{{#Wiki_filter:February 12, 2018
{{#Wiki_filter:February 12, 2018  
Mr. Richard L. Anderson, Vice President
Entergy Operations, Inc.
1448 S.R. 333
Russellville, AR 72802-0967
Mr. Richard L. Anderson, Vice President  
SUBJECT:       ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF CYBER-
                SECURITY INSPECTION (NRC INSPECTION REPORT 05000313/2018405
Entergy Operations, Inc.  
                AND 05000368/2018405) AND REQUEST FOR INFORMATION
1448 S.R. 333  
Dear Mr. Anderson:
Russellville, AR 72802-0967  
On July 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in
accordance with Inspection Procedure (IP) 71130.10P, Cyber-Security, Revision 0, at
SUBJECT:  
Arkansas Nuclear One, Units 1 and 2. This inspection evaluates and verifies your ability to
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF CYBER-
meet the full implementation requirements of the NRCs Cyber-Security Rule, Title 10, Code of
SECURITY INSPECTION (NRC INSPECTION REPORT 05000313/2018405
Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and
AND 05000368/2018405) AND REQUEST FOR INFORMATION  
Communication Systems and Networks. The onsite portion of the inspection will take place
during the weeks of July 23, 2018, and August 6, 2018.
Dear Mr. Anderson:  
Experience has shown that these inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
On July 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in  
and to ensure a productive inspection for both parties, we have enclosed a request for
accordance with Inspection Procedure (IP) 71130.10P, Cyber-Security, Revision 0, at  
documents needed for the inspection. The document request has been divided into four
Arkansas Nuclear One, Units 1 and 2. This inspection evaluates and verifies your ability to  
groups.
meet the full implementation requirements of the NRCs Cyber-Security Rule, Title 10, Code of  
The first group specifies information necessary to assist the team in choosing the focus areas
Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and  
(i.e., sample set) to be inspected in accordance with the cyber-security inspection procedure.
Communication Systems and Networks. The onsite portion of the inspection will take place  
This information should be made available using either IMS/CERTREC (preferred) or passive
during the weeks of July 23, 2018, and August 6, 2018.  
media (i.e. CD, DVD) and delivered to the regional office no later than April 30, 2018. The
inspection team will review this information and by the end of the planned information gathering
Experience has shown that these inspections are extremely resource intensive, both for the  
visit on June 28, 2018, will request the specific items that should be provided for review.
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site  
The second group of requested documents will assist the team in their evaluation of the critical
and to ensure a productive inspection for both parties, we have enclosed a request for  
systems and critical digital assets, defensive architecture, and the areas of the cyber-security
documents needed for the inspection. The document request has been divided into four  
plan selected for inspection. This information will be requested for review in the regional office
groups.  
prior to the inspection by July 9, 2018, as identified above.
The third group of requested documents consists of those items that the team will review or
The first group specifies information necessary to assist the team in choosing the focus areas  
need access to, during the inspection. Please have this information available by the first day of
(i.e., sample set) to be inspected in accordance with the cyber-security inspection procedure.
the onsite inspection, July 23, 2018.
This information should be made available using either IMS/CERTREC (preferred) or passive  
The fourth group of information is necessary to aid the team in tracking issues identified as a
media (i.e. CD, DVD) and delivered to the regional office no later than April 30, 2018. The  
result of the inspection. It is requested that this information be provided to the lead inspector as
inspection team will review this information and by the end of the planned information gathering  
visit on June 28, 2018, will request the specific items that should be provided for review.  
The second group of requested documents will assist the team in their evaluation of the critical  
systems and critical digital assets, defensive architecture, and the areas of the cyber-security  
plan selected for inspection. This information will be requested for review in the regional office  
prior to the inspection by July 9, 2018, as identified above.  
The third group of requested documents consists of those items that the team will review or  
need access to, during the inspection. Please have this information available by the first day of  
the onsite inspection, July 23, 2018.  
The fourth group of information is necessary to aid the team in tracking issues identified as a  
result of the inspection. It is requested that this information be provided to the lead inspector as  


