ML19210D092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML19210D092
| number = ML19210D092
| issue date = 11/06/1979
| issue date = 11/06/1979
| title = Performance Testing Procedure PT-108,Revision 0, Decay Heat Removal & Reactor Bldg Spray Sys Leak Rate Test.
| title = Performance Testing Procedure PT-108,Revision 0, Decay Heat Removal & Reactor Bldg Spray Sys Leak Rate Test
| author name =  
| author name =  
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:~
        ~     --
Rev. 0 11/1/79
,g                                                                        Rev. 0     11/1/79 I
,g I
1
occument sceti,n 9
                      ~
1 N F O R is AT I O N O N L 'id
occument sceti,n             ,  9 N F O R is AT I O N O N L 'id         ~
~
C. R. Nuclear PERFORMANCE TESTING PROCEDURE PT-108 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DECAY HEAT RD10 VAL AND REACTOR BUILDING SPRAY SYSTDi LEAK RATE TEST REVIEWED BY:   Plant Review Cocu:littee M     u     e\l h ate     }/ /
C. R. Nuclear
I Q
~
                                                                                /
PERFORMANCE TESTING PROCEDURE PT-108 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DECAY HEAT RD10 VAL AND REACTOR BUILDING SPRAY SYSTDi LEAK RATE TEST REVIEWED BY:
Meeting No.       N APPROVED BY: Nuclear Plant !!anage r i               N c5n 29                   0.t.   ' u/ug        -
Plant Review Cocu:littee M
    \                                                        70112oo
u e\\l h ate
      \                                                                        : R SI 2
}/ /
Q
/
I Meeting No.
N APPROVED BY: Nuclear Plant !!anage r N
i c5n 29
' u/ug 0.t.
70112oo : R SI 2
\\
\\


1.0       PURPOSE 1.1       The purpose of this test is to determine the actual leak rate of the decay heat removal (DHR) and Reactor Building (RB) spray systems to assure compliance with the applicable Technical Specifications.
1.0 PURPOSE 1.1 The purpose of this test is to determine the actual leak rate of the decay heat removal (DHR) and Reactor Building (RB) spray systems to assure compliance with the applicable Technical Specifications.


==2.0       REFERENCES==
==2.0 REFERENCES==
AND ENCLOSURES
AND ENCLOSURES
              ~


==2.1         REFERENCES==
==2.1 REFERENCES==
~
2.1.1 OP-404, Decay Heat Removal System 2.1.2 OP-405, Reactor Building Spray System 2.1.3 FPC Drawings 2.1. 3.1 IS-318-641, Decay Heat Removal 2.1.3.2 IS-318-621, Spent Fuel Cooling 2.1. 3. 3 IS-318-711, Reactor Building Spray 2.1.3.4 IS-318-661, Makeup and Purification 2.1.3.5 IS-318-651, Reactor Coolant 2.1.4 ttP-137, System Hydrostatic Pressure Testing 2.1. 5 Plant Technical Specifications 2.2 ENCLOSURES Data Sheet 1 3.0 TI!1E REQUIRED 3.1 Approximately 8 hrs. from start of test to completion, including:
a.
Assembly of Pressure Test Rig (PTR) b.
System Testing (two trains) i 1371 203 Page 1 FI-108 Date 11/1/79 Rev. 0


