ML17264A992: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17264A992
| number = ML17264A992
| issue date = 07/31/1997
| issue date = 07/31/1997
| title = Monthly Operating Rept for July 1997 for Ginna Station. W/970813 Ltr
| title = Monthly Operating Rept for July 1997 for Ginna Station
| author name = Norton B, Widay J
| author name = Norton B, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATO+INFORMATION DISTRIBUTION             +TEN     (RIDE)
{{#Wiki_filter:CATEGORY 1 REGULATO+INFORMATION DISTRIBUTION +TEN (RIDE)
ACC"SSION NBR:9708180264           DOC.DATE:   97/07/31     NOTARIZED: NO             DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                   G  05000244 AUTH. NAME           AUTHOR AFFILIATION NORTON,B.A.           Rochester   Gas s Electric Corp.
ACC"SSION NBR:9708180264 DOC.DATE: 97/07/31 NOTARIZED:
WIDAY,J.A.           Rochester   Gas & Electric Corp.
NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester AUTH.NAME AUTHOR AFFILIATION NORTON,B.A.
RECIP.NAME           RECIPIENT AFFILIATION
Rochester Gas s Electric Corp.
WIDAY,J.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION DOCKET G
05000244


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Jul 1997 for Ginna Station.
Monthly operating rept for Jul 1997 for Ginna Station.
W/970813   ltr.
W/970813 ltr.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
DISTRIBUTION CODE:
                                                              /ENCL    g  SIZE:
IE24D COPIES RECEIVED:LTR
NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72).                 05000244 E
/ENCL g SIZE:
RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD1-1 PD                 1    1      VISSING,G.                1    1 INTERNAL: AEOD/SPD/RRAB               1    1      FILE  CENTER    01      1    1 NRR/DRPM/PECB             1    1                                1    1 RGN1                     3.                                                              Y EXTERNAL   LITCO BRYCE F J   H       1     1       NOAC                     1     1 NRC PDR                  1     1 D
TITLE: Monthly Operating Report (per Tech Specs)
U E
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
N NOTE TO ALL "RIDS" RECIPIENTS:
05000244 E
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL   10
RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 EXTERNAL LITCO BRYCE F J H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 3.
1 1
1 1
RECIPIENT ID CODE/NAME VISSING,G.
FILE CENTER 01 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 Y
D U
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10


Q                                                          foal
g ZZZZZZZ "/ll(IIISZ/
~   1g  -. II" ZZZZZZZ          '
~ 1 -. II" '
                  "/ll(IIISZ/                                                                          QAlk& MEM ZZig)ge uuN(E PiVSWZ liZZZiZZ ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 8P TELEPHONE AREA CODE 7l6 546.2700 August 13, 1997 US   Nuclear Regulatory Commission Document               Control Desk Attn:                     Guy S. Vissing Project Directorate I-1 Washington,                   DC 20555
ZZig)ge PiVSWZ uuN(E liZZZiZZ Q
foal QAlk&
MEM 8P ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7l6 546.2700 August 13, 1997 US Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate I-1 Washington, DC 20555


==Subject:==
==Subject:==
Monthly Report for July, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244
Monthly Report for July, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244


==Dear Mr.               Vissing:==
==Dear Mr. Vissing:==
 
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1997.
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1997.
Very     truly yours, cL     d.
Very truly yours, cL d.
J s     h A. Wida a   t Manager xc:       U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
J s
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475         Allendale     Road King of Prussia,               PA 19406 U.S.           NRC   Ginna Senior Resident Inspector Attachments
h A. Wida a t Manager xc:
                                                                'IIIIIIIIIII!IIIIIIIII!IIIIIIIIIIIIIIIIj
U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
      ~Q vQ Q~Q 9708i80264 97073i PDR           ADQCK       05000244 R                             'DR
Project Directorate I-1 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.
NRC Ginna Senior Resident Inspector Attachments
~Q vQ Q~Q 9708i80264 97073i PDR ADQCK 05000244 R
'DR
'IIIIIIIIIII!IIIIIIIII!IIIIIIIIIIIIIIIIj


