ML18130A835: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-401                             Record of Rejected K/As                                 Form ES-401-4 Tier /         Randomly                                   Reason for Rejection Group        Selected K/A Tier     272000 (SF7, SF9       Question R64. We do not have any relationships between radiation 2/Group 2 RMS) Radiation        monitoring and Aux Building ventilation. Dont have Aux Building (RO)      Monitoring:            ventilation.
{{#Wiki_filter:ES-401 Record of Rejected K/As Form ES-401-4 Tier /
K3.08 Knowledge of    REPLACED by 272000 (SF7, SF9 RMS) Radiation Monitoring: K3.10 the effect that a loss Knowledge of the effect that a loss or malfunction of the RADIATION or malfunction of the  MONITORING System will have on following: Control room RADIATION              ventilation.
Group Randomly Selected K/A Reason for Rejection Tier 2/Group 2 (RO) 272000 (SF7, SF9 RMS) Radiation Monitoring:
MONITORING System will have on following: Auxiliary building ventilation.
K3.08 Knowledge of the effect that a loss or malfunction of the RADIATION MONITORING System will have on following: Auxiliary building ventilation.
Tier     205000 (SF4 SCS)      Question R29: We don't monitor RR loop temps while in SDC (loop temps 2/Group 1 Shutdown Cooling      are not reliable without forced RR flow). Our plant is not analyzed for RR (RO)                             pumps to be running in SDC A4.12 Ability to manually operate      REPLACED by 205000 (SF4 SCS) Shutdown Cooling: A4.11 Ability to and/or monitor in the  manually operate and/or monitor in the control room: Heat exchanger control room:          cooling flow.
Question R64. We do not have any relationships between radiation monitoring and Aux Building ventilation. Dont have Aux Building ventilation.
REPLACED by 272000 (SF7, SF9 RMS) Radiation Monitoring: K3.10 Knowledge of the effect that a loss or malfunction of the RADIATION MONITORING System will have on following: Control room ventilation.
Tier 2/Group 1 (RO) 205000 (SF4 SCS)
Shutdown Cooling A4.12 Ability to manually operate and/or monitor in the control room:
Recirculation loop temperatures.
Recirculation loop temperatures.
Tier      205000 (SF4 SCS)       Question S86:Our plant is not analyzed for RR pumps to be running in 2/Group 1 Shutdown Cooling      SDC, so I cant meet this K/A because the conditions for a trip would not (SRO)                           occur.
Question R29: We don't monitor RR loop temps while in SDC (loop temps are not reliable without forced RR flow). Our plant is not analyzed for RR pumps to be running in SDC REPLACED by 205000 (SF4 SCS) Shutdown Cooling: A4.11 Ability to manually operate and/or monitor in the control room: Heat exchanger cooling flow.
A2.11 Ability to (a) predict the impacts of REPLACED by A2.06 Ability to (a) predict the impacts of the following the following on the  on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN SHUTDOWN              COOLING MODE) ; and (b) based on those predictions, use procedures to COOLING SYSTEM        correct, control, or mitigate the consequences of those abnormal conditions (RHR SHUTDOWN          or operations: SDC/RHR pump trips COOLING MODE) ;
Tier 2/Group 1 (SRO) 205000 (SF4 SCS)
Shutdown Cooling A2.11 Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) ;
and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
Recirculation pump trips.
Recirculation pump trips.
Question S86:Our plant is not analyzed for RR pumps to be running in SDC, so I cant meet this K/A because the conditions for a trip would not occur.
REPLACED by A2.06 Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: SDC/RHR pump trips