2.1.1      OP-404, Decay Heat Removal System 2.1.2      OP-405, Reactor Building Spray System 2.1.3      FPC Drawings 2.1. 3.1    IS-318-641, Decay Heat Removal 2.1.3.2    IS-318-621, Spent Fuel Cooling
c.
  -              2.1. 3. 3  IS-318-711, Reactor Building Spray 2.1.3.4    IS-318-661, Makeup and Purification 2.1.3.5    IS-318-651, Reactor Coolant 2.1.4      ttP-137, System Hydrostatic Pressure Testing 2.1. 5      Plant Technical Specifications 2.2        ENCLOSURES Enclosure 1        Data Sheet 1 3.0        TI!1E REQUIRED 3.1        Approximately 8 hrs. from start of test to completion, including:
Calculations d.
: a. Assembly of Pressure Test Rig (PTR)
Disassembly of PTR 4.0 MANPOWER 4.1 Plant Auxiliary Operator (1) 4.2 Level II Visual Inspectors (2) 4.3 Nbintenance Ikchanics (2) 4.4 Test Engineer (1) 5.0 SPECIAL TEST EQUIP!1ENT 5.1 Method of timing leak collection (stopwatch) 5.2 Containers suitable for leakage collection.
: b. System Testing (two trains) i 1371 203 Page 1      FI-108      Date 11/1/79      Rev. 0
5.3 PTR similar to that described in MP-137, System Hydro-static Pressure Testing, Figure 1.
: c. Calculations
5.4 Calibrated container suitable for measuring total collected leakage.
: d. Disassembly of PTR 4.0     MANPOWER 4.1     Plant Auxiliary Operator (1) 4.2     Level II Visual Inspectors (2) 4.3     Nbintenance Ikchanics (2) 4.4     Test Engineer (1) 5.0     SPECIAL TEST EQUIP!1ENT 5.1     Method of timing leak collection (stopwatch) 5.2     Containers suitable for leakage collection.
6.0 LIMITS AND PRECAUTIONS 6.1 Any leak found during the performance of this test must be measured for a period of no less than I hr.
5.3     PTR similar to that described in MP-137, System Hydro-static Pressure Testing, Figure 1.
b.2 The PTR sater supply boron concentration must be main-tained equal or greater than that required for cold shutdova.
5.4     Calibrated container suitable for measuring total collected leakage.
o.3 One train of the DilR must be operable for low pressure injection (LPI) during !! odes 1, 2, 3, and 4.
6.0     LIMITS AND PRECAUTIONS 6.1     Any leak found during the performance of this test must be measured for a period of no less than I hr.
{37}
b.2     The PTR sater supply boron concentration must be main-tained equal or greater than that required for cold shutdova.
Page 2 PT-108 Date 11/1/79 Rev. O
o.3     One train of the DilR must be operable for low pressure injection (LPI) during !! odes 1, 2, 3, and 4.
: 6. 4 One train of the RB spray must be operable during Modes 1, 2, 3, and 4.
Page 2     PT-108     Date 11/1/79     Rev. O             {37}  -
6.5 When the system is under pressure, the PTR must be manned at all times and pressure monitored.
: 6. 4     One train of the RB spray must be operable during Modes 1, 2, 3, and 4.
6.6 All work will be performed under a Radiation Work Permit (RWP).
6.5       When the system is under pressure, the PTR must be manned at all times and pressure monitored.
6.7 If at any time the leak rate exceeds 6 gph in the DHR or RB spray systems, refer to Technical Specification 3.5.1 or 3.6.1.
6.6       All work will be performed under a Radiation Work Permit (RWP).
6.8 SYSTEM TEST PRESSURE 6.8.1 Technical Specifications require leak rate measurement pressures of above 190 psig.
6.7       If at any time the leak rate exceeds 6 gph in the DHR
The combined system leak rate test shall be conducted at 200 psig +5 -0% to assure meeting all requirements.
        ..          or RB spray systems, refer to Technical Specification 3.5.1 or 3.6.1.
If specific sections of the system are to be tested, refer to Technical Specifications 4.5.1 and 4.6.1 for minimum acceptable test pressures.
6.8       SYSTEM TEST PRESSURE 6.8.1     Technical Specifications require leak rate measurement pressures of above 190 psig. The combined system leak rate test shall be conducted at 200 psig +5 -0% to assure meeting all requirements. If specific sections of the system are to be tested, refer to Technical Specifications 4.5.1 and 4.6.1 for minimum acceptable test pressures.
7.0 REQUIRED PLAh"I STATUS AND PREREQUISITE CONDITIONS 7.1 The plant should be in tbde 1, 2, or 3.
7.0       REQUIRED PLAh"I STATUS AND PREREQUISITE CONDITIONS 7.1       The plant should be in tbde 1, 2, or 3.
7.2 The DER system is in the normal standby mode per OP-404, Decay Ikat Removal System.
7.2       The DER system is in the normal standby mode per OP-404, Decay Ikat Removal System.
7.3 The RB spray system is in the normal standby mode per OP-405, Reactor Building Spray System.
7.3       The RB spray system is in the normal standby mode per OP-405, Reactor Building Spray System.
7.4 RWP(s) for the performance of the test have been issued and approved.
7.4       RWP(s) for the performance of the test have been issued and approved.
1371 205 Page 3 PT-108 Date 11/1/79 Rev. O
1371 205 Page 3     PT-108       Date 11/1/79     Rev. O
: 7. 5 System fluid and PTR fluid are at approximately the same temperature.
: 7. 5       System fluid and PTR fluid are at approximately the same temperature.
8.0 TEST METHOD Initials 8.1 Verify all required plant status and prerequisite conditions have been met.
8.0       TEST METHOD                                                 Initials 8.1       Verify all required plant status and prerequisite conditions have been met.
8.2 Verify that the DHR system is aligned as required by Valve Check List III of OP-404, Decay Ikat Removal System.
8.2       Verify that the DHR system is aligned as required by Valve Check List III of OP-404, Decay Ikat Removal System.
: 6. 3 Verify that the RB spray system is aligned as required by Valve Check List I of OP-405, Reactor Building Spray System.
: 6. 3       Verify that the RB spray system is aligned as required by Valve Check List I of OP-405, Reactor Building Spray System.
8.4 Notify the Shift Supervisor that test is to begin and of the nature of the test.
8.4       Notify the Shift Supervisor that test is to begin and of the nature of the test.
8.5 Connect PTR to DHR system as follows:
8.5         Connect PTR to DHR system as follows:
a.
: a. Verify SFV-87 is closed.
Verify SFV-87 is closed.
: b. Connect PTR to DRV-89.
b.
8.6       Perform leak rate test on "A" train as follows:
Connect PTR to DRV-89.
8.6.1     Open and tag out breakers for DHP-3A and RBSP-3A.
8.6 Perform leak rate test on "A" train as follows:
NOTE:     Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.
8.6.1 Open and tag out breakers for DHP-3A and RBSP-3A.
8.6.2     Verify RCV-53 is closed.
NOTE:
8.o.3     Align DHR system valves as follows:
Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.
: 8. 6. 3.1 Close the following:
8.6.2 Verify RCV-53 is closed.
: a. DHV-34F
8.o.3 Align DHR system valves as follows:
: b. DilV-18
: 8. 6. 3.1 Close the following:
: c. DHV-1.i
a.
DHV-34F b.
DilV-18 c.
DHV-1.i
(
(
Page 4         PT-108     Date 11/1/79     Rev. 0 1371    206
1371 206 Page 4 PT-108 Date 11/1/79 Rev. 0