I I
I
            ~f eS l a I'
~f I
eS !
l a I'


50-244 COMPLETED BY:
50-244 COMPLETED BY:
Benjamin A. Norton TELEPHONE (716) 771-3653
Benjamin A. Norton TELEPHONE (716) 771-3653 Notes
: 1. Unit Name:             R.E. GINNA NUCLEAR POWER PLANT                     Notes
: 1. Unit Name:
: 2. Reporting Period:             Ju 1997
R.E. GINNANUCLEAR POWER PLANT
: 3. Licensed Thermal Power (MWI):                           1520
: 2. Reporting Period:
: 4. Nameplate Rating (Gross MWe):                           517
Ju 1997 3.
: 5. Design Electric Rating (Net MWe):                       470
Licensed Thermal Power (MWI):
: 6. Maximum Dependable Capacity (Gross MWe):                 490
1520 4.
: 7. Maximum Dependable Capacity (Net MWe):                   480
Nameplate Rating (Gross MWe):
: 8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report. Give Reason:
517 5.
: 9. Power Level to Which Restricted, IfAny (Net MWe):
Design Electric Rating (Net MWe):
: 10. Reason For Restrictions, If An:
470 6.
This Month             Yr.-to.Date             Cumulative"
Maximum Dependable Capacity (Gross MWe):
: 11. Hours in Reported Period                                 744.0                  508?.0                242639.0
490 7.
: 12. Number   of hours Reactor Was Critical                   744.0                  5087.0                195001.3
Maximum Dependable Capacity (Net MWe):
: 13. Reactor Reserve Shutdown Hours                             0.0                      0.0                  1687.6 *
480 8.
: 14. Hours Generator On-line                                 744.0                  5087.0                192013.5
IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report. Give Reason:
: 15. Unit Reserve Shutdown Hours                                 0.0                      0.0                      8.5 *
9.
: 16. Gross Thermal Energy Generated (MWH)                 1128410.0              7678398.0              273554668.0
Power Level to Which Restricted, IfAny (Net MWe):
: 17. Gross Electrical Energy Generated (MWH)               380900.0              2621594.0                90731903.0
: 10. Reason For Restrictions, IfAn:
: 18. Net Electrical Energy Generated (MWH)                 362656.0              2496939.0                86142805.8
This Month Yr.-to.Date Cumulative"
: 19. Unit Service Factor (%)                                 100.0                    100.0                      79.1
: 11. Hours in Reported Period
: 20. Unit Availability Factor (%)                             100.0                    100.0                      79.1
: 12. Number of hours Reactor Was Critical
: 21. Unit Capacity Factor (using MDC Net) (%)                 101.6                    102.3                      76.5
: 13. Reactor Reserve Shutdown Hours
: 22. Unit Capacity Factor (using DER Net) (%)                 103.7                    104.4                      76.6
: 14. Hours Generator On-line
: 23. Unit Forced Outage Rate (%)                                 0.0                     0.0                     5.6
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
: 19. Unit Service Factor (%)
: 20. Unit AvailabilityFactor (%)
: 21. Unit Capacity Factor (using MDC Net) (%)
: 22. Unit Capacity Factor (using DER Net) (%)
: 23. Unit Forced Outage Rate (%)
744.0 744.0 0.0 744.0 0.0 1128410.0 380900.0 362656.0 100.0 100.0 101.6 103.7 0.0 508?.0 5087.0 0.0 5087.0 0.0 7678398.0 2621594.0 2496939.0 100.0 100.0 102.3 104.4 0.0 242639.0 195001.3 1687.6
* 192013.5 8.5
* 273554668.0 90731903.0 86142805.8 79.1 79.1 76.5 76.6 5.6
: 24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
: 24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Therefuelin andmaintenanceouta       eisscheduledforOctober20       1997. The lanneddurationis22da s.
Therefuelin andmaintenanceouta eisscheduledforOctober20 1997. The lanneddurationis22da s.
: 25. If Shutdown At End of Report Period, Estimate Date of Startup:
: 25. IfShutdown At End of Report Period, Estimate Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                     Forcast                 Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
: 26. Units in Test Status (Prior to Commercial Operation):
'UMULATIVETOTAL COMMENCING JANUARY 1, 1975 "CUMUlATIVETOTAL COMMENCING NOVEMBER 8, 1969
Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 "CUMUlATIVETOTALCOMMENCINGNOVEMBER 8, 1969


