{{#Wiki_filter:ust 15, 2019
{{#Wiki_filter:August 15, 2019


==SUBJECT:==
==SUBJECT:==
Line 33: Line 33:


Sincerely,
Sincerely,
/RA/
/RA/  
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
 
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety  
 
Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000315 and 05000316 License Numbers: DPR-58 and DPR-74 Report Numbers: 05000315/2019410 and 05000316/2019410 Enterprise Identifier: I-2019-410-0048 Licensee: Indiana Michigan Power Company Nuclear Generation Group Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Inspection Dates: June 3, 2019, to July 12, 2019 Inspector: M. Ziolkowski, Senior Physical Security Inspector Approved By: Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure
Docket Numbers:
05000315 and 05000316  
 
License Numbers:
DPR-58 and DPR-74  
 
Report Numbers:
05000315/2019410 and 05000316/2019410  
 
Enterprise Identifier: I-2019-410-0048  
 
Licensee:
Indiana Michigan Power Company Nuclear Generation Group  
 
Facility:
Donald C. Cook Nuclear Power Plant, Units 1 and 2  
 
Location:
Bridgman, MI  
 
Inspection Dates:
June 3, 2019, to July 12, 2019  
 
Inspector:
M. Ziolkowski, Senior Physical Security Inspector  
 
Approved By:
Diana Betancourt-Roldan, Acting Chief
Plant Support Branch
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.


List of Findings and Violations No findings or violations of more-than-minor significance were identified.
===List of Findings and Violations===
No findings or violations of more-than-minor significance were identified.


Additional Tracking Items None.
===Additional Tracking Items===
None.


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 56: Line 90:


==SAFEGUARDS==
==SAFEGUARDS==
==71130.02 - Access Control==
The inspector evaluated the security access control program. The following elements were


==71130.02 - Access Control The inspector evaluated the security access control program. The following elements were evaluated from this IP.
===evaluated from this IP.


Access Control==
Access Control===
{{IP sample|IP=IP 71130.02|count=1}}
{{IP sample|IP=IP 71130.02|count=1}}


    (1)
(1)
* Tier I: All
* Tier I: All
* Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I)
* Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I)
* Tier III: 02.09
* Tier III: 02.09


==71130.06 - Protection of Safeguards Information The inspector evaluated the safeguards information protection program. The following elements were evaluated from this IP:
==71130.06 - Protection of Safeguards Information==
Protection of Safeguards Information==
The inspector evaluated the safeguards information protection program. The following elements were evaluated from this IP:  
{{IP sample|IP=IP 71130.06|count=1}}


    (1)
===Protection of Safeguards Information (1 Sample)===
(1)
* Tier I: All
* Tier I: All
* Tier II: 02.04.b, 02.05 (a-b), 02.07.c
* Tier II: 02.04.b, 02.05 (a-b), 02.07.c
* Tier III: 02.08, 02.09 (a-b)
* Tier III: 02.08, 02.09 (a-b)


==71130.07 - Security Training The inspector evaluated the nuclear Security Training Program. The following elements were evaluated from this IP.
==71130.07 - Security Training==
The inspector evaluated the nuclear Security Training Program. The following elements were  
 
===evaluated from this IP.


Security Training==
Security Training===
{{IP sample|IP=IP 71130.07|count=1}}
{{IP sample|IP=IP 71130.07|count=1}}


    (1)
(1)
* Tier I: All
* Tier I: All
* Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b)
* Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b)
* Tier III: 02.12 (a-b), 02.13 (a-c)
* Tier III: 02.12 (a-b), 02.13 (a-c)
 
===71151 - Performance Indicator Verification
 
The inspector verified licensee performance indicators submittals listed below:
 
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)  


===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
===
===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
    (1)   (10.01/2018 - 3/30/2019)
 
(1)  
(10.01/2018 - 3/30/2019)


