{{#Wiki_filter:V. C. Summ er Nucl ear Station Bradham Blvd & Hwy 215, Jen kin sv ille, SC 29065 Mailing Address:
{{#Wiki_filter:V. C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jen kinsville, SC 29065 Mailing Address:
P. O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com a
P. O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 May 29, 2019 SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 a Dominion
                                                                    ~
~
Dominion Energy May 29, 2019 Document Control Desk                                             Serial No. 19-254 U.S. Nuclear Regulatory Commission                               VCS LIC/TS/Rev 0 Washington, DC 20555                                               Docket No. 50-395 License No. NPF-12 SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 EMERGENCY CORE COOLING SYSTEM EVALUATION MODEL REVISIONS ANNUAL REPORT South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, hereby submits the 2018 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Annual Report for VCSNS. This report is being submitted pursuant to 10 CFR 50.46, which requires licensees to notify the NRC on at least an annual basis of corrections to or changes in the ECCS Evaluation Models.
Energy Serial No. 19-254 VCS LIC/TS/Rev 0 Docket No. 50-395 License No. NPF-12 EMERGENCY CORE COOLING SYSTEM EVALUATION MODEL REVISIONS ANNUAL REPORT South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, hereby submits the 2018 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Annual Report for VCSNS. This report is being submitted pursuant to 10 CFR 50.46, which requires licensees to notify the NRC on at least an annual basis of corrections to or changes in the ECCS Evaluation Models.
Summary sheets describing changes and enhancements to the ECCS Evaluation Models for 2018 are included in Enclosure I. Peak Clad Temperature (PCT) Rackup Sheets are included in Enclosure II.
Summary sheets describing changes and enhancements to the ECCS Evaluation Models for 2018 are included in Enclosure I. Peak Clad Temperature (PCT) Rackup Sheets are included in Enclosure II.
On April 29, 2019, South Carolina Electric & Gas Company (SCE&G), which is authorized under Facility Operating License NPF-12 to operate and possess Virgil C. Summer Nuclear Station Unit 1, changed its name to Dominion Energy South Carolina, Inc. SCE&G will be requesting a license amendment to reflect this name change in the near future.
On April 29, 2019, South Carolina Electric & Gas Company (SCE&G), which is authorized under Facility Operating License NPF-12 to operate and possess Virgil C. Summer Nuclear Station Unit 1, changed its name to Dominion Energy South Carolina, Inc. SCE&G will be requesting a license amendment to reflect this name change in the near future.
Should you have any questions, please contact Michael Moore at (803) 345-4752 .
Should you have any questions, please contact Michael Moore at (803) 345-4752.
Sincerely,                        ,
Sincerely,  
~::~
~::~
Site Vice President V.C . Summer Nuclear Station Commitments contained in this letter: None Enclosure I:         Changes and Enhancements to the ECCS Evaluation Models for 2018 Enclosure II:       Peak Clad Temperature (PCT) Rackup Sheets cc: (Without Enclosures unless noted)
Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None Enclosure I:
G. J. Lindamood - Santee Cooper C. Haney - NRC Region II S. A Williams - NRC NRC Resident Inspector
Changes and Enhancements to the ECCS Evaluation Models for 2018 Enclosure II:
Peak Clad Temperature (PCT) Rackup Sheets cc: (Without Enclosures unless noted)
G. J. Lindamood - Santee Cooper C. Haney - NRC Region II S. A Williams - NRC NRC Resident Inspector  


Serial No. 19-254 Docket No. 50-395 Enclosure I CHANGES AND ENHANCEMENTS TO THE ECCS EVALUATION MODELS FOR 2018 VIRGIL C. SUMMER POWER STATION- UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY
Enclosure I Serial No. 19-254 Docket No. 50-395 CHANGES AND ENHANCEMENTS TO THE ECCS EVALUATION MODELS FOR 2018 VIRGIL C. SUMMER POWER STATION-UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY  


Serial No. 19-254 Docket No. 50-395 U02 FUEL PELLET HEAT CAPACITY
U02 FUEL PELLET HEAT CAPACITY  


===Background===
===Background===
A typographical error was discovered in the implementation of the U02 fuel pellet heat capacity as described by Equation C-4 of WCAP-8301 [1] for fuel rod heat-up calculations within the Appendix K Large Break and Small Break LOCA evaluation models. The erroneous formulation results in an over-prediction of heat capacity that increases with fuel temperature. The corrected formulation results in a maximum decrease in heat capacity on the order of approximately 1.2 percent for existing analyses of record. This represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451 .
Serial No. 19-254 Docket No. 50-395 A typographical error was discovered in the implementation of the U02 fuel pellet heat capacity as described by Equation C-4 of WCAP-8301 [1] for fuel rod heat-up calculations within the Appendix K Large Break and Small Break LOCA evaluation models. The erroneous formulation results in an over-prediction of heat capacity that increases with fuel temperature. The corrected formulation results in a maximum decrease in heat capacity on the order of approximately 1.2 percent for existing analyses of record. This represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451.
Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The small over-prediction in U02 fuel pellet heat capacity has been evaluated to have a negligible effect on existing large and small break LOCA analysis results due to the small magnitude of the change, leading to an estimated PCT impact of O degrees Fahrenheit.
Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The small over-prediction in U02 fuel pellet heat capacity has been evaluated to have a negligible effect on existing large and small break LOCA analysis results due to the small magnitude of the change, leading to an estimated PCT impact of O degrees Fahrenheit.
Reference
Reference
: 1) WCAP-8301, "LOCTA-IV Program : Loss-of-Coolant Transient Analysis, " June 1974.
: 1) WCAP-8301, "LOCTA-IV Program: Loss-of-Coolant Transient Analysis," June 1974.
Page 2 of 3
Page 2 of 3  


