ML17325A842: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'ACCELERATED | {{#Wiki_filter:'ACCELERATED DISIItBUTION DEMONSTRAON SYSTEM rtrt rt REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
ACCESSION NBR:8806280047 | DOCKET I 05000316 ACCESSION NBR:8806280047 DOC.DATE: 88/06/23 NOTARIZED: NO FACIL:50-316 Donald C. | ||
AUTH. NAME | Cook Nuclear Power Plant, Unit 2, Indiana AUTH.NAME AUTHOR AFFXLIATION'LEXICH,M.P. | ||
RECIP.NAME | Xndiana Michigan Power Co. (formerly Indiana | ||
& Michigan Ele RECIP.NAME RECIPXENT AFFILIATION MURLEY,T.E. | |||
Document Control Branch (Document Control Desk) | |||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards "Steam Generator Repair Project Radiation Protection 90 Day Interim Rept 1," for 880216-0516. | Forwards "Steam Generator Repair Project Radiation Protection 90 Day Interim Rept 1," for 880216-0516. | ||
TITLE: OR Submittal: General Distribution | DISTRIBUTION CODE: | ||
AOOID COPIES RECEIVED:LTR J ENCL Q SIZE: + | |||
TITLE: OR Submittal: | |||
General Distribution NOTES: | |||
R I | |||
,, "'ECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NU~S-ABSTRACT EG F 01 | |||
: COPIES, | |||
'TTR. | |||
ENCL 1 | |||
INTERNAL: ARM/DAF/LFMB | 0 1 | ||
1 II 1 | |||
0 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
0 | |||
'1 1 | |||
,'i 'RECIPIENT i | |||
","'OPIES," | |||
i ID CODE/NAME 'TTR ENCLrt""~ | |||
PD3-1 PD 5 | |||
5 I | |||
A EXTERNAL: LPDR NSIC 1 | |||
1 1 | |||
1 NRC PDR 1 | |||
1 S | |||
'A D | |||
I I | I I | ||
TOTAL NUMBER OF COPIES REQUIRED: LTTR | TOTAL NUMBER OF COPIES REQUIRED: | ||
LTTR 22 ENCL 19 | |||
f | f | ||
~)t I | ~)t I | ||
lr IT I | lr IT I | ||
I | I I | ||
Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC'0980M Donald C. Cook Nuclear Plant Unit | Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC'0980M Donald C. | ||
Cook Nuclear Plant Unit 2 Docket: No. 50-316 License No. | |||
DPR-74 STEAM GENERATOR REPAIR PROJECT RADIATION PROTECTION 90-DAY INTERIM REPORT NO. | |||
1 U.S. Nuclear Regulatory Commission ATTN: | |||
Document Control Desk Washington, D.C. | |||
20555 ATTN: | |||
T. | |||
E. Murley June 23, 1988 | |||
==Dear Dr. Murley:== | ==Dear Dr. Murley:== | ||
As required by section 7.3 of the Safety Evaluation by the Office of Nuclear Reactor Regulation related to Amendment No. | |||
As | 100 to Facility License No. DPR-74, enclosed is one copy of the Steam Generator Repair Project Radiation Protection 90-Day Interim Report No. | ||
This report summarizes the activities of the Project Radiation Protection/ALARA Group (PRPAG) for the period February 16, 1988, to May 16, 1988. | 1. | ||
This report summarizes the activities of the Project Radiation Protection/ALARA Group (PRPAG) for the period February 16, | |||
: 1988, to May 16, 1988. | |||
These activities included procedure development, ALARA reviews of work packages, training, radwaste control, installation of a computerized radiation work permit and dose tracking system (PRISM), and NVLAP accreditation of our TLD processing laboratory. | |||
Attachment 1 to this letter provides a detailed discussion of these activities. | Attachment 1 to this letter provides a detailed discussion of these activities. | ||
The | The collective occupational exposure estimate for the Steam Generator Repair Project remains at 1733 man-rem. | ||
,J'806280047 | The Project ALARA group tracks exposure on a per shift basis and reports the totals weekly in the Project ALARA Committee and the Project Management weekly meetings. | ||
Attachment 2 to this letter provides a comparison, on a weekly basis, of the actual man-rem expended versus the estimated man-rem expenditure. | |||
The reported weekly estimate is derived by calculating the job percent complete based on actual man-hours compared to 512,691 total Project RWP hours. | |||
The estimated man-rem expenditure through May 19, | |||
: 1988, was 43.5 man-rem. | |||
Actual man-rem expenditure for this time period was 12.906 man-rem. | |||
