ML18059A028: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Co.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Co.
Mail Stop: EX/JB 700 Universe Blvd.
Mail Stop: EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
Juno Beach, FL 33408  


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - REPORT 05000250/2017006 AND 05000251/2017006, REPORT 05000250/2017402 AND 05000251/2017402, REPORT 05000250/2017501 AND 05000251/2017501
ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - REPORT 05000250/2017006 AND 05000251/2017006, REPORT 05000250/2017402 AND 05000251/2017402, REPORT 05000250/2017501 AND 05000251/2017501  


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4, during the most recent quarter, was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4, during the most recent quarter, was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The NRC will perform Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
The NRC will perform Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.  


M. Nazar                                           2 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Nazar 2
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4603 with any questions you have regarding this letter.
Please contact me at 404-997-4603 with any questions you have regarding this letter.
Sincerely,
Sincerely,  
                                                    /RA/
/RA/
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41  


==Enclosure:==
==Enclosure:==
Turkey Point Inspection/Activity Plan (03/01/2018 - 12/31/2019) cc Distribution via ListServ


Turkey Point Inspection/Activity Plan (03/01/2018 - 12/31/2019) cc Distribution via ListServ
ML18059A028 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 2/21/2018 2/22/2018


ML18059A028 OFFICE          RII:DRP      RII:DRP NAME            LPressley    RMusser DATE            2/21/2018    2/22/2018 IP 22 Inspection Activity Plan Report Turkey Point 03/01/2018 - 12/31/2019 Unit               Start               End                   Activity     CAC               Title                               Staff Count MITIGATING STRATEGIES                                                                                                                                                 3 3, 4         03/05/2018         03/09/2018       TI 2515/191       000509   Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 TRANSPORTATION & PUBLIC PIV                                                                                                                                           1 3, 4         05/21/2018         05/25/2018       IP 71124.08       000732   Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4         05/21/2018         05/25/2018       IP 71151           000746   Performance Indicator Verification SECURITY BASELINE INSPECTION                                                                                                                                         3 3, 4         05/21/2018         05/25/2018       IP 71130.02       000734   Access Control 3, 4         05/21/2018         05/25/2018       IP 71130.04       000736   Equipment Performance, Testing, and Maintenance 3, 4         05/21/2018         05/25/2018       IP 71130.07       000739   Security Training 3, 4         05/21/2018         05/25/2018       IP 71151           001338   Performance Indicator Verification 3, 4         05/21/2018         05/25/2018       IP 81311           000831   Physical Security Requirements for Independent Spent Fuel Storage Installations FORCE-ON-FORCE PLANNING & EXERCISE WEEK                                                                                                                               7 3, 4         07/09/2018         07/13/2018       IP 71130.03       000735   Contingency Response - Force-On-Force Testing 3, 4         07/30/2018         08/03/2018       IP 71130.03       000735   Contingency Response - Force-On-Force Testing UNIT 3 IN-SERVICE INSPECTION                                                                                                                                         1 3           10/08/2018         10/12/2018       IP 71111.08P       000702   Inservice Inspection Activities - PWR RAD HAZARDS & OCC PIV                                                                                                                                                 1 3, 4         10/15/2018         10/19/2018       IP 71124.01       000725   Radiological Hazard Assessment and Exposure Controls 3, 4         10/15/2018         10/19/2018       IP 71151           000746   Performance Indicator Verification FPL CORP AA/FFD/SGI SECURITY INSPECTION                                                                                                                               2 3, 4         10/22/2018         10/26/2018       IP 71130.01       000733   Access Authorization 3, 4         10/22/2018         10/26/2018       IP 71130.06       000738   Protection of Safeguards Information 3, 4         10/22/2018         10/26/2018       IP 71130.08       000740   Fitness For Duty Program TURKEY POINT INITIAL LICENSE EXAM                                                                                                                                     6 3, 4         12/03/2018         12/07/2018       OV                 000956   VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 3, 4         01/07/2019         01/25/2019       EXAD               000500   LICENSE EXAM ADMINISTRATION (EXAD)
IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.
This report does not include INPO and OUTAGE activities.                                                                                                  Page 1 of 3 This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 1 of 3 Enclosure Turkey Point 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MITIGATING STRATEGIES 3
3, 4 03/05/2018 03/09/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 TRANSPORTATION & PUBLIC PIV 1
3, 4 05/21/2018 05/25/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 05/21/2018 05/25/2018 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 3
3, 4 05/21/2018 05/25/2018 IP 71130.02 000734 Access Control 3, 4 05/21/2018 05/25/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3, 4 05/21/2018 05/25/2018 IP 71130.07 000739 Security Training 3, 4 05/21/2018 05/25/2018 IP 71151 001338 Performance Indicator Verification 3, 4 05/21/2018 05/25/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7
3, 4 07/09/2018 07/13/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3, 4 07/30/2018 08/03/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 3 IN-SERVICE INSPECTION 1
3 10/08/2018 10/12/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD HAZARDS & OCC PIV 1
3, 4 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification FPL CORP AA/FFD/SGI SECURITY INSPECTION 2
3, 4 10/22/2018 10/26/2018 IP 71130.01 000733 Access Authorization 3, 4 10/22/2018 10/26/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 10/22/2018 10/26/2018 IP 71130.08 000740 Fitness For Duty Program TURKEY POINT INITIAL LICENSE EXAM 6
3, 4 12/03/2018 12/07/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 3, 4 01/07/2019 01/25/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)  