8.6.3.2   Open the following:
8.6.3.2 Open the following:
: a. DHV-8
a.
: b. DHV-39
DHV-8 b.
: c. DIIV-91
DHV-39 c.
: d. DHV-41
DIIV-91 d.
: e. DHV-48 8.6.4     Align RB spray system valves as follows:
DHV-41 e.
: a. Open BSV-5.
DHV-48 8.6.4 Align RB spray system valves as follows:
: b. Open BSV-28.
a.
8.6.5     Start PTR and pressurize to test pressure.
Open BSV-5.
: d. 6. 6   Visually check PTR connection for leakage; assure zero leakage before continuing.
b.
8.6.7     Pressurize the system as follows:
Open BSV-28.
8.6.7.1   Notify the Control Center Operator that system pres-
8.6.5 Start PTR and pressurize to test pressure.
                                                    ~
: d. 6. 6 Visually check PTR connection for leakage; assure zero leakage before continuing.
8.6.7 Pressurize the system as follows:
8.6.7.1 Notify the Control Center Operator that system pres-
~
sure test is now in progress.
sure test is now in progress.
8.6.7.2   Slowly open DHV-89.
8.6.7.2 Slowly open DHV-89.
8.6.7.3   Verify that system pressure increases to test pressure
8.6.7.3 Verify that system pressure increases to test pressure
(+5% -0%).
(+5% -0%).
8.6.7.4   Allow 15 min. for system stabilization.
8.6.7.4 Allow 15 min. for system stabilization.
8.6.7.5   Initiate inspection of components and piping for evidence of leakage.
8.6.7.5 Initiate inspection of components and piping for evidence of leakage.
8.6.7.6   If leakage is detected, collect the leakage for a period of not less than I hr. and record on Data Sheet I.
8.6.7.6 If leakage is detected, collect the leakage for a period of not less than I hr. and record on Data Sheet I.
8.6.7.7   Determine the system leak rate per Data Sheet I.
8.6.7.7 Determine the system leak rate per Data Sheet I.
1371 207
1371 207
(
(
Page 5     PT-108     Date 11/1/79       Rev. O
Page 5 PT-108 Date 11/1/79 Rev. O