The difference between actual and estimated accumulative exposure can be traced to | |||
,J'806280047 880623 1 | |||
l PDR ADOCK 05000316 P | |||
DCD | |||
Dr. T. E. Murley | Dr. T. E. Murley AEP:NRC:0980M the fact that most of the preparatory work to date took place in extremely low dose areas. | ||
The | As the Project moves into the removal | ||
: phase, tasks should accrue exposure at a rate closer to the estimated average effective dose rate (task exposure/task RWP hours). | |||
The Radiation Protection 90-Day Interim Report No. 2, which will cover the period May 17, 1988, to August 18, 1988, will be provided to you by September 16, 1988. | |||
This document has been prepared following corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned. | This document has been prepared following corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned. | ||
Sincerely, M. | Sincerely, M. | ||
W. G. Smith, Jr. | . Ale ich Vice President edg Attachments cc: | ||
D. H. Williams, Jr. | |||
W. | |||
G. Smith, Jr. | |||
- Bridgman R. | |||
C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector | |||
- Bridgman A. B. Davis, NRC Region | |||
ATTACHMENT 1 TO AEP:NRC:0980M COOK NUCLEAR PLANT, UNIT 2 STEAM GENERATOR REPAIR PROJECT RADIATION PROTECTION 90-DAY INTERIM REPORT NO. 1 1.0 | ATTACHMENT 1 TO AEP:NRC:0980M COOK NUCLEAR PLANT, UNIT 2 STEAM GENERATOR REPAIR PROJECT RADIATION PROTECTION 90-DAY INTERIM REPORT NO. | ||
2.0 | 1 1.0 Introduction Indiana Michigan Power Company is repairing the four steam generators at the Cook Nuclear Plant unit 2 which suffered secondary side tube degradation due to intergranular attack/stress corrosion cracking at the tube support plate and tube sheet regions. | ||
3.0 | Since this type of large-scale maintenance has the potential for individual and collective radiation exp'osures beyond that of routine maintenance, the NRC received a description of the project's planned radiation protection program as part of the Steam Generator Repair Report submitted November 7, | ||
To date 349 whole body counts and 177 been performed. | : 1986, and revised on March 30, July 24, October 30, December 4, | ||
: 1987, and February 18, 1988. | |||
A | The implementation of the Radiation Protection Program as of May 16, 1988, is provided below. | ||
5.0 PRISM | 2.0 Pro rams and Procedures The Project Radiation Protection/ALARA Group (PRPAG) completed and issued 88 project-specific procedures to control the radiation protection and radwaste aspects of the Repair Project. | ||
The procedures cover seven functional areas: | |||
operational radiation" protection, ALARA, dosimetry, training, support services, PRISM and radwaste. | |||
The status of each functional area is identified below. | |||
3.0 | |||
~Dosimet PRPAG dosimetry staff completed the development, installation and National Voluntary Laboratory Accreditation Program (NVLAP) accreditation of the TLD processing laboratory. | |||
Final NVLAP approval was received April 28, 1988. | |||
Project personnel were badged under the new system on May 1, 1988, at which time the dosimetry records staff completed program development for dosimetry recordkeeping, whole body counting and respirator fit testing. | |||
To date 349 whole body counts and 177 respirator fit tests have been performed. | |||
4.0 Training The PRPAG Training Staff completed the development and implementation of 29 training modules covering: | |||
General Employees Training (GET), Project-Specific Training, Supervisor ALARA Training and Radiation Protection Technician Training. | |||
The training of 89 Radiation Protection Personnel has been completed. | |||
A total of 341 personnel have attended PRPAG GET training sessions. | |||
5.0 PRISM is a computerized radiation work permit and dose tracking system. | |||
The PRISM System installation was completed on | |||
Page 2 November 16, 1987, and became | Page 2 | ||
6.0 | November 16, | ||
