ML18010B013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML18010B013
| number = ML18010B013
| issue date = 01/31/1993
| issue date = 01/31/1993
| title = Monthly Operating Rept for Jan 1993 for Harris Nuclear Plant Unit 1.W/930211 Ltr
| title = Monthly Operating Rept for Jan 1993 for Harris Nuclear Plant Unit 1
| author name = Crenshaw A, Vaughn G
| author name = Crenshaw A, Vaughn G
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~ - =-
{{#Wiki_filter:~ -
ACCEI i
=-
AUTH. NAME CRENSHAW,A.
ACCEIERAT DOCUMENT DIST UTION SYSTEM i
REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)
>>>>7.:~:
*8 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power S Light Co.
VAUGHN,G.E.
VAUGHN,G.E.
RECIP.NAME ERAT REGULAT
Carolina Power
                      >>>>7 AUTHOR AFFILIATION Carolina Power Carolina Power
& Light Co.
                        'ECIPIENT
RECIP.NAME
                                              .:~:
'ECIPIENT AFFILIATION R'i
DOCUMENT DIST INFORMATION DISTRIBUTIO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina S
Light Light AFFILIATION Co.
Co.
UTION SYSTEM STEM (RIDS)
                                                                                                  *8 05000400 R'i


==SUBJECT:==
==SUBJECT:==
Monthly o         ing rept for Jan 1993 for Harris Nuclear Plant Unit l. 930211     tr.                                                           D DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR             ENCL       SIZE:
Monthly o ing rept for Jan 1993 for Harris Nuclear Plant Unit l.
930211 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application     for permit renewal filed.                                       05000400
D NOTES:Application for permit renewal filed.
                  'ECIPIENT             COPIES                RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL            ID  CODE/NAME      LTTR ENCL PD2-1 LA                   3      3      PD2-1 PD                1    1            D LE,N                       1      1 D
05000400
INTERNAL: ACRS                           10      10        AEOD/DOA                1    1
'ECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS
              'AEOD/DSP/TPAB NRR/DOEA/OEAB 1
'AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EGStG BRYCE g J ~ H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1        'E~DLPQ/LPEB10 NR~R 01 1
1 1
1 1
1           S, RGN2                        1       1 EXTERNAL      EGStG BRYCE g J ~ H        1       1       NRC PDR                 1     1 NSIC                        1       1 I
1 1
i D
1 1
D NOTE TO ALL"RIDS", RECIPIENTS:
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NR~R DLPQ/LPEB10
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                   24   ENCL   24
'E~
 
01 NRC PDR COPIES LTTR ENCL 1
  '0 p      II                    a
1 1
* l g
1 1
                  ~  1
1 1
                        ~ k, 2
1 1
          ~
1 D
(~ -'.<<'g,ega t
D S,
I D
i D
NOTE TO ALL"RIDS", RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI D
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24


CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hill NC 27562
p
                                                                  ~
'0 II a
G.E. VAUGHN Vce President Hanis Nudear Plant FEB f t f99 File Number:    SHF/10-15505 Letter  Number:    H0931005 Document Control Desk United States Nuclear Regulatory Commission Washington,   DC  20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
g l
~
1
~ k,
( ~
t
~
-'.<<'g,ega 2


==Dear  Sirs:==
CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hill~ NC 27562 G.E. VAUGHN Vce President Hanis Nudear Plant FEB f t f99 File Number:
SHF/10-15505 Letter Number:
H0931005 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT


In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Powe'r 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of January 1993.
==Dear Sirs:==
Yours very truly, G. E. Vaughn Vice President Harris Nuclear Plant
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
            , APC:kjc Enclosure cc: Mr. S. D. Ebneter (NRC-RII)t.
1, Carolina Powe'r 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of January 1993.
Mr. J. E. Tedrow (NRC-SHNPP) 18.130 MIS/MTH-OPR.RPT/1/OS4                                                             P ~I
Yours very truly, G.
(     9SOEX90ZV7 VSOisi.
E. Vaughn Vice President Harris Nuclear Plant
PDR   ADOCK   05000400 R               ~   FDR
, APC:kjc Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)t.
Mr. J.
E. Tedrow (NRC-SHNPP) 18.130 MIS/MTH-OPR.RPT/1/OS4
(
9SOEX90ZV7 VSOisi.
PDR ADOCK 05000400 R
~
FDR P
~I


