{{#Wiki_filter:January 12, 2018
{{#Wiki_filter:January 12, 2018  
Mr. Mark E. Reddemann
Chief Executive Officer
Energy Northwest
MD 1023
Mr. Mark E. Reddemann  
P.O. Box 968
Chief Executive Officer  
Richland, WA 99352
Energy Northwest  
SUBJECT:       COLUMBIA GENERATING STATION - NOTIFICATION OF NRC TRIENNIAL
MD 1023  
              FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
P.O. Box 968  
              REPORT 05000397/2018007) AND REQUEST FOR INFORMATION
Richland, WA 99352  
Dear Mr. Reddemann:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
SUBJECT:  
Region IV staff will conduct a Triennial Fire Protection Baseline inspection at the Columbia
COLUMBIA GENERATING STATION - NOTIFICATION OF NRC TRIENNIAL  
Generating Station in April 2018. The inspection team will be comprised of four reactor
FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION  
inspectors from the NRC Region IV office. The inspection will be conducted in accordance with
REPORT 05000397/2018007) AND REQUEST FOR INFORMATION  
Inspection Procedure 71111.05T, Fire Protection (Triennial), the NRCs baseline fire protection
inspection procedure.
Dear Mr. Reddemann:  
The schedule for the inspection is as follows:
    *   Information gathering visit:     March 7 & 8, 2018
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
    *   Onsite inspection:               April 09 - 13, 2018
Region IV staff will conduct a Triennial Fire Protection Baseline inspection at the Columbia  
                                        April 23 - 27, 2018
Generating Station in April 2018. The inspection team will be comprised of four reactor  
The purpose of the information gathering visit is to obtain information and documentation
inspectors from the NRC Region IV office. The inspection will be conducted in accordance with  
needed to support the inspection and to become familiar with the fire protection program, fire
Inspection Procedure 71111.05T, Fire Protection (Triennial), the NRCs baseline fire protection  
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies
inspection procedure.  
to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
The schedule for the inspection is as follows:  
The team leader will participate in the information gathering visit to select the fire areas for
evaluation, identify additional documents needed to support the inspection, obtain unescorted
*  
access, and meet with the key personnel who will support the inspection. The fire area
Information gathering visit:
March 7 & 8, 2018  
*  
Onsite inspection:  
April 09 - 13, 2018  
     
April 23 - 27, 2018  
The purpose of the information gathering visit is to obtain information and documentation  
needed to support the inspection and to become familiar with the fire protection program, fire  
protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies  
to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security  
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
The team leader will participate in the information gathering visit to select the fire areas for  
evaluation, identify additional documents needed to support the inspection, obtain unescorted  
access, and meet with the key personnel who will support the inspection. The fire area  


M. Reddemann                                       2
selection will require a walk down of candidate fire areas accompanied by key personnel from
M. Reddemann  
your staff. The enclosure to this letter provides an initial list of the documents the team will need
            2  
for their review. We request that your staff transmit copies of the documents listed in the
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please
selection will require a walk down of candidate fire areas accompanied by key personnel from  
send this information so that it will arrive in the NRC Region IV office by the dates listed in the
your staff. The enclosure to this letter provides an initial list of the documents the team will need  
enclosure.
for their review. We request that your staff transmit copies of the documents listed in the  
During the information gathering visit, the team leader will also discuss the following inspection
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please  
support administrative details: office space size and location, specific documents requested to
send this information so that it will arrive in the NRC Region IV office by the dates listed in the  
be made available to the team in their office spaces, arrangements for reactor site access, and
enclosure.  
the availability of knowledgeable plant engineering and licensing organization personnel to
serve as points of contact during the inspection.
During the information gathering visit, the team leader will also discuss the following inspection  
We request that during the onsite inspection weeks, you ensure that copies of analyses,
support administrative details: office space size and location, specific documents requested to  
evaluations, or documentation regarding the implementation and maintenance of the fire
be made available to the team in their office spaces, arrangements for reactor site access, and  
protection program, including post-fire safe shutdown capability, be readily accessible to the
the availability of knowledgeable plant engineering and licensing organization personnel to  
team for their review. Of specific interest for the fire protection portion of the inspection are
serve as points of contact during the inspection.  
those documents that establish that your fire protection program satisfies the NRC regulatory
requirements, and conforms to applicable NRC and industry fire protection guidance. For
We request that during the onsite inspection weeks, you ensure that copies of analyses,  
Section B.5.b portion of the inspection, those documents implementing your mitigating
evaluations, or documentation regarding the implementation and maintenance of the fire  
strategies and demonstrating the management of your commitments for the strategies are of
protection program, including post-fire safe shutdown capability, be readily accessible to the  
specific interest. Also, please ensure that appropriate personnel are available to support the
team for their review. Of specific interest for the fire protection portion of the inspection are  
team at the site during the inspection. These personnel should be knowledgeable of the plant
those documents that establish that your fire protection program satisfies the NRC regulatory  
systems required to achieve and maintain safe shutdown conditions from inside and outside the
requirements, and conforms to applicable NRC and industry fire protection guidance. For  
control room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire
Section B.5.b portion of the inspection, those documents implementing your mitigating  
protection systems, and the fire protection program and its implementation.
strategies and demonstrating the management of your commitments for the strategies are of  
This letter does not contain new or amended information collection requirements subject to the
specific interest. Also, please ensure that appropriate personnel are available to support the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
team at the site during the inspection. These personnel should be knowledgeable of the plant  
requirements were approved by the Office of Management and Budget under control
systems required to achieve and maintain safe shutdown conditions from inside and outside the  
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
control room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire  
respond to, a request for information or an information collection requirement unless the
protection systems, and the fire protection program and its implementation.
requesting document displays a currently valid Office of Management and Budget control
number.
This letter does not contain new or amended information collection requirements subject to the  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
and its enclosure will be available electronically for public inspection in the NRC Public
requirements were approved by the Office of Management and Budget under control  
Document Room or from the Publicly Available Records (PARS) component of NRC's
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
document system (ADAMS). ADAMS is accessible from the NRC Web site at
respond to, a request for information or an information collection requirement unless the  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
requesting document displays a currently valid Office of Management and Budget control  
number.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public  
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  


