{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:September 27, 2016
                            NUCLEAR REGULATORY COMMISSION
                                                REGION IV
                                          1600 E. LAMAR BLVD
                                        ARLINGTON, TX 76011-4511
                                        September 27, 2016
Mr. Dennis Koehl  
Mr. Dennis Koehl
President and Chief Executive Officer  
President and Chief Executive Officer
STP Nuclear Operating Company  
STP Nuclear Operating Company
P.O. Box 289  
P.O. Box 289
Wadsworth, TX 77483  
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1
              AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION
AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION  
              BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007
BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007  
              AND 05000499/2017007) AND REQUEST FOR INFORMATION
AND 05000499/2017007) AND REQUEST FOR INFORMATION  
Dear Mr. Koehl:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
Dear Mr. Koehl:  
Region IV staff will conduct a triennial fire protection baseline inspection at the South Texas
Project Electric Generating Station, Units 1 and 2, in January and February 2017. The
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
inspection team will be comprised of four reactor inspectors from the NRC Region IV office.
Region IV staff will conduct a triennial fire protection baseline inspection at the South Texas  
The inspection will be conducted in accordance with Inspection Procedure 71111.05T, Fire
Project Electric Generating Station, Units 1 and 2, in January and February 2017. The  
Protection (Triennial), the NRCs baseline fire protection inspection procedure.
inspection team will be comprised of four reactor inspectors from the NRC Region IV office.
The schedule for the inspection is as follows:
The inspection will be conducted in accordance with Inspection Procedure 71111.05T, Fire  
    *   Information gathering visit:   January 4-5, 2017
Protection (Triennial), the NRCs baseline fire protection inspection procedure.  
    *   On-site inspection:             January 23-27, 2017
                                        February 6-10, 2017
The schedule for the inspection is as follows:  
The purpose of the information gathering visit is to obtain information and documentation
needed to support the inspection and to become familiar with the fire protection program, fire
*  
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies
Information gathering visit:
to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security
January 4-5, 2017  
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
One inspector will participate in the information gathering visit to select the fire areas for
*  
evaluation, identify additional documents needed to support the inspection, obtain unescorted
On-site inspection:  
access, and meet with the key personnel who will support the inspection. The fire area
selection will require a walkdown of candidate fire areas in company with key personnel from
January 23-27, 2017  
your staff. The enclosure to this letter provides an initial list of the documents the team will need
     
for their review. We request that your staff transmit copies of the documents listed in the
February 6-10, 2017  
The purpose of the information gathering visit is to obtain information and documentation  
needed to support the inspection and to become familiar with the fire protection program, fire  
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies  
to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security  
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
One inspector will participate in the information gathering visit to select the fire areas for  
evaluation, identify additional documents needed to support the inspection, obtain unescorted  
access, and meet with the key personnel who will support the inspection. The fire area  
selection will require a walkdown of candidate fire areas in company with key personnel from
your staff. The enclosure to this letter provides an initial list of the documents the team will need  
for their review. We request that your staff transmit copies of the documents listed in the  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511


