{{#Wiki_filter:October 21, 2019
{{#Wiki_filter:October 21, 2019  
Mr. G. T. Powell
President and CEO
STP Nuclear Operating Company
P.O. Box 289
Mr. G. T. Powell  
Wadsworth, TX 77483
President and CEO  
SUBJECT:         SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF AN
STP Nuclear Operating Company  
                NRC FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION
P.O. Box 289  
                REPORT 05000498/2020011 AND 05000499/2020011) AND REQUEST FOR
Wadsworth, TX 77483  
                INFORMATION
Dear Mr. Powell:
SUBJECT:  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),
SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF AN
Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas
 
Project, Units 1 and 2 in January and February 2020. The inspection team will be comprised of
three reactor inspectors from the NRC Region IV office. The inspection will be conducted in
NRC FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION  
accordance with Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team
REPORT 05000498/2020011 AND 05000499/2020011) AND REQUEST FOR  
Inspection, the NRCs baseline fire protection inspection procedure.
INFORMATION  
The schedule for the inspection is as follows:
    *   Information gathering visit: January 7 and 8, 2020
Dear Mr. Powell:  
    *   Onsite inspection: January 27 - 31, 2020, and February 10 - 14, 2020
The purpose of the information gathering visit is to obtain information and documentation
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),  
needed to support the inspection and to become familiar with the fire protection program, fire
Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas  
protection features, post-fire safe shutdown capabilities, and plant layout.
Project, Units 1 and 2 in January and February 2020. The inspection team will be comprised of  
The team lead will participate in the information gathering visit to select the fire areas for
three reactor inspectors from the NRC Region IV office. The inspection will be conducted in  
evaluation, identify additional documents needed to support the inspection, obtain unescorted
accordance with Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team  
access, and meet with the key personnel who will support the inspection. The fire area
Inspection, the NRCs baseline fire protection inspection procedure.  
selection will require a walkdown of candidate fire areas in company with key personnel from
your staff. The enclosure to this letter provides an initial list of the documents the team will need
The schedule for the inspection is as follows:  
for their review. We request that your staff transmit copies of the documents listed in the
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please
*  
send this information so that it will arrive in the NRC Region IV office by the dates listed in the
Information gathering visit: January 7 and 8, 2020  
enclosure.
During the information gathering visit, the team lead will also discuss the following inspection
*  
support administrative details: (1) office space size and location; (2) specific documents
Onsite inspection: January 27 - 31, 2020, and February 10 - 14, 2020  
requested to be made available to the team in their office spaces; (3) arrangements for reactor
The purpose of the information gathering visit is to obtain information and documentation  
needed to support the inspection and to become familiar with the fire protection program, fire  
protection features, post-fire safe shutdown capabilities, and plant layout.
The team lead will participate in the information gathering visit to select the fire areas for  
evaluation, identify additional documents needed to support the inspection, obtain unescorted  
access, and meet with the key personnel who will support the inspection. The fire area  
selection will require a walkdown of candidate fire areas in company with key personnel from  
your staff. The enclosure to this letter provides an initial list of the documents the team will need  
for their review. We request that your staff transmit copies of the documents listed in the  
enclosure to the NRC Region IV office for team use in preparation for the inspection. Please  
send this information so that it will arrive in the NRC Region IV office by the dates listed in the  
enclosure.  
During the information gathering visit, the team lead will also discuss the following inspection  
support administrative details: (1) office space size and location; (2) specific documents  
requested to be made available to the team in their office spaces; (3) arrangements for reactor  


