ML18157A067: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML18157A067
| number = ML18157A067
| issue date = 06/01/2018
| issue date = 06/01/2018
| title = Boiling Water Reactor - Submittal of Quality Assurance Program Changes
| title = Submittal of Quality Assurance Program Changes
| author name = Vannoordennen G
| author name = Vannoordennen G
| author affiliation = LaCrosseSolutions, LLC
| author affiliation = LaCrosseSolutions, LLC
Line 18: Line 18:
{{#Wiki_filter:~
{{#Wiki_filter:~
LACROSSESOLUTIONS 10 CFR 50.54(a)(3) 10 CFR 50.71(e)(4)
LACROSSESOLUTIONS 10 CFR 50.54(a)(3) 10 CFR 50.71(e)(4)
June 1, 2018                                                                     LC-2018-0036 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046
June 1, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046 LC-2018-0036


==Subject:==
==Subject:==
Line 25: Line 25:
==Reference:==
==Reference:==
Letter from Bruce Watson, U.S: Nuclear Regulatory Commission, to Barbara A.
Letter from Bruce Watson, U.S: Nuclear Regulatory Commission, to Barbara A.
Nick, Dairyland Power Cooperative, "La Crosse Boiling water Reactor - Safety Evaluation Approving Revision 29 to the Quality Assurance Program Description,"
Nick, Dairyland Power Cooperative, "La Crosse Boiling water Reactor - Safety Evaluation Approving Revision 29 to the Quality Assurance Program Description,"  
              . dated May 31, 2016 In accordance with the requirements of 10 CFR 50.54(a)(3), LaCrosseSolutions, LLC is notifying the NRC that no changes to the Quality Assurance Program Description (QAPD) for the La Crosse Boiling Water Reactor (LACBWR) facility have occurred since implementation of Revision 29 on June 1, 2016. In accordance with 10 CFR 50.7l(e)(4), the QAPD update is being submitted within 24 months of QAPD Revision 29 approved in Reference .1. Therefore, no summary of changes is being reported for this period.
. dated May 31, 2016 In accordance with the requirements of 10 CFR 50.54(a)(3), LaCrosseSolutions, LLC is notifying the NRC that no changes to the Quality Assurance Program Description (QAPD) for the La Crosse Boiling Water Reactor (LACBWR) facility have occurred since implementation of Revision 29 on June 1, 2016. In accordance with 10 CFR 50.7l(e)(4), the QAPD update is being submitted within 24 months of QAPD Revision 29 approved in Reference.1. Therefore, no summary of changes is being reported for this period.  
.There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707.
.There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707.
Respectfully,           ~JJ _ ,I
Respectfully,  
~JJ _,I
{;~~1~~
{;~~1~~
Gerard van Noordennen Vice President Regulatory Affairs
Gerard van Noordennen Vice President Regulatory Affairs  
. cc:   Marlayna Vaaler, U.S. NRC Project Manager Service List .
. cc:
I .
Marlayna Vaaler, U.S. NRC Project Manager Service List.
S4601 State Highway 35, Genoa, WI 54632
I.
S4601 State Highway 35, Genoa, WI 54632  


