Line 2: Line 2:
| number = ML18010B077
| number = ML18010B077
| issue date = 03/31/1993
| issue date = 03/31/1993
| title = Monthly Operating Rept for Harris Nuclear Power Plant,Unit 1.W/930415 Ltr
| title = Monthly Operating Rept for Harris Nuclear Power Plant,Unit 1
| author name = Crenshaw A, Vaughn G
| author name = Crenshaw A, Vaughn G
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM C.':9>>
{{#Wiki_filter:1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM (RIDS)
AUTH. NAME REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM 9
C.':9>>
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTHOR AFFILIATION (RIDS)
9 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWPA.
DOCKET 05000400 CRENSHAWPA.           Carolina Power         &   Light Co.
Carolina Power
UAUGHNPG.E.           Carolina Power         &   Light Co.
& Light Co.
RECIP.NAME           RECIPIENT AFFILIATION
UAUGHNPG.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400


==SUBJECT:==
==SUBJECT:==
Mont           crating rept for Harris Nuclear             Power Plant, unit tr.
Mont crating rept for Harris Nuclear Power Plant, unit 1
1    /930415 DZSTR1BDTZON CODE:       ZE24D     COPTER RECETVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
/930415 tr.
I  ENCL  f  SIZE:
DZSTR1BDTZON CODE:
NOTES:Application for permit renewal               filed.                               o5ooo4oo RECIPIENT               COPIES                RECIPIENT          COPIES ID CODE/NAME             LTTR ENCL           ID CODE/NAME       LTTR ENCL PD2-1 LA                    3        3      PD2-1  PD               1     1 LE,N                        1        1 INTERNAL: ACRS                         10      10      AEOD DOA                1    1 AEOD/DSP/TPAB               1       1     pNHR"'D S/OEAB           1     1 NRR/DRIL/RPEB                1        1     iREG   FILE     ol       1     1 RGN2                        1       1 EXTERNAL   EGStG   BRYCE P J ~ H       1       1     NRC PDR                 1     1 NSIC                        1        1 NOTE TO ALL"RIDS" RECIPIENTS:
ZE24D COPTER RECETVED:LTR I ENCLf SIZE:
CONTROL DESK, PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT YOUR  NAME FROM DISTRIBUTION ROOM PI-37 (EXT. 504-2065) TO ELIMINATE LISTS FOR DOCUMENTS YOU DON'T HEED!
TITLE: Monthly Operating Report (per Tech Specs)
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   24   ENCL   24
NOTES:Application for permit renewal filed.
o5ooo4oo RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 10 10 AEOD DOA 1
1 pNHR"'D S/OEAB 1
1 iREG FILE ol 1
1 1
1 1
1 1
1 EXTERNAL EGStG BRYCE P J
~ H NSIC 1
1 1
1 NRC PDR 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24


0 a COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph ) 5 iSn File  Number:    SHF/10-15505 Letter  Number:    H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington,    DC  20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.
0 a


==Dear  Sirs:==
COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph )
5 iSn File Number:
SHF/10-15505 Letter Number:
H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.


In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.
==Dear Sirs:==
Yours very truly, G. E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc:   Mr. ST D. Ebneter (NRC-RII)
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
Mr. J. E. Tedrow (NRC-SHNPP)
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.
Yours very truly, G.
E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc:
Mr.
ST D. Ebneter (NRC-RII)
Mr. J.
E. Tedrow (NRC-SHNPP)
MIS/MTH-OPR.RPT/1/OS4
MIS/MTH-OPR.RPT/1/OS4
      ''' 930'41'90095       93033i PDR''     'ADOCK 05000400 R                       PDR
''' 930'41'90095 93033i PDR''
'ADOCK 05000400 R
PDR


k DOCKET NO.:             050-400 DATE'arch UNIT:
k
COMPLETED BY:
 
Harris Unit 1993 Amanda Crenshaw 1
DOCKET NO.:
OPERATIONS  
050-400 UNIT:
Harris Unit 1 DATE'arch 1993 COMPLETED BY:
Amanda Crenshaw OPERATIONS


==SUMMARY==
==SUMMARY==
 
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor.
Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor.     There were no significant power reductions.
There were no significant power reductions.
There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools. 413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick, Plant.       224 of the spent fuel assemblies are from CP&L's Robinson Plant.
There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.
413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick,Plant.
224 of the spent fuel assemblies are from CP&L's Robinson Plant.
MISXMTH-OPR.RPTX2%0S4
MISXMTH-OPR.RPTX2%0S4


