{{#Wiki_filter:^Southern Nuclear                                   Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4                706-848-6459 tel APR 1 1 2019 Docket Nos.: 52-025 52-026 ND-19-0354 10CFR 52.99(c)(3)
{{#Wiki_filter:^
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.09.03.ii [Index Number 4241 Ladies and Gentlemen:
Southern Nuclear APR 1 1 2019 Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel Docket Nos.: 52-025 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ND-19-0354 10CFR 52.99(c)(3)
Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 05, 2019, Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Uncompleted Inspections Tests Analyses and Acceptance Criteria (ITAAC) Item 2.3.09.03.ii
Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.09.03.ii [Index Number 4241 Ladies and Gentlemen:
Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 05, 2019, Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections Tests Analyses and Acceptance Criteria (ITAAC) Item 2.3.09.03.ii
[Index Number 424] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing ITAAC 2.3.09.03.11 [Index Number 424]. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
[Index Number 424] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing ITAAC 2.3.09.03.11 [Index Number 424]. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.
This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.
Line 28: Line 29:


==Enclosure:==
==Enclosure:==
Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]
Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]
MJY/DLW/sfr
MJY/DLW/sfr


U.S. Nuclear Regulatory Commission ND-19-0354 Page 3 of 4 To:
U.S. Nuclear Regulatory Commission ND-19-0354 Page 3 of 4 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Best(w/o enclosures)
Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Best (w/o enclosures)
Mr. D. L. McKinney(w/o enclosures)
Mr. D. L. McKinney (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones(w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Vox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Vox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuclear Reaulatorv Commission Mr. W.Jones(w/o enclosures)
Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)
Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson
Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson


U.S. Nuclear Regulatory Commission ND-19-0354 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani(w/o enclosures)
U.S. Nuclear Regulatory Commission ND-19-0354 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. C. Durham (w/o enclosures)
Mr. D. C. Durham (w/o enclosures)
Mr. M. M. Corletti Ms. L. G. Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Mr. M. M. Corletti Ms. L. G.
Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kemizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kemizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 1 of 10 Southern Nuclear Operating Company ND-19-0354 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 1 of 10 Southern Nuclear Operating Company ND-19-0354 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 2of 10 ITAAC Statement Desion Commitment
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 2 of 10 ITAAC Statement Desion Commitment
: 3. The VLB provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents.
: 3. The VLB provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents.
4.a) Controls exist in the MCR to cause the components identified in Table 2.3.9-2 to perform the listed function.
4.a) Controls exist in the MCR to cause the components identified in Table 2.3.9-2 to perform the listed function.
: 5. Displays of the parameters identified in Table 2.3.9-1 can be retrieved in the MCR.
: 5. Displays of the parameters identified in Table 2.3.9-1 can be retrieved in the MCR.
I nsoections/Tests/Analvses i) Inspection for the number of igniters will be performed.
I nsoections/T ests/Analvses i) Inspection for the number of igniters will be performed.
ii) Operability testing will be performed on the igniters.
ii) Operability testing will be performed on the igniters.
Testing will be performed on the igniters using the controls in the MCR.
Testing will be performed on the igniters using the controls in the MCR.
Line 59: Line 61:
ii) The surface temperature of the igniter meets or exceeds 1700°F.
ii) The surface temperature of the igniter meets or exceeds 1700°F.
Controls in the MCR operate to energize the igniters Displays identified in Table 2.3.9-1 can be retrieved in the MCR.
Controls in the MCR operate to energize the igniters Displays identified in Table 2.3.9-1 can be retrieved in the MCR.
ITAAC Completion Description This ITAAC requires testing and inspections be performed to verify that the Containment Hydrogen Control System (VLB) provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents by ensuring that the required number of hydrogen igniters are installed in the appropriate locations as specified by VEGP Combined License(COL)Appendix C Table 2.3.9-2(Attachment A)and that the surface temperature of the igniters meets or exceeds 1700°F. This ITAAC also verifies that controls exist in the Main Control Room (MCR)to cause the components identified in COL Appendix C Table 2.3.9-2 (Attachment A)to perform the listed function and that displays of the parameters identified in COL Appendix C Table 2.3.9-1 (Attachment B)can be retrieved in the MCR.
ITAAC Completion Description This ITAAC requires testing and inspections be performed to verify that the Containment Hydrogen Control System (VLB) provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents by ensuring that the required number of hydrogen igniters are installed in the appropriate locations as specified by VEGP Combined License (COL) Appendix C Table 2.3.9-2 (Attachment A) and that the surface temperature of the igniters meets or exceeds 1700°F. This ITAAC also verifies that controls exist in the Main Control Room (MCR) to cause the components identified in COL Appendix C Table 2.3.9-2 (Attachment A) to perform the listed function and that displays of the parameters identified in COL Appendix C Table 2.3.9-1 (Attachment B) can be retrieved in the MCR.
if At least 66 hvdrooen ioniters are provided inside containment at the locations specified in Table 2.3.9-2.
if At least 66 hvdrooen ioniters are provided inside containment at the locations specified in Table 2.3.9-2.