La Crosse Boiling Water Reactor Service List cc:
La Crosse Boiling Water Reactor Service List cc:
Ken Robuck                                 Jeffery Kitsembel Group President Disposal and               Division of Energy Regulation Decommissioning                            Wisconsin .Public Service Commission EnergySolutions                            P.O. Box 7854 299 South Main Street, Suite 1700          Madison, WI 53707-7854 Salt Lake City, UT 84111 Paul Schmidt, Manager John Sauger                                Radiation Protection Section Executive VP and Chief Nuclear Officer      Bureau of Environmental and Occupational Health ReactorD&D                                  Division of Public Health EnergySolutions                            Wisconsin Department of Health Services 121 W. Trade Street, Suite 2700            P.O. Box 2659 Charlotte, NC 28202                        Madison, WI 53701-2659 Gerard van Noordennen                      Barbara Nick VP Regulatory Affairs                      President and CEO EnergySolutions                            Dairyland Power Cooperative 121 W. Trade Street, Suite 2700            3200 East Avenue South Charlotte, NC 28202                        La Crosse, WI 54602-081 7
Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP and Chief Nuclear Officer ReactorD&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202
_Joseph Nowak                                Cheryl Olson, ISFSI Manager General Manager                            La Crosse Boiling Water Reactor LaCrosseSolutions                          Dairyland Power Cooperative S4601 State Highway 35                     S4601 State Highway 35 Genoa, WI54632-8846                        P.O. Box 817 Genoa, WI 54632-8846 Russ Workman General Counsel                            Lane Peters EnergySolutions                            La Crosse Boiling Water Reactor 299 South Main Street, Suite 1700          Dairyland Power Cooperative Salt Lake City, UT 84111                    S4601 State Highway 35 Genoa, WI 54632-8846 Jerome Pedretti, Clerk Town of Genoa                              Thomas Zaremba *1 E860 Mundsack Road                          Wheeler, Van Sickle and Anderson, S.C.
_Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI54632-8846 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, Wl 54632 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 Jeffery Kitsembel Division of Energy Regulation Wisconsin.Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East A venue South La Crosse, WI 54602-081 7 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI 54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Thomas Zaremba *1 Wheeler, Van Sickle and Anderson, S.C.
Genoa, Wl 54632                            44 East Mifflin Street, Suite 1000 Madison, WI 53703 Regional Administrator U.S. NRC, Region III                        John E. Matthews 2443 Warrenville Road                      Morgan, Lewis & Bockius LLP Lisle, IL 60532-4352                        1111 Pennsylvania Avenue, NW Washington, DC 20004}}
44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004}}

Latest revision as of 18:33, 5 January 2025

Submittal of Quality Assurance Program Changes
ML18157A067
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/01/2018
From: Gerard van Noordennen
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LC-2018-0036
Download: ML18157A067 (2)


Text

~

LACROSSESOLUTIONS 10 CFR 50.54(a)(3) 10 CFR 50.71(e)(4)

June 1, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046 LC-2018-0036

Subject:

La Crosse Boiling Water Reactor Submittal of Quality Assurance Program Changes 1

Reference:

Letter from Bruce Watson, U.S: Nuclear Regulatory Commission, to Barbara A.

Nick, Dairyland Power Cooperative, "La Crosse Boiling water Reactor - Safety Evaluation Approving Revision 29 to the Quality Assurance Program Description,"

. dated May 31, 2016 In accordance with the requirements of 10 CFR 50.54(a)(3), LaCrosseSolutions, LLC is notifying the NRC that no changes to the Quality Assurance Program Description (QAPD) for the La Crosse Boiling Water Reactor (LACBWR) facility have occurred since implementation of Revision 29 on June 1, 2016. In accordance with 10 CFR 50.7l(e)(4), the QAPD update is being submitted within 24 months of QAPD Revision 29 approved in Reference.1. Therefore, no summary of changes is being reported for this period.

.There are no regulatory commitments contained in this letter. If you have any questions regarding this letter, please contact me at (860) 462-9707.

Respectfully,

~JJ _,I

{;~~1~~

Gerard van Noordennen Vice President Regulatory Affairs

. cc:

Marlayna Vaaler, U.S. NRC Project Manager Service List.

I.

S4601 State Highway 35, Genoa, WI 54632

La Crosse Boiling Water Reactor Service List cc:

Ken Robuck Group President Disposal and Decommissioning Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger Executive VP and Chief Nuclear Officer ReactorD&D Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Gerard van Noordennen VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202

_Joseph Nowak General Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI54632-8846 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, Wl 54632 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 Jeffery Kitsembel Division of Energy Regulation Wisconsin.Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East A venue South La Crosse, WI 54602-081 7 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI 54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Thomas Zaremba *1 Wheeler, Van Sickle and Anderson, S.C.

44 East Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania A venue, NW Washington, DC 20004