{{#Wiki_filter:==SUBJECT:== | {{#Wiki_filter:May 29, 2019 | ||
COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000298/2019412 | |||
==SUBJECT:== | |||
COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION | |||
REPORT 05000298/2019412 | |||
==Dear Mr. Dent:== | ==Dear Mr. Dent:== | ||
| Line 31: | Line 35: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Enclosure: | |||
Inspection Report 05000298/2019412 | Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety | ||
Docket No. 50-298 License No. DPR-46 | |||
Enclosure: | |||
Inspection Report 05000298/2019412 | |||
U.S. NUCLEAR REGULATORY COMMISSION | Enclosure U.S. NUCLEAR REGULATORY COMMISSION | ||
==Inspection Report== | ==Inspection Report== | ||
Docket Number: 05000298 License Number: DPR-46 Report Number: 05000298/2019412 Enterprise Identifier: I-2019-412-0015 Licensee: Nebraska Public Power District Facility: Cooper Nuclear Station Location: Brownville, Nebraska Inspection Dates: April 23, 2019, to May 2, 2019 Inspectors: C. Jewett, Physical Security Inspector R. Lanfear, Physical Security Inspector Approved By: Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety | Docket Number: | ||
05000298 | |||
License Number: | |||
DPR-46 | |||
Report Number: | |||
05000298/2019412 | |||
Enterprise Identifier: I-2019-412-0015 | |||
Licensee: | |||
Nebraska Public Power District | |||
Facility: | |||
Cooper Nuclear Station | |||
Location: | |||
Brownville, Nebraska | |||
Inspection Dates: | |||
April 23, 2019, to May 2, 2019 | |||
Inspectors: | |||
C. Jewett, Physical Security Inspector | |||
R. Lanfear, Physical Security Inspector | |||
Approved By: | |||
Jeremy R. Groom, Chief | |||
Plant Support Branch 1 | |||
Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
| Line 45: | Line 87: | ||
Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report. | Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report. | ||
List of Findings and Violations No findings were identified. | ===List of Findings and Violations=== | ||
No findings were identified. | |||
Additional Tracking Items Type Issue | ===Additional Tracking Items=== | ||
Type Issue | |||
Issued Number Title Inspection Procedure Status LER 05000298/53753 Security Measure Suspended Due to Severe Weather 71153 Closed | |||
=INSPECTION SCOPES= | =INSPECTION SCOPES= | ||
| Line 56: | Line 102: | ||
==SAFEGUARDS== | ==SAFEGUARDS== | ||
==71130.05 - Protective Strategy Evaluation and Performance Evaluation Program== | ==71130.05 - Protective Strategy Evaluation and Performance Evaluation Program== | ||
{{IP sample|IP=IP 71130.05|count=2}} | {{IP sample|IP=IP 71130.05|count=2}} | ||
| Line 62: | Line 107: | ||
The inspectors evaluated the sites protective strategy and performance evaluation program. | The inspectors evaluated the sites protective strategy and performance evaluation program. | ||
The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated: | The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated: | ||
Tier I: all requirements Tier II: all requirements Tier III: all requirements | Tier I: all requirements Tier II: all requirements Tier III: all requirements | ||
==OTHER ACTIVITIES - BASELINE== | ==OTHER ACTIVITIES - BASELINE== | ||
===71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports=== | |||
===71153Follow-up of Events and Notices of Enforcement Discretion | |||
{{IP sample|IP=IP 71153|count=1}} | {{IP sample|IP=IP 71153|count=1}} | ||
The inspectors evaluated the following licensee event report: | The inspectors evaluated the following licensee event report: | ||
| Line 80: | Line 125: | ||
Condition Reports | Condition Reports | ||
2017-06438 | 2017-06438 | ||
2019-02429 | 2018-05409 | ||
2018-07895 | |||
2018-07958 | |||
2018-08037 | |||
2019-02429 | |||
2019-02442 | |||
2019-02444 | |||
2019-02464 | |||
2019-02484 | |||
Procedures | Procedures | ||
Number | Number | ||
Administrative | Title | ||
Revision | |||
Administrative | |||
Procedure 0 | Procedure 0 | ||
Security | Safety/Security Interface Screen | ||
Security | Security | ||
Procedure 1.6 | |||
Firearms and Personal Equipment Issuance, Control, | |||
Testing, and Maintenance | |||
Security | |||
Procedure 2.13 | Procedure 2.13 | ||
Security | Security Team Training and Exercises | ||
Security | |||
Procedure 2.4 | Procedure 2.4 | ||
Patrol Duties | |||
Miscellaneous | Miscellaneous | ||
Documents | Documents | ||
Number | Number | ||
S-40 | |||
QA Audit 19-01 | Title | ||
Cooper Nuclear Station Protective Strategy Plan | Revision | ||