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 3 of 10 An Inspection Is performed In accordance with Unit 3 and Unit 4 Inspection procedure SV3-VLS-ITR-XXXX and SV4-VLS-ITR-XXXX (References 1 and 2)to verify that at least 66 hydrogen Igniters are provided Inside containment at the locations specified In Attachment A.
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 3 of 10 An Inspection Is performed In accordance with Unit 3 and Unit 4 Inspection procedure SV3-VLS-ITR-XXXX and SV4-VLS-ITR-XXXX (References 1 and 2) to verify that at least 66 hydrogen Igniters are provided Inside containment at the locations specified In Attachment A.
The Inspection Is conducted by performing a walk down of the Installed hydrogen Igniters to verify the correct number of hydrogen Igniters are Installed and that they are all In the proper location. The results of the Inspection verify that for Unit 3 and Unit 4 there are at least 66 hydrogen Igniters provided Inside containment at the locations specified In Table 2.3.9-2.
The Inspection Is conducted by performing a walk down of the Installed hydrogen Igniters to verify the correct number of hydrogen Igniters are Installed and that they are all In the proper location. The results of the Inspection verify that for Unit 3 and Unit 4 there are at least 66 hydrogen Igniters provided Inside containment at the locations specified In Table 2.3.9-2.
II) The surface temperature of the Igniter meets or exceeds 1700°F.
II) The surface temperature of the Igniter meets or exceeds 1700°F.
Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4)to verify that the surface temperature of the Igniter meets or exceeds 1700°F.
Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4) to verify that the surface temperature of the Igniter meets or exceeds 1700°F.
Testing begins by Installing appropriate personnel protection barriers and closing the power supply breakers for the hydrogen Igniters and control cabinets. Each hydrogen Igniter group control Is placed to ON and the temperature of each Igniter Is taken and verified to meet acceptance criteria.
Testing begins by Installing appropriate personnel protection barriers and closing the power supply breakers for the hydrogen Igniters and control cabinets. Each hydrogen Igniter group control Is placed to ON and the temperature of each Igniter Is taken and verified to meet acceptance criteria.
The results of the testing on Unit 3 and Unit 4 verifies the surface temperature of each Igniter meets or exceeds 1700°F.
The results of the testing on Unit 3 and Unit 4 verifies the surface temperature of each Igniter meets or exceeds 1700°F.
Controls In the MGR operate to enerolze the lonlters Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4)to verify that controls In the MGR operate to energize the Igniters.
Controls In the MGR operate to enerolze the lonlters Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4) to verify that controls In the MGR operate to energize the Igniters.
Testing Is performed at an operator work station In Unit 3 and Unit 4 MGR and places the hydrogen Igniters controls to GN. All of the Igniters listed In Attachment A are verified to energize by measuring the temperature which Is performed by Item II) above.
Testing Is performed at an operator work station In Unit 3 and Unit 4 MGR and places the hydrogen Igniters controls to GN. All of the Igniters listed In Attachment A are verified to energize by measuring the temperature which Is performed by Item II) above.
Dlsolavs Identified In Table 2.3.9-1 can be retrieved In the MGR.
Dlsolavs Identified In Table 2.3.9-1 can be retrieved In the MGR.
An Inspection Is performed In accordance with the Unit 3 and Unit 4 component test package work orders SNC922139 and SNGXXXXXX (References 5 and 6)for VLS Indication verifications, and visually confirms that when each of the displays of parameters Identified In Attachment B Is summoned at an MGR workstation, the summoned plant parameter appears on a display monitor at that MGR workstation.
An Inspection Is performed In accordance with the Unit 3 and Unit 4 component test package work orders SNC922139 and SNGXXXXXX (References 5 and 6) for VLS Indication verifications, and visually confirms that when each of the displays of parameters Identified In Attachment B Is summoned at an MGR workstation, the summoned plant parameter appears on a display monitor at that MGR workstation.
The completed test and Inspection results(References 1 through 6), confirm that at least 66 hydrogen Igniters are provided inside containment at the locations specified In Table 2.3.9-2, that the surface temperature of the Igniter meets or exceeds 1700°F, that controls In the MGR operate to energize the Igniters, and that the displays Identified In Table 2.3.9-1 can be retrieved In the MGR.
The completed test and Inspection results (References 1 through 6), confirm that at least 66 hydrogen Igniters are provided inside containment at the locations specified In Table 2.3.9-2, that the surface temperature of the Igniter meets or exceeds 1700°F, that controls In the MGR operate to energize the Igniters, and that the displays Identified In Table 2.3.9-1 can be retrieved In the MGR.
References 1 through 6 are available for NRG Inspection as part of Unit 3 and Unit 4ITAAG Gompletlon Packages(Reference 7 and 8).
References 1 through 6 are available for NRG Inspection as part of Unit 3 and Unit 4ITAAG Gompletlon Packages (Reference 7 and 8).


