{{#Wiki_filter:..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM J
{{#Wiki_filter:..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM J
I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405310164               DOC.DATE: 94/05/23   NOTARIZED: YES         DOCKET FACIL:50-244 Robert Emmet             Ginna Nuclear Plant, Unit 1, Rochester       G 05000244 AUTH.*NAME           AUTHOR AFFILIATION MECREDY,R.C.           Rochester Gas 6 Electric Corp.
ACCESSION NBR:9405310164 DOC.DATE: 94/05/23 NOTARIZED: YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
RECIP.NAME           RECIPIENT AFFILIATION JOHNSON,A.R.               Project Directorate I-3                                     +5     R
05000244 AUTH.*NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
+5 R


==SUBJECT:==
==SUBJECT:==
Forwards application for amend to license DPR-18,increasing                         I allowable RCA to improved TS values (NUREG-1431).
Forwards application for amend to license DPR-18,increasing allowable RCA to improved TS values (NUREG-1431).
Westinghouse proprietary rept WCAP-11668 6 nonproprietary rept WCAP-11678 encl. Proprietary rept WCAP-11668 withheld.                         D DISTRIBUTION CODE: AP01D TITLE: Proprietary Review COPIES RECEIVED:LTR Distribution J ENCL  L    SIZE:     / S Pre Operating License 6 Operating     R NOTES:License Exp date         in accordance with 10CFR2,2.109(9/19/72).
I Westinghouse proprietary rept WCAP-11668 6 nonproprietary rept WCAP-11678 encl. Proprietary rept WCAP-11668 withheld.
                                                                                                  /
D DISTRIBUTION CODE:
AP01D COPIES RECEIVED:LTR J ENCLL SIZE:
/ S TITLE: Proprietary Review Distribution Pre Operating License 6 Operating R /
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244 A
05000244 A
RECIPIENT               COPIES          RECIPIENT          COPIES            D ID CODE/NAME             LTTR ENCL       ID CODE/NAME       LTTR ENCL PD1-3 LA                      1    1    PD1-3 PD               1   1             D JOHNSON,A                    3    3 INTERNAL:   AEO~D   OA                   1    1    OGC/HDS1                1    0
RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A COPIES LTTR ENCL 1
            ~GF fQE           01         1     1 EXTERNAL    NRC PDR                      1     0 D
1 3
S D
3 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1
D NOTE TO ALL "RIDS" RECIPIENTS:
1 D
D INTERNAL: AEO~D OA
~GF fQE EXTERNAL NRC PDR 01 1
1 1
1 1
0 OGC/HDS1 1
0 D
S NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     7
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 7


g~
It g~0
It 0 < ~
~


                  /////I/////// 'g//Z1
/////I/////// 'g//Z1
                //I///   I/ I///////////
//I/// I/
i/ ///I     /         /////SKf ROCHESTER GAS AND ELECTRIC CORPORATION                         o 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY                                                                                 TELEPHONE Vice President                                                                               hREA CODE 7 t B 546 Clnna Nuclear Production                                   May 23, 1994                                         2700 U.S. Nuclear Regulatory Commission Document                         Control Desk Attn:                               Allen R. Johnson Project Directorate I-3 Washington, D.C.                             20555
I///////////
i/ ///I /
/////SKf ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY Vice President Clnna Nuclear Production May 23, 1994 TELEPHONE hREA CODE 7t B 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555


==Subject:==
==Subject:==
Application for     Amendment to Operating License Reactor Coolant Activity Technical Specifications Rochester Gas and Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):                           NRC Letter, C. Rossi to A. Ladieu (WOG), "Acceptance for Referencing of Licensing Topical Report WCAP-10698...",
Application for Amendment to Operating License Reactor Coolant Activity Technical Specifications Rochester Gas and Electric Corporation R.E.
Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):
NRC Letter, C. Rossi to A. Ladieu (WOG), "Acceptance for Referencing of Licensing Topical Report WCAP-10698...",
March 30, 1987.
March 30, 1987.
(b):               NUREG-0916, "Safety Evaluation Report Related to the Restart of R.E. Ginna Nuclear Power Plant", May 1982.
(b):
(c):               RG&E Letter,   R. Mecredy to A. Johnson     (NRC), "Emergency Response   Capability...",   October 14, 1992.
NUREG-0916, "Safety Evaluation Report Related to the Restart of R.E.
(d):               NRC Letter, A. Johnson to R. Mecredy (RG&E), Emergency Response Capability       Conformance to Regulatory Guide 1.97, revision   3", February 24, 1993.
Ginna Nuclear Power Plant",
(e):               WOG Letter,     L. Walsh and A. Engel to R. Jones (NRC),
May 1982.
                                          "Westinghouse Owners Group Steam Generator Tube Uncovery Issue", March 31, 1992.
(c):
(f):               NRC Letter, R. Jones to L. Walsh           (WOG), "Westinghouse Issue", March Owners Group, Steam Generator Tube Uncovery 10, 1993.
RG&E Letter, R. Mecredy to A. Johnson (NRC),
"Emergency Response Capability...", October 14, 1992.
(d):
NRC Letter, A. Johnson to R.
Mecredy (RG&E), Emergency
 
===Response===
Capability Conformance to Regulatory Guide 1.97, revision 3", February 24, 1993.
(e):
WOG Letter, L. Walsh and A.
Engel to R.
Jones (NRC),
"Westinghouse Owners Group Steam Generator Tube Uncovery Issue",
March 31, 1992.
(f):
NRC Letter, R.
Jones to L. Walsh (WOG),
"Westinghouse Owners Group, Steam Generator Tube Uncovery Issue", March 10, 1993.


==Dear Mr. Johnson:==
==Dear Mr. Johnson:==
WCAP-11668 (Proprietary)/WCAP-11678 (Non-Proprietary) evaluate the potential radiological consequences due to a steam generator tube rupture (SGTR) for the R.
E.
Ginna Nuclear Power Plant.
This g
'Ti4053101b4'Tl40523 PDR" ADOt"K'05000244 The purpose of this application for Amendment to Operating License is to amend Appendix A of that License to increase the Technical Specification allowable primary coolant iodine (I-131) activity limit from 0.2 pC+igm to 1.0pCi/gm; and the total primary coolant activity from 84/E pCi/gm to the Standard Technical Specification value of 100/E pCi/gm, consistent with the Improved Technical Specifications (NUREG-1431).


The purpose                          of this application for Amendment to Operating License is to                    amend Appendix A          of that License to increase the Technical Specification allowable primary coolant iodine (I-131) activity limit from 0.2 pC+igm to 1.0pCi/gm; and the total primary coolant activity from 84/E pCi/gm to the Standard Technical Specification value of 100/E pCi/gm, consistent with the Improved Technical Specifications (NUREG-1431).
evaluation utilizes the analysis methodology of WCAP-10698-P-A "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill."
WCAP-11668                          (Proprietary)/WCAP-11678 (Non-Proprietary) evaluate the potential radiological consequences due to a steam generator tube rupture (SGTR) for the R. E. Ginna Nuclear Power Plant.                                                    This
RG&E has met the requirements for usage of WCAP-10698 as outlined in Nuclear Regulatory Commission letter from C. E. Rossi (NRC) to A. E. Ladieu (WOG), (Reference a).
'Ti4053101b4'Tl40523 PDR" ADOt"K'05000244 g
The letter required each utility to provide five plant specific inputs:
 
1.
evaluation utilizes the analysis methodology of WCAP-10698-P-A "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill." RG&E has met the requirements for usage of WCAP-10698 as outlined in Nuclear Regulatory Commission letter from C. E. Rossi (NRC) to A. E. Ladieu (WOG), (Reference a). The letter required each utility to provide five plant specific inputs:
Demonstration that critical operator action times used in the analysis are realistic and consistent with those observed during simulator exercises.
: 1. Demonstration that critical operator action times used in the analysis are realistic and consistent with those observed during simulator exercises.
2.
: 2. A site specific Steam Generator       Tube Rupture   radiological offsite consequence analysis.
A site specific Steam Generator Tube Rupture radiological offsite consequence analysis.
: 3. A     structural,   analysis     of the   main   steam 'ines demonstrating adequacy under         water-filled conditions.
3.
: 4. A   list of systems, components, and instrumentation credited for accident mitigation and the specified safety grade   for each.
A structural, analysis of the main steam 'ines demonstrating adequacy under water-filled conditions.
: 5. A comparison of the plant       to the "bounding plant" used in WCAP-10698.
4.
Items 2 and 5 are addressed in .the site specific analysis being submitted with this letter, WCAP-11668 (Proprietary). Item 3 was addressed during the review of the Steam Generator Tube Rupture incident at Ginna Station. Its acceptability is documented in NUREG-0916,     (Reference b).       Item 4 is contained in our post-accident instrumentation submittal (Reference c) (re. Regulatory Guide 1.97).       NRC review and acceptance       of this information is documented   in reference d.       Item   1 is discussed   below.
A list of
During the week of August     19 through 23, 1991 simulator runs of the two most   limiting   cases   identified in     WCAP-11668   (Proprietary)/
: systems, components, and instrumentation credited for accident mitigation and the specified safety grade for each.
WCAP-11678     (Non-Proprietary), were made to validate assumed operator response times. These simulator runs demonstrated that not only were the operator response times assumed in the WCAPs conservative with adequate margin, but also that recent refinements in the emergency operating procedures have further reduced the likelihood of overfilling the ruptured steam generator. For the two limiting cases identified operator response prevented overfill with significant margin, and terminated break flow in under 45 minutes. In both cases       it was necessary to use the WCAP assumed times for operator action outside the control room. These times were the limiting factors in the scenarios,                 as control room operators had to wait to proceed with further mitigating actions until these actions were assumed to be completed.                   Operator critique following the sessions indicated that they felt these times were unrealistically conservative. We, therefore, feel that actual mitigation times would be even less than those demonstrated during the simulator exercise.
5.
A comparison of the plant to the "bounding plant" used in WCAP-10698.
Items 2 and 5 are addressed in.the site specific analysis being submitted with this letter, WCAP-11668 (Proprietary).
Item 3 was addressed during the review of the Steam Generator Tube Rupture incident at Ginna Station.
Its acceptability is documented in NUREG-0916, (Reference b).
Item 4 is contained in our post-accident instrumentation submittal (Reference c)
(re. Regulatory Guide 1.97).
NRC review and acceptance of this information is documented in reference d.
Item 1 is discussed below.
During the week of August 19 through 23, 1991 simulator runs of the two most limiting cases identified in WCAP-11668 (Proprietary)/
WCAP-11678 (Non-Proprietary),
were made to validate assumed operator response times.
These simulator runs demonstrated that not only were the operator response times assumed in the WCAPs conservative with adequate margin, but also that recent refinements in the emergency operating procedures have further reduced the likelihood of overfilling the ruptured steam generator.
For the two limiting cases identified operator response prevented overfill with significant margin, and terminated break flow in under 45 minutes.
In both cases it was necessary to use the WCAP assumed times for operator action outside the control room.
These times were the limiting factors in the scenarios, as control room operators had to wait to proceed with further mitigating actions until these actions were assumed to be completed.
Operator critique following the sessions indicated that they felt these times were unrealistically conservative.
We, therefore, feel that actual mitigation times would be even less than those demonstrated during the simulator exercise.
WCAP-11668/11678 assumes the tube rupture remains covered through-
WCAP-11668/11678 assumes the tube rupture remains covered through-


It I
It I


out the event.     More recently     it has been suggested that, this assumption may not be conservative. The Westinghouse Owners Group (WOG) has undertaken a program to assess       the consequences of tube rupture uncovery. The results indicate that the increase in doses is insignificant. These results were transmitted to the staff (Reference e).       The staff has reviewed and approved this transmittal (reference     f). Therefore,   we feel this issue has been adequately addressed.
out the event.
It should be noted that a proposal to modify Section 3.1.4.3.a has already been submitted to the NRC via letter May 13, 1994. Page 3.1-21 of Attachments B and C is being submitted in both versions, so that approval is not dependent on the sequence of proposed License Amendment Request reviews.
More recently it has been suggested that, this assumption may not be conservative.
We request     that upon NRC approval, this amendment should be considered effective immediately and implemented within 60 days.
The Westinghouse Owners Group (WOG) has undertaken a program to assess the consequences of tube rupture uncovery.
Very   ruly yours, o ert c. ecr   y BJF/190 Attachment
The results indicate that the increase in doses is insignificant.
These results were transmitted to the staff (Reference e).
The staff has reviewed and approved this transmittal (reference f).
Therefore, we feel this issue has been adequately addressed.
It should be noted that a proposal to modify Section 3.1.4.3.a has already been submitted to the NRC via letter May 13, 1994.
Page 3.1-21 of Attachments B and C is being submitted in both versions, so that approval is not dependent on the sequence of proposed License Amendment Request reviews.
We request that upon NRC
: approval, this amendment should be considered effective immediately and implemented within 60 days.
Very ruly yours, o ert c.
ecr y
BJF/190 Attachment


==Enclosures:==
==Enclosures:==
1 ~
One (1) submittal of an Application for Amendment to Operating License and associated safety evaluation.
2 ~
3
~
4
~
One (1) copy of an Application for Withholding, CAW-87-123, dated December 3,
: 1987, accompanying Affidavit, and Proprietary Information Notice One (1) copy of WCAP-11668, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at the R.E.
Ginna Nuclear Plant",
November 1987 (Proprietary).
One (1) copy of WCAP-11678, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at, the R.E. Ginna Nuclear Plant", November 1987 (Non-Proprietary).
xc>>
Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector


1~    One (1)  submittal of  an Application for Amendment to Operating License and associated    safety evaluation.
WESTINGHOUSE PROPRIETARY CLASS 2 WCAP"11668 74>5'9Q V LOFTTR2 ANALYSIS OF POTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING A STEAM GENERATOR TUBE RUPTURE AT THE R.
2 ~  One (1) copy of an Application for Withholding, CAW-87-123, dated December      3,    1987,    accompanying    Affidavit, and Proprietary  Information  Notice 3 ~  One (1) copy of WCAP-11668, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at the R.E. Ginna Nuclear Plant", November 1987 (Proprietary).
E.
4 ~  One (1) copy of WCAP-11678, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at, the R.E. Ginna Nuclear Plant", November 1987 (Non-Proprietary).
GINNA NUCLEAR POWER PLANT
xc>>  Mr. Allen R. Johnson (Mail Stop 14Dl)
: 0. J. Mendler K. Rubin NOVEMBER 1987 Nuclear Safety Department This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in.confidence and is to be used solely for the purpose for which it is furnished and returned upon request.
Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475  Allendale  Road King of Prussia,  PA    19406 Ginna Senior Resident Inspector
This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without authorization of Westinghouse Electric Corporation, Nuclear Energy Systems.
 
Westinghouse Electric Corporation Nuclear Energy Systems P.O.
WESTINGHOUSE PROPRIETARY CLASS 2 WCAP" 11668 74>5'9Q V LOFTTR2 ANALYSIS OF POTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING A STEAM GENERATOR TUBE RUPTURE AT THE R. E. GINNA NUCLEAR POWER PLANT
Box 355 Pittsburgh, Pennsylvania 15230 1987 by Westinghouse Electric Corporation 1074v:1OP/120487
: 0. J. Mendler K. Rubin NOVEMBER 1987 Nuclear Safety Department This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in .confidence and is to be used solely for the purpose for which it is furnished and returned upon request. This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without authorization of Westinghouse Electric Corporation, Nuclear Energy Systems.
Westinghouse   Electric Corporation Nuclear Energy Systems P.O. Box 355 Pittsburgh, Pennsylvania   15230 1987 by Westinghouse   Electric Corporation 1074v:1OP/120487


I P.
I P.
'\
'\\
1 0
1 0


WESTINGHOUSE PROPRIETARY CLASS 2 This document contains material that is proprietary to the Westinghouse Electric Corporation. This propr'ietary information has been marked by means of brackets. The basis for marking the material proprietary is identified by marginal notes referring to the standards in Section 8 of the affidavit of R. A. Wiesemann of record "In the Hatter of Acceptance Criteria for Emergency   .
WESTINGHOUSE PROPRIETARY CLASS 2 This document contains material that is proprietary to the Westinghouse Electric Corporation.
Core Cooling Systems   for Light Water Cooled Nuclear Power Reactors (Docket No.
This propr'ietary information has been marked by means of brackets.
The basis for marking the material proprietary is identified by marginal notes referring to the standards in Section 8 of the affidavit of R. A. Wiesemann of record "In the Hatter of Acceptance Criteria for Emergency Core Cooling Systems for Light Water Cooled Nuclear Power Reactors (Docket No.
RH-50-1)" at teanscript pages 3706 through 3710 (February 24, 1972).
RH-50-1)" at teanscript pages 3706 through 3710 (February 24, 1972).
Due to the proprietary nature of the material contained in this report which was obtained at considerable Westinghouse expense and the release of which would seriously affect our competitive position, we request this information to be withheld from public disclosure in accordance with the Rules of Practice, 10 CFR 2.790, and that the information presented therein be safeguarded in accordance with 10 CFR 2.903. We believe that withholding this information will not adversely affect the public interest.
Due to the proprietary nature of the material contained in this report which was obtained at considerable Westinghouse expense and the release of which would seriously affect our competitive position, we request this information to be withheld from public disclosure in accordance with the Rules of
This information is for your internal use only and should not be released to persons or organizations outside the directorate of Regulation and the ACRS without prior approval of Westinghouse Electric Corporation. Should 1
: Practice, 10 CFR 2.790, and that the information presented therein be safeguarded in accordance with 10 CFR 2.903.
it become necessary to release this information to such persons as part of the review procedure, please contact Westinghouse Electric Corporation and they will make the necessary arrangements required to protect their proprietary'nterests.
We believe that withholding this information will not adversely affect the public interest.
This information is for your internal use only and should not be released to persons or organizations outside the directorate of Regulation and the ACRS without prior approval of Westinghouse Electric Corporation.
Should it become 1
necessary to release this information to such persons as part of the review procedure, please contact Westinghouse Electric Corporation and they will make the necessary arrangements required to protect their proprietary'nterests.
1D74v:1D/7120B7
1D74v:1D/7120B7


WESTINGHOUSE PROPRIETARY CLASS 2 TABLE OF CONTENTS Pacaes I.     INTRODUCTION II. THERHAL HYDRAULIC ANALYSIS A.     Design Basis Accident                             2 B.      Conservative Assumptions                         3 C.      Operator Action Times                             6 D.      Transient Description -   Case 1                 13 E.      Transient Description - Case 2                 24 F.      Hass Releases                                   34 I I I. RADIOLOGICAL CONSEQUENCES ANALYSIS                       43 IV. CONCLUSION                                               58 V.     REFERENCES                                               59 1074v:1D/112087
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE OF CONTENTS Pacaes I.
INTRODUCTION II.
THERHAL HYDRAULIC ANALYSIS A.
B.
C.
D.
E.
F.
Design Basis Accident Conservative Assumptions Operator Action Times Transient Description - Case 1
Transient Description - Case 2
Hass Releases 2
3 6
13 24 34 I II.
RADIOLOGICAL CONSEQUENCES ANALYSIS IV.
CONCLUSION 43 58 V.
REFERENCES 59 1074v:1D/112087


0 0-
0 0-


WESTINGHOUSE PROPRIETARY CLASS 2 I. INTRODUCTION An evaluation of the potential radiological consequences due to a steam generator tube rupture (SGTR) event has been performed for the R. E. Ginna nuclear power plant to demonstrate that the offsite radiation doses will be less than the allowable guidelines based on the Standard Technical Specification limit on primary coolant activity. The evaluation discussed herein assumes that 151. of the steam generator tubes are plugged.
WESTINGHOUSE PROPRIETARY CLASS 2 I.
A design basis steam generator tube rupture was analyzed for Ginna using the methodology developed in MCAP-10698 (reference 1) and the supplement to HCAP-10698 (reference 2). Two single failure cases were considered to determine which is the most limiting single failure for Ginna with respect to radiological. consequences.       The two cases examined were:
INTRODUCTION An evaluation of the potential radiological consequences due to a steam generator tube rupture (SGTR) event has been performed for the R.
a,c Case 1     Intact steam generator power operated relief valve (PORV) fails closed and must be locally opened.
E. Ginna nuclear power plant to demonstrate that the offsite radiation doses will be less than the allowable guidelines based on the Standard Technical Specification limit on primary coolant activity.
Case 2     Ruptured steam generator power operated   relief valve fails open and must be   locally isolated.
The evaluation discussed herein assumes that 151. of the steam generator tubes are plugged.
Plant response to the event was modeled using the LOFTTR2 computer code with conservative assumptions of break size and location, condenser availability and initial secondary water mass in the faulted steam generator.         The analysis methodology includes the simulation of the operator actions for recovery from' steam generator tube rupture based on the Westinghouse Owners Group Emergency Response Guidelines, which are the basis for the Ginna Emergency Operating Procedures.         The mass releases were calculated with the LOFTTR2
A design basis steam generator tube rupture was analyzed for Ginna using the methodology developed in MCAP-10698 (reference
~
: 1) and the supplement to HCAP-10698 (reference 2).
program from the initiation of the event until termination of the break flow.
Two single failure cases were considered to determine which is the most limiting single failure for Ginna with respect to radiological. consequences.
For the time period following break flow termination, steam releases and feedwater flows from the intact and faulted steam generators were determined from a mass and energy balance using the calculated RCS and steam generator conditions at the time of leakage termination. The mass releases for both cases were used to determine the radiation doses at the exclusion area boundary and low population zone assuming that the primary coolant activity 'is at the Standard Technical Specification limit prior to the accident.
The two cases examined were:
a,c Case 1
Intact steam generator power operated relief valve (PORV) fails closed and must be locally opened.
Case 2
Ruptured steam generator power operated relief valve fails open and must be locally isolated.
Plant response to the event was modeled using the LOFTTR2 computer code with conservative assumptions of break size and location, condenser availability and initial secondary water mass in the faulted steam generator.
The analysis methodology includes the simulation of the operator actions for recovery from' steam generator tube rupture based on the Westinghouse Owners Group Emergency
 
===Response===
Guidelines, which are the basis for the Ginna Emergency Operating Procedures.
The mass releases were calculated with the LOFTTR2
~ program from the initiation of the event until termination of the break flow.
For the time period following break flow termination, steam releases and feedwater flows from the intact and faulted steam generators were determined from a mass and energy balance using the calculated RCS and steam generator conditions at the time of leakage termination.
The mass releases for both cases were used to determine the radiation doses at the exclusion area boundary and low population zone assuming that the primary coolant activity 'is at the Standard Technical Specification limit prior to the accident.
1074v:1D/112087
1074v:1D/112087


MESTINGHOUSE PROPRIETARY CLASS 2 II. THERMAL HYDRAULIC ANALYSIS Integrated mass releases to the atmosphere and condenser during a steam generator tube rupture event were calculated for various time periods during the accident. This section includes the methods and assumptions used to model the SGTR event and calculate the mass releases, as well as the sequence of events for the recovery.
MESTINGHOUSE PROPRIETARY CLASS 2 II.
A. Desi   n Basis Accident The   accident modeled is the complete severance of a steam generator tube located at the tube sheet on the cold leg side. It was also assumed that loss of offsite power occurred at the time of reactor trip, and the worst rod was assumed to be stuck at reactor trip.
THERMAL HYDRAULIC ANALYSIS Integrated mass releases to the atmosphere and condenser during a steam generator tube rupture event were calculated for various time periods during the accident.
a,c The most   limiting single failure with respect to steam generator overfill was determined by reference 1 to be a failed closed PORV on the intact steam generator.     Since Ginna is a two loop plant, the intact steam generator PORV must be locally opened before RCS cooldown can begin. This additional time to locally open the intact steam generator PORV will delay RCS depressurization,       causing an increase in total primary to secondary leakage. Consequently,   more water   will accumulate in the faulted           steam generator.     The case where   the intact steam generator PORV fails           to open on demand and must be       locally opened will be referred to   as Case 1.
This section includes the methods and assumptions used to model the SGTR event and calculate the mass releases, as well as the sequence of events for the recovery.
The most   limiting single failure with respect to offsite doses was determined by reference 2 to be a failed open PORV on the faulte'd steam generator. Failure of this PORV will cause an uncontrolled depressurization of the faulted steam generator which will increase primary to secondary leakage. Pressure in the ruptured steam generator will remain below that in the primary system until the failed PORV can be isolated, and recovery actions completed. The case where the           faulted'team generator PORV fails open and must be locally isolated will be referred to as Case 2.
A.
Desi n Basis Accident The accident modeled is the complete severance of a steam generator tube located at the tube sheet on the cold leg side.
It was also assumed that loss of offsite power occurred at the time of reactor trip, and the worst rod was assumed to be stuck at reactor trip.
a,c The most limiting single failure with respect to steam generator overfill was determined by reference 1 to be a failed closed PORV on the intact steam generator.
Since Ginna is a two loop plant, the intact steam generator PORV must be locally opened before RCS cooldown can begin.
This additional time to locally open the intact steam generator PORV will delay RCS depressurization, causing an increase in total primary to secondary leakage.
Consequently, more water will accumulate in the faulted steam generator.
The case where the intact steam generator PORV fails to open on demand and must be locally opened will be referred to as Case 1.
The most limiting single failure with respect to offsite doses was determined by reference 2 to be a failed open PORV on the faulte'd steam generator.
Failure of this PORV will cause an uncontrolled depressurization of the faulted steam generator which will increase primary to secondary leakage.
Pressure in the ruptured steam generator will remain below that in the primary system until the failed PORV can be
: isolated, and recovery actions completed.
The case where the faulted'team generator PORV fails open and must be locally isolated will be referred to as Case 2.
1074v:1D/112087
1074v:1D/112087


