ML18038B724: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY | {{#Wiki_filter:CATEGORY 1~ | ||
ACCESSION NBR:9607260166 FACIL:50-260 Browns | t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
Ferry, Nuclear Power Station, Uni:t 2, | ACCESSION NBR:9607260166 DOC.DATE: 96/07/22 NOTARIZED: NO FACIL:50-260 Browns Ferry, Nuclear Power Station, Uni:t 2, Tennessee AUTH.NAY~'AUTHOR | ||
AUTH.NAY~'AUTHOR | 'AFFILIATION'ALAS,P.'= | ||
Tennessee Valley Authority RECIP.NAME RECIPIENT'FFILIATION Document Control Branch (Document Control Desk) | |||
RECIP.NAME | |||
==SUBJECT:== | ==SUBJECT:== | ||
Provides, Unit | Provides, Unit 2 Cycle 9 Startup Rept per. | ||
DISTRIBUTION CODE: IE26D | TS 6.9.1.1 due to installation of fuel w/different design. | ||
DISTRIBUTION CODE: | |||
IE26D COPIES RECEIVED:LTR ENCL SIZE: | |||
TITLE: Startup Report/Refueling Report (per Tech Specs) | TITLE: Startup Report/Refueling Report (per Tech Specs) | ||
NOTES: | NOTES: | ||
RECIPIENT | DOCKET t 05000260 RECIPIENT ID CODE/NAME PD2-3-PD COPIES | ||
INTERNAL: ACRS | -RECIPIENT LTTR ENCL ID CODE/NAME l. | ||
NOAC | 1 WILLIAMS,J. | ||
NOTE TO | COPIES LTTR ENCL 1 | ||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | 1 0 | ||
TOTAL NUMBER | INTERNAL: ACRS NRR/DSSA/SRXB/B'XTERNAL: | ||
NOAC 5 | |||
5 | |||
'FILE CENTER 1 | |||
1 R | |||
F 1 | |||
1 NRC PDR 01 1 | |||
1 1 | |||
1 1 | |||
1 D I N | |||
NOTE TO ALL '"RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE! | |||
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) | |||
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF'OPIES REQUIRED:.LTTR 12 ENCL 12 | |||
ll Ot | ll Ot | ||
)' | |||
Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22, | " Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22, 1996 U.S. Nuclear Regulatory Commission ATTN: | ||
In the Matter of | Document Control Desk Washington, D.C. | ||
Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP. Completed tests met performance criteria or had test deficiencies issued which were | 20555 Gentlemen: | ||
Test results show that BFN Unit 2 systems are capable of meeting design functions. Further, power operation. can be safely and efficiently continued. There are no known deficiencies that could be detrimental to continued safe operation of the unit. | In the Matter of Tennessee Valley Authority Docket Nos. | ||
The final PATP Startup Report is provided in the enclosure and detailed test result packages are available | 50-260 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 CYCLE 9 - POWER ASCENSION TEST PROGRAM '(PATP) | ||
9607260166 960722 PDR | STARTUP REPORT This letter provides the BFN Unit 2 Cycle 9 Startup Report as required by BFN Technical Specification, Section 6.9.1.1, due to the installation of fuel with a different design (General Electric 11). | ||
The Unit 2 PATP refueling operations were performed during the period March 25, 1996, to April 29, 1996. | |||
Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP. | |||
Completed tests met performance criteria or had test deficiencies issued which were satisfactorily dispositioned. | |||
Test results show that BFN Unit 2 systems are capable of meeting design functions. | |||
: Further, power operation. can be safely and efficiently continued. | |||
There are no known deficiencies that could be detrimental to continued safe operation of the unit. | |||
The final PATP Startup Report is provided in the enclosure and detailed test result packages are available on site for review. | |||
9607260166 960722 PDR ADQCK 05000260 p | |||
PDR | |||
li Oi I | li Oi I | ||
\ | \\ | ||
, U.S. Nuclear Regulatory Commission Page 2 July | , U.S. Nuclear Regulatory Commission Page 2 | ||