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 4 of 10 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 4 of 10 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.
References favailable for NRG inspection)
References favailable for NRG inspection)
: 1. SV3-VLS-ITR-XXXX,"Hydrogen Igniter Location Verification"
: 1. SV3-VLS-ITR-XXXX, "Hydrogen Igniter Location Verification"
: 2. SV4-VLS-ITR-XXXX,"Hydrogen Igniter Location Verification"
: 2. SV4-VLS-ITR-XXXX, "Hydrogen Igniter Location Verification"
: 3. 3-VLS-ITPP-501,"Containment Hydrogen Control System Preoperational Test Procedure"
: 3. 3-VLS-ITPP-501, "Containment Hydrogen Control System Preoperational Test Procedure"
: 4. 4-VLS-ITPP-501,"Containment Hydrogen Control System Preoperational Test Procedure"
: 4. 4-VLS-ITPP-501, "Containment Hydrogen Control System Preoperational Test Procedure"
: 5. SNC922139,"Containment Hydrogen Control System Indication Verifications- ITAAC: SV3-2.3.09.03.ii Item 5"
: 5. SNC922139, "Containment Hydrogen Control System Indication Verifications -
: 6. SNCXXXXXX,"Containment Hydrogen Control System Indication Verifications- ITAAC:
ITAAC: SV3-2.3.09.03.ii Item 5"
: 6. SNCXXXXXX, "Containment Hydrogen Control System Indication Verifications -
ITAAC:
SV4-2.3.09.03.ii Item 5"
SV4-2.3.09.03.ii Item 5"
: 7. 2.3.09.03.ii-U3-CP-Rev 0, ITAAC Completion Package
: 7. 2.3.09.03.ii-U3-CP-Rev 0, ITAAC Completion Package
: 8. 2.3.09.03.ii-U4-CP-Rev 0, ITAAC Completion Package
: 8. 2.3.09.03.ii-U4-CP-Rev 0, ITAAC Completion Package
: 9. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"
: 9. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 5 of 10 Attachment A COL Appendix C Table 2.3.9-2 Equipment     Tag Number     Function       Power Group   Location       Room No.
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 5 of 10 Attachment A COL Appendix C Table 2.3.9-2 Equipment Name Tag Number Function Power Group Number Location Room No.
Name                                        Number Hydrogen       VLS-EH-01     Energize       1           Tunnel         11204 Igniter 01                                                connection loop compartments Hydrogen       VLS-EH-02     Energize       2           Tunnel         11204 Igniter 02                                                connection loop compartments Hydrogen       VLS-EH-03     Energize       1           Tunnel         11204 Igniter 03                                                connection loop compartments Hydrogen       VLS-EH-04     Energize       2           Tunnel         11204 Igniter 04                                                connection loop compartments Hydrogen       VLS-EH-OS     Energize       1             Loop           11402 Igniter 05                                                compartment 02 Hydrogen       VLS-EH-06     Energize       2             Loop           11502 Igniter 06                                                compartment 02 Hydrogen       VLS-EH-07     Energize       2             Loop           11402 Igniter 07                                                compartment 02 Hydrogen       VLS-EH-08     Energize       1             Loop           11502 Igniter 08                                                compartment 02 Hydrogen       VLS-EH-09     Energize       1             In-             11305 Igniter 09                                                containment refueling water storage tank (IRWST) sparger side Hydrogen       VLS-EH-10     Energize       2             IRWST sparger   11305 Igniter 10                                                side Hydrogen      VLS-EH-11     Energize       2             Loop           11401 Igniter 11                                                compartment 01
Hydrogen Igniter 01 VLS-EH-01 Energize 1
Tunnel connection loop compartments 11204 Hydrogen Igniter 02 VLS-EH-02 Energize 2
Tunnel connection loop compartments 11204 Hydrogen Igniter 03 VLS-EH-03 Energize 1
Tunnel connection loop compartments 11204 Hydrogen Igniter 04 VLS-EH-04 Energize 2
Tunnel connection loop compartments 11204 Hydrogen Igniter 05 VLS-EH-OS Energize 1
Loop compartment 02 11402 Hydrogen Igniter 06 VLS-EH-06 Energize 2
Loop compartment 02 11502 Hydrogen Igniter 07 VLS-EH-07 Energize 2
Loop compartment 02 11402 Hydrogen Igniter 08 VLS-EH-08 Energize 1
Loop compartment 02 11502 Hydrogen Igniter 09 VLS-EH-09 Energize 1
In-containment refueling water storage tank (IRWST) sparger side 11305 Hydrogen Igniter 10 VLS-EH-10 Energize 2
IRWST sparger side 11305 Hydrogen Igniter 11 VLS-EH-11 Energize 2
Loop compartment 01 11401


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 6 of 10 Attachment A(con't)
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 6 of 10 Attachment A (con't)
Equipment     Tag Number     Function     Power Group Location     Room No.
Equipment Name Tag Number Function Power Group Number Location Room No.
Name                                        Number Hydrogen       VLS-EH-12     Energize     1           Loop         11501 Igniter 12                                              compartment 01 Hydrogen       VLS-EH-13     Energize     1             Loop         11401 Igniter 13                                              compartment 01 Hydrogen       VLS-EH-14     Energize     2             Loop         11501 Igniter 14                                              compartment 01 Hydrogen       VLS-EH-15     Energize     2           IRWST vacuum   11305 Igniter 15                                              breaker vents Hydrogen       VLS-EH-16     Energize     1           IRWST vacuum   11305 Igniter 16                                              breaker vents Hydrogen       VLS-EH-17     Energize     2             Northeast     11207 Igniter 17                                              valve room Hydrogen       VLS-EH-18     Energize     1             Northeast     11207 Igniter 18                                              accumulator room Hydrogen       VLS-EH-19     Energize     2           East valve     11208 Igniter 19                                              room Hydrogen      VLS-EH-20     Energize     2           Southeast     11206 Igniter 20                                              accumulator room Hydrogen       VLS-EH-21     Energize     1           Southeast     11206 Igniter 21                                              valve room Hydrogen       VLS-EH-22     Energize     1           Lower         11400 Igniter 22                                              compartment area (core makeup tank
Hydrogen Igniter 12 VLS-EH-12 Energize 1
[CMT]and valve area)
Loop compartment 01 11501 Hydrogen Igniter 13 VLS-EH-13 Energize 1
Hydrogen       VLS-EH-23     Energize     2           Lower         11400 Igniter 23                                              compartment area (CMT and valve area)
Loop compartment 01 11401 Hydrogen Igniter 14 VLS-EH-14 Energize 2
Loop compartment 01 11501 Hydrogen Igniter 15 VLS-EH-15 Energize 2
IRWST vacuum breaker vents 11305 Hydrogen Igniter 16 VLS-EH-16 Energize 1
IRWST vacuum breaker vents 11305 Hydrogen Igniter 17 VLS-EH-17 Energize 2
Northeast valve room 11207 Hydrogen Igniter 18 VLS-EH-18 Energize 1
Northeast accumulator room 11207 Hydrogen Igniter 19 VLS-EH-19 Energize 2
East valve room 11208 Hydrogen Igniter 20 VLS-EH-20 Energize 2
Southeast accumulator room 11206 Hydrogen Igniter 21 VLS-EH-21 Energize 1
Southeast valve room 11206 Hydrogen Igniter 22 VLS-EH-22 Energize 1
Lower compartment area (core makeup tank
[CMT] and valve area) 11400 Hydrogen Igniter 23 VLS-EH-23 Energize 2
Lower compartment area (CMT and valve area) 11400