M. Reddemann                                     3
Your cooperation and support during this inspection will be appreciated. If you have questions
M. Reddemann  
concerning this inspection or the inspection team's information or logistical needs, please
            3  
contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or
john.mateychick@nrc.gov.
Your cooperation and support during this inspection will be appreciated. If you have questions  
                                              Sincerely,
concerning this inspection or the inspection team's information or logistical needs, please  
                                              /RA Greg Pick Acting for/
contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or  
                                              Gregory E. Werner, Chief
john.mateychick@nrc.gov.  
                                              Engineering Branch 2
                                              Division of Reactor Safety
Sincerely,
Dockets: 50-397
Licenses: NPF-21
/RA Greg Pick Acting for/  
Enclosure:
Triennial Fire Protection Inspection
   Documentation Request
Gregory E. Werner, Chief  
cc w/ encl: Electronic Distribution
Engineering Branch 2  
Division of Reactor Safety  
Dockets: 50-397  
Licenses: NPF-21  
Enclosure:  
Triennial Fire Protection Inspection
   Documentation Request  
cc w/ encl: Electronic Distribution  


                  Triennial Fire Protection Inspection Documentation Request
Please provide the following documentation (Items 1 - 5) prior to the onsite information
Enclosure
gathering visit, preferably no later than February 16, 2018. Whenever practical, please provide
Triennial Fire Protection Inspection Documentation Request  
copies electronically. Please provide an index of the requested documents which includes a
brief description of the document and the numerical heading associated with the request
Please provide the following documentation (Items 1 - 5) prior to the onsite information  
(i.e., where it can be found in the list of documents requested).
gathering visit, preferably no later than February 16, 2018. Whenever practical, please provide  
1. The current version of the fire protection program and fire hazards analysis.
copies electronically. Please provide an index of the requested documents which includes a  
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate
brief description of the document and the numerical heading associated with the request  
    acceptable plant response.
(i.e., where it can be found in the list of documents requested).  
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of
    the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire
1. The current version of the fire protection program and fire hazards analysis.  
    protection/fire safe shutdown, etc.).
4. The fire probabilistic risk assessment or portions of the plants individual plant examination
2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate  
    for external events (IPEEE) report addressing fire events. Also, include the results of any
acceptable plant response.
    post-IPEEE reviews and listings of actions taken/plant modifications conducted in response
    to IPEEE information that relate to fire risk.
3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of  
5. A copy of the documents that support your multiple spurious operation evaluations
the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire  
    (i.e., expert panel reports, evaluation packages, etc.).
protection/fire safe shutdown, etc.).  
Please provide the following documentation (Items 6 - 48) prior to the week of March 26, 2018,
to support inspection preparation. Whenever practical, please provide copies electronically.
4. The fire probabilistic risk assessment or portions of the plants individual plant examination  
Drawings should be provided as paper copies of sufficient size such that all details are legible.
for external events (IPEEE) report addressing fire events. Also, include the results of any  
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant
post-IPEEE reviews and listings of actions taken/plant modifications conducted in response  
    locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire
to IPEEE information that relate to fire risk.  
    zone delineation; (c) the locations of fire protection equipment, such as detection,
    suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The
5. A copy of the documents that support your multiple spurious operation evaluations  
    specific documents needed to support inspection preparation will be discussed during the
(i.e., expert panel reports, evaluation packages, etc.).  
    site visit.
7. Fire protection program implementing procedures (e.g., administrative controls, operator
Please provide the following documentation (Items 6 - 48) prior to the week of March 26, 2018,  
    response procedures for fires, firefighting procedures, etc.).
to support inspection preparation. Whenever practical, please provide copies electronically.
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions
Drawings should be provided as paper copies of sufficient size such that all details are legible.
    from the control room in the event of a fire outside the control room (III.G.2 areas).
9. Operating procedures used to implement an alternative shutdown capability with or without
6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant  
    control room evacuation (III.G.3 areas).
locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire  
10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the
zone delineation; (c) the locations of fire protection equipment, such as detection,  
    event of a fire (safe shutdown equipment list).
suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The  
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and
specific documents needed to support inspection preparation will be discussed during the  
    maintain hot standby and cold shutdown for normal and alternative shutdown. Please
site visit.  
    provide one copy of the piping and instrumentation (flow) diagrams for these systems of a
                                                                                            Enclosure
7. Fire protection program implementing procedures (e.g., administrative controls, operator  
response procedures for fires, firefighting procedures, etc.).  
8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions  
from the control room in the event of a fire outside the control room (III.G.2 areas).  
