NRC PDR           1     .      R. DeYoung   I. Peltier                         J. Knight            bcc:
NRC PDR 1
cal PDR         (8)         D. Vassallo   E. Hylton                         R. Tedesco          J. Buchanan, NSIC ocket File (8) F. Williams                   R. Mattson                     'H. Denton              T. Abernathy, TIC LWR-1 File                       J. Stolz     D. Ross                           V. Moore            ACRS-(16)
R.
R. Boyd                                                                           R. Vollmer General Electric Company                                                         M. Ernst ATTfi: Dr. G. G. Sherwood, Manager                                                 W. Gammill Safety and Security                                                 ELD 175 Curtner Avenue San Jose, California 95114
DeYoung I. Peltier cal PDR (8)
D. Vassallo E. Hylton ocket File (8) F. Williams R. Mattson LWR-1 File J. Stolz D. Ross R.
Boyd General Electric Company ATTfi:
Dr.
G.
G. Sherwood, Manager Safety and Security 175 Curtner Avenue San Jose, California 95114 FEB 33 J.
Knight R. Tedesco
'H. Denton V. Moore R. Vollmer M. Ernst W. Gammill ELD bcc:
J.
: Buchanan, NSIC T. Abernathy, TIC ACRS-(16)


==SUBJECT:==
==SUBJECT:==
MARK       II CONTAINNENTS -       REQUEST FOR ADDITIONAL INFORMATION Gentlemen:
MARK II CONTAINNENTS - REQUEST FOR ADDITIONAL INFORMATION Gentlemen:
As a     result of our on going review of your report, NEDft-20988, "Caorso         Relief Valve Loads Tests - Test Plan," we have the following comments and significant areas of conoern.
As a result of our on going review of your report, NEDft-20988, "Caorso Relief Valve Loads Tests - Test Plan," we have the following comments and significant areas of conoern.
: 1. Effects of leaking               SRV on quencher loads has been identified as an area       of     concern. The Qaorso test plan, however, has not addressed this concern.                 It is our position that tests on leaking SRV should be conducted and that a test matrix addressing this concern should be provided for our review.
1.
: 2. The     test matrix shows that the parameters of interest will be repeated only once. We believe that this is not sufficient to demonstrate the repeatability of test data. We, thevefore, suggest that additional tests be conducted to demonstrate repeatability.
Effects of leaking SRV on quencher loads has been identified as an area of concern.
Et should be noted that our review to date                                           has not considered     fluid/
The Qaorso test plan, however, has not addressed this concern.
It is our position that tests on leaking SRV should be conducted and that a test matrix addressing this concern should be provided for our review.
2.
The test matrix shows that the parameters of interest will be repeated only once.
We believe that this is not sufficient to demonstrate the repeatability of test data.
We, thevefore, suggest that additional tests be conducted to demonstrate repeatability.
Et should be noted that our review to date has not considered fluid/
structure interattion effects.
structure interattion effects.
Enclosed is a request for additional information. We                                               believe you were advised of this needed information in July 1977.
Enclosed is a request for additional information.
Sincerely, OdghmI Signing aloha P.           Qah John F.                   Stolz, Chief Light Hater Reactors Branch No.                         1 Division of Project fianagement
We believe you were advised of this needed information in July 1977.
Sincerely, OdghmI Signing aloha P. Qah John F. Stolz, Chief Light Hater Reactors Branch No.
1 Division of Project fianagement


==Enclosure:==
==Enclosure:==
As stated cc:
See following pages OPPICe~
0URNAMe&
OATe~
LWR-1
,.I,Pel ti, lb
..2./..1.7./,78....,.,
JSRPgLl78, DS$........,
CAnger so~
avgas 2/.~ /8 DS RTed co 2
/7,8, NRC,PORM 918 (9.76) NRCM 0240 4 UI 0, OOVRRNMeNT PRINTINO OPPICes 1070 020 024


As  stated cc:      See      following        pages OPPICe~    LWR-1                                        DS$ ........, ..........,...                        DS 0URNAMe&    ,.I,Pel  ti      ,    lb  JS              CAnger        so~                  avgas          RTed    co OATe~    ..2./..1.7./,78....,.,      RPgLl78,                                          2/.~ /8            2  /7,8, NRC,PORM 918 (9.76) NRCM 0240                            4 UI 0, OOVRRNMeNT PRINTINO OPPICes            1070 020 024
i 88 83$
 