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 7 of 10 Attachment A (con't)
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 7 of 10 Attachment A (con't)
Equipment     Tag Number     Function     Power Group Location     Room No.
Equipment Tag Number Function Power Group Location Room No.
Name                                       Number Hydrogen       VLS-EH-24     Energize     2           Lower         11400 igniter 24                                             compartment area (CMT and valve area)
Name Number Hydrogen VLS-EH-24 Energize 2
Hydrogen       VLS-EH-25     Energize     2           Lower         11400 Igniter 25                                             compartment area(CMT and valve area)
Lower 11400 igniter 24 compartment area (CMT and valve area)
Hydrogen       VLS-EH-26     Energize     2           Lower         11400 Igniter 26                                             compartment area (CMT and valve area)
Hydrogen VLS-EH-25 Energize 2
Hydrogen       VLS-EH-27     Energize     1           Lower         11300 Igniter 27                                             compartment area(CMT and valve area)
Lower 11400 Igniter 25 compartment area (CMT and valve area)
Hydrogen       VLS-EH-28     Energize     1           Lower         11400 Igniter 28                                             compartment area (CMT and valve area)
Hydrogen VLS-EH-26 Energize 2
Hydrogen       VLS-EH-29     Energize     1           Lower         11400 Igniter 29                                             compartment area (CMT and valve area)
Lower 11400 Igniter 26 compartment area (CMT and valve area)
Hydrogen       VLS-EH-30     Energize     2           Lower         11403 Igniter 30                                             compartment area(CMT and valve area)
Hydrogen VLS-EH-27 Energize 1
Hydrogen       VLS-EH-31     Energize     1           Lower         11400 Igniter 31                                             compartment area(CMT and valve area)
Lower 11300 Igniter 27 compartment area (CMT and valve area)
Hydrogen       VLS-EH-32     Energize     1           Lower         11400 Igniter 32                                             compartment area (CMT and valve area)
Hydrogen VLS-EH-28 Energize 1
Lower 11400 Igniter 28 compartment area (CMT and valve area)
Hydrogen VLS-EH-29 Energize 1
Lower 11400 Igniter 29 compartment area (CMT and valve area)
Hydrogen VLS-EH-30 Energize 2
Lower 11403 Igniter 30 compartment area (CMT and valve area)
Hydrogen VLS-EH-31 Energize 1
Lower 11400 Igniter 31 compartment area (CMT and valve area)
Hydrogen VLS-EH-32 Energize 1
Lower 11400 Igniter 32 compartment area (CMT and valve area)


