IR 05000445/2019410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:uly 2, 2019
{{#Wiki_filter:July 2, 2019


==SUBJECT:==
==SUBJECT:==
Line 31: Line 31:


Sincerely,
Sincerely,
/RA/
/RA/  
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Enclosure:
 
Inspection Report 05000445/2019410 and 05000446/2019410 cc: Electronic Distribution to Comanche Peak Nuclear Power Plant
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89  
 
Enclosure:
Inspection Report 05000445/2019410 and 05000446/2019410  
 
cc: Electronic Distribution to Comanche Peak Nuclear Power Plant  


ML19184A629 Entire Report:
ML19184A629 Entire Report:
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JRG Yes No Publicly Available Sensitive Cover Letter Only: ML19184A631 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JRG Yes No Publicly Available Sensitive  
By: JRG Yes No Publicly Available Sensitive OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRP C:PSB1 NAME DHostetter CJewett JGroom NOKeefe JGroom SIGNATURE /RA/ /RA/ /RA/ /RA by /RA/
 
BTharakan Acting For/
Cover Letter Only: ML19184A631 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JRG Yes No Publicly Available Sensitive  
 
OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRP C:PSB1  
 
NAME DHostetter CJewett JGroom NOKeefe JGroom  
 
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA by BTharakan Acting For/
/RA/  
 
DATE 06/24/19 06/25/19 6/26/19 0702/19 07/02/19
DATE 06/24/19 06/25/19 6/26/19 0702/19 07/02/19
}}
}}

Latest revision as of 01:31, 5 January 2025

NRC Security Inspection Report 05000445/2019410, 05000446/2019410
ML19184A631
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/02/2019
From: Jeremy Groom
Division of Nuclear Materials Safety IV
To: Peters K
Vistra Operations Company
References
IR 2019410
Download: ML19184A631 (3)


Text

July 2, 2019

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000445/2019410, 05000446/2019410

Dear Mr. Peters:

On June 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC inspector discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

This letter, and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89

Enclosure:

Inspection Report 05000445/2019410 and 05000446/2019410

cc: Electronic Distribution to Comanche Peak Nuclear Power Plant

ML19184A629 Entire Report:

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JRG Yes No Publicly Available Sensitive

Cover Letter Only: ML19184A631 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JRG Yes No Publicly Available Sensitive

OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:DRP C:PSB1

NAME DHostetter CJewett JGroom NOKeefe JGroom

SIGNATURE

/RA/

/RA/

/RA/

/RA by BTharakan Acting For/

/RA/

DATE 06/24/19 06/25/19 6/26/19 0702/19 07/02/19