IP 22 Inspection Activity Plan Report SECURITY BASELINE INSPECTION                                                                                                                       1 3, 4         12/10/2018         12/14/2018       IP 71130.01   000733   Access Authorization 3, 4         12/10/2018         12/14/2018       IP 71130.06   000738   Protection of Safeguards Information 3, 4         12/10/2018         12/14/2018       IP 71130.08   000740   Fitness For Duty Program SECURITY BASELINE INSPECTION                                                                                                                       3 3, 4         01/28/2019         02/01/2019       IP 71130.05   000737   Protective Strategy Evaluation PROBLEM IDENTIFICATION AND RESOLUTION                                                                                                             4 3, 4         01/28/2019         02/01/2019       IP 71152B     000747   Problem Identification and Resolution 3, 4         02/11/2019         02/15/2019       IP 71152B     000747   Problem Identification and Resolution EP EXERCISE INSPECTION                                                                                                                             3 3, 4         02/18/2019         02/22/2019       IP 71114.01   000716   Exercise Evaluation 3, 4         02/18/2019         02/22/2019       IP 71114.04   000719   Emergency Action Level and Emergency Plan Changes 3, 4         02/18/2019         02/22/2019       IP 71114.08   000723   Exercise Evaluation Scenario Review 3, 4         02/18/2019         02/22/2019       IP 71151       001397   Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION                                                                                                                       1 4           03/18/2019         03/22/2019       IP 71111.08P   000702   Inservice Inspection Activities - PWR UNIT 4 SG IN-SERVICE INSPECTION                                                                                                                   1 4           03/18/2019         03/22/2019       IP 71111.08P   000702   Inservice Inspection Activities - PWR RP OCCUPATIONAL WEEK 1                                                                                                                             2 3, 4         03/18/2019         03/22/2019       IP 71124.01   000725   Radiological Hazard Assessment and Exposure Controls 3, 4         03/18/2019         03/22/2019       IP 71124.02   000726   Occupational ALARA Planning and Controls 3, 4         03/18/2019         03/22/2019       IP 71124.03   000727   In-Plant Airborne Radioactivity Control and Mitigation 3, 4         03/18/2019         03/22/2019       IP 71124.04   000729   Occupational Dose Assessment 3, 4         03/18/2019         03/22/2019       IP 71124.05   000729   Radiation Monitoring Instrumentation 3, 4         03/18/2019         03/22/2019       IP 71151       000746   Performance Indicator Verification RP OCCUPATIONAL WEEK 2                                                                                                                             3 3, 4         04/08/2019         04/12/2019       IP 71124.01   000725   Radiological Hazard Assessment and Exposure Controls 3, 4         04/08/2019         04/12/2019       IP 71124.02   000726   Occupational ALARA Planning and Controls 3, 4         04/08/2019         04/12/2019       IP 71124.03   000727   In-Plant Airborne Radioactivity Control and Mitigation 3, 4         04/08/2019         04/12/2019       IP 71124.04   000729   Occupational Dose Assessment 3, 4         04/08/2019         04/12/2019       IP 71124.05   000729   Radiation Monitoring Instrumentation 3, 4         04/08/2019         04/12/2019       IP 71151       000746   Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE                                                                                                                   1 3, 4         07/15/2019         07/19/2019       IP 71111.07T   000700   Heat Sink Performance -Triennial This report does not include INPO and OUTAGE activities.                                                                                Page 2 of 3 This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.
Enclosure
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Enclosure SECURITY BASELINE INSPECTION 1
3, 4 12/10/2018 12/14/2018 IP 71130.01 000733 Access Authorization 3, 4 12/10/2018 12/14/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 12/10/2018 12/14/2018 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 3
3, 4 01/28/2019 02/01/2019 IP 71130.05 000737 Protective Strategy Evaluation PROBLEM IDENTIFICATION AND RESOLUTION 4
3, 4 01/28/2019 02/01/2019 IP 71152B 000747 Problem Identification and Resolution 3, 4 02/11/2019 02/15/2019 IP 71152B 000747 Problem Identification and Resolution EP EXERCISE INSPECTION 3
3, 4 02/18/2019 02/22/2019 IP 71114.01 000716 Exercise Evaluation 3, 4 02/18/2019 02/22/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 02/18/2019 02/22/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 3, 4 02/18/2019 02/22/2019 IP 71151 001397 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION 1
4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 4 SG IN-SERVICE INSPECTION 1
4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL WEEK 1 2
3, 4 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 03/18/2019 03/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 03/18/2019 03/22/2019 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL WEEK 2 3
3, 4 04/08/2019 04/12/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 04/08/2019 04/12/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 04/08/2019 04/12/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/08/2019 04/12/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 04/08/2019 04/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 04/08/2019 04/12/2019 IP 71151 000746 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1
3, 4 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial  