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 8 of 10 Attachment A(con't)
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 8 of 10 Attachment A (con't)
Equipment     Tag Number     Function     Power Group Location     Room No.
Equipment Name Tag Number Function Power Group Number Location Room No.
Name                                        Number Hydrogen       VLS-EH-33     Energize     2           North CVS   11209 Igniter 33                                              equipment room Hydrogen       VLS-EH-34     Energize     1           North CVS   11209 Igniter 34                                              equipment room Hydrogen       VLS-EH-35     Energize     1           IRWST hooded 11500 Igniter 35                                              vents Hydrogen      VLS-EH-36     Energize     2           IRWST hooded 11500 Igniter 36                                              vents Hydrogen      VLS-EH-37     Energize     1           IRWST hooded 11500 Igniter 37                                              vents Hydrogen      VLS-EH-38     Energize     2           IRWST hooded 11500 Igniter 38                                              vents Hydrogen      VLS-EH-39     Energize     1           Upper       11500 Igniter 39                                              compartment lower region Hydrogen       VLS-EH-40     Energize     2           Upper       11500 Igniter 40                                              compartment lower region Hydrogen       VLS-EH-41     Energize     2           Upper       11500 Igniter 41                                              compartment lower region Hydrogen       VLS-EH-42     Energize     1           Upper       11500 Igniter 42                                              compartment lower region Hydrogen       VLS-EH-43     Energize     1           Upper       11500 Igniter 43                                              compartment lower region Hydrogen       VLS-EH-44     Energize     1           Upper       11500 Igniter 44                                              compartment lower region Hydrogen       VLS-EH-45     Energize     2           Upper       11500 Igniter 45                                              compartment lower region Hydrogen       VLS-EH-46     Energize     2           Upper       11500 Igniter 46                                              compartment lower region
Hydrogen Igniter 33 VLS-EH-33 Energize 2
North CVS equipment room 11209 Hydrogen Igniter 34 VLS-EH-34 Energize 1
North CVS equipment room 11209 Hydrogen Igniter 35 VLS-EH-35 Energize 1
IRWST hooded vents 11500 Hydrogen Igniter 36 VLS-EH-36 Energize 2
IRWST hooded vents 11500 Hydrogen Igniter 37 VLS-EH-37 Energize 1
IRWST hooded vents 11500 Hydrogen Igniter 38 VLS-EH-38 Energize 2
IRWST hooded vents 11500 Hydrogen Igniter 39 VLS-EH-39 Energize 1
Upper compartment lower region 11500 Hydrogen Igniter 40 VLS-EH-40 Energize 2
Upper compartment lower region 11500 Hydrogen Igniter 41 VLS-EH-41 Energize 2
Upper compartment lower region 11500 Hydrogen Igniter 42 VLS-EH-42 Energize 1
Upper compartment lower region 11500 Hydrogen Igniter 43 VLS-EH-43 Energize 1
Upper compartment lower region 11500 Hydrogen Igniter 44 VLS-EH-44 Energize 1
Upper compartment lower region 11500 Hydrogen Igniter 45 VLS-EH-45 Energize 2
Upper compartment lower region 11500 Hydrogen Igniter 46 VLS-EH-46 Energize 2
Upper compartment lower region 11500


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 9 of 10 Attachment A(con't)
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 9 of 10 Attachment A (con't)
Equipment     Tag Number     Function     Power Group Location     Room No.
Equipment Name Tag Number Function Power Group Number Location Room No.
Name                                        Number Hydrogen       VLS-EH-47     Energize     1           Upper       11500 Igniter 47                                              compartment lower region Hydrogen       VLS-EH-48     Energize     2           Upper       11500 Igniter 48                                              compartment lower region Hydrogen       VLS-EH-49     Energize       1           Pressurizer 11503 Igniter 49                                              compartment Hydrogen      VLS-EH-50     Energize     2           Pressurizer 11503 Igniter 50                                              compartment Hydrogen      VLS-EH-51     Energize     1           Upper       11500 Igniter 51                                              compartment mid-region Hydrogen       VLS-EH-52     Energize     2           Upper       11500 Igniter 52                                              compartment mid-region Hydrogen       VLS-EH-53     Energize     2           Upper       11500 Igniter 53                                              compartment mid-region Hydrogen       VLS-EH-54     Energize     1           Upper       11500 Igniter 54                                              compartment mid-region Hydrogen       VLS-EH-55     Energize     1           Refueling   11504 Igniter 55                                              cavity Hydrogen      VLS-EH-56     Energize     2           Refueling   11504 Igniter 56                                              cavity Hydrogen      VLS-EH-57     Energize     2           Refueling   11504 Igniter 57                                              cavity Hydrogen      VLS-EH-58     Energize     1           Refueling   11504 Igniter 58                                              cavity Hydrogen      VLS-EH-59     Energize     2           Pressurizer 11503 Igniter 59                                              compartment Hydrogen      VLS-EH-60     Energize     1           Pressurizer 11503 Igniter 60                                              compartment Hydrogen      VLS-EH-61     Energize     1           Upper       11500 Igniter 61                                              compartment-upper region
Hydrogen Igniter 47 VLS-EH-47 Energize 1
Upper compartment lower region 11500 Hydrogen Igniter 48 VLS-EH-48 Energize 2
Upper compartment lower region 11500 Hydrogen Igniter 49 VLS-EH-49 Energize 1
Pressurizer compartment 11503 Hydrogen Igniter 50 VLS-EH-50 Energize 2
Pressurizer compartment 11503 Hydrogen Igniter 51 VLS-EH-51 Energize 1
Upper compartment mid-region 11500 Hydrogen Igniter 52 VLS-EH-52 Energize 2
Upper compartment mid-region 11500 Hydrogen Igniter 53 VLS-EH-53 Energize 2
Upper compartment mid-region 11500 Hydrogen Igniter 54 VLS-EH-54 Energize 1
Upper compartment mid-region 11500 Hydrogen Igniter 55 VLS-EH-55 Energize 1
Refueling cavity 11504 Hydrogen Igniter 56 VLS-EH-56 Energize 2
Refueling cavity 11504 Hydrogen Igniter 57 VLS-EH-57 Energize 2
Refueling cavity 11504 Hydrogen Igniter 58 VLS-EH-58 Energize 1
Refueling cavity 11504 Hydrogen Igniter 59 VLS-EH-59 Energize 2
Pressurizer compartment 11503 Hydrogen Igniter 60 VLS-EH-60 Energize 1
Pressurizer compartment 11503 Hydrogen Igniter 61 VLS-EH-61 Energize 1
Upper compartment-upper region 11500