4 V
i       4 88 83$
<< ~
V
" l.y 4
                                                          << ~
y n >>-,
                                                                                                                " l.y 4
j
y n >>-,                   Pff j                                                                     I>> ~
~Pff
tl'
$ I, I v''Ivv 4
                          ~      ,  $
<<n Pa s'V'll 4
I, I                                                                           V  L<<1  4  l v''Ivv     4       <<n Pa s'V'll is 4
I>> ~
I                                                                 ~
V L<<1 4 l
V ~ 'n
is tl' V
                            ~         4                                                                               n I     ~
~ 'n I
I                                             y                                                                                                          V 4
~ n
                                                                                                              .4 n
~
            ~ n V
4 y
is ~ <<pn>>pp*                     '"I I
I
~
V I
n V
4
.4 n
is ~ <<pn>>pp*
~
'"I V
n V
n V
V                           I'                   ~   t V                                                         V s      Il
V I
                                                                                                                                            << ~
I' s Il
4 I9*                               LN
~ t V
  ~       '
<< ~
4       p 4 nt h, =-   ~
4 I9*
I   4 I
LN
                                            ~          "Ii '
~
4 p 4 nt h, =-
~
I 4
I ~
"Ii '
4 I' I
4 I' I
V 44   Is>> t ~     p l
V 44 Is>> t ~
I              ~ -.
p l I
                                                                                                                              * ~
~
P ~                               Pl                                                           4  IP ~ if
* ~
                                                  ~ 'I I
P
                                                                              'y=, Vl
~
Pl
~ 'I I 4 IP ~ if
'y=,
Vl


FEB 23 1978 Niagra Mohawk Power Corporation ATTN:     fir. Jerald K. Rhode Vice President Engineering 300 Erie Boulavard West Syracuse New York 13202 Eugene   B. Thomas, Ji .
Niagra Mohawk Power Corporation ATTN:
LeBoeuf, Lamb, Leiby II MacRae 1757   N Street,   N. W.
fir. Jerald K.
Washington, D. C.       20036 Anthony Z. Roisman, Esq.
Rhode Vice President Engineering 300 Erie Boulavard West Syracuse New York 13202 Eugene B. Thomas, Ji
Roisman, Kessler 8 Cashdan 1'025 15th Street, N. W.
: LeBoeuf, Lamb, Leiby II MacRae 1757 N Street, N.
Washington, D. C. 20036 Mr. Richard Goldsmith Syracuse     University College of     Law E. I. White Hall Campus Syracuse, Nevi York 13210 '
W.
  ~ K, DeBoer,     Director Technological Development Programs New York State Energy Office Swan   Street Building Core 1 - 2nd Floor Empire State Plaza Albany, New York 12223
Washington, D.
C.
20036 Anthony Z. Roisman, Esq.
: Roisman, Kessler 8
Cashdan 1'025 15th Street, N.
W.
Washington, D.
C.
20036 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
: Syracuse, Nevi York 13210 '
~
K, DeBoer, Director Technological Development Programs New York State Energy Office Swan Street Building Core 1 - 2nd Floor Empire State Plaza
: Albany, New York 12223 FEB 23 1978


0 A 1
0 A
1


FEB 23 1978 Washington Public Power Supply System ATTN: Hr. Kneil 0. Strand Managing Director 3000 George Washington Way Richland Washington 99352 Joseph B. Knotts, Jr., Esq.
Washington Public Power Supply System ATTN:
Oebevoise & Liberman 700. Shor'cham Building 806 Fifteenth Street, N. W.
Hr. Kneil 0. Strand Managing Director 3000 George Washington Way Richland Washington 99352 Joseph B. Knotts, Jr.,
Washington, D. C. 20005 Richard Q. Quigley, Esq.
Esq.
Washington Public Power Supply System P. 0. Box 968 Richland, Washington 99352
Oebevoise
& Liberman 700. Shor'cham Building 806 Fifteenth Street, N.
W.
Washington, D.
C.
20005 Richard Q. Quigley, Esq.
Washington Public Power Supply System P.
0.
Box 968
: Richland, Washington 99352 FEB 23 1978


Pennsylvania Power and Light Company ATTN:   Hr. Norman W. Curtis Vice President - Engineering and Construction 2 North Ninth Street Allentown, Pennsylvania     18101 Hr. Earle H. Head Project Manager Pennsylvania Power & Light Company 2 North Ninth Street Al'lentown, Pennsylvania 18101 Gerald Charnoff, Esq.
Pennsylvania Power and Light Company ATTN:
Shaw, Pi ttman, Potts, Trowbridge
Hr.
  & Madden 1800 H Street, N. W.
Norman W. Curtis Vice President
Washington,   D.'. 20036 Hr. William E. Barberich Licensing Engineer Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Robert J. Shovlin, Project, Manager'usquehanna Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania .18101 Hubert Barnes, Esq.
- Engineering and Construction 2 North Ninth Street Allentown, Pennsylvania 18101 Hr. Earle H.
Pennsylvania Power & Light Company 901 Hamilton Street Allentown, Pennsylvania 18101 Edward H. Nagel, Esquire General Counsel and Secretary Pennsylvania Power & Light Company 2 North Ninth Street Allentown, Pennsylvania     18101
Head Project Manager Pennsylvania Power
& Light Company 2 North Ninth Street Al'lentown, Pennsylvania 18101 Gerald Charnoff, Esq.
: Shaw, Pi ttman, Potts, Trowbridge
& Madden 1800 H Street, N.
W.
Washington, D.'.
20036 Hr. William E. Barberich Licensing Engineer Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Robert J. Shovlin, Project, Manager'usquehanna Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania
.18101 Hubert Barnes, Esq.
Pennsylvania Power
& Light Company 901 Hamilton Street Allentown, Pennsylvania 18101 Edward H. Nagel, Esquire General Counsel and Secretary Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101