WESTINGHOUSE PROPRIETARY CLASS 2 B. Conservative     Assum   tions Plant responses and mass releases from the intact and faulted steam generator prior to break flow termination were calculated using LOFTTR2.
WESTINGHOUSE PROPRIETARY CLASS 2 B.
Conservative Assum tions Plant responses and mass releases from the intact and faulted steam generator prior to break flow termination were calculated using LOFTTR2.
While modeling the SGTR event the following assumptions were made:
While modeling the SGTR event the following assumptions were made:
: 1. Reactor Tri on Overtem erature Delta-T a,c A turbine runback   can be initiated automatically or   the operator can manually reduce the turbine load to attempt to prevent a reactor trip on overtemperature delta-T.       Although turbine runback is simulated in this analysis, credit is.not taken for delaying reactor trip. Reactor trip is assumed to occur on overtemperature delta-T. Due to the assumed loss of offsite power the condenser is not available for steam releases once the reactor is tripped. Consequently, after reactor trip the steam generator PORYs are used for steam releases. Thus an earlier trip time leads to more steam released to the atmosphere from the faulted and intact steam generators.
1.
: 2. Power a
Reactor Tri on Overtem erature Delta-T a,c A turbine runback can be initiated automatically or the operator can manually reduce the turbine load to attempt to prevent a reactor trip on overtemperature delta-T.
The   initial steam generator water mass decreases   with increasing power level.,   Thus, a lower initial power results in a higher initial steam generator secondary water mass which is conservative. On this basis, 100%   nominal power was assumed for the analysis rather than considering an overpower factor.
Although turbine runback is simulated in this analysis, credit is.not taken for delaying reactor trip.
: 3. Pressurizer   Water Level a,c The RCS   depressurization rate increases after the pressurizer empties. A higher pressurizer water level will increase the time required for the pressurizer to empty. This results in maintaining a higher primary to secondary pressure differential and thus a larger break flow rate for a longer time period. Therefore,         it is concluded that maximizing the pressurizer water level is conservative.
Reactor trip is assumed to occur on overtemperature delta-T.
1 074 v:1D/112087
Due to the assumed loss of offsite power the condenser is not available for steam releases once the reactor is tripped.
Consequently, after reactor trip the steam generator PORYs are used for steam releases.
Thus an earlier trip time leads to more steam released to the atmosphere from the faulted and intact steam generators.
2.
Power a
The initial steam generator water mass decreases with increasing power level., Thus, a lower initial power results in a higher initial steam generator secondary water mass which is conservative.
On this basis, 100% nominal power was assumed for the analysis rather than considering an overpower factor.
3.
Pressurizer Water Level The RCS depressurization rate increases after the pressurizer empties.
A higher pressurizer water level will increase the time required for the pressurizer to empty.
This results in maintaining a
higher primary to secondary pressure differential and thus a larger break flow rate for a longer time period.
Therefore, it is concluded that maximizing the pressurizer water level is conservative.
a,c 1 074 v:1D/112087


HESTINGHOUSE PROPRIETARY CLASS 2
HESTINGHOUSE PROPRIETARY CLASS 2 4.
: 4. Steam Generator Seoond~ar   Mass a,c A higher initial secondary water mass in the ruptured steam generator was determined by Reference 1 to be conservative for overfill. For the Case 1 analysis turbine runback was assumed initiated and was simulated by artificially increasing initial steam generator water mass. The initial steam generator total fluid mass was assumed to be lOA above nominal value plus the differential mass between 100% power and 70&#xc3; power to simulate turbine runback. However,   if steam generator overfill does not occur, a lower initial mass in the ruptur'ed steam generator results in a conservative prediction of offsite doses. .Thus, for Case 2 the initial secondary mass was assumed to correspond to operation at 10K below nominal steam generator water mass.
Steam Generator Seoond~ar Mass A higher initial secondary water mass in the ruptured steam generator was determined by Reference 1 to be conservative for overfill.
: 5. Break Location 4i, C The tube rupture analyzed is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet side of the steam generator. The location of the break on the cold side of the steam generator results in higher primary to secondary leakage than a break on the hot side of the steam generator as determined by reference 1. Therefore,   it is concluded that the cold leg side break location is conservative.
For the Case 1 analysis turbine runback was assumed initiated and was simulated by artificially increasing initial steam generator water mass.
: 6. Reactor Tri   Oela a,c.
The initial steam generator total fluid mass was assumed to be lOA above nominal value plus the differential mass between 100% power and 70&#xc3; power to simulate turbine runback.
As noted previously, the results for cases which produce an earlier reactor trip are more conservative with respect to the radiological consequences from a SGTR. Thus, a minimum delay time from the reactor trip signal to reactor trip is conservative for the analysis. In addition, as noted above, no credit is taken for turbine runback delaying reactor trip.
However, if steam generator overfill does not occur, a lower initial mass in the ruptur'ed steam generator results in a conservative prediction of offsite doses.
.Thus, for Case 2 the initial secondary mass was assumed to correspond to operation at 10K below nominal steam generator water mass.
a,c 5.
Break Location The tube rupture analyzed is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet side of the steam generator.
The location of the break on the cold side of the steam generator results in higher primary to secondary leakage than a break on the hot side of the steam generator as determined by reference 1.
Therefore, it is concluded that the cold leg side break location is conservative.
4i, C 6.
Reactor Tri Oela As noted previously, the results for cases which produce an earlier reactor trip are more conservative with respect to the radiological consequences from a SGTR.
: Thus, a minimum delay time from the reactor trip signal to reactor trip is conservative for the analysis.
In
: addition, as noted above, no credit is taken for turbine runback delaying reactor trip.
a,c.
1074v:10/112387
1074v:10/112387


ttESTINGHOUSE PROPRIETARY CLASS 2
ttESTINGHOUSE PROPRIETARY CLASS 2 7.
: 7. T~ti     Ti   D1 a,c Following a reactor trip, the turbine will be automatically tripped after a suitable delay time. Minimizing the delay time between reactor trip and turbine trip reduces the amount of steam flow to the turbine and increases the. secondary water inventory. Thus, a minimum delay time between reactor trip and turbine trip is conservative for the SGTR analysis.
T~ti Ti D1 Following a reactor trip, the turbine will be automatically tripped after a suitable delay time.
: 8. Steam Generator   Relief Valve Pressure Set oint Hith a loss of offsite power, the secondary pressure will increase following reactor and turbine trip, and steam will be relieved through the steam generator PORVs and safety valves. A lower steam generator relief valve pressure setpoint leads to a higher primary to secondary pressure differential and thus higher primary to secondary leakage.
Minimizing the delay time between reactor trip and turbine trip reduces the amount of steam flow to the turbine and increases the. secondary water inventory.
Thus, the use of the lowest setpoint for the steam generator. relief valves is conservative for the analysis. Since the PORV setpoint is lower than .the safety valve setpoints, the use of the PORV setpoint of 1050 psig for steam relief is more conservative,
: Thus, a minimum delay time between reactor trip and turbine trip is conservative for the SGTR analysis.
: 9. Pressurizer Pressure for SI   Initiation a,c The use of the maximum pressurizer pressure setpoint for SI initiation results in earlier actuation of the SI system. This leads to the maintenance of a higher primary to secondary pressure differential and consequently a higher break flow rate for a longer time period. Thus, the use of the maximum pressurizer pressure setpoint for SI initiation
a,c 8.
          .in the analysis is conservative.
Steam Generator Relief Valve Pressure Set oint Hith a loss of offsite power, the secondary pressure will increase following reactor and turbine trip, and steam will be relieved through the steam generator PORVs and safety valves.
: 10. Leaka e   after Overfill a,c Overfill is assumed to occur if the ruptured steam generator becomes water solid. No credit is taken for steam line volume.
A lower steam generator relief valve pressure setpoint leads to a higher primary to secondary pressure differential and thus higher primary to secondary leakage.
: Thus, the use of the lowest setpoint for the steam generator. relief valves is conservative for the analysis.
Since the PORV setpoint is lower than.the safety valve setpoints, the use of the PORV setpoint of 1050 psig for steam relief is more conservative, 9.
Pressurizer Pressure for SI Initiation The use of the maximum pressurizer pressure setpoint for SI initiation results in earlier actuation of the SI system.
This leads to the maintenance of a higher primary to secondary pressure differential and consequently a higher break flow rate for a longer time period.
: Thus, the use of the maximum pressurizer pressure setpoint for SI initiation
.in the analysis is conservative.
a,c 10.
Leaka e after Overfill a,c Overfill is assumed to occur if the ruptured steam generator becomes water solid.
No credit is taken for steam line volume.
1074v:10/1 12087
1074v:10/1 12087


WESTINGHOUSE PROPRIETARY CLASS 2
WESTINGHOUSE PROPRIETARY CLASS 2
: 11. Flashin     Fraction a,c When   calculating the amount of break flow that flashes to steam, 100 percent of the break flow is assumed to come from the hot leg side of the break. Since the tube rupture flow actually consists of flow from the hot leg and cold leg sides of the steam generator, the temperature of the combined flow will be less than the hot leg temperature and the flashing fraction will be correspondingly lower. Thus the assumption that 100 percent of the break flow comes from the hot leg is conservative for a SGTR analysis.
: 11. Flashin Fraction a,c When calculating the amount of break flow that flashes to steam, 100 percent of the break flow is assumed to come from the hot leg side of the break.
C.     erator Action   Times In the event of an SGTR, the operator is required to take actions to stabilize the plant and terminate the primary to secondary leakage. An evaluation has been performed (reference 1) to establish the operator action times for'use in the analysis of a design basis SGTR event. The operator actions which are required for recovery from an SGTR and the available data on the times to perform these actions have b'een reviewed.
Since the tube rupture flow actually consists of flow from the hot leg and cold leg sides of the steam generator, the temperature of the combined flow will be less than the hot leg temperature and the flashing fraction will be correspondingly lower.
The available data on operator action times for an SGTR includes information which has been obtained from reactor plant simulator studies as well as plant data from five actual SGTR events.       Using this data, operator -action times have been established. which are considered to be appropriate for a design basis SGTR event. These operator action times were be used as input for the analysis of the design basis SGTR event.
Thus the assumption that 100 percent of the break flow comes from the hot leg is conservative for a SGTR analysis.
The major operator     actions for SGTR recovery which are included in the E-3 guideline of the Westinghouse Owners Group Emergency Response Guidelines were explicitly modeled in the analysis.       The operator actions modeled include identification and isolation of the ruptured steam generator, cooldown and depressurization of the RCS to restore inventory, and termination of SI to stop primary to secondary leakage. These operator actions are described below.
C.
erator Action Times In the event of an SGTR, the operator is required to take actions to stabilize the plant and terminate the primary to secondary leakage.
An evaluation has been performed (reference
: 1) to establish the operator action times for'use in the analysis of a design basis SGTR event.
The operator actions which are required for recovery from an SGTR and the available data on the times to perform these actions have b'een reviewed.
The available data on operator action times for an SGTR includes information which has been obtained from reactor plant simulator studies as well as plant data from five actual SGTR events.
Using this data, operator -action times have been established. which are considered to be appropriate for a design basis SGTR event.
These operator action times were be used as input for the analysis of the design basis SGTR event.
The major operator actions for SGTR recovery which are included in the E-3 guideline of the Westinghouse Owners Group Emergency
 
===Response===
Guidelines were explicitly modeled in the analysis.
The operator actions modeled include identification and isolation of the ruptured steam generator, cooldown and depressurization of the RCS to restore inventory, and termination of SI to stop primary to secondary leakage.
These operator actions are described below.
1074v:1D/112087
1074v:1D/112087


MESTINGHOUSE PROPRIETARY CLASS 2
MESTINGHOUSE PROPRIETARY CLASS 2 1.
: 1. I.dentify the ruptured steam generator (step 2).
I.dentify the ruptured steam generator (step 2).
High secondary side   activity, as indicated by the steam generator blowdown line radiation monitor or air ejector radiation monitor, typically will provide the first indication of an SBTR event. The ruptured steam generator can be identified by high activity in the corresponding steam generator blowdown line, main steamline, or water sample. For an SBTR that results in a high power reactor trip, the steam generator water level will decrease off-scale on the narrow range for both steam generators. The auxiliary feedwater (AFM) flow will begin to refill the steam generators, typically distributing approximately equal flow to both steam generators.     Since primary to secondary leakage adds additional inventory which accumulates in the ruptured steam generator, level will return to the narrow range in that steam generator significantly earlier and will continue to increase more rapidly. This response provides confirmation of .an SGTR event and also identifies the ruptured steam generator.
High secondary side activity, as indicated by the steam generator blowdown line radiation monitor or air ejector radiation monitor, typically will provide the first indication of an SBTR event.
: 2. Isolate the ruptured steam generator from the intact steam generator and isolate feedwater to the ruptured steam generator.(steps 3 and 4).
The ruptured steam generator can be identified by high activity in the corresponding steam generator blowdown line, main steamline, or water sample.
Once a   tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator. In addition to minimizing radiological releases, this also reduces the possibility of filling the ruptured steam generator with water by 1) minimizing the accumulation of feedwater flow   and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating pr imary to secondary leakage. In the guideline for steam generator tube rupture recovery in the ERGs, the operator is directed to maintain the level in the ruptured steam generator between just on span and 50% on the narrow range instrument. Reference 1 assumed that the ruptured steam generator would be isolated when level in the steam generator reached [midway between these points]
For an SBTR that results in a high power reactor trip, the steam generator water level will decrease off-scale on the narrow range for both steam generators.
                                                                    '074v:1D/112487
The auxiliary feedwater (AFM) flow will begin to refill the steam generators, typically distributing approximately equal flow to both steam generators.
Since primary to secondary leakage adds additional inventory which accumulates in the ruptured steam generator, level will return to the narrow range in that steam generator significantly earlier and will continue to increase more rapidly.
This response provides confirmation of.an SGTR event and also identifies the ruptured steam generator.
2.
Isolate the ruptured steam generator from the intact steam generator and isolate feedwater to the ruptured steam generator.(steps 3 and 4).
Once a tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator.
In addition to minimizing radiological releases, this also reduces the possibility of filling the ruptured steam generator with water by 1) minimizing the accumulation of feedwater flow and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating pr imary to secondary leakage.
In the guideline for steam generator tube rupture recovery in the ERGs, the operator is directed to maintain the level in the ruptured steam generator between just on span and 50% on the narrow range instrument.
Reference 1
assumed that the ruptured steam generator would be isolated when level in the steam generator reached
[midway between these points]
'074v:1D/112487


WESTINGHOUSE PROPRIETARY CLASS 2
WESTINGHOUSE PROPRIETARY CLASS 2
[(33% narrow range
[(33% narrow range level).] 'or Ginna it was also conservative to use
                                'f level).]   'orfor level Ginna   it was also conservative isolation. The ruptured steam to use [33 percent]
[33 percent] 'f level for isolation.
generator was assumed to be isolated at [33 percent narrow range level or at 10 minutes, whichever was longer.]
The ruptured steam generator was assumed to be isolated at [33 percent narrow range level or at 10 minutes, whichever was longer.]
Cool down the Reactor Coolant System (RCS) using       the intact steam generator (step 14).
Cool down the Reactor Coolant System (RCS) using the intact steam generator (step 14).
After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generator . This ensures adequate subcooling in the.
After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generator This ensures adequate subcooling in the.
RCS after depressurization   to the ruptured steam generator pressure in subsequent actions., With offsite power available, the normal steam dump system to the condenser will provide sufficient capacity to perform this cooldown rapidly'. If offsite power is lost, the RCS is cooled using the power-operated relief valve (PORV) on the intact steam generator since neither the steam dump valves nor the condenser would be available. It is noted that RCS pressure will decrease during the cooldown as shrinkage of the reactor coolant expands the steam bubble in the pressurizer.
RCS after depressurization to the ruptured steam generator pressure in subsequent actions.,
: 4. Depressurize the   RCS to restore reactor coolant inventory (steps         17 or 18).
With offsite power available, the normal steam dump system to the condenser will provide sufficient capacity to perform this cooldown rapidly'. If offsite power is lost, the RCS is cooled using the power-operated relief valve (PORV) on the intact steam generator since neither the steam dump valves nor the condenser would be available.
When the cooldown is completed, SI flow   will   increase   RCS pressure until break flow matches SI flow. Consequently,         SI'flow   must be terminated to stop primary to secondary leakage.         However, adequate reactor coolant inventory must     first be assured.     This includes both sufficient reactor coolant subcooling and pressurizer inventory to maintain a reliable pressurizer level indication after SI flow is stopped. Since leakage from the primary side will continue after SI flow is stopped until RCS and ruptured steam generator pressures equalize,   an "excess" amount of inventory is needed to ensure 1074v:10/112487
It is noted that RCS pressure will decrease during the cooldown as shrinkage of the reactor coolant expands the steam bubble in the pressurizer.
4.
Depressurize the RCS to restore reactor coolant inventory (steps 17 or 18).
When the cooldown is completed, SI flow will increase RCS pressure until break flow matches SI flow.
Consequently, SI'flow must be terminated to stop primary to secondary leakage.
: However, adequate reactor coolant inventory must first be assured.
This includes both sufficient reactor coolant subcooling and pressurizer inventory to maintain a reliable pressurizer level indication after SI flow is stopped.
Since leakage from the primary side will continue after SI flow is stopped until RCS and ruptured steam generator pressures
: equalize, an "excess" amount of inventory is needed to ensure 1074v:10/112487


WESTINGHOUSE PROPRIETARY CLASS 2 pressurizer level remains   on span. The "excess" amount                       required depends on RCS pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator. To reduce break flow and establish sufficient pressurizer level, RCS pressure is decreased by opening the   pressurizer   PORV.
WESTINGHOUSE PROPRIETARY CLASS 2 pressurizer level remains on span.
: 5. Terminate SI to stop primary to secondary leakage (steps 21-23).
The "excess" amount required depends on RCS pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator.
The previous actions will have established adequate RCS subcooling, secondary side heat sink; and reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.                             When these actions have been completed, SI flow must be stopped to of the RCS and to terminate primary to secondary prevent'epressurization leakage. Primary to secondary leakage will continue after SI flow is stopped until RCS pressure and ruptured steam generator pressures equalize. Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS'nd reinitiation of leakage into the ruptured steam .generator.
To reduce break flow and establish sufficient pressurizer
Since these major recovery actions will be modelled in the SGTR analysis, it is necessary to establish the times required to perform these actions.
: level, RCS pressure is decreased by opening the pressurizer PORV.
Although the intermediate steps between the major actions will not be explicitly modelled,     it is also necessary to account for the time required to perform the steps,     It is noted that the total time required to complete the recovery-operations consists of both operator action time and system, or plant, response time; For instance, the time for each of the major recovery operations (i.e., RCS cooldown, RCS depressurization,'tc.)
5.
Terminate SI to stop primary to secondary leakage (steps 21-23).
The previous actions will have established adequate RCS subcooling, secondary side heat sink; and reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.
When these actions have been completed, SI flow must be stopped to prevent'epressurization of the RCS and to terminate primary to secondary leakage.
Primary to secondary leakage will continue after SI flow is stopped until RCS pressure and ruptured steam generator pressures equalize.
Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS'nd reinitiation of leakage into the ruptured steam.generator.
Since these major recovery actions will be modelled in the SGTR analysis, it is necessary to establish the times required to perform these actions.
Although the intermediate steps between the major actions will not be explicitly modelled, it is also necessary to account for the time required to perform the steps, It is noted that the total time required to complete the recovery-operations consists of both operator action time and
: system, or plant, response time; For instance, the time for each of the major recovery operations (i.e.,
RCS cooldown, RCS depressurization,'tc.)
is primarily due to the time required for the system response, whereas the operator action time is reflected by the time required for the operator to perform the intermediate action steps.
is primarily due to the time required for the system response, whereas the operator action time is reflected by the time required for the operator to perform the intermediate action steps.
    'The operator   action times to initiate RCS cooldown, RCS depressurization and safety injection termination were developed in reference 1 and are listed in Table II.1. In addition to the operator action times developed in reference 1, Rochester Gas and Electric supplied the operator action 1074v:1D/112087
'The operator action times to initiate RCS cooldown, RCS depressurization and safety injection termination were developed in reference 1 and are listed in Table II.1.
In addition to the operator action times developed in reference 1, Rochester Gas and Electric supplied the operator action 1074v:1D/112087


MESTINGHOUSE PROPRIETARY CLASS 2 times associated with recovering from the single failures (Reference 3).
MESTINGHOUSE PROPRIETARY CLASS 2 times associated with recovering from the single failures (Reference 3).
[These operator 'actions, which would occur outside the control room, include locally opening the intact steam generator PORV, locally closing the intact steam generator PORV block valve and locally closing the faulted steam generator PORV block valve.]   'he     times associated with performing these operator actions are listed in Table II.2.     [It is noted that the 20 minutes to open the intact steam generator PORV consists of 10 minutes to identify and locate the valve and 10 minutes to linearly open the PORV. Due to limitations of LOFTTR2, the operator action to open the intact steam generator PORV was simulated as a step opening after a 15 minute delay, which results in an equivalent integrated steam flow through the PORV at the end of the 20 minute period.] '
[These operator 'actions, which would occur outside the control room, include locally opening the intact steam generator PORV, locally closing the intact steam generator PORV block valve and locally closing the faulted steam generator PORV block valve.] 'he times associated with performing these operator actions are listed in Table II.2. [It is noted that the 20 minutes to open the intact steam generator PORV consists of 10 minutes to identify and locate the valve and 10 minutes to linearly open the PORV.
074 v:i o/1 1 2087                       10
Due to limitations of LOFTTR2, the operator action to open the intact steam generator PORV was simulated as a step opening after a 15 minute delay, which results in an equivalent integrated steam flow through the PORV at the end of the 20 minute period.] '
074v:io/1 1 2087 10


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.1 OPERATOR ACTION TIMES FOR DESIGN BASIS SGTR ANALYSIS Action                                     Time   min Identify   and isolate ruptured SG       Haximum of 10 min or calculated time to reach 334 narrow range level in the ruptured SG Operator action time to     initiate cooldown Cooldown                                   Calculated time for   RCS cooldown Operator action time to     initiate depressurization Depressurization                           Calculated time for   RCS depressurization Operator action time to     initiate SI termination SI termination and pressure                 Calculated time for SI termination equalization                                and equalization of RCS   and ruptured SG pressures 1074v:1D/112087
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.1 OPERATOR ACTION TIMES FOR DESIGN BASIS SGTR ANALYSIS Action Time min Identify and isolate ruptured SG Haximum of 10 min or calculated time to reach 334 narrow range level in the ruptured SG Operator action time to initiate cooldown Cooldown Calculated time for RCS cooldown Operator action time to initiate depressurization Depressurization Calculated time for RCS depressurization Operator action time to initiate SI termination SI termination and pressure equalization Calculated time for SI termination and equalization of RCS and ruptured SG pressures 1074v:1D/112087


WESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.2 GINNA SPECIFIC OPERATOR ACTION TIMES Q,C Action                                                  Time  min Faulted Steam Generator PORV Block                         15 Valve Closing-Local Action Intact   Steam Generator PORV Opening-Local               20 Action Intact   Steam Generator PORV Block Valve Closing-Local Action 1074v:1D/112087                           12
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.2 Action GINNA SPECIFIC OPERATOR ACTION TIMES Time min Q,C Faulted Steam Generator PORV Block Valve Closing-Local Action 15 Intact Steam Generator PORV Opening-Local Action 20 Intact Steam Generator PORV Block Valve Closing-Local Action 1074v:1D/112087 12