U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 10 ol 10 Attachment A (con't)
U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 10 ol 10 Attachment A (con't)
Equipment       Tag Number   Function       Power Group   Location     Room No.
Equipment Name Tag Number Function Power Group Number Location Room No.
Name                                        Number Hydrogen       VLS-EH-62     Energize       2             Upper       11500 Igniter 62                                                compartment-upper region Hydrogen       VLS-EH-63     Energize       1             Upper       11500 Igniter 63                                                compartment-upper region Hydrogen       VLS-EH-64     Energize       2             Upper       11500 Igniter 64                                                compartment-upper region Hydrogen       VLS-EH-65     Energize       1             IRWST roof   11500 Igniter 65                                                vents Hydrogen        VLS-EH-66     Energize       2             IRWST roof   11500 Igniter 66                                                vents Attachment B COL Appendix C Table 2.3.9-1 Equipment                         Tag No.           Display Containment Hydrogen Monitor               VLS-001             Yes Containment Hydrogen Monitor               VLS-002             Yes Containment Hydrogen Monitor               VLS-003             Yes}}
Hydrogen Igniter 62 VLS-EH-62 Energize 2
Upper compartment-upper region 11500 Hydrogen Igniter 63 VLS-EH-63 Energize 1
Upper compartment-upper region 11500 Hydrogen Igniter 64 VLS-EH-64 Energize 2
Upper compartment-upper region 11500 Hydrogen Igniter 65 VLS-EH-65 Energize 1
IRWST roof vents 11500 Hydrogen Igniter 66 VLS-EH-66 Energize 2
IRWST roof vents 11500 Attachment B COL Appendix C Table 2.3.9-1 Equipment Tag No.
Display Containment Hydrogen Monitor VLS-001 Yes Containment Hydrogen Monitor VLS-002 Yes Containment Hydrogen Monitor VLS-003 Yes}}

Latest revision as of 03:13, 5 January 2025

Unit 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.09.03.ii (Index Number 424)
ML19105B144
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/11/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ND-19-0354
Download: ML19105B144 (14)


Text

^

Southern Nuclear APR 1 1 2019 Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6459 tel Docket Nos.: 52-025 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ND-19-0354 10CFR 52.99(c)(3)

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.09.03.ii [Index Number 4241 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 05, 2019, Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections Tests Analyses and Acceptance Criteria (ITAAC) Item 2.3.09.03.ii

[Index Number 424] has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing ITAAC 2.3.09.03.11 [Index Number 424]. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed.

All ITAAC will be fully completed and all Section 52.99(c)(3) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575

U.S. Nuclear Regulatory Commission ND-19-0354 Page 2 of 4 Respectfully submittecL Mfchael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]

MJY/DLW/sfr

U.S. Nuclear Regulatory Commission ND-19-0354 Page 3 of 4 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Best (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Vox Mr. A. 8. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Ms. J. M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

U.S. Nuclear Regulatory Commission ND-19-0354 Page 4 of 4 Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G.

Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kemizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 1 of 10 Southern Nuclear Operating Company ND-19-0354 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.3.09.03.11 [Index Number 424]

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 2 of 10 ITAAC Statement Desion Commitment

3. The VLB provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents.

4.a) Controls exist in the MCR to cause the components identified in Table 2.3.9-2 to perform the listed function.

5. Displays of the parameters identified in Table 2.3.9-1 can be retrieved in the MCR.

I nsoections/T ests/Analvses i) Inspection for the number of igniters will be performed.

ii) Operability testing will be performed on the igniters.

Testing will be performed on the igniters using the controls in the MCR.

Inspection will be performed for retrievability of the displays identified in Table 2.3.9-1 in the MCR.

Acceptance Criteria i) At least 66 hydrogen igniters are provided inside containment at the locations specified in Table 2.3.9-2.

ii) The surface temperature of the igniter meets or exceeds 1700°F.

Controls in the MCR operate to energize the igniters Displays identified in Table 2.3.9-1 can be retrieved in the MCR.

ITAAC Completion Description This ITAAC requires testing and inspections be performed to verify that the Containment Hydrogen Control System (VLB) provides the nonsafety-related function to control the containment hydrogen concentration for beyond design basis accidents by ensuring that the required number of hydrogen igniters are installed in the appropriate locations as specified by VEGP Combined License (COL) Appendix C Table 2.3.9-2 (Attachment A) and that the surface temperature of the igniters meets or exceeds 1700°F. This ITAAC also verifies that controls exist in the Main Control Room (MCR) to cause the components identified in COL Appendix C Table 2.3.9-2 (Attachment A) to perform the listed function and that displays of the parameters identified in COL Appendix C Table 2.3.9-1 (Attachment B) can be retrieved in the MCR.

if At least 66 hvdrooen ioniters are provided inside containment at the locations specified in Table 2.3.9-2.

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 3 of 10 An Inspection Is performed In accordance with Unit 3 and Unit 4 Inspection procedure SV3-VLS-ITR-XXXX and SV4-VLS-ITR-XXXX (References 1 and 2) to verify that at least 66 hydrogen Igniters are provided Inside containment at the locations specified In Attachment A.

The Inspection Is conducted by performing a walk down of the Installed hydrogen Igniters to verify the correct number of hydrogen Igniters are Installed and that they are all In the proper location. The results of the Inspection verify that for Unit 3 and Unit 4 there are at least 66 hydrogen Igniters provided Inside containment at the locations specified In Table 2.3.9-2.

II) The surface temperature of the Igniter meets or exceeds 1700°F.

Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4) to verify that the surface temperature of the Igniter meets or exceeds 1700°F.