G. Powell                                       2
site access (including radiation protection training, security, safety, and fitness-for-duty
G. Powell
requirements); and (4) the availability of knowledgeable plant staff and licensing organization
2  
personnel to serve as points of contact during the inspection.
We request that during the onsite inspection weeks you ensure that copies of analyses,
site access (including radiation protection training, security, safety, and fitness-for-duty  
evaluations, or documentation regarding the implementation and maintenance of the stations
requirements); and (4) the availability of knowledgeable plant staff and licensing organization  
fire protection program, including the success path necessary to achieve and maintain the
personnel to serve as points of contact during the inspection.  
nuclear safety performance criteria, be readily accessible to the team for their review. Of
specific interest for the fire protection portion of the inspection are those documents which
We request that during the onsite inspection weeks you ensure that copies of analyses,  
establish that your fire protection program satisfies NRC regulatory requirements and conforms
evaluations, or documentation regarding the implementation and maintenance of the stations  
to applicable NRC and industry fire protection guidance (i.e., fire protection compliance
fire protection program, including the success path necessary to achieve and maintain the  
assessment documents). Also, personnel should be available at the site during the inspection
nuclear safety performance criteria, be readily accessible to the team for their review. Of  
who are knowledgeable regarding those plant systems required to achieve and maintain safe
specific interest for the fire protection portion of the inspection are those documents which  
and stable plant conditions, including the electrical aspects of the nuclear safety capability
establish that your fire protection program satisfies NRC regulatory requirements and conforms  
assessment, reactor plant fire protection systems and features, and the stations fire protection
to applicable NRC and industry fire protection guidance (i.e., fire protection compliance  
program and its implementation.
assessment documents). Also, personnel should be available at the site during the inspection  
This letter does not contain new or amended information collections that are subject to the
who are knowledgeable regarding those plant systems required to achieve and maintain safe  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and
and stable plant conditions, including the electrical aspects of the nuclear safety capability  
Budget (OMB) approved these information collections (approval number 3150-0011). The NRC
assessment, reactor plant fire protection systems and features, and the stations fire protection  
may not conduct nor sponsor, and a person is not required to respond to, a request for
program and its implementation.  
information or an information collection requirement unless the requesting document displays a
currently valid OMB control number.
This letter does not contain new or amended information collections that are subject to the  
This letter, its enclosure, and your response (if any) will be made available for public inspection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Budget (OMB) approved these information collections (approval number 3150-0011). The NRC  
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
may not conduct nor sponsor, and a person is not required to respond to, a request for  
Withholding.
information or an information collection requirement unless the requesting document displays a  
Your cooperation and support during this inspection will be appreciated. If you have questions
currently valid OMB control number.  
concerning this inspection or the inspection teams information or logistical needs, please
contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or
This letter, its enclosure, and your response (if any) will be made available for public inspection  
John.Mateychick@nrc.gov.
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
                                                Sincerely,
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for  
                                                /RA/
Withholding.  
                                                Nicholas H. Taylor, Chief
                                                Engineering Branch 2
Your cooperation and support during this inspection will be appreciated. If you have questions  
                                                Division of Reactor Safety
concerning this inspection or the inspection teams information or logistical needs, please  
Docket Nos. 50-498 and 50-499
contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or  
License Nos. NPF-76 and NPF-80
John.Mateychick@nrc.gov.  
Enclosure:
Triennial Fire Protection Inspection Document Request
Sincerely,
cc w/enclosure: Electronic Distribution for South Texas Project
/RA/  
Nicholas H. Taylor, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos. 50-498 and 50-499  
License Nos. NPF-76 and NPF-80  
Enclosure:  
Triennial Fire Protection Inspection Document Request  
cc w/enclosure: Electronic Distribution for South Texas Project  




ML19295C482
  ML19295C482  
  SUNSI Review: ADAMS:         Non-Publicly Available Non-Sensitive Keyword:
  SUNSI Review:     ADAMS:               Non-Publicly Available         Non-Sensitive       Keyword:
By: JMM         Yes  No    Publicly Available     Sensitive     NRC-002
By: JMM                 Yes   No
OFFICE       SRI:EB2     C:EB2
  Publicly Available                 Sensitive                 NRC-002  
  NAME         JMateychick  NTaylor
OFFICE  
  SIGNATURE     /RA per NHT/     /RA/
SRI:EB2  
  DATE           10/21/2019   10/21/2019
C:EB2  
                                   
   
                    Triennial Fire Protection Inspection Document Request
The documents and information requested below should generally be made available to the
inspection team prior to the inspection. Electronic format is the preferred format, except where
specifically noted. If electronic files are made available via a secure document management
NAME  
service, then the remote document access must allow inspectors to download, save, and print
JMateychick  
the documents in the NRCs regional office.
NTaylor
If a secure document management service is utilized, it is recommended that a separate folder
be used corresponding to each item listed below. Multiple documents within each folder be
individually entered and also combined into a ZIP file which is uploading in the same folder.
   
Documents should be identified by both document number and noun name. Electronic media
   
on compact disc or paper records (hard copy) are also acceptable.
SIGNATURE  
To allow review before the onsite information gathering visit, the documents requested in
/RA per NHT/  
items A.1 thru A.8 should be made available to the team in the regional office no later than
/RA/  
December 27, 2019.
   