      ~ I
~
~b J )
I
~b J
)


                      .0,                         DOCKET NO.:             050-400 UNIT:             Harris Unit   1 DATE:             January 1993 COMPLETED BY:   Amanda Crenshaw OPERATIONS  
.0, DOCKET NO.:
050-400 UNIT:
Harris Unit 1 DATE:
January 1993 COMPLETED BY:
Amanda Crenshaw OPERATIONS


==SUMMARY==
==SUMMARY==
 
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 100.9 percent     Capacity Factor. There was one significant power reduction. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
100.9 percent Capacity Factor.
There are 157 fuel assemblies in the reactor vessel and 847 spent fuel assemblies stored in the spent fuel pools. 413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.       210 of the spent fuel assemblies are from CPSL's Robinson Plant.
There was one significant power reduction.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel and 847 spent fuel assemblies stored in the spent fuel pools.
413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.
210 of the spent fuel assemblies are from CPSL's Robinson Plant.
MISXMTH-OPR.RPTX2%OS4
MISXMTH-OPR.RPTX2%OS4


CPhL CO ~                       ANT PERFORMANCE DATA SYSTEM                      PAGE RUH DATE     82/05/93             OPERATIHG DATA REPORT                          RPD36-000 RUH TIME     >8:57:23               HARRIS UNIT   1 DOCKET HO. 858-400 COMPLETED BY AMAHDA CREHBHAW OPERATING STATUS                                        TELEPHONE   (919)362-2888 UNIT NAME:   HARRIS UNIT 1                       NOTES
CPhL CO
: 2. REPORTING PERIOD: JANUARY     93               I
~
: 3. LICENSED THERMAL POWER (MWT): 2775               See Operations Summary.
RUH DATE 82/05/93 RUH TIME
: 4. NAMEPLATE RATING (GROSS MWE): 950.9             I
>8:57:23 ANT PERFORMANCE DATA SYSTEM OPERATIHG DATA REPORT HARRIS UNIT 1
: 5. DESIGN ELECTRICAL RATIHG <NET MWE): 980.0
PAGE RPD36-000 OPERATING STATUS DOCKET HO. 858-400 COMPLETED BY AMAHDA CREHBHAW TELEPHONE (919)362-2888 UNIT NAME:
: 6. MAX DEPENDABLE CAPACITY <GROSS MWE): 928.0
HARRIS UNIT 1
: 7. MAX DEPENDABLE CAPACITY <NET MWE): 860.8 8   IF CHAHGES OCCUR IH CAPACITY RATIHGS (ITEMS 3 THRU 7) BIHCE LAST REPORT i GIVE REASONS:   None.
NOTES 2.
POWER LEVEL TO WHICH RESTRICTED   IF ANY <HET MWE):    None.
REPORTING PERIOD:
3 8. REASONS FOR RESTRICTION IF AHY:      N/A THIS          YR TO          CUMUL MON'EH          DATE          ATIVE HOURS IH REPORTIHG PERIOD                  744.80          744.00          50449.08 1 2. NUMBER OF HOURS REACTOR CRITICAL            744.00          744.00          48312.98
JANUARY 93 I
: 13. REACTOR RESERVE SHUTDOWN HRS                    .00              .00              .00 HOURS GENERATOR ON LIHE                    744.00          744.00          39888.18
3.
  $ 5. UNIT RESERVE SHUTDOWN HOURS                    .08              .00              .00
LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.
: 16. GROSS THERMAL EHERGY GEH. (MWH)        2806564.76      2006564.76    $ 85357678.28
4.
: 17. GROSS ELEC. ENERGY GEH. (MWH)            688813.88      688833.88      35182854.88
NAMEPLATE RATING (GROSS MWE): 950.9 I
: 18. HET ELEC. ENERGY GENERATED (MWH)        645579.00      645579.00      32651255.88 UNIT SERVICE FACTOR                        388.88          188.88            78.89
5.
: 20. UNIT AVAILABILITYFACTOR                      388.88          188.88            78.89 2$  . UNIT CAP. FACTOR (USING  MDC HET)          188.90          188.98            75.26
DESIGN ELECTRICAL RATIHG <NET MWE): 980.0 6.
: 22. UNIT CAP. FACTOR (USING DER NET)              96.43            96.43            71.93
MAX DEPENDABLE CAPACITY <GROSS MWE): 928.0 7.
: 23. UNIT FORCED OUTAGE RATE                          .80              .00            3.98
MAX DEPENDABLE CAPACITY <NET MWE): 860.8 8
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE,        AHD DURATION OF EACH):
IF CHAHGES OCCUR IH CAPACITY RATIHGS (ITEMS 3 THRU 7)
BIHCE LAST REPORT i GIVE REASONS:
None.
POWER LEVEL TO WHICH RESTRICTED IF ANY <HET MWE):
None.
None.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
3 8.
: 26. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
REASONS FOR RESTRICTION IF AHY:
N/A THIS MON'EH YR TO DATE CUMUL ATIVE HOURS IH REPORTIHG PERIOD 1 2.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LIHE
$ 5.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL EHERGY GEH.
(MWH) 17.
GROSS ELEC.
ENERGY GEH.
(MWH) 18.
HET ELEC.
ENERGY GENERATED (MWH)
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 2$. UNIT CAP.
FACTOR (USING MDC HET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
744.80 744.00
.00 744.00
.08 2806564.76 688813.88 645579.00 388.88 388.88 188.90 96.43
.80 (TYPE,
: DATE, 744.00 744.00
.00 744.00
.00 2006564.76 688833.88 645579.00 188.88 188.88 188.98 96.43
.00 AHD DURATION 50449.08 48312.98
.00 39888.18
.00
$ 85357678.28 35182854.88 32651255.88 78.89 78.89 75.26 71.93 3.98 OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT
: PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
HIS/MTH-OPR, RPT/3/OS4
HIS/MTH-OPR, RPT/3/OS4