8.7       Return the system to normal as follows:
8.7 Return the system to normal as follows:
8.7.1     Close DHV-89.
8.7.1 Close DHV-89.
8.7.2     Stop the PTR pump.
8.7.2 Stop the PTR pump.
8.7.3     Align DHR valves as follows:
8.7.3 Align DHR valves as follows:
8.7.3.1   Close the following:
8.7.3.1 Close the following:
: a. DHV-48
a.
: b. DHV-8
DHV-48 b.
: c. DHV-39
DHV-8 c.
: d. DHV-41
DHV-39 d.
: e. DHV-91 8.7.3.2   Open the following:
DHV-41 e.
: a. DHV-34F
DHV-91 8.7.3.2 Open the following:
: b. DRV-13
a.
: c. DHV-18 6.7.3.3   Remove the tag from DHP-3A.
DHV-34F b.
8.7.4     Align RB spray system as follows:
DRV-13 c.
8.7.4.1   Close the following:
DHV-18 6.7.3.3 Remove the tag from DHP-3A.
: a. BSV-28
8.7.4 Align RB spray system as follows:
: b. BSV-5 8.7.4.2   Remove the tag f rom RBSP-3A.
8.7.4.1 Close the following:
8.8       Perform leak rate test on "B" train as follows:
a.
8.8.1     Open and tag out the breaker for DHP-3B and RBSP-38.
BSV-28 b.
NOTE:   Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.
BSV-5 8.7.4.2 Remove the tag f rom RBSP-3A.
8.8.2     Align the valves of the DHR as follows:
8.8 Perform leak rate test on "B" train as follows:
1 1371 208 Page 6     PT-108     Date 11/1/79     Rev. O
8.8.1 Open and tag out the breaker for DHP-3B and RBSP-38.
NOTE:
Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.
8.8.2 Align the valves of the DHR as follows:
1371 208 1
Page 6 PT-108 Date 11/1/79 Rev. O


8.8.2.1     Close the following:
8.8.2.1 Close the following:
: a. DHV-35F
a.
: b. DHV-24 8.8.2.2     Open the following:
DHV-35F b.
: a. DHV-7
DHV-24 8.8.2.2 Open the following:
: b. Dl!V-48 8.8.3       Pressurize the PTR to test pressure.
a.
8.8.4       Assure zero leakage of PTR before continuing.
DHV-7 b.
8.8.5       Repeat Section 8.6.7 for the   "B" train.
Dl!V-48 8.8.3 Pressurize the PTR to test pressure.
8.9         Return the systes to normal as follows:
8.8.4 Assure zero leakage of PTR before continuing.
8.9.1       Close DHV-89.
8.8.5 Repeat Section 8.6.7 for the "B"
8.9.2         Stop the PTR pump.
train.
: e. 9. 3     Align the DHR system as follows:
8.9 Return the systes to normal as follows:
8.9.3.1       Close the following:
8.9.1 Close DHV-89.
: a. DHV-48
8.9.2 Stop the PTR pump.
: b. DHV-7
: e. 9. 3 Align the DHR system as follows:
: 8. 9. 3. 2   Open the following:
8.9.3.1 Close the following:
: a. DHV-35F
a.
: b. DHV-24 8.9.3.3     Remove the tag f rom DHP-33.
DHV-48 b.
8.9.4       Align RB spray system as follows:
DHV-7
8.9.4.1     Remove the tag f rom RBSP-3B.
: 8. 9. 3. 2 Open the following:
: 8. 10       Determine the total system leak rate for the DHR system per Data Sheet I.
a.
8.11         Determine the total system leak rate for the RB spray system per Data Sheet I.
DHV-35F b.
k 1371 209 Page 7         PI-108     Date 11/1/79     Rev. O
DHV-24 8.9.3.3 Remove the tag f rom DHP-33.
8.9.4 Align RB spray system as follows:
8.9.4.1 Remove the tag f rom RBSP-3B.
: 8. 10 Determine the total system leak rate for the DHR system per Data Sheet I.
8.11 Determine the total system leak rate for the RB spray system per Data Sheet I.
k 1371 209 Page 7 PI-108 Date 11/1/79 Rev. O