Based on a review of the above eight items, team lead should identify a preliminary list of fire
areas being considered for inspection prior to the onsite information gathering visit. During the
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.
DATE  
This document request is based on typical documents that a generic plant might have. As such,
10/21/2019  
this generic document request is not meant to imply that any specific plant is required to have all
10/21/2019  
of the listed documents. It is recognized that some documents listed below may not be
available for your plant. In addition, the document titles listed below are based on typical
industry document names; your plant-specific document titles may vary.
To allow review before the onsite inspection weeks, the documents listed in the attachment
should be made available to the team in the regional office no later than January 10, 2020.
                                                                                    Enclosure


A. DESIGN AND LICENSING BASIS DOCUMENTS
  A.1 The current version of the Fire Protection Program and Fire Hazards Analysis.
  A.2 Post-fire safe shutdown analysis and the supporting calculations that
   
        demonstrate acceptable plant response.
Enclosure
  A.3 The fire probabilistic risk assessment or portions of the plants individual plant
Triennial Fire Protection Inspection Document Request
        examination for external events (IPEEE) report addressing fire events. Also,
   
        include the results of any post-IPEEE reviews and listings of actions taken/plant
The documents and information requested below should generally be made available to the  
        modifications conducted in response to IPEEE information that relate to fire risk.
inspection team prior to the inspection. Electronic format is the preferred format, except where
  A.4 Licensing basis documents for fire protection (safety evaluation reports, pertinent
specifically notedIf electronic files are made available via a secure document management
        sections of the final safety analysis report, exemptions, deviations, letters to/from
service, then the remote document access must allow inspectors to download, save, and print
        the NRC regarding fire protection/fire safe shutdown, etc.).
the documents in the NRCs regional office.  
  A.5 List of post-fire safe shutdown systems and components (i.e., safe shutdown
   
        equipment list).
If a secure document management service is utilized, it is recommended that a separate folder
  A.6 List of fire areas with automatic fire suppression systems.
be used corresponding to each item listed below.  Multiple documents within each folder be
  A.7  A list, with descriptions, of design change packages performed since the last fire
individually entered and also combined into a ZIP file which is uploading in the same folder.
        protection team inspection associated with fire protection or post-fire safe
Documents should be identified by both document number and noun nameElectronic media
        shutdown systems.
on compact disc or paper records (hard copy) are also acceptable.  
  A.8 A list, with descriptions, of any fire protection program changes and evaluations
   
        (not limited to Generic Letter 86-10 evaluations) performed since the last fire
To allow review before the onsite information gathering visit, the documents requested in
        protection team inspection.
items A.1 thru A.8 should be made available to the team in the regional office no later than
  A.9 Fire Protection System(s) Design Basis Document.
December 27, 2019.  
  A.10 List of applicable NFPA codes and standards and issuance dates (i.e., codes of
   
        record).
Based on a review of the above eight items, team lead should identify a preliminary list of fire
  A.11 A list or document identifying any deviations from the NFPA codes of record.
areas being considered for inspection prior to the onsite information gathering visit. During the
  A.12 Facility Operating License.
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
  A.13 Technical Specifications (electronic format only).
determined.  
  A.14 Updated Final Safety Analysis Report (electronic format only).
B. GENERAL PLANT DESIGN DOCUMENTS
This document request is based on typical documents that a generic plant might have. As such,
  B.1 Piping and instrumentation diagrams (P&IDs) and legend list for components
this generic document request is not meant to imply that any specific plant is required to have all
        used to achieve and maintain post-fire safe shutdown. These should include the
of the listed documents. It is recognized that some documents listed below may not be
        systems used for reactor coolant system makeup, reactor coolant system
available for your plantIn addition, the document titles listed below are based on typical
        pressure control, decay heat removal, and reactivity control, including the
industry document names; your plant-specific document titles may vary.  
        essential support systems.
                                            2
To allow review before the onsite inspection weeks, the documents listed in the attachment
should be made available to the team in the regional office no later than January 10, 2020.  


  B.2 Piping and instrumentation diagrams and legend list for fire protection systems,
        including the fire water supply; water suppression sprinklers; and deluge, CO2,
        and Halon systems (electronic format and C-size paper drawings).
2
  B.3 Yard layout drawings for underground fire protection buried piping (electronic
        format and C-size paper drawings).
  B.4 AC and DC electrical system single line diagrams, from off-site power down to
A.  
        the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
DESIGN AND LICENSING BASIS DOCUMENTS
        and C-size paper drawings).
   