D. Koehl                                       -2-
D. Koehl  
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please
- 2 -  
send this information so that it will arrive in the NRC Region IV office by the dates listed in the
enclosure.
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please  
During the information gathering visit, the team will also discuss the following inspection support
send this information so that it will arrive in the NRC Region IV office by the dates listed in the  
administrative details: office space size and location, specific documents requested to be made
enclosure.  
available to the team in their office spaces, arrangements for reactor site access, and the
availability of knowledgeable plant engineering and licensing organization personnel to serve as
During the information gathering visit, the team will also discuss the following inspection support  
points of contact during the inspection.
administrative details: office space size and location, specific documents requested to be made  
We request that during the on-site inspection weeks, you ensure that copies of analyses,
available to the team in their office spaces, arrangements for reactor site access, and the  
evaluations, or documentation regarding the implementation and maintenance of the fire
availability of knowledgeable plant engineering and licensing organization personnel to serve as  
protection program, including post-fire safe shutdown capability, be readily accessible to the
points of contact during the inspection.  
team for their review. Of specific interest for the fire protection portion of the inspection are
those documents that establish that your fire protection program satisfies the NRC regulatory
We request that during the on-site inspection weeks, you ensure that copies of analyses,  
requirements and conforms to applicable NRC and industry fire protection guidance. For
evaluations, or documentation regarding the implementation and maintenance of the fire  
the B.5.b portion of the inspection, those documents implementing your mitigating strategies
protection program, including post-fire safe shutdown capability, be readily accessible to the  
and demonstrating the management of your commitments for the strategies are of specific
team for their review. Of specific interest for the fire protection portion of the inspection are  
interest. Also, please ensure that appropriate personnel are available to support the team at the
those documents that establish that your fire protection program satisfies the NRC regulatory  
site during the inspection. These personnel should be knowledgeable of the plant systems
requirements and conforms to applicable NRC and industry fire protection guidance. For  
required to achieve and maintain safe shutdown conditions from inside and outside the control
the B.5.b portion of the inspection, those documents implementing your mitigating strategies  
room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire
and demonstrating the management of your commitments for the strategies are of specific  
protection systems, and the fire protection program and its implementation.
interest. Also, please ensure that appropriate personnel are available to support the team at the  
This letter does not contain new or amended information collection requirements subject to the
site during the inspection. These personnel should be knowledgeable of the plant systems  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
required to achieve and maintain safe shutdown conditions from inside and outside the control  
requirements were approved by the Office of Management and Budget under control
room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire  
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
protection systems, and the fire protection program and its implementation.  
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
This letter does not contain new or amended information collection requirements subject to the  
number.
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
requirements were approved by the Office of Management and Budget under control  
this letter and its enclosure will be available electronically for public inspection in the NRC Public
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
Document Room or from the Publicly Available Records (PARS) component of NRC's document
respond to, a request for information or an information collection requirement unless the  
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
requesting document displays a currently valid Office of Management and Budget control  
rm/adams.html (the Public Electronic Reading Room).
number.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of  
this letter and its enclosure will be available electronically for public inspection in the NRC Public  
Document Room or from the Publicly Available Records (PARS) component of NRC's document  
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).  


D. Koehl                                   -3-
D. Koehl  
Your cooperation and support during this inspection will be appreciated. If you have
- 3 -  
questions concerning this inspection or the inspection team's information or logistical needs,
please contact Samuel Graves, the team lead inspector, in the Region IV office at
Your cooperation and support during this inspection will be appreciated. If you have  
(817) 200-1102 or samuel.graves@nrc.gov.
questions concerning this inspection or the inspection team's information or logistical needs,  
                                              Sincerely,
please contact Samuel Graves, the team lead inspector, in the Region IV office at
                                              /RA/
(817) 200-1102 or samuel.graves@nrc.gov.  
                                              Gregory E. Werner, Chief
                                              Engineering Branch 2
Sincerely,
                                              Division of Reactor Safety
Docket Nos. 50-498 and 50-499
/RA/  
License Nos. NPF-76 and NPF-80
Enclosure:
Triennial Fire Protection Inspection
Gregory E. Werner, Chief  
Documentation Request
Engineering Branch 2  
cc w/encl: Electronic Distribution
Division of Reactor Safety  
Docket Nos. 50-498 and 50-499  
License Nos. NPF-76 and NPF-80  
Enclosure:  
Triennial Fire Protection Inspection
  Documentation Request  
cc w/encl: Electronic Distribution  




ML16271A467
  ML16271A467  
  SUNSI Review           ADAMS          Publicly Available      Non-Sensitive      Keyword:
SUNSI Review  
By: SGraves               Yes  No    Non-Publicly Available  Sensitive         NRC-002
By: SGraves  
OFFICE       SRI:EB2     C:EB2
ADAMS
  NAME          SGraves    GWerner
Yes   No
  SIGNATURE /RA/            /RA/
Publicly Available
  DATE          9/15/16    9/27/16
  Non-Publicly Available  
                                   
Non-Sensitive
Letter to Dennis Koehl from Gregory E. Werner, dated September 27, 2016
  Sensitive  
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1
Keyword:
              AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION
NRC-002  
              BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007
OFFICE  
              AND 05000499/2017007) AND REQUEST FOR INFORMATION
SRI:EB2  
Electronic distribution by RIV:
C:EB2  
Regional Administrator (Kriss.Kennedy@nrc.gov)
   
Deputy Regional Administrator (Scott.Morris@nrc.gov)
   
DRP Director (Troy.Pruett@nrc.gov)
   
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
NAME
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
SGraves
Resident Inspector (Nicholas.Hernandez@nrc.gov)
GWerner
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
SIGNATURE
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
/RA/
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
/RA/  
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
DATE
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
9/15/16
RIV RSLO (Bill.Maier@nrc.gov)
9/27/16