7.0 | : 1987, and became the system of record dose on April 1, 1988, for the SGRP project. | ||
8.0 | Fine tuning of report formats and the incorporation of user identified needs is on-going. | ||
: 9. 0 | 6.0 0 e at onal Radiation Protectio The PRPAG-Operational Radiation Protection Group has completed program development, begun staff augmentation and completed the set-up of Radiation Protection areas in the new Containment Access Building (CAB). | ||
The PRPAG ALARA Group completed 82 planning stage work package ALARA | This included the counting room (2 HPGi counters and 1 proportional counter), | ||
Thirty-seven shielding and four containment requests have been received and are in progress. Five pre-job briefings have been performed. | the instrument area, the Radiation Work Permit area (PRISM terminals and office areas), | ||
personnel decontamination areas and access/egress routes into the Radiation Control Area. | |||
Staffing levels during the period grew to 65 technicians to support Project work activities. | |||
There have been three personnel contaminations, one exposure investigation (lost TLD) and one Radiological Occurrence Peport during the period. | |||
7.0 Su ort Services Arrangements for the purchase or lease of protective clothing, expendable | |||
: supplies, support facilities and equipment continued during the period. | |||
On April 14, | |||
: 1988, 14 Support Services Technicians completed initial training. | |||
The mobile respirator cleaning/repair facility was received on April 18, | |||
: 1988, and was available for use May 13, 1988. | |||
An initial stock of 440 respirators have been made available for service. | |||
8.0 Radwaste The Radwaste Group completed development of the Project Radwaste Plan in January 1988. | |||
Major objectives of this plan called for construction of a Radwaste Support Building, contracting for off-site processing | |||
: services, implementation of a computerized Waste Tracking and Manifesting System, and development of program procedures. | |||
The construction of the Radwaste Support Building began February 26, | |||
: 1988, and was completed May 16, 1988. | |||
A contract was awarded for off-site processing of Radwaste. | |||
A contract was awarded for the purchase of a computerized Waste Tracking and Manifesting System and installation of the system was scheduled for May 17 and 18, 1988. | |||
Nine Radwaste Procedures have been developed and issued. | |||
The first Radwaste Technicians arrived on-site May 2, 1988, and completed training on May 16, 1988. | |||
: 9. 0 ALA~ | |||
The PRPAG ALARA Group completed 82 planning stage work package ALARA reviews out of a total 126. | |||
During these reviews hold points, special ALARA Notes and Cautions and'training requirements were introduced into the work packages. | |||
Thirty-seven shielding and four containment requests have been received and are in progress. | |||
Five pre-job briefings have been performed. | |||
SGRP PREPARA TION PHA SE PERSONNEL EXPOSURES - ESTIMA TEO vs. ACTUAL | 40 SGRP PREPARA TION PHA SE PERSONNEL EXPOSURES - ESTIMA TEO vs. ACTUAL | ||
: 43. 8 tK2 ESTIMATE | : 43. 8 tK2 ESTIMATE | ||
~ ACTUAL 35~ | |||
r p 20 | g 3o-I 25~ | ||
r p 20 Z9. 8 3 1.0 34.4 | |||
: 0. t 04/22 | ~oJ | ||
: 0. t 04/22 12.9 1.9 2.8 4.8 04/28 05/ 12 05/05 WEEK 05/ 19 NOTE: ESTIMATE VALUES DERIVED FROM PROJECT COMPLETE BY RWP HOURS | |||
1 ~ A}} | 1 | ||
~ | |||
A}} | |||
Latest revision as of 15:39, 7 January 2025
| ML17325A842 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/23/1988 |
| From: | Alexich M INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| AEP:NRC:0980M, AEP:NRC:980M, NUDOCS 8806280047 | |
| Download: ML17325A842 (9) | |
Text
'ACCELERATED DISIItBUTION DEMONSTRAON SYSTEM rtrt rt REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET I 05000316 ACCESSION NBR:8806280047 DOC.DATE: 88/06/23 NOTARIZED: NO FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana AUTH.NAME AUTHOR AFFXLIATION'LEXICH,M.P.
Xndiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPXENT AFFILIATION MURLEY,T.E.
Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Steam Generator Repair Project Radiation Protection 90 Day Interim Rept 1," for 880216-0516.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR J ENCL Q SIZE: +
TITLE: OR Submittal:
General Distribution NOTES:
R I
,, "'ECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NU~S-ABSTRACT EG F 01
- COPIES,
'TTR.
ENCL 1
0 1
1 II 1
0 1
1 1
1 1
1 1
1 1
1 NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB 1
1 1
1 1
1 1
1 1
0
'1 1
,'i 'RECIPIENT i
","'OPIES,"
i ID CODE/NAME 'TTR ENCLrt""~
PD3-1 PD 5
5 I
A EXTERNAL: LPDR NSIC 1
1 1
1 NRC PDR 1
1 S
'A D
I I
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 19
f
~)t I
lr IT I
I I
Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC'0980M Donald C.
Cook Nuclear Plant Unit 2 Docket: No. 50-316 License No.
DPR-74 STEAM GENERATOR REPAIR PROJECT RADIATION PROTECTION 90-DAY INTERIM REPORT NO.
1 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 ATTN:
T.
E. Murley June 23, 1988
Dear Dr. Murley:
As required by section 7.3 of the Safety Evaluation by the Office of Nuclear Reactor Regulation related to Amendment No.
100 to Facility License No. DPR-74, enclosed is one copy of the Steam Generator Repair Project Radiation Protection 90-Day Interim Report No.
1.
This report summarizes the activities of the Project Radiation Protection/ALARA Group (PRPAG) for the period February 16,
- 1988, to May 16, 1988.
These activities included procedure development, ALARA reviews of work packages, training, radwaste control, installation of a computerized radiation work permit and dose tracking system (PRISM), and NVLAP accreditation of our TLD processing laboratory.
Attachment 1 to this letter provides a detailed discussion of these activities.
The collective occupational exposure estimate for the Steam Generator Repair Project remains at 1733 man-rem.
The Project ALARA group tracks exposure on a per shift basis and reports the totals weekly in the Project ALARA Committee and the Project Management weekly meetings.
Attachment 2 to this letter provides a comparison, on a weekly basis, of the actual man-rem expended versus the estimated man-rem expenditure.
The reported weekly estimate is derived by calculating the job percent complete based on actual man-hours compared to 512,691 total Project RWP hours.
The estimated man-rem expenditure through May 19,
- 1988, was 43.5 man-rem.
Actual man-rem expenditure for this time period was 12.906 man-rem.
The difference between actual and estimated accumulative exposure can be traced to
,J'806280047 880623 1
l PDR ADOCK 05000316 P
Dr. T. E. Murley AEP:NRC:0980M the fact that most of the preparatory work to date took place in extremely low dose areas.
As the Project moves into the removal
- phase, tasks should accrue exposure at a rate closer to the estimated average effective dose rate (task exposure/task RWP hours).
The Radiation Protection 90-Day Interim Report No. 2, which will cover the period May 17, 1988, to August 18, 1988, will be provided to you by September 16, 1988.
This document has been prepared following corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Sincerely, M.
. Ale ich Vice President edg Attachments cc:
D. H. Williams, Jr.
W.
G. Smith, Jr.
- Bridgman R.
C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector
- Bridgman A. B. Davis, NRC Region
ATTACHMENT 1 TO AEP:NRC:0980M COOK NUCLEAR PLANT, UNIT 2 STEAM GENERATOR REPAIR PROJECT RADIATION PROTECTION 90-DAY INTERIM REPORT NO.
1 1.0 Introduction Indiana Michigan Power Company is repairing the four steam generators at the Cook Nuclear Plant unit 2 which suffered secondary side tube degradation due to intergranular attack/stress corrosion cracking at the tube support plate and tube sheet regions.
Since this type of large-scale maintenance has the potential for individual and collective radiation exp'osures beyond that of routine maintenance, the NRC received a description of the project's planned radiation protection program as part of the Steam Generator Repair Report submitted November 7,
- 1986, and revised on March 30, July 24, October 30, December 4,
- 1987, and February 18, 1988.