  B.5  Single line diagrams for motor control centers (MCCs) that supply post-fire
A.1
        nuclear safety component loads (only for selected fire areas) (electronic format
The current version of the Fire Protection Program and Fire Hazards Analysis.
        and C-size paper drawings).
  B.6  Equipment location drawings which identify the physical plant locations of post-
A.2
        fire safe shutdown equipment (electronic format and C-size paper drawings).
Post-fire safe shutdown analysis and the supporting calculations that
  B.7 Plant layout drawings which identify: (electronic format and C-size paper
demonstrate acceptable plant response.  
        drawings)
            *  Plant fire area boundaries
A.3  
            *  Combustible control zone drawings
The fire probabilistic risk assessment or portions of the plants individual plant
            *  Areas protected by automatic fire suppression and detection
examination for external events (IPEEE) report addressing fire eventsAlso,  
            *  Locations of fire protection equipment
include the results of any post-IPEEE reviews and listings of actions taken/plant
C. CLASSIC FIRE PROTECTION
modifications conducted in response to IPEEE information that relate to fire risk.  
  C.1  Copy of the fire protection program implementing procedures (e.g., administrative
        controls, surveillance testing, and fire brigade).
A.4
  C.2  List of calculations and engineering analyses, studies, or evaluations for the fire
Licensing basis documents for fire protection (safety evaluation reports, pertinent
        protection system, including the fire water system.
sections of the final safety analysis report, exemptions, deviations, letters to/from
  C.3  Last two completed surveillances of fire protection features in the selected fire
the NRC regarding fire protection/fire safe shutdown, etc.).
        areas (detection, suppression, damper inspections, damper tests, penetration
        inspections, barrier inspections, etc.).
A.5
  C.List of routine tests, surveillances, and preventive maintenance on fire pumps,
List of post-fire safe shutdown systems and components (i.e., safe shutdown
        including pump controllers and batteries.
equipment list).  
  C.5 Last two completed annual fire pump pressure and flow tests.
   
  C.6 Last two completed monthly and/or quarterly fire pump tests.
A.6
  C.7 Last two completed fire loop flow tests and loop flushes.
List of fire areas with automatic fire suppression systems.
  C.8 Last five hot work permits (at power).
  C.9 Last five transient combustible permits (at power).
A.7
                                            3
A list, with descriptions, of design change packages performed since the last fire
protection team inspection associated with fire protection or post-fire safe
shutdown systems.  
A.8
A list, with descriptions, of any fire protection program changes and evaluations
(not limited to Generic Letter 86-10 evaluations) performed since the last fire  
protection team inspection.  
A.9
Fire Protection System(s) Design Basis Document.  
A.10
List of applicable NFPA codes and standards and issuance dates (i.e., codes of
record).  
   
A.11
A list or document identifying any deviations from the NFPA codes of record.  
   
A.12
Facility Operating License.  
   
A.13
Technical Specifications (electronic format only).  
   
A.14
Updated Final Safety Analysis Report (electronic format only).  
B.  
GENERAL PLANT DESIGN DOCUMENTS
   
B.1
Piping and instrumentation diagrams (P&IDs) and legend list for components
used to achieve and maintain post-fire safe shutdown.  These should include the
systems used for reactor coolant system makeup, reactor coolant system
pressure control, decay heat removal, and reactivity control, including the
essential support systems.  


C.10 For Fire Brigade Drills, provide the following:
        *  Last five fire brigade drill critiques
        *  Last drill critique for a drill with off-site fire department support
3
        *  Last unannounced drill critique
        *  Last back-shift drill critique
        *  Dates, shifts, and locations of unannounced drills for last three years
B.2
        *  Summary of any unsatisfactory drill performance items for last three years
Piping and instrumentation diagrams and legend list for fire protection systems,  
        *  Last unannounced drill critique by a qualified individual independent of
including the fire water supply; water suppression sprinklers; and deluge, CO2,
            the licensees staff
and Halon systems (electronic format and C-size paper drawings).
C.11 For fire brigade equipment provide the following:
        *   Procedure for inventory and inspection
B.3
        *   Most recent inspection and inventory results
Yard layout drawings for underground fire protection buried piping (electronic
C.12 Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)
format and C-size paper drawings).
    and training lesson plans.
C.13 Copy of the mutual aid agreement for the first-due local fire department that is
B.4
    currently in effect.
AC and DC electrical system single line diagrams, from off-site power down to
C.14 Copy of the evaluation or analysis of the effects of fire suppression activities on
the highest safety-related bus level (typically 4kV, EDG bus) (electronic format
    the ability to achieve the nuclear safety performance criteria (only for selected fire
and C-size paper drawings).
    areas) demonstrating:
        *  The automatic or manually actuation of a suppression system, due to a
B.5
            fire in a single location, will not indirectly cause damage to the success
Single line diagrams for motor control centers (MCCs) that supply post-fire
            path
nuclear safety component loads (only for selected fire areas) (electronic format
        *  The inadvertent actuation or rupture of a suppression system will not
and C-size paper drawings). 
            indirectly cause damage to the success path
        *  Adequate drainage for areas protected by water suppression systems
B.6
        *  The hydrostatic rating of any floor penetration seals installed within the
Equipment location drawings which identify the physical plant locations of post-
            fire areas that are credited with keeping water from leaking into fire areas
fire safe shutdown equipment (electronic format and C-size paper drawings).  
            below
C.15 Pre-fire plans for all fire areas.
B.7
C.16 Impairment Log (at start of inspection) for fire protection features that are out of
Plant layout drawings which identify:  (electronic format and C-size paper
    service.
drawings)
                                          4
*
Plant fire area boundaries
*
Combustible control zone drawings
*  
Areas protected by automatic fire suppression and detection
*  
Locations of fire protection equipment
C.  
CLASSIC FIRE PROTECTION
C.1
Copy of the fire protection program implementing procedures (e.g., administrative
controls, surveillance testing, and fire brigade).  
C.2
List of calculations and engineering analyses, studies, or evaluations for the fire  
protection system, including the fire water system.
C.3
Last two completed surveillances of fire protection features in the selected fire  
areas (detection, suppression, damper inspections, damper tests, penetration
inspections, barrier inspections, etc.).
C.4
List of routine tests, surveillances, and preventive maintenance on fire pumps,  
including pump controllers and batteries.
C.5
Last two completed annual fire pump pressure and flow tests.
C.6
Last two completed monthly and/or quarterly fire pump tests.
C.7
Last two completed fire loop flow tests and loop flushes.  
C.8
Last five hot work permits (at power).
C.9
Last five transient combustible permits (at power).