R. Anderson                                       2
the information is generated during the inspection. It is important that all of these documents
R. Anderson  
are up-to-date and complete in order to minimize the number of additional documents requested
2  
during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Sam Graves. We understand that our regulatory
the information is generated during the inspection. It is important that all of these documents  
contact for this inspection is Natalie Mosher. If there are any questions about the inspection or
are up-to-date and complete in order to minimize the number of additional documents requested  
the material requested, please contact the lead inspector at 817-200-1102, or by e-mail at
during the preparation and/or the onsite portions of the inspection.  
samuel.graves@nrc.gov.
This letter does not contain new or amended information collection requirements subject
The lead inspector for this inspection is Sam Graves. We understand that our regulatory  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
contact for this inspection is Natalie Mosher. If there are any questions about the inspection or  
collection requirements were approved by the Office of Management and Budget under control
the material requested, please contact the lead inspector at 817-200-1102, or by e-mail at  
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
samuel.graves@nrc.gov.
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
This letter does not contain new or amended information collection requirements subject
number.
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
This letter and its enclosure will be made available for public inspection and copying at
collection requirements were approved by the Office of Management and Budget under control  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
respond to, a request for information or an information collection requirement unless the  
                                              Sincerely,
requesting document displays a currently valid Office of Management and Budget control  
                                              /RA/
number.  
                                              Gregory E. Werner, Chief
                                              Engineering Branch 2
This letter and its enclosure will be made available for public inspection and copying at  
                                              Division of Reactor Safety
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
Dockets: 50-313; 50-368
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
Licenses: DPR-51; NPF-6
Enclosure:
Sincerely,  
Arkansas Nuclear One -
   Cyber-Security Inspection Document Request
/RA/  
cc w/ encl: Electronic Distribution
Gregory E. Werner, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Dockets: 50-313; 50-368  
Licenses: DPR-51; NPF-6  
Enclosure:  
Arkansas Nuclear One -
   Cyber-Security Inspection Document Request  
cc w/ encl: Electronic Distribution


          Arkansas Nuclear One - Cyber-Security Inspection Document Request
Inspection Report:             05000313/2018405
                                05000368/2018405
Inspection Dates:               Weeks of July 23, 2018, and August 6, 2018
Enclosure
Inspection Procedure:           IP 71130.10P, Cyber-Security, Revision 0
Arkansas Nuclear One - Cyber-Security Inspection Document Request  
Reference 1:                   ML17156A215 - Guidance Document for Development of the
                                Request for Information (RFI) and Notification Letter for
                                Full-Implementation of the Cyber-Security Inspection, Revision 1,
Inspection Report:
                                dated October 26, 2017, [OFFICIAL USE ONLY- SECURITY
05000313/2018405  
                                RELATED INFORMATION]
NRC Inspectors:                 Sam Graves, Lead                       Greg Pick
                                817-200-1102                           817-200-1270
                                samuel.graves@nrc.gov                 greg.pick@nrc.gov
                                Dan Livermore (Observer)               Catherine Allen (HQ Liaison)
05000368/2018405  
                                817-200-1517                           catherine.allen@nrc.gov
                                dan.livermore@nrc.gov
Inspection Dates:  
NRC Contractors:               William Jones                         Cynthia DeBisschop
Weeks of July 23, 2018, and August 6, 2018  
                                william.jones2@nrc.gov                 cynthia.debisschop@nrc.gov
I.   Information Requested for In-Office Preparation
Inspection Procedure:  
      The initial request for information (i.e., first RFI) provides the team with the general
IP 71130.10P, Cyber-Security, Revision 0
      information necessary to select appropriate components and cyber-security plan
      elements to develop a site-specific inspection plan. The team will use the first set of
Reference 1:  
      information requested to identify the list of critical systems and critical digital assets plus
ML17156A215 - Guidance Document for Development of the  
      operational and management (O&M) security control portions of the Cyber-Security Plan
Request for Information (RFI) and Notification Letter for
      to be chosen as the sample set required to be inspected during this inspection. The
      first information request is specified in Table RFI #1. Provide the first set of information
Full-Implementation of the Cyber-Security Inspection, Revision 1,  
      to the team leader in the regional office by April 30, 2018, or sooner, to facilitate the
dated October 26, 2017, [OFFICIAL USE ONLY- SECURITY  
      selection of the specific items that will be reviewed during the onsite inspection weeks.
RELATED INFORMATION]  
      The team will examine the returned documentation from the first RFI and identify/select
      specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up
NRC Inspectors:  
      request for information to develop the second RFI. The inspection team will submit the
Sam Graves, Lead  
      specific systems and equipment list to your staff by the end of the planned information
Greg Pick  
      gathering visit on June 28, 2018, which will identify the specific systems and equipment
817-200-1102  
      that will be utilized to evaluate the critical systems and critical digital assets, defensive
817-200-1270  
      architecture, and the areas of the cyber-security program selected for the cyber-security
samuel.graves@nrc.gov  
      inspection. We request that the additional information provided from the second RFI be
greg.pick@nrc.gov  
      made available to the regional office prior to the inspection by July 9, 2018. All requests
      for information shall follow the guidance in Reference 1.
Dan Livermore (Observer)  
                                                                                            Enclosure
Catherine Allen (HQ Liaison)  
817-200-1517
catherine.allen@nrc.gov  
dan.livermore@nrc.gov  
NRC Contractors:  
William Jones  
Cynthia DeBisschop  
william.jones2@nrc.gov  
cynthia.debisschop@nrc.gov  
I.  
Information Requested for In-Office Preparation  
The initial request for information (i.e., first RFI) provides the team with the general  
information necessary to select appropriate components and cyber-security plan  
elements to develop a site-specific inspection plan. The team will use the first set of  
information requested to identify the list of critical systems and critical digital assets plus  
operational and management (O&M) security control portions of the Cyber-Security Plan  
to be chosen as the sample set required to be inspected during this inspection. The  
first information request is specified in Table RFI #1. Provide the first set of information  
to the team leader in the regional office by April 30, 2018, or sooner, to facilitate the  
selection of the specific items that will be reviewed during the onsite inspection weeks.
The team will examine the returned documentation from the first RFI and identify/select  
specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up  
request for information to develop the second RFI. The inspection team will submit the  
specific systems and equipment list to your staff by the end of the planned information  
gathering visit on June 28, 2018, which will identify the specific systems and equipment  
that will be utilized to evaluate the critical systems and critical digital assets, defensive  
architecture, and the areas of the cyber-security program selected for the cyber-security  
inspection. We request that the additional information provided from the second RFI be  
made available to the regional office prior to the inspection by July 9, 2018. All requests  
for information shall follow the guidance in Reference 1.  