I CI
I CI


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:   Au ust 13 1997 COMPLETED BY:           ''. ~~~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.
Benjamin A. Norton TELEPHONE:     716   771-3653 MONTH    Jul  1997 DAY AVERAGE   DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                  (MWe-Net) 489                         17.               485 490                         18.               482
Ginna Nuclear Power Plant DATE:
: 3.             489                         19.               482 486                         20.               483
Au ust 13 1997 MONTH Jul 1997 COMPLETED BY:
: 5.             487                         21.               483
''. ~~~
: 6.             486                         22.               486
Benjamin A. Norton TELEPHONE:
: 7.             487                         23.               491 8 ~           490                         24.               497
716 771-3653 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 9.             491                         25.               497
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 489 17.
: 10.           490                         26.               498 487                         27.               495
485 490 18.
: 12.           488                         28.               491
482 3.
: 13.           489                         29.               484
489 19.
: 14.           487                         30.               483
482 486 20.
: 15.           487                         31.               482
483 5.
: 16.           487 INSTRUCTIONS On this format, list the average daily unit power level in     MWe-Net   for each day   in reporting month. Compute to the nearest whole     megawatt.
487 21.
483 6.
486 22.
486 7.
487 23.
491 8
~
490 24.
497 9.
491 25.
497 10.
490 26.
498 487 27.
495 12.
488 28.
491 13.
489 29.
484 14.
487 30.
483 15.
487 31.
482 16.
487 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the nearest whole megawatt.


  ~
~
I 1
I 1
4 I I
I 4 I 4
4 t
t


DOCKET NO: 50-244 UNIT: R.E. GINNA       NUCLEAR     POWER PLANT COMPLETED BY:
DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:
Benjamin A. Norton N
Benjamin A. Norton N
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH ~Jul         1997 No. Date Type   Duration         Reason'ethod     of                 Code'omponent System Code'ause               & Corrective Action to (hours)                    reactors'icensee shuting down Event                                      Prevent Recurrence Report  ¹ 1
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH ~Jul 1997 No.
F: Forced             2 S: Scheduled           Reason:                       3                          4 A-Equipment (Explain)         Method:                    Exhibit G - Instructions B-Maintenance or Test         1-Manual                    for Preparation of Data C-Refueling                   2-Manual Scram.            Entry Sheets for D-Regulatory                 3-Automatic Scram.          Licensee Event Report E-Operator Training &         4-Other (Explain)          (LER) File (NUREG-Lecensee Examination                                     0161)
Date Type Duration
F-Administrative G-Operational Error (Explain)
. (hours)
H-Other (Explain) 5 Exhibit 1- Same Source
Reason'ethod of shuting down reactors'icensee Event Report ¹ System Code'omponent Code'ause
& Corrective Action to Prevent Recurrence 1
F: Forced S:
Scheduled 2
Reason:
A-Equipment (Explain)
B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training &
Lecensee Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1-Same Source


NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO:   50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:   Au ust 13   1997 COMPLETED BY:
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:
Benjamin A. Norton TELEPHONE:    716 771-3653 MONTH   Jul   1997 The unit operated at full power for the entire   month of July. The average power level was 99.8'%
Au ust 13 1997 COMPLETED BY:
TELEPHONE:
Benjamin A. Norton 716 771-3653 MONTH Jul 1997 The unit operated at full power for the entire month of July.
The average power level was 99.8'%