FEB 23 $ 978 t
t Commonwealth Edison Company ATTN:, Nr. Byron Lee, Jr.
Commonwealth Edison Company ATTN:, Nr. Byron Lee, Jr.
Vice President P.
Vice President P. 0. Box 767 Chicago, Illinois 60690 Richard E. Powell, Esq.
0.
Isham,.Lincoln 8 Beale One First National Plaza 2400 Chicago, Illinois 60670
Box 767 Chicago, Illinois 60690 Richard E. Powell, Esq.
Isham,.Lincoln 8 Beale One First National Plaza 2400 Chicago, Illinois 60670 FEB 23
$978


Northern Indi ana Publ i c Ser vi ce Company   FE8 23 1978 ATTN: Mr. H. P. Lyle, Vice President Electric Production 5 Engineering 5265 Holman Ave.
Northern Indi ana Publ i c Ser vice Company ATTN:
'ammond, Indiana     46325 Meredith Hemphill, Jr. Esq.
Mr. H.
Assistant General Counsel Bethlehem Steel Corporation Martin Tower Bethlehem, Pennsylvania       18016 William H. Eichhorn, Esq.
P. Lyle, Vice President Electric Production 5 Engineering 5265 Holman Ave.
Eichhorn, /1orrow 8 Eichhorn 5243 Hohman Avenue Hammond, Indiana   46320 a
'ammond, Indiana 46325 Meredith Hemphill, Jr.
Edward W. Osann, Jr.,   Esq.
Esq.
Wolfe, Hubbard, -Leydid, Voit     & Osann, Ltd.
Assistant General Counsel Bethlehem Steel Corporation Martin Tower Bethlehem, Pennsylvania 18016 William H. Eichhorn, Esq.
Suite 4600 One IBM Plaza Chicago,   Illinois 60611 Marvin N, Berm, Esq.
: Eichhorn,
Special Assistant Attorney General 134 North LaSalle Street Suite 2222 Chicago,   Illinois 60602 Robert J. Vollen, Esq.
/1orrow 8 Eichhorn 5243 Hohman Avenue
109 North Dearborn Street Chicago, Illinois 60602
: Hammond, Indiana 46320 a
Edward W. Osann, Jr.,
Esq.
Wolfe, Hubbard, -Leydid, Voit & Osann, Ltd.
Suite 4600 One IBM Plaza Chicago, Illinois 60611 Marvin N, Berm, Esq.
Special Assistant Attorney General 134 North LaSalle Street Suite 2222 Chicago, Illinois 60602 Robert J. Vollen, Esq.
109 North Dearborn Street Chicago, Illinois 60602 FE8 23 1978


FEB  23 1978
'The Cin'cinnati Gas
  'The Cin'cinnati Gas & Electric Company       David B. Fankhauser,  PhD ATTN: Mr. Farl A. Borgmann                   3569 Nine  Mile Road Vice President - Engineering         Cincinnati, Ohio    45230 P. 0. Box 960 Cincinnati,   Ohio   45201                   Thomas A. Luebbers, Esq.
& Electric Company ATTN:
Cincinnati City Solicitor Mr. William J. Moran                         Room 214  - City Hall General Counsel                             Cincinnati, Ohio    45202 The Cincinnati Gas & Electric Co.
Mr. Farl A. Borgmann Vice President
P. 0. Box 960                               Troy B. Conner, Esq..
- Engineering P. 0.
Cincinnati, Ohio 45201                       Conner, Moore & Cober 1747 Pennsylvania    Ave. N. W.
Box 960 Cincinnati, Ohio 45201 Mr. William J.
Mr. William G. Porter, Jr.                 Washington, D. C. 20006 Porter, Stanley, Arthur, & Platt 37- West Broad Street Columbus, Ohio     43215
Moran General Counsel The Cincinnati Gas
. Mr. Robert fli 11en, Chairman of the Board & Chief Executive Officer The Dayton Power & Light Company PE 0. Box 1034 Dayton, Ohio '5401 fir. J. Robert Newlin,   Counsel The Dayton Power &   Light Company P. 0. Box 1034 Dayton, Ohio 45401 Mr. Stephen   Schumacher Miani Valley Power Project P. 0. Box 252 Dayton,. Ohio 45401 Ms. Augusta   Price 601 Stanley 'Avenue Cincinnati,   Ohio   45226 Mr. James D. Flynn Manager, Licensing   & Environmental Affairs The Cincinnati Gas   & Electric Company P. 0. Box 960 Cincinnati, Ohio     45201 Mr. J. P. Fenstermaker Senior Vice President - Operations Columbus & -Southern Ohio   Electric Co.
& Electric Co.
215 North Front Street Columbus, Ohio 43215
P. 0.
Box 960 Cincinnati, Ohio 45201 Mr. William G. Porter, Jr.
Porter, Stanley, Arthur,
& Platt 37-West Broad Street
: Columbus, Ohio 43215
. Mr. Robert fli11en, Chairman of the Board
& Chief Executive Officer The Dayton Power
& Light Company PE 0.
Box 1034 Dayton, Ohio '5401 fir. J.
Robert Newlin, Counsel The Dayton Power
& Light Company P. 0.
Box 1034 Dayton, Ohio 45401 Mr. Stephen Schumacher Miani Valley Power Project P. 0.
Box 252 Dayton,. Ohio 45401 FEB 23 1978 David B. Fankhauser, PhD 3569 Nine Mile Road Cincinnati, Ohio 45230 Thomas A. Luebbers, Esq.
Cincinnati City Solicitor Room 214 - City Hall Cincinnati, Ohio 45202 Troy B. Conner, Esq..
: Conner, Moore
& Cober 1747 Pennsylvania Ave.
N.
W.
Washington, D.
C.
20006 Ms. Augusta Price 601 Stanley 'Avenue Cincinnati, Ohio 45226 Mr. James D. Flynn
: Manager, Licensing
& Environmental Affairs The Cincinnati Gas
& Electric Company P. 0.
Box 960 Cincinnati, Ohio 45201 Mr. J.
P.
Fenstermaker Senior Vice President
- Operations Columbus
& -Southern Ohio Electric Co.
215 North Front Street
: Columbus, Ohio 43215


