ML19162A156: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:DRAFT 5-31-2019 Draft NPM Valve Installation Verification ITAAC Design Commitment                             Inspections, Tests, Analyses                 Acceptance Criteria The ECCS valves, CIVs, DHRS actuation         i. An inspection will be performed of        i. A report exists and concludes each valves, and their associated hydraulic           each Quality Control inspection hold        Quality Control inspection hold point lines are installed such that each valve         point in each construction procedure        in each construction procedure can perform its safety function.                 associated with the installation of         associated with ECCS valves, CIVs, ECCS valves, CIVs, DHRS actuation            DHRS actuation valves, and their valves, and their associated hydraulic      associated hydraulic lines is lines.                                       completed in accordance with the associated Quality Assurance ii. An inspection will be performed of           Program.
{{#Wiki_filter:Draft NPM Valve Installation Verification ITAAC Design Commitment Inspections, Tests, Analyses Acceptance Criteria The ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines are installed such that each valve can perform its safety function.
each Quality Control inspection hold point in each receipt procedure         ii. A report exists and concludes each associated with ECCS valves, CIVs,           Quality Control inspection hold point DHRS actuation valves, and their             in each receipt procedure associated associated hydraulic lines.                  with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines is completed in accordance with the associated Quality Assurance Program.
: i.
An inspection will be performed of each Quality Control inspection hold point in each construction procedure associated with the installation of ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines.
ii.
An inspection will be performed of each Quality Control inspection hold point in each receipt procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines.
: i.
A report exists and concludes each Quality Control inspection hold point in each construction procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines is completed in accordance with the associated Quality Assurance Program.
ii.
A report exists and concludes each Quality Control inspection hold point in each receipt procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines is completed in accordance with the associated Quality Assurance Program.
Tier 2 Section 14.3 Discussion Quality Control inspection hold points are used to ensure the as-built ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines are installed consistent with design specifications, and therefore capable of performing their safety functions. An inspection of the procedures associated with the receipt and installation of these valves and their hydraulic lines is performed to verify the Quality Control inspection hold points are completed in accordance with the requirements of the associated Quality Assurance Program.
Tier 2 Section 14.3 Discussion Quality Control inspection hold points are used to ensure the as-built ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines are installed consistent with design specifications, and therefore capable of performing their safety functions. An inspection of the procedures associated with the receipt and installation of these valves and their hydraulic lines is performed to verify the Quality Control inspection hold points are completed in accordance with the requirements of the associated Quality Assurance Program.
DRAFT 5-31-2019}}
DRAFT 5-31-2019 DRAFT 5-31-2019}}

Latest revision as of 02:00, 5 January 2025

Draft ITAAC for Npm Valve Installation Verification
ML19162A156
Person / Time
Site: NuScale
Issue date: 05/31/2019
From: Cayetano Santos
NRC/NRO/DLSE/LB1
To:
Santos C / 415-7270
References
Download: ML19162A156 (1)


Text

Draft NPM Valve Installation Verification ITAAC Design Commitment Inspections, Tests, Analyses Acceptance Criteria The ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines are installed such that each valve can perform its safety function.

i.

An inspection will be performed of each Quality Control inspection hold point in each construction procedure associated with the installation of ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines.

ii.

An inspection will be performed of each Quality Control inspection hold point in each receipt procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines.

i.

A report exists and concludes each Quality Control inspection hold point in each construction procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines is completed in accordance with the associated Quality Assurance Program.

ii.

A report exists and concludes each Quality Control inspection hold point in each receipt procedure associated with ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines is completed in accordance with the associated Quality Assurance Program.

Tier 2 Section 14.3 Discussion Quality Control inspection hold points are used to ensure the as-built ECCS valves, CIVs, DHRS actuation valves, and their associated hydraulic lines are installed consistent with design specifications, and therefore capable of performing their safety functions. An inspection of the procedures associated with the receipt and installation of these valves and their hydraulic lines is performed to verify the Quality Control inspection hold points are completed in accordance with the requirements of the associated Quality Assurance Program.

DRAFT 5-31-2019 DRAFT 5-31-2019