,        8.12     When the total systeu leak rate has been determined to be 'less than 6 gph each for both the DER and RB spray syscens, return the system to normal as follows:
8.12 When the total systeu leak rate has been determined to be 'less than 6 gph each for both the DER and RB spray syscens, return the system to normal as follows:
8.12.1   Verify that the DRR system is aligned per Valve Check List III of OP-404, Decay Heat Removal System.
8.12.1 Verify that the DRR system is aligned per Valve Check List III of OP-404, Decay Heat Removal System.
8.12.2   Verify that the FB spray systen is aligned per Valve Check List I of OP-405, Reactor Building Spray System.
8.12.2 Verify that the FB spray systen is aligned per Valve Check List I of OP-405, Reactor Building Spray System.
8.12.3   Vent and remove the PTR.
8.12.3 Vent and remove the PTR.
9.0     DATA COLLECTION 9.1     Refer to Data Sheet I.
9.0 DATA COLLECTION 9.1 Refer to Data Sheet I.
10.0     ACCEPTANCE CRITERIA 10.1     The leak rate of either the DER system or the RB spray system may not exceed 6 gph.
10.0 ACCEPTANCE CRITERIA 10.1 The leak rate of either the DER system or the RB spray system may not exceed 6 gph.
kb     -
kb Page 8 PT-108 Da te 11/1/79 Rev. O
Page 8   PT-108       Da te 11/1/79     Rev. O


DATA SilEET I                         ENCLOSURE 1 Decay lleat Removal System:
DATA SilEET I ENCLOSURE 1 Decay lleat Removal System:
LOCATION       TIME START TIME STOP   DELTA TIME       VOLUME LEAK RATE
LOCATION TIME START TIME STOP DELTA TIME VOLUME LEAK RATE
* INITIALS TOTAT, Reactor Building Spray System:
* INITIALS
: TOTAT, Reactor Building Spray System:
TOTAL
TOTAL
* Leak Rate = Volume (gals.)
* Leak Rate = Volume (gals.)
Time (hrs.)
Time (hrs.)
L                                                                               \57\ 2\\
L
Page 9       PT-108   Date 11/1/79       Rev. O}}
\\57\\ 2\\\\
Page 9 PT-108 Date 11/1/79 Rev. O}}

Latest revision as of 21:39, 4 January 2025

Performance Testing Procedure PT-108,Revision 0, Decay Heat Removal & Reactor Bldg Spray Sys Leak Rate Test
ML19210D092
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/06/1979
From:
FLORIDA POWER CORP.
To:
Shared Package
ML19210D080 List:
References
PT-108, NUDOCS 7911200518
Download: ML19210D092 (10)


Text

~

Rev. 0 11/1/79

,g I

occument sceti,n 9

1 N F O R is AT I O N O N L 'id

~

C. R. Nuclear

~

PERFORMANCE TESTING PROCEDURE PT-108 FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DECAY HEAT RD10 VAL AND REACTOR BUILDING SPRAY SYSTDi LEAK RATE TEST REVIEWED BY:

Plant Review Cocu:littee M

u e\\l h ate

}/ /

Q

/

I Meeting No.

N APPROVED BY: Nuclear Plant !!anage r N

i c5n 29

' u/ug 0.t.

70112oo : R SI 2

\\

\\

1.0 PURPOSE 1.1 The purpose of this test is to determine the actual leak rate of the decay heat removal (DHR) and Reactor Building (RB) spray systems to assure compliance with the applicable Technical Specifications.