9. Operating procedures used to implement an alternative shutdown capability with or without  
control room evacuation (III.G.3 areas).  
10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the  
event of a fire (safe shutdown equipment list).
11. Piping and instrumentation (flow) diagrams showing the components used to achieve and  
maintain hot standby and cold shutdown for normal and alternative shutdown. Please  
provide one copy of the piping and instrumentation (flow) diagrams for these systems of a  


    size sufficient to read all details. These should include the systems used for reactor coolant
    system makeup, reactor coolant system pressure control, decay heat removal, and reactivity
    control, including the essential support systems.
2
12. A listing, with descriptions, of design change packages performed since the last triennial fire
 
    protection inspection which were determined to impact fire protection and post-fire safe
size sufficient to read all details. These should include the systems used for reactor coolant  
    shutdowns.
system makeup, reactor coolant system pressure control, decay heat removal, and reactivity  
13. A list of any fire protection program changes and evaluations (not limited to Generic
control, including the essential support systems.  
    Letter 86-10 evaluations) performed since the last triennial fire protection inspection.
14. Procedures/instructions that control the configuration of the plants fire protection program,
12. A listing, with descriptions, of design change packages performed since the last triennial fire  
    features, and post-fire safe shutdown methodology and system design. Also,
protection inspection which were determined to impact fire protection and post-fire safe  
    procedures/instructions that govern the implementation of plant modifications, maintenance,
shutdowns.
    and special operations and their impact on fire protection.
15. A listing of open and closed corrective action documents initiated since the last triennial fire
13. A list of any fire protection program changes and evaluations (not limited to Generic  
    protection inspection which relate to the fire protection program or equipment, including
Letter 86-10 evaluations) performed since the last triennial fire protection inspection.  
    corrective actions for fire-induced circuit failures (both single and multiple spurious
    actuations) for the selected fire areas. Include the corrective action program document
14. Procedures/instructions that control the configuration of the plants fire protection program,  
    number, date, and subject.
features, and post-fire safe shutdown methodology and system design. Also,  
16. A listing of the applicable codes and standards (with the versions/dates) related to the
procedures/instructions that govern the implementation of plant modifications, maintenance,  
    design of plant fire protection features and evaluations of any code deviations. Copies of
and special operations and their impact on fire protection.  
    these codes should be available for review.
17. Drawings of the portions of the emergency lighting system which support fire response.
15. A listing of open and closed corrective action documents initiated since the last triennial fire  
18. Procedures used to remove smoke from safety-related areas and the engineering studies or
protection inspection which relate to the fire protection program or equipment, including  
    calculations which support the design basis.
corrective actions for fire-induced circuit failures (both single and multiple spurious  
19. Drawings of communication systems credited in the license basis for firefighting and plant
actuations) for the selected fire areas. Include the corrective action program document  
    operations during fires where control room is occupied and/or evacuated.
number, date, and subject.  
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.
21. A listing of maintenance and surveillance testing procedures for alternative shutdown
16. A listing of the applicable codes and standards (with the versions/dates) related to the  
    capability and fire barriers, detectors, pumps, and suppression systems. Also, include a list
design of plant fire protection features and evaluations of any code deviations. Copies of  
    of maintenance and surveillance testing procedures which verify fuse and breaker
these codes should be available for review.  
    coordination in accordance with the post-fire safe shutdown coordination analysis.
22. Maintenance rule performance criteria and a summary of the performance history for
17. Drawings of the portions of the emergency lighting system which support fire response.
    systems or functions monitored within the maintenance rule program that support the fire
    protection program, or involve safe shutdown equipment over the period since the last
18. Procedures used to remove smoke from safety-related areas and the engineering studies or  
    triennial fire protection inspection.
calculations which support the design basis.  
23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test
    requirements) covered by technical specifications, the technical requirements manual, the
19. Drawings of communication systems credited in the license basis for firefighting and plant  
    updated final safety analysis report, or similar documents.
operations during fires where control room is occupied and/or evacuated.  
                                              2
20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.  
21. A listing of maintenance and surveillance testing procedures for alternative shutdown  
capability and fire barriers, detectors, pumps, and suppression systems. Also, include a list  
of maintenance and surveillance testing procedures which verify fuse and breaker  
coordination in accordance with the post-fire safe shutdown coordination analysis.  
22. Maintenance rule performance criteria and a summary of the performance history for  
systems or functions monitored within the maintenance rule program that support the fire  
protection program, or involve safe shutdown equipment over the period since the last  
triennial fire protection inspection.  
23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test  
requirements) covered by technical specifications, the technical requirements manual, the  
updated final safety analysis report, or similar documents.  