The required Table RFI #1 information shall be provided on IMS/CERTREC or passive
media (i.e. CD or DVD) to the lead inspector by April 30, 2018. Please provide five
2
copies of each passive media submitted (i.e., one for each inspector/contractor). The
preferred file format for all lists is a searchable Excel spreadsheet file. The files should
be indexed and hyperlinked to facilitate efficient review. If you have any questions
The required Table RFI #1 information shall be provided on IMS/CERTREC or passive  
regarding this information, please contact the inspection team leader as soon as
media (i.e. CD or DVD) to the lead inspector by April 30, 2018. Please provide five  
possible.
copies of each passive media submitted (i.e., one for each inspector/contractor). The  
                                          Table RFI #1
preferred file format for all lists is a searchable Excel spreadsheet file. The files should  
Section 3: Initial Documentation Requests (See Reference 1)
be indexed and hyperlinked to facilitate efficient review. If you have any questions  
              Paragraph Number/Title:                                                 Items
regarding this information, please contact the inspection team leader as soon as  
  1   List All Identified Critical Systems and Critical Digital Assets                 All
possible.  
      List CDA Facility and Site Ethernet - Transmission Control                       All
  2  Protocol/Internet Protocol (TCP/IP) based Local Area Networks (LANs)
Table RFI #1  
      and identify those LANs that have non-CDAs on them
Section 3: Initial Documentation Requests (See Reference 1)
      List CDA facility and site non-Ethernet TCP/IP based LANs including               All
                  Paragraph Number/Title:  
  3  those industrial networks and identify LANs that have non-CDAs on
Items  
      them
1  
      Network Topology Diagrams (be sure to include all NIDS and SIEMs                 All
List All Identified Critical Systems and Critical Digital Assets  
  4
All  
      for EP networks and Security level 3 and 4 networks)
2
      List all network security boundary devices for EP networks and all               All
List CDA Facility and Site Ethernet - Transmission Control  
  8
Protocol/Internet Protocol (TCP/IP) based Local Area Networks (LANs)  
      network security boundary devices for levels 3 and 4
and identify those LANs that have non-CDAs on them  
  9   List CDA wireless Industrial networks                                             All
All
      Network intrusion detection system documentation for Critical Systems         11.a.1)
3
  11
List CDA facility and site non-Ethernet TCP/IP based LANs including  
      that have CDAs associated with them                                            11.a.2)
those industrial networks and identify LANs that have non-CDAs on  
      Security Information and Event Management (SIEM) documentation for             12.a.1)
them  
  12
All
      Critical Systems that have CDAs associated with them                           12.a.2)
4
  14   List EP and Security onsite and offsite digital communication systems             All
Network Topology Diagrams (be sure to include all NIDS and SIEMs  
      Cyber-Security Assessment and Cyber-Security Incident Response                   All
for EP networks and Security level 3 and 4 networks)  
  25
All
      Teams
8
      Copy of Current Cyber-Security Plan and copy of any 50.54(p) analysis             All
List all network security boundary devices for EP networks and all  
  28
network security boundary devices for levels 3 and 4  
      to support changes to that plan
All
      Copy of any Licensee Identified Violations (LIVs) and associated                 All
9  
  29
List CDA wireless Industrial networks  
      Corrective Action Program (CAP) documentation to resolve issue(s)
All  
In addition to the above information please provide the following:
11 Network intrusion detection system documentation for Critical Systems  
    (1) Electronic copy of the UFSAR and technical specifications
that have CDAs associated with them
    (2) Name(s) and phone numbers for the regulatory and technical contacts
11.a.1)  
    (3) Current management and engineering organizational charts
11.a.2)  
Based on this information, the team will identify and select specific systems and
12 Security Information and Event Management (SIEM) documentation for  
equipment (e.g., critical systems and critical digital assets) from the information
Critical Systems that have CDAs associated with them  
requested by Table RFI #1 and submit a list of specific systems and equipment to your
12.a.1)
                                              2
12.a.2)  
14  
List EP and Security onsite and offsite digital communication systems  
All  
25 Cyber-Security Assessment and Cyber-Security Incident Response  
Teams
All  
28
Copy of Current Cyber-Security Plan and copy of any 50.54(p) analysis  
to support changes to that plan  
All
29
Copy of any Licensee Identified Violations (LIVs) and associated  
Corrective Action Program (CAP) documentation to resolve issue(s)  
All
In addition to the above information please provide the following:  
(1) Electronic copy of the UFSAR and technical specifications  
(2) Name(s) and phone numbers for the regulatory and technical contacts  
(3) Current management and engineering organizational charts  
Based on this information, the team will identify and select specific systems and  
equipment (e.g., critical systems and critical digital assets) from the information  
requested by Table RFI #1 and submit a list of specific systems and equipment to your  