Page1 of 2 RG&E                                               GINNA STATION              OPERATIONS RECORDS OPERATING  
RG&E GINNASTATION OPERATING  


==SUMMARY==
==SUMMARY==
Category       3.4.8 July, 1997              Reviewed by MONTH        YEAR        TO DATE GROSS GENERATION                           MWH        380900.0    2621594.0      90731903.0
July, 1997 Page1 of 2 OPERATIONS RECORDS Category 3.4.8 Reviewed by GROSS GENERATION
¹11 TRANSFORMER                             MWH        16721.0      115613.0      4241560.0
¹11 TRANSFORMER
¹12A TRANSFORMER                           MWH          562.0        3519.0        283931.4
¹12A TRANSFORMER
¹12B TRANSFORMER                           MWH           961.0        5523.0        63605.8
¹12B TRANSFORMER MWH MWH MWH MWH
¹11 AND ¹12 TRANSFORMER, ON LINE           MWH         18244.0      124655.0      4589097.2 NET GENERATION ON LINE                     MWH        362656.0    2496939.0      86142805.8
¹11 AND¹12 TRANSFORMER, ON LINE MWH NET GENERATION ON LINE
¹11 TRANSFORMER, OFF LINE                   MWH             0.0          0.0          3958.0
¹11 TRANSFORMER, OFF LINE MWH MWH
¹12A TRANSFORMERS, OFF LINE                 MWH             0.0          0.0        264301.8
¹12A TRANSFORMERS, OFF LINE MWH
¹12B TRANSFORMER, OFF LINE                 MWH             0.0         0.0         47324.0 AVERAGE GENERATION/HR            GROSS      MW            512.0         515.4            472.5 TOTAL STATION SERVICE / GROSS GENERATION                    0.0           0.0             0.1 ON LINE HOURS            744.0       5087.0       192013.5 OFF LINE HOURS              0.0           0.0       50625.4 TOTAL HOURS              744.0       5087.0       242639.0 UNIT RESERVE SHUTDOWN HOURS                                  0.0           0.0             8.5 "Cumlative Total Commencing January 1, 1975
¹12B TRANSFORMER, OFF LINE MWH AVERAGEGENERATION/HR GROSS MW TOTALSTATION SERVICE / GROSS GENERATION ON LINE HOURS OFF LINE HOURS TOTALHOURS UNIT RESERVE SHUTDOWN HOURS "Cumlative Total Commencing January 1, 1975 MONTH 380900.0 16721.0 562.0 961.0 18244.0 362656.0 0.0 0.0 0.0 512.0 0.0 744.0 0.0 744.0 0.0 YEAR 2621594.0 115613.0 3519.0 5523.0 124655.0 2496939.0 0.0 0.0 0.0 515.4 0.0 5087.0 0.0 5087.0 0.0 TO DATE 90731903.0 4241560.0 283931.4 63605.8 4589097.2 86142805.8 3958.0 264301.8 47324.0 472.5 0.1 192013.5 50625.4 242639.0 8.5
                                                                                              'ross Plant Efficiency                                     33.8        34.1            33.2 Gross Plant Heat Rate                       BTU/KWH     10111.0       9996.4          10290.1 Unit Operating Factor                                      99.8         99.3            75.8 Unit Service Factor                                      100.0         100.0             79.1 Unit Availability Factor                                  100.0         100.0             79.1 Unit Capacity Factor                                      101.6        102.3            76.5
'ross Plant Efficiency Gross Plant Heat Rate Unit Operating Factor Unit Service Factor UnitAvailabilityFactor Unit Capacity Factor BTU/KWH 33.8 10111.0 99.8 100.0 100.0 101.6 34.1 9996.4 99.3 100.0 100.0 102.3 33.2 10290.1 75.8 79.1 79.1 76.5


4
4
    ~ ~
~ ~
l'
l'