                  Triennial Fire Protection Inspection Documentation Request
Please provide the following documentation (Items 1-5) prior to the on-site information
gathering visit, preferably no later than December 19, 2016. Whenever practical, please provide
Letter to Dennis Koehl from Gregory E. Werner, dated September 27, 2016  
copies electronically in a searchable format. Please provide an index of the requested
documents which includes a brief description of the document and the numerical heading
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 
associated with the request (i.e., where it can be found in the list of documents requested).
AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION
1. The current version of the fire protection program and fire hazards analysis.
BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
AND 05000499/2017007) AND REQUEST FOR INFORMATION
    acceptable plant response.
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of
Electronic distribution by RIV:
    the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire
Regional Administrator (Kriss.Kennedy@nrc.gov)  
    protection/fire safe shutdown, etc.).
Deputy Regional Administrator (Scott.Morris@nrc.gov)
4. The fire probabilistic risk assessment or portions of the plants individual plant examination
DRP Director (Troy.Pruett@nrc.gov)
    for external events (IPEEE) report addressing fire events. Also, include the results of any
DRP Deputy Director (Ryan.Lantz@nrc.gov)
    post-IPEEE reviews and listings of actions taken/plant modifications conducted in response
DRS Director (Anton.Vegel@nrc.gov)
    to IPEEE information that relate to fire risk.
DRS Deputy Director (Jeff.Clark@nrc.gov)
5. A copy of the documents that support your multiple spurious operation evaluations (i.e.,
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
    expert panel reports, evaluation packages, etc.).
Resident Inspector (Nicholas.Hernandez@nrc.gov)  
Please provide the following documentation (Items 6 - 48) prior to the week of January 9, 2017,
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
to support inspection preparation. Whenever practical, please provide copies electronically in a
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
searchable format. Drawings should be provided as paper copies of sufficient size such that all
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)  
details are legible.
Administrative Assistant (Lynn.Wright@nrc.gov)  
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant
Public Affairs Officer (Victor.Dricks@nrc.gov)
    locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
Project Manager (Lisa.Regner@nrc.gov)  
    zone delineation; (c) the locations of fire protection equipment, such as detection,
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
    suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
    specific documents needed to support inspection preparation will be discussed during the
RITS Coordinator (Marisa.Herrera@nrc.gov)
    site visit.
ACES (R4Enforcement.Resource@nrc.gov)  
7. Fire protection program implementing procedures (e.g., administrative controls, operator
Regional Counsel (Karla.Fuller@nrc.gov)
    response procedures for fires, fire fighting procedures, etc.).
Technical Support Assistant (Loretta.Williams@nrc.gov)  
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
    from the control room in the event of a fire outside the control room (III.G.2 areas).
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
9. Operating procedures used to implement an alternative shutdown capability with or without
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
    control room evacuation (III.G.3 areas).
RIV RSLO (Bill.Maier@nrc.gov)  
10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the
    event of a fire (safe shutdown equipment list).
                                                                                  Enclosure