Serial No. 19-254 Docket No. 50-395 VAPOR TEMPERATURE RESETTING
VAPOR TEMPERATURE RESETTING  


===Background===
===Background===
In the WCOBRA/TRAC AND WCOBRA/TRAC-TF2 codes, when the vapor temperature is greater than the wall temperature, and several other conditions are met, the vapor temperature is reset to the saturation temperature for heat transfer calculations. It was discovered that this vapor temperature resetting logic results in an inconsistency between the conduction solution and the hydraulic solution, such that energy is not conserved between the two solutions. The correction of this error represents a Non-Discretionary Change in the Evaluation Model as described in Section 4.1.2 of WCAP-13451.
Serial No. 19-254 Docket No. 50-395 In the WCOBRA/TRAC AND WCOBRA/TRAC-TF2 codes, when the vapor temperature is greater than the wall temperature, and several other conditions are met, the vapor temperature is reset to the saturation temperature for heat transfer calculations. It was discovered that this vapor temperature resetting logic results in an inconsistency between the conduction solution and the hydraulic solution, such that energy is not conserved between the two solutions. The correction of this error represents a Non-Discretionary Change in the Evaluation Model as described in Section 4.1.2 of WCAP-13451.
Affected Evaluation Model(s) 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect Engineering judgement supported by sensitivity calculations showed that correcting th is error had minimal impact on LOCA transient calculations, leading to an estimated peak cladding temperature impact of O degrees Fahrenheit.
Affected Evaluation Model(s) 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect Engineering judgement supported by sensitivity calculations showed that correcting this error had minimal impact on LOCA transient calculations, leading to an estimated peak cladding temperature impact of O degrees Fahrenheit.
Page 3 of 3
Page 3 of 3  


Serial No. 19-254 Docket No. 50-395 Enclosure II PEAK CLAD TEMPERATURE (PCT) RACKUP SHEETS VIRGIL C. SUMMER POWER STATION - UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY
Enclosure II PEAK CLAD TEMPERATURE (PCT) RACKUP SHEETS VIRGIL C. SUMMER POWER STATION - UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY Serial No. 19-254 Docket No. 50-395


Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature (PCT) Summary Plant Name:                     VIRGIL C. SUMMER Utility Name:                   South Carolina Electric & Gas EM:                             NOTRUMP AOR
LOCA Peak Cladding Temperature (PCT) Summary Plant Name:
VIRGIL C. SUMMER Utility Name:
South Carolina Electric & Gas EM:
NOTRUMP AOR


== Description:==
== Description:==
Appendix K Small Break Summary Sheet Status:           Current PCT (°F)       Reference#              Note#
Appendix K Small Break Summary Sheet Status:
ANALYSIS-OF-RECORD                 1775               9               (a,b,c,d)
Current PCT (°F)
Delta PCT                                                 Reporting ASSESSMENTS                         (.6oF)       Reference#             Note#                  Year
Reference#
: 1. Upflow Conversion                 148             10, 11                                   2008 AOR + Assessments               PCT=           1923.0°F REFERENCES
ANALYSIS-OF-RECORD 1775 9
: 1. CGE-94-205, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1994.
Delta PCT ASSESSMENTS
: 2. CGE-94-228, "South Carolina Electric and Gas Company, Virgil C. Summer Station, SBLOCTA Axial Nodalization," October 1994.
(.6oF)
: 3. CGE-95-201, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1995.
Reference#
: 1.
Upflow Conversion 148 10, 11 AOR + Assessments PCT=
1923.0°F REFERENCES Note#
(a,b,c,d)
Note#
Serial No. 19-254 Docket No. 50-395 Reporting Year 2008
: 1.
CGE-94-205, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1994.
: 2. CGE-94-228, "South Carolina Electric and Gas Company, Virgil C. Summer Station, SBLOCT A Axial Nodalization," October 1994.
: 3.
CGE-95-201, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 1 O CFR 50.46 Notification and Reporting Information," February 1995.
: 4. CGE-96-202, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1996.
: 4. CGE-96-202, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1996.
: 5. CGE-96-213, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Small Break LOCA Notification and Reporting Information," July 1996.
: 5.
CGE-96-213, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Small Break LOCA Notification and Reporting Information," July 1996.
: 6. CGE-00-044, "South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, 10 CFR 50.46 Appendix K (BART/ BASH/ NOTRUMP) Evaluation Model, Mid-Year Notification and Reporting for 2000," June 1996.
: 6. CGE-00-044, "South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, 10 CFR 50.46 Appendix K (BART/ BASH/ NOTRUMP) Evaluation Model, Mid-Year Notification and Reporting for 2000," June 1996.
: 7. CGE-03-80, "10 CFR 50.46 Mid-Year Notification and Reporting for 2003," January 2004.
: 7.
: 8. LTR-LIS-06-344, "Transmittal of Updated V. C. Summer SBLOCA PCT Rackup Sheets, "
CGE-03-80, "10 CFR 50.46 Mid-Year Notification and Reporting for 2003," January 2004.
November 2006 .
: 8.
L TR-LIS-06-344, "Transmittal of Updated V. C. Summer SBLOCA PCT Rackup Sheets,"
November 2006.
: 9. LTR-LIS-06-662, ''Transmittal of V. C. Summer SBLOCTA PCT Rackup Sheets for HHSI Throttle Valve Replacement," November 2006.
: 9. LTR-LIS-06-662, ''Transmittal of V. C. Summer SBLOCTA PCT Rackup Sheets for HHSI Throttle Valve Replacement," November 2006.
: 10. WCAP-16980-P, Revision 1, "Reactor Internals Upflow Conversion Program Engineering Report V. C. Summer Nuclear Station Unit 1," December 2008.
: 10. WCAP-16980-P, Revision 1, "Reactor Internals Upflow Conversion Program Engineering Report V. C. Summer Nuclear Station Unit 1," December 2008.
: 11. LTR-LIS-09-18, "1 O CFR 50.46 Report for the V. C. Summer (CGE) Upflow Conversion Program Small Break LOCA Evaluation," January 2009.
: 11. L TR-LIS-09-18, "1 O CFR 50.46 Report for the V. C. Summer (CGE) Upflow Conversion Program Small Break LOCA Evaluation," January 2009.
NOTES:
NOTES:
(a) The Rebaseline Analysis includes the impacts of the following model assessments: (1)
(a) The Rebaseline Analysis includes the impacts of the following model assessments: (1)
LUCIFER Error Corrections (Ref. 1), (2) Effect of SI in Broken Loop (Ref. 1), (3) Effect of Improved Condensation Model (Ref. 1),
LUCIFER Error Corrections (Ref. 1 ), (2) Effect of SI in Broken Loop (Ref. 1 ), (3) Effect of Improved Condensation Model (Ref. 1 ),
(b) (4) Axial Nodalization, RIP Model Revision and SBLOCTA Error Corrections Analysis (Ref. 2),
(b) (4) Axial Nodalization, RIP Model Revision and SBLOCTA Error Corrections Analysis (Ref. 2),
(5) Boiling Heat Transfer Error (Ref. 3), (6) Steam Line Isolation Logic Error (Ref. 3),
(5) Boiling Heat Transfer Error (Ref. 3), (6) Steam Line Isolation Logic Error (Ref. 3),
(7) NOTRUMP Specific Enthalpy Error (Ref. 4),
(7) NOTRUMP Specific Enthalpy Error (Ref. 4),
(c) (8) SALIBRARY Double Precision Error (Ref. 40, (9) SBLOCTA Fuel Rod Initialization Error (Ref. 5) , (10) NOTRUMP Mixture Level Tracking/ Region Depletion Errors (Ref. 6) ,
(c) (8) SALIBRARY Double Precision Error (Ref. 40, (9) SBLOCTA Fuel Rod Initialization Error (Ref. 5), (10) NOTRUMP Mixture Level Tracking/ Region Depletion Errors (Ref. 6),
(d) (11) NOTRUMP Bubble Rise/ Drift Flux Model Inconsistency Corrections (Ref. 7), (12) Refined Break Spectrum (Ref. 8), (13) High head safety injection (HHSI) flow increase (Ref. 9)
(d) (11) NOTRUMP Bubble Rise/ Drift Flux Model Inconsistency Corrections (Ref. 7), (12) Refined Break Spectrum (Ref. 8), (13) High head safety injection (HHSI) flow increase (Ref. 9)
Page 1 of 10
Page 1 of 10  


Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:                   VIRGIL C. SUMMER Utility Name:                 South Carolina Electric & Gas EM:                           COD (1996)
Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:
VIRGIL C. SUMMER Utility Name:
South Carolina Electric & Gas EM:
COD (1996)
AOR
AOR


== Description:==
== Description:==
Best Estimate Large Break - Composite Summary Sheet Status:         Current PCT (°F)   Reference#         Note#
Best Estimate Large Break - Composite Summary Sheet Status:
ANALYSIS-OF-RECORD               1988           1 Delta PCT                             Reporting ASSESSMENTS                     (.6oF)     Reference#         Note#   Year
Current PCT (°F)
: 1. Backfit Through 2001 Reporting Year                 0           2                     2003
Reference#
: 2. Revised Slowdown Heatup Uncertainty             5           3                     2004 Distribution
Note#
: 3. PAD 4.0 Implementation       -118           6                     2012
ANALYSIS-OF-RECORD 1988 1
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and               123           6             (a)   2012 Peaking Factor Burndown
Delta PCT Reporting ASSESSMENTS
: 5. Transverse Momentum Cells for Zero Cross-flow       0           6             (b)   2012 Boundary Condition Error
(.6oF)
: 6. Revised Heat Transfer Multiplier Distributions     -35           7                     2013
Reference#
: 7. Changes to Grid Blockage Ratio and             24           8                     2013 Porosity
Note#
: 8. Error in Burst Strain Application                     0           9                     2013
Year
: 9. Fan Cooler Performance Increase                       2           2                     2003
: 1.
: 10. Upflow Conversion Evaluation                   -29           4                     2008 11 . Additional Heat Sinks and Increased Spray             1           5                     2010 Flow Rate AOR + Assessments             PCT=       1961.Q Of Page 2 of 9
Backfit Through 2001 Reporting Year 0
2 2003
: 2.
Revised Slowdown Heatup Uncertainty 5
3 2004 Distribution
: 3. PAD 4.0 Implementation  
-118 6
2012
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 123 6
(a) 2012 Peaking Factor Burndown
: 5.
Transverse Momentum Cells for Zero Cross-flow 0
6 (b) 2012 Boundary Condition Error
: 6. Revised Heat Transfer Multiplier Distributions  
-35 7
2013
: 7. Changes to Grid Blockage Ratio and 24 8
2013 Porosity
: 8.
Error in Burst Strain Application 0
9 2013
: 9.
Fan Cooler Performance Increase 2
2 2003
: 10. Upflow Conversion Evaluation  
-29 4
2008 11. Additional Heat Sinks and Increased Spray 1
5 2010 Flow Rate AOR + Assessments PCT=
1961.Q Of Page 2 of 9  


