{{#Wiki_filter:CATEGORY               1~                                     t REGULATORY INFORMATION DISTRIBUTION SYSTEM                                 (RIDS)
{{#Wiki_filter:CATEGORY 1~
ACCESSION NBR:9607260166 FACIL:50-260 Browns DOC.DATE:
t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Ferry, Nuclear Power Station, Uni:t 2, 96/07/22    NOTARIZED: NO Tennessee DOCKET 05000260 t
ACCESSION NBR:9607260166 DOC.DATE: 96/07/22 NOTARIZED: NO FACIL:50-260 Browns Ferry, Nuclear Power Station, Uni:t 2, Tennessee AUTH.NAY~'AUTHOR
AUTH.NAY~'AUTHOR Tennessee Valley Authority
'AFFILIATION'ALAS,P.'=
                                                      'AFFILIATION'ALAS,P.'=
Tennessee Valley Authority RECIP.NAME RECIPIENT'FFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME                               RECIPIENT'FFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Provides, Unit         2 Cycle                       9   Startup Rept   per. TS 6.9.1.1   due   to installation of fuel w/different design.
Provides, Unit 2 Cycle 9 Startup Rept per.
DISTRIBUTION CODE: IE26D                                       COPIES RECEIVED:LTR                     ENCL       SIZE:
TS 6.9.1.1 due to installation of fuel w/different design.
DISTRIBUTION CODE:
IE26D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Startup Report/Refueling Report (per Tech Specs)
TITLE: Startup Report/Refueling Report (per Tech Specs)
NOTES:
NOTES:
RECIPIENT                             COPIES              -RECIPIENT          COPIES ID CODE/NAME                           LTTR ENCL         ID CODE/NAME       LTTR ENCL PD2-3-PD                                                        l. 1       WILLIAMS,J.             1     1 0
DOCKET t 05000260 RECIPIENT ID CODE/NAME PD2-3-PD COPIES
INTERNAL: ACRS                                                               5      5      'FILE CENTER              1      1 1      1      R        F      01      1      1 NRR/DSSA/SRXB/B'XTERNAL:
-RECIPIENT LTTR ENCL ID CODE/NAME l.
NOAC                                                             1     1     NRC PDR                   1     1 D I N
1 WILLIAMS,J.
NOTE TO                     ALL '"RIDS" RECIPIENTS:
COPIES LTTR ENCL 1
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
1 0
TOTAL NUMBER                         OF'OPIES REQUIRED:                         .LTTR     12   ENCL   12
INTERNAL: ACRS NRR/DSSA/SRXB/B'XTERNAL:
NOAC 5
5
'FILE CENTER 1
1 R
F 1
1 NRC PDR 01 1
1 1
1 1
1 D I N
NOTE TO ALL '"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF'OPIES REQUIRED:.LTTR 12 ENCL 12


ll Ot
ll Ot
      )'
)'


Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22,       1996 U.S. Nuclear Regulatory Commission ATTN:         Document           Control Desk Washington, D.C. 20555 Gentlemen:
" Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22, 1996 U.S. Nuclear Regulatory Commission ATTN:
In the Matter of                                                               Docket Nos. 50-260 Tennessee          Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN)                                 -   UNIT 2 CYCLE 9 - POWER ASCENSION TEST PROGRAM '(PATP) STARTUP REPORT This letter provides the BFN Unit 2 Cycle 9 Startup Report as required by BFN Technical Specification, Section 6.9.1.1, due to the installation of fuel with a different design (General Electric 11). The Unit 2 PATP refueling operations were performed during the period March 25, 1996, to April 29, 1996.
Document Control Desk Washington, D.C.
Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP. Completed tests met performance criteria or had test deficiencies issued which were     satisfactorily dispositioned.
20555 Gentlemen:
Test results show that BFN Unit 2 systems are capable of meeting design functions. Further, power operation. can be safely and efficiently continued. There are no known deficiencies that could be detrimental to continued safe operation of the unit.
In the Matter of Tennessee Valley Authority Docket Nos.
The final PATP Startup Report is provided in the enclosure and detailed test result packages are available                                   on site for review.
50-260 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 CYCLE 9 - POWER ASCENSION TEST PROGRAM '(PATP)
9607260166 960722 PDR     ADQCK 05000260 p                           PDR
STARTUP REPORT This letter provides the BFN Unit 2 Cycle 9 Startup Report as required by BFN Technical Specification, Section 6.9.1.1, due to the installation of fuel with a different design (General Electric 11).
The Unit 2 PATP refueling operations were performed during the period March 25, 1996, to April 29, 1996.
Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP.
Completed tests met performance criteria or had test deficiencies issued which were satisfactorily dispositioned.
Test results show that BFN Unit 2 systems are capable of meeting design functions.
: Further, power operation. can be safely and efficiently continued.
There are no known deficiencies that could be detrimental to continued safe operation of the unit.
The final PATP Startup Report is provided in the enclosure and detailed test result packages are available on site for review.
9607260166 960722 PDR ADQCK 05000260 p
PDR