24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related
    to post-fire safe shutdown capability or the fire protection program completed since the last
    triennial fire protection inspection.
3
25. A list of manual actions taken outside the control room which are credited to mitigate the
 
    consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should
24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related  
    group actions by the initiating fire area or zone, and indicate where the action must take
to post-fire safe shutdown capability or the fire protection program completed since the last  
    place.
triennial fire protection inspection.  
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design
    basis documents that describe the purpose/function/operating characteristics of the safe
25. A list of manual actions taken outside the control room which are credited to mitigate the  
    shutdown systems (reactor coolant system makeup, reactor coolant system pressure
consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should  
    control, decay heat removal, and reactivity control, including the essential support systems).
group actions by the initiating fire area or zone, and indicate where the action must take  
27. Two paper copies of one-line diagrams of the AC and vital DC electrical distribution
place.  
    systems. These should depict how power gets from the switchyard to the engineered safety
    feature loads (480V and 4160V).
26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design  
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,
basis documents that describe the purpose/function/operating characteristics of the safe  
    giving their location and the key equipment being protected.
shutdown systems (reactor coolant system makeup, reactor coolant system pressure  
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or
control, decay heat removal, and reactivity control, including the essential support systems).  
    maintain hot or cold shutdown.
30. A list of high to low pressure interface valves.
27. Two paper copies of one-line diagrams of the AC and vital DC electrical distribution  
31. Procedures governing the training and operation of the fire brigade.
systems. These should depict how power gets from the switchyard to the engineered safety  
32. Organization charts of site personnel down to the level of fire protection staff personnel.
feature loads (480V and 4160V).  
33. A contact list of key site personnel who will be supporting this inspection, giving the office
    location and phone number onsite.
28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,  
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,
giving their location and the key equipment being protected.  
    during the week of April 23, 2018. Please put us in contact with the appropriate personnel
    for planning fire brigade drills during the onsite information gathering trip.
29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or  
35. The team would like to perform a walkthrough of the alternative shutdown procedure with
maintain hot or cold shutdown.  
    qualified operators in the plant during the week of April 9, 2018. The team would like to
    perform a walkthrough of a sample of manual actions required for other fires not requiring
30. A list of high to low pressure interface valves.  
    control room evacuation. Please put us in contact with the appropriate personnel for
    planning the walkthroughs during the onsite information gathering trip.
31. Procedures governing the training and operation of the fire brigade.  
The following documents (Items 36 - 48) involve Section B.5.b mitigating strategies.
36. License condition that incorporated the requirements issued to address the requirements of
32. Organization charts of site personnel down to the level of fire protection staff personnel.  
    Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
    Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).
33. A contact list of key site personnel who will be supporting this inspection, giving the office  
37. A list of all modifications to regulatory commitments made to meet the requirements of
location and phone number onsite.  
    Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security
                                                3
34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,  
during the week of April 23, 2018. Please put us in contact with the appropriate personnel  
for planning fire brigade drills during the onsite information gathering trip.  
35. The team would like to perform a walkthrough of the alternative shutdown procedure with  
qualified operators in the plant during the week of April 9, 2018. The team would like to  
perform a walkthrough of a sample of manual actions required for other fires not requiring  
control room evacuation. Please put us in contact with the appropriate personnel for  
planning the walkthroughs during the onsite information gathering trip.  
The following documents (Items 36 - 48) involve Section B.5.b mitigating strategies.  
36. License condition that incorporated the requirements issued to address the requirements of  
Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security  
Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).  
37. A list of all modifications to regulatory commitments made to meet the requirements of  
Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security  