Serial No. 19-254 Docket No. 50-395 REFERENCES
REFERENCES Serial No. 19-254 Docket No. 50-395
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 1.
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 2.
CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 4. LTR-LIS-08-578, Revision 2, "1 O CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
: 4.
L TR-LIS-08-578, Revision 2, "1 O CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010.
: 6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
: 6. L TR-LIS-12-372, "V. C. Summer, 1 O CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
: 7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 7.
: 8. LTR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
: 8.
LTR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
: 9. L TR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
NOTES:
NOTES:
(a) This evaluation credits peaking factor burndown, see Reference 6.
(a) This evaluation credits peaking factor burndown, see Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
Page 3 of 9
Page 3 of 9  


Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature (PCT) Summary Plant Name:                   VIRGIL C. SUMMER Utility Name:                 South Carolina Electric & Gas EM:                           CQD (1996)
LOCA Peak Cladding Temperature (PCT) Summary Plant Name:
VIRGIL C. SUMMER Utility Name:
South Carolina Electric & Gas EM:
CQD (1996)
AOR
AOR


== Description:==
== Description:==
Best Estimate Large Break - Slowdown Summary Sheet Status:         Current PCT (°F)   Reference#         Note#
Best Estimate Large Break - Slowdown Summary Sheet Status:
ANALYSIS-OF-RECORD               1860           1 Delta PCT                             Reporting ASSESSMENTS                     (~OF)     Reference#         Note#   Year
Current PCT (°F)
: 1. Backfit Through 2001 Reporting Year                 0           2                     2003
Reference#
: 2. Revised Slowdown Heatup Uncertainty             49           3                     2004 Distribution
Note#
: 3. PAD 4.0 Implementation       -83           6                     2012
ANALYSIS-OF-RECORD 1860 1
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and                 0           6               (a)   2012 Peaking Factor Burndown
Delta PCT ASSESSMENTS
: 5. Transverse Momentum Cells for Zero Cross-flow       0           6               (b)   2012 Boundary Condition Error
(~OF)
: 6. Revised Heat Transfer Multiplier Distributions       -5           7                     2013
Reference#
: 7. Changes to Grid Blockage Ratio and             0           8                     2013 Porosity
Note#
: 8. Error in Burst Strain Application                     0           9                     2013
: 1. Backfit Through 2001 Reporting Year 0
: 9. Fan Cooler Performance Increase                       0           2                     2003
2
: 10. Upflow Conversion Evaluation                     -7           4                     2008
: 2.
: 11. Additional Heat Sinks and Increased Spray             0           5                     2010 Flow Rate AOR + Assessments             PCT=       1814.0 Of Page 4 of 9
Revised Slowdown Heatup Uncertainty 49 3
Distribution
: 3. PAD 4.0 Implementation  
-83 6
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 0
6 (a)
Peaking Factor Burndown
: 5. Transverse Momentum Cells for Zero Cross-flow 0
6 (b)
Boundary Condition Error
: 6. Revised Heat Transfer Multiplier Distributions  
-5 7
: 7. Changes to Grid Blockage Ratio and 0
8 Porosity
: 8. Error in Burst Strain Application 0
9
: 9. Fan Cooler Performance Increase 0
2
: 10. Upflow Conversion Evaluation  
-7 4
: 11. Additional Heat Sinks and Increased Spray 0
5 Flow Rate AOR + Assessments PCT=
1814.0 Of Page 4 of 9 Serial No. 19-254 Docket No. 50-395 Reporting Year 2003 2004 2012 2012 2012 2013 2013 2013 2003 2008 2010


Serial No. 19-254 Docket No. 50-395 REFERENCES
REFERENCES Serial No. 19-254 Docket No. 50-395
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002, " March 2003.
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 3.
: 4. LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010.
: 4.
: 6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown ," September 2012.
L TR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
: 7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 5.
: 8. LTR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013 .
CGE-10-29, "BELOCA Summary Report," November 2010.
: 9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction ," January 2014.
: 6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
: 7.
L TR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 8.
L TR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
: 9.
LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
NOTES:
NOTES:
(a) This evaluation credits peaking factor burndown, see Reference 6.
(a) This evaluation credits peaking factor burndown, see Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
Page 5 of 9
Page 5 of 9  


Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:                   VIRGIL C. SUMMER Utility Name:                 South Carolina Electric & Gas EM:                           COD (1996)
Serial No. 19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:
VIRGIL C. SUMMER Utility Name:
South Carolina Electric & Gas EM:
COD (1996)
AOR
AOR


