ML18108A092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 22: Line 22:


==Reference:==
==Reference:==
: 1. NRC Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018
1.
: 2. TVA letter to NRC, "Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations,"
NRC Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 2.
TVA letter to NRC, "Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations,"
dated November 3, 2017 The Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2018-02 (Reference 1) requested specific information regarding Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.
dated November 3, 2017 The Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2018-02 (Reference 1) requested specific information regarding Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.
The enclosure to this letter provides updated information to address the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data." The information provided in this enclosure updates the information previously provided in Reference 2.
The enclosure to this letter provides updated information to address the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data." The information provided in this enclosure updates the information previously provided in Reference 2.
Line 37: Line 38:
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328
ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328


NRC FORM 536           U. S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                                         EXPIRES: 11/30/2020 (11-2017)
NRC FORM 536 (11-2017)
              ^RR\
^RR\\
Estimated burden perresponse tocomply with this voluntary information collection request: 1hour. This OPERATOR LICENSING                information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA              Regulatory Commission, Washington, DC20555-0001, orby e-mail tolnfocollects.Resource@nrc.gov, and tothe Desk Officer, Office ofInformation and Regulatory Affairs, NEOB-10202, (3150-0131), Office ofManagement and Budget, Washington, DC 20503. Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct orsponsor, anda person is notrequired torespond to,the information collection.
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 Estimated burden perresponse tocomply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operator examinations.
FACILITY                                                                                                     NRC REGION Sequoyah Unit 1 and Unit 2                                                                                   Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER             CY 20                CY    21                                  CY 22                                  CY 23 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER               CY 20              CY 21                                CY 22                                    CY 23 NUMBER OF REACTOR OPERATORS                 12                                                                10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE             Mar 2020               N/A                                   Apr 2022                                    N/A ALTERNATE DATE              Apr 2020              N/A                                   May 2022                                   N/A NRC FORM 536 (11-2017)}}
Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, orby e-mail tolnfocollects.Resource@nrc.gov, and tothe Desk Officer, Office ofInformation and Regulatory Affairs, NEOB-10202, (3150-0131), Office ofManagement and Budget, Washington, DC 20503.
Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct orsponsor, anda person isnotrequired torespond to,theinformation collection.
FACILITY Sequoyah Unit 1 and Unit 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 20 CY 21 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE NRC FORM536 (11-2017)
CY 20 CY 21 12 Mar 2020 N/A Apr 2020 N/A NRC REGION Region II CY 22 CY 23 CY 22 CY 23 10 Apr 2022 N/A May 2022 N/A}}

Latest revision as of 23:56, 5 January 2025

Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18108A092
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/17/2018
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2018-002
Download: ML18108A092 (4)


Text

Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 April 17, 2018 10CFR50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations

Reference:

1.

NRC Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," dated March 26, 2018 2.

TVA letter to NRC, "Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations,"

dated November 3, 2017 The Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2018-02 (Reference 1) requested specific information regarding Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.

The enclosure to this letter provides updated information to address the NRC's request and provides an estimate of the examination requirements for SQN on NRC Form 536, "Operator Licensing Examination Data." The information provided in this enclosure updates the information previously provided in Reference 2.

There are no commitments contained in this submittal. Should you require additional information regarding this matter, please contact Mr. Michael McBrearty, SQN Licensing Manager at (423)843-7170.

CntKbny L. Williams Site Vice President Sequoyah Nuclear Plant

Enclosure:

NRC Form 536, Operator Licensing Examination Data printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 April 17,2018 cc (Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant

ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328

NRC FORM 536 (11-2017)

^RR\\

U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 Estimated burden perresponse tocomply with this voluntary information collection request: 1hour. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, orby e-mail tolnfocollects.Resource@nrc.gov, and tothe Desk Officer, Office ofInformation and Regulatory Affairs, NEOB-10202, (3150-0131), Office ofManagement and Budget, Washington, DC 20503.

Ifa means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct orsponsor, anda person isnotrequired torespond to,theinformation collection.

FACILITY Sequoyah Unit 1 and Unit 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 20 CY 21 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE NRC FORM536 (11-2017)

CY 20 CY 21 12 Mar 2020 N/A Apr 2020 N/A NRC REGION Region II CY 22 CY 23 CY 22 CY 23 10 Apr 2022 N/A May 2022 N/A