    Compensatory Measures, dated February 25, 2002; the subsequently imposed license
    conditions; and 10 CFR 50.54(hh)(2).
38. A list of procedures/guidelines which were revised or generated to implement the mitigation
4
    strategies. These could be extensive damage mitigation guidelines, severe accident
 
    management guidelines, emergency operating procedures, abnormal operating procedures,
Compensatory Measures, dated February 25, 2002; the subsequently imposed license  
    etc.
conditions; and 10 CFR 50.54(hh)(2).  
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear
    Energy Institute 06-12 and the site-specific procedures or guidelines that are used to
38. A list of procedures/guidelines which were revised or generated to implement the mitigation  
    implement each strategy.
strategies. These could be extensive damage mitigation guidelines, severe accident  
40. A list of engineering evaluations/calculations that were used to verify engineering bases for
management guidelines, emergency operating procedures, abnormal operating procedures,  
    the mitigation strategies.
etc.  
41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in
    the mitigation strategies. These could be the type used for training.
39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear  
42. A list of modification packages and simplified drawings/descriptions of modifications that
Energy Institute 06-12 and the site-specific procedures or guidelines that are used to  
    were made to plant systems to implement the mitigation strategies.
implement each strategy.  
43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to
    implement the mitigation strategies.
40. A list of engineering evaluations/calculations that were used to verify engineering bases for  
44. A list of Section B.5.b strategies, if any, which have implementing details that differ from that
the mitigation strategies.  
    documented in the submittals to the NRC and the safety evaluation report.
45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in
41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in  
    Section B.5.b documents.
the mitigation strategies. These could be the type used for training.  
46. Training records and lesson plans related to the Section B.5.b mitigating strategies.
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required
42. A list of modification packages and simplified drawings/descriptions of modifications that  
    to implement any mitigating strategies.
were made to plant systems to implement the mitigation strategies.  
48. The team would like to perform a walkthrough of the procedure implementing a sample
    mitigating strategy (to be selected by the inspector during the information gathering visit)
43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to  
    and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement
implement the mitigation strategies.  
    the mitigation strategies during the week of February 12, 2018. Please put us in contact
    with the appropriate personnel for planning the walkthrough during the onsite information
44. A list of Section B.5.b strategies, if any, which have implementing details that differ from that  
    gathering trip.
documented in the submittals to the NRC and the safety evaluation report.  
The following documentation needs (Items 49 - 52) will be dependent upon sample selections
and will be finalized during discussions with your staff. Please provide the required documents
45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in  
prior to the week of March 26, 2018. Whenever practical, please provide copies electronically.
Section B.5.b documents.  
Drawings should be provided as paper copies of sufficient size such that all details are legible.
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite
46. Training records and lesson plans related to the Section B.5.b mitigating strategies.  
    information gathering trip).
                                                4
47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required  
to implement any mitigating strategies.  
48. The team would like to perform a walkthrough of the procedure implementing a sample  
mitigating strategy (to be selected by the inspector during the information gathering visit)  
and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement  
the mitigation strategies during the week of February 12, 2018. Please put us in contact  
with the appropriate personnel for planning the walkthrough during the onsite information  
gathering trip.  
The following documentation needs (Items 49 - 52) will be dependent upon sample selections  
and will be finalized during discussions with your staff. Please provide the required documents  
prior to the week of March 26, 2018. Whenever practical, please provide copies electronically.
Drawings should be provided as paper copies of sufficient size such that all details are legible.
49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite  
information gathering trip).