CPAL CO RUNDATE   04/06/93         O  INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT PAGE RPD36-000
CPAL CO RUNDATE 04/06/93
..RUH TIME   98:57:11                 HARRIS UNIT 1 DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW OPERATING STATUS                                        TELEPHONE   (919)362-2808 UNIT NAME:   HARRIS UNIT 1                       NOTES
..RUH TIME 98:57:11 O
: 2. REPORTING PERIOD: MARCH         93 See 0 erations     Summar
INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
: 3. LICENSED THERMAL POWER (MWT): 2775
PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 UNIT NAME:
: 4. NAMEPLATE RATING (GROSS MWE): 950.9             I
HARRIS UNIT 1
: 5. DESIGN ELECTRICAL RATING (NET MWE): 909.0
NOTES 2.
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
REPORTING PERIOD:
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 869.0
MARCH 93 See 0 erations Summar 3.
: 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE           LAST REPORT, GIVE REASONS:       None.
LICENSED THERMAL POWER (MWT): 2775 4.
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):      None.
NAMEPLATE RATING (GROSS MWE): 950.9 I
: 10. REASONS fOR RESTRICTION IF ANY: N/A THIS          YR TO          CUMUL MONTH          DATE          ATIVE
5.
: 11. HOURS IH REPORTING PERIOD                  744.88        2160.00          51865.00
DESIGN ELECTRICAL RATING (NET MWE): 909.0 6.
: 12. NUMBER OF HOURS REACTOR CRITICAL            744.09        2169.90          41728.90
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
: 13. REACTOR RESERVE SHUTDOWN HRS                    .00              .08              .00
MAX DEPENDABLE CAPACITY (NET MWE): 869.0
: 14. HOURS GENERATOR OH LINE                    744.80        2160.00          41216.18
: 8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
: 15. UNIT RESERVE SHUTDOWN HOURS                      .00            .09              .00
SINCE LAST REPORT, GIVE REASONS:
: 16. GROSS THERMAL ENERGY GEH. (MWH)          2062488.78      5921066.34    109272171.78
None.
: 17. GROSS ELEC. ENERGY GEH. (MWH)            699839.98      2018009.00      36432850.09
9.
: 18. NET ELEC. ENERGY GENERATED (MWH)          657527.00      1894531.ee      33900207.00
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
: 19. UNIT  SERVICE FACTOR                        108.09          1ee.ee            79.47
: 20. UNIT  AVAILABILITYFACTOR                    100.00          198.80            79.47
: 21. UNIT  CAP. FACTOR (USING MDC NET)          182.76          101.99            76.99
: 22. UNIT  CAP. FACTOR (USIHG DER NET)            98.29            97.46            72.62
: 23. UNIT  FORCED OUTAGE RATE                        .09            .09              3.85
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS      (TYPE, DATE,  AND DURATION OF    EACH):
None.
None.
10.
REASONS fOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IH REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR OH LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEH.
(MWH) 17.
GROSS ELEC.
ENERGY GEH.
(MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNIT SERVICE FACTOR 20.
UNIT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USIHG DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS None.
744.88 744.09
.00 744.80
.00 2062488.78 699839.98 657527.00 108.09 100.00 182.76 98.29
.09 (TYPE,
: DATE, 2160.00 2169.90
.08 2160.00
.09 5921066.34 2018009.00 1894531.ee 1ee.ee 198.80 101.99 97.46
.09 AND DURATION 51865.00 41728.90
.00 41216.18
.00 109272171.78 36432850.09 33900207.00 79.47 79.47 76.99 72.62 3.85 OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OP R. RPT/3/OS 4
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OPR. RPT/3/OS 4


  ~   ~
~
~
(
(
g
g


.Cf bL CO                 ~NT     PERFORMANCE DATA SYSTEM               PAGE RUN.,DATE 04/06/93   APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-999
.Cf bL CO
.fAJN TIME   98:57:99               HARRIS UNIT 5
~NT PERFORMANCE DATA SYSTEM RUN.,DATE 04/06/93 APPENDIX B AVERAGE DAILY POWER LEVEL
  ~ ~
.fAJN TIME 98:57:99 HARRIS UNIT 5
DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 MARCH DAY    AVG. DAILY POWER LEVEL        DAY AVG. DAILY POWER LEVEL (MWE-NET)                           (MWE-NET) 886                                  879 885                                   886 884                                   889 88'8 889 888 20            887 884 880 877                                   876 882                   24             879 885                    25            882
~
  )9                                                    887 887                   27            885 888                    28            885 886                    29            885 888                    30            883 887                                  882 885
~
                                  $ .16 8 MIS/MTH-OPR.RPT/4/OS4
PAGE RPD39-999 MARCH DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 DAY AVG. DAILY POWER LEVEL (MWE-NET) 879 885 884 889 88888'8 20 886 889 887 884 880
)9 877 882 885 887 888 886 888 887 885 24 25 27 28 29 30 876 879 882 887 885 885 885 883 882
$.16 8
MIS/MTH-OPR.RPT/4/OS4