PROPRIETARY CLASS 2 II'ESTINGHOUSE D. Transient Descri tion -       Case 1
II'ESTINGHOUSE PROPRIETARY CLASS 2 D.
[Case   1 addresses a SGTR in which the single failure assumed is that the intact steam generator PORV fails to open on demand and must be locally opened.]     'he     sequence, of events for Case 1 is presented in Table II.3.
Transient Descri tion - Case 1
Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure.         In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure II.1. The RCS pressure also decreases as shown in Figure II.2 as the steam bubble in the pressurizer expands. As the RCS pressure decreases due to the continued primary to secondary leakage, automatic reactor trip occurs on an overtemperature delta-T trip signal.
[Case 1 addresses a
SGTR in which the single failure assumed is that the intact steam generator PORV fails to open on demand and must be locally opened.] 'he sequence, of events for Case 1 is presented in Table II.3.
Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure.
In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure II.1.
The RCS pressure also decreases as shown in Figure II.2 as the steam bubble in the pressurizer expands.
As the RCS pressure decreases due to the continued primary to secondary
: leakage, automatic reactor trip occurs on an overtemperature delta-T trip signal.
After reactor trip, core power rapidly decreases to decay heat levels.
After reactor trip, core power rapidly decreases to decay heat levels.
The turbine stop valves close and steam flow to the turbine is terminated. The steam dump system is designed to actuate following reactor trip to limit the increase in secondary pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip. Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after 'reactor trip until the steam generator.
The turbine stop valves close and steam flow to the turbine is terminated.
The steam dump system is designed to actuate following reactor trip to limit the increase in secondary
: pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip.
: Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after 'reactor trip until the steam generator.
PORVs lift to dissipate the energy, as shown in Figure II.3.
PORVs lift to dissipate the energy, as shown in Figure II.3.
The RCS     pressure decreases more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory. The decrease in RCS inventory results in a low pressurizer pressure SI signal. Pressurizer level also decreases more rapidly following reactor trip and the pressurizer eventually empties as shown in Figure II.1. After the pressurizer empties, the RCS pressure rapidly decreases as shown in Figure II.2.
The RCS pressure decreases more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory.
1074v:10/120487                             13
The decrease in RCS inventory results in a low pressurizer pressure SI signal.
Pressurizer level also decreases more rapidly following reactor trip and the pressurizer eventually empties as shown in Figure II.1.
After the pressurizer
: empties, the RCS pressure rapidly decreases as shown in Figure II.2.
1074v:10/120487 13


WESTINGHOUSE PROPRIETARY CLASS 2 Since offsite power is assumed lost at reactor-trip, the RCPs trip and a gradual transition to natural circulation flow occurs. Immediately following reactor trip the temperature rise across the core decreases as core power decays (see Figure 11.4), however, the temperature rise subsequently increases as natural circulation flow develops. The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases.       The RCS temperatures continue to slowly decrease due to the continued addition of the auxiliary feedwater to the steam generators until operator actions are initiated to cool down the     RCS.
WESTINGHOUSE PROPRIETARY CLASS 2 Since offsite power is assumed lost at reactor-trip, the RCPs trip and a
major Operator Actions
gradual transition to natural circulation flow occurs.
: 1. Identify   and Isolate the Ruptured Steam Generator Once a   tube rupture has been identified, recovery actions begin by isolating steam flow from the ruptured steam generator and .throttling the   auxiliary feedwater flow to the ruptured   steam generator.       As indicated previously, the ruptured steam generator is assumed to be identified and isolated when the narrow range level reaches [33%]
Immediately following reactor trip the temperature rise across the core decreases as core power decays (see Figure 11.4),
the ruptured steam generator or at [10] 'inutes after .
: however, the temperature rise subsequently increases as natural circulation flow develops.
                                                                                      'n reach [33%]    's initiation of the SGTR, whichever is longer. For Ginna, the time to less than [10] 'inutes, thus the ruptured steam generator is assumed to be isolated at [10] 'inutes.
The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases.
: 2. Cool down the   RCS to Establish Subcooling Margin After isolation of the ruptured steam generator, there is     a [5]
The RCS temperatures continue to slowly decrease due to the continued addition of the auxiliary feedwater to the steam generators until operator actions are initiated to cool down the RCS.
operator. action time imposed prior to initiating the cooldown. 'inute The actual delay time used in the analysis is 4 seconds longer because of the computer program requirements for simulating the operator actions. After this time, actions are taken to cool the RCS as rapidly as possible by dumping steam from the intact steam generators. Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the PORV on the intact steam generator.
major Operator Actions 1.
[For Case 1, as previously noted, the intact steam generator]
Identify and Isolate the Ruptured Steam Generator Once a tube rupture has been identified, recovery actions begin by isolating steam flow from the ruptured steam generator and.throttling the auxiliary feedwater flow to the ruptured steam generator.
                                                                          '074 v:1D/112487                             14
As indicated previously, the ruptured steam generator is assumed to be identified and isolated when the narrow range level reaches
[33%]
'n the ruptured steam generator or at [10] 'inutes after initiation of the SGTR, whichever is longer.
For Ginna, the time to reach
[33%] 's less than [10] 'inutes, thus the ruptured steam generator is assumed to be isolated at [10] 'inutes.
2.
Cool down the RCS to Establish Subcooling Margin After isolation of the ruptured steam generator, there is a [5]
'inute operator. action time imposed prior to initiating the cooldown.
The actual delay time used in the analysis is 4 seconds longer because of the computer program requirements for simulating the operator actions.
After this time, actions are taken to cool the RCS as rapidly as possible by dumping steam from the intact steam generators.
Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the PORV on the intact steam generator.
[For Case 1,
as previously noted, the intact steam generator]
'074 v:1D/112487 14


MESTINGHOUSE PROPRIETARY CLASS 2
MESTINGHOUSE PROPRIETARY CLASS 2
[PORV fails to open. For the analysis, it was       assumed that the valve was fully opened after an additional period of       15 minutes (see pg.
[PORV fails to open.
10). Thus at 1804 seconds   the intact steam generator PORV is opened for RCS cooldown.]     'he     cooldown is continued unti 1 RCS subcooling at the ruptured steam generator pressure is 20'F plus an are satisfied   it is assumed that   it close the intact steam generator PORV block valve.]         't allowance of 17'F for subcooling uncertainty. [When these conditions takes the operator five minutes to is noted that overfill of the ruptured steam generator occurs during this time period at '[2372] 'econds, as shown in Figure II.6. This cooldown ensures that there will be adequate subcooling in the RCS after the subsequent depressurization of the RCS to the ruptured steam generator pressure. The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.3, and the effect of the cooldown on the RCS temperature is shown in Figure II.4. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.2.
For the analysis, it was assumed that the valve was fully opened after an additional period of 15 minutes (see pg.
3,   Depressurize   RCS to Restore Inventory After the   RCS cooldown,   a [2] 'inute operator action time is included prior to depressurization.         The RCS is depressurized at 2688 seconds to assure adequate coolant inventory prior to terminating SI flow. Mith the RCPs stopped, normal pressurizer'pray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer, level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.5 and increases SI flow to refill the pressurizer, as shown in Figure II.1.
10).
1074v:10/112487                               15
Thus at 1804 seconds the intact steam generator PORV is opened for RCS cooldown.] 'he cooldown is continued unti 1 RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for subcooling uncertainty.
[When these conditions are satisfied it is assumed that it takes the operator five minutes to close the intact steam generator PORV block valve.]'t is noted that overfill of the ruptured steam generator occurs during this time period at '[2372] 'econds, as shown in Figure II.6.
This cooldown ensures that there will be adequate subcooling in the RCS after the subsequent depressurization of the RCS to the ruptured steam generator pressure.
The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.3, and the effect of the cooldown on the RCS temperature is shown in Figure II.4.
The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.2.
3, Depressurize RCS to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization.
The RCS is depressurized at 2688 seconds to assure adequate coolant inventory prior to terminating SI flow.
Mith the RCPs stopped, normal pressurizer'pray is not available and thus the RCS is depressurized by opening a pressurizer PORV.
The depressurization is continued until any of the following conditions are satisfied:
RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer, level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty.
The RCS depressurization reduces the break flow as shown in Figure II.5 and increases SI flow to refill the pressurizer, as shown in Figure II.1.
1074v:10/112487 15


WESTINGHOUSE PROPRIETARY CLASS 2
WESTINGHOUSE PROPRIETARY CLASS 2 4.
: 4. Terminate SI to Stop Primary to Secondary Leakage The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following a SGTR to ensure that SI flow is no longer needed. When these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,,minimum AFW flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3X allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated in the analysis until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
Terminate SI to Stop Primary to Secondary Leakage The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following a SGTR to ensure that SI flow is no longer needed.
When these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate
" primary to secondary leakage.
The SI flow is terminated when the RCS pressure increases,,minimum AFW flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3X allowance for pressurizer level uncertainty.
To assure that the RCS pressure is increasing, SI was not terminated in the analysis until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
After depressurization is completed, an operator action time of
After depressurization is completed, an operator action time of
[1] 'inute is imposed prior to SI termination. The primary to secondary leakage continues after the SI flow is terminated until the RCS   and ruptured steam generators equalize. This occurs when'the intact steam generator PORV is locally opened to cooldown the RCS so that subcooling may be maintained. When the PORV is opened the increased energy transfer from primary to secondary depressurizes the RCS to the ruptured .steam generator pressure.
[1] 'inute is imposed prior to SI termination.
1074v:10/112087                             16
The primary to secondary leakage continues after the SI flow is terminated until the RCS and ruptured steam generators equalize.
This occurs when'the intact steam generator PORV is locally opened to cooldown the RCS so that subcooling may be maintained.
When the PORV is opened the increased energy transfer from primary to secondary depressurizes the RCS to the ruptured.steam generator pressure.
1074v:10/112087 16


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.3 SEQUENCE OF EVENTS CASE 1 d., C EVENT                                                          Time sec Reactor Trip                                                   50 Ruptured. SG Isolated                                     600 Intact   SG PORV   Opened                                   1804 Overfill     Ruptured   SG                                   2372 Intact   SG PORV   Isolated                                 2568 PRZR PORV Opened                                               2688 PRZR PORV     Closed                                           2738 SI Terminated                                                 2798 Intact   PORV   Opened                                       3288 Break Flow Terminated                                         3428 1074v:1D/112087                             17
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.3 SEQUENCE OF EVENTS EVENT CASE 1
Time sec d., C Reactor Trip 50 Ruptured.
SG Isolated 600 Intact SG PORV Opened 1804 Overfill Ruptured SG 2372 Intact SG PORV Isolated PRZR PORV Opened PRZR PORV Closed 2568 2688 2738 SI Terminated 2798 Intact PORV Opened 3288 Break Flow Terminated 3428 1074v:1D/112087 17


WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE   1 188.
WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1
88 ~
188.
88
~
78.
78.
68.
68.
Line 226: Line 482:
t4 48.
t4 48.
38.
38.
18 ~
18
8.
~
: 8.   .1Ei84       .2E+84       .3Ei84   .4E~84 TINE (SEC)
8.8.
Figure   II.1   Pressurizer Level - Case 1 1074v:1D/112087                               18
.1Ei84
.2E+84 TINE (SEC)
.3Ei84
.4E~84 Figure II.1 Pressurizer Level - Case 1
1074v:1D/112087 18


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE   I
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE I
                  .25E+84
.25E+84
                .225Ei84
.225Ei84
                    .2E 84
.2E 84
                .175E'84
.175E'84
                . 15E+84 Ld
. 15E+84 Ld
            ~, 12SE LJ
~, 12SE ~ 84 LJ Of
                      ~ 84 Of
~o
            ~o   .1E 84 Of 758.
.1E 84 Of 758.
588.
588.
258.
258.
                                . IE~84   .2E 84     .3E ~ 84    .4E 84 TIME (SEC)
. IE~84
Figure   II.2 RCS Pressure     - Case 1 1 074 v:10/112087                               19
.2E 84
.3E ~ 84 TIME (SEC)
.4E 84 Figure II.2 RCS Pressure - Case 1
1 074 v:10/112087 19


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS IS PERCENT TUBE PLUGGING CASE I
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS IS PERCENT TUBE PLUGGING CASE I
              .I4E     84
.I4E 84
              . 12Ei84                                   RUPTURED LOOP
. 12Ei84 RUPTURED LOOP
                . 1E ~ 84 888.                                     INTACT LOOP OC 688.
. 1E ~ 84 888.
C) ill        488.
INTACT LOOP OC C) ill 688.
488.
288.
288.
8.
8.
                                . IE ~ 84   .2E 84     .3E ~ 84     .4E ~ 84 TINE (SEC)
. IE ~ 84
Figure   II.3 Secondary Pressure     - Case 1 1 074 v:1D/11208l                               20
.2E 84
.3E ~ 84
.4E ~ 84 TINE (SEC)
Figure II.3 Secondary Pressure
- Case 1
1 074 v:1D/11208l 20


MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAi1 GENERATOR TUBE RUPTURE ANALYSIS PERCENT       TUBE PLUGGING CASE 1 658.
MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAi1 GENERATOR TUBE RUPTURE ANALYSIS PERCENT TUBE PLUGGING CASE 1
658.
688.
688.
          ~ 558.
~ 558.
4J CD 588.
4J CD 588.
          ~ 458.
~ 458.
I X
IX 488.
488.
C) 358.
C) 358.
CD CD
CD CD
          ~ 388.
~ 388.
258 ~
258
288 '.       . 1E ~ 84   .  .2E ~ 84     .3E ~ 84     ~ 4E ~ 84 TI11E (SEC)
~
Figure     II.4 Intact     Loop Hot and Cold Leg       RCS Temperatures - Case 1 1074v:10/112087                                     21
288'.
. 1E ~ 84
.2E ~ 84 TI11E (SEC)
.3E ~ 84
~ 4E ~ 84 Figure II.4 Intact Loop Hot and Cold Leg RCS Temperatures - Case 1
1074v:10/112087 21


MESTINGHOUSE PROPRIETARY CLASS 2 G     INNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1 168.
MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1
I48.'SSUE 128 Ul K
168.
I48.
128
'SSUE Ul K
lD 88.
lD 88.
C) 68 ~
C) 68 ~
hC EZ IIJ m   48.
hC EZ IIJ m
48.
28.
28.
              -28.                                                 .4E+84
-28.
                                ..IE~84       .2E ~ 84     .3E 84 TIt1E ISEC)
..IE~84
Figure II.5   Primary to Secondary Leakage   - Case 1 1074v:1D/112087                                       22
.2E ~ 84 TIt1E ISEC)
.3E 84
.4E+84 Figure II.5 Primary to Secondary Leakage - Case 1
1074v:1D/112087 22


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE   1
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1
              .6E 84
.6E 84
              .SE 84
.SE 84
          ~   .4E ~ 84
~.4E ~ 84
          ~ .3'4 0
~.3'4 0
              .2Ei84
.2Ei84
              .1E 84
.1E 84
                                . lE. 84     .2E~B4       .3E~84   .4E~84 TlNE tSEC)
. lE. 84
Figure II.S     Ruptured SG Rater Volume - Case 1 1074v:1D/112081                                   23
.2E~B4
.3E~84
.4E~84 TlNE tSEC)
Figure II.S Ruptured SG Rater Volume - Case 1
1074v:1D/112081 23


WESTINGHOUSE PROPRIETARY CLASS 2 E. Transient Descri tion -     Case 2
WESTINGHOUSE PROPRIETARY CLASS 2 E.
[Case 2 addresses a SGTR in which the single failure assumed is that the faulted steam generator PORV fails open at the time the faulted steam generator is isolated.]       'hus,     the Case   2 transient is similar to the Case   1 transient until that time.     .The sequence of events for Case 2 is I
Transient Descri tion - Case 2
[Case 2 addresses a
SGTR in which the single failure assumed is that the faulted steam generator PORV fails open at the time the faulted steam generator is isolated.] 'hus, the Case 2 transient is similar to the Case 1 transient until that time.
.The sequence of events for Case 2 is I
presented in Table II.4.
presented in Table II.4.
Following the tube rupture the RCS pressure decreases as shown in Figure 11.7 due to the primary to secondary leakage.           In response to this depressurization, the reactor trips on overtemperature delta-T. After reactor trip, core power rapidly decreases to decay heat levels and the RCS depressurization     becomes more rapid. The steam dump system is inoperable due to the assumed loss of offsite power, which results in the secondary pressure rising to the steam generator PORV setpoint as shown in Figure 11.8. The decreasing pressurizer pressure leads to an automatic SI signal on low pressurizer pressure. Pressurizer level also decreases more rapidly following reactor trip until         it eventually empties, as shown in Figure 11.9.
Following the tube rupture the RCS pressure decreases as shown in Figure 11.7 due to the primary to secondary leakage.
major Operator Actions
In response to this depressurization, the reactor trips on overtemperature delta-T.
: 1. Identify   and Isolate the Ruptured   Steam Generator The   ruptured steam generator is assumed to be identified and isolated at [10 minutes after the initiation of the SGTR or when the narrow range level reaches 33%, whichever time is greater.]         'or     this case, the time to reach [33/] 'arrow range level is [652]
After reactor trip, core power rapidly decreases to decay heat levels and the RCS depressurization becomes more rapid.
and thus, it was assumed that the ruptured steam generator is
The steam dump system is inoperable due to the assumed loss of offsite power, which results in the secondary pressure rising to the steam generator PORV setpoint as shown in Figure 11.8.
                                                                                'econds, isolated at that time. [The ruptured steam generator PORV is also assumed to fail open at this time.]       'he     failure causes the steam generator to rapidly depressurize, which results in an increase in primary to secondary leakage. The depressu'rization of the ruptured steam generator increases'he break flow and energy transfer from primary to secondary which results in RCS pressure and temperature decreasing more rapidly than in Case 1. The ruptured steam generator 1074v:10/120487                               24
The decreasing pressurizer pressure leads to an automatic SI signal on low pressurizer pressure.
Pressurizer level also decreases more rapidly following reactor trip until it eventually empties, as shown in Figure 11.9.
major Operator Actions 1.
Identify and Isolate the Ruptured Steam Generator The ruptured steam generator is assumed to be identified and isolated at [10 minutes after the initiation of the SGTR or when the narrow range level reaches 33%, whichever time is greater.] 'or this
: case, the time to reach [33/] 'arrow range level is [652]
'econds, and thus, it was assumed that the ruptured steam generator is isolated at that time.
[The ruptured steam generator PORV is also assumed to fail open at this time.] 'he failure causes the steam generator to rapidly depressurize, which results in an increase in primary to secondary leakage.
The depressu'rization of the ruptured steam generator increases'he break flow and energy transfer from primary to secondary which results in RCS pressure and temperature decreasing more rapidly than in Case 1.
The ruptured steam generator 1074v:10/120487 24


MESTINGHOUSE PROPRIETARY CLASS 2 depressurization       causes   a cooldown in the intact   steam generator loop. As the'ntact     steam generator hot leg temperature   decreases below the steam generator water temperature         reverse heat transfer takes place as shown in Figure II. 10.         [It is assumed that the time required for the operator to identify that the ruptured steam generator PORV is open and to close the associated block valve is 15 minutes. Thus, at 1558 seconds the depressurization of ruptured steam generator is terminated.] ',c
MESTINGHOUSE PROPRIETARY CLASS 2 depressurization causes a cooldown in the intact steam generator loop.
: 2. Cool Down the     RCS to establish Subcooling Margin
As the'ntact steam generator hot leg temperature decreases below the steam generator water temperature reverse heat transfer takes place as shown in Figure II.10.
[After the ruptured steam generator         PORV block valve is closed,'here is a 5 minute operator action time         imposed prior to initiation of cooldown.]     'he       depressurization of the ruptured steam generator affects the RCS cooldown target temperature since the temperature is dependent upon the pressure in the ruptured steam generator.             Since
[It is assumed that the time required for the operator to identify that the ruptured steam generator PORV is open and to close the associated block valve is 15 minutes.
        'ffsite     power is lost the RCS is cooled by dumping steam to the atmosphere using the intact steam generator PORV. The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for instrument uncertainty. Hecause of the lower pressure in the ruptured steam generator the associated temperature the RCS must be cooled to is also lower, which has the net effect of extending the time for cooldown.
Thus, at 1558 seconds the depressurization of ruptured steam generator is terminated.]
For Case 2 cooldown begins at [1858] 'econds 'and is completed at
',c 2.
[2852] 'econds.
Cool Down the RCS to establish Subcooling Margin
The   reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.8, and the effect of the cooldown on the RCS temperature is shown in Figure II.10. The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.7.
[After the ruptured steam generator PORV block valve is closed,'here is a 5 minute operator action time imposed prior to initiation of cooldown.] 'he depressurization of the ruptured steam generator affects the RCS cooldown target temperature since the temperature is dependent upon the pressure in the ruptured steam generator.
: 3. Depressurize     to Restore Inventory After the   RCS cooldown,     a [2] 'inute   operator action time is included prior to depressurization.         The RCS is depressurized at
Since
[2974]   'econds       to assure adequate coolant inventory prior to 1074v:10/112487                                   25
'ffsite power is lost the RCS is cooled by dumping steam to the atmosphere using the intact steam generator PORV.
The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for instrument uncertainty.
Hecause of the lower pressure in the ruptured steam generator the associated temperature the RCS must be cooled to is also lower, which has the net effect of extending the time for cooldown.
For Case 2 cooldown begins at [1858] 'econds
'and is completed at
[2852] 'econds.
The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.8, and the effect of the cooldown on the RCS temperature is shown in Figure II.10.
The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.7.
3.
Depressurize to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization.
The RCS is depressurized at
[2974] 'econds to assure adequate coolant inventory prior to 1074v:10/112487 25


HESTINGHOUSE PROPRIETARY CLASS 2 terminating SI flow, -Hith the RCPs stopped, normal pressurizer spray is not available and thus the RCS is depressurized by opening a pressurizer PORV. The depressurization is continued until any of the following conditions are satisfied: RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty. The RCS depressurization reduces the break flow as shown in Figure II.11 and increases SI flow to refill the pressurizer, as shown in Figure 11.9.
HESTINGHOUSE PROPRIETARY CLASS 2 terminating SI flow, -Hith the RCPs stopped, normal pressurizer spray is not available and thus the RCS is depressurized by opening a
: 4. Terminate SI to Stop Primary to Secondary Leakage, The   previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed. Nhen these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage. The SI flow is terminated when the RCS pressure increases,'minimum AFH flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3% allowance for pressurizer level uncertainty. To assure that the RCS pressure is increasing, SI was not terminated until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
pressurizer PORV.
The depressurization is continued until any of the following conditions are satisfied:
RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty.
The RCS depressurization reduces the break flow as shown in Figure II.11 and increases SI flow to refill the pressurizer, as shown in Figure 11.9.
4.
Terminate SI to Stop Primary to Secondary
: Leakage, The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.
Nhen these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage.
The SI flow is terminated when the RCS pressure increases,'minimum AFH flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3% allowance for pressurizer level uncertainty.
To assure that the RCS pressure is increasing, SI was not terminated until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.
After depressurization is completed, an operator action time of
After depressurization is completed, an operator action time of
[1] 'inute is imposed prior to SI termination. Figure II.11 shows that the primary to secondary leakage continues after the SI flow is stopped until the RCS and ruptured steam generator pressure equalize. The ruptured steam water volume is shown in Figure II.12.
[1] 'inute is imposed prior to SI termination.
For Case 2, the ruptured steam generator does not   overfill.
Figure II.11 shows that the primary to secondary leakage continues after the SI flow is stopped until the RCS and ruptured steam generator pressure equalize.
The ruptured steam water volume is shown in Figure II.12.
For Case 2, the ruptured steam generator does not overfill.
1074v:1D/112487
1074v:1D/112487


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.4 SEQUENCE OF EVENTS CASE 2 EVENT                                                         TIME   sec Reactor Trip                                                     49.4 Ruptured   SG   Isolated a.c Ruptured   SG PORV   Fails Open Ruptured   SG Block Valve Closed                             1558 Intact   SG PORV   Opened                                     1858 Intact   SG PORV   Closed                                     2852 PRZR PORV Opened                                               2974 PRZR PORV   Closed                                           3006 SI Terminated                                                 3066 Break Flow Terminated                                         3438 1D74v:1O/112087                             27
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.4 SEQUENCE OF EVENTS CASE 2 EVENT TIME sec Reactor Trip 49.4 Ruptured SG Isolated Ruptured SG PORV Fails Open a.c Ruptured SG Block Valve Closed 1558 Intact SG PORV Opened Intact SG PORV Closed 1858 2852 PRZR PORV Opened PRZR PORV Closed 2974 3006 SI Terminated 3066 Break Flow Terminated 3438 1D74v:1O/112087 27


WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAt1 GENERATOR TUBE RUPTURE 4NAL'/SIS 15 PERCENT TUBE PLUGGING CASE 2 2588.
WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAt1 GENERATOR TUBE RUPTURE 4NAL'/SIS 15 PERCENT TUBE PLUGGING 2588.
2258.
2258.
2888.
CASE 2 2888.
CC l758.
CC l758.
1588.
1588.
          ~ 1258.
~ 1258.
cn I 888.
cn I 888.
758.
758.
Line 328: Line 646:
258.
258.
8.
8.
: 8. 588. 1888. l588. 2888 '588. 5888. 5588." 4888.
8.
588.
1888.
l588.
2888 '588.
5888.
5588." 4888.
TIME(SEC)
TIME(SEC)
Figure   II.7   RCS Pressure - Case 2 1074v:10/112087                                 28
Figure II.7 RCS Pressure
- Case 2
1074v:10/112087 28


HESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 2 1488.
HESTINGHOUSE PROPRIETARY CLASS 2 1488.
RUPTURED LOOP 1288.
GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 2 1288.
l888.
l888.
w   888.
w 888.
688.
688.
INTACT LOOP w   488, 288,
w
: 8. 588. 1888.:l588. 2888. 2588. 3888. 3588. 4888.
: 488, RUPTURED LOOP INTACT LOOP
: 288, 8.
588.
1888.:l588.
2888.
2588.
3888.
3588.
4888.
TIME(SEC)
TIME(SEC)
Figure II.8   Secondary Pressure   - Case 2 1074v:10/112087                             29
Figure II.8 Secondary Pressure
- Case 2
1074v:10/112087 29


WESTINGHOUSE PROPRIETARY CLASS 2 G1NNA STEAN GENERATOR TUBE RUPTURE ANALYS15 15 PERCENT TUBE PLUGGING CASE 2 188.
WESTINGHOUSE PROPRIETARY CLASS 2 G1NNA STEAN GENERATOR TUBE RUPTURE ANALYS15 15 PERCENT TUBE PLUGGING 188.
98.
CASE 2 98.
e8.
e8.
78.
78.
LJ w   68.
LJ w
              '58.
68.
48 ~
'58.
48
~
38.
38.
0 28.
0 28.
18.
18.
8.
8.
: 8. 588. 1888. 1588. 2888 '588.     3888. 3588. 4888.
8.
588.
1888.
1588.
2888 '588.
3888.
3588.
4888.
TINE ( SEC )
TINE ( SEC )
Figure II.9   Pressurizer     Level - Case.2 1074v:10/1 1ZOST                               30
Figure II.9 Pressurizer Level - Case.2 1074v:10/1 1ZOST 30


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 658.
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING 658.
688.                 THOT
CASE 2 688.
          ~ 558.
~ 558.
O                                     , TCOLD THOT 588.           TCOLD
O 588.
        ~z. 458.
~z. 458.
ox 488.
o 488.
I THOT                  TCOLD o 358, 388.
x I
258
o 358, 388.
                '88.
TCOLD THOT THOT
: 8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.
, TCOLD THOT TCOLD 258
T I ME ( SEC )
'88.
Figure         II.10 Intact   Loop Hot and Cold Leg   RCS Temperatures - Case 2 1074v:1D/1 12087                                       31
8.
588.
1888.
1588.
2888.
2588.
3888.
3588.
4888.
TIME ( SEC )
Figure II.10 Intact Loop Hot and Cold Leg RCS Temperatures
- Case 2
1074v:1D/1 12087 31


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 78.
MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 78.
Line 375: Line 732:
o 48.
o 48.
38.
38.
oc 28.
oc 28.
I8,
I8,
            -18.
-18.
            -28
-28 8.
: 8. 588. 1888. 1588. 2888. 2588. 3888. 3588. 4888.
588.
1888.
1588.
2888.
2588.
3888.
3588.
4888.
TIME(SEC)
TIME(SEC)
Figure II.11 Primary to Secondary Leakage     - Case 2 1074v:1D/112087                                 32
Figure II.11 Primary to Secondary Leakage - Case 2
1074v:1D/112087 32


MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING
MESTINGHOUSE PROPRIETARY CLASS 2 6888.
                                                'ASE     2 6888.
GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING
H)
'ASE 2 H)
I
I~ 5888.
      ~ 5888.
K o 4888.
K o 4888.
      ~ 5888.
~ 5888.
      ~g 2888 ~
~g 2888
~
I888.
I888.
: 8. 588. 1888. 1588. 2888. 2588. 5888. 5588. 4888.,
8.
588.
1888.
1588.
2888.
2588.
5888.
5588.
4888.,
T I ME ( SEC )
T I ME ( SEC )
Mater Volume  Case Figure 11,12   Ruptured     SG                       2 1074v:1D/112087                                   33
Figure 11,12 Ruptured SG Mater Volume Case 2
1074v:1D/112087 33


WESTINGHOUSE PROPRIETARY CLASS 2 F. Mass Releases The mass     releases were determined for each of the single failure cases for use in evaluating the exclusion area boundary and low population zone radiation exposure. The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator were determined for the period from accident initiation until 2 hours after the accident and from 2 to 8 hours after the accident. The releases for 0-2. hours are used to calculate the radiation doses at the exclusion area boundary for a 2 hour exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the accident.
WESTINGHOUSE PROPRIETARY CLASS 2 F.
Mass Releases The mass releases were determined for each of the single failure cases for use in evaluating the exclusion area boundary and low population zone radiation exposure.
The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator were determined for the period from accident initiation until 2 hours after the accident and from 2 to 8 hours after the accident.
The releases for 0-2. hours are used to calculate the radiation doses at the exclusion area boundary for a 2 hour exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the accident.
In the LOFTTR2 analyses, the SGTR recovery actions in the E-3 guideline were simulated until the termination of primary to secondary leakage.
In the LOFTTR2 analyses, the SGTR recovery actions in the E-3 guideline were simulated until the termination of primary to secondary leakage.
After the primary to secondary leakage is terminated, the operators will continue the SGTR recovery actions in the E-3 guideline to prepare the plant for cooldown to cold shutdown conditions. These actions include establishing normal Chemical and Volume Control System (CVCS) operation to provide reactor coolant inventory control and a boration path; restarting a reac'tor coolant pump (RCP),     if none are running, to ensure homogeneous RCS conditions and to provide normal pressurizer spray; or stopping one RCP,   if both are running, to minimize the heat input'uring the subsequent cooldown; and the actions necessary to'inimize the spread of contamination on the secondary side. When the instructions provided in E-3 are completed, the plant should be cooled and depressurized to cold shutdown conditions. There are three alternate means of performing the post-SGTR cooldown provided in the WOG Emergency Response Guidelines.         The guidelines are: ES-3.1, POST-SGTR COOLDOWN USING BACKFILL; ES-3.2, POST-SGTR COOLDOWN USING BLOWDOWN; and ES-3.3, POST-SGTR COOLDOWN USING STEAM DUMP.       The preferred methods are using backfill or blowdown since these methods minimize the radioactivity released to the atmosphere.       The ES-3.3 guideline using steam dump provides the fastest method for 1074v:1D/112087                             34
After the primary to secondary leakage is terminated, the operators will continue the SGTR recovery actions in the E-3 guideline to prepare the plant for cooldown to cold shutdown conditions.
These actions include establishing normal Chemical and Volume Control System (CVCS) operation to provide reactor coolant inventory control and a boration path; restarting a reac'tor coolant pump (RCP), if none are running, to ensure homogeneous RCS conditions and to provide normal pressurizer spray; or stopping one RCP, if both are running, to minimize the heat input'uring the subsequent cooldown; and the actions necessary to'inimize the spread of contamination on the secondary side.
When the instructions provided in E-3 are completed, the plant should be cooled and depressurized to cold shutdown conditions.
There are three alternate means of performing the post-SGTR cooldown provided in the WOG Emergency
 
===Response===
Guidelines.
The guidelines are:
ES-3.1, POST-SGTR COOLDOWN USING BACKFILL; ES-3.2, POST-SGTR COOLDOWN USING BLOWDOWN; and ES-3.3, POST-SGTR COOLDOWN USING STEAM DUMP.
The preferred methods are using backfill or blowdown since these methods minimize the radioactivity released to the atmosphere.
The ES-3.3 guideline using steam dump provides the fastest method for 1074v:1D/112087 34


WESTINGHOUSE PROPRIETARY CLASS 2 depressurizing the RCS and ruptured steam generator. This method also results in the worst radiological releases, especially               if steam dump to the condenser is unavailable. Therefore, the method using steam dump was selected for evaluation of the long-term mass releases since this produces conservative results for the offsite dose evaluation. It is noted that the use of the steam dump method would not be permitted               if steam generator overfill occurs and water enters the main steamlines.
WESTINGHOUSE PROPRIETARY CLASS 2 depressurizing the RCS and ruptured steam generator.
The high     level actions for the ES-3.3 guideline are discussed below,
This method also results in the worst radiological releases, especially if steam dump to the condenser is unavailable.
: 1. Prepare   for   Cooldown   to Cold Shutdown The   initial   steps to prepare for cooldown to cold shutdown are performed in the E-3 guideline following SI termination, and these steps will be continued in ES-3.3         if they have not already been completed. A few additional steps are also performed in ES-3.3 prior
Therefore, the method using steam dump was selected for evaluation of the long-term mass releases since this produces conservative results for the offsite dose evaluation.
        . to initiating cooldown. These include isolating the cold leg. SI accumulators to prevent unnecessary injection, energizing pressurizer heaters as necessary to saturate the pressurizer water and to provide for better pressure control, and assuring adequate shutdown margin in the event of potential boron dilution due to in-leakage from the
It is noted that the use of the steam dump method would not be permitted if steam generator overfill occurs and water enters the main steamlines.
          'ruptured   steam generator.
The high level actions for the ES-3.3 guideline are discussed
: 2. Cooldown   RCS   to Residual Heat   Removal     (RHR) System Temperature The RCS   is cooled   by steaming and feeding the intact steam generator similar to a normal cooldown. Since all immediate safety concerns have been resolved, the cooldown rate should be maintained less than the maximum allowable rate of       100'F/hr. The preferred means for cooling the RCS is steam dump       to the condenser since this minimizes the radiological releases and       conserves feedwater supply.       The PORV for the intact steam generator       can also be used   if steam   dump to the condenser is unavailable.       When the RHR   system operating temperature is reached, the cooldown     is stopped   until RCS pressure can also be decreased. This ensures   that pressure/temperature limits will not be exceeded.
: below, 1.
1074v:1D/112087                                   35
Prepare for Cooldown to Cold Shutdown The initial steps to prepare for cooldown to cold shutdown are performed in the E-3 guideline following SI termination, and these steps will be continued in ES-3.3 if they have not already been completed.
A few additional steps are also performed in ES-3.3 prior
. to initiating cooldown.
These include isolating the cold leg. SI accumulators to prevent unnecessary injection, energizing pressurizer heaters as necessary to saturate the pressurizer water and to provide for better pressure control, and assuring adequate shutdown margin in the event of potential boron dilution due to in-leakage from the
'ruptured steam generator.
2.
Cooldown RCS to Residual Heat Removal (RHR) System Temperature The RCS is cooled by steaming and feeding the intact steam generator similar to a normal cooldown.
Since all immediate safety concerns have been resolved, the cooldown rate should be maintained less than the maximum allowable rate of 100'F/hr.
The preferred means for cooling the RCS is steam dump to the condenser since this minimizes the radiological releases and conserves feedwater supply.
The PORV for the intact steam generator can also be used if steam dump to the condenser is unavailable.
When the RHR system operating temperature is reached, the cooldown is stopped until RCS pressure can also be decreased.
This ensures that pressure/temperature limits will not be exceeded.
1074v:1D/112087 35


WESTINGHOUSE PROPRIETARY CLASS 2
WESTINGHOUSE PROPRIETARY CLASS 2 3.
: 3. Depressurize   RCS to RHR System Pressure When   the cooldown to RHR system temperature is completed, the pressure in the ruptured steam generator is decreased by releasing steam from the ruptured steam generator. Steam release to the condenser is preferred since this minimizes radiological releases. However, steam can also be released to the atmosphere using the PORV on the ruptured steam generator.       An evaluation of the potential radiological consequences should be performed before releasing steam from the ruptured steam generator to the atmosphere. As the ruptured steam generator pressure is reduced, the RCS pressure is maintained equal to the pressure in the ruptured steam generator in order to prevent in-leakage of secondary side water or additional primary to secondary leakage. Normal pressurizer spray is the preferred means of RCS pressure control since this conserves coolant inventory.       If pressurizer spray is not available, a pressurizer PORV or auxiliary spray can be used to control RCS pressure.
Depressurize RCS to RHR System Pressure When the cooldown to RHR system temperature is completed, the pressure in the ruptured steam generator is decreased by releasing steam from the ruptured steam generator.
When overfill of   the ruptured steam generator occurs, as with Case 1, guideline ES-3.1     POST-SGTR COOLDOWN USING BACKFILL is assumed to be used. The high level actions for ES-3.1 are similar to ES-3.3.
Steam release to the condenser is preferred since this minimizes radiological releases.
However, the method by which ES-3.1 instructs the operator to depressurize the ruptured steam generator differs from ES-3.3. In Guideline ES-3.1 the RCS is depressurized to promote back flow through the failed tube which depressurizes the ruptured steam generator without steam releases to the atmosphere.
: However, steam can also be released to the atmosphere using the PORV on the ruptured steam generator.
: 4. Cooldown   to Cold   Shutdown When RCS   temperature and pressure have been reduced to the RHR system in-service values, RHR system cooling is initiated to complete the cooldown to cold shutdown. When cold shutdown conditions are achieved, the pressurizer can be cooled to terminate the event.
An evaluation of the potential radiological consequences should be performed before releasing steam from the ruptured steam generator to the atmosphere.
1074v:1O/112087                               36
As the ruptured steam generator pressure is reduced, the RCS pressure is maintained equal to the pressure in the ruptured steam generator in order to prevent in-leakage of secondary side water or additional primary to secondary leakage.
Normal pressurizer spray is the preferred means of RCS pressure control since this conserves coolant inventory. If pressurizer spray is not available, a pressurizer PORV or auxiliary spray can be used to control RCS pressure.
When overfill of the ruptured steam generator
: occurs, as with Case 1,
guideline ES-3.1 POST-SGTR COOLDOWN USING BACKFILL is assumed to be used.
The high level actions for ES-3.1 are similar to ES-3.3.
However, the method by which ES-3.1 instructs the operator to depressurize the ruptured steam generator differs from ES-3.3.
In Guideline ES-3.1 the RCS is depressurized to promote back flow through the failed tube which depressurizes the ruptured steam generator without steam releases to the atmosphere.
4.
Cooldown to Cold Shutdown When RCS temperature and pressure have been reduced to the RHR system in-service values, RHR system cooling is initiated to complete the cooldown to cold shutdown.
When cold shutdown conditions are
: achieved, the pressurizer can be cooled to terminate the event.
1074v:1O/112087 36


WESTINGHOUSE PROPRIETARY CLASS 2 F.1   Methodology for Calculation of Mass Releases L2,C The operator actions for the SGTR recovery up to the termination of primary to secondary leakage are simulated in the LOFTTR2 analyses.     Thus, the steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary leakage into the ruptured steam generator were determined from the LOFTTR2 results for the period from the initiation of the accident until the leakage is terminated.
WESTINGHOUSE PROPRIETARY CLASS 2 F.1 Methodology for Calculation of Mass Releases The operator actions for the SGTR recovery up to the termination of primary to secondary leakage are simulated in the LOFTTR2 analyses.
Following the termination of leakage, the operators are assumed to complete the steps in the E-3 and ES-3.3 or ES-3.1 guidelines to prepare for cooldown to cold shutdown. The time from leakage termination until the initiation of cooldown was assumed to be 20 minutes (see Reference 2). The assumed time of 20 minutes to initiate the cooldown is considered to be conservative, since the actual time is expected to be longer for an actual event because an evaluation of the potential offsite radiation doses would be required prior to using the steam dump method for the post-SGTR cooldown. It was assumed that the RCS and intact steam generator conditions are maintained stable during the 20 minute period until the cooldown is initiated. The PORV for the intact steam generator was then assumed to be used to cool down the RCS to the RHR system operating temperature of 332'F, at the maximum allowable cooldown rate of 100'F/hr.. The RCS and the intact steam generator temperatures at 2 hours were then determined using the RCS and intact steam generator parameters at the time of leakage termination and the RCS cooldown rate.'he steam releases and the feedwater flows for the intact steam generator for the period from leakage termination until 2 hours were determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of leakage termination and at 2 hours. The core decay heat and the heat added from the operation of one RCP were included in the energy balance for this time period. Since the ruptured steam generator is isolated, no change in the ruptured steam generator conditions is assumed to occur until subsequent depressurization. The assumptions of a reasonably short preparation time for cooldown and the maximum cooldown rate result in minimum RCS and steam generator temperatures     at 2 hours, and therefore, a conservative estimate of the steam released to the atmosphere during the first 2 hours.
Thus, the steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary leakage into the ruptured steam generator were determined from the LOFTTR2 results for the period from the initiation of the accident until the leakage is terminated.
1074v:1D/112087                           37
L2,C Following the termination of leakage, the operators are assumed to complete the steps in the E-3 and ES-3.3 or ES-3.1 guidelines to prepare for cooldown to cold shutdown.
The time from leakage termination until the initiation of cooldown was assumed to be 20 minutes (see Reference 2).
The assumed time of 20 minutes to initiate the cooldown is considered to be conservative, since the actual time is expected to be longer for an actual event because an evaluation of the potential offsite radiation doses would be required prior to using the steam dump method for the post-SGTR cooldown.
It was assumed that the RCS and intact steam generator conditions are maintained stable during the 20 minute period until the cooldown is initiated.
The PORV for the intact steam generator was then assumed to be used to cool down the RCS to the RHR system operating temperature of 332'F, at the maximum allowable cooldown rate of 100'F/hr..
The RCS and the intact steam generator temperatures at 2 hours were then determined using the RCS and intact steam generator parameters at the time of leakage termination and the RCS cooldown rate.'he steam releases and the feedwater flows for the intact steam generator for the period from leakage termination until 2 hours were determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of leakage termination and at 2 hours.
The core decay heat and the heat added from the operation of one RCP were included in the energy balance for this time period.
Since the ruptured steam generator is isolated, no change in the ruptured steam generator conditions is assumed to occur until subsequent depressurization.
The assumptions of a reasonably short preparation time for cooldown and the maximum cooldown rate result in minimum RCS and steam generator temperatures at 2 hours, and therefore, a conservative estimate of the steam released to the atmosphere during the first 2 hours.
1074v:1D/112087 37


HESTINGHOUSE PROPRIETARY CLASS 2 a,c
HESTINGHOUSE PROPRIETARY CLASS 2 a,c
  'The   RCS   cooldown was assumed   to be continued after 2 hours until the RHR system in-service temperature of 332'F is reached.         Depressurization of the ruptured steam generator was then assumed to be performed immediately following the completion of the RCS cooldown. The ruptured steam generator was assumed to be depressurized to the RHR in-service pressure of 343 psia via steam release from the ruptured steam generator PORV, since this maximizes the steam release from ruptured steam generator to the atmosphere which is conservative for the evaluation of the offsite radiation doses. The RCS pressure is also assumed to be reduced concurrently as the ruptured steam generator is depressurized to minimize flow between the RCS and the ruptured steam generator.       It is assumed that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours after the accident since there is ample time to complete the operations during this time period. The steam releases and feedwater flows from 2 to 8 hours were determined     for the intact   steam generator from a mass and energy balance using the     RCS and steam generator   conditions at 2 hours and at the RHR system in-service conditions. The core decay heat and         the heat addition due to the operation of one RCP were also included in the energy balance for this time interval. The steam released from the ruptured steam generator from 2 to 8 hours was determined. based'n a mass and energy balance for the ruptured steam generator using the conditions at the time of leakage termination and saturated conditions at the RHR in-service pressure.
'The RCS cooldown was assumed to be continued after 2 hours until the RHR system in-service temperature of 332'F is reached.
After   8 hours, it is assumed that further plant cooldown to cold shutdown as well as long-term cooling is provided by the RHR system. Therefore, the steam
Depressurization of the ruptured steam generator was then assumed to be performed immediately following the completion of the RCS cooldown.
The ruptured steam generator was assumed to be depressurized to the RHR in-service pressure of 343 psia via steam release from the ruptured steam generator PORV, since this maximizes the steam release from ruptured steam generator to the atmosphere which is conservative for the evaluation of the offsite radiation doses.
The RCS pressure is also assumed to be reduced concurrently as the ruptured steam generator is depressurized to minimize flow between the RCS and the ruptured steam generator.
It is assumed that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours after the accident since there is ample time to complete the operations during this time period.
The steam releases and feedwater flows from 2 to 8 hours were determined for the intact steam generator from a mass and energy balance using the RCS and steam generator conditions at 2 hours and at the RHR system in-service conditions.
The core decay heat and the heat addition due to the operation of one RCP were also included in the energy balance for this time interval.
The steam released from the ruptured steam generator from 2 to 8 hours was determined. based'n a mass and energy balance for the ruptured steam generator using the conditions at the time of leakage termination and saturated conditions at the RHR in-service pressure.
After 8 hours, it is assumed that further plant cooldown to cold shutdown as well as long-term cooling is provided by the RHR system.
Therefore, the steam
~
~
releases to the atmosphere are terminated after RHR in-service conditions are assumed to be .reached at 8 hours.
releases to the atmosphere are terminated after RHR in-service conditions are assumed to be.reached at 8 hours.
F.2     Hass Release   Results The mass     release calculations were performed for both single failure cases using the methodology discussed above. For the time period from initiation of the accident until leakage termination, the releases were determined from the LOFTTR2 results for two separate periods for use in the dose calculations.
F.2 Hass Release Results The mass release calculations were performed for both single failure cases using the methodology discussed above.
The first time period considered is from accident initiation until reactor trip. Since the condenser is in service until reactor trip, any radioactivity 1074v:1D/112087                             38
For the time period from initiation of the accident until leakage termination, the releases were determined from the LOFTTR2 results for two separate periods for use in the dose calculations.
The first time period considered is from accident initiation until reactor trip.
Since the condenser is in service until reactor trip, any radioactivity 1074v:1D/112087 38


WESTINGHOUSE PROPRIETARY CLASS 2 released to the atmosphere     prior to reactor trip will be through'he       condenser air ejector. After reactor trip,'he         releases   to the atmosphere are assumed to be via the steam generator PORVs. The mass releases calculated from the time of leakage termination until 2 hours and from 2-8 hours are also assumed to be released to the atmosphere via the steam generator PORVs. The mass releases for the SGTR event [assuming delayed use of the intact steam generator PORV] 'Case 1) are presented in Table II.5. The results indicate that approximately [21,990]       'bm     of steam and [23,710]   'bm of water is released from the ruptured steam generator to the atmosphere in the first 2 hours. A total of [129,300]           'bm   of primary water is transferred to the secondary side of the ruptured steam. generator before the break flow is terminated.
WESTINGHOUSE PROPRIETARY CLASS 2 released to the atmosphere prior to reactor trip will be through'he condenser air ejector.
The mass     releases for the SGTR event assuming [failure and isolation of the ruptured steam generator PORV] 'Case 2) are presented in Table II.6. The results indicate that approximately [62,480]         'bm     of steam is released to the atmosphere from the ruptured steam generator within the first 2 hours.
After reactor trip,'he releases to the atmosphere are assumed to be via the steam generator PORVs.
After 2 hours [33,300]     'bm     is released to the atmosphere from the ruptured steam generator. A total of [172,800]           'bm   of primary water is transferred to the secondary side of the ruptured steam generator before break flow is terminated.
The mass releases calculated from the time of leakage termination until 2 hours and from 2-8 hours are also assumed to be released to the atmosphere via the steam generator PORVs.
1074v:1D/112087                             39
The mass releases for the SGTR event [assuming delayed use of the intact steam generator PORV] 'Case
: 1) are presented in Table II.5.
The results indicate that approximately [21,990] 'bm of steam and [23,710] 'bm of water is released from the ruptured steam generator to the atmosphere in the first 2 hours.
A total of [129,300] 'bm of primary water is transferred to the secondary side of the ruptured steam. generator before the break flow is terminated.
The mass releases for the SGTR event assuming [failure and isolation of the ruptured steam generator PORV] 'Case
: 2) are presented in Table II.6.
The results indicate that approximately [62,480] 'bm of steam is released to the atmosphere from the ruptured steam generator within the first 2 hours.
After 2 hours [33,300] 'bm is released to the atmosphere from the ruptured steam generator.
A total of [172,800] 'bm of primary water is transferred to the secondary side of the ruptured steam generator before break flow is terminated.
1074v:1D/112087 39