Testing begins by Installing appropriate personnel protection barriers and closing the power supply breakers for the hydrogen Igniters and control cabinets. Each hydrogen Igniter group control Is placed to ON and the temperature of each Igniter Is taken and verified to meet acceptance criteria.

The results of the testing on Unit 3 and Unit 4 verifies the surface temperature of each Igniter meets or exceeds 1700°F.

Controls In the MGR operate to enerolze the lonlters Testing Is performed In accordance with Unit 3 and Unit 4 preoperatlonal test procedures 3-VLS-ITPP-501 and 4-VLS-ITPP-501 (References 3 and 4) to verify that controls In the MGR operate to energize the Igniters.

Testing Is performed at an operator work station In Unit 3 and Unit 4 MGR and places the hydrogen Igniters controls to GN. All of the Igniters listed In Attachment A are verified to energize by measuring the temperature which Is performed by Item II) above.

Dlsolavs Identified In Table 2.3.9-1 can be retrieved In the MGR.

An Inspection Is performed In accordance with the Unit 3 and Unit 4 component test package work orders SNC922139 and SNGXXXXXX (References 5 and 6) for VLS Indication verifications, and visually confirms that when each of the displays of parameters Identified In Attachment B Is summoned at an MGR workstation, the summoned plant parameter appears on a display monitor at that MGR workstation.

The completed test and Inspection results (References 1 through 6), confirm that at least 66 hydrogen Igniters are provided inside containment at the locations specified In Table 2.3.9-2, that the surface temperature of the Igniter meets or exceeds 1700°F, that controls In the MGR operate to energize the Igniters, and that the displays Identified In Table 2.3.9-1 can be retrieved In the MGR.

References 1 through 6 are available for NRG Inspection as part of Unit 3 and Unit 4ITAAG Gompletlon Packages (Reference 7 and 8).

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 4 of 10 List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References favailable for NRG inspection)

1. SV3-VLS-ITR-XXXX, "Hydrogen Igniter Location Verification"
2. SV4-VLS-ITR-XXXX, "Hydrogen Igniter Location Verification"
3. 3-VLS-ITPP-501, "Containment Hydrogen Control System Preoperational Test Procedure"
4. 4-VLS-ITPP-501, "Containment Hydrogen Control System Preoperational Test Procedure"
5. SNC922139, "Containment Hydrogen Control System Indication Verifications -

ITAAC: SV3-2.3.09.03.ii Item 5"

6. SNCXXXXXX, "Containment Hydrogen Control System Indication Verifications -

ITAAC:

SV4-2.3.09.03.ii Item 5"

7. 2.3.09.03.ii-U3-CP-Rev 0, ITAAC Completion Package
8. 2.3.09.03.ii-U4-CP-Rev 0, ITAAC Completion Package
9. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 5 of 10 Attachment A COL Appendix C Table 2.3.9-2 Equipment Name Tag Number Function Power Group Number Location Room No.

Hydrogen Igniter 01 VLS-EH-01 Energize 1

Tunnel connection loop compartments 11204 Hydrogen Igniter 02 VLS-EH-02 Energize 2

Tunnel connection loop compartments 11204 Hydrogen Igniter 03 VLS-EH-03 Energize 1

Tunnel connection loop compartments 11204 Hydrogen Igniter 04 VLS-EH-04 Energize 2

Tunnel connection loop compartments 11204 Hydrogen Igniter 05 VLS-EH-OS Energize 1

Loop compartment 02 11402 Hydrogen Igniter 06 VLS-EH-06 Energize 2

Loop compartment 02 11502 Hydrogen Igniter 07 VLS-EH-07 Energize 2

Loop compartment 02 11402 Hydrogen Igniter 08 VLS-EH-08 Energize 1

Loop compartment 02 11502 Hydrogen Igniter 09 VLS-EH-09 Energize 1

In-containment refueling water storage tank (IRWST) sparger side 11305 Hydrogen Igniter 10 VLS-EH-10 Energize 2

IRWST sparger side 11305 Hydrogen Igniter 11 VLS-EH-11 Energize 2

Loop compartment 01 11401

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 6 of 10 Attachment A (con't)

Equipment Name Tag Number Function Power Group Number Location Room No.

Hydrogen Igniter 12 VLS-EH-12 Energize 1

Loop compartment 01 11501 Hydrogen Igniter 13 VLS-EH-13 Energize 1

Loop compartment 01 11401 Hydrogen Igniter 14 VLS-EH-14 Energize 2

Loop compartment 01 11501 Hydrogen Igniter 15 VLS-EH-15 Energize 2

IRWST vacuum breaker vents 11305 Hydrogen Igniter 16 VLS-EH-16 Energize 1

IRWST vacuum breaker vents 11305 Hydrogen Igniter 17 VLS-EH-17 Energize 2

Northeast valve room 11207 Hydrogen Igniter 18 VLS-EH-18 Energize 1

Northeast accumulator room 11207 Hydrogen Igniter 19 VLS-EH-19 Energize 2

East valve room 11208 Hydrogen Igniter 20 VLS-EH-20 Energize 2

Southeast accumulator room 11206 Hydrogen Igniter 21 VLS-EH-21 Energize 1

Southeast valve room 11206 Hydrogen Igniter 22 VLS-EH-22 Energize 1

Lower compartment area (core makeup tank

[CMT] and valve area) 11400 Hydrogen Igniter 23 VLS-EH-23 Energize 2

Lower compartment area (CMT and valve area) 11400

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 7 of 10 Attachment A (con't)

Equipment Tag Number Function Power Group Location Room No.

