| number = ML19282B654
| number = ML19282B654
| issue date = 02/23/1979
| issue date = 02/23/1979
| title = Responds to NRC 790201 Ltr Re Violations Noted in IE Insp Repts 50-282/78-23, & 50-306/78-23.Corrective Actions: Preventive Maint Procedures for Safeguards Buses Are Being Rewritten to Comply W/Tech Specs
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-282/78-23, & 50-306/78-23.Corrective Actions: Preventive Maint Procedures for Safeguards Buses Are Being Rewritten to Comply W/Tech Specs
| author name = Wachter L
| author name = Wachter L
| author affiliation = NORTHERN STATES POWER CO.
| author affiliation = NORTHERN STATES POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 7903160083
| document report number = NUDOCS 7903160083
| title reference date = 02-01-1979
| package number = ML19282B652
| package number = ML19282B652
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:. .. .            . .        ._...        ,..
{{#Wiki_filter:....
NSP                                                 -
NSP NORTHERN STATES POWER COMPANY winn zapou e. usw us sora es4oi February 23, 1979 Mr. Gaston Fiorelli Chief, Reactor Operations and Nuclear Support Branch Region III United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
NORTHERN               STATES             POWER           COMPANY winn zapou e. usw us sora es4oi February 23, 1979 Mr. Gaston Fiorelli Chief, Reactor Operations and Nuclear Support Branch Region III United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois       60137                                         -


==Dear Mr. Fiorelli:==
==Dear Mr. Fiorelli:==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and Nol QO-3ve)
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and Nol QO-3ve)
In response to your letter of February 1, 1979, which transmitted Inspection Reports 50-282/78-23 and 50-306/78-23, the following information is offered:
In response to your letter of February 1, 1979, which transmitted Inspection Reports 50-282/78-23 and 50-306/78-23, the following information is offered:
Infraction Section 6.5. A of the Technical Specifications requires that detailed written procedures, including applicable checkof f lists .and instructions covering testing require =cata that could have an effect on nuclear safety, shall be prepared and followed.
Infraction Section 6.5. A of the Technical Specifications requires that detailed written procedures, including applicable checkof f lists.and instructions covering testing require =cata that could have an effect on nuclear safety, shall be prepared and followed.
Contrary to the above, on November 30, 1978, during relay testing on Unit 2, an electrical jumper that had not been identified to be required by procedure BT-256 was applied without obtaining proper review and approval.
Contrary to the above, on November 30, 1978, during relay testing on Unit 2, an electrical jumper that had not been identified to be required by procedure BT-256 was applied without obtaining proper review and approval.


Line 32: Line 31:
Procedures perta[nkpg to preventive maintenance to be performed on 4160 volt b'uses during the Unit 1 outage scheduled for April,1979, will be completed before then. Procedures covering the remaining buses should be completed by the end of 1979.
Procedures perta[nkpg to preventive maintenance to be performed on 4160 volt b'uses during the Unit 1 outage scheduled for April,1979, will be completed before then. Procedures covering the remaining buses should be completed by the end of 1979.
Personnel involved in Safeguards Bus Maintenance will review these procedures prior to actual accomplishment.
Personnel involved in Safeguards Bus Maintenance will review these procedures prior to actual accomplishment.
Yours very truly, 79031600Rg                                                                #6 1979 gf4ff&u L. J. Wachter Vice President - Power Production and System Operation ec: Mr. G. Charnoff}}
Yours very truly,
#6 79031600Rg gf4ff&u 1979 L. J. Wachter Vice President - Power Production and System Operation ec: Mr. G. Charnoff}}

Latest revision as of 22:59, 2 January 2025

Responds to NRC Re Violations Noted in IE Insp Repts 50-282/78-23, & 50-306/78-23.Corrective Actions: Preventive Maint Procedures for Safeguards Buses Are Being Rewritten to Comply W/Tech Specs
ML19282B654
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/23/1979
From: Wachter L
NORTHERN STATES POWER CO.
To: Fioreeli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19282B652 List:
References
NUDOCS 7903160083
Download: ML19282B654 (1)


Text

....

NSP NORTHERN STATES POWER COMPANY winn zapou e. usw us sora es4oi February 23, 1979 Mr. Gaston Fiorelli Chief, Reactor Operations and Nuclear Support Branch Region III United States Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Fiorelli:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and Nol QO-3ve)

In response to your letter of February 1, 1979, which transmitted Inspection Reports 50-282/78-23 and 50-306/78-23, the following information is offered:

Infraction Section 6.5. A of the Technical Specifications requires that detailed written procedures, including applicable checkof f lists.and instructions covering testing require =cata that could have an effect on nuclear safety, shall be prepared and followed.

Contrary to the above, on November 30, 1978, during relay testing on Unit 2, an electrical jumper that had not been identified to be required by procedure BT-256 was applied without obtaining proper review and approval.

Response

Preventive Maintenance Procedures for Safeguards Buses are presently being rewritten to include detailed test procedures and checkoff lists to be used by relay test personnel. These procedures will comply with Technical Specification 6.5.As,and plant directives covering bypass controls.

Procedures perta[nkpg to preventive maintenance to be performed on 4160 volt b'uses during the Unit 1 outage scheduled for April,1979, will be completed before then. Procedures covering the remaining buses should be completed by the end of 1979.

Personnel involved in Safeguards Bus Maintenance will review these procedures prior to actual accomplishment.

Yours very truly,

  1. 6 79031600Rg gf4ff&u 1979 L. J. Wachter Vice President - Power Production and System Operation ec: Mr. G. Charnoff