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.5 CASE 1 MASS RELEASES TOTAL MASS FLOW (POUNDS)
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.5 CASE 1
TIME PERIOD 0-TRIP      TRIP       TMSEP - OVFILL -     TTBRK   -   T2HRS TMSEP       OVFILL   TTBRK         T2HRS     'RHR Faulted   SG                                                                               PIC Condenser       47,800         0           0       0             0 Atmosphere          0        15,450     6540     23,710*
MASS RELEASES 0-TRIP TOTAL MASS FLOW (POUNDS)
Feedwater        43,600       30,500         0       0             0 Intact   SG Condenser       47,150         0           0       0             0           0 Atmosphere                    14,730     32,950   13,450       151,870     505,500 Feedwa  ter      47,150      46,040     29,610   17,900       158,700     513,500 Break Flow           4216         47,574     53,710   23,800 TRIP     = Time of reactor   trip =   [50] 'ec.
TIME PERIOD TRIP TMSEP -
TMSEP    = Time when water reaches the moisture separators     =   [1086]   'ec.
OVFILL -
OVF ILL =   Time when   steam generator overfills = [2372]   'ec.
TTBRK -
TTBRK    = Time when break flow is terminated = [3428]     'ec.
T2HRS TMSEP OVFILL TTBRK T2HRS
T2HRS    = Time at 2 hours = 7200 sec.
'RHR Faulted SG Condenser Atmosphere Feedwater 47,800 0
TRHR    = Time to reach RHR in-service conditions,     8 hours   =   28,800 sec.
0 0
*Ha'ter 1074v:1D/1120Sl                               40
15,450 6540 43,600 30,500 0
0 0
23,710*
0 0
PIC Intact SG Condenser Atmosphere 47,150 Feedwa ter 47,150 0
0 0
0 0
14,730 32,950 13,450 151,870 505,500 46,040 29,610 17,900 158,700 513,500 Break Flow 4216 47,574 53,710 23,800 TRIP TMSEP OVFILL TTBRK T2HRS TRHR
= Time of reactor trip = [50] 'ec.
= Time when water reaches the moisture separators
= [1086] 'ec.
= Time when steam generator overfills = [2372] 'ec.
= Time when break flow is terminated
= [3428] 'ec.
= Time at 2 hours
= 7200 sec.
= Time to reach RHR in-service conditions, 8 hours
= 28,800 sec.
*Ha'ter 1074v:1D/1120Sl 40


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.6 CASE 2 MASS RELEASES
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.6 CASE 2 MASS RELEASES
                                ~
~ TOTAL MASS FLOM (POUNDS)
TOTAL MASS FLOM (POUNDS)
TIME PERIOD 0-TRIP TRIP TMSEP "
TIME PERIOD 0-TRIP       TRIP       TMSEP   " TTBRK -     T2HRS TMSEP       TTBRK     T2HRS       TRHR CL, C Faulted   SG Condenser         46,880         0           0 Atmosphere                    62,090       390                 33,300 Feedwater        42,740       33,260         0 Intact   SG Condenser         46,220         0           0         0           0 Atmosphere                    35,430     18,450   153,920     457,000 Feedwater        46,220       97,780     19,700   160,300     457,700 Break Flow             4134         132,666     36,000       0           0 TRIP     =   Time of reactor   trip   = [49.4] 'ec.
TTBRK -
TMSEP    =  Time when water reaches     the moisture separators   =   [2372] 'ec.
T2HRS TMSEP TTBRK T2HRS TRHR Faulted SG Condenser Atmosphere Feedwater 46,880 0
TTBRK    =  Time when break flow is terminated = [3438]     'ec.
0 62,090 390 42,740 33,260 0
T2HRS    =  Time at 2 hours = 7200 sec.
33,300 CL, C Intact SG Condenser Atmosphere Feedwater 46,220 0
TRHR      =  Time to reach RHR in-service conditions,       8 hours   = 28,800 sec.
0 0
1074v:1D/112087                                 41
0 35,430 18,450 153,920 457,000 46,220 97,780 19,700 160,300 457,700 Break Flow 4134 132,666 36,000 0
0 TRIP
= Time TMSEP
= Time TTBRK
= Time T2HRS
= Time TRHR
= Time of reactor trip = [49.4] 'ec.
when water reaches the moisture separators
= [2372] 'ec.
when break flow is terminated
= [3438] 'ec.
at 2 hours
= 7200 sec.
to reach RHR in-service conditions, 8 hours
= 28,800 sec.
1074v:1D/112087 41


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.7 SUMMARIZED MASS RELEASES TOTAL MASS FLOM (POUNDS)
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.7 SUMMARIZED MASS RELEASES TOTAL MASS FLOM (POUNDS)
CASE 1                       CASE 2 0-         TTBRK -   2HRS-         0 -   TTBRK -   2HRS TTBRK         2HRS     8HRS         TTBRK  2HRS      8HRS Faulted    SG Condenser     47,820                             46,880 Atmosphere   45,700*                             62,480             33,300 Feedwater     74,100                             76,000 Intact   SG Condenser     47,150                             46,220   0 Atmosphere   61,130       151,870   505,500     53,880  153,920    457,000 Feedwater     122,800     158,700   513,500     163,700 160,300 . 457,700 Break Flow         129,300         0                   172,800   0 23,710 ibm of this is water.
CASE 1
1074v:10/1120S7                           42
CASE 2 Faulted SG 0-TTBRK TTBRK -
2HRS-2HRS 8HRS 0 -
TTBRK -
2HRS TTBRK 2HRS 8HRS Condenser 47,820 46,880 Atmosphere 45,700*
62,480 33,300 Feedwater 74,100 76,000 Intact SG Condenser 47,150 46,220 0
Atmosphere 61,130 151,870 505,500 Feedwater 122,800 158,700 513,500 53,880 153,920 457,000 163,700 160,300 457,700 Break Flow 129,300 0
172,800 0
23,710 ibm of this is water.
1074v:10/1120S7 42


WESTINGHOUSE PROPRIETARY CLASS 2 II I. RADIOLOGICAL CONSEQUENCES ANALYSIS The   evaluation of the radiological consequences of a steam generator tube rupture, assumes that the reactor has been operating at the proposed Technical Specification limit for primary coolant activity and at the existing Technical Specification limit for primary to secondary leakage for sufficient time to establish equilibrium concentrations of radionuclides in the reactor coolant and in the secondary coolant.       Radionuclides from the primary coolant enter the steam generator, via the ruptured tube, and are released to the atmosphere through the steam generator safety or power operated relief valves and via the 4
WESTINGHOUSE PROPRIETARY CLASS 2 III.
RADIOLOGICAL CONSEQUENCES ANALYSIS The evaluation of the radiological consequences of a steam generator tube
: rupture, assumes that the reactor has been operating at the proposed Technical Specification limit for primary coolant activity and at the existing Technical Specification limit for primary to secondary leakage for sufficient time to establish equilibrium concentrations of radionuclides in the reactor coolant and in the secondary coolant.
Radionuclides from the primary coolant enter the steam generator, via the ruptured tube, and are released to the atmosphere through the steam generator safety or power operated relief valves and via the 4
condenser air ejector, exhaust.
condenser air ejector, exhaust.
The   quantity of radioactivity released to the environment, due to a SGTR, depends upon primary and secondary coolant activity, iodine spiking effects, primary to secondary break flow, break flow flashing fractions, attenuation of iodine carried by the flashed portion of the break flow, partitioning of iodine between the liquid and steam phases, the mass of fluid released from the generator and liquid-vapor partitioning in the turbine condenser hot well. All of these parameters were conservatively evaluated for a design basis double ended rupture of a single tube.
The quantity of radioactivity released to the environment, due to a SGTR, depends upon primary and secondary coolant activity, iodine spiking effects, primary to secondary break flow, break flow flashing fractions, attenuation of iodine carried by the flashed portion of the break flow, partitioning of iodine between the liquid and steam phases, the mass of fluid released from the generator and liquid-vapor partitioning in the turbine condenser hot well.
A.'esi       n Basis Anal tical Assum tions The   major'assumptions and parameters used in the analysis are itemized in Table 111.1. The following is a discussion of the source term.
All of these parameters were conservatively evaluated for a design basis double ended rupture of a single tube.
Source Term Calculations The radionuclide concentrations in the primary and secondary system, prior to and following the SGTR are determined as follows:
A.'esi n Basis Anal tical Assum tions The major'assumptions and parameters used in the analysis are itemized in Table 111.1.
: a. The   iodine concentrations in the reactor coolant   will be based upon preaccident and accident initiated iodine spikes.
The following is a discussion of the source term.
1074v:1D/112087                           43
Source Term Calculations The radionuclide concentrations in the primary and secondary system, prior to and following the SGTR are determined as follows:
a.
The iodine concentrations in the reactor coolant will be based upon preaccident and accident initiated iodine spikes.
1074v:1D/112087 43


MESTINGHOUSE PROPRIETARY CLASS 2 Accident Initiated Spike - The initial primary coolant iodine concentration is 1 yCi/gm of Dose Equivalent (D.E.) I-131.
MESTINGHOUSE PROPRIETARY CLASS 2 Accident Initiated Spike - The initial primary coolant iodine concentration is 1 yCi/gm of Dose Equivalent (D.E.) I-131.
Following the primary system depressurization associated with the SGTR, an iodine spike is initiated in the primary system which increases the iodine release rate from the fuel to the coolant to a value 500 times greater than the release rate corresponding to the initial primary system iodine concentration. The duration of the spike, [3.31   'ours,     is sufficient to increase the initial RCS I-131 inventory by a factor of [100] '
Following the primary system depressurization associated with the
ii.     Preaccident Spike - A reactor transient has occured prior to the SGTR and has raised the primary coolant iodine concentration from 1 to 60 yCi/gram of D.E. I-131.
: SGTR, an iodine spike is initiated in the primary system which increases the iodine release rate from the fuel to the coolant to a value 500 times greater than the release rate corresponding to the initial primary system iodine concentration.
: b. The     initial   secondary coolant iodine concentration   is 0.1 yCi/gram of D.E. I-131.
The duration of the
: c. The chemical form       of iodine in the primary   and secondary coolant is assumed       to be elemental.
: spike,
4 Dose     Calculations The   following assumptions       and parameters were used to calculate the activity released to the atmosphere and           the offsite doses following a SGTR.
[3.31 'ours, is sufficient to increase the initial RCS I-131 inventory by a factor of [100] '
: 1. The mass       of reactor coolant discharged into the secondary system through the rupture and the mass of steam released from the intact and ruptured steam generators to the atmosphere are presented in Table II.5 and II.G.
ii.
: 2. The time dependent       fraction of rupture flow that flashes to steam and is immediately released to the environment is presented in Figure III.1.
Preaccident Spike - A reactor transient has occured prior to the SGTR and has raised the primary coolant iodine concentration from 1 to 60 yCi/gram of D.E. I-131.
: 3. The time dependent       iodine removal efficiency for scrubbing of steam bubbles as'hey rise from the leak site [(assumed to be at the top of the tube bundle)]       'o   the water surface was also determined for each
b.
,1 074v: 1 0/112087
The initial secondary coolant iodine concentration is 0.1 yCi/gram of D.E. I-131.
c.
The chemical form of iodine in the primary and secondary coolant is assumed to be elemental.
4 Dose Calculations The following assumptions and parameters were used to calculate the activity released to the atmosphere and the offsite doses following a SGTR.
1.
The mass of reactor coolant discharged into the secondary system through the rupture and the mass of steam released from the intact and ruptured steam generators to the atmosphere are presented in Table II.5 and II.G.
2.
The time dependent fraction of rupture flow that flashes to steam and is immediately released to the environment is presented in Figure III.1.
3.
The time dependent iodine removal efficiency for scrubbing of steam bubbles as'hey rise from the leak site
[(assumed to be at the top of the tube bundle)] 'o the water surface was also determined for each
,1 074v: 1 0/112087


MESTINGHOUSE PROPRIETARY CLASS 2 case.,     The iodine removal efficiency is determined by the. method suggested by Postma     and Tam (Ref. 6). The iodine removal efficiencies are shown in Figure     III.2.
MESTINGHOUSE PROPRIETARY CLASS 2 case., The iodine removal efficiency is determined by the. method suggested by Postma and Tam (Ref. 6).
: 4. The   0.2   gpm   primary to secondary leak is assumed to be       split evenly between the steam generators.
The iodine removal efficiencies are shown in Figure III.2.
: 5. The   iodine partition factor between the liquid and steam of the ruptured and intact steam generators is assumed to be 1DO.
4.
: 6. No credit'as       taken   for radioactive   decay during release and   transport, or for cloud depletion         by ground deposition during transport       to the site boundary or outer boundary of the low population zone.
The 0.2 gpm primary to secondary leak is assumed to be split evenly between the steam generators.
: 7. Short-term atmospheric dispersion factors (x/gs) for accident analysis and breathing rates are provided in Table III.4. The breathing rates were obtained from NRC Regulatory Guide 1.4, (Ref. 4).
5.
Offsite   Th   roid   Dose   Calculation Model Offsite thyroid       doses are   calculated using the ~uation:
The iodine partition factor between the liquid and steam of the ruptured and intact steam generators is assumed to be 1DO.
Th                 gtDCF,.
6.
1 gJ
No credit'as taken for radioactive decay during release and transport, or for cloud depletion by ground deposition during transport to the site boundary or outer boundary of the low population zone.
( IAR); . (BR) . (x/()) .
7.
                                                                            ]
Short-term atmospheric dispersion factors (x/gs) for accident analysis and breathing rates are provided in Table III.4.
The breathing rates were obtained from NRC Regulatory Guide 1.4, (Ref. 4).
Offsite Th roid Dose Calculation Model Offsite thyroid doses are calculated using the ~uation:
Th gtDCF,. g ( IAR);.
(BR).
(x/()). ]
1 J
where
where
( IAR)..       =   integrated activity of isotope     i released during'the 1J time interval   j'n Ci>>
( IAR)..
F
=
* No credit is taken for cloud depletion by ground deposition or by radioactive decay during transport to the exclusion area boundary or to the outer boundary of the low-population zone.
integrated activity of isotope i released during'the 1J time interval j'n Ci>>
1074v:1D/112087                                   45
F No credit is taken for cloud depletion by ground deposition or by radioactive decay during transport to the exclusion area boundary or to the outer boundary of the low-population zone.
1074v:1D/112087 45


WESTINGHOUSE PROPRIETARY CLASS 2 (BR) ~     breathing rate during time interval'   in meter /second (Table III.4)
WESTINGHOUSE PROPRIETARY CLASS 2 (BR)
~
breathing rate during time interval' in meter /second (Table III.4)
(x/Q)
(x/Q)
J
=
                    =  atmospheric dispersion factor during time interval j in second/meter (Table III.4)
atmospheric dispersion factor during time interval j J
(DCF).= thyroid dose conversion factor via inhalation for isotope i in rem/Ci (Table III.5) thyroid dose via inhalation in rem Results Thyroid doses at the Exclusion Area Boundary and Low Population Zone are presented in Table III.6. All doses are well within the allowable guidelines as specified by Standard Review Plan 15.6e3 and 10CFR100.
in second/meter (Table III.4)
1074v:1D/112487                       46
(DCF).
=
thyroid dose conversion factor via inhalation for 1
isotope i in rem/Ci (Table III.5) thyroid dose via inhalation in rem Results Thyroid doses at the Exclusion Area Boundary and Low Population Zone are presented in Table III.6.
All doses are well within the allowable guidelines as specified by Standard Review Plan 15.6e3 and 10CFR100.
1074v:1D/112487 46


WESTINGHOUSE PROPRIETARY CLASS 2 TABLE I I I.1 PARAMETERS USED   IN EVALUATING THE RADIOLOGICAL CONSEQUENCES OF A STEAM GENERATOR TUBE RUPTURE I.       Source Data A. Core power level, MWt                       1520 B. Total steam generator tube                     0.2 leakage, prior to accident,   gpm C. Reactor coolant iodine activity:
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.1 PARAMETERS USED IN EVALUATING THE RADIOLOGICAL CONSEQUENCES OF A STEAM GENERATOR TUBE RUPTURE I.
: 1. Accident Initiated Spike                 The initial   RC iodine activities   based on I
Source Data A.
1
Core power level, MWt 1520 B.
                                                              >Ci/gram of D.E. I-131 are presented in Table III.3. The iodine appearance rates assumed for the accident initiated spike are presented   in Table   III.2.
Total steam generator tube leakage, prior to accident, gpm 0.2 C.
2,   Pre-Accident Spike                       Primary coolant iodine activities   based on 60 gCi/gram of D.E. I-131 are presented in Table I I I.3.,
Reactor coolant iodine activity:
D. Secondary system   initial activity           Dose equivalent of 0.1 yCi/gm of I-131, presented in Table III.3.
1.
1074v:1D/112087                             47
Accident Initiated Spike The initial RC iodine activities based on 1
I
>Ci/gram of D.E. I-131 are presented in Table III.3.
The iodine appearance rates assumed for the accident initiated spike are presented in Table III.2.
2, Pre-Accident Spike Primary coolant iodine activities based on 60 gCi/gram of D.E. I-131 are presented in Table III.3.,
D.
Secondary system initial activity Dose equivalent of 0.1 yCi/gm of I-131, presented in Table III.3.
1074v:1D/112087 47


HESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.l (Sheet 2)
HESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.l (Sheet 2)
E. Reactor coolant mass, grams                     1.27 x 10 F. Steam    generator  mass                      3.39 x 10 (each), grams G. Offsite   pow'er                               Lost at time of reactor trip H. Primar y-to-secondary leakage duration for intact       SG, hrs.
E.
I. Species of iodine                               100 percent elemental II. Activity Release       Data A. Faulted steam generator
Reactor coolant mass, grams F.
: 1. Rupture flow                               See Table   II.5 or II.G
Steam generator mass (each),
: 2. Rupture flow flashing      fraction        See Figure III.1
grams 1.27 x 10 3.39 x 10 G.
: 3. Iodine scrubbing plus moisture             See Figure III.2 separator removal efficiency
Offsite pow'er Lost at time of reactor trip H.
: 4. Total steam release,     lbs               See Table II.5 or II.G
Primar y-to-secondary leakage duration for intact SG, hrs.
: 5. Iodine partition factor
I.
: a. Prior to overfill                   100
Species of iodine 100 percent elemental II.
: b. After overfill                     -1.0 - See Figure         III.3
Activity Release Data A.
: 6. Location of tube rupture                   [Top of Bundle]
Faulted steam generator 1.
                                                                            '074v:1 0/1120S7                                 48
Rupture flow 2.
Rupture flow flashing fraction See Table II.5 or II.G See Figure III.1 3.
Iodine scrubbing plus moisture separator removal efficiency See Figure III.2 4.
Total steam release, lbs See Table II.5 or II.G 5.
Iodine partition factor a.
Prior to overfill b.
After overfill 100
-1.0 - See Figure III.3 6.
Location of tube rupture
[Top of Bundle]
'074v:1 0/1120S7 48


MESTINGHOUSE.PROPRIETARY CLASS 2 TABLE III.1 (Sheet 3)
MESTINGHOUSE.PROPRIETARY CLASS 2 TABLE III.1 (Sheet 3)
B. Intact steam generator
B.
: 1. Primary-to-secondary leakage, gpm     0.1
Intact steam generator 1.
: 2. Total steam release, lbs               See Table 11.5 or 11.6
Primary-to-secondary
: 3. Iodine partition factor                 100 C. Condenser
: leakage, gpm 0.1 2.
: 1. Iodine partition factor               100 D. Atmospheric Oispersion Factors             See Table III,4 1074v:lo/112087                             49
Total steam release, lbs See Table 11.5 or 11.6 3.
Iodine partition factor 100 C.
Condenser 1.
Iodine partition factor 100 D.
Atmospheric Oispersion Factors See Table III,4 1074v:lo/112087 49


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.2 IODINE SPIKE APPEARANCE RATES (CURIES/SECOND) 1-132     3-133           I"134 0.94             2.22       1.74             3.07 1074v:1D/112087                       50
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.2 IODINE SPIKE APPEARANCE RATES (CURIES/SECOND) 1-132 3-133 I"134 0.94 2.22 1.74 3.07 1074v:1D/112087 50


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II I.3 IODINE SPECIFIC ACTIVITIES IN (yCi/gm) THE PRIMARY AND SECONDARY COOLANT BASED ON   1, 60 AND 0.1 yCi/gram   OF D.E. I-131
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.3 IODINE SPECIFIC ACTIVITIES IN (yCi/gm) THE PRIMARY AND SECONDARY COOLANT BASED ON 1, 60 AND 0.1 yCi/gram OF D.E. I-131 Nuclide
                            ~Pi     t   1 1                     Secondar  Coolant Nuclide              ~luCD/ m             60 uCi/cDm           0,1 wCi/(1m 0.79                 47.1                 0.079 I-132                 0.35                 20.7                 0. 035 1.01                 60.7                 0.101 0.20                 12.2                 0.020 I-135                 0.79                 47.1                 0.079 1074v:1D/1 12087                         51
~Pi t
1 1
~luCD/
m 60 uCi/cDm Secondar Coolant 0,1 wCi/(1m 0.79 47.1 0.079 I-132 0.35 20.7
: 0. 035 1.01 60.7 0.101 0.20 12.2 0.020 I-135 0.79 47.1 0.079 1074v:1D/1 12087 51


MESTINGHOUSE PROPRIETARY CLASS 2 TABLE   III.4 ATMOSPHERIC DISPERSION FACTORS AND BREATHING RATES Time         Exclusion Area Boundary   Low Population       Breathing 3                                3 (hours)       x/Q (Sec/m )             Zone x/Q (Sec/m )     Rate (m /Sec) [4]
MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.4 ATMOSPHERIC DISPERSION FACTORS AND BREATHING RATES Time Exclusion Area Boundary Low Population (hours) x/Q (Sec/m
0-2           4.8 x 10                 3 x 10                 3.47 x 10 2-8                                    3x10                  3.47 x 10 1074v:1D/112087                             52
)
3 Zone x/Q (Sec/m
)
3 Breathing Rate (m /Sec) [4]
0-2 2-8 4.8 x 10 3 x 10 3x10 3.47 x 10 3.47 x 10 1074v:1D/112087 52


WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.5 THYROID DOSE CONVERSION FACTORS (Rem/Curie) [51 Nuclide
WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.5 THYROID DOSE CONVERSION FACTORS (Rem/Curie)
                ~ I-131                     1.49 x 10 1.43 x 10 2.69 x 10 I-134                    3.73 x 10 5.60 x 10 1074v:1D/112087                         53
[51 Nuclide
~
I-131 I-134 1.49 x 10 1.43 x 10 2.69 x 10 3.73 x 10 5.60 x 10 1074v:1D/112087 53


NESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.6 RESULTS Ooses Rem Allowable Case 1   Case 2   Guideline Value
NESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.6 RESULTS Ooses Rem Allowable Case 1
: l. Accident   Initiated Iodine S ike Exclusion Area Boundary (0-2   hr.)
Case 2
Thyroid                           26.4     3.8           30 Low   Population Zone (0-8 hr.)
Guideline Value l.
Thyroid                           1.7       0.3           30
Accident Initiated Iodine S ike Exclusion Area Boundary (0-2 hr.)
: 2. Pre-Accident Iodine   S ike Exclusion Area Boundary (0-2   hr.)
Thyroid 26.4 3.8 30 Low Population Zone (0-8 hr.)
Thyroid                           102.1     22.1         300, Low   Population Zone (0-8 hr.)
Thyroid 1.7 0.3 30 2.
Thyroid                           6.4       1.4           300   ~
Pre-Accident Iodine S ike Exclusion Area Boundary (0-2 hr.)
1074v:1D/112487                           54
Thyroid 102.1 22.1
: 300, Low Population Zone (0-8 hr.)
Thyroid 6.4 1.4 300
~
1074v:1D/112487 54


WESTINGHOUSE PROPRIETARY CLASS 2 GINN4 SGTR IS% TUBE PLUGGING           -   C4SE R4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAK FLOW FL4SNING FR4CTION
WESTINGHOUSE PROPRIETARY CLASS 2 GINN4 SGTR IS%
                      ~ IS                       Case 1 e.
TUBE PLUGGING - C4SE R4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAK FLOW FL4SNING FR4CTION
                                      ~ It ~ Si,tt & TIIC
~ IS Case 1
                                                            ~
e.
Itttl tt ~ S4,lt ~ Si GINN4 SGTR ISZ TUBE PLUGGING               CASE 2 R4O IGLOO   I CAL CONSEOUENCES       EVALUATION BREAK FLOW FLASHING FR4CTION
~ It~Si,tt &
                        ~ IS Case 2
~tt ~S4,lt ~Si TIIC Itttl GINN4 SGTR ISZ TUBE PLUGGING CASE 2
                                    ~ It  H,tt   14 Tlet
R4O IGLOO I CAL CONSEOUENCES EVALUATION BREAK FLOW FLASHING FR4CTION
                                                            ~
~ IS Case 2
ItttI St   SI,at   ei Figure     III.1       Break Flow Flashing Fraction 1 074 v:1D/112087                                           55
~ ItH,tt 14
~ St SI,at ei Tlet ItttI Figure III.1 Break Flow Flashing Fraction 1 074 v:1D/112087 55