IP 22 Inspection Activity Plan Report SECURITY BASELINE INSPECTION                                                                                                                                   1 3, 4         07/22/2019         07/26/2019       IP 71130.02   000734   Access Control 3, 4         07/22/2019         07/26/2019       IP 71151       001338   Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAM)                                                                                                                     3 3, 4         07/29/2019         08/02/2019       IP 71111.21N   000714   Design Bases Assurance Inspection (Programs) 3, 4         08/12/2019         08/16/2019       IP 71111.21N   000714   Design Bases Assurance Inspection (Programs)
IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.
TURKEY POINT REQUAL INSPECTION                                                                                                                                 2 3, 4         08/26/2019         08/30/2019       IP 71111.11B   000704   Licensed Operator Requalification Program and Licensed Operator Performance -
This report shows only on-site and announced inspection procedures.
Biennial NPFA 805 TFPI                                                                                                                                                   1 3, 4         10/21/2019         10/25/2019       IP 71111.05XT 000697   Fire Protection - NFPA 805 (Triennial) 3, 4         11/04/2019         11/08/2019       IP 71111.05XT 000697   Fire Protection - NFPA 805 (Triennial)
Page 3 of 3 Enclosure SECURITY BASELINE INSPECTION 1
TARGET SET                                                                                                                                                     2 3, 4         11/04/2019         11/08/2019       IP 71130.14   000743   Review of Power Reactor Target Sets This report does not include INPO and OUTAGE activities.                                                                                            Page 3 of 3 This report shows only on-site and announced inspection procedures.
3, 4 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 3, 4 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 3, 4 07/29/2019 08/02/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 3, 4 08/12/2019 08/16/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)
Enclosure}}
TURKEY POINT REQUAL INSPECTION 2
3, 4 08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
Biennial NPFA 805 TFPI 1
3, 4 10/21/2019 10/25/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 3, 4 11/04/2019 11/08/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)
TARGET SET 2
3, 4 11/04/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets}}

Latest revision as of 07:54, 6 January 2025

EOC Assessment Letter Final
ML18059A028
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/28/2018
From: Randy Musser
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18059A028 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 28, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Co.

Mail Stop: EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING STATION UNIT 3 AND UNIT 4 - REPORT 05000250/2017006 AND 05000251/2017006, REPORT 05000250/2017402 AND 05000251/2017402, REPORT 05000250/2017501 AND 05000251/2017501

Dear Mr. Nazar:

The Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Turkey Point Nuclear Generating Station Unit 3 and Unit 4, during the most recent quarter, was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The NRC will perform Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

M. Nazar 2

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4603 with any questions you have regarding this letter.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

Turkey Point Inspection/Activity Plan (03/01/2018 - 12/31/2019) cc Distribution via ListServ

ML18059A028 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 2/21/2018 2/22/2018

IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 1 of 3 Enclosure Turkey Point 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MITIGATING STRATEGIES 3

3, 4 03/05/2018 03/09/2018 TI 2515/191 000509 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 TRANSPORTATION & PUBLIC PIV 1

3, 4 05/21/2018 05/25/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 3, 4 05/21/2018 05/25/2018 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 3

3, 4 05/21/2018 05/25/2018 IP 71130.02 000734 Access Control 3, 4 05/21/2018 05/25/2018 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3, 4 05/21/2018 05/25/2018 IP 71130.07 000739 Security Training 3, 4 05/21/2018 05/25/2018 IP 71151 001338 Performance Indicator Verification 3, 4 05/21/2018 05/25/2018 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7

3, 4 07/09/2018 07/13/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3, 4 07/30/2018 08/03/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 3 IN-SERVICE INSPECTION 1

3 10/08/2018 10/12/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD HAZARDS & OCC PIV 1

3, 4 10/15/2018 10/19/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 10/15/2018 10/19/2018 IP 71151 000746 Performance Indicator Verification FPL CORP AA/FFD/SGI SECURITY INSPECTION 2

3, 4 10/22/2018 10/26/2018 IP 71130.01 000733 Access Authorization 3, 4 10/22/2018 10/26/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 10/22/2018 10/26/2018 IP 71130.08 000740 Fitness For Duty Program TURKEY POINT INITIAL LICENSE EXAM 6

3, 4 12/03/2018 12/07/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV) 3, 4 01/07/2019 01/25/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Enclosure SECURITY BASELINE INSPECTION 1

3, 4 12/10/2018 12/14/2018 IP 71130.01 000733 Access Authorization 3, 4 12/10/2018 12/14/2018 IP 71130.06 000738 Protection of Safeguards Information 3, 4 12/10/2018 12/14/2018 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 3

3, 4 01/28/2019 02/01/2019 IP 71130.05 000737 Protective Strategy Evaluation PROBLEM IDENTIFICATION AND RESOLUTION 4

3, 4 01/28/2019 02/01/2019 IP 71152B 000747 Problem Identification and Resolution 3, 4 02/11/2019 02/15/2019 IP 71152B 000747 Problem Identification and Resolution EP EXERCISE INSPECTION 3

3, 4 02/18/2019 02/22/2019 IP 71114.01 000716 Exercise Evaluation 3, 4 02/18/2019 02/22/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3, 4 02/18/2019 02/22/2019 IP 71114.08 000723 Exercise Evaluation Scenario Review 3, 4 02/18/2019 02/22/2019 IP 71151 001397 Performance Indicator Verification UNIT 4 IN-SERVICE INSPECTION 1

4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR UNIT 4 SG IN-SERVICE INSPECTION 1

4 03/18/2019 03/22/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP OCCUPATIONAL WEEK 1 2

3, 4 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 03/18/2019 03/22/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 03/18/2019 03/22/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 03/18/2019 03/22/2019 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL WEEK 2 3

3, 4 04/08/2019 04/12/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3, 4 04/08/2019 04/12/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 3, 4 04/08/2019 04/12/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3, 4 04/08/2019 04/12/2019 IP 71124.04 000729 Occupational Dose Assessment 3, 4 04/08/2019 04/12/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 3, 4 04/08/2019 04/12/2019 IP 71151 000746 Performance Indicator Verification TRIENNIAL HEAT SINK PERFORMANCE 1

3, 4 07/15/2019 07/19/2019 IP 71111.07T 000700 Heat Sink Performance -Triennial

IP 22 Inspection Activity Plan Report This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Enclosure SECURITY BASELINE INSPECTION 1

3, 4 07/22/2019 07/26/2019 IP 71130.02 000734 Access Control 3, 4 07/22/2019 07/26/2019 IP 71151 001338 Performance Indicator Verification DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 3, 4 07/29/2019 08/02/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs) 3, 4 08/12/2019 08/16/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

TURKEY POINT REQUAL INSPECTION 2

3, 4 08/26/2019 08/30/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial NPFA 805 TFPI 1

3, 4 10/21/2019 10/25/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial) 3, 4 11/04/2019 11/08/2019 IP 71111.05XT 000697 Fire Protection - NFPA 805 (Triennial)

TARGET SET 2

3, 4 11/04/2019 11/08/2019 IP 71130.14 000743 Review of Power Reactor Target Sets