    staff by the end of the information gathering visit on June 28, 2018, for the second
    information request (i.e., RFI #2).
3
II. Additional Information Requested to be Available Prior to Inspection
    As stated in Section I above, the team will examine the returned documentation
    requested from the initial information request and submit the list of specific systems and
staff by the end of the information gathering visit on June 28, 2018, for the second  
    equipment to your staff by the end of the information gathering visit on June 28, 2018,
information request (i.e., RFI #2).  
    for the second request for information (i.e., Table RFI #2). The second RFI will request
    additional information required to evaluate the CSs/CDAs, defensive architecture, and
II.  
    the areas of the licensees CSP selected for the cyber-security inspection. The
Additional Information Requested to be Available Prior to Inspection  
    additional information requested for the specific systems and equipment is identified in
    Table RFI #2. All requested information shall follow the guidance document
As stated in Section I above, the team will examine the returned documentation  
    Reference 1.
requested from the initial information request and submit the list of specific systems and  
    The Table RFI #2 information shall be provided on IMS/CERTREC or passive media to
equipment to your staff by the end of the information gathering visit on June 28, 2018,  
    the lead inspector by July 9, 2018. Please provide five copies of each passive media
for the second request for information (i.e., Table RFI #2). The second RFI will request  
    submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is
additional information required to evaluate the CSs/CDAs, defensive architecture, and  
    a searchable Excel spreadsheet file. These files should be indexed and hyperlinked to
the areas of the licensees CSP selected for the cyber-security inspection. The  
    facilitate efficient review. If you have any questions regarding this information, please
additional information requested for the specific systems and equipment is identified in  
    call the inspection team leader as soon as possible.
Table RFI #2. All requested information shall follow the guidance document  
                                            Table RFI #2
Reference 1.  
    Section 3: Initial Documentation Requests (See Reference 1)
                    Paragraph Number/Title:                                             Items
The Table RFI #2 information shall be provided on IMS/CERTREC or passive media to  
            Plant Computer System Block Diagram (if Plant Computer System is               All
the lead inspector by July 9, 2018. Please provide five copies of each passive media  
        5
submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is  
            selected for inspection)
a searchable Excel spreadsheet file. These files should be indexed and hyperlinked to  
            Plant Security System Block Diagram (if Security Computer System is           All
facilitate efficient review. If you have any questions regarding this information, please  
        6
call the inspection team leader as soon as possible.
            selected for inspection)
            Block Diagrams for distributed systems (for systems selected for               All
Table RFI #2  
        7
Section 3: Initial Documentation Requests (See Reference 1)
            inspection)
                  Paragraph Number/Title:  
            Host-Based Intrusion Detection System Documentation (for CDAs for           10.a.1)
Items  
      10
5 Plant Computer System Block Diagram (if Plant Computer System is  
            systems selected for inspection)                                            10.a.2)
selected for inspection)  
            List all Maintenance and Test Equipment (M&TE) used on CDAs (for               All
All
      13
6 Plant Security System Block Diagram (if Security Computer System is  
            systems selected for inspection)
selected for inspection)  
      15   Configuration Management                                                       All
All
                                                                                          16.a.
7 Block Diagrams for distributed systems (for systems selected for  
                                                                                        16.b.1)
inspection)  
      16    Supply Chain Management
All
                                                                                        16.b.5)
10 Host-Based Intrusion Detection System Documentation (for CDAs for  
                                                                                        16.b.6)
systems selected for inspection)
      17   Portable Media and Mobile Device Control                                       All
10.a.1)  
      18   Software Management                                                           All
10.a.2)  
      20   Vendor Access and Monitoring                                                   All
13 List all Maintenance and Test Equipment (M&TE) used on CDAs (for  
      21   Work Control                                                                   All
systems selected for inspection)  
                                                3
All
15 Configuration Management  
All  
16 Supply Chain Management
16.a.  
16.b.1)  
16.b.5)  
16.b.6)  
17 Portable Media and Mobile Device Control  
All  
18 Software Management  
All  
20 Vendor Access and Monitoring  
All  
21 Work Control  
All  


