ML17265A324: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML17265A324
| number = ML17265A324
| issue date = 05/31/1998
| issue date = 05/31/1998
| title = Monthly Operating Rept for May 1998 for Re Ginna Nuclear Power Plant.W/980610 Ltr
| title = Monthly Operating Rept for May 1998 for Re Ginna Nuclear Power Plant
| author name = Walden J, Widay J
| author name = Walden J, Widay J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT       INFORMATION DjSTRIBUTIO         YSTEM (RIDS)
{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DjSTRIBUTIO YSTEM (RIDS)
~"
~"
ACCESSION NBR:9806150291             DOC.DATE: 98/05/31 NOTARIZED: NO                     DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                     G 05000244 AUTH. NAME           AUTHOR AFFILIATION WALDEN,J.V.,         Rochester Gas &, Electric Corp.
ACCESSION NBR:9806150291 DOC.DATE: 98/05/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
WIDAY,J.A.           Rochester Gas 6 Electric Corp.
05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.,
RECIP.NAME           RECIPIENT AFFILIATION VISSING,G.S.
Rochester Gas
&, Electric Corp.
WIDAY,J.A.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.


==SUBJECT:==
==SUBJECT:==
Monthly operating rept         for May 1998   for RE Ginna Nuclear Power Plant.W/980610       ltr.
Monthly operating rept for May 1998 for RE Ginna Nuclear Power Plant.W/980610 ltr.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
TITLE: Monthly Operating Report (per Tech Specs)
E NOTES:License Exp date       in accordance with 10CFR2,2.109(9/19/72)           .      05000244 Q
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 E Q
RECIPIENT             COPIES      v      RECIPIENT            COPIES                0 ID CODE/NAME           LTTR ENCL         ID CODE/NAME         LTTR ENCL PD1-1 PD                  1      1     VISSING,G.               1     1 INTERNAL: AEOD/SPD/RRAB                 1                          ER  Ol        1      1 OC/DBA/PAD                 1      1                                1      1 EXTERNAL: LITCO BRYCE,J H               1       1     NOAC                       1     1 I
RECIPIENT ID CODE/NAME PD1-1 PD COPIES v
NRC PDR                    1       1 D
RECIPIENT LTTR ENCL ID CODE/NAME 1
1 VISSING,G.
COPIES LTTR ENCL 1
1 0
INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 1
1 1
1 1
NOAC I
ER Ol 1
1 1
1 1
1 D
0 N
0 N
NOTE TO ALL "RIDS" RECIPIENTS:
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL     9
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9
ENCL 9


AHn ROCHfSTER GAS AND EIECTRIC CORPORATION ~ 89 EASTAVFNUE, ROCHESTER, N. Y Id6d9-OOOI   ARfA CODE 7I6 5'-27OO June 10, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:       Guy S. Vissing Project Directorate l-1 Washington, DC 20555
AHn ROCHfSTER GASANDEIECTRIC CORPORATION
~ 89 EASTAVFNUE, ROCHESTER, N. Y Id6d9-OOOI ARfACODE 7I6 5'-27OO June 10, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:
Guy S. Vissing Project Directorate l-1 Washington, DC 20555


==Subject:==
==Subject:==
Line 40: Line 61:
==Dear Mr. Vissing:==
==Dear Mr. Vissing:==
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 1998.
Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 1998.
Very truly yours, s   h A. Widay lant Manager xc:         U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
Very truly yours, s
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
h A. Widay lant Manager xc:
                                                                                            ~g >It
U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)
      'PSObi5029i ADQCK    05000244 98053'DR R                         PDR
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I
475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments
~g >It
'PSObi5029i 98053'DR ADQCK 05000244 R
PDR


OPERATING DATA REPORT 50-244 June 10, 1998 COMPLETED BY:
OPERATING DATAREPORT COMPLETED BY:
ohn V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS
50-244 June 10, 1998 ohn V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480
: 1. Unit Name:           R.E. GINNA NUCLEAR POWER PLANT   Notes:
: 1. Unit Name:
: 2. Reporting Period:           Ma, 1998
R.E. GINNANUCLEAR POWER PLANT
: 3. Design Electric Rating (Net MWe):           470
: 2. Reporting Period:
: 4. Maximum Dependable Capacity (Net MWe):       480 This Month   Yr.-to-Date     Cumulative'.
Ma, 1998 3.
Number of hours Reactor Was Critical         744.0        3623.0                    201582.2
Design Electric Rating (Net MWe):
: 6. Hours Generator On-line                       744.0        3623.0                      198561.7
470 4.
: 7. Unit Reserve Shutdown Hours                       0.0          0.0                            8.5 *
Maximum Dependable Capacity (Net MWe):
: 8. Net Electrical Energy Generated (MWH)     369192.0     1798985.0                   89340501.4
Notes:
** CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969
This Month Yr.-to-Date Cumulative'.
Number of hours Reactor Was Critical
: 6. Hours Generator On-line
: 7. Unit Reserve Shutdown Hours
: 8. Net Electrical Energy Generated (MWH) 744.0 744.0 0.0 369192.0 3623.0 3623.0 0.0 1798985.0 201582.2 198561.7 8.5 89340501.4
**CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969