li Oi I
li Oi I
\
\\


, U.S. Nuclear Regulatory Commission Page 2 July 22,, 1996 There are no commitments contained in this letter. If you have any questions, please contact me at '(205) 729-2636.
, U.S. Nuclear Regulatory Commission Page 2
Sincerely, Pe ro Salas Manager   of Site Licensing Enclosure cc: See page     3
July 22,, 1996 There are no commitments contained in this letter. If you have any questions, please contact me at '(205) 729-2636.
Sincerely, Pe ro Salas Manager of Site Licensing Enclosure cc:
See page 3


41 U.S. Nuclear Regulatory Commission Page' July 22', 1996 Enclosure cc (Enclosure):
41
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region 101 II Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr., J. F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
 
U.S. Nuclear Regulatory Commission Page' July 22',
1996 Enclosure cc (Enclosure):
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
: Athens, Alabama 35611 Mr., J.
F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852


0 E
0 E

Latest revision as of 00:45, 7 January 2025

Provides Unit 2 Cycle 9 Startup Rept Per TS 6.9.1.1 Due to Installation of Fuel W/Different Design
ML18038B724
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/22/1996
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18038B725 List:
References
NUDOCS 9607260166
Download: ML18038B724 (10)


Text

CATEGORY 1~

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9607260166 DOC.DATE: 96/07/22 NOTARIZED: NO FACIL:50-260 Browns Ferry, Nuclear Power Station, Uni:t 2, Tennessee AUTH.NAY~'AUTHOR

'AFFILIATION'ALAS,P.'=

Tennessee Valley Authority RECIP.NAME RECIPIENT'FFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides, Unit 2 Cycle 9 Startup Rept per.

TS 6.9.1.1 due to installation of fuel w/different design.

DISTRIBUTION CODE:

IE26D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES:

DOCKET t 05000260 RECIPIENT ID CODE/NAME PD2-3-PD COPIES

-RECIPIENT LTTR ENCL ID CODE/NAME l.

1 WILLIAMS,J.

COPIES LTTR ENCL 1

1 0

INTERNAL: ACRS NRR/DSSA/SRXB/B'XTERNAL:

NOAC 5

5

'FILE CENTER 1

1 R

F 1

1 NRC PDR 01 1

1 1

1 1

1 D I N

NOTE TO ALL '"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF'OPIES REQUIRED:.LTTR 12 ENCL 12

ll Ot

)'

" Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22, 1996 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.

50-260 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 CYCLE 9 - POWER ASCENSION TEST PROGRAM '(PATP)

STARTUP REPORT This letter provides the BFN Unit 2 Cycle 9 Startup Report as required by BFN Technical Specification, Section 6.9.1.1, due to the installation of fuel with a different design (General Electric 11).

The Unit 2 PATP refueling operations were performed during the period March 25, 1996, to April 29, 1996.

Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP.

Completed tests met performance criteria or had test deficiencies issued which were satisfactorily dispositioned.

Test results show that BFN Unit 2 systems are capable of meeting design functions.

Further, power operation. can be safely and efficiently continued.

There are no known deficiencies that could be detrimental to continued safe operation of the unit.

The final PATP Startup Report is provided in the enclosure and detailed test result packages are available on site for review.

9607260166 960722 PDR ADQCK 05000260 p

PDR

li Oi I

\\

, U.S. Nuclear Regulatory Commission Page 2

July 22,, 1996 There are no commitments contained in this letter. If you have any questions, please contact me at '(205) 729-2636.

Sincerely, Pe ro Salas Manager of Site Licensing Enclosure cc:

See page 3

41

U.S. Nuclear Regulatory Commission Page' July 22',

1996 Enclosure cc (Enclosure):

Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road

Athens, Alabama 35611 Mr., J.

F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

0 E

I 1

ENCLOSURE TENNESSEE ~ALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2 FINAL,POWER ASCENSION TEST REPORT FOR CYCLE 9 (SEE ATTACHED)

~I