F ~
F
~
A 4'
A 4'


'CPM   CO "               ~   AHT PERFORMANCE DATA SYSTEM                 PAGE RUH DATE   02/05/93   APPENDIX B AVERAGE DAILY POWER LEVEL             RPD39-000 RUH TIME   -1 0: 57: 22             HARRIS UNIT I DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAW TELEPHONE (919)362-2808 JANUARY            <993 i
'CPM CO "
DAY   AVG. DAILY POWER LEVEL          DAY  AVG. DAILY POWER LEVEL (MWE-HET)                            (MWE-NET) 884                                  886 879                 18             887 878                                  887 877                  20              887 875                  21              884 886                                  884 593                                  885 677                                  880 884                                  888 10                890                                  887 888                                  886 888                  28              884 883                                 883 30              867 888 887 3 ~ 16 8 MIS/MTH-OPR.RPT/4/OS4
~
AHT PERFORMANCE DATA SYSTEM RUH DATE 02/05/93 APPENDIX B AVERAGE DAILY POWER LEVEL RUH TIME
-1 0: 57: 22 HARRIS UNIT I PAGE RPD39-000 JANUARY
<993 DAY AVG. DAILY POWER LEVEL (MWE-HET) 884 DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAW TELEPHONE (919)362-2808 i
DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 10 879 878 877 875 886 593 677 884 890 888 888 883 888 887 18 20 21 28 30 887 887 887 884 884 885 880 888 887 886 884 883 867 3
~ 16 8
MIS/MTH-OPR.RPT/4/OS4