HESTINGHOUSE PROPRIETARY CLASS 2 GL,G CASE 1 o5
HESTINGHOUSE PROPRIETARY CLASS 2 GL,G CASE 1 o5
              ~ 2 0
~ 2 0
8                           1eee         1588 288 TINE (SECONDS) 4Z. (
8 1eee TINE (SECONDS) 1588 288
                ~ 5 CASE 2
~ 5 CASE 2 4Z.(
                ~ 2 V
~ 2 V
M
M'I 0
            'I 0
1088 TINE ISECONDSI 1508 288 Figure III.2 Srubbing Efficiency 1 074 v:1D/112087
1088         1508 288 TINE ISECONDSI Figure III.2   Srubbing Efficiency 1 074 v:1D/112087
 
WESTINGHOUSE PROPRIETARY CLASS 2 IE+2 CASE 1 1E+1 20
~a C<LE+8 ZIHE (HOURS) 1.5 JE+2 CASE 2 1E+1 20 C
C+IE+8 TIHE (HOURS)
Figure III.3 Faulted SG Iodine Partition Factors 1074v:1D/112087 57


WESTINGHOUSE PROPRIETARY CLASS 2 CASE 1 IE+2 1E+1 2
WESTINGHOUSE PROPRIETARY CLASS 2 IV.
0
CONCLUSION The potential radiological consequences of a steam generator tube failure were evaluated for the R.E. Ginna nuclear power plant to demonstrate that the use of the Standard Technical Specification (STS) primary coolant activity limit of 1 yCi/gram of dose equivalent I-131 will result. in offsite doses that are within the appropriate guidelines, The mass releases for a design basis double ended rupture of a single tube with a loss of offsite power were conservatively calculated using the computer code LOFTTR2.
            ~a C
Two cases were considered:
            <LE+8 1.5 ZIHE (HOURS)
[1) intact steam generator PORV fails closed and must be locally 1
CASE 2 JE+2 1E+1 2
: opened, and 2) ruptured steam generator PORV fails open and must be locally isolated.] 'he analysis explicitly modeled the time needed for the'perators to perform the recovery steps outlined in guideline E-3 of Revision 1 of the Westinghouse Owners Group Emergency
0 C
C
            +IE+8 TIHE (HOURS)
Figure  III.3   Faulted  SG  Iodine Partition Factors 1074v:1D/112087                                    57


WESTINGHOUSE PROPRIETARY CLASS 2 IV. CONCLUSION The  potential radiological consequences    of  a steam generator tube failure were evaluated for the R.E. Ginna nuclear power plant to demonstrate that the use of the Standard Technical Specification (STS) primary coolant activity limit of 1 yCi/gram of dose equivalent I-131 will result. in offsite doses that are within the appropriate guidelines, The mass releases for a design basis double ended rupture of a single tube with a loss of offsite power were conservatively calculated using the computer code LOFTTR2. Two cases were considered:      [1) intact steam generator PORV fails closed and must be locally    1 opened, and 2) ruptured steam generator PORV fails open and must be locally isolated.]    'he    analysis explicitly modeled the time needed for to perform the recovery steps outlined in guideline E-3 of Revision the'perators 1 of the Westinghouse Owners Group Emergency Response Guidelines.       The resulting doses at the exclusion area boundary and low population zone are within the allowable guidelines as specified by Standard Review Plan 15.6.3 and 10CFR100. Consequently, the STS primary coolant activity limit is sufficiently low to ensure that the radiological consequences of a steam generator tube rupture at the R.E, Ginna plant will be within the guidelines.
===Response===
1074v:1D/112087                           58
Guidelines.
The resulting doses at the exclusion area boundary and low population zone are within the allowable guidelines as specified by Standard Review Plan 15.6.3 and 10CFR100.
Consequently, the STS primary coolant activity limit is sufficiently low to ensure that the radiological consequences of a steam generator tube rupture at the R.E, Ginna plant will be within the guidelines.
1074v:1D/112087 58


HESTINGHOUSE PROPRIETARY CLASS 2 V. REFERENCES
HESTINGHOUSE PROPRIETARY CLASS 2 V.
: 1. Lewis, Huang, Behnke, Fittante, Gelman,                 "SGTR Analysis Methodology to Determine the Margin to Steam Generator                 Overfill," HCAP-10698-P-A,   August 1987.     [PROPRIETARY'.
REFERENCES 1.
Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to HCAP-10698-P-A, March 1986.     [PROPRIETARY]
Lewis, Huang, Behnke, Fittante,
: 3. R. Elaisz, Letter from RGE to Hestinghouse concerning Ginna specific operator action times for SGTR analysis, February 7, 1985.
: Gelman, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill," HCAP-10698-P-A, August 1987.
: 4. NRC   Regulatory Guide 1.4, Rev. 2, "Assumptions Used for Evaluating the Potential Radiological Consequences of a LOCA for Pressurized Hater Reactors", Jun'e 1974.
[PROPRIETARY'.
: 5. NRC   Regulatory Guide 1. 109, Rev. 1, "Calculation of Annual Doses to Man From Routine, Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50 Appendix I", October 1977.
Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to HCAP-10698-P-A, March 1986.
: 6. Postma,             A. K., Tam, P. S., "Iodine Behavior in a PHR Cooling System Following               a Postulated Steam Generator Tube Rupture",   NUREG-0409.
[PROPRIETARY]
1074v:1D/120487                                       59
3.
R. Elaisz, Letter from RGE to Hestinghouse concerning Ginna specific operator action times for SGTR analysis, February 7,
1985.
4.
NRC Regulatory Guide 1.4, Rev.
2, "Assumptions Used for Evaluating the Potential Radiological Consequences of a LOCA for Pressurized Hater Reactors",
Jun'e 1974.
5.
NRC Regulatory Guide 1. 109, Rev.
1, "Calculation of Annual Doses to Man From Routine, Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50 Appendix I", October 1977.
6.
: Postma, A. K., Tam, P. S., "Iodine Behavior in a PHR Cooling System Following a Postulated Steam Generator Tube Rupture",
NUREG-0409.
1074v:1D/120487 59


I   ra V
I ra V
0; J
0; J
ih}}
ih}}

Latest revision as of 01:08, 8 January 2025

Forwards Application for Amend to License DPR-18,increasing Allowable RCA to Improved TS Values (NUREG-1431). Westinghouse Proprietary Rept WCAP-11668 & Nonproprietary Rept WCAP-11678 Encl.Proprietary Rept WCAP-11668 Withheld
ML17309A545
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/23/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A656 List:
References
RTR-NUREG-1431 NUDOCS 9405310164
Download: ML17309A545 (71)


Text

..ACCELERATED DISTRIBUTION DEMONS+ATION SYSTEM J

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9405310164 DOC.DATE: 94/05/23 NOTARIZED: YES DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.*NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

Project Directorate I-3

+5 R

SUBJECT:

Forwards application for amend to license DPR-18,increasing allowable RCA to improved TS values (NUREG-1431).

I Westinghouse proprietary rept WCAP-11668 6 nonproprietary rept WCAP-11678 encl. Proprietary rept WCAP-11668 withheld.

D DISTRIBUTION CODE:

AP01D COPIES RECEIVED:LTR J ENCLL SIZE:

/ S TITLE: Proprietary Review Distribution Pre Operating License 6 Operating R /

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 A

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A COPIES LTTR ENCL 1

1 3

3 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 1

1 D

D INTERNAL: AEO~D OA

~GF fQE EXTERNAL NRC PDR 01 1

1 1

1 1

0 OGC/HDS1 1

0 D

S NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 7

It g~0

~

/////I/////// 'g//Z1

//I/// I/

I///////////

i/ ///I /

/////SKf ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER N.Y. 14649-0001 ROBERT C. MECREDY Vice President Clnna Nuclear Production May 23, 1994 TELEPHONE hREA CODE 7t B 546 2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Allen R. Johnson Project Directorate I-3 Washington, D.C.

20555

Subject:

Application for Amendment to Operating License Reactor Coolant Activity Technical Specifications Rochester Gas and Electric Corporation R.E.

Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):

NRC Letter, C. Rossi to A. Ladieu (WOG), "Acceptance for Referencing of Licensing Topical Report WCAP-10698...",

March 30, 1987.

(b):

NUREG-0916, "Safety Evaluation Report Related to the Restart of R.E.

Ginna Nuclear Power Plant",

May 1982.

(c):

RG&E Letter, R. Mecredy to A. Johnson (NRC),

"Emergency Response Capability...", October 14, 1992.

(d):

NRC Letter, A. Johnson to R.

Mecredy (RG&E), Emergency

Response

Capability Conformance to Regulatory Guide 1.97, revision 3", February 24, 1993.

(e):

WOG Letter, L. Walsh and A.

Engel to R.

Jones (NRC),

"Westinghouse Owners Group Steam Generator Tube Uncovery Issue",

March 31, 1992.

(f):

NRC Letter, R.

Jones to L. Walsh (WOG),

"Westinghouse Owners Group, Steam Generator Tube Uncovery Issue", March 10, 1993.

Dear Mr. Johnson:

WCAP-11668 (Proprietary)/WCAP-11678 (Non-Proprietary) evaluate the potential radiological consequences due to a steam generator tube rupture (SGTR) for the R.

E.

Ginna Nuclear Power Plant.

This g

'Ti4053101b4'Tl40523 PDR" ADOt"K'05000244 The purpose of this application for Amendment to Operating License is to amend Appendix A of that License to increase the Technical Specification allowable primary coolant iodine (I-131) activity limit from 0.2 pC+igm to 1.0pCi/gm; and the total primary coolant activity from 84/E pCi/gm to the Standard Technical Specification value of 100/E pCi/gm, consistent with the Improved Technical Specifications (NUREG-1431).

evaluation utilizes the analysis methodology of WCAP-10698-P-A "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill."

RG&E has met the requirements for usage of WCAP-10698 as outlined in Nuclear Regulatory Commission letter from C. E. Rossi (NRC) to A. E. Ladieu (WOG), (Reference a).

The letter required each utility to provide five plant specific inputs:

1.

Demonstration that critical operator action times used in the analysis are realistic and consistent with those observed during simulator exercises.

2.

A site specific Steam Generator Tube Rupture radiological offsite consequence analysis.

3.

A structural, analysis of the main steam 'ines demonstrating adequacy under water-filled conditions.

4.

A list of

systems, components, and instrumentation credited for accident mitigation and the specified safety grade for each.

5.

A comparison of the plant to the "bounding plant" used in WCAP-10698.

Items 2 and 5 are addressed in.the site specific analysis being submitted with this letter, WCAP-11668 (Proprietary).

Item 3 was addressed during the review of the Steam Generator Tube Rupture incident at Ginna Station.

Its acceptability is documented in NUREG-0916, (Reference b).

Item 4 is contained in our post-accident instrumentation submittal (Reference c)

(re. Regulatory Guide 1.97).

NRC review and acceptance of this information is documented in reference d.

Item 1 is discussed below.

During the week of August 19 through 23, 1991 simulator runs of the two most limiting cases identified in WCAP-11668 (Proprietary)/

WCAP-11678 (Non-Proprietary),

were made to validate assumed operator response times.

These simulator runs demonstrated that not only were the operator response times assumed in the WCAPs conservative with adequate margin, but also that recent refinements in the emergency operating procedures have further reduced the likelihood of overfilling the ruptured steam generator.

For the two limiting cases identified operator response prevented overfill with significant margin, and terminated break flow in under 45 minutes.

In both cases it was necessary to use the WCAP assumed times for operator action outside the control room.

These times were the limiting factors in the scenarios, as control room operators had to wait to proceed with further mitigating actions until these actions were assumed to be completed.

Operator critique following the sessions indicated that they felt these times were unrealistically conservative.

We, therefore, feel that actual mitigation times would be even less than those demonstrated during the simulator exercise.

WCAP-11668/11678 assumes the tube rupture remains covered through-

It I

out the event.

More recently it has been suggested that, this assumption may not be conservative.

The Westinghouse Owners Group (WOG) has undertaken a program to assess the consequences of tube rupture uncovery.

The results indicate that the increase in doses is insignificant.

These results were transmitted to the staff (Reference e).

The staff has reviewed and approved this transmittal (reference f).

Therefore, we feel this issue has been adequately addressed.

It should be noted that a proposal to modify Section 3.1.4.3.a has already been submitted to the NRC via letter May 13, 1994.

Page 3.1-21 of Attachments B and C is being submitted in both versions, so that approval is not dependent on the sequence of proposed License Amendment Request reviews.

We request that upon NRC

approval, this amendment should be considered effective immediately and implemented within 60 days.

Very ruly yours, o ert c.

ecr y

BJF/190 Attachment

Enclosures:

1 ~

One (1) submittal of an Application for Amendment to Operating License and associated safety evaluation.

2 ~

3

~

4

~

One (1) copy of an Application for Withholding, CAW-87-123, dated December 3,

1987, accompanying Affidavit, and Proprietary Information Notice One (1) copy of WCAP-11668, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at the R.E.

Ginna Nuclear Plant",

November 1987 (Proprietary).

One (1) copy of WCAP-11678, "LOFTTR2 Analysis of Potential Radiological Consequences Following a Steam Generator Tube Rupture at, the R.E. Ginna Nuclear Plant", November 1987 (Non-Proprietary).

xc>>

Mr. Allen R. Johnson (Mail Stop 14Dl)

Project Directorate I-3 Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

WESTINGHOUSE PROPRIETARY CLASS 2 WCAP"11668 74>5'9Q V LOFTTR2 ANALYSIS OF POTENTIAL RADIOLOGICAL CONSEQUENCES FOLLOWING A STEAM GENERATOR TUBE RUPTURE AT THE R.

E.

GINNA NUCLEAR POWER PLANT

0. J. Mendler K. Rubin NOVEMBER 1987 Nuclear Safety Department This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in.confidence and is to be used solely for the purpose for which it is furnished and returned upon request.

This document and such information is not to be reproduced, transmitted, disclosed or used otherwise in whole or in part without authorization of Westinghouse Electric Corporation, Nuclear Energy Systems.

Westinghouse Electric Corporation Nuclear Energy Systems P.O.

Box 355 Pittsburgh, Pennsylvania 15230 1987 by Westinghouse Electric Corporation 1074v:1OP/120487

I P.

'\\

1 0

WESTINGHOUSE PROPRIETARY CLASS 2 This document contains material that is proprietary to the Westinghouse Electric Corporation.

This propr'ietary information has been marked by means of brackets.

The basis for marking the material proprietary is identified by marginal notes referring to the standards in Section 8 of the affidavit of R. A. Wiesemann of record "In the Hatter of Acceptance Criteria for Emergency Core Cooling Systems for Light Water Cooled Nuclear Power Reactors (Docket No.

RH-50-1)" at teanscript pages 3706 through 3710 (February 24, 1972).

Due to the proprietary nature of the material contained in this report which was obtained at considerable Westinghouse expense and the release of which would seriously affect our competitive position, we request this information to be withheld from public disclosure in accordance with the Rules of

Practice, 10 CFR 2.790, and that the information presented therein be safeguarded in accordance with 10 CFR 2.903.

We believe that withholding this information will not adversely affect the public interest.

This information is for your internal use only and should not be released to persons or organizations outside the directorate of Regulation and the ACRS without prior approval of Westinghouse Electric Corporation.

Should it become 1

necessary to release this information to such persons as part of the review procedure, please contact Westinghouse Electric Corporation and they will make the necessary arrangements required to protect their proprietary'nterests.

1D74v:1D/7120B7

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE OF CONTENTS Pacaes I.

INTRODUCTION II.

THERHAL HYDRAULIC ANALYSIS A.

B.

C.

D.

E.

F.

Design Basis Accident Conservative Assumptions Operator Action Times Transient Description - Case 1

Transient Description - Case 2

Hass Releases 2

3 6

13 24 34 I II.

RADIOLOGICAL CONSEQUENCES ANALYSIS IV.

CONCLUSION 43 58 V.

REFERENCES 59 1074v:1D/112087

0 0-

WESTINGHOUSE PROPRIETARY CLASS 2 I.

INTRODUCTION An evaluation of the potential radiological consequences due to a steam generator tube rupture (SGTR) event has been performed for the R.

E. Ginna nuclear power plant to demonstrate that the offsite radiation doses will be less than the allowable guidelines based on the Standard Technical Specification limit on primary coolant activity.

The evaluation discussed herein assumes that 151. of the steam generator tubes are plugged.

A design basis steam generator tube rupture was analyzed for Ginna using the methodology developed in MCAP-10698 (reference

1) and the supplement to HCAP-10698 (reference 2).

Two single failure cases were considered to determine which is the most limiting single failure for Ginna with respect to radiological. consequences.

The two cases examined were:

a,c Case 1

Intact steam generator power operated relief valve (PORV) fails closed and must be locally opened.

Case 2

Ruptured steam generator power operated relief valve fails open and must be locally isolated.

Plant response to the event was modeled using the LOFTTR2 computer code with conservative assumptions of break size and location, condenser availability and initial secondary water mass in the faulted steam generator.

The analysis methodology includes the simulation of the operator actions for recovery from' steam generator tube rupture based on the Westinghouse Owners Group Emergency

Response

Guidelines, which are the basis for the Ginna Emergency Operating Procedures.

The mass releases were calculated with the LOFTTR2

~ program from the initiation of the event until termination of the break flow.

For the time period following break flow termination, steam releases and feedwater flows from the intact and faulted steam generators were determined from a mass and energy balance using the calculated RCS and steam generator conditions at the time of leakage termination.

The mass releases for both cases were used to determine the radiation doses at the exclusion area boundary and low population zone assuming that the primary coolant activity 'is at the Standard Technical Specification limit prior to the accident.

1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2 II.

THERMAL HYDRAULIC ANALYSIS Integrated mass releases to the atmosphere and condenser during a steam generator tube rupture event were calculated for various time periods during the accident.

This section includes the methods and assumptions used to model the SGTR event and calculate the mass releases, as well as the sequence of events for the recovery.

A.

Desi n Basis Accident The accident modeled is the complete severance of a steam generator tube located at the tube sheet on the cold leg side.

It was also assumed that loss of offsite power occurred at the time of reactor trip, and the worst rod was assumed to be stuck at reactor trip.

a,c The most limiting single failure with respect to steam generator overfill was determined by reference 1 to be a failed closed PORV on the intact steam generator.

Since Ginna is a two loop plant, the intact steam generator PORV must be locally opened before RCS cooldown can begin.

This additional time to locally open the intact steam generator PORV will delay RCS depressurization, causing an increase in total primary to secondary leakage.

Consequently, more water will accumulate in the faulted steam generator.

The case where the intact steam generator PORV fails to open on demand and must be locally opened will be referred to as Case 1.

The most limiting single failure with respect to offsite doses was determined by reference 2 to be a failed open PORV on the faulte'd steam generator.

Failure of this PORV will cause an uncontrolled depressurization of the faulted steam generator which will increase primary to secondary leakage.

Pressure in the ruptured steam generator will remain below that in the primary system until the failed PORV can be

isolated, and recovery actions completed.

The case where the faulted'team generator PORV fails open and must be locally isolated will be referred to as Case 2.

1074v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 B.

Conservative Assum tions Plant responses and mass releases from the intact and faulted steam generator prior to break flow termination were calculated using LOFTTR2.

While modeling the SGTR event the following assumptions were made:

1.

Reactor Tri on Overtem erature Delta-T a,c A turbine runback can be initiated automatically or the operator can manually reduce the turbine load to attempt to prevent a reactor trip on overtemperature delta-T.

Although turbine runback is simulated in this analysis, credit is.not taken for delaying reactor trip.

Reactor trip is assumed to occur on overtemperature delta-T.

Due to the assumed loss of offsite power the condenser is not available for steam releases once the reactor is tripped.

Consequently, after reactor trip the steam generator PORYs are used for steam releases.

Thus an earlier trip time leads to more steam released to the atmosphere from the faulted and intact steam generators.

2.

Power a

The initial steam generator water mass decreases with increasing power level., Thus, a lower initial power results in a higher initial steam generator secondary water mass which is conservative.

On this basis, 100% nominal power was assumed for the analysis rather than considering an overpower factor.

3.

Pressurizer Water Level The RCS depressurization rate increases after the pressurizer empties.

A higher pressurizer water level will increase the time required for the pressurizer to empty.

This results in maintaining a

higher primary to secondary pressure differential and thus a larger break flow rate for a longer time period.

Therefore, it is concluded that maximizing the pressurizer water level is conservative.

a,c 1 074 v:1D/112087

HESTINGHOUSE PROPRIETARY CLASS 2 4.

Steam Generator Seoond~ar Mass A higher initial secondary water mass in the ruptured steam generator was determined by Reference 1 to be conservative for overfill.

For the Case 1 analysis turbine runback was assumed initiated and was simulated by artificially increasing initial steam generator water mass.

The initial steam generator total fluid mass was assumed to be lOA above nominal value plus the differential mass between 100% power and 70Ã power to simulate turbine runback.

However, if steam generator overfill does not occur, a lower initial mass in the ruptur'ed steam generator results in a conservative prediction of offsite doses.

.Thus, for Case 2 the initial secondary mass was assumed to correspond to operation at 10K below nominal steam generator water mass.

a,c 5.

Break Location The tube rupture analyzed is a double-ended break of one steam generator tube located at the top of the tube sheet on the outlet side of the steam generator.

The location of the break on the cold side of the steam generator results in higher primary to secondary leakage than a break on the hot side of the steam generator as determined by reference 1.

Therefore, it is concluded that the cold leg side break location is conservative.

4i, C 6.

Reactor Tri Oela As noted previously, the results for cases which produce an earlier reactor trip are more conservative with respect to the radiological consequences from a SGTR.

Thus, a minimum delay time from the reactor trip signal to reactor trip is conservative for the analysis.

In

addition, as noted above, no credit is taken for turbine runback delaying reactor trip.

a,c.

1074v:10/112387

ttESTINGHOUSE PROPRIETARY CLASS 2 7.

T~ti Ti D1 Following a reactor trip, the turbine will be automatically tripped after a suitable delay time.

Minimizing the delay time between reactor trip and turbine trip reduces the amount of steam flow to the turbine and increases the. secondary water inventory.

Thus, a minimum delay time between reactor trip and turbine trip is conservative for the SGTR analysis.

a,c 8.

Steam Generator Relief Valve Pressure Set oint Hith a loss of offsite power, the secondary pressure will increase following reactor and turbine trip, and steam will be relieved through the steam generator PORVs and safety valves.

A lower steam generator relief valve pressure setpoint leads to a higher primary to secondary pressure differential and thus higher primary to secondary leakage.

Thus, the use of the lowest setpoint for the steam generator. relief valves is conservative for the analysis.

Since the PORV setpoint is lower than.the safety valve setpoints, the use of the PORV setpoint of 1050 psig for steam relief is more conservative, 9.

Pressurizer Pressure for SI Initiation The use of the maximum pressurizer pressure setpoint for SI initiation results in earlier actuation of the SI system.

This leads to the maintenance of a higher primary to secondary pressure differential and consequently a higher break flow rate for a longer time period.

Thus, the use of the maximum pressurizer pressure setpoint for SI initiation

.in the analysis is conservative.

a,c 10.

Leaka e after Overfill a,c Overfill is assumed to occur if the ruptured steam generator becomes water solid.

No credit is taken for steam line volume.

1074v:10/1 12087

WESTINGHOUSE PROPRIETARY CLASS 2

11. Flashin Fraction a,c When calculating the amount of break flow that flashes to steam, 100 percent of the break flow is assumed to come from the hot leg side of the break.

Since the tube rupture flow actually consists of flow from the hot leg and cold leg sides of the steam generator, the temperature of the combined flow will be less than the hot leg temperature and the flashing fraction will be correspondingly lower.

Thus the assumption that 100 percent of the break flow comes from the hot leg is conservative for a SGTR analysis.

C.

erator Action Times In the event of an SGTR, the operator is required to take actions to stabilize the plant and terminate the primary to secondary leakage.

An evaluation has been performed (reference

1) to establish the operator action times for'use in the analysis of a design basis SGTR event.

The operator actions which are required for recovery from an SGTR and the available data on the times to perform these actions have b'een reviewed.

