Copies of procedures associated with operating during adverse weather
the service water pump bay water level instruments.    
                conditions (e.g., icing, high-temperatures, or low-level).
h. Copies of procedures associated with operating during adverse weather  
            i. Copy of the evaluation for the potential effects of low-flow/level on underwater
conditions (e.g., icing, high-temperatures, or low-level).  
                weir walls intended to limit silt or sand intake, if applicable.
i.  
If the information requested above will not be available, please contact Mr. Andrew Dunlop as
Copy of the evaluation for the potential effects of low-flow/level on underwater  
soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.
weir walls intended to limit silt or sand intake, if applicable.  
                                                      5
If the information requested above will not be available, please contact Mr. Andrew Dunlop as  
soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.  


B. Hanson                                                                 -2-
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions
B. Hanson  
about the inspection or the material requested in the enclosure, please contact the lead
-2-  
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.
The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing  
This letter does not contain new or amended information collection requirements subject
contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
about the inspection or the material requested in the enclosure, please contact the lead  
collection requirements were approved by the Office of Management and Budget, Control
inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required
This letter does not contain new or amended information collection requirements subject  
to respond to, a request for information or an information collection requirement unless the
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
requesting document displays a currently valid Office of Management and Budget Control
collection requirements were approved by the Office of Management and Budget, Control  
Number.
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
to respond to, a request for information or an information collection requirement unless the  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
requesting document displays a currently valid Office of Management and Budget Control  
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Number.  
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
of this letter and its enclosure will be available electronically for public inspection in the NRCs  
Reading Room).
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's  
                                                                          Sincerely,
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible  
                                                                          /RA/
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic  
                                                                          Andrew Dunlop, Senior Reactor Engineer
Reading Room).  
                                                                          Engineering Branch 2
Sincerely,  
                                                                          Division of Reactor Safety
Docket Nos. 50-454; 50-455
/RA/  
License Nos. NPF-37; NPF-66
Enclosure:
Andrew Dunlop, Senior Reactor Engineer  
   Triennial Heat Sink Performance Inspection
Engineering Branch 2  
    Document Request
Division of Reactor Safety
cc: Distribution via LISTSERV
Docket Nos. 50-454; 50-455  
DISTRIBUTION:                                             Cynthia Pederson                                        Linda Linn
License Nos. NPF-37; NPF-66  
Jeremy Bowen                                               Darrell Roberts                                          DRPIII
Enclosure:  
RidsNrrDorlLpl3-2 Resource                                 Richard Skokowski                                       DRSIII
   Triennial Heat Sink Performance Inspection  
RidsNrrPMByron Resource                                    Allan Barker
  Document Request  
RidsNrrDirsIrib Resource                                  Carole Ariano
cc: Distribution via LISTSERV  
ADAMS Accession Number ML16196A110
DISTRIBUTION:  
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
Jeremy Bowen  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
RidsNrrDorlLpl3-2 Resource  
  OFFICE             RIII                                 RIII                           RIII                               RIII
RidsNrrPMByron Resource
  NAME               ADunlop:cl
RidsNrrDirsIrib Resource
  DATE               07/14/16
Cynthia Pederson
                                                                OFFICIAL RECORD
Darrell Roberts
Richard Skokowski  
Allan Barker  
Carole Ariano  
Linda Linn
DRPIII
DRSIII
ADAMS Accession Number ML16196A110  
Publicly Available  
Non-Publicly Available  
Sensitive  
Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
ADunlop:cl  
DATE  
07/14/16  
OFFICIAL RECORD
}}
}}

Latest revision as of 21:54, 9 January 2025

Notification of NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2016004; 05000455/2016004
ML16196A110
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/14/2016
From: Dunlop A
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co
References
IR 2016004
Download: ML16196A110 (8)


See also: IR 05000454/2016004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 14, 2016

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION, UNITS 1 AND 2 - NOTIFICATION OF AN NRC TRIENNIAL

HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION;

INSPECTION REPORT 05000454/2016004; 05000455/2016004

Dear Mr. Hanson:

On October 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your Byron Station, Units 1 and 2. This

inspection will be performed in accordance with NRC baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than August 30, 2016. By

September 9, 2016, the inspector will communicate the initial selected set of approximately

1 - 2 risk-significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should be

available at the Regional Office no later than October 13, 2016. This information should be

separated for each selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance history, etc).

During the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available onsite to the inspector on October 24, 2016.

It is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the onsite inspection.

B. Hanson

-2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing

contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter and its enclosure will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000454/2016004; 05000455/2016004

Inspection Dates:

October 24 - 28, 2016;

Inspection Procedure:

IP 71111.07, Heat Sink Performance

Lead Inspector:

Andrew Dunlop, DRS

630-829-9726

Andrew.Dunlop@nrc.gov

I.

Information Requested By August 30, 2016:

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous 3 years.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers that were in place within the last 3 years.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers for the last 3 years.

II.

Information Requested By October 13, 2016:

1. Copies of the GL 89-13 responses.

2. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the

GL 89-13 Heat Exchanger Program.

3. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g. the GL 89-13 Heat Exchanger Program description).

4. Copies of the selected Corrective Action Program documents.

5. For the specific heat exchangers selected:

a. Copies of the UFSAR sections applicable for each heat exchanger.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

2

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for the

heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

6. For the Ultimate Heat Sink (UHS) and the safety-related service water system

(or equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and Design Specification.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

3

g. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

h. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last Heat Sink Inspection.

i.

If available, provide an electronic copy of piping and instrumentation diagrams for

the service water system, including the intake structure.

j.

Provide a list of calculations (with a short description), which currently apply to

UHS and safety-related service water system.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service water system and/or UHS.

l.

Provide a list of any design change (with a short description) performed on the

UHS or safety-related service water system since the last heat sink performance

inspection.

7. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related

plant heat exchanger to be performed during the on-site portion of the inspection.

III.

Information Requested to be Available on First Day of Inspection, October 24, 2016:

1. For the specific heat exchangers selected.

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested.

c. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

d. Information regarding any alarms which monitor on-line performance.

e. Copy of the document describing the inspection results of each heat exchanger.

f. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

h. Copy of the vendor manuals including component drawings for each heat

exchanger.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

4

i.

Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

j.

Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

l.

Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation.

m. Copy of the periodic flow testing at or near maximum design flow.

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

p. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g. eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the operation of the safety-related service water system

(or equivalent) and the UHS:

a. Copies of any design change performed on the UHS in last 3 years.

b. Copies of any design change performed on the safety-related service water

system in last 3 years.

c. Copies of procedures for a loss of UHS.

d. Copies of procedures for a loss of service water system.

e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp)

in last 3 years.

f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc.

Also, provide copies of the associated results for the last 3 years.

g. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

5

3. For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances associated with service

water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion). For

example, inspections for the mounts for the, Service water pumps, service water

strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

g. Copies of surveillance procedures and testing results for the last performed on

the service water pump bay water level instruments.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g., icing, high-temperatures, or low-level).

i.

Copy of the evaluation for the potential effects of low-flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

If the information requested above will not be available, please contact Mr. Andrew Dunlop as

soon as possible at 630-829-9726, or via e-mail Andrew.Dunlop@nrc.gov.

B. Hanson

-2-

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our licensing

contact for this inspection is Ms. L. Zurawski of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9726, or via e-mail at Andrew.Dunlop@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter and its enclosure will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Andrew Dunlop, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Triennial Heat Sink Performance Inspection

Document Request

cc: Distribution via LISTSERV

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3-2 Resource

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML16196A110

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

ADunlop:cl

DATE

07/14/16

OFFICIAL RECORD