4g DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10 1998 COMPLETED BY: John V. Walden UNIT SHUTDOWN REPORTING PERIOD:             Ma     1998 (Month/Year)
4g DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10 1998 COMPLETED BY:
DATE               TYPE         DURATION         REASON"'ETHOD           OF DOWN~'AUSE/CORRECTIVE         ACTIONS F: FORCED              (HOURS)                          SHUTTING S: SCHEDULED                                                                    COMMENTS
John V. Walden UNIT SHUTDOWN REPORTING PERIOD:
Ma 1998 (Month/Year)
DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)
REASON"'ETHOD OF SHUTTING DOWN~'AUSE/CORRECTIVE ACTIONS COMMENTS


==SUMMARY==
==SUMMARY==
The unit operated at full power for the entire month of May.
The unit operated at full power for the entire month of May.
(1) Reason (2) Method A - Equipment Failure (Explain)                       1 - Manual B - Maintenance or Test                               2 - Manual Trip/Scram C - Refueling                                         3 - Automatic Trip/Scram D - Regulatory Restriction                             4 - Continuation E - Operator Training/License Examination             5 - Other (Explain)
(1) Reason (2) Method A - Equipment Failure (Explain)
F - Administrative G - Operational Error (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)}}
H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)}}

Latest revision as of 09:32, 8 January 2025

Monthly Operating Rept for May 1998 for Re Ginna Nuclear Power Plant
ML17265A324
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1998
From: Walden J, Widay J
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9806150291
Download: ML17265A324 (4)


Text

CATEGORY 1 REGULAT INFORMATION DjSTRIBUTIO YSTEM (RIDS)

~"

ACCESSION NBR:9806150291 DOC.DATE: 98/05/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION WALDEN,J.V.,

Rochester Gas

&, Electric Corp.

WIDAY,J.A.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING,G.S.

SUBJECT:

Monthly operating rept for May 1998 for RE Ginna Nuclear Power Plant.W/980610 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) 05000244 E Q

RECIPIENT ID CODE/NAME PD1-1 PD COPIES v

RECIPIENT LTTR ENCL ID CODE/NAME 1

1 VISSING,G.

COPIES LTTR ENCL 1

1 0

INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 1

1 1

NOAC I

ER Ol 1

1 1

1 1

1 D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9

ENCL 9

AHn ROCHfSTER GASANDEIECTRIC CORPORATION

~ 89 EASTAVFNUE, ROCHESTER, N. Y Id6d9-OOOI ARfACODE 7I6 5'-27OO June 10, 1998 US Nuclear Regulatory Commission Document Control Desk Attn:

Guy S. Vissing Project Directorate l-1 Washington, DC 20555

Subject:

Monthly Report for May, 1998 Operating Status Information R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

Pursuant to Ginna Improved Technical Specifications Section 5.6.4, attached is the monthly operating status report for Ginna Station for the month of May, 1998.

Very truly yours, s

h A. Widay lant Manager xc:

U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector Attachments

~g >It

'PSObi5029i 98053'DR ADQCK 05000244 R

PDR

OPERATING DATAREPORT COMPLETED BY:

50-244 June 10, 1998 ohn V. Walden TELEPHONE (716) 771-3588 OPERATING STATUS 480

1. Unit Name:

R.E. GINNANUCLEAR POWER PLANT

2. Reporting Period:

Ma, 1998 3.

Design Electric Rating (Net MWe):

470 4.

Maximum Dependable Capacity (Net MWe):

Notes:

This Month Yr.-to-Date Cumulative'.

Number of hours Reactor Was Critical

6. Hours Generator On-line
7. Unit Reserve Shutdown Hours
8. Net Electrical Energy Generated (MWH) 744.0 744.0 0.0 369192.0 3623.0 3623.0 0.0 1798985.0 201582.2 198561.7 8.5 89340501.4
    • CUMULATIVETOTALCOMMENCING NOVEMBER 8, 1969

4g DOCKET NO: 50-244 UNIT NAME: R.E. GINNA NUCLEAR POWER PLANT DATE: June 10 1998 COMPLETED BY:

John V. Walden UNIT SHUTDOWN REPORTING PERIOD:

Ma 1998 (Month/Year)

DATE TYPE F: FORCED S: SCHEDULED DURATION (HOURS)

REASON"'ETHOD OF SHUTTING DOWN~'AUSE/CORRECTIVE ACTIONS COMMENTS

SUMMARY

The unit operated at full power for the entire month of May.

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain) 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)