50. List of identified fire-induced circuit failure configurations that could prevent operation or
    cause maloperation of equipment credited for safe shutdown in the event of a fire (for the
    selected fire areas). Include failure configurations associated with hot shorts, open circuits,
5
    or shorts to ground identified as potentially causing spurious or multiple spurious actuations
 
    or maloperations of this equipment.
50. List of identified fire-induced circuit failure configurations that could prevent operation or  
51. Cable routing information for components and equipment credited for safe shutdown in the
cause maloperation of equipment credited for safe shutdown in the event of a fire (for the  
    selected fire areas. This information request item will be discussed and finalized with your
selected fire areas). Include failure configurations associated with hot shorts, open circuits,  
    staff during the information gathering visit.
or shorts to ground identified as potentially causing spurious or multiple spurious actuations  
52. Drawings showing the location details for detection and suppression systems in the selected
or maloperations of this equipment.  
    fire areas.
                                                  5
51. Cable routing information for components and equipment credited for safe shutdown in the  
selected fire areas. This information request item will be discussed and finalized with your  
staff during the information gathering visit.  
52. Drawings showing the location details for detection and suppression systems in the selected  
fire areas.




ML18012A711
  ML18012A711  
  SUNSI Review         ADAMS:             Non-Publicly Available  Non-Sensitive Keyword:
  SUNSI Review  
  By: JMM               Yes  No        Publicly Available     Sensitive     NRC-002
ADAMS:  
OFFICE       SRI: EB2       C:EB2
Non-Publicly Available  
  NAME         JMateychick   GWerner
  Non-Sensitive  
  SIGNATURE         /RA/       /RA/GAP for
Keyword:
  DATE           01/11/2018     01/12/2018
By: JMM  
Yes     No
  Publicly Available  
Sensitive
NRC-002  
OFFICE  
SRI: EB2  
C:EB2  
   
NAME  
JMateychick  
GWerner  
   
SIGNATURE  
/RA/  
/RA/GAP for  
   
DATE  
01/11/2018  
01/12/2018
}}
}}

Latest revision as of 06:08, 7 January 2025

Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2018007) and Request for Information
ML18012A711
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/12/2018
From: Greg Werner
NRC/RGN-IV/DRS/EB-2
To: Reddemann M
Energy Northwest
Werner G
References
IR 2018007
Download: ML18012A711 (9)


See also: IR 05000397/2018007

Text

January 12, 2018

Mr. Mark E. Reddemann

Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT:

COLUMBIA GENERATING STATION - NOTIFICATION OF NRC TRIENNIAL

FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000397/2018007) AND REQUEST FOR INFORMATION

Dear Mr. Reddemann:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a Triennial Fire Protection Baseline inspection at the Columbia

Generating Station in April 2018. The inspection team will be comprised of four reactor

inspectors from the NRC Region IV office. The inspection will be conducted in accordance with

Inspection Procedure 71111.05T, Fire Protection (Triennial), the NRCs baseline fire protection

inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit:

March 7 & 8, 2018

Onsite inspection:

April 09 - 13, 2018

April 23 - 27, 2018

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, plant layout, and mitigating strategies

to address Section B.5.b of NRC Order EA-02-026, Order for Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

The team leader will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

M. Reddemann

2

selection will require a walk down of candidate fire areas accompanied by key personnel from

your staff. The enclosure to this letter provides an initial list of the documents the team will need

for their review. We request that your staff transmit copies of the documents listed in the

enclosure to the NRC Region IV office for team use in preparation for the inspection. Please

send this information so that it will arrive in the NRC Region IV office by the dates listed in the

enclosure.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space size and location, specific documents requested to

be made available to the team in their office spaces, arrangements for reactor site access, and

the availability of knowledgeable plant engineering and licensing organization personnel to

serve as points of contact during the inspection.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection are

those documents that establish that your fire protection program satisfies the NRC regulatory

requirements, and conforms to applicable NRC and industry fire protection guidance. For

Section B.5.b portion of the inspection, those documents implementing your mitigating

strategies and demonstrating the management of your commitments for the strategies are of

specific interest. Also, please ensure that appropriate personnel are available to support the

team at the site during the inspection. These personnel should be knowledgeable of the plant

systems required to achieve and maintain safe shutdown conditions from inside and outside the

control room, the electrical aspects of the post-fire safe shutdown analyses, the reactor plant fire

protection systems, and the fire protection program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget under control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Reddemann

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or

john.mateychick@nrc.gov.