FEB 23 1978 Philadelphi Electric     Company           Eugene  J. Bradley ATTN;   Mr. Fdward   G. Bauer, Jr.       Philadelphia Electric Company Vice President and General        Associate General Counsel Counsel                        2301 Market Street 2301 Market    Street                      Philadelphia, Pennsylvania 19101 Philadelphia, Pensylva'nia     19101 Troy B. Conner, Jr. Ewq.
Philadelphi Electric Company ATTN; Mr. Fdward G. Bauer, Jr.
Conner, Moore & Corber 1747'Pennsylvania Avenue,     N. W.
Vice President and General Counsel 2301 Market Street Philadelphia, Pensylva'nia 19101 Troy B. Conner, Jr.
Washington, D.. C. 20006 W. William Anderson, Esq.
Ewq.
Deputy Attorney General Room 512, Main Capitol Building Harrisburg, Pennsylvania       17120 Frank R. Clokey, Esq.
: Conner, Moore
Special Assistant Attorney General Room 218, Towne House Apartments P. 0. Box 2063 Harrisburg, Pensylvania 17105 Honorable Lawrence Coughlin House of .Representatives Congress of the United States Washington, D. C.     20515 Roger B. Reynolds,     Jr., Esq.
& Corber 1747'Pennsylvania
324 Swede   Street Norristown, Pennsylvania       19401 Willard   C. Hetzel, Esq.
: Avenue, N.
312 main   Street East Greenville, Pennsylvania       18041 Lawrence Sager, Esq.
W.
Sager 8 Sager'ssociates 45 Hi gh Street Pottstown, Pennsylvania       19464 Joseph A. Smyth Assistant County Solicitor County of Montgomery Courthouse
Washington, D..
'Norristown, Pennsylvania       19404
C.
20006 W. William Anderson, Esq.
Deputy Attorney General Room 512, Main Capitol Building Harrisburg, Pennsylvania 17120 Frank R. Clokey, Esq.
Special Assistant Attorney General Room 218, Towne House Apartments P.
0.
Box 2063 Harrisburg, Pensylvania 17105 Honorable Lawrence Coughlin House of.Representatives Congress of the United States Washington, D.
C.
20515 Roger B. Reynolds, Jr.,
Esq.
324 Swede Street Norristown, Pennsylvania 19401 Willard C. Hetzel, Esq.
312 main Street East Greenville, Pennsylvania 18041 Lawrence Sager, Esq.
Sager 8 Sager'ssociates 45 Hi gh Street Pottstown, Pennsylvania 19464 FEB 23 1978 Eugene J.
Bradley Philadelphia Electric Company Associate General Counsel 2301 Market Street Philadelphia, Pennsylvania 19101 Joseph A. Smyth Assistant County Solicitor County of Montgomery Courthouse
'Norristown, Pennsylvania 19404