Name Number Hydrogen VLS-EH-24 Energize 2

Lower 11400 igniter 24 compartment area (CMT and valve area)

Hydrogen VLS-EH-25 Energize 2

Lower 11400 Igniter 25 compartment area (CMT and valve area)

Hydrogen VLS-EH-26 Energize 2

Lower 11400 Igniter 26 compartment area (CMT and valve area)

Hydrogen VLS-EH-27 Energize 1

Lower 11300 Igniter 27 compartment area (CMT and valve area)

Hydrogen VLS-EH-28 Energize 1

Lower 11400 Igniter 28 compartment area (CMT and valve area)

Hydrogen VLS-EH-29 Energize 1

Lower 11400 Igniter 29 compartment area (CMT and valve area)

Hydrogen VLS-EH-30 Energize 2

Lower 11403 Igniter 30 compartment area (CMT and valve area)

Hydrogen VLS-EH-31 Energize 1

Lower 11400 Igniter 31 compartment area (CMT and valve area)

Hydrogen VLS-EH-32 Energize 1

Lower 11400 Igniter 32 compartment area (CMT and valve area)

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 8 of 10 Attachment A (con't)

Equipment Name Tag Number Function Power Group Number Location Room No.

Hydrogen Igniter 33 VLS-EH-33 Energize 2

North CVS equipment room 11209 Hydrogen Igniter 34 VLS-EH-34 Energize 1

North CVS equipment room 11209 Hydrogen Igniter 35 VLS-EH-35 Energize 1

IRWST hooded vents 11500 Hydrogen Igniter 36 VLS-EH-36 Energize 2

IRWST hooded vents 11500 Hydrogen Igniter 37 VLS-EH-37 Energize 1

IRWST hooded vents 11500 Hydrogen Igniter 38 VLS-EH-38 Energize 2

IRWST hooded vents 11500 Hydrogen Igniter 39 VLS-EH-39 Energize 1

Upper compartment lower region 11500 Hydrogen Igniter 40 VLS-EH-40 Energize 2

Upper compartment lower region 11500 Hydrogen Igniter 41 VLS-EH-41 Energize 2

Upper compartment lower region 11500 Hydrogen Igniter 42 VLS-EH-42 Energize 1

Upper compartment lower region 11500 Hydrogen Igniter 43 VLS-EH-43 Energize 1

Upper compartment lower region 11500 Hydrogen Igniter 44 VLS-EH-44 Energize 1

Upper compartment lower region 11500 Hydrogen Igniter 45 VLS-EH-45 Energize 2

Upper compartment lower region 11500 Hydrogen Igniter 46 VLS-EH-46 Energize 2

Upper compartment lower region 11500

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 9 of 10 Attachment A (con't)

Equipment Name Tag Number Function Power Group Number Location Room No.

Hydrogen Igniter 47 VLS-EH-47 Energize 1

Upper compartment lower region 11500 Hydrogen Igniter 48 VLS-EH-48 Energize 2

Upper compartment lower region 11500 Hydrogen Igniter 49 VLS-EH-49 Energize 1

Pressurizer compartment 11503 Hydrogen Igniter 50 VLS-EH-50 Energize 2

Pressurizer compartment 11503 Hydrogen Igniter 51 VLS-EH-51 Energize 1

Upper compartment mid-region 11500 Hydrogen Igniter 52 VLS-EH-52 Energize 2

Upper compartment mid-region 11500 Hydrogen Igniter 53 VLS-EH-53 Energize 2

Upper compartment mid-region 11500 Hydrogen Igniter 54 VLS-EH-54 Energize 1

Upper compartment mid-region 11500 Hydrogen Igniter 55 VLS-EH-55 Energize 1

Refueling cavity 11504 Hydrogen Igniter 56 VLS-EH-56 Energize 2

Refueling cavity 11504 Hydrogen Igniter 57 VLS-EH-57 Energize 2

Refueling cavity 11504 Hydrogen Igniter 58 VLS-EH-58 Energize 1

Refueling cavity 11504 Hydrogen Igniter 59 VLS-EH-59 Energize 2

Pressurizer compartment 11503 Hydrogen Igniter 60 VLS-EH-60 Energize 1

Pressurizer compartment 11503 Hydrogen Igniter 61 VLS-EH-61 Energize 1

Upper compartment-upper region 11500

U.S. Nuclear Regulatory Commission ND-19-0354 Enclosure Page 10 ol 10 Attachment A (con't)

Equipment Name Tag Number Function Power Group Number Location Room No.

Hydrogen Igniter 62 VLS-EH-62 Energize 2

Upper compartment-upper region 11500 Hydrogen Igniter 63 VLS-EH-63 Energize 1

Upper compartment-upper region 11500 Hydrogen Igniter 64 VLS-EH-64 Energize 2

Upper compartment-upper region 11500 Hydrogen Igniter 65 VLS-EH-65 Energize 1

IRWST roof vents 11500 Hydrogen Igniter 66 VLS-EH-66 Energize 2

IRWST roof vents 11500 Attachment B COL Appendix C Table 2.3.9-1 Equipment Tag No.

Display Containment Hydrogen Monitor VLS-001 Yes Containment Hydrogen Monitor VLS-002 Yes Containment Hydrogen Monitor VLS-003 Yes