Sincerely,

/RA Greg Pick Acting for/

Gregory E. Werner, Chief

Engineering Branch 2

Division of Reactor Safety

Dockets: 50-397

Licenses: NPF-21

Enclosure:

Triennial Fire Protection Inspection

Documentation Request

cc w/ encl: Electronic Distribution

Enclosure

Triennial Fire Protection Inspection Documentation Request

Please provide the following documentation (Items 1 - 5) prior to the onsite information

gathering visit, preferably no later than February 16, 2018. Whenever practical, please provide

copies electronically. Please provide an index of the requested documents which includes a

brief description of the document and the numerical heading associated with the request

(i.e., where it can be found in the list of documents requested).

1. The current version of the fire protection program and fire hazards analysis.

2. Post-fire safe shutdown analysis and the supporting calculations that demonstrate

acceptable plant response.

3. Licensing basis documents for fire protection (safety evaluation reports, pertinent sections of

the final safety analysis report, exemptions, deviations, letters to/from the NRC regarding fire

protection/fire safe shutdown, etc.).

4. The fire probabilistic risk assessment or portions of the plants individual plant examination

for external events (IPEEE) report addressing fire events. Also, include the results of any

post-IPEEE reviews and listings of actions taken/plant modifications conducted in response

to IPEEE information that relate to fire risk.

5. A copy of the documents that support your multiple spurious operation evaluations

(i.e., expert panel reports, evaluation packages, etc.).

Please provide the following documentation (Items 6 - 48) prior to the week of March 26, 2018,

to support inspection preparation. Whenever practical, please provide copies electronically.

Drawings should be provided as paper copies of sufficient size such that all details are legible.

6. Plant layout and equipment drawings for fire areas that identify: (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or fire

zone delineation; (c) the locations of fire protection equipment, such as detection,

suppression, and post-fire emergency lighting units; and (d) fire area boundaries. The

specific documents needed to support inspection preparation will be discussed during the

site visit.

7. Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, firefighting procedures, etc.).

8. Operating procedures used for achieving and maintaining hot and cold shutdown conditions

from the control room in the event of a fire outside the control room (III.G.2 areas).

9. Operating procedures used to implement an alternative shutdown capability with or without

control room evacuation (III.G.3 areas).

10. A list of equipment used to achieve and maintain hot standby and cold shutdown in the

event of a fire (safe shutdown equipment list).

11. Piping and instrumentation (flow) diagrams showing the components used to achieve and

maintain hot standby and cold shutdown for normal and alternative shutdown. Please

provide one copy of the piping and instrumentation (flow) diagrams for these systems of a

2

size sufficient to read all details. These should include the systems used for reactor coolant

system makeup, reactor coolant system pressure control, decay heat removal, and reactivity

control, including the essential support systems.

12. A listing, with descriptions, of design change packages performed since the last triennial fire

protection inspection which were determined to impact fire protection and post-fire safe

shutdowns.

13. A list of any fire protection program changes and evaluations (not limited to Generic

Letter 86-10 evaluations) performed since the last triennial fire protection inspection.

14. Procedures/instructions that control the configuration of the plants fire protection program,

features, and post-fire safe shutdown methodology and system design. Also,

procedures/instructions that govern the implementation of plant modifications, maintenance,

and special operations and their impact on fire protection.

15. A listing of open and closed corrective action documents initiated since the last triennial fire

protection inspection which relate to the fire protection program or equipment, including

corrective actions for fire-induced circuit failures (both single and multiple spurious

actuations) for the selected fire areas. Include the corrective action program document

number, date, and subject.

16. A listing of the applicable codes and standards (with the versions/dates) related to the

design of plant fire protection features and evaluations of any code deviations. Copies of

these codes should be available for review.

17. Drawings of the portions of the emergency lighting system which support fire response.

18. Procedures used to remove smoke from safety-related areas and the engineering studies or

calculations which support the design basis.

19. Drawings of communication systems credited in the license basis for firefighting and plant

operations during fires where control room is occupied and/or evacuated.

20. Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

21. A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems. Also, include a list

of maintenance and surveillance testing procedures which verify fuse and breaker

coordination in accordance with the post-fire safe shutdown coordination analysis.

22. Maintenance rule performance criteria and a summary of the performance history for

systems or functions monitored within the maintenance rule program that support the fire

protection program, or involve safe shutdown equipment over the period since the last

triennial fire protection inspection.

23. Fire protection program requirements (e.g., limiting conditions for operation, surveillance test

requirements) covered by technical specifications, the technical requirements manual, the

updated final safety analysis report, or similar documents.

3

24. Internal and external self-assessments, audits, peer-assessments, or similar reviews related

to post-fire safe shutdown capability or the fire protection program completed since the last

triennial fire protection inspection.

25. A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone, and indicate where the action must take

place.