  C.17 List of penetration seal work, re-work, or installation activities, in the last
        three years.
  C.18 List of fire wrap work, re-work, or installation activities, in the last three years.
4
  C.19 Fire protection system health reports for the two most recent quarters.
  C.20 Fire protection program health reports for the two most recent quarters.
  C.21 Emergency lighting system health reports for the two most recent quarters.
  C.22 List of fire protection system design changes completed in the last three years.
C.10
  C.23 List of fire protection system engineering equivalency evaluations completed in
For Fire Brigade Drills, provide the following:
        the last three years.
  C.24 Licensee evaluations of industry operating experience concerning fire protection
*
        issues completed in the last three years.
Last five fire brigade drill critiques
  C.25 List of fire event analysis reports for the last three years.
  C.26 Fire protection program requirements (e.g., limiting conditions for operation,
*
        surveillance test requirements) covered by technical specifications, the technical
Last drill critique for a drill with off-site fire department support
        requirements manual, the updated final safety analysis report, procedures, or
        similar documents.
*
  C.27 Organization charts of site personnel down to the level of fire protection staff
Last unannounced drill critique
        personnel.
  C.28 A contact list of key site personnel who will be supporting this inspection, giving
*
        the office location and phone number onsite.
Last back-shift drill critique
  C.29 The team would like to observe an unannounced fire brigade drill in the plant, if
        possible, during the week of February 10, 2020. Please put us in contact with
*
        the appropriate personnel for planning fire brigade drills during the onsite
Dates, shifts, and locations of unannounced drills for last three years  
        information gathering trip.
D. ELECTRICAL
*
  D.1 Administrative or configuration control procedures that govern fuse replacement
Summary of any unsatisfactory drill performance items for last three years  
        (e.g., fuse control procedures).
  D.2  Maintenance procedures that verify breaker over-current trip settings to ensure
*
        coordination remains functional for post-fire nuclear safety capability
Last unannounced drill critique by a qualified individual independent of  
        components.
the licensees staff
  D.3 Electrical system health reports for the two most recent quarters.
  D.4  Surveillance procedures and last surveillance demonstrating operability of
C.11
        components required for alternative shutdown.
For fire brigade equipment provide the following:
                                          5
*
Procedure for inventory and inspection
*
Most recent inspection and inventory results
C.12
Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)  
and training lesson plans.
C.13
Copy of the mutual aid agreement for the first-due local fire department that is
currently in effect.  
C.14
Copy of the evaluation or analysis of the effects of fire suppression activities on
the ability to achieve the nuclear safety performance criteria (only for selected fire
areas) demonstrating:
*
The automatic or manually actuation of a suppression system, due to a
fire in a single location, will not indirectly cause damage to the success
path
*
The inadvertent actuation or rupture of a suppression system will not
indirectly cause damage to the success path
*
Adequate drainage for areas protected by water suppression systems
*
The hydrostatic rating of any floor penetration seals installed within the  
fire areas that are credited with keeping water from leaking into fire areas
below
   
C.15
Pre-fire plans for all fire areas.  
   