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 101: Line 146:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type           Designation Description or Title             Revision or
Inspection
Procedure                                                              Date
Procedure
71130.02 Procedures       PMP-2060-   Security Requirements for Plant   34
Type
SEC-006    Personnel
Designation
SPP-2060-   Protected Area Access/Exit       23
Description or Title
SFI-209    Requirements
Revision or
SPP-2060-   Security Core, Key and Lock       24
Date
SFI-214    Program
71130.02
71130.06   Miscellaneous             Safeguards Information Access     06/24/2019
Procedures
PMP-2060-
SEC-006
Security Requirements for Plant
Personnel
SPP-2060-
SFI-209
Protected Area Access/Exit
Requirements
SPP-2060-
SFI-214
Security Core, Key and Lock
Program
71130.06
Miscellaneous
Safeguards Information Access
List
List
Procedures     DTG-SPS-   SGI Retained Memory               0
06/24/2019
073        Verification
Procedures
PMP-2030-   Protection of Nuclear Security   23
DTG-SPS-
SIC-001    Documents/Records
073
Self-         2019-4198-1 NRC Inspection Quick Hit Self     0
SGI Retained Memory
Assessments                Assessment - Protection of
Verification
PMP-2030-
SIC-001
Protection of Nuclear Security
Documents/Records
Self-
Assessments
2019-4198-1
NRC Inspection Quick Hit Self
Assessment - Protection of
Safeguards Information
Safeguards Information
71130.07   Corrective     AR 2019-    TAC Fire Basis Document          06/26/2019
71130.07
Action         6417
Corrective
Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous             National Rifle Association       12/07/2017
AR 2019-
6417
TAC Fire Basis Document
06/26/2019
Miscellaneous
National Rifle Association
Endorsement - Tactical
Endorsement - Tactical
Qualification Course
Qualification Course
Procedures     DTG-SPS-   Practical Physical Fitness Test  0
2/07/2017
Procedures
DTG-SPS-
066
066
SE-C-AR018 Suspected Tampering               2
Practical Physical Fitness Test
SE-C-AR028 Deadly Force                     0
SE-C-AR018
SE-C-AR049 Response Activities               0
Suspected Tampering
SE-C-AR063 Bomb Threats and Search           0
SE-C-AR028
SE-Q-       Force-on-Force 40 Hr.             0
Deadly Force
FOF01-1    Qualification Card
SE-C-AR049
                          (Initial)
Response Activities
SE-Q-       Force-on-Force 40 Hr.             0
SE-C-AR063
FOF01-2    Qualification Card
Bomb Threats and Search
SPP-2060-   Site Protective Services Security 8
SE-Q-
SFI-105    Organization and
FOF01-1
(Initial)
Force-on-Force 40 Hr.
Qualification Card
SE-Q-
FOF01-2
Force-on-Force 40 Hr.
Qualification Card
SPP-2060-
SFI-105
Site Protective Services Security
Organization and
Responsibilities
Responsibilities
TPD-600-   Security Training Program         10
TPD-600-
SEC        Description
SEC
Self-         GT 2018-   NRC Inspection Quick Hit Self     0
Security Training Program
Assessments    10514      Assessment - Security Training
Description
5
Self-
Assessments
GT 2018-
10514
NRC Inspection Quick Hit Self
Assessment - Security Training
0
}}
}}

Latest revision as of 15:03, 4 January 2025

NRC Security Baseline Inspection Report 05000315/2019410 and 05000316/2019410 (DRS-M.Ziolkowski)
ML19227A339
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/15/2019
From: Diana Betancourt-Roldan
Plant Support Branch II
To: Gebbie J
Indiana Michigan Power Co
References
IR 2019410
Download: ML19227A339 (8)


Text

August 15, 2019

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC SECURITY BASELINE INSPECTION REPORT 05000315/2019410 AND 05000316/2019410

Dear Mr. Gebbie:

On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. S. Lies and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2019410 and 05000316/2019410

Enterprise Identifier: I-2019-410-0048

Licensee:

Indiana Michigan Power Company Nuclear Generation Group

Facility:

Donald C. Cook Nuclear Power Plant, Units 1 and 2

Location:

Bridgman, MI

Inspection Dates:

June 3, 2019, to July 12, 2019

Inspector:

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Diana Betancourt-Roldan, Acting Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more-than-minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the security access control program. The following elements were

===evaluated from this IP.

Access Control===

(1)

  • Tier I: All
  • Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I)
  • Tier III: 02.09

71130.06 - Protection of Safeguards Information

The inspector evaluated the safeguards information protection program. The following elements were evaluated from this IP:

Protection of Safeguards Information (1 Sample)

(1)

  • Tier I: All
  • Tier II: 02.04.b, 02.05 (a-b), 02.07.c
  • Tier III: 02.08, 02.09 (a-b)

71130.07 - Security Training

The inspector evaluated the nuclear Security Training Program. The following elements were

===evaluated from this IP.

Security Training===

(1)

  • Tier I: All
  • Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b)
  • Tier III: 02.12 (a-b), 02.13 (a-c)

===71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1)

(10.01/2018 - 3/30/2019)

INSPECTION RESULTS

No findings or violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On July 11, 2019, the inspector presented the security baseline inspection results to Mr. S. Lies and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

PMP-2060-

SEC-006

Security Requirements for Plant

Personnel

SPP-2060-

SFI-209

Protected Area Access/Exit

Requirements

SPP-2060-

SFI-214

Security Core, Key and Lock

Program

71130.06

Miscellaneous

Safeguards Information Access

List

06/24/2019

Procedures

DTG-SPS-

073

SGI Retained Memory

Verification

PMP-2030-

SIC-001

Protection of Nuclear Security

Documents/Records

Self-

Assessments

2019-4198-1

NRC Inspection Quick Hit Self

Assessment - Protection of

Safeguards Information

71130.07

Corrective

Action

Documents

Resulting from

Inspection

AR 2019-

6417

TAC Fire Basis Document

06/26/2019

Miscellaneous

National Rifle Association

Endorsement - Tactical

Qualification Course

2/07/2017

Procedures

DTG-SPS-

066

Practical Physical Fitness Test

SE-C-AR018

Suspected Tampering

SE-C-AR028

Deadly Force

SE-C-AR049

Response Activities

SE-C-AR063

Bomb Threats and Search

SE-Q-

FOF01-1

(Initial)

Force-on-Force 40 Hr.

Qualification Card

SE-Q-

FOF01-2

Force-on-Force 40 Hr.

Qualification Card

SPP-2060-

SFI-105

Site Protective Services Security

Organization and

Responsibilities

TPD-600-

SEC

Security Training Program

Description

Self-

Assessments

GT 2018-

10514

NRC Inspection Quick Hit Self

Assessment - Security Training

0