26. Electronic copies of operator study guides (i.e., lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (reactor coolant system makeup, reactor coolant system pressure

control, decay heat removal, and reactivity control, including the essential support systems).

27. Two paper copies of one-line diagrams of the AC and vital DC electrical distribution

systems. These should depict how power gets from the switchyard to the engineered safety

feature loads (480V and 4160V).

28. A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving their location and the key equipment being protected.

29. A list of repairs (and the procedure that controls the repairs) needed to reach and/or

maintain hot or cold shutdown.

30. A list of high to low pressure interface valves.

31. Procedures governing the training and operation of the fire brigade.

32. Organization charts of site personnel down to the level of fire protection staff personnel.

33. A contact list of key site personnel who will be supporting this inspection, giving the office

location and phone number onsite.

34. The team would like to observe an unannounced fire brigade drill in the plant, if possible,

during the week of April 23, 2018. Please put us in contact with the appropriate personnel

for planning fire brigade drills during the onsite information gathering trip.

35. The team would like to perform a walkthrough of the alternative shutdown procedure with

qualified operators in the plant during the week of April 9, 2018. The team would like to

perform a walkthrough of a sample of manual actions required for other fires not requiring

control room evacuation. Please put us in contact with the appropriate personnel for

planning the walkthroughs during the onsite information gathering trip.

The following documents (Items 36 - 48) involve Section B.5.b mitigating strategies.

36. License condition that incorporated the requirements issued to address the requirements of

Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security

Compensatory Measures, dated February 25, 2002, and 10 CFR 50.54(hh)(2).

37. A list of all modifications to regulatory commitments made to meet the requirements of

Section B.5.b of NRC Order EA-02-026, Order for NRC Interim Safeguards and Security

4

Compensatory Measures, dated February 25, 2002; the subsequently imposed license

conditions; and 10 CFR 50.54(hh)(2).

38. A list of procedures/guidelines which were revised or generated to implement the mitigation

strategies. These could be extensive damage mitigation guidelines, severe accident

management guidelines, emergency operating procedures, abnormal operating procedures,

etc.

39. A matrix that shows the correlation between the mitigation strategies identified in Nuclear

Energy Institute 06-12 and the site-specific procedures or guidelines that are used to

implement each strategy.

40. A list of engineering evaluations/calculations that were used to verify engineering bases for

the mitigation strategies.

41. Piping and instrumentation diagrams or simplified flow diagrams for systems relied upon in

the mitigation strategies. These could be the type used for training.

42. A list of modification packages and simplified drawings/descriptions of modifications that

were made to plant systems to implement the mitigation strategies.

43. Procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to

implement the mitigation strategies.

44. A list of Section B.5.b strategies, if any, which have implementing details that differ from that

documented in the submittals to the NRC and the safety evaluation report.

45. Site general arrangement drawing(s) that show the majority of buildings/areas referenced in

Section B.5.b documents.

46. Training records and lesson plans related to the Section B.5.b mitigating strategies.

47. Copies of Memoranda of Understanding (MOUs) (e.g., with local fire departments) required

to implement any mitigating strategies.

48. The team would like to perform a walkthrough of the procedure implementing a sample

mitigating strategy (to be selected by the inspector during the information gathering visit)

and the inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement

the mitigation strategies during the week of February 12, 2018. Please put us in contact

with the appropriate personnel for planning the walkthrough during the onsite information

gathering trip.

The following documentation needs (Items 49 - 52) will be dependent upon sample selections

and will be finalized during discussions with your staff. Please provide the required documents

prior to the week of March 26, 2018. Whenever practical, please provide copies electronically.

Drawings should be provided as paper copies of sufficient size such that all details are legible.

49. Pre-fire plans for the selected fire areas (areas to be selected by the team during the onsite

information gathering trip).

5

50. List of identified fire-induced circuit failure configurations that could prevent operation or

cause maloperation of equipment credited for safe shutdown in the event of a fire (for the

selected fire areas). Include failure configurations associated with hot shorts, open circuits,

or shorts to ground identified as potentially causing spurious or multiple spurious actuations

or maloperations of this equipment.

51. Cable routing information for components and equipment credited for safe shutdown in the

selected fire areas. This information request item will be discussed and finalized with your

staff during the information gathering visit.

52. Drawings showing the location details for detection and suppression systems in the selected

fire areas.

ML18012A711

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JMM

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI: EB2

C:EB2

NAME

JMateychick

GWerner

SIGNATURE

/RA/

/RA/GAP for

DATE

01/11/2018

01/12/2018