C.16
Impairment Log (at start of inspection) for fire protection features that are out of  
service.  


  D.Schematic or elementary diagrams for circuits to be reviewed (samples to be
        identified by the inspector) (C-size paper drawings).
  D.6 Cable routing for components and equipment credited for post-fire safe shutdown
5  
        systems and components (samples to be identified by the inspector).
   
  D.7 For emergency lighting units, provide the following:
            *  List of Preventive Maintenance tasks, frequencies, and bases
            *  Most recently performed monthly or quarterly functional test
C.17
            *  Most recently performed battery discharge performance test or
List of penetration seal work, re-work, or installation activities, in the last 
                conductance measurement test
three years. 
            *  Emergency lighting unit battery loading analysis
            *  Vendor manual(s) for onsite inspector use
C.18
            *  Results of black-out testing (if performed)
List of fire wrap work, re-work, or installation activities, in the last three years.
            *  Maintenance Rule program information related to the emergency lighting
                system
C.19
            *  Compensatory measures taken when emergency lighting units are out of
Fire protection system health reports for the two most recent quarters.  
                service
   
            *  Drawings showing emergency light locations and lamp orientation
C.20
E. OPERATIONS
Fire protection program health reports for the two most recent quarters.
  E.1  The team would like to perform a walkthrough of a sample of post-fire safe
        shutdown procedures with qualified operators in the plant during the week of
C.21
        January 27, 2020. Please put us in contact with the appropriate personnel for
Emergency lighting system health reports for the two most recent quarters.
        planning the walkthroughs during the onsite information gathering trip.
  E.2 List of licensed operator Job Performance Measures (JPMs) for operator actions
C.22
        required to achieve and maintain post-fire safe shutdown.
List of fire protection system design changes completed in the last three years.
  E.3  List of non-licensed operator training associated with non-licensed operator
        actions to achieve and maintain post-fire nuclear safe shutdown (including JPMs,
C.23
        in-field training walkdowns, simulations, or initial qualification).
List of fire protection system engineering equivalency evaluations completed in
  E.4 Lesson plans for post-fire safe shutdown training for licensed and non-licensed
the last three years.
        operators.
  E.5 For local manual operator actions, provide the following:
C.24
            *  Manual Action Feasibility Study
Licensee evaluations of industry operating experience concerning fire protection
                                            6
issues completed in the last three years.  
   
C.25
List of fire event analysis reports for the last three years.
C.26
Fire protection program requirements (e.g., limiting conditions for operation,  
surveillance test requirements) covered by technical specifications, the technical
requirements manual, the updated final safety analysis report, procedures, or  
similar documents.
C.27
Organization charts of site personnel down to the level of fire protection staff
personnel.
C.28
A contact list of key site personnel who will be supporting this inspection, giving
the office location and phone number onsite.
C.29
The team would like to observe an unannounced fire brigade drill in the plant, if
possible, during the week of February 10, 2020. Please put us in contact with  
the appropriate personnel for planning fire brigade drills during the onsite  
information gathering trip.  
D.  
ELECTRICAL
   
D.1
Administrative or configuration control procedures that govern fuse replacement
(e.g., fuse control procedures).
D.2
Maintenance procedures that verify breaker over-current trip settings to ensure
coordination remains functional for post-fire nuclear safety capability
components.  
   
D.3
Electrical system health reports for the two most recent quarters.  
   
D.4
Surveillance procedures and last surveillance demonstrating operability of
components required for alternative shutdown.


          *  Operator Time Critical Action Program
          *  Time lines for time-critical manual actions
          *  Time line validations
6
E.6  Thermal hydraulic calculation or analysis that determines the time requirements
    for time-critical manual operator actions.
E.7  Operating procedures to achieve and maintain post-fire safe shutdown with a
    postulated fire in the selected fire areas.
D.5
E.For safe shutdown equipment and tools, provide the following:
Schematic or elementary diagrams for circuits to be reviewed (samples to be
          *   Procedure for inventory and inspection
identified by the inspector) (C-size paper drawings).  
          *   Most recent inspection and inventory results
E.9 List of procedures that implement cold shutdown repairs.
D.6
E.10 For cold shutdown repairs, provide the following:
Cable routing for components and equipment credited for post-fire safe shutdown  
          *   Procedure for inventory and inspection (i.e., needed tools, material, etc.)
systems and components (samples to be identified by the inspector).  
          *   Most recent inspection and inventory results
E.11 For radio communications, provide the following:
D.7
          *  Communications Plan for firefighting and post-fire safe shutdown manual
For emergency lighting units, provide the following:  
              actions
          *  Repeater locations
*  
          *  Cable routing for repeater power supply cables
List of Preventive Maintenance tasks, frequencies, and bases
          *  Radio coverage test results
          *  Radio Dead Spot locations in the plant
*  
E.12 For telephone, plant pager or sound powered phone systems, if relied upon to
Most recently performed monthly or quarterly functional test
    achieve and maintain post-fire safe shutdown, provide the following:
          *  Communications Plan for firefighting and post-fire safe shutdown manual
*
              actions
Most recently performed battery discharge performance test or
          *  Locations of phone, pager units, sound powered phone jacks, and sound
conductance measurement test
              powered phone headsets
   
