ML19228A170: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Verification and Validation of Circuit Interrupting Ratings for Low Voltage Protective Equipment November xx, 2014 EQ Technical Meeting Jeffrey Jacobson Quality Assurance Vendor Inspection Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation 1
{{#Wiki_filter:November xx, 2014 EQ Technical Meeting 1
Verification and Validation of Circuit Interrupting Ratings for Low Voltage Protective Equipment Jeffrey Jacobson Quality Assurance Vendor Inspection Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation


Purpose of Interrupting Ratings The interrupting rating of a protective device provides assurance that for a given voltage and current, the device will be capable of interrupting a fault with a magnitude up to and including its rating, without significant damage to the protective device itself, or the emission of flame, hot gasses, or particles that could impact nearby equipment (specific language included in applicable standards) 2
Purpose of Interrupting Ratings The interrupting rating of a protective device provides assurance that for a given voltage and current, the device will be capable of interrupting a fault with a magnitude up to and including its rating, without significant damage to the protective device itself, or the emission of flame, hot gasses, or particles that could impact nearby equipment (specific language included in applicable standards) 2
Line 22: Line 23:
* Plant specific licensing basis although most likely required for devices that provide 1E/non-1E isolation
* Plant specific licensing basis although most likely required for devices that provide 1E/non-1E isolation
* Lots of Operating Experience on this subject
* Lots of Operating Experience on this subject
  - NRC Information Notices
- NRC Information Notices
* 2006-31 Inadequate Fault Interrupting Rating of Breakers
* 2006-31 Inadequate Fault Interrupting Rating of Breakers
* 2002-01 Metalclad Switchgear Failures
* 2002-01 Metalclad Switchgear Failures
* 1991-29 Deficiencies identified during NRC EDV inspections
* 1991-29 Deficiencies identified during NRC EDV inspections
  - NRC Generic Letter 88-15 Electric Power Systems -
- NRC Generic Letter 88-15 Electric Power Systems -
Inadequate Control Over Design Process
Inadequate Control Over Design Process
  - Recent Vendor Inspection NONs at AZZ and           3 WECTEC
- Recent Vendor Inspection NONs at AZZ and WECTEC 3


Applicable Commercial Standards
Applicable Commercial Standards
Line 38: Line 39:
* Initial testing per UL/ANSI standards either by commercial OEM or dedicating entity
* Initial testing per UL/ANSI standards either by commercial OEM or dedicating entity
* Possible industrywide approach to accepting commercial UL/ANSI testing
* Possible industrywide approach to accepting commercial UL/ANSI testing
  - Similar to ILAC for calibration laboratories
- Similar to ILAC for calibration laboratories
  - Need some nuclear industry oversight
- Need some nuclear industry oversight
* Assessment of adequacy of UL/ANSI standard with regard to testing scope, sample size, frequency, requirements for retesting
* Assessment of adequacy of UL/ANSI standard with regard to testing scope, sample size, frequency, requirements for retesting
* Verification that standards have been met 5
* Verification that standards have been met 5
Line 45: Line 46:
Discussion Point - Verification of Interrupting Ratings as Part of Dedication Process
Discussion Point - Verification of Interrupting Ratings as Part of Dedication Process
* Verification that no changes made to breakers that would invalidate interrupting ratings
* Verification that no changes made to breakers that would invalidate interrupting ratings
  - Possible reliance on other non-destructive tests in combination with visual examination of key physical characteristics
- Possible reliance on other non-destructive tests in combination with visual examination of key physical characteristics
* Breakers traceable to OEM report with verified C of C from OEM (need to develop standard language) 6
* Breakers traceable to OEM report with verified C of C from OEM (need to develop standard language) 6



Latest revision as of 15:02, 4 January 2025

JUTG Presentation Interrupting Rating
ML19228A170
Person / Time
Issue date: 08/16/2019
From: Jeffrey Jacobson
NRC/NRR/DIRS/IQVB
To:
References
Download: ML19228A170 (7)


Text

November xx, 2014 EQ Technical Meeting 1

Verification and Validation of Circuit Interrupting Ratings for Low Voltage Protective Equipment Jeffrey Jacobson Quality Assurance Vendor Inspection Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

Purpose of Interrupting Ratings The interrupting rating of a protective device provides assurance that for a given voltage and current, the device will be capable of interrupting a fault with a magnitude up to and including its rating, without significant damage to the protective device itself, or the emission of flame, hot gasses, or particles that could impact nearby equipment (specific language included in applicable standards) 2

Basis for Interrupting Ratings

  • Plant specific licensing basis although most likely required for devices that provide 1E/non-1E isolation
  • Lots of Operating Experience on this subject

- NRC Information Notices

  • 2006-31 Inadequate Fault Interrupting Rating of Breakers
  • 2002-01 Metalclad Switchgear Failures
  • 1991-29 Deficiencies identified during NRC EDV inspections

- NRC Generic Letter 88-15 Electric Power Systems -

Inadequate Control Over Design Process

- Recent Vendor Inspection NONs at AZZ and WECTEC 3

Applicable Commercial Standards

  • Class J and L current limiting fuses - UL 198C 4

Discussion Point - Establishment of Initial Interrupting Ratings

  • Initial testing per UL/ANSI standards either by commercial OEM or dedicating entity
  • Possible industrywide approach to accepting commercial UL/ANSI testing

- Similar to ILAC for calibration laboratories

- Need some nuclear industry oversight

  • Assessment of adequacy of UL/ANSI standard with regard to testing scope, sample size, frequency, requirements for retesting
  • Verification that standards have been met 5

Discussion Point - Verification of Interrupting Ratings as Part of Dedication Process

  • Verification that no changes made to breakers that would invalidate interrupting ratings

- Possible reliance on other non-destructive tests in combination with visual examination of key physical characteristics

  • Breakers traceable to OEM report with verified C of C from OEM (need to develop standard language) 6

Challenges that Need to Be Addressed

  • Access to commercial test reports
  • How to address any weaknesses in commercial standards
  • Supply chain verification issues when purchased from distributors
  • Development of standard contract language (similar to ILAC) 7