Sincerely, Pe | July 22,, 1996 There are no commitments contained in this letter. If you have any questions, please contact me at '(205) 729-2636. | ||
Sincerely, Pe ro Salas Manager of Site Licensing Enclosure cc: | |||
See page 3 | |||
41 U.S. Nuclear Regulatory Commission Page' July | 41 | ||
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region 101 | |||
U.S. Nuclear Regulatory Commission Page' July 22', | |||
1996 Enclosure cc (Enclosure): | |||
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road | |||
: Athens, Alabama 35611 Mr., J. | |||
F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 | |||
0 E | 0 E | ||
Latest revision as of 00:45, 7 January 2025
| ML18038B724 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/22/1996 |
| From: | Salas P TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18038B725 | List: |
| References | |
| NUDOCS 9607260166 | |
| Download: ML18038B724 (10) | |
Text
CATEGORY 1~
t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9607260166 DOC.DATE: 96/07/22 NOTARIZED: NO FACIL:50-260 Browns Ferry, Nuclear Power Station, Uni:t 2, Tennessee AUTH.NAY~'AUTHOR
'AFFILIATION'ALAS,P.'=
Tennessee Valley Authority RECIP.NAME RECIPIENT'FFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides, Unit 2 Cycle 9 Startup Rept per.
TS 6.9.1.1 due to installation of fuel w/different design.
DISTRIBUTION CODE:
IE26D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Startup Report/Refueling Report (per Tech Specs)
NOTES:
DOCKET t 05000260 RECIPIENT ID CODE/NAME PD2-3-PD COPIES
-RECIPIENT LTTR ENCL ID CODE/NAME l.
1 WILLIAMS,J.
COPIES LTTR ENCL 1
1 0
INTERNAL: ACRS NRR/DSSA/SRXB/B'XTERNAL:
NOAC 5
5
'FILE CENTER 1
1 R
F 1
1 NRC PDR 01 1
1 1
1 1
1 D I N
NOTE TO ALL '"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF'OPIES REQUIRED:.LTTR 12 ENCL 12
ll Ot
)'
" Tennessee Vatley Authority. Post Office Box 2000. Decatur, Alabama 35609 July 22, 1996 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.
50-260 BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 2 CYCLE 9 - POWER ASCENSION TEST PROGRAM '(PATP)
STARTUP REPORT This letter provides the BFN Unit 2 Cycle 9 Startup Report as required by BFN Technical Specification, Section 6.9.1.1, due to the installation of fuel with a different design (General Electric 11).
The Unit 2 PATP refueling operations were performed during the period March 25, 1996, to April 29, 1996.
Testing has been satisfactorily completed as defined within the scope of the BFN Unit 2 PATP.
Completed tests met performance criteria or had test deficiencies issued which were satisfactorily dispositioned.
Test results show that BFN Unit 2 systems are capable of meeting design functions.
- Further, power operation. can be safely and efficiently continued.
There are no known deficiencies that could be detrimental to continued safe operation of the unit.
The final PATP Startup Report is provided in the enclosure and detailed test result packages are available on site for review.
9607260166 960722 PDR ADQCK 05000260 p
li Oi I
\\
, U.S. Nuclear Regulatory Commission Page 2
July 22,, 1996 There are no commitments contained in this letter. If you have any questions, please contact me at '(205) 729-2636.
Sincerely, Pe ro Salas Manager of Site Licensing Enclosure cc:
See page 3
41
U.S. Nuclear Regulatory Commission Page' July 22',
1996 Enclosure cc (Enclosure):
Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
- Athens, Alabama 35611 Mr., J.
F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
0 E
I 1
ENCLOSURE TENNESSEE ~ALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNIT 2 FINAL,POWER ASCENSION TEST REPORT FOR CYCLE 9 (SEE ATTACHED)