The available data on operator action times for an SGTR includes information which has been obtained from reactor plant simulator studies as well as plant data from five actual SGTR events.

Using this data, operator -action times have been established. which are considered to be appropriate for a design basis SGTR event.

These operator action times were be used as input for the analysis of the design basis SGTR event.

The major operator actions for SGTR recovery which are included in the E-3 guideline of the Westinghouse Owners Group Emergency

Response

Guidelines were explicitly modeled in the analysis.

The operator actions modeled include identification and isolation of the ruptured steam generator, cooldown and depressurization of the RCS to restore inventory, and termination of SI to stop primary to secondary leakage.

These operator actions are described below.

1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2 1.

I.dentify the ruptured steam generator (step 2).

High secondary side activity, as indicated by the steam generator blowdown line radiation monitor or air ejector radiation monitor, typically will provide the first indication of an SBTR event.

The ruptured steam generator can be identified by high activity in the corresponding steam generator blowdown line, main steamline, or water sample.

For an SBTR that results in a high power reactor trip, the steam generator water level will decrease off-scale on the narrow range for both steam generators.

The auxiliary feedwater (AFM) flow will begin to refill the steam generators, typically distributing approximately equal flow to both steam generators.

Since primary to secondary leakage adds additional inventory which accumulates in the ruptured steam generator, level will return to the narrow range in that steam generator significantly earlier and will continue to increase more rapidly.

This response provides confirmation of.an SGTR event and also identifies the ruptured steam generator.

2.

Isolate the ruptured steam generator from the intact steam generator and isolate feedwater to the ruptured steam generator.(steps 3 and 4).

Once a tube rupture has been identified, recovery actions begin by isolating steam flow from and stopping feedwater flow to the ruptured steam generator.

In addition to minimizing radiological releases, this also reduces the possibility of filling the ruptured steam generator with water by 1) minimizing the accumulation of feedwater flow and 2) enabling the operator to establish a pressure differential between the ruptured and intact steam generators as a necessary step toward terminating pr imary to secondary leakage.

In the guideline for steam generator tube rupture recovery in the ERGs, the operator is directed to maintain the level in the ruptured steam generator between just on span and 50% on the narrow range instrument.

Reference 1

assumed that the ruptured steam generator would be isolated when level in the steam generator reached

[midway between these points]

'074v:1D/112487

WESTINGHOUSE PROPRIETARY CLASS 2

[(33% narrow range level).] 'or Ginna it was also conservative to use

[33 percent] 'f level for isolation.

The ruptured steam generator was assumed to be isolated at [33 percent narrow range level or at 10 minutes, whichever was longer.]

Cool down the Reactor Coolant System (RCS) using the intact steam generator (step 14).

After isolation of the ruptured steam generator, the RCS is cooled as rapidly as possible to less than saturation temperature corresponding to the ruptured steam generator pressure by dumping steam from only the intact steam generator This ensures adequate subcooling in the.

RCS after depressurization to the ruptured steam generator pressure in subsequent actions.,

With offsite power available, the normal steam dump system to the condenser will provide sufficient capacity to perform this cooldown rapidly'. If offsite power is lost, the RCS is cooled using the power-operated relief valve (PORV) on the intact steam generator since neither the steam dump valves nor the condenser would be available.

It is noted that RCS pressure will decrease during the cooldown as shrinkage of the reactor coolant expands the steam bubble in the pressurizer.

4.

Depressurize the RCS to restore reactor coolant inventory (steps 17 or 18).

When the cooldown is completed, SI flow will increase RCS pressure until break flow matches SI flow.

Consequently, SI'flow must be terminated to stop primary to secondary leakage.

However, adequate reactor coolant inventory must first be assured.

This includes both sufficient reactor coolant subcooling and pressurizer inventory to maintain a reliable pressurizer level indication after SI flow is stopped.

Since leakage from the primary side will continue after SI flow is stopped until RCS and ruptured steam generator pressures

equalize, an "excess" amount of inventory is needed to ensure 1074v:10/112487

WESTINGHOUSE PROPRIETARY CLASS 2 pressurizer level remains on span.

The "excess" amount required depends on RCS pressure and reduces to zero when RCS pressure equals the pressure in the ruptured steam generator.

To reduce break flow and establish sufficient pressurizer

level, RCS pressure is decreased by opening the pressurizer PORV.

5.

Terminate SI to stop primary to secondary leakage (steps 21-23).

The previous actions will have established adequate RCS subcooling, secondary side heat sink; and reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.

When these actions have been completed, SI flow must be stopped to prevent'epressurization of the RCS and to terminate primary to secondary leakage.

Primary to secondary leakage will continue after SI flow is stopped until RCS pressure and ruptured steam generator pressures equalize.

Charging flow, letdown, and pressurizer heaters will then be controlled to prevent repressurization of the RCS'nd reinitiation of leakage into the ruptured steam.generator.

Since these major recovery actions will be modelled in the SGTR analysis, it is necessary to establish the times required to perform these actions.

Although the intermediate steps between the major actions will not be explicitly modelled, it is also necessary to account for the time required to perform the steps, It is noted that the total time required to complete the recovery-operations consists of both operator action time and

system, or plant, response time; For instance, the time for each of the major recovery operations (i.e.,

RCS cooldown, RCS depressurization,'tc.)

is primarily due to the time required for the system response, whereas the operator action time is reflected by the time required for the operator to perform the intermediate action steps.

'The operator action times to initiate RCS cooldown, RCS depressurization and safety injection termination were developed in reference 1 and are listed in Table II.1.

In addition to the operator action times developed in reference 1, Rochester Gas and Electric supplied the operator action 1074v:1D/112087

MESTINGHOUSE PROPRIETARY CLASS 2 times associated with recovering from the single failures (Reference 3).

[These operator 'actions, which would occur outside the control room, include locally opening the intact steam generator PORV, locally closing the intact steam generator PORV block valve and locally closing the faulted steam generator PORV block valve.] 'he times associated with performing these operator actions are listed in Table II.2. [It is noted that the 20 minutes to open the intact steam generator PORV consists of 10 minutes to identify and locate the valve and 10 minutes to linearly open the PORV.

Due to limitations of LOFTTR2, the operator action to open the intact steam generator PORV was simulated as a step opening after a 15 minute delay, which results in an equivalent integrated steam flow through the PORV at the end of the 20 minute period.] '

074v:io/1 1 2087 10

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.1 OPERATOR ACTION TIMES FOR DESIGN BASIS SGTR ANALYSIS Action Time min Identify and isolate ruptured SG Haximum of 10 min or calculated time to reach 334 narrow range level in the ruptured SG Operator action time to initiate cooldown Cooldown Calculated time for RCS cooldown Operator action time to initiate depressurization Depressurization Calculated time for RCS depressurization Operator action time to initiate SI termination SI termination and pressure equalization Calculated time for SI termination and equalization of RCS and ruptured SG pressures 1074v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.2 Action GINNA SPECIFIC OPERATOR ACTION TIMES Time min Q,C Faulted Steam Generator PORV Block Valve Closing-Local Action 15 Intact Steam Generator PORV Opening-Local Action 20 Intact Steam Generator PORV Block Valve Closing-Local Action 1074v:1D/112087 12

II'ESTINGHOUSE PROPRIETARY CLASS 2 D.

Transient Descri tion - Case 1

[Case 1 addresses a

SGTR in which the single failure assumed is that the intact steam generator PORV fails to open on demand and must be locally opened.] 'he sequence, of events for Case 1 is presented in Table II.3.

Following the tube rupture, reactor coolant flows from the primary into the secondary side of the ruptured steam generator since the primary pressure is greater than the steam generator pressure.

In response to this loss of reactor coolant, pressurizer level decreases as shown in Figure II.1.

The RCS pressure also decreases as shown in Figure II.2 as the steam bubble in the pressurizer expands.

As the RCS pressure decreases due to the continued primary to secondary

leakage, automatic reactor trip occurs on an overtemperature delta-T trip signal.

After reactor trip, core power rapidly decreases to decay heat levels.

The turbine stop valves close and steam flow to the turbine is terminated.

The steam dump system is designed to actuate following reactor trip to limit the increase in secondary

pressure, but the steam dump valves remain closed due to the loss of condenser vacuum resulting from the assumed loss of offsite power at the time of reactor trip.
Thus, the energy transfer from the primary system causes the secondary side pressure to increase rapidly after 'reactor trip until the steam generator.

PORVs lift to dissipate the energy, as shown in Figure II.3.

The RCS pressure decreases more rapidly after reactor trip as energy transfer to the secondary shrinks the reactor coolant and the leak flow continues to deplete primary inventory.

The decrease in RCS inventory results in a low pressurizer pressure SI signal.

Pressurizer level also decreases more rapidly following reactor trip and the pressurizer eventually empties as shown in Figure II.1.

After the pressurizer

empties, the RCS pressure rapidly decreases as shown in Figure II.2.

1074v:10/120487 13

WESTINGHOUSE PROPRIETARY CLASS 2 Since offsite power is assumed lost at reactor-trip, the RCPs trip and a

gradual transition to natural circulation flow occurs.

Immediately following reactor trip the temperature rise across the core decreases as core power decays (see Figure 11.4),

however, the temperature rise subsequently increases as natural circulation flow develops.

The cold leg temperatures trend toward the steam generator temperature as the fluid residence time in the tube region increases.

The RCS temperatures continue to slowly decrease due to the continued addition of the auxiliary feedwater to the steam generators until operator actions are initiated to cool down the RCS.

major Operator Actions 1.

Identify and Isolate the Ruptured Steam Generator Once a tube rupture has been identified, recovery actions begin by isolating steam flow from the ruptured steam generator and.throttling the auxiliary feedwater flow to the ruptured steam generator.

As indicated previously, the ruptured steam generator is assumed to be identified and isolated when the narrow range level reaches

[33%]

'n the ruptured steam generator or at [10] 'inutes after initiation of the SGTR, whichever is longer.

For Ginna, the time to reach

[33%] 's less than [10] 'inutes, thus the ruptured steam generator is assumed to be isolated at [10] 'inutes.

2.

Cool down the RCS to Establish Subcooling Margin After isolation of the ruptured steam generator, there is a [5]

'inute operator. action time imposed prior to initiating the cooldown.

The actual delay time used in the analysis is 4 seconds longer because of the computer program requirements for simulating the operator actions.

After this time, actions are taken to cool the RCS as rapidly as possible by dumping steam from the intact steam generators.

Since offsite power is lost, the RCS is cooled by dumping steam to the atmosphere using the PORV on the intact steam generator.

[For Case 1,

as previously noted, the intact steam generator]

'074 v:1D/112487 14

MESTINGHOUSE PROPRIETARY CLASS 2

[PORV fails to open.

For the analysis, it was assumed that the valve was fully opened after an additional period of 15 minutes (see pg.

10).

Thus at 1804 seconds the intact steam generator PORV is opened for RCS cooldown.] 'he cooldown is continued unti 1 RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for subcooling uncertainty.

[When these conditions are satisfied it is assumed that it takes the operator five minutes to close the intact steam generator PORV block valve.]'t is noted that overfill of the ruptured steam generator occurs during this time period at '[2372] 'econds, as shown in Figure II.6.

This cooldown ensures that there will be adequate subcooling in the RCS after the subsequent depressurization of the RCS to the ruptured steam generator pressure.

The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.3, and the effect of the cooldown on the RCS temperature is shown in Figure II.4.

The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.2.

3, Depressurize RCS to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization.

The RCS is depressurized at 2688 seconds to assure adequate coolant inventory prior to terminating SI flow.

Mith the RCPs stopped, normal pressurizer'pray is not available and thus the RCS is depressurized by opening a pressurizer PORV.

The depressurization is continued until any of the following conditions are satisfied:

RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer, level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty.

The RCS depressurization reduces the break flow as shown in Figure II.5 and increases SI flow to refill the pressurizer, as shown in Figure II.1.

1074v:10/112487 15

WESTINGHOUSE PROPRIETARY CLASS 2 4.

Terminate SI to Stop Primary to Secondary Leakage The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following a SGTR to ensure that SI flow is no longer needed.

When these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate

" primary to secondary leakage.

The SI flow is terminated when the RCS pressure increases,,minimum AFW flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3X allowance for pressurizer level uncertainty.

To assure that the RCS pressure is increasing, SI was not terminated in the analysis until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.

After depressurization is completed, an operator action time of

[1] 'inute is imposed prior to SI termination.

The primary to secondary leakage continues after the SI flow is terminated until the RCS and ruptured steam generators equalize.

This occurs when'the intact steam generator PORV is locally opened to cooldown the RCS so that subcooling may be maintained.

When the PORV is opened the increased energy transfer from primary to secondary depressurizes the RCS to the ruptured.steam generator pressure.

1074v:10/112087 16

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.3 SEQUENCE OF EVENTS EVENT CASE 1

Time sec d., C Reactor Trip 50 Ruptured.

SG Isolated 600 Intact SG PORV Opened 1804 Overfill Ruptured SG 2372 Intact SG PORV Isolated PRZR PORV Opened PRZR PORV Closed 2568 2688 2738 SI Terminated 2798 Intact PORV Opened 3288 Break Flow Terminated 3428 1074v:1D/112087 17

WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1

188.

88

~

78.

68.

4J 68.

t4 48.

38.

18

~

8.8.

.1Ei84

.2E+84 TINE (SEC)

.3Ei84

.4E~84 Figure II.1 Pressurizer Level - Case 1

1074v:1D/112087 18

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE I

.25E+84

.225Ei84

.2E 84

.175E'84

. 15E+84 Ld

~, 12SE ~ 84 LJ Of

~o

.1E 84 Of 758.

588.

258.

. IE~84

.2E 84

.3E ~ 84 TIME (SEC)

.4E 84 Figure II.2 RCS Pressure - Case 1

1 074 v:10/112087 19

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS IS PERCENT TUBE PLUGGING CASE I

.I4E 84

. 12Ei84 RUPTURED LOOP

. 1E ~ 84 888.

INTACT LOOP OC C) ill 688.

488.

288.

8.

. IE ~ 84

.2E 84

.3E ~ 84

.4E ~ 84 TINE (SEC)

Figure II.3 Secondary Pressure

- Case 1

1 074 v:1D/11208l 20

MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAi1 GENERATOR TUBE RUPTURE ANALYSIS PERCENT TUBE PLUGGING CASE 1

658.

688.

~ 558.

4J CD 588.

~ 458.

IX 488.

C) 358.

CD CD

~ 388.

258

~

288'.

. 1E ~ 84

.2E ~ 84 TI11E (SEC)

.3E ~ 84

~ 4E ~ 84 Figure II.4 Intact Loop Hot and Cold Leg RCS Temperatures - Case 1

1074v:10/112087 21

MESTINGHOUSE PROPRIETARY CLASS 2 G INNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1

168.

I48.

128

'SSUE Ul K

lD 88.

C) 68 ~

hC EZ IIJ m

48.

28.

-28.

..IE~84

.2E ~ 84 TIt1E ISEC)

.3E 84

.4E+84 Figure II.5 Primary to Secondary Leakage - Case 1

1074v:1D/112087 22

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAI1 GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 1

.6E 84

.SE 84

~.4E ~ 84

~.3'4 0

.2Ei84

.1E 84

. lE. 84

.2E~B4

.3E~84

.4E~84 TlNE tSEC)

Figure II.S Ruptured SG Rater Volume - Case 1

1074v:1D/112081 23

WESTINGHOUSE PROPRIETARY CLASS 2 E.

Transient Descri tion - Case 2

[Case 2 addresses a

SGTR in which the single failure assumed is that the faulted steam generator PORV fails open at the time the faulted steam generator is isolated.] 'hus, the Case 2 transient is similar to the Case 1 transient until that time.

.The sequence of events for Case 2 is I

presented in Table II.4.

Following the tube rupture the RCS pressure decreases as shown in Figure 11.7 due to the primary to secondary leakage.

In response to this depressurization, the reactor trips on overtemperature delta-T.

After reactor trip, core power rapidly decreases to decay heat levels and the RCS depressurization becomes more rapid.

The steam dump system is inoperable due to the assumed loss of offsite power, which results in the secondary pressure rising to the steam generator PORV setpoint as shown in Figure 11.8.

The decreasing pressurizer pressure leads to an automatic SI signal on low pressurizer pressure.

Pressurizer level also decreases more rapidly following reactor trip until it eventually empties, as shown in Figure 11.9.

major Operator Actions 1.

Identify and Isolate the Ruptured Steam Generator The ruptured steam generator is assumed to be identified and isolated at [10 minutes after the initiation of the SGTR or when the narrow range level reaches 33%, whichever time is greater.] 'or this

case, the time to reach [33/] 'arrow range level is [652]

'econds, and thus, it was assumed that the ruptured steam generator is isolated at that time.

[The ruptured steam generator PORV is also assumed to fail open at this time.] 'he failure causes the steam generator to rapidly depressurize, which results in an increase in primary to secondary leakage.

The depressu'rization of the ruptured steam generator increases'he break flow and energy transfer from primary to secondary which results in RCS pressure and temperature decreasing more rapidly than in Case 1.

The ruptured steam generator 1074v:10/120487 24

MESTINGHOUSE PROPRIETARY CLASS 2 depressurization causes a cooldown in the intact steam generator loop.

As the'ntact steam generator hot leg temperature decreases below the steam generator water temperature reverse heat transfer takes place as shown in Figure II.10.

[It is assumed that the time required for the operator to identify that the ruptured steam generator PORV is open and to close the associated block valve is 15 minutes.

Thus, at 1558 seconds the depressurization of ruptured steam generator is terminated.]

',c 2.

Cool Down the RCS to establish Subcooling Margin

[After the ruptured steam generator PORV block valve is closed,'here is a 5 minute operator action time imposed prior to initiation of cooldown.] 'he depressurization of the ruptured steam generator affects the RCS cooldown target temperature since the temperature is dependent upon the pressure in the ruptured steam generator.

Since

'ffsite power is lost the RCS is cooled by dumping steam to the atmosphere using the intact steam generator PORV.

The cooldown is continued until RCS subcooling at the ruptured steam generator pressure is 20'F plus an allowance of 17'F for instrument uncertainty.

Hecause of the lower pressure in the ruptured steam generator the associated temperature the RCS must be cooled to is also lower, which has the net effect of extending the time for cooldown.

For Case 2 cooldown begins at [1858] 'econds

'and is completed at

[2852] 'econds.

The reduction in the intact steam generator pressure required to accomplish the cooldown is shown in Figure II.8, and the effect of the cooldown on the RCS temperature is shown in Figure II.10.

The RCS pressure also decreases during this cooldown process due to shrinkage of the reactor coolant as shown in Figure II.7.

3.

Depressurize to Restore Inventory After the RCS cooldown, a [2] 'inute operator action time is included prior to depressurization.

The RCS is depressurized at

[2974] 'econds to assure adequate coolant inventory prior to 1074v:10/112487 25

HESTINGHOUSE PROPRIETARY CLASS 2 terminating SI flow, -Hith the RCPs stopped, normal pressurizer spray is not available and thus the RCS is depressurized by opening a

pressurizer PORV.

The depressurization is continued until any of the following conditions are satisfied:

RCS pressure is less than the ruptured steam generator pressure and pressurizer level is greater than 0% plus an allowance of 3% for pressurizer level uncertainty, or pressurizer level is greater than 80% minus an allowance of 3% for pressurizer level uncertainty, or RCS subcooling is less than the 17'F allowance for subcooling uncertainty.

The RCS depressurization reduces the break flow as shown in Figure II.11 and increases SI flow to refill the pressurizer, as shown in Figure 11.9.

4.

Terminate SI to Stop Primary to Secondary

Leakage, The previous actions should have established adequate RCS subcooling, verified a secondary side heat sink, and restored the reactor coolant inventory following an SGTR to ensure that SI flow is no longer needed.

Nhen these actions have been completed, the SI flow must be stopped to prevent repressurization of the RCS and to terminate primary to secondary leakage.

The SI flow is terminated when the RCS pressure increases,'minimum AFH flow is available and at least one intact steam generator level is in the narrow range, RCS subcooling is greater than the 17'F allowance for subcooling uncertainty, and the pressurizer level is greater than the 3% allowance for pressurizer level uncertainty.

To assure that the RCS pressure is increasing, SI was not terminated until the RCS pressure increased to 50 psi above the ruptured steam generator pressure.

After depressurization is completed, an operator action time of

[1] 'inute is imposed prior to SI termination.

Figure II.11 shows that the primary to secondary leakage continues after the SI flow is stopped until the RCS and ruptured steam generator pressure equalize.

The ruptured steam water volume is shown in Figure II.12.

For Case 2, the ruptured steam generator does not overfill.

1074v:1D/112487

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.4 SEQUENCE OF EVENTS CASE 2 EVENT TIME sec Reactor Trip 49.4 Ruptured SG Isolated Ruptured SG PORV Fails Open a.c Ruptured SG Block Valve Closed 1558 Intact SG PORV Opened Intact SG PORV Closed 1858 2852 PRZR PORV Opened PRZR PORV Closed 2974 3006 SI Terminated 3066 Break Flow Terminated 3438 1D74v:1O/112087 27

WESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAt1 GENERATOR TUBE RUPTURE 4NAL'/SIS 15 PERCENT TUBE PLUGGING 2588.

2258.

CASE 2 2888.

CC l758.

1588.

~ 1258.

cn I 888.

758.

588.

258.

8.

8.

588.

1888.

l588.

2888 '588.

5888.

5588." 4888.

TIME(SEC)

Figure II.7 RCS Pressure

- Case 2

1074v:10/112087 28

HESTINGHOUSE PROPRIETARY CLASS 2 1488.

GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING CASE 2 1288.

l888.

w 888.

688.

w

488, RUPTURED LOOP INTACT LOOP
288, 8.

588.

1888.:l588.

2888.

2588.

3888.

3588.

4888.

TIME(SEC)

Figure II.8 Secondary Pressure

- Case 2

1074v:10/112087 29

WESTINGHOUSE PROPRIETARY CLASS 2 G1NNA STEAN GENERATOR TUBE RUPTURE ANALYS15 15 PERCENT TUBE PLUGGING 188.

CASE 2 98.

e8.

78.

LJ w

68.

'58.

48

~

38.

0 28.

18.

8.

8.

588.

1888.

1588.

2888 '588.

3888.

3588.

4888.

TINE ( SEC )

Figure II.9 Pressurizer Level - Case.2 1074v:10/1 1ZOST 30

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING 658.

CASE 2 688.

~ 558.

O 588.

~z. 458.

o 488.

x I

o 358, 388.

TCOLD THOT THOT

, TCOLD THOT TCOLD 258

'88.

8.

588.

1888.

1588.

2888.

2588.

3888.

3588.

4888.

TIME ( SEC )

Figure II.10 Intact Loop Hot and Cold Leg RCS Temperatures

- Case 2

1074v:1D/1 12087 31

MESTINGHOUSE PROPRIETARY CLASS 2 GINNA STEAM GENERATOR TUBE RUPTURE ANALVSIS 15 PERCENT TUBE PLUGGING CASE 2 78.

w 68 ~

58.

o 48.

38.

oc 28.

I8,

-18.

-28 8.

588.

1888.

1588.

2888.

2588.

3888.

3588.

4888.

TIME(SEC)

Figure II.11 Primary to Secondary Leakage - Case 2

1074v:1D/112087 32

MESTINGHOUSE PROPRIETARY CLASS 2 6888.

GINNA STEAM GENERATOR TUBE RUPTURE ANALYSIS 15 PERCENT TUBE PLUGGING

'ASE 2 H)

I~ 5888.

K o 4888.

~ 5888.

~g 2888

~

I888.

8.

588.

1888.

1588.

2888.

2588.

5888.

5588.

4888.,

T I ME ( SEC )

Figure 11,12 Ruptured SG Mater Volume Case 2

1074v:1D/112087 33

WESTINGHOUSE PROPRIETARY CLASS 2 F.

Mass Releases The mass releases were determined for each of the single failure cases for use in evaluating the exclusion area boundary and low population zone radiation exposure.

The steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and primary to secondary break flow into the ruptured steam generator were determined for the period from accident initiation until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after the accident and from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident.

The releases for 0-2. hours are used to calculate the radiation doses at the exclusion area boundary for a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> exposure, and the releases for 0-8 hours are used to calculate the radiation doses at the low population zone for the duration of the accident.

In the LOFTTR2 analyses, the SGTR recovery actions in the E-3 guideline were simulated until the termination of primary to secondary leakage.

After the primary to secondary leakage is terminated, the operators will continue the SGTR recovery actions in the E-3 guideline to prepare the plant for cooldown to cold shutdown conditions.