                                            Table RFI #2
      Section 3: Initial Documentation Requests (See Reference 1)
4
                    Paragraph Number/Title:                                               Items
        22 Device Access and Key Control                                                   All
        23 Password/Authenticator Policy                                                   All
Table RFI #2  
        24 User Account/Credential Policy                                                   All
Section 3: Initial Documentation Requests (See Reference 1)
        26 Corrective Actions since last NRC Inspection                                     All
                  Paragraph Number/Title:  
        27 Cyber-Security Assessments for Selected Systems                                 All
Items  
III. Information Requested to be Available on First Day of Inspection
22 Device Access and Key Control  
    For the specific systems and equipment identified in Section II above, provide the
All  
    following RFI (i.e., Table 1st Week Onsite) on either IMS/CERTREC or passive media by
23 Password/Authenticator Policy  
    July 23, 2018, the first day of the inspection. All requested information shall follow the
All  
    guidance in Reference 1.
24 User Account/Credential Policy  
    Please provide five copies of each passive media submitted (i.e., one for each
All  
    inspector/contactor). The preferred file format for all lists is a searchable Excel
26 Corrective Actions since last NRC Inspection  
    spreadsheet file. These files should be indexed and hyperlinked to facilitate ease of use.
All  
    If you have any questions regarding this information, please call the inspection team
27 Cyber-Security Assessments for Selected Systems  
    leader as soon as possible.
All  
                                        Table 1st Week Onsite
      Section 3: Initial Documentation Requests (See Reference 1)
III.  
                   Paragraph Number/Title:                                               Items
Information Requested to be Available on First Day of Inspection  
                                                                                        10.a.3)
            Host-Based Intrusion Detection System Documentation (for CDAs
For the specific systems and equipment identified in Section II above, provide the  
        10                                                                                thru
following RFI (i.e., Table 1st Week Onsite) on either IMS/CERTREC or passive media by  
            for systems selected for inspection)
July 23, 2018, the first day of the inspection. All requested information shall follow the  
                                                                                      10.a.12)
guidance in Reference 1.  
                                                                                        11.a.3)
            Network intrusion Detection System documentation for Critical
Please provide five copies of each passive media submitted (i.e., one for each  
        11                                                                                thru
inspector/contactor). The preferred file format for all lists is a searchable Excel  
            Systems that have CDAs associated with them
spreadsheet file. These files should be indexed and hyperlinked to facilitate ease of use.
                                                                                      11.a.15)
If you have any questions regarding this information, please call the inspection team  
                                                                                        12.a.3)
leader as soon as possible.  
            Security Information and Event Management (SIEM) documentation
        12                                                                                thru
Table 1st Week Onsite  
            for Critical systems that have CDAs associated with them
Section 3: Initial Documentation Requests (See Reference 1)
                                                                                      12.a.14)
                   Paragraph Number/Title:  
                                                                                        16.b.2)
Items  
        16 Supply Chain Management                                                      16.b.3)
10 Host-Based Intrusion Detection System Documentation (for CDAs  
                                                                                        16.b.4)
for systems selected for inspection)  
        19 Cyber-Security Event Notifications                                               All
10.a.3)  
            Copy of any Licensee Identified Violations (LIVs) and associated               All
thru
        29
10.a.12)  
            Corrective Action Program (CAP) documentation to resolve issue(s)
11 Network intrusion Detection System documentation for Critical  
    In addition to the above information please provide the following:
Systems that have CDAs associated with them  
                                                4
11.a.3)  
thru
11.a.15)  
12 Security Information and Event Management (SIEM) documentation  
for Critical systems that have CDAs associated with them  
12.a.3)
thru
12.a.14)  
16 Supply Chain Management
16.b.2)  
16.b.3)  
16.b.4)  
19 Cyber-Security Event Notifications  
All  
29 Copy of any Licensee Identified Violations (LIVs) and associated  
Corrective Action Program (CAP) documentation to resolve issue(s)  
All
In addition to the above information please provide the following:  


