L-2022-082: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
#REDIRECT [[L-2022-082, NextEra Energy | #REDIRECT [[L-2022-082, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 28 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11]] | ||