          *  Cable routing including power supply cables
*
E.13 Environmental and habitability evaluations for post-fire safe shutdown operator
Emergency lighting unit battery loading analysis
    actions (temperature, smoke, humidity, SCBAs, etc.).
                                        7
*  
Vendor manual(s) for onsite inspector use
*
Results of black-out testing (if performed)  
*
Maintenance Rule program information related to the emergency lighting
system
*
Compensatory measures taken when emergency lighting units are out of
service
*  
Drawings showing emergency light locations and lamp orientation
E.  
OPERATIONS
E.1
The team would like to perform a walkthrough of a sample of post-fire safe  
shutdown procedures with qualified operators in the plant during the week of
January 27, 2020.  Please put us in contact with the appropriate personnel for  
planning the walkthroughs during the onsite information gathering trip.
E.2
List of licensed operator Job Performance Measures (JPMs) for operator actions
required to achieve and maintain post-fire safe shutdown.
E.3
List of non-licensed operator training associated with non-licensed operator
actions to achieve and maintain post-fire nuclear safe shutdown (including JPMs,
in-field training walkdowns, simulations, or initial qualification).
E.4
Lesson plans for post-fire safe shutdown training for licensed and non-licensed
operators.
E.5
For local manual operator actions, provide the following:
*
Manual Action Feasibility Study


F. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION
  PROGRAMS
  F.1 Copies of procedures that control the configuration of the fire protection program,
7
        features, and post-fire safe shutdown methodology and system design. Also,
        copies of procedures that govern the implementation of plant modifications,
        maintenance, and special operations and their impact on fire protection.
*
  F.2 List of open and closed condition reports for the fire protection systems for the
Operator Time Critical Action Program
        last three years.
*
  F.3 List of open and closed condition reports associated with the post-fire safe
Time lines for time-critical manual actions
        shutdown analysis for the last three years.
*
  F.4 List of open and closed condition reports associated with operator actions to
Time line validations
        achieve and maintain post-fire safe shutdown for the last three years.
  F.5 List of open and closed condition reports associated with the fire protection
E.6
        program including plant change evaluations, post-fire operating procedures
Thermal hydraulic calculation or analysis that determines the time requirements
        and/or training, timeline evaluations for operator actions, and supporting
for time-critical manual operator actions.
        engineering evaluations, analysis, or calculations for the last three years.
  F.6 List of open and closed condition reports for emergency lighting units for the last
E.7
        three years.
Operating procedures to achieve and maintain post-fire safe shutdown with a
  F.7 Self-assessments, peer assessments, and audits of fire protection activities for
postulated fire in the selected fire areas.
        the last three years.
  F.8 Self-assessments, peer assessments, and audits of post-fire nuclear safety
E.8
        capability methodology for the last three years.
For safe shutdown equipment and tools, provide the following:
G. AGING MANAGEMENT PROGRAM
  G.1 Copies of the aging management programs applicable to fire protection including
*
        but not limited to the following:
Procedure for inventory and inspection
            *   Fire Protection
*
            *   Fire Water System
Most recent inspection and inventory results
            *   Aboveground Metallic Tanks
            *   Buried and Underground Piping and Tanks
E.9
  G.2 Copies of procedures, work orders, preventive maintenance tasks, or other
List of procedures that implement cold shutdown repairs.
        documents which implement the commitments made as part of the license
        extension related to fire protection.
E.10
  G.3 List of aging management activities related to fire protection performed to date.
For cold shutdown repairs, provide the following:
                                          8
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.)
*
Most recent inspection and inventory results
E.11
For radio communications, provide the following:
*
Communications Plan for firefighting and post-fire safe shutdown manual
actions
*
Repeater locations
*
Cable routing for repeater power supply cables
*
Radio coverage test results
*
Radio Dead Spot locations in the plant
E.12
For telephone, plant pager or sound powered phone systems, if relied upon to
achieve and maintain post-fire safe shutdown, provide the following:
*
Communications Plan for firefighting and post-fire safe shutdown manual
actions
*
Locations of phone, pager units, sound powered phone jacks, and sound
powered phone headsets
*
Cable routing including power supply cables
E.13
Environmental and habitability evaluations for post-fire safe shutdown operator
actions (temperature, smoke, humidity, SCBAs, etc.).
 
