{{#Wiki_filter:July 5, 2019 Mr. Thomas Bergman Vice President, Regulatory Affairs NuScale Power, LLC 1100 NE Circle Boulevard, Suite 200 Corvallis, OR 97330
{{#Wiki_filter:July 5, 2019 Mr. Thomas Bergman Vice President, Regulatory Affairs NuScale Power, LLC 1100 NE Circle Boulevard, Suite 200 Corvallis, OR 97330  


==SUBJECT:==
==SUBJECT:==
NUSCALE POWER, LLC, DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH OPEN ITEMS FOR CHAPTER 20, MITIGATION OF BEYOND-DESIGN-BASIS EVENTS
NUSCALE POWER, LLC, DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH OPEN ITEMS FOR CHAPTER 20, MITIGATION OF BEYOND-DESIGN-BASIS EVENTS  


==Dear Mr. Bergman:==
==Dear Mr. Bergman:==
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with open items (OIs) for each chapter of the NuScale Power, LLC (NuScale) Design Certification Application submitted by NuScale on January 6, 20171.
The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with open items (OIs) for each chapter of the NuScale Power, LLC (NuScale) Design Certification Application submitted by NuScale on January 6, 20171.
The NRC staffs preliminary SE with OIs for Chapter 20, Mitigation of Beyond-Design-Basis Events, is being provided to the Advisory Committee on Reactor Safeguards (ACRS)
The NRC staffs preliminary SE with OIs for Chapter 20, Mitigation of Beyond-Design-Basis Events, is being provided to the Advisory Committee on Reactor Safeguards (ACRS)
Subcommittee to support an upcoming meeting of the ACRS Subcommittee, scheduled to be held on July 9, 2019.
Subcommittee to support an upcoming meeting of the ACRS Subcommittee, scheduled to be held on July 9, 2019.
The enclosed SE with OIs is being provided to NuScale for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations, Section 2.390, Public Inspections, Exemptions, Requests for Withholding. The NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to identify any proprietary information or factual errors. If within that ten-day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public viewing through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public webpage for this application.
The enclosed SE with OIs is being provided to NuScale for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations, Section 2.390, Public Inspections, Exemptions, Requests for Withholding. The NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to identify any proprietary information or factual errors. If within that ten-day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public viewing through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public webpage for this application.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.
1 The Design Certification Application was submitted via a transmittal {{letter dated|date=December 31, 2016|text=letter dated December 31, 2016}}.
1 The Design Certification Application was submitted via a transmittal letter dated December 31, 2016.
Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.  


T. Bergman                               2 If you have any questions or comments concerning this matter, I can be reached at (301) 415-6616 or via e-mail address at Omid.Tabatabai@nrc.gov.
T. Bergman 2
Sincerely,
If you have any questions or comments concerning this matter, I can be reached at (301) 415-6616 or via e-mail address at Omid.Tabatabai@nrc.gov.
                                                  /RA/
Sincerely,  
Omid Tabatabai, Senior Project Manager Licensing Branch 1 Division of Licensing, Siting and Environmental Analysis Office of New Reactors Docket No. 52-048
/RA/
Omid Tabatabai, Senior Project Manager Licensing Branch 1 Division of Licensing, Siting and Environmental Analysis Office of New Reactors Docket No. 52-048  


==Enclosure:==
==Enclosure:==
As stated cc w/o encl.: DC NuScale Listserv


As stated cc w/o encl.: DC NuScale Listserv
PKG: ML18201A279 LETTER: ML18201A281 SE: ML19157A346  
 
*via email NRO-002 OFFICE NRO/DLSE/LB1: PM NRO/DLSE/LB1: LA* NRO/DLSE/LB1: BC* NRO/DLSE/LB1: PM*
PKG: ML18201A279 LETTER: ML18201A281 SE: ML19157A346                           *via email             NRO-002 OFFICE     NRO/DLSE/LB1: PM   NRO/DLSE/LB1: LA* NRO/DLSE/LB1: BC* NRO/DLSE/LB1: PM*
NAME OTabatabai MMoore SLee OTabatabai DATE 07/03/2019 07/03/2019 07/03/2019 07/05/2019}}
NAME       OTabatabai         MMoore           SLee             OTabatabai DATE       07/03/2019         07/03/2019       07/03/2019       07/05/2019}}

Latest revision as of 17:16, 5 January 2025

Letter to NuScale Requesting Prop Check for SER W OIs
ML18201A281
Person / Time
Site: NuScale
Issue date: 07/05/2019
From: Omid Tabatabai
NRC/NRO/DLSE/LB1
To: Bergman T
NuScale
Chowdhury P / 415-1647
Shared Package
ML18201A279 List:
References
Download: ML18201A281 (3)


Text

July 5, 2019 Mr. Thomas Bergman Vice President, Regulatory Affairs NuScale Power, LLC 1100 NE Circle Boulevard, Suite 200 Corvallis, OR 97330

SUBJECT:

NUSCALE POWER, LLC, DESIGN CERTIFICATION APPLICATION - SAFETY EVALUATION WITH OPEN ITEMS FOR CHAPTER 20, MITIGATION OF BEYOND-DESIGN-BASIS EVENTS

Dear Mr. Bergman:

The U.S. Nuclear Regulatory Commission (NRC) staff is preparing a safety evaluation (SE) with open items (OIs) for each chapter of the NuScale Power, LLC (NuScale) Design Certification Application submitted by NuScale on January 6, 20171.

The NRC staffs preliminary SE with OIs for Chapter 20, Mitigation of Beyond-Design-Basis Events, is being provided to the Advisory Committee on Reactor Safeguards (ACRS)

Subcommittee to support an upcoming meeting of the ACRS Subcommittee, scheduled to be held on July 9, 2019.

The enclosed SE with OIs is being provided to NuScale for review of proprietary information pursuant to Title 10 of the Code of Federal Regulations, Section 2.390, Public Inspections, Exemptions, Requests for Withholding. The NRC will withhold the enclosed SE from public disclosure for ten business days from the date of this letter to allow you the opportunity to identify any proprietary information or factual errors. If within that ten-day period, you do not request that all or portions of the SE be withheld from public disclosure, the enclosure will be made available for public viewing through the Publicly Available Records component of NRCs Agencywide Documents Access and Management System and placed on the NRCs public webpage for this application.

1 The Design Certification Application was submitted via a transmittal letter dated December 31, 2016.

Document transmitted herewith contains sensitive unclassified information. When separated from the enclosure, this document is DECONTROLLED.

T. Bergman 2

If you have any questions or comments concerning this matter, I can be reached at (301) 415-6616 or via e-mail address at Omid.Tabatabai@nrc.gov.

Sincerely,

/RA/

Omid Tabatabai, Senior Project Manager Licensing Branch 1 Division of Licensing, Siting and Environmental Analysis Office of New Reactors Docket No.52-048

Enclosure:

As stated cc w/o encl.: DC NuScale Listserv

PKG: ML18201A279 LETTER: ML18201A281 SE: ML19157A346

  • via email NRO-002 OFFICE NRO/DLSE/LB1: PM NRO/DLSE/LB1: LA* NRO/DLSE/LB1: BC* NRO/DLSE/LB1: PM*

NAME OTabatabai MMoore SLee OTabatabai DATE 07/03/2019 07/03/2019 07/03/2019 07/05/2019