11. Piping and instrumentation (flow) diagrams showing the components used to achieve and
    maintain hot standby and cold shutdown for normal and alternative shutdown. Please
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of a
    size sufficient to read all details. These should include the systems used for reactor coolant
Enclosure
    system makeup, reactor coolant system pressure control, decay heat removal, and reactivity
Triennial Fire Protection Inspection Documentation Request
    control, including the essential support systems.
12. A listing, with descriptions, of design change packages performed since the last triennial fire
Please provide the following documentation (Items 1-5) prior to the on-site information
    protection inspection which were determined to impact fire protection and post-fire safe
gathering visit, preferably no later than December 19, 2016.  Whenever practical, please provide
    shutdowns.
copies electronically in a searchable format.  Please provide an index of the requested
13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed
documents which includes a brief description of the document and the numerical heading
    since the last triennial fire protection inspection.
associated with the request (i.e., where it can be found in the list of documents requested).  
14. Procedures/instructions that control the configuration of the plants fire protection program,
    features, and post-fire safe shutdown methodology and system design. Also,
1. The current version of the fire protection program and fire hazards analysis.
    procedures/instructions that govern the implementation of plant modifications, maintenance,
    and special operations and their impact on fire protection.
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
15. A listing of open and closed corrective action documents initiated since the last triennial fire
acceptable plant response.
    protection inspection which relate to the fire protection program or equipment, including
    corrective actions for fire-induced circuit failures (both single and multiple spurious
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of
    actuations) for the selected fire areas. Include the corrective action program document
the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire  
    number, date, and subject.
protection/fire safe shutdown, etc.).  
16. A listing of the applicable codes and standards (with the versions/dates) related to the
    design of plant fire protection features and evaluations of any code deviations. Copies of
4. The fire probabilistic risk assessment or portions of the plants individual plant examination
    these codes should be available for review.
for external events (IPEEE) report addressing fire events.  Also, include the results of any
17. Drawings of the portions of the emergency lighting system which support fire response.
post-IPEEE reviews and listings of actions taken/plant modifications conducted in response
18. Procedures used to remove smoke from safety-related areas and the engineering studies or
to IPEEE information that relate to fire risk.  
    calculations which support the design basis.
19. Drawings of communication systems credited in the license basis for firefighting and plant
5. A copy of the documents that support your multiple spurious operation evaluations (i.e.,
    operations during fires where control room is occupied and/or evacuated.
expert panel reports, evaluation packages, etc.).  
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
21. A listing of maintenance and surveillance testing procedures for alternative shutdown
Please provide the following documentation (Items 6 - 48) prior to the week of January 9, 2017,
    capability and fire barriers, detectors, pumps and suppression systems. Also, include a list
to support inspection preparation. Whenever practical, please provide copies electronically in a
    of maintenance and surveillance testing procedures which verify fuse and breaker
searchable format. Drawings should be provided as paper copies of sufficient size such that all
    coordination in accordance with the post-fire safe shutdown coordination analysis.
details are legible.
22. Maintenance rule performance criteria and a summary of the performance history for
    systems or functions monitored within the maintenance rule program that support the fire
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant
    protection program or involve safe shutdown equipment over the period since the last
locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
    triennial fire protection inspection.
zone delineation; (c) the locations of fire protection equipment, such as detection,
                                              -2-
suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The
specific documents needed to support inspection preparation will be discussed during the
site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator
response procedures for fires, fire fighting procedures, etc.).  
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions
from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedures used to implement an alternative shutdown capability with or without
control room evacuation (III.G.3 areas).  
10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the  
event of a fire (safe shutdown equipment list). 


23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test
    requirements) covered by technical specifications, the technical requirements manual, the
    updated final safety analysis report, or similar documents.
- 2 -  
24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related
    to post-fire safe shutdown capability or the fire protection program completed since the last
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and
    triennial fire protection inspection.
maintain hot standby and cold shutdown for normal and alternative shutdown. Please
25. A list of manual actions taken outside the control room which are credited to mitigate the
provide one copy of the piping and instrumentation (flow) diagrams for these systems of a
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
size sufficient to read all details.  These should include the systems used for reactor coolant  
    group actions by the initiating fire area or zone and indicate where the action must take
system makeup, reactor coolant system pressure control, decay heat removal, and reactivity  
    place.
control, including the essential support systems.  
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
    basis documents that describe the purpose/function/operating characteristics of the safe
12. A listing, with descriptions, of design change packages performed since the last triennial fire
    shutdown systems (reactor coolant system makeup, reactor coolant system pressure
protection inspection which were determined to impact fire protection and post-fire safe
    control, decay heat removal, and reactivity control, including the essential support systems).
shutdowns.
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.
    These should depict how power gets from the switchyard to the engineered safety feature
13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed
    loads (480V and 4160V).
since the last triennial fire protection inspection.  
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
    giving their location and the key equipment being protected.
14. Procedures/instructions that control the configuration of the plants fire protection program,
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or
features, and post-fire safe shutdown methodology and system design.  Also,
    maintain hot or cold shutdown.
procedures/instructions that govern the implementation of plant modifications, maintenance,  
30. A list of high to low pressure interface valves.
and special operations and their impact on fire protection.  
31. Procedures governing the training and operation of the fire brigade.
32. Organization charts of site personnel down to the level of fire protection staff personnel.
15. A listing of open and closed corrective action documents initiated since the last triennial fire
33. A contact list of key site personnel who will be supporting this inspection, giving the office
protection inspection which relate to the fire protection program or equipment, including
    location and phone number onsite.
corrective actions for fire-induced circuit failures (both single and multiple spurious
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
actuations) for the selected fire areas.  Include the corrective action program document
    during the week of February 6, 2017. Please put us in contact with the appropriate
number, date, and subject.
    personnel for planning fire brigade drills during the onsite information gathering trip.
35. The team would like to perform a walkthrough of the alternative shutdown procedure with
16. A listing of the applicable codes and standards (with the versions/dates) related to the
    qualified operators in the plant during the week of January 23, 2017. The team would like to
design of plant fire protection features and evaluations of any code deviations. Copies of  
    perform a walkthrough of a sample of manual actions required for other fires not requiring
these codes should be available for review.  
    control room evacuation. Please put us in contact with the appropriate personnel for
    planning the walkthroughs during the onsite information gathering trip.
17. Drawings of the portions of the emergency lighting system which support fire response.
                                              -3-
18. Procedures used to remove smoke from safety-related areas and the engineering studies or
calculations which support the design basis.  
19. Drawings of communication systems credited in the license basis for firefighting and plant  
operations during fires where control room is occupied and/or evacuated.  
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  
21. A listing of maintenance and surveillance testing procedures for alternative shutdown  
capability and fire barriers, detectors, pumps and suppression systems.  Also, include a list
of maintenance and surveillance testing procedures which verify fuse and breaker
coordination in accordance with the post-fire safe shutdown coordination analysis.  
22. Maintenance rule performance criteria and a summary of the performance history for  
systems or functions monitored within the maintenance rule program that support the fire
protection program or involve safe shutdown equipment over the period since the last
triennial fire protection inspection.  


