ML17229A611: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY | {{#Wiki_filter:CATEGORY 3. | ||
JBA | JBA INFORMATION DISTRIBUTI SYSTEM (RIDS) l | ||
~N NBR.:9802090240 DOC,DATE: 98/02/02 NOTARIZED: NO IL:50.--335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co. | |||
RECIP.NAME | AUTH.NAME AUTHOR AFFILIATION STALL,J.A. | ||
Florida Power 5 Light Co.. | |||
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | |||
DOCKET 05000335 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211 &. ends on Feb 10,2008.Encl program outlines ISI plan & schedule for St Lucie Unit 1 & based on requirements of Section ZI of ASME Boiler. | Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211 | ||
DISTRIBUTION CODE: A047D | &. ends on Feb 10,2008.Encl program outlines ISI plan | ||
RECIPIENT | & schedule for St Lucie Unit 1 | ||
& based on requirements of Section ZI of ASME Boiler. | |||
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR J ENCL | |||
( | |||
SIZE: | |||
l 4 TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES: | |||
RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L. | |||
COPIES RECIPIENT LTTR ENCL 7 | |||
ID CODE/NAME 1 | |||
1 PD2-3 PD 1 | |||
1 COPIES LTTR ENCL 1 | |||
1 0 | |||
INTERNAL: A 0 | |||
OCS-ABSTRA RES/DET/EIB 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB 1 | |||
1' 1 | |||
1 0 | |||
1 1 | |||
Y ERNAL: LITCO ANDERSON NRC,PDR 1 | |||
1 1 | |||
1 NOAC 1 | |||
1 D | |||
M E~ | M E~ | ||
N NOTE TO ALL "RIDS" RECIPIENTS: | N NOTE TO ALL "RIDS" RECIPIENTS: | ||
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR | PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) | ||
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: | |||
LTTR 14 ENCL 13 | |||
1 l | 1 l t | ||
1 4 | |||
l 0 | |||
Florida Power & Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: | Florida Power &Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE: | ||
St. Lucie Unit 1 Docket No. 50-335 Third Ten-Year In-Service-Inspection Interval The third ten-year in-service-inspection (ISI) interval for St. Lucie Unit 1 begins on February 11, 1998, and ends on February 10, 2008. Pursuant to 10 CFR 50.55a(g)(4)(ii), the enclosed program outlines the ISI plan and schedule for St. Lucie Unit 1 and is based on the requirements of Section XIof the ASME Boiler and Pressure Vessel Code, 1989 Edition. | |||
Enclosed is one (1) copy of the Third Interval ISI Program (Document No. ISI-PSI 1-Program, Revision 0), one (1) copy of the Unit 1 ISI sketches (Document No. ISI-PSL-1-Sketches, Revision 1), and one (1) copy of the Unit 1 ISI plan (Document No. ISI-PSL-1-Plan, Revision 0). | Enclosed is one (1) copy of the Third Interval ISI Program (Document No. ISI-PSI 1-Program, Revision 0), one (1) copy of the Unit 1 ISI sketches (Document No. ISI-PSL-1-Sketches, Revision 1), and one (1) copy of the Unit 1 ISI plan (Document No. ISI-PSL-1-Plan, Revision 0). | ||
Please contact us | Please contact us ifthere are any questions about this submittal. | ||
Very truly yours, J. A. Stall | Very truly yours, J. A. Stall | ||
'ice President St. Lucie Plant JAS/GRM U " 'r' 9 | |||
cc: | |||
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant | |||
'F8020'&240 980202 j | |||
PDR ADQCK 05000335 8 | |||
PDR H!II!III!IIIIIII,Illllllllllwl an FPL Group company | |||
e 4}} | e 4}} | ||
Latest revision as of 13:15, 8 January 2025
| ML17229A611 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/02/1998 |
| From: | Stall J FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17229A612 | List: |
| References | |
| L-98-14, NUDOCS 9802090240 | |
| Download: ML17229A611 (4) | |
Text
CATEGORY 3.
JBA INFORMATION DISTRIBUTI SYSTEM (RIDS) l
~N NBR.:9802090240 DOC,DATE: 98/02/02 NOTARIZED: NO IL:50.--335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
Florida Power 5 Light Co..
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000335
SUBJECT:
Informs that third 10-Yr ISI interval for St Lucie Unit 1 begins on 980211
&. ends on Feb 10,2008.Encl program outlines ISI plan
& schedule for St Lucie Unit 1
& based on requirements of Section ZI of ASME Boiler.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR J ENCL
(
SIZE:
l 4 TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:
RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.
COPIES RECIPIENT LTTR ENCL 7
ID CODE/NAME 1
1 PD2-3 PD 1
1 COPIES LTTR ENCL 1
1 0
INTERNAL: A 0
OCS-ABSTRA RES/DET/EIB 1
1 1
1 1
1 1
AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB 1
1' 1
1 0
1 1
Y ERNAL: LITCO ANDERSON NRC,PDR 1
1 1
1 NOAC 1
1 D
M E~
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
1 l t
1 4
l 0
Florida Power &Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 February 2, 1998 L-98-14 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:
St. Lucie Unit 1 Docket No. 50-335 Third Ten-Year In-Service-Inspection Interval The third ten-year in-service-inspection (ISI) interval for St. Lucie Unit 1 begins on February 11, 1998, and ends on February 10, 2008. Pursuant to 10 CFR 50.55a(g)(4)(ii), the enclosed program outlines the ISI plan and schedule for St. Lucie Unit 1 and is based on the requirements of Section XIof the ASME Boiler and Pressure Vessel Code, 1989 Edition.
Enclosed is one (1) copy of the Third Interval ISI Program (Document No. ISI-PSI 1-Program, Revision 0), one (1) copy of the Unit 1 ISI sketches (Document No. ISI-PSL-1-Sketches, Revision 1), and one (1) copy of the Unit 1 ISI plan (Document No. ISI-PSL-1-Plan, Revision 0).
Please contact us ifthere are any questions about this submittal.
Very truly yours, J. A. Stall
'ice President St. Lucie Plant JAS/GRM U " 'r' 9
cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
'F8020'&240 980202 j
PDR ADQCK 05000335 8
PDR H!II!III!IIIIIII,Illllllllllwl an FPL Group company
e 4