== Description:==
== Description:==
Best Estimate Large Break - Reflood 1 Summary Sheet Status:         Current PCT (°F)   Reference#         Note#
Best Estimate Large Break - Reflood 1 Summary Sheet Status:
ANALYSIS-OF-RECORD               1808           1 Delta PCT                             Reporting ASSESSMENTS                     (A°F)     Reference#         Note#   Year
Current PCT (°F)
: 1. Backfit Through 2001 Reporting Year                 0           2                       2003
Reference#
: 2. Revised Blowdown Heatup Uncertainty             5           3                       2004 Distribution
Note#
: 3. PAD 4.0 Implementation       -118           6                     2012
ANALYSIS-OF-RECORD 1808 1
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and               113           6               (a)   2012 Peaking Factor Burndown
Delta PCT Reporting ASSESSMENTS (A°F)
: 5. Transverse Momentum Cells for Zero Cross-flow       0           6               (b)   2012 Boundary Condition Error
Reference#
: 6. Revised Heat Transfer Multiplier Distributions       5           7                     2013
Note#
: 7. Changes to Grid Blockage Ratio and             24           8                     2013 Porosity
Year
: 8. Error in Burst Strain Application                   20           9                     2013
: 1.
: 9. Fan Cooler Performance Increase                       1           2                     2003
Backfit Through 2001 Reporting Year 0
: 10. Upflow Conversion Evaluation                   -44           4                     2008 11 . Additional Heat Sinks and Increased Spray             0           5                     2010 Flow Rate AOR + Assessments             PCT=       1814.0 °F Page 6 of 9
2 2003
: 2. Revised Blowdown Heatup Uncertainty 5
3 2004 Distribution
: 3.
PAD 4.0 Implementation  
-118 6
2012
: 4.
Evaluation of Fuel Pellet Thermal Conductivity Degradation and 113 6
(a) 2012 Peaking Factor Burndown
: 5. Transverse Momentum Cells for Zero Cross-flow 0
6 (b) 2012 Boundary Condition Error
: 6.
Revised Heat Transfer Multiplier Distributions 5
7 2013
: 7.
Changes to Grid Blockage Ratio and 24 8
2013 Porosity
: 8.
Error in Burst Strain Application 20 9
2013
: 9.
Fan Cooler Performance Increase 1
2 2003
: 10. Upflow Conversion Evaluation  
-44 4
2008 11. Additional Heat Sinks and Increased Spray 0
5 2010 Flow Rate AOR + Assessments PCT=
1814.0 °F Page 6 of 9  


Serial No. 19-254 Docket No. 50-395 REFERENCES
REFERENCES Serial No. 19-254 Docket No. 50-395
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Statior;i ," June 2003.
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Statior;i," June 2003.
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003 .
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 4. LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," Jan uary 2009.
: 4. LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010.
: 6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown ," September 2012 .
: 6.
: 7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013 .
L TR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
: 8. LTR-LIS-13-4 76, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity, " October 2013.
: 7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction, " January 2014.
: 8. L TR-LIS-13-4 76, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
: 9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
NOTES:
NOTES:
(a) This evaluation cred its peaking factor burndown , see Reference 6.
(a) This evaluation credits peaking factor burndown, see Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
Page 7 of 9
Page 7 of 9  


Serial No. 19-254 Docket No. 50-395 LOCA Peak Claddin~ Temperature WCT) Summary Plant Name:                   VIRGIL C. SUMMER Utility Name:                 South Carolina Electric & Gas EM:                           COD (1996)
Serial No. 19-254 Docket No. 50-395 LOCA Peak Claddin~ Temperature WCT) Summary Plant Name:
VIRGIL C. SUMMER Utility Name:
South Carolina Electric & Gas EM:
COD (1996)
AOR
AOR


== Description:==
== Description:==
Best Estimate Large Break- Reflood 2 Summary Sheet Status:         Current PCT (°F)   Reference#         Note#
Best Estimate Large Break-Reflood 2 Summary Sheet Status:
ANALYSIS-OF-RECORD               1988           1 Delta PCT                             Reporting ASSESSMENTS                     (A.OF)     Reference#         Note#   Year
Current PCT (°F)
: 1. Backfit Through 2001 Reporting Year                 0           2                     2003
Reference#
: 2. Revised Slowdown Heatup Uncertainty             5           3                     2004 Distribution
Note#
: 3. PAD 4.0 Implementation         -118           6                     2012
ANALYSIS-OF-RECORD 1988 1
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and               123           6             (a)     2012 Peaking Factor Burndown
Delta PCT Reporting ASSESSMENTS (A.OF)
: 5. Transverse Momentum Cells for Zero Cross-flow     0           6             (b)     2012 Boundary Condition Error
Reference#
: 6. Revised Heat Transfer Multiplier Distributions     -35           7                     2013
Note#
: 7. Changes to Grid Blockage Ratio and           24           8                     2013 Porosity
Year
: 8. Error in Burst Strain Application                   0           9                     2013
: 1. Backfit Through 2001 Reporting Year 0
: 9. Fan Cooler Performance Increase                       2           2                     2003
2 2003
: 10. Upflow Conversion Evaluation                   -29           4                     2008 11 . Additional Heat Sinks and Increased Spray           1           5                     2010 Flow Rate AOR + Assessments             PCT=       1961.0°F Page 8 of 9
: 2.
Revised Slowdown Heatup Uncertainty 5
3 2004 Distribution
: 3. PAD 4.0 Implementation  
-118 6
2012
: 4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 123 6
(a) 2012 Peaking Factor Burndown
: 5. Transverse Momentum Cells for Zero Cross-flow 0
6 (b) 2012 Boundary Condition Error
: 6. Revised Heat Transfer Multiplier Distributions  
-35 7
2013
: 7. Changes to Grid Blockage Ratio and 24 8
2013 Porosity
: 8.
Error in Burst Strain Application 0
9 2013
: 9.
Fan Cooler Performance Increase 2
2 2003
: 10. Upflow Conversion Evaluation  
-29 4
2008 11. Additional Heat Sinks and Increased Spray 1
5 2010 Flow Rate AOR + Assessments PCT=
1961.0°F Page 8 of 9  


Serial No. 19-254 Docket No. 50-395 REFERENCES
REFERENCES Serial No. 19-254 Docket No. 50-395
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003 .
: 2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
: 3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 3.
: 4. LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error, " January 2009.
CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
: 5. CGE-10-29, "BELOCA Summary Report," November 2010 .
: 4.
: 6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
: 7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 5.
: 8. LTR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
CGE-10-29, "BELOCA Summary Report," November 2010.
: 9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
: 6.
L TR-LIS-12-372, "V. C. Summer, 1 O CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
: 7. L TR-LIS-13-353, "V. C. Summer 1 O CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
: 8.
L TR-LIS-13-476, "V. C. Summer 1 O CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
: 9.
L TR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.
NOTES:
NOTES:
(a) This evaluation credits peaking factor burndown , see Reference 6.
(a) This evaluation credits peaking factor burndown, see Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.
Page 9 of 9}}
Page 9 of 9}}

