{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:April 13, 2017  
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E. LAMAR BLVD
Mr. G. T. Powell  
                                        ARLINGTON, TX 76011-4511
Executive Vice President and CNO  
                                            April 13, 2017
STP Nuclear Operating Company  
Mr. G. T. Powell
P.O. Box 289  
Executive Vice President and CNO
Wadsworth, TX 77483  
STP Nuclear Operating Company
P.O. Box 289
SUBJECT:  
Wadsworth, TX 77483
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -  
SUBJECT:       SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -
NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND  
                NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND
EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)  
                EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)
AND REQUEST FOR INFORMATION  
                AND REQUEST FOR INFORMATION
Dear Mr. Powell:
Dear Mr. Powell:  
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the baseline inspection of changes, tests, experiments, and permanent plant
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff  
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.
will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
The inspection will consist of three reactor inspectors from the NRCs Region IV office for
modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.
one week. The inspection will be conducted in accordance with NRC Inspection
The inspection will consist of three reactor inspectors from the NRCs Region IV office for  
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.
one week. The inspection will be conducted in accordance with NRC Inspection  
Experience has shown that this inspection is resource intensive for both the NRC inspectors
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.  
and your staff. In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
Experience has shown that this inspection is resource intensive for both the NRC inspectors  
Please note that the documents are requested to be provided by May 15, 2017. Upon review of
and your staff. In order to minimize the impact to your on-site resources and to ensure a  
these documents, the inspectors will select additional documentation for review upon arrival. It
productive inspection, we have enclosed a request for documents needed for this inspection.
is important that all of these documents are up-to-date and complete in order to minimize the
Please note that the documents are requested to be provided by May 15, 2017. Upon review of  
number of additional documents requested during the preparation and/or the on-site portions of
these documents, the inspectors will select additional documentation for review upon arrival. It  
the inspection.
is important that all of these documents are up-to-date and complete in order to minimize the  
We have discussed the schedule for these inspection activities with your staff and understand
number of additional documents requested during the preparation and/or the on-site portions of  
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing
the inspection.  
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at
We have discussed the schedule for these inspection activities with your staff and understand  
Chris.Smith@nrc.gov.
that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing  
This letter does not contain new or amended information collection requirements subject
organization. If there are any questions about this inspection or the material requested, please  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at  
collection requirements were approved by the Office of Management and Budget, control
Chris.Smith@nrc.gov.
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
collection requirements were approved by the Office of Management and Budget, control  
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511


G. Powell                                       2
G. Powell  
requesting document displays a currently valid Office of Management and Budget control
2  
number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
requesting document displays a currently valid Office of Management and Budget control  
enclosure will be available electronically for public inspection in the NRC Public Document
number.  
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
rm/adams.html (the Public Electronic Reading Room).
enclosure will be available electronically for public inspection in the NRC Public Document  
                                                Sincerely,
Room or from the Publicly Available Records (PARS) component of NRC's document system  
                                                /RA/
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
                                                Thomas R. Farnholtz, Chief
rm/adams.html (the Public Electronic Reading Room).  
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket Nos. 50-498 and 50-499
Sincerely,  
License Nos. NPF-76 and NPF-80
Enclosure:
Evaluations of Changes, Tests,
   and Experiments Inspection
/RA/  
   Request for Information
cc: Electronic Distribution for STP
Thomas R. Farnholtz, Chief  
Engineering Branch 1  
Division of Reactor Safety  
Docket Nos. 50-498 and 50-499  
License Nos. NPF-76 and NPF-80  
Enclosure:  
Evaluations of Changes, Tests,
   and Experiments Inspection
   Request for Information  
cc: Electronic Distribution for STP  




ML17103A627
  ML17103A627  
  SUNSI Review           ADAMS:           Non-Publicly Available  Non-Sensitive Keyword:
  SUNSI Review  
  By: TFarnholtz         Yes  No        Publicly Available     Sensitive     NRC-002
ADAMS:  
OFFICE           RI:EB1       C:EB1
Non-Publicly Available  
  NAME             CSmith       TFarnholtz
  Non-Sensitive  
  SIGNATURE       /RA/         /RA/
Keyword:
  DATE             4/12/17       4/13/17
By: TFarnholtz  
                                       
Yes     No
                                      Request for Information
  Publicly Available  
                  Evaluations of Changes, Tests, and Experiments Inspection
Sensitive
                South Texas Project Electric Generating Station, Units 1 and 2
NRC-002  
Inspection Report:              05000498/2017007; 05000499/2017007
OFFICE  
Inspection Dates:              May 22-26, 2017
RI:EB1  
Inspection Procedure:          IP 71111.17T, Evaluations of Changes, Tests, and Experiments
C:EB1  
Lead Inspector:                Chris Smith, Reactor Inspector
   
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of
NAME  
the requested documents are available or if the electronic format is too large, please inform the
CSmith  
lead inspector and provide the documents on the first day of the on-site inspection. Also, the
TFarnholtz  
inspectors will select specific items from the information requested below and request from your
   
staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
SIGNATURE  
    1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
/RA/  
    2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
/RA/  
        implemented changes, tests, and experiments performed since the last triennial
   
        modification inspection that did not result in an evaluation.
    3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
        tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
        did not result in an application for a license amendment.
DATE  
    4. A list with descriptions of all temporary plant modifications implemented since the last
4/12/17
        triennial 10 CFR 50.59 inspection.
4/13/17  
    5. A list with descriptions of all compensatory actions for degraded or non-conforming
        conditions implemented since the last triennial 10 CFR 50.59 inspection.
    6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
        screenings and evaluations since the last triennial 10 CFR 50.59 inspection.
    7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
        including qualification dates.
    8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
        evaluations, including qualification dates.
                                                                                  Enclosure


