ML19257B735: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML19257B735 | | number = ML19257B735 | ||
| issue date = 12/13/1979 | | issue date = 12/13/1979 | ||
| title = Responds to | | title = Responds to Requesting Backup Power for Red Emergency Telephones at Site.Facilities Change Request Initiated 790126.Review Completion Expected by 791217 & Installation Approx Four Wks Later | ||
| author name = Crouse R | | author name = Crouse R | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8001180224 | | document report number = NUDOCS 8001180224 | ||
| title reference date = 11-30-1979 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
pg | pg TOLEDO Docket No. | ||
50-346 6 EDISON License No. | |||
NPF-3 Serial No. | |||
1-110 December 13, 1979 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 | |||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
This letter is in response to your {{letter dated|date=November 30, 1979|text=November 30, 1979 letter}}, requesting back-up power for the red emergency (OPX lines) telephones at our Davis-Besse site. | |||
This letter is in response to your November 30, 1979 letter, requesting back-up power for the red emergency (OPX lines) telephones at our Davis-Besse site. A Facilities Change Request was initiated on January 26, 1979 to provide the necessary back-up power supply to the telephone system. | A Facilities Change Request was initiated on January 26, 1979 to provide the necessary back-up power supply to the telephone system. | ||
This Facility Change Request has been expanded to include connection to the uninterruptible power supply which will provide the requested back-up power to the red emergency (OPX lines) telephones. | This Facility Change Request has been expanded to include connection to the uninterruptible power supply which will provide the requested back-up power to the red emergency (OPX lines) telephones. | ||
Review completion is expected the week of December 17, 1979. | Review completion is expected the week of December 17, 1979. | ||
Installation is expected to be completed approximately four (4) weeks af ter review. | |||
The four (4) week installation time is contingent upon material availability. | The four (4) week installation time is contingent upon material availability. | ||
Yours very truly, Richard P. Crouse Vice President Nuclear RPC:lar | Yours very truly, Richard P. | ||
},,1GfQfD{ ~b 'b0 pn 36CH CFH. | Crouse Vice President Nuclear RPC:lar | ||
NO | },,1GfQfD{ | ||
~b 'b0 pn 36CH CFH. | |||
NO 1 Y 1979 176f226 THE TCLEDO ED! SON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, CHIO 43652 8001180 2}} | |||
Latest revision as of 19:32, 3 January 2025
| ML19257B735 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/13/1979 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8001180224 | |
| Download: ML19257B735 (1) | |
Text
-
pg TOLEDO Docket No.
50-346 6 EDISON License No.
NPF-3 Serial No.
1-110 December 13, 1979 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
This letter is in response to your November 30, 1979 letter, requesting back-up power for the red emergency (OPX lines) telephones at our Davis-Besse site.
A Facilities Change Request was initiated on January 26, 1979 to provide the necessary back-up power supply to the telephone system.
This Facility Change Request has been expanded to include connection to the uninterruptible power supply which will provide the requested back-up power to the red emergency (OPX lines) telephones.
Review completion is expected the week of December 17, 1979.
Installation is expected to be completed approximately four (4) weeks af ter review.
The four (4) week installation time is contingent upon material availability.
Yours very truly, Richard P.
Crouse Vice President Nuclear RPC:lar