The following documents (Items 36 - 48) involve 10 CFR 50.54(hh)(2) mitigating strategies.
36. License condition that incorporated the requirements issued to address the requirements of
    Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
- 3 -  
    Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
37. A list of all modifications to regulatory commitments made to meet the requirements of
23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test
    Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
requirements) covered by technical specifications, the technical requirements manual, the  
    Compensatory Measures, dated February 25, 2002; the subsequently imposed license
updated final safety analysis report, or similar documents.  
    conditions; and 10 CFR 50.54(hh)(2).
38. A list of procedures/guidelines which were revised or generated to implement the mitigation
24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related
    strategies. These could be extensive damage mitigation guidelines, severe accident
to post-fire safe shutdown capability or the fire protection program completed since the last
    management guidelines, emergency operating procedures, abnormal operating procedures,
triennial fire protection inspection.  
    etc.
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear
25. A list of manual actions taken outside the control room which are credited to mitigate the  
    Energy Institute 06-12 and the site-specific procedures or guidelines that are used to
consequences of fires in III.G.2 areas (non-alternative shutdown areas).  The list should
    implement each strategy.
group actions by the initiating fire area or zone and indicate where the action must take
40. A list of engineering evaluations/calculations that were used to verify engineering bases for
place.
    the mitigation strategies.
41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
    the mitigation strategies. These could be the type used for training.
basis documents that describe the purpose/function/operating characteristics of the safe
42. A list of modification packages and simplified drawings/descriptions of modifications that
shutdown systems (reactor coolant system makeup, reactor coolant system pressure
    were made to plant systems to implement the mitigation strategies.
control, decay heat removal, and reactivity control, including the essential support systems).
43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to
    implement the mitigation strategies.
27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems. 
44. A list of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ
These should depict how power gets from the switchyard to the engineered safety feature
    from that documented in the submittals to the NRC and the safety evaluation report.
loads (480V and 4160V).  
45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in
    B.5.b documents.
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
46. Training records and lesson plans related to the 10 CFR 50.54(hh)(2) mitigating strategies.
giving their location and the key equipment being protected.  
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required
    to implement any mitigating strategies.
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or
48. The team would like to perform a walkthrough of the procedure implementing a sample
maintain hot or cold shutdown.  
    mitigating strategy (to be selected by the inspector during the information gathering visit)
    and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement
30. A list of high to low pressure interface valves.  
    the mitigation strategies during the week of February 6, 2017. Please put us in contact with
    the appropriate personnel for planning the walkthrough during the onsite information
31. Procedures governing the training and operation of the fire brigade.  
    gathering trip.
                                              -4-
32. Organization charts of site personnel down to the level of fire protection staff personnel.
33. A contact list of key site personnel who will be supporting this inspection, giving the office
location and phone number onsite.  
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
during the week of February 6, 2017. Please put us in contact with the appropriate
personnel for planning fire brigade drills during the onsite information gathering trip.
35. The team would like to perform a walkthrough of the alternative shutdown procedure with
qualified operators in the plant during the week of January 23, 2017. The team would like to  
perform a walkthrough of a sample of manual actions required for other fires not requiring
control room evacuation. Please put us in contact with the appropriate personnel for  
planning the walkthroughs during the onsite information gathering trip.  