Page2of2 RG8 E                                                       GINNA STATION            OPERATIONS RECORDS OPERATING  
RG8 E GINNASTATION OPERATING  


==SUMMARY==
==SUMMARY==
Category       3.4.8 July, 1997            Reviewed by NUCLEAR                                                       MONTH        YEAR        TO DATE NUCLEAR PLANT OPERATION (HOURS)                                     744.0      5087.0        195001.3 NUCLEAR PLANT SHUTDOWN (HOURS)                                         0.0        0.0        46352.6 REACTOR RESERVE SHUTDOWN (HOURS)                                       0.0         0.0         1687.6 NUCLEAR PLANT TOTAL                (HOURS)                          744.0     5087.0                 '43041.5 NUMBER OF CRITICALITIES                                                0.0         0.0           385.0 NUMBER OF SHUTDOWNS a) Normal                                                  0.0         0.0           279.0 b)Trips                                                    0.0         0.0           105.0 c)Total                                                    0.0         0.0           384.0 GROSS THERMAL                                   MWTh          1128410.0    7678398.0      273554668 EQUIVALENTFULL POWER (HOURS)                                         742.4     5050.6       181908.0 Cumulative Total Commencing January 1, 1975 Reactor Service Factor                                               100.0       100.0           80.2 Reactor Availability Factor                                          100.0       100.0           80.9 UNIT FORCED OUTAGES Unit Forced Outage (Hours)                                            0.0         0.0         11446.7 Unit Forced Outage Rate                                                0.0        0.0            5.6 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications
July, 1997 Page2of2 OPERATIONS RECORDS Category 3.4.8 Reviewed by NUCLEAR NUCLEAR PLANTOPERATION (HOURS)
NUCLEAR PLANT SHUTDOWN (HOURS)
REACTOR RESERVE SHUTDOWN (HOURS)
NUCLEAR PLANTTOTAL (HOURS)
NUMBER OF CRITICALITIES NUMBER OF SHUTDOWNS a) Normal b)Trips c)Total MONTH 744.0 0.0 0.0 744.0 0.0 0.0 0.0 0.0 YEAR 5087.0 0.0 0.0 5087.0 0.0 0.0 0.0 0.0 TO DATE 195001.3 46352.6 1687.6
'43041.5 385.0 279.0 105.0 384.0 GROSS THERMAL EQUIVALENTFULL POWER (HOURS)
Cumulative Total Commencing January 1, 1975 MWTh 1128410.0 742.4 7678398.0 5050.6 273554668 181908.0 Reactor Service Factor Reactor AvailabilityFactor UNITFORCED OUTAGES Unit Forced Outage (Hours)
Unit Forced Outage Rate 100.0 100.0 0.0 0.0 100.0 100.0 0.0 0.0 80.2 80.9 11446.7 5.6 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications


JULY 1997 100            ~
100 JULY 1997 Q~~N~R~Q 8N~
Q~ N~R~Q 8 N~R0 %~IS %~~~%
R0%~I S %~~~%
80 gO 60 0
80 gO 60 0
40 20 0                                               e 3 5 7   9   11 13 15   17 19 21   23 25 27 29 31 Date
40 20 0
e 3
5 7
9 11 13 15 17 19 21 23 25 27 29 31 Date


      .L S   ~
.L S
~
7 Jl P
7 Jl P
'l e}}
'l e}}

Latest revision as of 09:45, 8 January 2025

Monthly Operating Rept for July 1997 for Ginna Station
ML17264A992
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1997
From: Norton B, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9708180264
Download: ML17264A992 (15)


Text

CATEGORY 1 REGULATO+INFORMATION DISTRIBUTION +TEN (RIDE)

ACC"SSION NBR:9708180264 DOC.DATE: 97/07/31 NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester AUTH.NAME AUTHOR AFFILIATION NORTON,B.A.

Rochester Gas s Electric Corp.

WIDAY,J.A.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET G

05000244

SUBJECT:

Monthly operating rept for Jul 1997 for Ginna Station.