Latest revision as of 02:15, 5 January 2025

Submittal of Emergency Core Cooling System Evaluation Model Revisions Annual Report
ML19151A384
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/29/2019
From: Lippard G
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
19-254
Download: ML19151A384 (14)


Text

V. C. Summer Nuclear Station Bradham Blvd & Hwy 215, Jen kinsville, SC 29065 Mailing Address:

P. O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 May 29, 2019 SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 a Dominion

~

Energy Serial No.19-254 VCS LIC/TS/Rev 0 Docket No. 50-395 License No. NPF-12 EMERGENCY CORE COOLING SYSTEM EVALUATION MODEL REVISIONS ANNUAL REPORT South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, hereby submits the 2018 Emergency Core Cooling System (ECCS) Evaluation Model Revisions Annual Report for VCSNS. This report is being submitted pursuant to 10 CFR 50.46, which requires licensees to notify the NRC on at least an annual basis of corrections to or changes in the ECCS Evaluation Models.

Summary sheets describing changes and enhancements to the ECCS Evaluation Models for 2018 are included in Enclosure I. Peak Clad Temperature (PCT) Rackup Sheets are included in Enclosure II.

On April 29, 2019, South Carolina Electric & Gas Company (SCE&G), which is authorized under Facility Operating License NPF-12 to operate and possess Virgil C. Summer Nuclear Station Unit 1, changed its name to Dominion Energy South Carolina, Inc. SCE&G will be requesting a license amendment to reflect this name change in the near future.

Should you have any questions, please contact Michael Moore at (803) 345-4752.

Sincerely,

~::~

Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None Enclosure I:

Changes and Enhancements to the ECCS Evaluation Models for 2018 Enclosure II:

Peak Clad Temperature (PCT) Rackup Sheets cc: (Without Enclosures unless noted)

G. J. Lindamood - Santee Cooper C. Haney - NRC Region II S. A Williams - NRC NRC Resident Inspector

Enclosure I Serial No.19-254 Docket No. 50-395 CHANGES AND ENHANCEMENTS TO THE ECCS EVALUATION MODELS FOR 2018 VIRGIL C. SUMMER POWER STATION-UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY

U02 FUEL PELLET HEAT CAPACITY

Background

Serial No.19-254 Docket No. 50-395 A typographical error was discovered in the implementation of the U02 fuel pellet heat capacity as described by Equation C-4 of WCAP-8301 [1] for fuel rod heat-up calculations within the Appendix K Large Break and Small Break LOCA evaluation models. The erroneous formulation results in an over-prediction of heat capacity that increases with fuel temperature. The corrected formulation results in a maximum decrease in heat capacity on the order of approximately 1.2 percent for existing analyses of record. This represents a Non-Discretionary Change in accordance with Section 4.1.2 of WCAP-13451.

Affected Evaluation Model(s) 1985 Westinghouse Small Break LOCA Evaluation Model with NOTRUMP Estimated Effect The small over-prediction in U02 fuel pellet heat capacity has been evaluated to have a negligible effect on existing large and small break LOCA analysis results due to the small magnitude of the change, leading to an estimated PCT impact of O degrees Fahrenheit.

Reference

1) WCAP-8301, "LOCTA-IV Program: Loss-of-Coolant Transient Analysis," June 1974.

Page 2 of 3

VAPOR TEMPERATURE RESETTING

Background

Serial No.19-254 Docket No. 50-395 In the WCOBRA/TRAC AND WCOBRA/TRAC-TF2 codes, when the vapor temperature is greater than the wall temperature, and several other conditions are met, the vapor temperature is reset to the saturation temperature for heat transfer calculations. It was discovered that this vapor temperature resetting logic results in an inconsistency between the conduction solution and the hydraulic solution, such that energy is not conserved between the two solutions. The correction of this error represents a Non-Discretionary Change in the Evaluation Model as described in Section 4.1.2 of WCAP-13451.

Affected Evaluation Model(s) 1996 Westinghouse Best Estimate Large Break LOCA Evaluation Model Estimated Effect Engineering judgement supported by sensitivity calculations showed that correcting this error had minimal impact on LOCA transient calculations, leading to an estimated peak cladding temperature impact of O degrees Fahrenheit.

Page 3 of 3

Enclosure II PEAK CLAD TEMPERATURE (PCT) RACKUP SHEETS VIRGIL C. SUMMER POWER STATION - UNIT 1 SOUTH CAROLINA ELECTRIC & GAS COMPANY Serial No.19-254 Docket No. 50-395

LOCA Peak Cladding Temperature (PCT) Summary Plant Name:

VIRGIL C. SUMMER Utility Name:

South Carolina Electric & Gas EM:

NOTRUMP AOR

Description:

Appendix K Small Break Summary Sheet Status:

Current PCT (°F)

Reference#

ANALYSIS-OF-RECORD 1775 9

Delta PCT ASSESSMENTS

(.6oF)

Reference#

1.

Upflow Conversion 148 10, 11 AOR + Assessments PCT=

1923.0°F REFERENCES Note#

(a,b,c,d)

Note#

Serial No.19-254 Docket No. 50-395 Reporting Year 2008

1.

CGE-94-205, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1994.