The following documentation needs (Items 49 - 52) will be dependent upon sample selections
and will be finalized during discussions with your staff. Please provide the required documents
prior to the week of January 9, 2017. Whenever practical, please provide copies electronically
- 4 -
in a searchable format. Drawings should be provided as paper copies of sufficient size such
that all details are legible.
The following documents (Items 36 - 48) involve 10 CFR 50.54(hh)(2) mitigating strategies.
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite
    information gathering trip).
36. License condition that incorporated the requirements issued to address the requirements of
50. List of identified fire-induced circuit failure configurations that could prevent operation or
Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
    cause maloperation of equipment credited for safe shutdown in the event of a fire (for the
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
    selected fire areas). Include failure configurations associated with hot shorts, open circuits,
    or shorts to ground identified as potentially causing spurious or multiple spurious actuations
37. A list of all modifications to regulatory commitments made to meet the requirements of
    or maloperations of this equipment.
Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
51. Cable routing information for components and equipment credited for safe shutdown in the
Compensatory Measures, dated February 25, 2002; the subsequently imposed license
    selected fire areas. This information request item will be discussed and finalized with your
conditions; and 10 CFR 50.54(hh)(2).
    staff during the information gathering visit.
52. Drawings showing the location details for detection and suppression systems in the selected
38. A list of procedures/guidelines which were revised or generated to implement the mitigation
    fire areas.
strategies.  These could be extensive damage mitigation guidelines, severe accident
                                                -5-
management guidelines, emergency operating procedures, abnormal operating procedures,
etc.
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear
Energy Institute 06-12 and the site-specific procedures or guidelines that are used to
implement each strategy.
40. A list of engineering evaluations/calculations that were used to verify engineering bases for
the mitigation strategies.
41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in
the mitigation strategies.  These could be the type used for training.
42. A list of modification packages and simplified drawings/descriptions of modifications that
were made to plant systems to implement the mitigation strategies.
43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to
implement the mitigation strategies.
44. A list of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ
from that documented in the submittals to the NRC and the safety evaluation report.
45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in
B.5.b documents.
46. Training records and lesson plans related to the 10 CFR 50.54(hh)(2) mitigating strategies.
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required
to implement any mitigating strategies.
48. The team would like to perform a walkthrough of the procedure implementing a sample
mitigating strategy (to be selected by the inspector during the information gathering visit)
and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement
the mitigation strategies during the week of February 6, 2017.  Please put us in contact with
the appropriate personnel for planning the walkthrough during the onsite information
gathering trip.
 
- 5 -
The following documentation needs (Items 49 - 52) will be dependent upon sample selections  
and will be finalized during discussions with your staff. Please provide the required documents  
prior to the week of January 9, 2017. Whenever practical, please provide copies electronically  
in a searchable format. Drawings should be provided as paper copies of sufficient size such  
that all details are legible.
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite  
information gathering trip).
50. List of identified fire-induced circuit failure configurations that could prevent operation or  
cause maloperation of equipment credited for safe shutdown in the event of a fire (for the  
selected fire areas). Include failure configurations associated with hot shorts, open circuits,  
or shorts to ground identified as potentially causing spurious or multiple spurious actuations  
or maloperations of this equipment.  
51. Cable routing information for components and equipment credited for safe shutdown in the  
selected fire areas. This information request item will be discussed and finalized with your  
staff during the information gathering visit.  
52. Drawings showing the location details for detection and suppression systems in the selected  
fire areas.
}}
}}

Latest revision as of 20:07, 9 January 2025

Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2017007 and 05000499/2017007) and Request for Information
ML16271A467
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/27/2016
From: Greg Werner
NRC/RGN-IV/DRS/EB-2
To: Koehl D
South Texas
References
IR 2017007
Download: ML16271A467 (10)


See also: IR 05000498/2017007

Text

September 27, 2016

Mr. Dennis Koehl

President and Chief Executive Officer

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1

AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION

BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007

AND 05000499/2017007) AND REQUEST FOR INFORMATION

Dear Mr. Koehl:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the South Texas

Project Electric Generating Station, Units 1 and 2, in January and February 2017. The

inspection team will be comprised of four reactor inspectors from the NRC Region IV office.

The inspection will be conducted in accordance with Inspection Procedure 71111.05T, Fire

Protection (Triennial), the NRCs baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit:

January 4-5, 2017

On-site inspection:

January 23-27, 2017

February 6-10, 2017

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies

to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

One inspector will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

selection will require a walkdown of candidate fire areas in company with key personnel from

your staff. The enclosure to this letter provides an initial list of the documents the team will need

for their review. We request that your staff transmit copies of the documents listed in the

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

D. Koehl

- 2 -

enclosure to the NRC Region IV office for team use in preparation for the inspection. Please

send this information so that it will arrive in the NRC Region IV office by the dates listed in the

enclosure.