        (1) Copies of the following documents do not need to be solely available to the
            inspection team as long as the inspectors have easy and unrestrained access
5
            to them.
                a. Updated Final Safety Analysis Report, if not previously provided;
                b. Original FSAR Volumes;
(1) Copies of the following documents do not need to be solely available to the  
                c. Original SER and Supplements;
inspection team as long as the inspectors have easy and unrestrained access  
                d. FSAR Question and Answers;
to them.  
                e. Quality Assurance Plan;
                f. Technical Specifications, if not previously provided;
a. Updated Final Safety Analysis Report, if not previously provided;  
                g. Latest IPE/PRA Report;
b. Original FSAR Volumes;  
        (2) Vendor Manuals, Assessments, and Corrective Actions:
c. Original SER and Supplements;  
                a. The most recent cyber-security quality assurance audit and/or
d. FSAR Question and Answers;  
                    self-assessment; and
e. Quality Assurance Plan;  
                b. Corrective action documents (e.g., condition reports, including status of
f. Technical Specifications, if not previously provided;  
                    corrective actions) generated as a result of the most recent cyber-security
g. Latest IPE/PRA Report;
                    quality assurance audit and/or self-assessment.
IV.     Information Requested To Be Provided Throughout the Inspection
(2) Vendor Manuals, Assessments, and Corrective Actions:  
            (1) Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
a. The most recent cyber-security quality assurance audit and/or  
            (2) Copies of the list of questions submitted by the inspection team members and
self-assessment; and  
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
b. Corrective action documents (e.g., condition reports, including status of  
If you have any questions regarding the information requested, please contact the team leader.
corrective actions) generated as a result of the most recent cyber-security  
                                                  5
quality assurance audit and/or self-assessment.  
IV.  
Information Requested To Be Provided Throughout the Inspection  
(1) Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during the inspection.  
(2) Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member).  
If you have any questions regarding the information requested, please contact the team leader.  




ML18044A048
  ML18044A048  
  SUNSI Review: ADAMS:       Non-Publicly Available     Non-Sensitive Keyword: NRC-002
  SUNSI Review:     ADAMS:               Non-Publicly Available         Non-Sensitive       Keyword: NRC-002  
By: STG         Yes No   Publicly Available           Sensitive
By: STG                 Yes   No       Publicly Available                 Sensitive
  OFFICE       SRI:EB2     BC:EB2             BC:PBE       BC:EB2
   
  NAME         SGraves     GWerner             NOKeefe     GWerner
OFFICE  
  SIGNATURE         /RA/         /RA/             /RA/         /RA/
SRI:EB2  
  DATE           01/23/2018   01/30/2018       02/08/2018   02/12/2018
BC:EB2  
BC:PBE  
BC:EB2  
   
NAME  
SGraves  
GWerner  
NOKeefe  
GWerner  
   
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
   
DATE  
01/23/2018  
01/30/2018  
02/08/2018  
02/12/2018
}}
}}

Latest revision as of 10:45, 6 January 2025

Notification of Cyber-Security Inspection (NRC Inspection Report 05000313/2018405 and 05000368/2018405) and Request for Information,
ML18044A048
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/12/2018
From: Greg Werner
Division of Reactor Safety IV
To: Richard Anderson
Entergy Operations
Werner G
References
IR 2018405
Download: ML18044A048 (8)


See also: IR 05000313/2018405

Text

February 12, 2018

Mr. Richard L. Anderson, Vice President

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NOTIFICATION OF CYBER-

SECURITY INSPECTION (NRC INSPECTION REPORT 05000313/2018405

AND 05000368/2018405) AND REQUEST FOR INFORMATION

Dear Mr. Anderson:

On July 23, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure (IP) 71130.10P, Cyber-Security, Revision 0, at

Arkansas Nuclear One, Units 1 and 2. This inspection evaluates and verifies your ability to

meet the full implementation requirements of the NRCs Cyber-Security Rule, Title 10, Code of

Federal Regulations (CFR), Part 73, Section 54, Protection of Digital Computer and

Communication Systems and Networks. The onsite portion of the inspection will take place

during the weeks of July 23, 2018, and August 6, 2018.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. The document request has been divided into four

groups.

The first group specifies information necessary to assist the team in choosing the focus areas

(i.e., sample set) to be inspected in accordance with the cyber-security inspection procedure.

This information should be made available using either IMS/CERTREC (preferred) or passive

media (i.e. CD, DVD) and delivered to the regional office no later than April 30, 2018. The

inspection team will review this information and by the end of the planned information gathering

visit on June 28, 2018, will request the specific items that should be provided for review.