2. CGE-94-228, "South Carolina Electric and Gas Company, Virgil C. Summer Station, SBLOCT A Axial Nodalization," October 1994.
3.

CGE-95-201, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 1 O CFR 50.46 Notification and Reporting Information," February 1995.

4. CGE-96-202, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Notification and Reporting Information," February 1996.
5.

CGE-96-213, "South Carolina Electric and Gas Company, Virgil C. Summer Station, 10 CFR 50.46 Small Break LOCA Notification and Reporting Information," July 1996.

6. CGE-00-044, "South Carolina Electric and Gas Company, Virgil C. Summer Nuclear Station, 10 CFR 50.46 Appendix K (BART/ BASH/ NOTRUMP) Evaluation Model, Mid-Year Notification and Reporting for 2000," June 1996.
7.

CGE-03-80, "10 CFR 50.46 Mid-Year Notification and Reporting for 2003," January 2004.

8.

L TR-LIS-06-344, "Transmittal of Updated V. C. Summer SBLOCA PCT Rackup Sheets,"

November 2006.

9. LTR-LIS-06-662, Transmittal of V. C. Summer SBLOCTA PCT Rackup Sheets for HHSI Throttle Valve Replacement," November 2006.
10. WCAP-16980-P, Revision 1, "Reactor Internals Upflow Conversion Program Engineering Report V. C. Summer Nuclear Station Unit 1," December 2008.
11. L TR-LIS-09-18, "1 O CFR 50.46 Report for the V. C. Summer (CGE) Upflow Conversion Program Small Break LOCA Evaluation," January 2009.

NOTES:

(a) The Rebaseline Analysis includes the impacts of the following model assessments: (1)

LUCIFER Error Corrections (Ref. 1 ), (2) Effect of SI in Broken Loop (Ref. 1 ), (3) Effect of Improved Condensation Model (Ref. 1 ),

(b) (4) Axial Nodalization, RIP Model Revision and SBLOCTA Error Corrections Analysis (Ref. 2),

(5) Boiling Heat Transfer Error (Ref. 3), (6) Steam Line Isolation Logic Error (Ref. 3),

(7) NOTRUMP Specific Enthalpy Error (Ref. 4),

(c) (8) SALIBRARY Double Precision Error (Ref. 40, (9) SBLOCTA Fuel Rod Initialization Error (Ref. 5), (10) NOTRUMP Mixture Level Tracking/ Region Depletion Errors (Ref. 6),

(d) (11) NOTRUMP Bubble Rise/ Drift Flux Model Inconsistency Corrections (Ref. 7), (12) Refined Break Spectrum (Ref. 8), (13) High head safety injection (HHSI) flow increase (Ref. 9)

Page 1 of 10

Serial No.19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:

VIRGIL C. SUMMER Utility Name:

South Carolina Electric & Gas EM:

COD (1996)

AOR

Description:

Best Estimate Large Break - Composite Summary Sheet Status:

Current PCT (°F)

Reference#

Note#

ANALYSIS-OF-RECORD 1988 1

Delta PCT Reporting ASSESSMENTS

(.6oF)

Reference#

Note#

Year

1.

Backfit Through 2001 Reporting Year 0

2 2003

2.

Revised Slowdown Heatup Uncertainty 5

3 2004 Distribution

3. PAD 4.0 Implementation

-118 6

2012

4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 123 6

(a) 2012 Peaking Factor Burndown

5.

Transverse Momentum Cells for Zero Cross-flow 0

6 (b) 2012 Boundary Condition Error

6. Revised Heat Transfer Multiplier Distributions

-35 7

2013

7. Changes to Grid Blockage Ratio and 24 8

2013 Porosity

8.

Error in Burst Strain Application 0

9 2013

9.

Fan Cooler Performance Increase 2

2 2003

10. Upflow Conversion Evaluation

-29 4

2008 11. Additional Heat Sinks and Increased Spray 1

5 2010 Flow Rate AOR + Assessments PCT=

1961.Q Of Page 2 of 9

REFERENCES Serial No.19-254 Docket No. 50-395

1.

WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.

2.

CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.

3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
4.

L TR-LIS-08-578, Revision 2, "1 O CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.

5. CGE-10-29, "BELOCA Summary Report," November 2010.
6. L TR-LIS-12-372, "V. C. Summer, 1 O CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
7.

LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.

8.

LTR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.

9. L TR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.

NOTES:

(a) This evaluation credits peaking factor burndown, see Reference 6.

(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.

Page 3 of 9

LOCA Peak Cladding Temperature (PCT) Summary Plant Name:

VIRGIL C. SUMMER Utility Name:

South Carolina Electric & Gas EM:

CQD (1996)

AOR

Description:

Best Estimate Large Break - Slowdown Summary Sheet Status:

Current PCT (°F)

Reference#

Note#

ANALYSIS-OF-RECORD 1860 1

Delta PCT ASSESSMENTS

(~OF)

Reference#

Note#

1. Backfit Through 2001 Reporting Year 0

2

2.

Revised Slowdown Heatup Uncertainty 49 3

Distribution

3. PAD 4.0 Implementation

-83 6

4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 0

6 (a)

Peaking Factor Burndown

5. Transverse Momentum Cells for Zero Cross-flow 0

6 (b)

Boundary Condition Error

6. Revised Heat Transfer Multiplier Distributions

-5 7

7. Changes to Grid Blockage Ratio and 0

8 Porosity

8. Error in Burst Strain Application 0

9

9. Fan Cooler Performance Increase 0

2

10. Upflow Conversion Evaluation

-7 4

11. Additional Heat Sinks and Increased Spray 0

5 Flow Rate AOR + Assessments PCT=

1814.0 Of Page 4 of 9 Serial No.19-254 Docket No. 50-395 Reporting Year 2003 2004 2012 2012 2012 2013 2013 2013 2003 2008 2010

REFERENCES Serial No.19-254 Docket No. 50-395

1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
3.

CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.

4.

L TR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.

5.

CGE-10-29, "BELOCA Summary Report," November 2010.

6. LTR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.
7.

L TR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.

8.

L TR-LIS-13-476, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.

9.

LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.

NOTES:

(a) This evaluation credits peaking factor burndown, see Reference 6.

(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.

Page 5 of 9

Serial No.19-254 Docket No. 50-395 LOCA Peak Cladding Temperature {PCT) Summary Plant Name:

VIRGIL C. SUMMER Utility Name:

South Carolina Electric & Gas EM:

COD (1996)

AOR

Description:

Best Estimate Large Break - Reflood 1 Summary Sheet Status:

Current PCT (°F)

Reference#

Note#

ANALYSIS-OF-RECORD 1808 1

Delta PCT Reporting ASSESSMENTS (A°F)

Reference#

Note#

Year

1.

Backfit Through 2001 Reporting Year 0

2 2003

2. Revised Blowdown Heatup Uncertainty 5

3 2004 Distribution

3.

PAD 4.0 Implementation

-118 6

2012

4.

Evaluation of Fuel Pellet Thermal Conductivity Degradation and 113 6

(a) 2012 Peaking Factor Burndown

5. Transverse Momentum Cells for Zero Cross-flow 0

6 (b) 2012 Boundary Condition Error

6.

Revised Heat Transfer Multiplier Distributions 5

7 2013

7.

Changes to Grid Blockage Ratio and 24 8

2013 Porosity

8.

Error in Burst Strain Application 20 9

2013

9.

Fan Cooler Performance Increase 1

2 2003

10. Upflow Conversion Evaluation

-44 4

2008 11. Additional Heat Sinks and Increased Spray 0

5 2010 Flow Rate AOR + Assessments PCT=

1814.0 °F Page 6 of 9

REFERENCES Serial No.19-254 Docket No. 50-395

1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Statior;i," June 2003.
2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
3. CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.
4. LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.
5. CGE-10-29, "BELOCA Summary Report," November 2010.
6.

L TR-LIS-12-372, "V. C. Summer, 10 CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.

7. LTR-LIS-13-353, "V. C. Summer 10 CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
8. L TR-LIS-13-4 76, "V. C. Summer 10 CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.
9. LTR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.

NOTES:

(a) This evaluation credits peaking factor burndown, see Reference 6.

(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.

Page 7 of 9

Serial No.19-254 Docket No. 50-395 LOCA Peak Claddin~ Temperature WCT) Summary Plant Name:

VIRGIL C. SUMMER Utility Name:

South Carolina Electric & Gas EM:

COD (1996)

AOR

Description:

Best Estimate Large Break-Reflood 2 Summary Sheet Status:

Current PCT (°F)

Reference#

Note#

ANALYSIS-OF-RECORD 1988 1

Delta PCT Reporting ASSESSMENTS (A.OF)

Reference#

Note#

Year

1. Backfit Through 2001 Reporting Year 0

2 2003

2.

Revised Slowdown Heatup Uncertainty 5

3 2004 Distribution

3. PAD 4.0 Implementation

-118 6

2012

4. Evaluation of Fuel Pellet Thermal Conductivity Degradation and 123 6

(a) 2012 Peaking Factor Burndown

5. Transverse Momentum Cells for Zero Cross-flow 0

6 (b) 2012 Boundary Condition Error

6. Revised Heat Transfer Multiplier Distributions

-35 7

2013

7. Changes to Grid Blockage Ratio and 24 8

2013 Porosity

8.

Error in Burst Strain Application 0

9 2013

9.

Fan Cooler Performance Increase 2

2 2003

10. Upflow Conversion Evaluation

-29 4

2008 11. Additional Heat Sinks and Increased Spray 1

5 2010 Flow Rate AOR + Assessments PCT=

1961.0°F Page 8 of 9

REFERENCES Serial No.19-254 Docket No. 50-395

1. WCAP-16043, "Best Estimate Analysis of the large Break Loss of Coolant Accident for the Virgil C. Summer Nuclear Station," June 2003.
2. CGE-03-12, "10 CFR 50.46 Annual Notification and Reporting for 2002," March 2003.
3.

CGE-05-20, "10 CFR 50.46 Annual Notification and Reporting for 2004," April 2005.

4.

LTR-LIS-08-578, Revision 2, "10 CFR 50.46 Reports for the V. C. Summer (CGE) Upflow Conversion Large Break LOCA Evaluation and Assessment of Transverse Momentum Cells with a Zero Cross-flow Boundary Condition Error," January 2009.

5.

CGE-10-29, "BELOCA Summary Report," November 2010.

6.

L TR-LIS-12-372, "V. C. Summer, 1 O CFR 50.46 Notification and Reporting for Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown," September 2012.

7. L TR-LIS-13-353, "V. C. Summer 1 O CFR 50.46 Report for Revised Heat Transfer Multiplier Distributions," July 2013.
8.

L TR-LIS-13-476, "V. C. Summer 1 O CFR 50.46 Report for Changes to Grid Blockage Ratio and Porosity," October 2013.

9.

L TR-LIS-14-37, "V. C. Summer 10 CFR 50.46 Report for the HOTSPOT Burst Strain Error Correction," January 2014.

NOTES:

(a) This evaluation credits peaking factor burndown, see Reference 6.

(b) This input error was originally reported in Reference 4. That evaluation is superseded by the report in Reference 6.

Page 9 of 9