W/970813 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

/ENCL g SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E

RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DRPM/PECB RGN1 EXTERNAL LITCO BRYCE F J H

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 3.

1 1

1 1

RECIPIENT ID CODE/NAME VISSING,G.

FILE CENTER 01 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 Y

D U

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

g ZZZZZZZ "/ll(IIISZ/

~ 1 -. II" '

ZZig)ge PiVSWZ uuN(E liZZZiZZ Q

foal QAlk&

MEM 8P ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7l6 546.2700 August 13, 1997 US Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate I-1 Washington, DC 20555

Subject:

Monthly Report for July, 1997 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of July, 1997.

Very truly yours, cL d.

J s

h A. Wida a t Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S.

NRC Ginna Senior Resident Inspector Attachments

~Q vQ Q~Q 9708i80264 97073i PDR ADQCK 05000244 R

'DR

'IIIIIIIIIII!IIIIIIIII!IIIIIIIIIIIIIIIIj

I

~f I

eS !

l a I'

50-244 COMPLETED BY:

Benjamin A. Norton TELEPHONE (716) 771-3653 Notes

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

Ju 1997 3.

Licensed Thermal Power (MWI):

1520 4.

Nameplate Rating (Gross MWe):

517 5.

Design Electric Rating (Net MWe):

470 6.

Maximum Dependable Capacity (Gross MWe):

490 7.

Maximum Dependable Capacity (Net MWe):

480 8.

IfChanges Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report. Give Reason:

9.

Power Level to Which Restricted, IfAny (Net MWe):

10. Reason For Restrictions, IfAn:

This Month Yr.-to.Date Cumulative"

11. Hours in Reported Period
12. Number of hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor (%)
20. Unit AvailabilityFactor (%)
21. Unit Capacity Factor (using MDC Net) (%)
22. Unit Capacity Factor (using DER Net) (%)
23. Unit Forced Outage Rate (%)

744.0 744.0 0.0 744.0 0.0 1128410.0 380900.0 362656.0 100.0 100.0 101.6 103.7 0.0 508?.0 5087.0 0.0 5087.0 0.0 7678398.0 2621594.0 2496939.0 100.0 100.0 102.3 104.4 0.0 242639.0 195001.3 1687.6

  • 192013.5 8.5
  • 273554668.0 90731903.0 86142805.8 79.1 79.1 76.5 76.6 5.6
24. Shutdovms Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Therefuelin andmaintenanceouta eisscheduledforOctober20 1997. The lanneddurationis22da s.

25. IfShutdown At End of Report Period, Estimate Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

'UMULATIVETOTALCOMMENCINGJANUARY1, 1975 "CUMUlATIVETOTALCOMMENCINGNOVEMBER 8, 1969

I CI

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-244 UNIT: R.E.

Ginna Nuclear Power Plant DATE:

Au ust 13 1997 MONTH Jul 1997 COMPLETED BY:

. ~~~

Benjamin A. Norton TELEPHONE:

716 771-3653 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 489 17.

485 490 18.

482 3.

489 19.

482 486 20.

483 5.

487 21.

483 6.

486 22.

486 7.

487 23.

491 8

~

490 24.

497 9.

491 25.

497 10.

490 26.

498 487 27.

495 12.

488 28.

491 13.

489 29.

484 14.

487 30.

483 15.

487 31.

482 16.

487 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

~

I 1

I 4 I 4

t

DOCKET NO: 50-244 UNIT: R.E. GINNA NUCLEAR POWER PLANT COMPLETED BY:

Benjamin A. Norton N

UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH ~Jul 1997 No.

Date Type Duration

. (hours)

Reason'ethod of shuting down reactors'icensee Event Report ¹ System Code'omponent Code'ause

& Corrective Action to Prevent Recurrence 1

F: Forced S:

Scheduled 2

Reason:

A-Equipment (Explain)

B-Maintenance or Test C-Refueling D-Regulatory E-Operator Training &

Lecensee Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit 1-Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE:

Au ust 13 1997 COMPLETED BY:

TELEPHONE:

Benjamin A. Norton 716 771-3653 MONTH Jul 1997 The unit operated at full power for the entire month of July.