These actions include establishing normal Chemical and Volume Control System (CVCS) operation to provide reactor coolant inventory control and a boration path; restarting a reac'tor coolant pump (RCP), if none are running, to ensure homogeneous RCS conditions and to provide normal pressurizer spray; or stopping one RCP, if both are running, to minimize the heat input'uring the subsequent cooldown; and the actions necessary to'inimize the spread of contamination on the secondary side.

When the instructions provided in E-3 are completed, the plant should be cooled and depressurized to cold shutdown conditions.

There are three alternate means of performing the post-SGTR cooldown provided in the WOG Emergency

Response

Guidelines.

The guidelines are:

ES-3.1, POST-SGTR COOLDOWN USING BACKFILL; ES-3.2, POST-SGTR COOLDOWN USING BLOWDOWN; and ES-3.3, POST-SGTR COOLDOWN USING STEAM DUMP.

The preferred methods are using backfill or blowdown since these methods minimize the radioactivity released to the atmosphere.

The ES-3.3 guideline using steam dump provides the fastest method for 1074v:1D/112087 34

WESTINGHOUSE PROPRIETARY CLASS 2 depressurizing the RCS and ruptured steam generator.

This method also results in the worst radiological releases, especially if steam dump to the condenser is unavailable.

Therefore, the method using steam dump was selected for evaluation of the long-term mass releases since this produces conservative results for the offsite dose evaluation.

It is noted that the use of the steam dump method would not be permitted if steam generator overfill occurs and water enters the main steamlines.

The high level actions for the ES-3.3 guideline are discussed

below, 1.

Prepare for Cooldown to Cold Shutdown The initial steps to prepare for cooldown to cold shutdown are performed in the E-3 guideline following SI termination, and these steps will be continued in ES-3.3 if they have not already been completed.

A few additional steps are also performed in ES-3.3 prior

. to initiating cooldown.

These include isolating the cold leg. SI accumulators to prevent unnecessary injection, energizing pressurizer heaters as necessary to saturate the pressurizer water and to provide for better pressure control, and assuring adequate shutdown margin in the event of potential boron dilution due to in-leakage from the

'ruptured steam generator.

2.

Cooldown RCS to Residual Heat Removal (RHR) System Temperature The RCS is cooled by steaming and feeding the intact steam generator similar to a normal cooldown.

Since all immediate safety concerns have been resolved, the cooldown rate should be maintained less than the maximum allowable rate of 100'F/hr.

The preferred means for cooling the RCS is steam dump to the condenser since this minimizes the radiological releases and conserves feedwater supply.

The PORV for the intact steam generator can also be used if steam dump to the condenser is unavailable.

When the RHR system operating temperature is reached, the cooldown is stopped until RCS pressure can also be decreased.

This ensures that pressure/temperature limits will not be exceeded.

1074v:1D/112087 35

WESTINGHOUSE PROPRIETARY CLASS 2 3.

Depressurize RCS to RHR System Pressure When the cooldown to RHR system temperature is completed, the pressure in the ruptured steam generator is decreased by releasing steam from the ruptured steam generator.

Steam release to the condenser is preferred since this minimizes radiological releases.

However, steam can also be released to the atmosphere using the PORV on the ruptured steam generator.

An evaluation of the potential radiological consequences should be performed before releasing steam from the ruptured steam generator to the atmosphere.

As the ruptured steam generator pressure is reduced, the RCS pressure is maintained equal to the pressure in the ruptured steam generator in order to prevent in-leakage of secondary side water or additional primary to secondary leakage.

Normal pressurizer spray is the preferred means of RCS pressure control since this conserves coolant inventory. If pressurizer spray is not available, a pressurizer PORV or auxiliary spray can be used to control RCS pressure.

When overfill of the ruptured steam generator

occurs, as with Case 1,

guideline ES-3.1 POST-SGTR COOLDOWN USING BACKFILL is assumed to be used.

The high level actions for ES-3.1 are similar to ES-3.3.

However, the method by which ES-3.1 instructs the operator to depressurize the ruptured steam generator differs from ES-3.3.

In Guideline ES-3.1 the RCS is depressurized to promote back flow through the failed tube which depressurizes the ruptured steam generator without steam releases to the atmosphere.

4.

Cooldown to Cold Shutdown When RCS temperature and pressure have been reduced to the RHR system in-service values, RHR system cooling is initiated to complete the cooldown to cold shutdown.

When cold shutdown conditions are

achieved, the pressurizer can be cooled to terminate the event.

1074v:1O/112087 36

WESTINGHOUSE PROPRIETARY CLASS 2 F.1 Methodology for Calculation of Mass Releases The operator actions for the SGTR recovery up to the termination of primary to secondary leakage are simulated in the LOFTTR2 analyses.

Thus, the steam releases from the ruptured and intact steam generators, the feedwater flows to the ruptured and intact steam generators, and the primary to secondary leakage into the ruptured steam generator were determined from the LOFTTR2 results for the period from the initiation of the accident until the leakage is terminated.

L2,C Following the termination of leakage, the operators are assumed to complete the steps in the E-3 and ES-3.3 or ES-3.1 guidelines to prepare for cooldown to cold shutdown.

The time from leakage termination until the initiation of cooldown was assumed to be 20 minutes (see Reference 2).

The assumed time of 20 minutes to initiate the cooldown is considered to be conservative, since the actual time is expected to be longer for an actual event because an evaluation of the potential offsite radiation doses would be required prior to using the steam dump method for the post-SGTR cooldown.

It was assumed that the RCS and intact steam generator conditions are maintained stable during the 20 minute period until the cooldown is initiated.

The PORV for the intact steam generator was then assumed to be used to cool down the RCS to the RHR system operating temperature of 332'F, at the maximum allowable cooldown rate of 100'F/hr..

The RCS and the intact steam generator temperatures at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were then determined using the RCS and intact steam generator parameters at the time of leakage termination and the RCS cooldown rate.'he steam releases and the feedwater flows for the intact steam generator for the period from leakage termination until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> were determined from a mass and energy balance using the calculated RCS and intact steam generator conditions at the time of leakage termination and at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The core decay heat and the heat added from the operation of one RCP were included in the energy balance for this time period.

Since the ruptured steam generator is isolated, no change in the ruptured steam generator conditions is assumed to occur until subsequent depressurization.

The assumptions of a reasonably short preparation time for cooldown and the maximum cooldown rate result in minimum RCS and steam generator temperatures at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, and therefore, a conservative estimate of the steam released to the atmosphere during the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

1074v:1D/112087 37

HESTINGHOUSE PROPRIETARY CLASS 2 a,c

'The RCS cooldown was assumed to be continued after 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> until the RHR system in-service temperature of 332'F is reached.

Depressurization of the ruptured steam generator was then assumed to be performed immediately following the completion of the RCS cooldown.

The ruptured steam generator was assumed to be depressurized to the RHR in-service pressure of 343 psia via steam release from the ruptured steam generator PORV, since this maximizes the steam release from ruptured steam generator to the atmosphere which is conservative for the evaluation of the offsite radiation doses.

The RCS pressure is also assumed to be reduced concurrently as the ruptured steam generator is depressurized to minimize flow between the RCS and the ruptured steam generator.

It is assumed that the continuation of the RCS cooldown and depressurization to RHR operating conditions are completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after the accident since there is ample time to complete the operations during this time period.

The steam releases and feedwater flows from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> were determined for the intact steam generator from a mass and energy balance using the RCS and steam generator conditions at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at the RHR system in-service conditions.

The core decay heat and the heat addition due to the operation of one RCP were also included in the energy balance for this time interval.

The steam released from the ruptured steam generator from 2 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> was determined. based'n a mass and energy balance for the ruptured steam generator using the conditions at the time of leakage termination and saturated conditions at the RHR in-service pressure.

After 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, it is assumed that further plant cooldown to cold shutdown as well as long-term cooling is provided by the RHR system.

Therefore, the steam

~

releases to the atmosphere are terminated after RHR in-service conditions are assumed to be.reached at 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

F.2 Hass Release Results The mass release calculations were performed for both single failure cases using the methodology discussed above.

For the time period from initiation of the accident until leakage termination, the releases were determined from the LOFTTR2 results for two separate periods for use in the dose calculations.

The first time period considered is from accident initiation until reactor trip.

Since the condenser is in service until reactor trip, any radioactivity 1074v:1D/112087 38

WESTINGHOUSE PROPRIETARY CLASS 2 released to the atmosphere prior to reactor trip will be through'he condenser air ejector.

After reactor trip,'he releases to the atmosphere are assumed to be via the steam generator PORVs.

The mass releases calculated from the time of leakage termination until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and from 2-8 hours are also assumed to be released to the atmosphere via the steam generator PORVs.

The mass releases for the SGTR event [assuming delayed use of the intact steam generator PORV] 'Case

1) are presented in Table II.5.

The results indicate that approximately [21,990] 'bm of steam and [23,710] 'bm of water is released from the ruptured steam generator to the atmosphere in the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

A total of [129,300] 'bm of primary water is transferred to the secondary side of the ruptured steam. generator before the break flow is terminated.

The mass releases for the SGTR event assuming [failure and isolation of the ruptured steam generator PORV] 'Case

2) are presented in Table II.6.

The results indicate that approximately [62,480] 'bm of steam is released to the atmosphere from the ruptured steam generator within the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

After 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> [33,300] 'bm is released to the atmosphere from the ruptured steam generator.

A total of [172,800] 'bm of primary water is transferred to the secondary side of the ruptured steam generator before break flow is terminated.

1074v:1D/112087 39

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.5 CASE 1

MASS RELEASES 0-TRIP TOTAL MASS FLOW (POUNDS)

TIME PERIOD TRIP TMSEP -

OVFILL -

TTBRK -

T2HRS TMSEP OVFILL TTBRK T2HRS

'RHR Faulted SG Condenser Atmosphere Feedwater 47,800 0

0 0

15,450 6540 43,600 30,500 0

0 0

23,710*

0 0

PIC Intact SG Condenser Atmosphere 47,150 Feedwa ter 47,150 0

0 0

0 0

14,730 32,950 13,450 151,870 505,500 46,040 29,610 17,900 158,700 513,500 Break Flow 4216 47,574 53,710 23,800 TRIP TMSEP OVFILL TTBRK T2HRS TRHR

= Time of reactor trip = [50] 'ec.

= Time when water reaches the moisture separators

= [1086] 'ec.

= Time when steam generator overfills = [2372] 'ec.

= Time when break flow is terminated

= [3428] 'ec.

= Time at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

= 7200 sec.

= Time to reach RHR in-service conditions, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

= 28,800 sec.

  • Ha'ter 1074v:1D/1120Sl 40

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.6 CASE 2 MASS RELEASES

~ TOTAL MASS FLOM (POUNDS)

TIME PERIOD 0-TRIP TRIP TMSEP "

TTBRK -

T2HRS TMSEP TTBRK T2HRS TRHR Faulted SG Condenser Atmosphere Feedwater 46,880 0

0 62,090 390 42,740 33,260 0

33,300 CL, C Intact SG Condenser Atmosphere Feedwater 46,220 0

0 0

0 35,430 18,450 153,920 457,000 46,220 97,780 19,700 160,300 457,700 Break Flow 4134 132,666 36,000 0

0 TRIP

= Time TMSEP

= Time TTBRK

= Time T2HRS

= Time TRHR

= Time of reactor trip = [49.4] 'ec.

when water reaches the moisture separators

= [2372] 'ec.

when break flow is terminated

= [3438] 'ec.

at 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

= 7200 sec.

to reach RHR in-service conditions, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

= 28,800 sec.

1074v:1D/112087 41

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE II.7 SUMMARIZED MASS RELEASES TOTAL MASS FLOM (POUNDS)

CASE 1

CASE 2 Faulted SG 0-TTBRK TTBRK -

2HRS-2HRS 8HRS 0 -

TTBRK -

2HRS TTBRK 2HRS 8HRS Condenser 47,820 46,880 Atmosphere 45,700*

62,480 33,300 Feedwater 74,100 76,000 Intact SG Condenser 47,150 46,220 0

Atmosphere 61,130 151,870 505,500 Feedwater 122,800 158,700 513,500 53,880 153,920 457,000 163,700 160,300 457,700 Break Flow 129,300 0

172,800 0

23,710 ibm of this is water.

1074v:10/1120S7 42

WESTINGHOUSE PROPRIETARY CLASS 2 III.

RADIOLOGICAL CONSEQUENCES ANALYSIS The evaluation of the radiological consequences of a steam generator tube

rupture, assumes that the reactor has been operating at the proposed Technical Specification limit for primary coolant activity and at the existing Technical Specification limit for primary to secondary leakage for sufficient time to establish equilibrium concentrations of radionuclides in the reactor coolant and in the secondary coolant.

Radionuclides from the primary coolant enter the steam generator, via the ruptured tube, and are released to the atmosphere through the steam generator safety or power operated relief valves and via the 4

condenser air ejector, exhaust.

The quantity of radioactivity released to the environment, due to a SGTR, depends upon primary and secondary coolant activity, iodine spiking effects, primary to secondary break flow, break flow flashing fractions, attenuation of iodine carried by the flashed portion of the break flow, partitioning of iodine between the liquid and steam phases, the mass of fluid released from the generator and liquid-vapor partitioning in the turbine condenser hot well.

All of these parameters were conservatively evaluated for a design basis double ended rupture of a single tube.

A.'esi n Basis Anal tical Assum tions The major'assumptions and parameters used in the analysis are itemized in Table 111.1.

The following is a discussion of the source term.

Source Term Calculations The radionuclide concentrations in the primary and secondary system, prior to and following the SGTR are determined as follows:

a.

The iodine concentrations in the reactor coolant will be based upon preaccident and accident initiated iodine spikes.

1074v:1D/112087 43

MESTINGHOUSE PROPRIETARY CLASS 2 Accident Initiated Spike - The initial primary coolant iodine concentration is 1 yCi/gm of Dose Equivalent (D.E.) I-131.

Following the primary system depressurization associated with the

SGTR, an iodine spike is initiated in the primary system which increases the iodine release rate from the fuel to the coolant to a value 500 times greater than the release rate corresponding to the initial primary system iodine concentration.

The duration of the

spike,

[3.31 'ours, is sufficient to increase the initial RCS I-131 inventory by a factor of [100] '

ii.

Preaccident Spike - A reactor transient has occured prior to the SGTR and has raised the primary coolant iodine concentration from 1 to 60 yCi/gram of D.E. I-131.

b.

The initial secondary coolant iodine concentration is 0.1 yCi/gram of D.E. I-131.

c.

The chemical form of iodine in the primary and secondary coolant is assumed to be elemental.

4 Dose Calculations The following assumptions and parameters were used to calculate the activity released to the atmosphere and the offsite doses following a SGTR.

1.

The mass of reactor coolant discharged into the secondary system through the rupture and the mass of steam released from the intact and ruptured steam generators to the atmosphere are presented in Table II.5 and II.G.

2.

The time dependent fraction of rupture flow that flashes to steam and is immediately released to the environment is presented in Figure III.1.

3.

The time dependent iodine removal efficiency for scrubbing of steam bubbles as'hey rise from the leak site

[(assumed to be at the top of the tube bundle)] 'o the water surface was also determined for each

,1 074v: 1 0/112087

MESTINGHOUSE PROPRIETARY CLASS 2 case., The iodine removal efficiency is determined by the. method suggested by Postma and Tam (Ref. 6).

The iodine removal efficiencies are shown in Figure III.2.

4.

The 0.2 gpm primary to secondary leak is assumed to be split evenly between the steam generators.

5.

The iodine partition factor between the liquid and steam of the ruptured and intact steam generators is assumed to be 1DO.

6.

No credit'as taken for radioactive decay during release and transport, or for cloud depletion by ground deposition during transport to the site boundary or outer boundary of the low population zone.

7.

Short-term atmospheric dispersion factors (x/gs) for accident analysis and breathing rates are provided in Table III.4.

The breathing rates were obtained from NRC Regulatory Guide 1.4, (Ref. 4).

Offsite Th roid Dose Calculation Model Offsite thyroid doses are calculated using the ~uation:

Th gtDCF,. g ( IAR);.

(BR).

(x/()). ]

1 J

where

( IAR)..

=

integrated activity of isotope i released during'the 1J time interval j'n Ci>>

F No credit is taken for cloud depletion by ground deposition or by radioactive decay during transport to the exclusion area boundary or to the outer boundary of the low-population zone.

1074v:1D/112087 45

WESTINGHOUSE PROPRIETARY CLASS 2 (BR)

~

breathing rate during time interval' in meter /second (Table III.4)

(x/Q)

=

atmospheric dispersion factor during time interval j J

in second/meter (Table III.4)

(DCF).

=

thyroid dose conversion factor via inhalation for 1

isotope i in rem/Ci (Table III.5) thyroid dose via inhalation in rem Results Thyroid doses at the Exclusion Area Boundary and Low Population Zone are presented in Table III.6.

All doses are well within the allowable guidelines as specified by Standard Review Plan 15.6e3 and 10CFR100.

1074v:1D/112487 46

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.1 PARAMETERS USED IN EVALUATING THE RADIOLOGICAL CONSEQUENCES OF A STEAM GENERATOR TUBE RUPTURE I.

Source Data A.

Core power level, MWt 1520 B.

Total steam generator tube leakage, prior to accident, gpm 0.2 C.

Reactor coolant iodine activity:

1.

Accident Initiated Spike The initial RC iodine activities based on 1

I

>Ci/gram of D.E. I-131 are presented in Table III.3.

The iodine appearance rates assumed for the accident initiated spike are presented in Table III.2.

2, Pre-Accident Spike Primary coolant iodine activities based on 60 gCi/gram of D.E. I-131 are presented in Table III.3.,

D.

Secondary system initial activity Dose equivalent of 0.1 yCi/gm of I-131, presented in Table III.3.

1074v:1D/112087 47

HESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.l (Sheet 2)

E.

Reactor coolant mass, grams F.

Steam generator mass (each),

grams 1.27 x 10 3.39 x 10 G.

Offsite pow'er Lost at time of reactor trip H.

Primar y-to-secondary leakage duration for intact SG, hrs.

I.

Species of iodine 100 percent elemental II.

Activity Release Data A.

Faulted steam generator 1.

Rupture flow 2.

Rupture flow flashing fraction See Table II.5 or II.G See Figure III.1 3.

Iodine scrubbing plus moisture separator removal efficiency See Figure III.2 4.

Total steam release, lbs See Table II.5 or II.G 5.

Iodine partition factor a.

Prior to overfill b.

After overfill 100

-1.0 - See Figure III.3 6.

Location of tube rupture

[Top of Bundle]

'074v:1 0/1120S7 48

MESTINGHOUSE.PROPRIETARY CLASS 2 TABLE III.1 (Sheet 3)

B.

Intact steam generator 1.

Primary-to-secondary

leakage, gpm 0.1 2.

Total steam release, lbs See Table 11.5 or 11.6 3.

Iodine partition factor 100 C.

Condenser 1.

Iodine partition factor 100 D.

Atmospheric Oispersion Factors See Table III,4 1074v:lo/112087 49

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.2 IODINE SPIKE APPEARANCE RATES (CURIES/SECOND) 1-132 3-133 I"134 0.94 2.22 1.74 3.07 1074v:1D/112087 50

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.3 IODINE SPECIFIC ACTIVITIES IN (yCi/gm) THE PRIMARY AND SECONDARY COOLANT BASED ON 1, 60 AND 0.1 yCi/gram OF D.E. I-131 Nuclide

~Pi t

1 1

~luCD/

m 60 uCi/cDm Secondar Coolant 0,1 wCi/(1m 0.79 47.1 0.079 I-132 0.35 20.7

0. 035 1.01 60.7 0.101 0.20 12.2 0.020 I-135 0.79 47.1 0.079 1074v:1D/1 12087 51

MESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.4 ATMOSPHERIC DISPERSION FACTORS AND BREATHING RATES Time Exclusion Area Boundary Low Population (hours) x/Q (Sec/m

)

3 Zone x/Q (Sec/m

)

3 Breathing Rate (m /Sec) [4]

0-2 2-8 4.8 x 10 3 x 10 3x10 3.47 x 10 3.47 x 10 1074v:1D/112087 52

WESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.5 THYROID DOSE CONVERSION FACTORS (Rem/Curie)

[51 Nuclide

~

I-131 I-134 1.49 x 10 1.43 x 10 2.69 x 10 3.73 x 10 5.60 x 10 1074v:1D/112087 53

NESTINGHOUSE PROPRIETARY CLASS 2 TABLE III.6 RESULTS Ooses Rem Allowable Case 1

Case 2

Guideline Value l.

Accident Initiated Iodine S ike Exclusion Area Boundary (0-2 hr.)

Thyroid 26.4 3.8 30 Low Population Zone (0-8 hr.)

Thyroid 1.7 0.3 30 2.

Pre-Accident Iodine S ike Exclusion Area Boundary (0-2 hr.)

Thyroid 102.1 22.1

300, Low Population Zone (0-8 hr.)

Thyroid 6.4 1.4 300

~

1074v:1D/112487 54

WESTINGHOUSE PROPRIETARY CLASS 2 GINN4 SGTR IS%

TUBE PLUGGING - C4SE R4OIOLOGIC4L CONSEOUENCES EV4LU4TION BREAK FLOW FL4SNING FR4CTION

~ IS Case 1

e.

~ It~Si,tt &

~tt ~S4,lt ~Si TIIC Itttl GINN4 SGTR ISZ TUBE PLUGGING CASE 2

R4O IGLOO I CAL CONSEOUENCES EVALUATION BREAK FLOW FLASHING FR4CTION

~ IS Case 2

~ ItH,tt 14

~ St SI,at ei Tlet ItttI Figure III.1 Break Flow Flashing Fraction 1 074 v:1D/112087 55

HESTINGHOUSE PROPRIETARY CLASS 2 GL,G CASE 1 o5

~ 2 0

8 1eee TINE (SECONDS) 1588 288

~ 5 CASE 2 4Z.(

~ 2 V

M'I 0

1088 TINE ISECONDSI 1508 288 Figure III.2 Srubbing Efficiency 1 074 v:1D/112087

WESTINGHOUSE PROPRIETARY CLASS 2 IE+2 CASE 1 1E+1 20

~a C<LE+8 ZIHE (HOURS) 1.5 JE+2 CASE 2 1E+1 20 C

C+IE+8 TIHE (HOURS)

Figure III.3 Faulted SG Iodine Partition Factors 1074v:1D/112087 57

WESTINGHOUSE PROPRIETARY CLASS 2 IV.

CONCLUSION The potential radiological consequences of a steam generator tube failure were evaluated for the R.E. Ginna nuclear power plant to demonstrate that the use of the Standard Technical Specification (STS) primary coolant activity limit of 1 yCi/gram of dose equivalent I-131 will result. in offsite doses that are within the appropriate guidelines, The mass releases for a design basis double ended rupture of a single tube with a loss of offsite power were conservatively calculated using the computer code LOFTTR2.

Two cases were considered:

[1) intact steam generator PORV fails closed and must be locally 1

opened, and 2) ruptured steam generator PORV fails open and must be locally isolated.] 'he analysis explicitly modeled the time needed for the'perators to perform the recovery steps outlined in guideline E-3 of Revision 1 of the Westinghouse Owners Group Emergency

Response

Guidelines.

The resulting doses at the exclusion area boundary and low population zone are within the allowable guidelines as specified by Standard Review Plan 15.6.3 and 10CFR100.

Consequently, the STS primary coolant activity limit is sufficiently low to ensure that the radiological consequences of a steam generator tube rupture at the R.E, Ginna plant will be within the guidelines.

1074v:1D/112087 58

HESTINGHOUSE PROPRIETARY CLASS 2 V.

REFERENCES 1.

Lewis, Huang, Behnke, Fittante,

Gelman, "SGTR Analysis Methodology to Determine the Margin to Steam Generator Overfill," HCAP-10698-P-A, August 1987.

[PROPRIETARY'.

Lewis, Huang, Rubin, "Evaluation of Offsite Radiation Doses for a Steam Generator Tube Rupture Accident," Supplement 1 to HCAP-10698-P-A, March 1986.

[PROPRIETARY]

3.

R. Elaisz, Letter from RGE to Hestinghouse concerning Ginna specific operator action times for SGTR analysis, February 7,

1985.

4.

NRC Regulatory Guide 1.4, Rev.

2, "Assumptions Used for Evaluating the Potential Radiological Consequences of a LOCA for Pressurized Hater Reactors",

Jun'e 1974.

5.

NRC Regulatory Guide 1. 109, Rev.

1, "Calculation of Annual Doses to Man From Routine, Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50 Appendix I", October 1977.

6.

Postma, A. K., Tam, P. S., "Iodine Behavior in a PHR Cooling System Following a Postulated Steam Generator Tube Rupture",

NUREG-0409.

1074v:1D/120487 59