FEB 23 1978 Long Island Lighting Company ATTN:- Mr. And> ew W. Wofford Vice President 175 East Old Country Road Hicksvi  lie, New York 11801 Edward H. Barrett,   Esq.
Long Island Lighting Company ATTN:- Mr.
General Counsel Long Island Lighting Company 250 Old Country Road Mineola,   New   York 11501 Edward J. Walsh. Esq.
And> ew W. Wofford Vice President 175 East Old Country Road Hicksvilie, New York 11801 Edward H. Barrett, Esq.
General Attorney Long Island Lighting Company 250 Old Country Road Mineola,   New   York   11501 Hr. Thomas Burke Project Manager Shoreham Nuclear Power       Station P. 0. Box 618 Wading River, New York       11792 Director, Technical Development     Programs State of New York Energy Office                       ~
General Counsel Long Island Lighting Company 250 Old Country Road
lf Agency Building 2 Empire State Plazq Albany,   New York 12223 Haward L. Blau Blau and Cohn, P. C.
: Mineola, New York 11501 Edward J.
380 North Broadway jericho, Nevi York 11753 Irving Like,   'Esq.
Walsh.
Reilly, Like.and Schnieder 200, West Main   Street Babylon,   New   York   11702 HUB Technical Associates 366 California   Avenue Suite 6 Palo Alto, California       94306
Esq.
General Attorney Long Island Lighting Company 250 Old Country Road
: Mineola, New York 11501 Hr. Thomas Burke Project Manager Shoreham Nuclear Power Station P.
0.
Box 618 Wading River, New York 11792 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plazq
: Albany, New York 12223 Haward L. Blau Blau and Cohn, P.
C.
380 North Broadway
: jericho, Nevi York 11753 Irving Like, 'Esq.
Reilly, Like.and Schnieder 200, West Main Street
: Babylon, New York 11702 HUB Technical Associates 366 California Avenue Suite 6
Palo Alto, California 94306 FEB 23 1978 lf
~


FEB   23 1978 Request for   Additional Information General Electric   Company Topical Report: NEON-20988, Revision           2 Test Plan - December, 1976
FEB 23 1978 Request for Additional Information General Electric Company Topical Report:
: 1. Effects of   a leaking SRV on quencher   loads has been     identified as an area of concern. The Caorso I test plan,   however, does not address       this concern. It is our position that tests on       a leaking   SRV should be conducted. Therefore, a test plan considering       a leaking   SRV should be provided 'for our review.
NEON-20988, Revision 2
: 2. The Caorso   test matrix indicates that       most of the parameters of interest will be   repeated only once.       Tests perfor'med either for ramshead       (squad City and Nonticello) or for quencher       (NEDE-11314-08)     exhibited a great degree of data scatter.     Th'erefore,   we believe that the current Caorso test matrix is insufficient to determine the repeatabi             lity of the test data. Me recommend   additional tests     be conducted     for first actuation of a SRV and   subsequent   actuations of the     same SRV   to demonstrate r epeatability. The number   of tests should result in test data with
Test Plan - December, 1976 1.
  ~
Effects of a leaking SRV on quencher loads has been identified as an area of concern.
statistical'significance.
The Caorso test plan,
: 3. Based on our   evaluation of previous     SRV test data,   we find that the SRV discharge time and duration between         first actuation     and subsequent actuation influence the quencher load         due to subsequent actuation.
: however, does not address this I
Therefore, provide the value       and the basis   for the selection of the times for the Caorso tests.
concern.
It is our position that tests on a leaking SRV should be conducted.
Therefore, a test plan considering a leaking SRV should be provided 'for our review.
2.
The Caorso test matrix indicates that most of the parameters of interest will be repeated only once.
Tests perfor'med either for ramshead (squad City and Nonticello) or for quencher (NEDE-11314-08) exhibited a great degree of data scatter.
Th'erefore, we believe that the current Caorso test matrix is insufficient to determine the repeatabi lity of the test data.
Me recommend additional tests be conducted for first actuation of a SRV and subsequent actuations of the same SRV to demonstrate r epeatability.
The number of tests should result in test data with
~ statistical'significance.
3.
Based on our evaluation of previous SRV test data, we find that the SRV discharge time and duration between first actuation and subsequent actuation influence the quencher load due to subsequent actuation.
Therefore, provide the value and the basis for the selection of the times for the Caorso tests.


I
I
                                                                                  ~F8 83 1978
~F8 83 1978 4.
: 4. Page   4-6 states that     a complete understanding       of the subsequent actuation effect requires data         on pool temperature       in the vicinity of the quencher, pipe temperature           and pressure     following valve closure, flow rate of air through the             vacuum breaker and dynamics of   back flow of water.       We agree that the air temperature history inside the pipe could       be important.     However, insufficient information has been given   in the   test plan regarding the measurement of air temperature in the pipe. Clarify. what measurements         or calculations wi 11   be made to 'monitor this. temperature.
Page 4-6 states that a complete understanding of the subsequent actuation effect requires data on pool temperature in the vicinity of the quencher, pipe temperature and pressure following valve closure, flow rate of air through the vacuum breaker and dynamics of back flow of water.
: 5. The sensor   failure rate     was found   to   be quite high in the Monticello Plant test program.       Sensors   of the   .same manufacturer model used in the Monticello     will also   be used in the Caorso.. In light of this experience,   we .believe that redundant instrumentation is needed in critical   areas. For instance, redundant sensors         should be provided in the following locations:
We agree that the air temperature history inside the pipe could be important.
: a. The vicinity of   quencher   A and   the place by which combined loads from multiple SRV's actuation           will be determined.
However, insufficient information has been given in the test plan regarding the measurement of air temperature in the pipe.
  'b. SRV line between   elevation 51.612       and 45.770. In addition, level probes should be added between Ll and L12.
Clarify. what measurements or calculations wi 11 be made to 'monitor this. temperature.
5.
The sensor failure rate was found to be quite high in the Monticello Plant test program.
Sensors of the.same manufacturer model used in the Monticello will also be used in the Caorso..
In light of this experience, we.believe that redundant instrumentation is needed in critical areas.
For instance, redundant sensors should be provided in the following locations:
a.
The vicinity of quencher A and the place by which combined loads from multiple SRV's actuation will be determined.
'b.
SRV line between elevation 51.612 and 45.770.
In addition, level probes should be added between Ll and L12.
 