2.0 REFERENCES

AND ENCLOSURES

2.1 REFERENCES

~

2.1.1 OP-404, Decay Heat Removal System 2.1.2 OP-405, Reactor Building Spray System 2.1.3 FPC Drawings 2.1. 3.1 IS-318-641, Decay Heat Removal 2.1.3.2 IS-318-621, Spent Fuel Cooling 2.1. 3. 3 IS-318-711, Reactor Building Spray 2.1.3.4 IS-318-661, Makeup and Purification 2.1.3.5 IS-318-651, Reactor Coolant 2.1.4 ttP-137, System Hydrostatic Pressure Testing 2.1. 5 Plant Technical Specifications 2.2 ENCLOSURES Data Sheet 1 3.0 TI!1E REQUIRED 3.1 Approximately 8 hrs. from start of test to completion, including:

a.

Assembly of Pressure Test Rig (PTR) b.

System Testing (two trains) i 1371 203 Page 1 FI-108 Date 11/1/79 Rev. 0

c.

Calculations d.

Disassembly of PTR 4.0 MANPOWER 4.1 Plant Auxiliary Operator (1) 4.2 Level II Visual Inspectors (2) 4.3 Nbintenance Ikchanics (2) 4.4 Test Engineer (1) 5.0 SPECIAL TEST EQUIP!1ENT 5.1 Method of timing leak collection (stopwatch) 5.2 Containers suitable for leakage collection.

5.3 PTR similar to that described in MP-137, System Hydro-static Pressure Testing, Figure 1.

5.4 Calibrated container suitable for measuring total collected leakage.

6.0 LIMITS AND PRECAUTIONS 6.1 Any leak found during the performance of this test must be measured for a period of no less than I hr.

b.2 The PTR sater supply boron concentration must be main-tained equal or greater than that required for cold shutdova.

o.3 One train of the DilR must be operable for low pressure injection (LPI) during !! odes 1, 2, 3, and 4.

{37}

Page 2 PT-108 Date 11/1/79 Rev. O

6. 4 One train of the RB spray must be operable during Modes 1, 2, 3, and 4.

6.5 When the system is under pressure, the PTR must be manned at all times and pressure monitored.

6.6 All work will be performed under a Radiation Work Permit (RWP).

6.7 If at any time the leak rate exceeds 6 gph in the DHR or RB spray systems, refer to Technical Specification 3.5.1 or 3.6.1.

6.8 SYSTEM TEST PRESSURE 6.8.1 Technical Specifications require leak rate measurement pressures of above 190 psig.

The combined system leak rate test shall be conducted at 200 psig +5 -0% to assure meeting all requirements.

If specific sections of the system are to be tested, refer to Technical Specifications 4.5.1 and 4.6.1 for minimum acceptable test pressures.

7.0 REQUIRED PLAh"I STATUS AND PREREQUISITE CONDITIONS 7.1 The plant should be in tbde 1, 2, or 3.

7.2 The DER system is in the normal standby mode per OP-404, Decay Ikat Removal System.

7.3 The RB spray system is in the normal standby mode per OP-405, Reactor Building Spray System.

7.4 RWP(s) for the performance of the test have been issued and approved.

1371 205 Page 3 PT-108 Date 11/1/79 Rev. O

7. 5 System fluid and PTR fluid are at approximately the same temperature.

8.0 TEST METHOD Initials 8.1 Verify all required plant status and prerequisite conditions have been met.

8.2 Verify that the DHR system is aligned as required by Valve Check List III of OP-404, Decay Ikat Removal System.

6. 3 Verify that the RB spray system is aligned as required by Valve Check List I of OP-405, Reactor Building Spray System.

8.4 Notify the Shift Supervisor that test is to begin and of the nature of the test.

8.5 Connect PTR to DHR system as follows:

a.

Verify SFV-87 is closed.

b.

Connect PTR to DRV-89.

8.6 Perform leak rate test on "A" train as follows:

8.6.1 Open and tag out breakers for DHP-3A and RBSP-3A.

NOTE:

Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.

8.6.2 Verify RCV-53 is closed.

8.o.3 Align DHR system valves as follows:

8. 6. 3.1 Close the following:

a.

DHV-34F b.

DilV-18 c.

DHV-1.i

(

1371 206 Page 4 PT-108 Date 11/1/79 Rev. 0

8.6.3.2 Open the following:

a.

DHV-8 b.

DHV-39 c.

DIIV-91 d.

DHV-41 e.