ES-401                             Record of Rejected K/As                               Form ES-401-4 Tier     295004 (APE 4)         Question R03: No procedural guidance for ground fault isolation/fault 1/Group 1 Partial or Total Loss   determination for operators. At Fermi 2 this is done under maintenance.
ES-401 Record of Rejected K/As Form ES-401-4 Tier 1/Group 1 (RO) 295004 (APE 4)
(RO)      of DC Power             All an operator does is write a CARD.
Partial or Total Loss of DC Power K3.02 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C. POWER:
K3.02 Knowledge of      REPLACED by K3.03 Knowledge of the reasons for the following the reasons for the    responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C.
following responses    POWER: Reactor SCRAM: Plant-Specific.
as they apply to PARTIAL OR COMPLETE LOSS OF D.C. POWER:
Ground isolation/fault determination.
Ground isolation/fault determination.
Tier     300000 (SF8 IA)         Question S90: Air system is highly sampled on this sample plan. (S87) 2/Group 1 Instrument Air          (R08) (R46) The K/A for S90 risks double jeopardy on this topic.
Question R03: No procedural guidance for ground fault isolation/fault determination for operators. At Fermi 2 this is done under maintenance.
(SRO)                            Recommend keeping the generic (G4.46) and changing the System to 264000 (SF6 EGE) Emergency Generators (Diesel/Jet) EDG which is the G4.46 Ability to        system on the sample plan above Instrument Air to minimize the impact on verify that the alarms  the sample plan.
All an operator does is write a CARD.
are consistent with the Accepted by chief examiner.
REPLACED by K3.03 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C.
plant conditions.
POWER: Reactor SCRAM: Plant-Specific.
Tier     234000 (SF8 FH)         Question R61: Question was found to be Unsat (U) due to low LOD (LOD 2/Group 2 Fuel-Handling          1). During onsite validation week, no suitable replacement could be found (RO)      Equipment              or written. Decision was made to replace K/A in the sample plan.
Tier 2/Group 1 (SRO) 300000 (SF8 IA)
G 2.1.27 Knowledge      REPLACED with Generic K/A 2.1.28 Knowledge of purpose and function of system purpose      of major system components and controls. 4.1/4.1 and/or function.}}
Instrument Air G4.46 Ability to verify that the alarms are consistent with the plant conditions.
Question S90: Air system is highly sampled on this sample plan. (S87)
(R08) (R46) The K/A for S90 risks double jeopardy on this topic.
Recommend keeping the generic (G4.46) and changing the System to 264000 (SF6 EGE) Emergency Generators (Diesel/Jet) EDG which is the system on the sample plan above Instrument Air to minimize the impact on the sample plan.
Accepted by chief examiner.
Tier 2/Group 2 (RO) 234000 (SF8 FH)
Fuel-Handling Equipment G 2.1.27 Knowledge of system purpose and/or function.
Question R61: Question was found to be Unsat (U) due to low LOD (LOD 1). During onsite validation week, no suitable replacement could be found or written. Decision was made to replace K/A in the sample plan.
REPLACED with Generic K/A 2.1.28 Knowledge of purpose and function of major system components and controls. 4.1/4.1}}

Latest revision as of 22:08, 5 January 2025

2018 Fermi Ile Administrative Files Forms ES-401-4
ML18130A835
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/09/2018
From: Chuck Zoia
Division of Reactor Safety III
To:
Detroit Edison
Zoia C
Shared Package
ML17164A399 List:
References
Download: ML18130A835 (2)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Tier /

Group Randomly Selected K/A Reason for Rejection Tier 2/Group 2 (RO) 272000 (SF7, SF9 RMS) Radiation Monitoring:

K3.08 Knowledge of the effect that a loss or malfunction of the RADIATION MONITORING System will have on following: Auxiliary building ventilation.

Question R64. We do not have any relationships between radiation monitoring and Aux Building ventilation. Dont have Aux Building ventilation.

REPLACED by 272000 (SF7, SF9 RMS) Radiation Monitoring: K3.10 Knowledge of the effect that a loss or malfunction of the RADIATION MONITORING System will have on following: Control room ventilation.

Tier 2/Group 1 (RO) 205000 (SF4 SCS)

Shutdown Cooling A4.12 Ability to manually operate and/or monitor in the control room:

Recirculation loop temperatures.

Question R29: We don't monitor RR loop temps while in SDC (loop temps are not reliable without forced RR flow). Our plant is not analyzed for RR pumps to be running in SDC REPLACED by 205000 (SF4 SCS) Shutdown Cooling: A4.11 Ability to manually operate and/or monitor in the control room: Heat exchanger cooling flow.

Tier 2/Group 1 (SRO) 205000 (SF4 SCS)

Shutdown Cooling A2.11 Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) ;

and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

Recirculation pump trips.

Question S86:Our plant is not analyzed for RR pumps to be running in SDC, so I cant meet this K/A because the conditions for a trip would not occur.

REPLACED by A2.06 Ability to (a) predict the impacts of the following on the SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: SDC/RHR pump trips

ES-401 Record of Rejected K/As Form ES-401-4 Tier 1/Group 1 (RO) 295004 (APE 4)

Partial or Total Loss of DC Power K3.02 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C. POWER:

Ground isolation/fault determination.

Question R03: No procedural guidance for ground fault isolation/fault determination for operators. At Fermi 2 this is done under maintenance.

All an operator does is write a CARD.

REPLACED by K3.03 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF D.C.

POWER: Reactor SCRAM: Plant-Specific.

Tier 2/Group 1 (SRO) 300000 (SF8 IA)

Instrument Air G4.46 Ability to verify that the alarms are consistent with the plant conditions.

Question S90: Air system is highly sampled on this sample plan. (S87)

(R08) (R46) The K/A for S90 risks double jeopardy on this topic.

Recommend keeping the generic (G4.46) and changing the System to 264000 (SF6 EGE) Emergency Generators (Diesel/Jet) EDG which is the system on the sample plan above Instrument Air to minimize the impact on the sample plan.

Accepted by chief examiner.

Tier 2/Group 2 (RO) 234000 (SF8 FH)

Fuel-Handling Equipment G 2.1.27 Knowledge of system purpose and/or function.

Question R61: Question was found to be Unsat (U) due to low LOD (LOD 1). During onsite validation week, no suitable replacement could be found or written. Decision was made to replace K/A in the sample plan.

REPLACED with Generic K/A 2.1.28 Knowledge of purpose and function of major system components and controls. 4.1/4.1