The second group of requested documents will assist the team in their evaluation of the critical

systems and critical digital assets, defensive architecture, and the areas of the cyber-security

plan selected for inspection. This information will be requested for review in the regional office

prior to the inspection by July 9, 2018, as identified above.

The third group of requested documents consists of those items that the team will review or

need access to, during the inspection. Please have this information available by the first day of

the onsite inspection, July 23, 2018.

The fourth group of information is necessary to aid the team in tracking issues identified as a

result of the inspection. It is requested that this information be provided to the lead inspector as

R. Anderson

2

the information is generated during the inspection. It is important that all of these documents

are up-to-date and complete in order to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Sam Graves. We understand that our regulatory

contact for this inspection is Natalie Mosher. If there are any questions about the inspection or

the material requested, please contact the lead inspector at 817-200-1102, or by e-mail at

samuel.graves@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget under control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Gregory E. Werner, Chief

Engineering Branch 2

Division of Reactor Safety

Dockets: 50-313; 50-368

Licenses: DPR-51; NPF-6

Enclosure:

Arkansas Nuclear One -

Cyber-Security Inspection Document Request

cc w/ encl: Electronic Distribution

Enclosure

Arkansas Nuclear One - Cyber-Security Inspection Document Request

Inspection Report: 05000313/2018405

05000368/2018405

Inspection Dates:

Weeks of July 23, 2018, and August 6, 2018

Inspection Procedure:

IP 71130.10P, Cyber-Security, Revision 0

Reference 1:

ML17156A215 - Guidance Document for Development of the

Request for Information (RFI) and Notification Letter for

Full-Implementation of the Cyber-Security Inspection, Revision 1,

dated October 26, 2017, [OFFICIAL USE ONLY- SECURITY

RELATED INFORMATION]

NRC Inspectors:

Sam Graves, Lead

Greg Pick

817-200-1102

817-200-1270

samuel.graves@nrc.gov

greg.pick@nrc.gov

Dan Livermore (Observer)

Catherine Allen (HQ Liaison)

817-200-1517

catherine.allen@nrc.gov

dan.livermore@nrc.gov

NRC Contractors:

William Jones

Cynthia DeBisschop

william.jones2@nrc.gov

cynthia.debisschop@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) provides the team with the general

information necessary to select appropriate components and cyber-security plan

elements to develop a site-specific inspection plan. The team will use the first set of

information requested to identify the list of critical systems and critical digital assets plus

operational and management (O&M) security control portions of the Cyber-Security Plan

to be chosen as the sample set required to be inspected during this inspection. The

first information request is specified in Table RFI #1. Provide the first set of information

to the team leader in the regional office by April 30, 2018, or sooner, to facilitate the

selection of the specific items that will be reviewed during the onsite inspection weeks.

The team will examine the returned documentation from the first RFI and identify/select

specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up

request for information to develop the second RFI. The inspection team will submit the

specific systems and equipment list to your staff by the end of the planned information

gathering visit on June 28, 2018, which will identify the specific systems and equipment

that will be utilized to evaluate the critical systems and critical digital assets, defensive

architecture, and the areas of the cyber-security program selected for the cyber-security

inspection. We request that the additional information provided from the second RFI be

made available to the regional office prior to the inspection by July 9, 2018. All requests

for information shall follow the guidance in Reference 1.

2

The required Table RFI #1 information shall be provided on IMS/CERTREC or passive

media (i.e. CD or DVD) to the lead inspector by April 30, 2018. Please provide five

copies of each passive media submitted (i.e., one for each inspector/contractor). The

preferred file format for all lists is a searchable Excel spreadsheet file. The files should

be indexed and hyperlinked to facilitate efficient review. If you have any questions

regarding this information, please contact the inspection team leader as soon as

possible.

Table RFI #1

Section 3: Initial Documentation Requests (See Reference 1)

Paragraph Number/Title:

Items

1

List All Identified Critical Systems and Critical Digital Assets

All

2

List CDA Facility and Site Ethernet - Transmission Control

Protocol/Internet Protocol (TCP/IP) based Local Area Networks (LANs)

and identify those LANs that have non-CDAs on them

All

3

List CDA facility and site non-Ethernet TCP/IP based LANs including

those industrial networks and identify LANs that have non-CDAs on

them

All

4

Network Topology Diagrams (be sure to include all NIDS and SIEMs

for EP networks and Security level 3 and 4 networks)

All

8

List all network security boundary devices for EP networks and all

network security boundary devices for levels 3 and 4

All

9

List CDA wireless Industrial networks

All

11 Network intrusion detection system documentation for Critical Systems

that have CDAs associated with them

11.a.1)