The implementation of the Radiation Protection Program as of May 16, 1988, is provided below.
2.0 Pro rams and Procedures The Project Radiation Protection/ALARA Group (PRPAG) completed and issued 88 project-specific procedures to control the radiation protection and radwaste aspects of the Repair Project.
The procedures cover seven functional areas:
operational radiation" protection, ALARA, dosimetry, training, support services, PRISM and radwaste.
The status of each functional area is identified below.
3.0
~Dosimet PRPAG dosimetry staff completed the development, installation and National Voluntary Laboratory Accreditation Program (NVLAP) accreditation of the TLD processing laboratory.
Final NVLAP approval was received April 28, 1988.
Project personnel were badged under the new system on May 1, 1988, at which time the dosimetry records staff completed program development for dosimetry recordkeeping, whole body counting and respirator fit testing.
To date 349 whole body counts and 177 respirator fit tests have been performed.
4.0 Training The PRPAG Training Staff completed the development and implementation of 29 training modules covering:
General Employees Training (GET), Project-Specific Training, Supervisor ALARA Training and Radiation Protection Technician Training.
The training of 89 Radiation Protection Personnel has been completed.
A total of 341 personnel have attended PRPAG GET training sessions.
5.0 PRISM is a computerized radiation work permit and dose tracking system.
The PRISM System installation was completed on
Page 2
November 16,
- 1987, and became the system of record dose on April 1, 1988, for the SGRP project.
Fine tuning of report formats and the incorporation of user identified needs is on-going.
6.0 0 e at onal Radiation Protectio The PRPAG-Operational Radiation Protection Group has completed program development, begun staff augmentation and completed the set-up of Radiation Protection areas in the new Containment Access Building (CAB).
This included the counting room (2 HPGi counters and 1 proportional counter),
the instrument area, the Radiation Work Permit area (PRISM terminals and office areas),
personnel decontamination areas and access/egress routes into the Radiation Control Area.
Staffing levels during the period grew to 65 technicians to support Project work activities.
There have been three personnel contaminations, one exposure investigation (lost TLD) and one Radiological Occurrence Peport during the period.
7.0 Su ort Services Arrangements for the purchase or lease of protective clothing, expendable
- supplies, support facilities and equipment continued during the period.
On April 14,
- 1988, 14 Support Services Technicians completed initial training.
The mobile respirator cleaning/repair facility was received on April 18,
- 1988, and was available for use May 13, 1988.
An initial stock of 440 respirators have been made available for service.
8.0 Radwaste The Radwaste Group completed development of the Project Radwaste Plan in January 1988.
Major objectives of this plan called for construction of a Radwaste Support Building, contracting for off-site processing
- services, implementation of a computerized Waste Tracking and Manifesting System, and development of program procedures.
The construction of the Radwaste Support Building began February 26,
- 1988, and was completed May 16, 1988.
A contract was awarded for off-site processing of Radwaste.
A contract was awarded for the purchase of a computerized Waste Tracking and Manifesting System and installation of the system was scheduled for May 17 and 18, 1988.
Nine Radwaste Procedures have been developed and issued.
The first Radwaste Technicians arrived on-site May 2, 1988, and completed training on May 16, 1988.
- 9. 0 ALA~
The PRPAG ALARA Group completed 82 planning stage work package ALARA reviews out of a total 126.
During these reviews hold points, special ALARA Notes and Cautions and'training requirements were introduced into the work packages.
Thirty-seven shielding and four containment requests have been received and are in progress.
Five pre-job briefings have been performed.
40 SGRP PREPARA TION PHA SE PERSONNEL EXPOSURES - ESTIMA TEO vs. ACTUAL
- 43. 8 tK2 ESTIMATE
~ ACTUAL 35~
g 3o-I 25~
r p 20 Z9. 8 3 1.0 34.4
~oJ
- 0. t 04/22 12.9 1.9 2.8 4.8 04/28 05/ 12 05/05 WEEK 05/ 19 NOTE: ESTIMATE VALUES DERIVED FROM PROJECT COMPLETE BY RWP HOURS
1
~