0                                 ~ ~
0
                                      ~ 5 1
~
~
~5 1
II
II
            $ >'V I
$ >'V I
d     1 E '
d 1
h III t ll N
E h III t ll N
lg II',
lg t'
t' K
k K
k lt}}
lt II',}}

Latest revision as of 06:37, 7 January 2025

Monthly Operating Rept for Harris Nuclear Power Plant,Unit 1
ML18010B077
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1993
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO931011, NUDOCS 9304190095
Download: ML18010B077 (9)


Text

1 ACCELERATQiP DOCUMENT DIST$UTION SYSTEM REGULAK%FZ INFORMATION DISTRIBUTION SYSTEM (RIDS)

C.':9>>

9 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWPA.

Carolina Power

& Light Co.

UAUGHNPG.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Mont crating rept for Harris Nuclear Power Plant, unit 1

/930415 tr.

DZSTR1BDTZON CODE:

ZE24D COPTER RECETVED:LTR I ENCLf SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

o5ooo4oo RECIPIENT ID CODE/NAME PD2-1 LA LE,N COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1

1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 10 10 AEOD DOA 1

1 pNHR"'D S/OEAB 1

1 iREG FILE ol 1

1 1

1 1

1 1

1 EXTERNAL EGStG BRYCE P J

~ H NSIC 1

1 1

1 NRC PDR 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T HEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

0 a

COLL Carolina Power & Light Company P.O. Box 165 ~ New Hill, NC 27562 G.E. VAUGHN Vice President Harris Nuctear Plant Aph )

5 iSn File Number:

SHF/10-15505 Letter Number:

H0931011 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PLANT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT.

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1993.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Plant APC:kjc Enclosure cc:

Mr.

ST D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

MIS/MTH-OPR.RPT/1/OS4

' 930'41'90095 93033i PDR

'ADOCK 05000400 R

PDR

k

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE'arch 1993 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100.00 percent Availability Factor for the referenced month and a 102.76 percent Capacity Factor.

There were no significant power reductions.

There are 157 fuel assemblies in the reactor vessel and 861 spent fuel assemblies stored in the spent fuel pools.

413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick,Plant.

224 of the spent fuel assemblies are from CP&L's Robinson Plant.

MISXMTH-OPR.RPTX2%0S4

CPAL CO RUNDATE 04/06/93

..RUH TIME 98:57:11 O

INT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-488 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 UNIT NAME:

HARRIS UNIT 1

NOTES 2.

REPORTING PERIOD:

MARCH 93 See 0 erations Summar 3.

LICENSED THERMAL POWER (MWT): 2775 4.

NAMEPLATE RATING (GROSS MWE): 950.9 I

5.

DESIGN ELECTRICAL RATING (NET MWE): 909.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE): 869.0

8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

None.

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

None.

10.

REASONS fOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE 11.

HOURS IH REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR OH LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEH.

(MWH) 17.

GROSS ELEC.

ENERGY GEH.

(MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NET) 22.

UNIT CAP.

FACTOR (USIHG DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS None.

744.88 744.09

.00 744.80

.00 2062488.78 699839.98 657527.00 108.09 100.00 182.76 98.29

.09 (TYPE,

DATE, 2160.00 2169.90

.08 2160.00

.09 5921066.34 2018009.00 1894531.ee 1ee.ee 198.80 101.99 97.46

.09 AND DURATION 51865.00 41728.90

.00 41216.18

.00 109272171.78 36432850.09 33900207.00 79.47 79.47 76.99 72.62 3.85 OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS /MTH-OPR. RPT/3/OS 4

~

~

(

g

.Cf bL CO

~NT PERFORMANCE DATA SYSTEM RUN.,DATE 04/06/93 APPENDIX B AVERAGE DAILY POWER LEVEL

.fAJN TIME 98:57:99 HARRIS UNIT 5

~

~

PAGE RPD39-999 MARCH DAY AVG. DAILY POWER LEVEL (MWE-NET) 886 DOCKET NO. 950-409 COMPLETED BY AMANDA CRENSHAW TELEPHONE (939)362-2898 DAY AVG. DAILY POWER LEVEL (MWE-NET) 879 885 884 889 88888'8 20 886 889 887 884 880

)9 877 882 885 887 888 886 888 887 885 24 25 27 28 29 30 876 879 882 887 885 885 885 883 882

$.16 8

MIS/MTH-OPR.RPT/4/OS4