11.a.2)

12 Security Information and Event Management (SIEM) documentation for

Critical Systems that have CDAs associated with them

12.a.1)

12.a.2)

14

List EP and Security onsite and offsite digital communication systems

All

25 Cyber-Security Assessment and Cyber-Security Incident Response

Teams

All

28

Copy of Current Cyber-Security Plan and copy of any 50.54(p) analysis

to support changes to that plan

All

29

Copy of any Licensee Identified Violations (LIVs) and associated

Corrective Action Program (CAP) documentation to resolve issue(s)

All

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications

(2) Name(s) and phone numbers for the regulatory and technical contacts

(3) Current management and engineering organizational charts

Based on this information, the team will identify and select specific systems and

equipment (e.g., critical systems and critical digital assets) from the information

requested by Table RFI #1 and submit a list of specific systems and equipment to your

3

staff by the end of the information gathering visit on June 28, 2018, for the second

information request (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the team will examine the returned documentation

requested from the initial information request and submit the list of specific systems and

equipment to your staff by the end of the information gathering visit on June 28, 2018,

for the second request for information (i.e., Table RFI #2). The second RFI will request

additional information required to evaluate the CSs/CDAs, defensive architecture, and

the areas of the licensees CSP selected for the cyber-security inspection. The

additional information requested for the specific systems and equipment is identified in

Table RFI #2. All requested information shall follow the guidance document

Reference 1.

The Table RFI #2 information shall be provided on IMS/CERTREC or passive media to

the lead inspector by July 9, 2018. Please provide five copies of each passive media

submitted (i.e., one for each inspector/contractor). The preferred file format for all lists is

a searchable Excel spreadsheet file. These files should be indexed and hyperlinked to

facilitate efficient review. If you have any questions regarding this information, please

call the inspection team leader as soon as possible.

Table RFI #2

Section 3: Initial Documentation Requests (See Reference 1)

Paragraph Number/Title:

Items

5 Plant Computer System Block Diagram (if Plant Computer System is

selected for inspection)

All

6 Plant Security System Block Diagram (if Security Computer System is

selected for inspection)

All

7 Block Diagrams for distributed systems (for systems selected for

inspection)

All

10 Host-Based Intrusion Detection System Documentation (for CDAs for

systems selected for inspection)

10.a.1)

10.a.2)

13 List all Maintenance and Test Equipment (M&TE) used on CDAs (for

systems selected for inspection)

All

15 Configuration Management

All

16 Supply Chain Management

16.a.

16.b.1)

16.b.5)

16.b.6)

17 Portable Media and Mobile Device Control

All

18 Software Management

All

20 Vendor Access and Monitoring

All

21 Work Control

All

4

Table RFI #2

Section 3: Initial Documentation Requests (See Reference 1)

Paragraph Number/Title:

Items

22 Device Access and Key Control

All

23 Password/Authenticator Policy

All

24 User Account/Credential Policy

All

26 Corrective Actions since last NRC Inspection

All

27 Cyber-Security Assessments for Selected Systems

All

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1st Week Onsite) on either IMS/CERTREC or passive media by

July 23, 2018, the first day of the inspection. All requested information shall follow the

guidance in Reference 1.

Please provide five copies of each passive media submitted (i.e., one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyperlinked to facilitate ease of use.

If you have any questions regarding this information, please call the inspection team

leader as soon as possible.

Table 1st Week Onsite

Section 3: Initial Documentation Requests (See Reference 1)

Paragraph Number/Title:

Items

10 Host-Based Intrusion Detection System Documentation (for CDAs

for systems selected for inspection)

10.a.3)

thru

10.a.12)

11 Network intrusion Detection System documentation for Critical

Systems that have CDAs associated with them

11.a.3)

thru

11.a.15)

12 Security Information and Event Management (SIEM) documentation

for Critical systems that have CDAs associated with them

12.a.3)

thru

12.a.14)

16 Supply Chain Management

16.b.2)

16.b.3)

16.b.4)

19 Cyber-Security Event Notifications

All

29 Copy of any Licensee Identified Violations (LIVs) and associated

Corrective Action Program (CAP) documentation to resolve issue(s)

All

In addition to the above information please provide the following:

5

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report;

(2) Vendor Manuals, Assessments, and Corrective Actions:

a. The most recent cyber-security quality assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent cyber-security

quality assurance audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the team leader.

ML18044A048

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002

By: STG Yes No Publicly Available Sensitive

OFFICE

SRI:EB2

BC:EB2

BC:PBE

BC:EB2

NAME

SGraves

GWerner

NOKeefe

GWerner

SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE

01/23/2018

01/30/2018

02/08/2018

02/12/2018