DHV-48 8.6.4 Align RB spray system valves as follows:

a.

Open BSV-5.

b.

Open BSV-28.

8.6.5 Start PTR and pressurize to test pressure.

d. 6. 6 Visually check PTR connection for leakage; assure zero leakage before continuing.

8.6.7 Pressurize the system as follows:

8.6.7.1 Notify the Control Center Operator that system pres-

~

sure test is now in progress.

8.6.7.2 Slowly open DHV-89.

8.6.7.3 Verify that system pressure increases to test pressure

(+5% -0%).

8.6.7.4 Allow 15 min. for system stabilization.

8.6.7.5 Initiate inspection of components and piping for evidence of leakage.

8.6.7.6 If leakage is detected, collect the leakage for a period of not less than I hr. and record on Data Sheet I.

8.6.7.7 Determine the system leak rate per Data Sheet I.

1371 207

(

Page 5 PT-108 Date 11/1/79 Rev. O

8.7 Return the system to normal as follows:

8.7.1 Close DHV-89.

8.7.2 Stop the PTR pump.

8.7.3 Align DHR valves as follows:

8.7.3.1 Close the following:

a.

DHV-48 b.

DHV-8 c.

DHV-39 d.

DHV-41 e.

DHV-91 8.7.3.2 Open the following:

a.

DHV-34F b.

DRV-13 c.

DHV-18 6.7.3.3 Remove the tag from DHP-3A.

8.7.4 Align RB spray system as follows:

8.7.4.1 Close the following:

a.

BSV-28 b.

BSV-5 8.7.4.2 Remove the tag f rom RBSP-3A.

8.8 Perform leak rate test on "B" train as follows:

8.8.1 Open and tag out the breaker for DHP-3B and RBSP-38.

NOTE:

Implement the " Action Statements" of Technical Specifications 3.5.1 and 3.6.1.

8.8.2 Align the valves of the DHR as follows:

1371 208 1

Page 6 PT-108 Date 11/1/79 Rev. O

8.8.2.1 Close the following:

a.

DHV-35F b.

DHV-24 8.8.2.2 Open the following:

a.

DHV-7 b.

Dl!V-48 8.8.3 Pressurize the PTR to test pressure.

8.8.4 Assure zero leakage of PTR before continuing.

8.8.5 Repeat Section 8.6.7 for the "B"

train.

8.9 Return the systes to normal as follows:

8.9.1 Close DHV-89.

8.9.2 Stop the PTR pump.

e. 9. 3 Align the DHR system as follows:

8.9.3.1 Close the following:

a.

DHV-48 b.

DHV-7

8. 9. 3. 2 Open the following:

a.

DHV-35F b.

DHV-24 8.9.3.3 Remove the tag f rom DHP-33.

8.9.4 Align RB spray system as follows:

8.9.4.1 Remove the tag f rom RBSP-3B.

8. 10 Determine the total system leak rate for the DHR system per Data Sheet I.

8.11 Determine the total system leak rate for the RB spray system per Data Sheet I.

k 1371 209 Page 7 PI-108 Date 11/1/79 Rev. O

8.12 When the total systeu leak rate has been determined to be 'less than 6 gph each for both the DER and RB spray syscens, return the system to normal as follows:

8.12.1 Verify that the DRR system is aligned per Valve Check List III of OP-404, Decay Heat Removal System.

8.12.2 Verify that the FB spray systen is aligned per Valve Check List I of OP-405, Reactor Building Spray System.

8.12.3 Vent and remove the PTR.

9.0 DATA COLLECTION 9.1 Refer to Data Sheet I.

10.0 ACCEPTANCE CRITERIA 10.1 The leak rate of either the DER system or the RB spray system may not exceed 6 gph.

kb Page 8 PT-108 Da te 11/1/79 Rev. O

DATA SilEET I ENCLOSURE 1 Decay lleat Removal System:

LOCATION TIME START TIME STOP DELTA TIME VOLUME LEAK RATE

  • INITIALS
TOTAT, Reactor Building Spray System:

TOTAL

  • Leak Rate = Volume (gals.)

Time (hrs.)

L

\\57\\ 2\\\\

Page 9 PT-108 Date 11/1/79 Rev. O