J


J FFR 28 1978 4 ~
4 ~
w3
w3 FFR 28 1978 6.
: 6. Submerged   structure loads     have been identified   as a primary'esijn load for the Mark     II containment. Me believe that the ana1ytical program indicated       in the Mark II owner group meeting which was held on February 16 and 17, 1977, is         insufficient to support the design loads for submerged structure without experimental data.
Submerged structure loads have been identified as a primary'esijn load for the Mark II containment.
Therefore,   we recommend     that additional pressure sensors should be installed   on   support columns and downcomers to measure the drag load during       SRY operation.
Me believe that the ana1ytical program indicated in the Mark II owner group meeting which was held on February 16 and 17, 1977, is insufficient to support the design loads for submerged structure without experimental data.
: 7. Provide the locations       for pressure   sensor's Nos . 19, 23, 35, 36 and 37.
Therefore, we recommend that additional pressure sensors should be installed on support columns and downcomers to measure the drag load during SRY operation.
7.
Provide the locations for pressure sensor's Nos
. 19, 23, 35, 36 and 37.


C A
C A
t}}
t}}

Latest revision as of 14:57, 9 January 2025

Letter Regarding Mark II Containments - Request for Additional Information and Enclosed Topical Report: NEDM-20988, Revision 2 Test Plan - December, 1976
ML17037B908
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/23/1978
From: Stolz J
Office of Nuclear Reactor Regulation
To: Sherwood G
General Electric Co
References
NEDM-20988
Download: ML17037B908 (24)


Text

~

~

D",stribution:

NRC PDR 1

R.

DeYoung I. Peltier cal PDR (8)

D. Vassallo E. Hylton ocket File (8) F. Williams R. Mattson LWR-1 File J. Stolz D. Ross R.

Boyd General Electric Company ATTfi:

Dr.

G.

G. Sherwood, Manager Safety and Security 175 Curtner Avenue San Jose, California 95114 FEB 33 J.

Knight R. Tedesco

'H. Denton V. Moore R. Vollmer M. Ernst W. Gammill ELD bcc:

J.

Buchanan, NSIC T. Abernathy, TIC ACRS-(16)

SUBJECT:

MARK II CONTAINNENTS - REQUEST FOR ADDITIONAL INFORMATION Gentlemen:

As a result of our on going review of your report, NEDft-20988, "Caorso Relief Valve Loads Tests - Test Plan," we have the following comments and significant areas of conoern.

1.

Effects of leaking SRV on quencher loads has been identified as an area of concern.

The Qaorso test plan, however, has not addressed this concern.

It is our position that tests on leaking SRV should be conducted and that a test matrix addressing this concern should be provided for our review.

2.

The test matrix shows that the parameters of interest will be repeated only once.

We believe that this is not sufficient to demonstrate the repeatability of test data.

We, thevefore, suggest that additional tests be conducted to demonstrate repeatability.

Et should be noted that our review to date has not considered fluid/

structure interattion effects.

Enclosed is a request for additional information.

We believe you were advised of this needed information in July 1977.

Sincerely, OdghmI Signing aloha P. Qah John F. Stolz, Chief Light Hater Reactors Branch No.

1 Division of Project fianagement

Enclosure:

As stated cc:

See following pages OPPICe~

0URNAMe&

OATe~

LWR-1

,.I,Pel ti, lb

..2./..1.7./,78....,.,

JSRPgLl78, DS$........,

CAnger so~

avgas 2/.~ /8 DS RTed co 2

/7,8, NRC,PORM 918 (9.76) NRCM 0240 4 UI 0, OOVRRNMeNT PRINTINO OPPICes 1070 020 024

i 88 83$

4 V

<< ~

" l.y 4

y n >>-,

j

~Pff

$ I, I vIvv 4

<<n Pa s'V'll 4

I>> ~

V L<<1 4 l

is tl' V

~ 'n I

~ n

~

4 y

I

~

V I

n V

4

.4 n

is ~ <<pn>>pp*

~

'"I V

n V

V I

I' s Il

~ t V

<< ~

4 I9*

LN

~

4 p 4 nt h, =-

~

I 4

I ~

"Ii '

4 I' I

V 44 Is>> t ~

p l I

~

  • ~

P

~

Pl

~ 'I I 4 IP ~ if

'y=,

Vl

Niagra Mohawk Power Corporation ATTN:

fir. Jerald K.