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space size and location, specific documents requested to be made

available to the team in their office spaces, arrangements for reactor site access, and the

availability of knowledgeable plant engineering and licensing organization personnel to serve as

points of contact during the inspection.

We request that during the on-site inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents that establish that your fire protection program satisfies the NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance. For

the B.5.b portion of the inspection, those documents implementing your mitigating strategies

and demonstrating the management of your commitments for the strategies are of specific

interest. Also, please ensure that appropriate personnel are available to support the team at the

site during the inspection. These personnel should be knowledgeable of the plant systems

required to achieve and maintain safe shutdown conditions from inside and outside the control

room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire

protection systems, and the fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget under control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

D. Koehl

- 3 -

Your cooperation and support during this inspection will be appreciated. If you have

questions concerning this inspection or the inspection team's information or logistical needs,

please contact Samuel Graves, the team lead inspector, in the Region IV office at

(817) 200-1102 or samuel.graves@nrc.gov.

Sincerely,

/RA/

Gregory E. Werner, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Triennial Fire Protection Inspection

Documentation Request

cc w/encl: Electronic Distribution

ML16271A467

SUNSI Review

By: SGraves

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE

SRI:EB2

C:EB2

NAME

SGraves

GWerner

SIGNATURE

/RA/

/RA/

DATE

9/15/16

9/27/16

Letter to Dennis Koehl from Gregory E. Werner, dated September 27, 2016

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1

AND 2 - NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION

BASELINE INSPECTION (NRC INSPECTION REPORT 05000498/2017007

AND 05000499/2017007) AND REQUEST FOR INFORMATION

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Enclosure

Triennial Fire Protection Inspection Documentation Request

Please provide the following documentation (Items 1-5) prior to the on-site information

gathering visit, preferably no later than December 19, 2016. Whenever practical, please provide

copies electronically in a searchable format. Please provide an index of the requested

documents which includes a brief description of the document and the numerical heading

associated with the request (i.e., where it can be found in the list of documents requested).

1. The current version of the fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of

the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire

protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plants individual plant examination

for external events (IPEEE) report addressing fire events. Also, include the results of any

post-IPEEE reviews and listings of actions taken/plant modifications conducted in response

to IPEEE information that relate to fire risk.

5. A copy of the documents that support your multiple spurious operation evaluations (i.e.,

expert panel reports, evaluation packages, etc.).

Please provide the following documentation (Items 6 - 48) prior to the week of January 9, 2017,

to support inspection preparation. Whenever practical, please provide copies electronically in a

searchable format. Drawings should be provided as paper copies of sufficient size such that all

details are legible.

6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire

zone delineation; (c) the locations of fire protection equipment, such as detection,

suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The

specific documents needed to support inspection preparation will be discussed during the

site visit.

7. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions

from the control room in the event of a fire outside the control room (III.G.2 areas).

9. Operating procedures used to implement an alternative shutdown capability with or without

control room evacuation (III.G.3 areas).

10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the

event of a fire (safe shutdown equipment list).

- 2 -

11. Piping and instrumentation (flow) diagrams showing the components used to achieve and

maintain hot standby and cold shutdown for normal and alternative shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of a

size sufficient to read all details. These should include the systems used for reactor coolant

system makeup, reactor coolant system pressure control, decay heat removal, and reactivity

control, including the essential support systems.

12. A listing, with descriptions, of design change packages performed since the last triennial fire

protection inspection which were determined to impact fire protection and post-fire safe

shutdowns.

13. Fire protection program change evaluations (Generic Letter 86-10 evaluations) performed

since the last triennial fire protection inspection.

14. Procedures/instructions that control the configuration of the plants fire protection program,

features, and post-fire safe shutdown methodology and system design. Also,

procedures/instructions that govern the implementation of plant modifications, maintenance,

and special operations and their impact on fire protection.

15. A listing of open and closed corrective action documents initiated since the last triennial fire

protection inspection which relate to the fire protection program or equipment, including

corrective actions for fire-induced circuit failures (both single and multiple spurious

actuations) for the selected fire areas. Include the corrective action program document

number, date, and subject.