                                                                                                                                                    'I
~
                                                                                                                                                  ~
'I UNIT SHUTDOWNS AND POWER REDUCTION IO F
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:                           Harris, I
O REPORT MONTH: January 1993 UNIT NAME:
DATE:                             02/04/93 O                                                                                                    COMPLETED BY:              A. P. Crenshaw F                                                                                                    TELEPHONE:                (919) 362-2808 REPORT MONTH: January  1993 O
DATE:
COMPLETED BY:
TELEPHONE:
: Harris, 02/04/93 A. P. Crenshaw (919) 362-2808 No.
Date y
P e
Duration (Hours)
R~
R~
e a
e a
y                    s       Method of   Licensee P    Duration      0      Shutting Down   Event      System    Component        Cause and Corrective Action No.        Date  e      (Hours)                Reactor~   Report &#xb9;     Code 4     Code 5             to Prevent Recurrence 93401     930107   F         0.0       A                       N/A         CB       VALVE   Reduced unit power to 10% to repair Steam Generator "A" bowl drain isolation valves. Valves were tightened and the drain plug downstream of the valves was replaced. Unit was returned to 100% power on January 8, 1993.
s 0
1                   2                                                      3                    4
Method of Shutting Down Reactor~
  .F: Forced           Reason:                                                Method:              Exhibit G-Instructions S: Scheduled ~
Licensee Event Report &#xb9; System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence 93401 930107 F
A-Equipment Failure (Explain)                           1-Manual              for Preparation of Data B-Maintenance or Test                                   2-Manual Scram        Entry Sheets for Licensee C-Refueling                                             3-Automatic Scram    Event Report (LER) File D-Regulatory Restriction                               4-Continued          (NUREG+1 51)
0.0 A
E-Operator Training 5 License Examination               5-Reduced Load F-Administrative                                        6-Other               5 G-Operational Error (Explain)                                                 Exhibit 1 -Same Source H-Other (Explain)
N/A CB VALVE Reduced unit power to 10% to repair Steam Generator "A" bowl drain isolation valves.
Valves were tightened and the drain plug downstream of the valves was replaced.
Unit was returned to 100% power on January 8, 1993.
1
.F:
Forced S:
Scheduled
~
2 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG+1 51) 5 Exhibit 1 -Same Source


~   j,     ).
~
        ~ ~
j,
  ~r 4}}
).
~
~
~r 4}}

Latest revision as of 06:38, 7 January 2025

Monthly Operating Rept for Jan 1993 for Harris Nuclear Plant Unit 1
ML18010B013
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/31/1993
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931005, NUDOCS 9302190227
Download: ML18010B013 (10)


Text

~ -

=-

ACCEIERAT DOCUMENT DIST UTION SYSTEM i

REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

>>>>7.:~:

  • 8 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

Carolina Power S Light Co.

VAUGHN,G.E.

Carolina Power

& Light Co.

RECIP.NAME

'ECIPIENT AFFILIATION R'i

SUBJECT:

Monthly o ing rept for Jan 1993 for Harris Nuclear Plant Unit l.

930211 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES:Application for permit renewal filed.

05000400

'ECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS

'AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EGStG BRYCE g J ~ H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NR~R DLPQ/LPEB10

'E~

01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D S,

I D

i D

NOTE TO ALL"RIDS", RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

p

'0 II a

g l

~

1

~ k,

( ~

t

~

-'.<<'g,ega 2

CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hill~ NC 27562 G.E. VAUGHN Vce President Hanis Nudear Plant FEB f t f99 File Number:

SHF/10-15505 Letter Number:

H0931005 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Powe'r 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of January 1993.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Plant

, APC:kjc Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)t.

Mr. J.

E. Tedrow (NRC-SHNPP) 18.130 MIS/MTH-OPR.RPT/1/OS4

(

9SOEX90ZV7 VSOisi.

PDR ADOCK 05000400 R

~

FDR P

~I

~

I

~b J

)

.0, DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

January 1993 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a

100.9 percent Capacity Factor.