    9. Current revisions of the Technical Specifications and Bases and the Updated Final
        Safety Analysis Report.
    10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59
Enclosure
        programs.
Request for Information
    11. A copy of the most recent submittal of the report containing a brief description of any
Evaluations of Changes, Tests, and Experiments Inspection
        changes, tests, and experiments, including a summary of the evaluation of each,
South Texas Project Electric Generating Station, Units 1 and 2
        required by 10 CFR 50.59(d)(2).
    12. A list of systems and system designators and a set of one-line (i.e., simplified) system
        diagrams.
Inspection Report: 
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
05000498/2017007; 05000499/2017007
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Inspection Dates:
Chris Smith                       Wes Cullum                        Nnaerika Okonkwo
Reactor Inspector                  Reactor Inspector                  Reactor Inspector
May 22-26, 2017
817-200-1095                       817-200-1563                      817-200-1114
Chris.Smith@nrc.gov               Wes.Cullum@nrc.gov                 Nnaerika.Okonkwo@nrc.gov
Inspection Procedure:
Mailing Address:
IP 71111.17T, Evaluations of Changes, Tests, and Experiments
U.S. NRC, Region IV
Attn: Chris Smith
Lead Inspector:
1600 East Lamar Blvd.
Chris Smith, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by May 15, 2017, to the attention of Chris Smith.  We request that you
categorize the documents in your response with the numbered list below.  If only hard copies of
the requested documents are available or if the electronic format is too large, please inform the
lead inspector and provide the documents on the first day of the on-site inspection.  Also, the
inspectors will select specific items from the information requested below and request from your
staff additional documents needed during the on-site inspection weeks.  We ask that the specific
items requested be available and ready for review on the first day of inspection.  If you have any
questions regarding this information request, please contact the lead inspector as soon as
possible.
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully
implemented changes, tests, and experiments performed since the last triennial
modification inspection that did not result in an evaluation. 
3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,
tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment. 
4. A list with descriptions of all temporary plant modifications implemented since the last
triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming
conditions implemented since the last triennial 10 CFR 50.59 inspection. 
6. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial 10 CFR 50.59 inspection. 
7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates.
8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates.
 
2
9. Current revisions of the Technical Specifications and Bases and the Updated Final  
Safety Analysis Report.  
10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59  
programs.  
11. A copy of the most recent submittal of the report containing a brief description of any  
changes, tests, and experiments, including a summary of the evaluation of each,  
required by 10 CFR 50.59(d)(2).  
12. A list of systems and system designators and a set of one-line (i.e., simplified) system  
diagrams.  
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.  
Inspector Contact Information:  
Chris Smith  
Reactor Inspector  
817-200-1095  
Chris.Smith@nrc.gov
Wes Cullum
Reactor Inspector
817-200-1563
Wes.Cullum@nrc.gov  
Nnaerika Okonkwo
Reactor Inspector
817-200-1114
Nnaerika.Okonkwo@nrc.gov
 
Mailing Address:  
U.S. NRC, Region IV  
Attn: Chris Smith  
1600 East Lamar Blvd.  
Arlington, TX 76011-4125
Arlington, TX 76011-4125
                                                2
}}
}}

Latest revision as of 10:27, 9 January 2025

Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000498/2017007 and 05000499/2017007) and Request for Information
ML17103A627
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/13/2017
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Gerry Powell
South Texas
References
IR 2017007
Download: ML17103A627 (5)


See also: IR 05000498/2017007

Text

April 13, 2017

Mr. G. T. Powell

Executive Vice President and CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION -

NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND

EXPERIMENTS INSPECTION (05000498/2017007 AND 05000499/2017007)

AND REQUEST FOR INFORMATION

Dear Mr. Powell:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your South Texas Project Electric Generating Station from May 22-26, 2017.

The inspection will consist of three reactor inspectors from the NRCs Region IV office for

one week. The inspection will be conducted in accordance with NRC Inspection

Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 15, 2017. Upon review of

these documents, the inspectors will select additional documentation for review upon arrival. It

is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Rafael Gonzalez of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Chris Smith, by telephone at 817-200-1095 or by e-mail at

Chris.Smith@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

G. Powell

2

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Evaluations of Changes, Tests,

and Experiments Inspection

Request for Information

cc: Electronic Distribution for STP

ML17103A627

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: TFarnholtz

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

RI:EB1

C:EB1

NAME

CSmith

TFarnholtz

SIGNATURE

/RA/

/RA/

DATE

4/12/17

4/13/17

Enclosure

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

South Texas Project Electric Generating Station, Units 1 and 2

Inspection Report: 05000498/2017007; 05000499/2017007

Inspection Dates:

May 22-26, 2017

Inspection Procedure:

IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector:

Chris Smith, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by May 15, 2017, to the attention of Chris Smith. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

4. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

6. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial 10 CFR 50.59 inspection.

7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

2

9. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59

programs.

11. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

12. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Chris Smith

Reactor Inspector

817-200-1095

Chris.Smith@nrc.gov

Wes Cullum

Reactor Inspector

817-200-1563

Wes.Cullum@nrc.gov

Nnaerika Okonkwo

Reactor Inspector

817-200-1114

Nnaerika.Okonkwo@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Chris Smith

1600 East Lamar Blvd.

Arlington, TX 76011-4125