Rhode Vice President Engineering 300 Erie Boulavard West Syracuse New York 13202 Eugene B. Thomas, Ji

LeBoeuf, Lamb, Leiby II MacRae 1757 N Street, N.

W.

Washington, D.

C.

20036 Anthony Z. Roisman, Esq.

Roisman, Kessler 8

Cashdan 1'025 15th Street, N.

W.

Washington, D.

C.

20036 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus

Syracuse, Nevi York 13210 '

~

K, DeBoer, Director Technological Development Programs New York State Energy Office Swan Street Building Core 1 - 2nd Floor Empire State Plaza

Albany, New York 12223 FEB 23 1978

0 A

1

Washington Public Power Supply System ATTN:

Hr. Kneil 0. Strand Managing Director 3000 George Washington Way Richland Washington 99352 Joseph B. Knotts, Jr.,

Esq.

Oebevoise

& Liberman 700. Shor'cham Building 806 Fifteenth Street, N.

W.

Washington, D.

C.

20005 Richard Q. Quigley, Esq.

Washington Public Power Supply System P.

0.

Box 968

Richland, Washington 99352 FEB 23 1978

Pennsylvania Power and Light Company ATTN:

Hr.

Norman W. Curtis Vice President

- Engineering and Construction 2 North Ninth Street Allentown, Pennsylvania 18101 Hr. Earle H.

Head Project Manager Pennsylvania Power

& Light Company 2 North Ninth Street Al'lentown, Pennsylvania 18101 Gerald Charnoff, Esq.

Shaw, Pi ttman, Potts, Trowbridge

& Madden 1800 H Street, N.

W.

Washington, D.'.

20036 Hr. William E. Barberich Licensing Engineer Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. Robert J. Shovlin, Project, Manager'usquehanna Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania

.18101 Hubert Barnes, Esq.

Pennsylvania Power

& Light Company 901 Hamilton Street Allentown, Pennsylvania 18101 Edward H. Nagel, Esquire General Counsel and Secretary Pennsylvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

t Commonwealth Edison Company ATTN:, Nr. Byron Lee, Jr.

Vice President P.

0.

Box 767 Chicago, Illinois 60690 Richard E. Powell, Esq.

Isham,.Lincoln 8 Beale One First National Plaza 2400 Chicago, Illinois 60670 FEB 23

$978

Northern Indi ana Publ i c Ser vice Company ATTN:

Mr. H.

P. Lyle, Vice President Electric Production 5 Engineering 5265 Holman Ave.

'ammond, Indiana 46325 Meredith Hemphill, Jr.

Esq.

Assistant General Counsel Bethlehem Steel Corporation Martin Tower Bethlehem, Pennsylvania 18016 William H. Eichhorn, Esq.

Eichhorn,

/1orrow 8 Eichhorn 5243 Hohman Avenue

Hammond, Indiana 46320 a

Edward W. Osann, Jr.,

Esq.

Wolfe, Hubbard, -Leydid, Voit & Osann, Ltd.

Suite 4600 One IBM Plaza Chicago, Illinois 60611 Marvin N, Berm, Esq.

Special Assistant Attorney General 134 North LaSalle Street Suite 2222 Chicago, Illinois 60602 Robert J. Vollen, Esq.

109 North Dearborn Street Chicago, Illinois 60602 FE8 23 1978

'The Cin'cinnati Gas

& Electric Company ATTN:

Mr. Farl A. Borgmann Vice President

- Engineering P. 0.

Box 960 Cincinnati, Ohio 45201 Mr. William J.

Moran General Counsel The Cincinnati Gas

& Electric Co.

P. 0.

Box 960 Cincinnati, Ohio 45201 Mr. William G. Porter, Jr.

Porter, Stanley, Arthur,

& Platt 37-West Broad Street

Columbus, Ohio 43215

. Mr. Robert fli11en, Chairman of the Board

& Chief Executive Officer The Dayton Power

& Light Company PE 0.

Box 1034 Dayton, Ohio '5401 fir. J.

Robert Newlin, Counsel The Dayton Power

& Light Company P. 0.

Box 1034 Dayton, Ohio 45401 Mr. Stephen Schumacher Miani Valley Power Project P. 0.

Box 252 Dayton,. Ohio 45401 FEB 23 1978 David B. Fankhauser, PhD 3569 Nine Mile Road Cincinnati, Ohio 45230 Thomas A. Luebbers, Esq.

Cincinnati City Solicitor Room 214 - City Hall Cincinnati, Ohio 45202 Troy B. Conner, Esq..

Conner, Moore

& Cober 1747 Pennsylvania Ave.

N.

W.

Washington, D.

C.

20006 Ms. Augusta Price 601 Stanley 'Avenue Cincinnati, Ohio 45226 Mr. James D. Flynn

Manager, Licensing

& Environmental Affairs The Cincinnati Gas

& Electric Company P. 0.

Box 960 Cincinnati, Ohio 45201 Mr. J.

P.

Fenstermaker Senior Vice President

- Operations Columbus

& -Southern Ohio Electric Co.