The average power level was 99.8'%

RG&E GINNASTATION OPERATING

SUMMARY

July, 1997 Page1 of 2 OPERATIONS RECORDS Category 3.4.8 Reviewed by GROSS GENERATION

¹11 TRANSFORMER

¹12A TRANSFORMER

¹12B TRANSFORMER MWH MWH MWH MWH

¹11 AND¹12 TRANSFORMER, ON LINE MWH NET GENERATION ON LINE

¹11 TRANSFORMER, OFF LINE MWH MWH

¹12A TRANSFORMERS, OFF LINE MWH

¹12B TRANSFORMER, OFF LINE MWH AVERAGEGENERATION/HR GROSS MW TOTALSTATION SERVICE / GROSS GENERATION ON LINE HOURS OFF LINE HOURS TOTALHOURS UNIT RESERVE SHUTDOWN HOURS "Cumlative Total Commencing January 1, 1975 MONTH 380900.0 16721.0 562.0 961.0 18244.0 362656.0 0.0 0.0 0.0 512.0 0.0 744.0 0.0 744.0 0.0 YEAR 2621594.0 115613.0 3519.0 5523.0 124655.0 2496939.0 0.0 0.0 0.0 515.4 0.0 5087.0 0.0 5087.0 0.0 TO DATE 90731903.0 4241560.0 283931.4 63605.8 4589097.2 86142805.8 3958.0 264301.8 47324.0 472.5 0.1 192013.5 50625.4 242639.0 8.5

'ross Plant Efficiency Gross Plant Heat Rate Unit Operating Factor Unit Service Factor UnitAvailabilityFactor Unit Capacity Factor BTU/KWH 33.8 10111.0 99.8 100.0 100.0 101.6 34.1 9996.4 99.3 100.0 100.0 102.3 33.2 10290.1 75.8 79.1 79.1 76.5

4

~ ~

l'

RG8 E GINNASTATION OPERATING

SUMMARY

July, 1997 Page2of2 OPERATIONS RECORDS Category 3.4.8 Reviewed by NUCLEAR NUCLEAR PLANTOPERATION (HOURS)

NUCLEAR PLANT SHUTDOWN (HOURS)

REACTOR RESERVE SHUTDOWN (HOURS)

NUCLEAR PLANTTOTAL (HOURS)

NUMBER OF CRITICALITIES NUMBER OF SHUTDOWNS a) Normal b)Trips c)Total MONTH 744.0 0.0 0.0 744.0 0.0 0.0 0.0 0.0 YEAR 5087.0 0.0 0.0 5087.0 0.0 0.0 0.0 0.0 TO DATE 195001.3 46352.6 1687.6

'43041.5 385.0 279.0 105.0 384.0 GROSS THERMAL EQUIVALENTFULL POWER (HOURS)

Cumulative Total Commencing January 1, 1975 MWTh 1128410.0 742.4 7678398.0 5050.6 273554668 181908.0 Reactor Service Factor Reactor AvailabilityFactor UNITFORCED OUTAGES Unit Forced Outage (Hours)

Unit Forced Outage Rate 100.0 100.0 0.0 0.0 100.0 100.0 0.0 0.0 80.2 80.9 11446.7 5.6 NOTE: This form has been revised to be consistent with U.S. Nuclear Regulatory Guide 1.6, Appendix A, Rev. 4, Aug. 1975 Titled "Reporting of Operating Information"- Technical Specifications

100 JULY 1997 Q~~N~R~Q 8N~

R0%~I S %~~~%

80 gO 60 0

40 20 0

e 3

5 7

9 11 13 15 17 19 21 23 25 27 29 31 Date

.L S

~

7 Jl P

'l e