Cooper Nuclear Station Adversary Training Course | or Date | ||
U.S. Nuclear Regulatory Commission - Operation | S-40 | ||
Perform Controller Duties in Security Drills | |||
QA Audit 19-01 | |||
Security Program and Access Authorization | |||
3/19/2019 | |||
Cooper Nuclear Station Protective Strategy Plan | |||
1/8/2019 | |||
Cooper Nuclear Station Adversary Training Course | |||
11/17/2018 | |||
U.S. Nuclear Regulatory Commission - Operation | |||
Center Event Reports | Center Event Reports | ||
53753 | |||
ML19150A257 | ML19150A257 | ||
SUNSI Review: ADAMS: | SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002 | ||
By: JRG | By: JRG Yes No | ||
OFFICE | Publicly Available Sensitive | ||
NAME | OFFICE | ||
SIGNATURE | PSI:PSB1 | ||
DATE | PSI:PSB1 | ||
C:PSB1 | |||
C:PBC | |||
C:PSB1 | |||
NAME | |||
CJewett | |||
RLanfear | |||
JGroom | |||
JKozal | |||
JGroom | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE | |||
5/28/2019 | |||
5/28/2019 | |||
5/28/2019 | |||
5/27/2019 | |||
5/29/2019 | |||
}} | }} | ||
Latest revision as of 02:17, 5 January 2025
| ML19150A257 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/29/2019 |
| From: | Jeremy Groom Plant Support Branch-1 |
| To: | Dent J Nebraska Public Power District (NPPD) |
| Groom J | |
| References | |
| IR 2019412 | |
| Download: ML19150A257 (6) | |
Text
May 29, 2019
SUBJECT:
COOPER NUCLEAR STATION - NRC SECURITY BASELINE INSPECTION
REPORT 05000298/2019412
Dear Mr. Dent:
On April 26, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Cooper Nuclear Station. On May 2, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-298 License No. DPR-46
Enclosure:
Inspection Report 05000298/2019412
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number:
05000298
License Number:
Report Number:
Enterprise Identifier: I-2019-412-0015
Licensee:
Nebraska Public Power District
Facility:
Cooper Nuclear Station
Location:
Brownville, Nebraska
Inspection Dates:
April 23, 2019, to May 2, 2019
Inspectors:
C. Jewett, Physical Security Inspector
R. Lanfear, Physical Security Inspector
Approved By:
Jeremy R. Groom, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Security Baseline inspection at Cooper Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below.
Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
List of Findings and Violations
No findings were identified.
Additional Tracking Items
Type Issue
Issued Number Title Inspection Procedure Status LER 05000298/53753 Security Measure Suspended Due to Severe Weather 71153 Closed
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation and Performance Evaluation Program
The inspectors evaluated the sites protective strategy and performance evaluation program.
The inspectors also observed one licensee annual force on force exercise. The following elements were evaluated:
Tier I: all requirements Tier II: all requirements Tier III: all requirements
OTHER ACTIVITIES - BASELINE
71153Follow-up of Events and Notices of Enforcement Discretion Licensee Event Reports
The inspectors evaluated the following licensee event report:
- (1) Licensee Event Report 05000298/53753, Security Measure Suspended Due to Severe Weather on November 25,
EXIT MEETINGS AND DEBRIEFS
On May 2, 2019, the inspectors presented the security baseline inspection results to Mr. J.
Dent, Jr., Vice President-Nuclear and Chief Nuclear Officer, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
Condition Reports
2017-06438
2018-05409
2018-07895
2018-07958
2018-08037
2019-02429
2019-02442
2019-02444
2019-02464
2019-02484
Procedures
Number
Title
Revision
Administrative
Procedure 0
Safety/Security Interface Screen
Security
Procedure 1.6
Firearms and Personal Equipment Issuance, Control,
Testing, and Maintenance
Security
Procedure 2.13
Security Team Training and Exercises
Security
Procedure 2.4
Patrol Duties
Miscellaneous
Documents
Number
Title
Revision
or Date
S-40
Perform Controller Duties in Security Drills
QA Audit 19-01
Security Program and Access Authorization
3/19/2019
Cooper Nuclear Station Protective Strategy Plan
1/8/2019
Cooper Nuclear Station Adversary Training Course
11/17/2018
U.S. Nuclear Regulatory Commission - Operation
Center Event Reports
53753
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: NRC-002
By: JRG Yes No
Publicly Available Sensitive
OFFICE
PSI:PSB1
PSI:PSB1
C:PSB1
C:PBC
C:PSB1
NAME
CJewett
RLanfear
JGroom
JKozal
JGroom
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
5/28/2019
5/28/2019
5/28/2019
5/27/2019
5/29/2019