215 North Front Street

Columbus, Ohio 43215

Philadelphi Electric Company ATTN; Mr. Fdward G. Bauer, Jr.

Vice President and General Counsel 2301 Market Street Philadelphia, Pensylva'nia 19101 Troy B. Conner, Jr.

Ewq.

Conner, Moore

& Corber 1747'Pennsylvania

Avenue, N.

W.

Washington, D..

C.

20006 W. William Anderson, Esq.

Deputy Attorney General Room 512, Main Capitol Building Harrisburg, Pennsylvania 17120 Frank R. Clokey, Esq.

Special Assistant Attorney General Room 218, Towne House Apartments P.

0.

Box 2063 Harrisburg, Pensylvania 17105 Honorable Lawrence Coughlin House of.Representatives Congress of the United States Washington, D.

C.

20515 Roger B. Reynolds, Jr.,

Esq.

324 Swede Street Norristown, Pennsylvania 19401 Willard C. Hetzel, Esq.

312 main Street East Greenville, Pennsylvania 18041 Lawrence Sager, Esq.

Sager 8 Sager'ssociates 45 Hi gh Street Pottstown, Pennsylvania 19464 FEB 23 1978 Eugene J.

Bradley Philadelphia Electric Company Associate General Counsel 2301 Market Street Philadelphia, Pennsylvania 19101 Joseph A. Smyth Assistant County Solicitor County of Montgomery Courthouse

'Norristown, Pennsylvania 19404

Long Island Lighting Company ATTN:- Mr.

And> ew W. Wofford Vice President 175 East Old Country Road Hicksvilie, New York 11801 Edward H. Barrett, Esq.

General Counsel Long Island Lighting Company 250 Old Country Road

Mineola, New York 11501 Edward J.

Walsh.

Esq.

General Attorney Long Island Lighting Company 250 Old Country Road

Mineola, New York 11501 Hr. Thomas Burke Project Manager Shoreham Nuclear Power Station P.

0.

Box 618 Wading River, New York 11792 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plazq

Albany, New York 12223 Haward L. Blau Blau and Cohn, P.

C.

380 North Broadway

jericho, Nevi York 11753 Irving Like, 'Esq.

Reilly, Like.and Schnieder 200, West Main Street

Babylon, New York 11702 HUB Technical Associates 366 California Avenue Suite 6

Palo Alto, California 94306 FEB 23 1978 lf

~

FEB 23 1978 Request for Additional Information General Electric Company Topical Report:

NEON-20988, Revision 2

Test Plan - December, 1976 1.

Effects of a leaking SRV on quencher loads has been identified as an area of concern.

The Caorso test plan,

however, does not address this I

concern.

It is our position that tests on a leaking SRV should be conducted.

Therefore, a test plan considering a leaking SRV should be provided 'for our review.

2.

The Caorso test matrix indicates that most of the parameters of interest will be repeated only once.

Tests perfor'med either for ramshead (squad City and Nonticello) or for quencher (NEDE-11314-08) exhibited a great degree of data scatter.

Th'erefore, we believe that the current Caorso test matrix is insufficient to determine the repeatabi lity of the test data.

Me recommend additional tests be conducted for first actuation of a SRV and subsequent actuations of the same SRV to demonstrate r epeatability.

The number of tests should result in test data with

~ statistical'significance.

3.

Based on our evaluation of previous SRV test data, we find that the SRV discharge time and duration between first actuation and subsequent actuation influence the quencher load due to subsequent actuation.

Therefore, provide the value and the basis for the selection of the times for the Caorso tests.

I

~F8 83 1978 4.

Page 4-6 states that a complete understanding of the subsequent actuation effect requires data on pool temperature in the vicinity of the quencher, pipe temperature and pressure following valve closure, flow rate of air through the vacuum breaker and dynamics of back flow of water.

We agree that the air temperature history inside the pipe could be important.

However, insufficient information has been given in the test plan regarding the measurement of air temperature in the pipe.

Clarify. what measurements or calculations wi 11 be made to 'monitor this. temperature.

5.

The sensor failure rate was found to be quite high in the Monticello Plant test program.

Sensors of the.same manufacturer model used in the Monticello will also be used in the Caorso..

In light of this experience, we.believe that redundant instrumentation is needed in critical areas.

For instance, redundant sensors should be provided in the following locations:

a.

The vicinity of quencher A and the place by which combined loads from multiple SRV's actuation will be determined.

'b.

SRV line between elevation 51.612 and 45.770.

In addition, level probes should be added between Ll and L12.

J

4 ~

w3 FFR 28 1978 6.

Submerged structure loads have been identified as a primary'esijn load for the Mark II containment.

Me believe that the ana1ytical program indicated in the Mark II owner group meeting which was held on February 16 and 17, 1977, is insufficient to support the design loads for submerged structure without experimental data.

Therefore, we recommend that additional pressure sensors should be installed on support columns and downcomers to measure the drag load during SRY operation.

7.

Provide the locations for pressure sensor's Nos

. 19, 23, 35, 36 and 37.

C A

t