There was one significant power reduction.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 847 spent fuel assemblies stored in the spent fuel pools.

413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.

210 of the spent fuel assemblies are from CPSL's Robinson Plant.

MISXMTH-OPR.RPTX2%OS4

CPhL CO

~

RUH DATE 82/05/93 RUH TIME

>8:57:23 ANT PERFORMANCE DATA SYSTEM OPERATIHG DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 858-400 COMPLETED BY AMAHDA CREHBHAW TELEPHONE (919)362-2888 UNIT NAME:

HARRIS UNIT 1

NOTES 2.

REPORTING PERIOD:

JANUARY 93 I

3.

LICENSED THERMAL POWER (MWT): 2775 See Operations Summary.

4.

NAMEPLATE RATING (GROSS MWE): 950.9 I

5.

DESIGN ELECTRICAL RATIHG <NET MWE): 980.0 6.

MAX DEPENDABLE CAPACITY <GROSS MWE): 928.0 7.

MAX DEPENDABLE CAPACITY <NET MWE): 860.8 8

IF CHAHGES OCCUR IH CAPACITY RATIHGS (ITEMS 3 THRU 7)

BIHCE LAST REPORT i GIVE REASONS:

None.

POWER LEVEL TO WHICH RESTRICTED IF ANY <HET MWE):

None.

3 8.

REASONS FOR RESTRICTION IF AHY:

N/A THIS MON'EH YR TO DATE CUMUL ATIVE HOURS IH REPORTIHG PERIOD 1 2.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LIHE

$ 5.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL EHERGY GEH.

(MWH) 17.

GROSS ELEC.

ENERGY GEH.

(MWH) 18.

HET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 2$. UNIT CAP.

FACTOR (USING MDC HET) 22.

UNIT CAP.

FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS None.

744.80 744.00

.00 744.00

.08 2806564.76 688813.88 645579.00 388.88 388.88 188.90 96.43

.80 (TYPE,

DATE, 744.00 744.00

.00 744.00

.00 2006564.76 688833.88 645579.00 188.88 188.88 188.98 96.43

.00 AHD DURATION 50449.08 48312.98

.00 39888.18

.00

$ 85357678.28 35182854.88 32651255.88 78.89 78.89 75.26 71.93 3.98 OF EACH):

25. IF SHUTDOWN AT END OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

HIS/MTH-OPR, RPT/3/OS4

F

~

A 4'

'CPM CO "

~

AHT PERFORMANCE DATA SYSTEM RUH DATE 02/05/93 APPENDIX B AVERAGE DAILY POWER LEVEL RUH TIME

-1 0: 57: 22 HARRIS UNIT I PAGE RPD39-000 JANUARY

<993 DAY AVG. DAILY POWER LEVEL (MWE-HET) 884 DOCKET HO. 050-400 COMPLETED BY AMAHDA CRENSHAW TELEPHONE (919)362-2808 i

DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 10 879 878 877 875 886 593 677 884 890 888 888 883 888 887 18 20 21 28 30 887 887 887 884 884 885 880 888 887 886 884 883 867 3

~ 16 8

MIS/MTH-OPR.RPT/4/OS4

~

'I UNIT SHUTDOWNS AND POWER REDUCTION IO F

O REPORT MONTH: January 1993 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris, 02/04/93 A. P. Crenshaw (919) 362-2808 No.

Date y

P e

Duration (Hours)

R~

e a

s 0

Method of Shutting Down Reactor~

Licensee Event Report ¹ System Code 4 Component Code 5 Cause and Corrective Action to Prevent Recurrence 93401 930107 F

0.0 A

N/A CB VALVE Reduced unit power to 10% to repair Steam Generator "A" bowl drain isolation valves.

Valves were tightened and the drain plug downstream of the valves was replaced.

Unit was returned to 100% power on January 8, 1993.

1

.F:

Forced S:

Scheduled

~

2 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG+1 51) 5 Exhibit 1 -Same Source

~

j,

).

~

~

~r 4