16. A listing of the applicable codes and standards (with the versions/dates) related to the

design of plant fire protection features and evaluations of any code deviations. Copies of

these codes should be available for review.

17. Drawings of the portions of the emergency lighting system which support fire response.

18. Procedures used to remove smoke from safety-related areas and the engineering studies or

calculations which support the design basis.

19. Drawings of communication systems credited in the license basis for firefighting and plant

operations during fires where control room is occupied and/or evacuated.

20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

21. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems. Also, include a list

of maintenance and surveillance testing procedures which verify fuse and breaker

coordination in accordance with the post-fire safe shutdown coordination analysis.

22. Maintenance rule performance criteria and a summary of the performance history for

systems or functions monitored within the maintenance rule program that support the fire

protection program or involve safe shutdown equipment over the period since the last

triennial fire protection inspection.

- 3 -

23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test

requirements) covered by technical specifications, the technical requirements manual, the

updated final safety analysis report, or similar documents.

24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related

to post-fire safe shutdown capability or the fire protection program completed since the last

triennial fire protection inspection.

25. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system makeup, reactor coolant system pressure

control, decay heat removal, and reactivity control, including the essential support systems).

27. Two copies of one-line diagrams of the AC and vital DC electrical distribution systems.

These should depict how power gets from the switchyard to the engineered safety feature

loads (480V and 4160V).

28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving their location and the key equipment being protected.

29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or

maintain hot or cold shutdown.

30. A list of high to low pressure interface valves.

31. Procedures governing the training and operation of the fire brigade.

32. Organization charts of site personnel down to the level of fire protection staff personnel.

33. A contact list of key site personnel who will be supporting this inspection, giving the office

location and phone number onsite.

34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of February 6, 2017. Please put us in contact with the appropriate

personnel for planning fire brigade drills during the onsite information gathering trip.

35. The team would like to perform a walkthrough of the alternative shutdown procedure with

qualified operators in the plant during the week of January 23, 2017. The team would like to

perform a walkthrough of a sample of manual actions required for other fires not requiring

control room evacuation. Please put us in contact with the appropriate personnel for

planning the walkthroughs during the onsite information gathering trip.

- 4 -

The following documents (Items 36 - 48) involve 10 CFR 50.54(hh)(2) mitigating strategies.

36. License condition that incorporated the requirements issued to address the requirements of

Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

37. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002; the subsequently imposed license

conditions; and 10 CFR 50.54(hh)(2).

38. A list of procedures/guidelines which were revised or generated to implement the mitigation

strategies. These could be extensive damage mitigation guidelines, severe accident

management guidelines, emergency operating procedures, abnormal operating procedures,

etc.

39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear

Energy Institute 06-12 and the site-specific procedures or guidelines that are used to

implement each strategy.

40. A list of engineering evaluations/calculations that were used to verify engineering bases for

the mitigation strategies.

41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in

the mitigation strategies. These could be the type used for training.

42. A list of modification packages and simplified drawings/descriptions of modifications that

were made to plant systems to implement the mitigation strategies.

43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to

implement the mitigation strategies.

44. A list of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ

from that documented in the submittals to the NRC and the safety evaluation report.

45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in

B.5.b documents.

46. Training records and lesson plans related to the 10 CFR 50.54(hh)(2) mitigating strategies.

47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required

to implement any mitigating strategies.

48. The team would like to perform a walkthrough of the procedure implementing a sample

mitigating strategy (to be selected by the inspector during the information gathering visit)

and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement

the mitigation strategies during the week of February 6, 2017. Please put us in contact with

the appropriate personnel for planning the walkthrough during the onsite information

gathering trip.

- 5 -

The following documentation needs (Items 49 - 52) will be dependent upon sample selections

and will be finalized during discussions with your staff. Please provide the required documents

prior to the week of January 9, 2017. Whenever practical, please provide copies electronically

in a searchable format. Drawings should be provided as paper copies of sufficient size such

that all details are legible.

49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite

information gathering trip).

50. List of identified fire-induced circuit failure configurations that could prevent operation or

cause maloperation of equipment credited for safe shutdown in the event of a fire (for the

selected fire areas). Include failure configurations associated with hot shorts, open circuits,

or shorts to ground identified as potentially causing spurious or multiple spurious actuations

or maloperations of this equipment.

51. Cable routing information for components and equipment credited for safe shutdown in the

selected fire areas. This information request item will be discussed and finalized with your

staff during the information gathering visit.

52. Drawings showing the location details for detection and suppression systems in the selected

fire areas.