8
F.  
ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION  
PROGRAMS  
F.1  
Copies of procedures that control the configuration of the fire protection program,  
features, and post-fire safe shutdown methodology and system design. Also,  
copies of procedures that govern the implementation of plant modifications,  
maintenance, and special operations and their impact on fire protection.  
F.2  
List of open and closed condition reports for the fire protection systems for the  
last three years.  
F.3  
List of open and closed condition reports associated with the post-fire safe  
shutdown analysis for the last three years.  
F.4  
List of open and closed condition reports associated with operator actions to  
achieve and maintain post-fire safe shutdown for the last three years.  
F.5  
List of open and closed condition reports associated with the fire protection  
program including plant change evaluations, post-fire operating procedures  
and/or training, timeline evaluations for operator actions, and supporting  
engineering evaluations, analysis, or calculations for the last three years.  
F.6  
List of open and closed condition reports for emergency lighting units for the last  
three years.  
F.7  
Self-assessments, peer assessments, and audits of fire protection activities for  
the last three years.  
F.8  
Self-assessments, peer assessments, and audits of post-fire nuclear safety  
capability methodology for the last three years.  
G.  
AGING MANAGEMENT PROGRAM  
G.1  
Copies of the aging management programs applicable to fire protection including  
but not limited to the following:  
*  
Fire Protection  
*  
Fire Water System  
*  
Aboveground Metallic Tanks  
*  
Buried and Underground Piping and Tanks  
G.2  
Copies of procedures, work orders, preventive maintenance tasks, or other  
documents which implement the commitments made as part of the license  
extension related to fire protection.  
G.3  
List of aging management activities related to fire protection performed to date.
}}
}}

Latest revision as of 08:05, 2 January 2025

Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000498/2020011 and 05000499/2020011) and Request for Information
ML19295C482
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/21/2019
From: Nick Taylor
Division of Reactor Safety IV
To: Gerry Powell
South Texas
Taylor N
References
IR 2020011
Download: ML19295C482 (11)


See also: IR 05000498/2020011

Text

October 21, 2019

Mr. G. T. Powell

President and CEO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - NOTIFICATION OF AN

NRC FIRE PROTECTION BASELINE INSPECTION (NRC INSPECTION

REPORT 05000498/2020011 AND 05000499/2020011) AND REQUEST FOR

INFORMATION

Dear Mr. Powell:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at your South Texas

Project, Units 1 and 2 in January and February 2020. The inspection team will be comprised of

three reactor inspectors from the NRC Region IV office. The inspection will be conducted in

accordance with Inspection Procedure 71111, Attachment 21N.05, Fire Protection Team

Inspection, the NRCs baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit: January 7 and 8, 2020

Onsite inspection: January 27 - 31, 2020, and February 10 - 14, 2020

The purpose of the information gathering visit is to obtain information and documentation

needed to support the inspection and to become familiar with the fire protection program, fire

protection features, post-fire safe shutdown capabilities, and plant layout.

The team lead will participate in the information gathering visit to select the fire areas for

evaluation, identify additional documents needed to support the inspection, obtain unescorted

access, and meet with the key personnel who will support the inspection. The fire area

selection will require a walkdown of candidate fire areas in company with key personnel from

your staff. The enclosure to this letter provides an initial list of the documents the team will need

for their review. We request that your staff transmit copies of the documents listed in the

enclosure to the NRC Region IV office for team use in preparation for the inspection. Please

send this information so that it will arrive in the NRC Region IV office by the dates listed in the

enclosure.

During the information gathering visit, the team lead will also discuss the following inspection

support administrative details: (1) office space size and location; (2) specific documents

requested to be made available to the team in their office spaces; (3) arrangements for reactor

G. Powell

2

site access (including radiation protection training, security, safety, and fitness-for-duty

requirements); and (4) the availability of knowledgeable plant staff and licensing organization

personnel to serve as points of contact during the inspection.

We request that during the onsite inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the stations

fire protection program, including the success path necessary to achieve and maintain the

nuclear safety performance criteria, be readily accessible to the team for their review. Of

specific interest for the fire protection portion of the inspection are those documents which

establish that your fire protection program satisfies NRC regulatory requirements and conforms

to applicable NRC and industry fire protection guidance (i.e., fire protection compliance

assessment documents). Also, personnel should be available at the site during the inspection

who are knowledgeable regarding those plant systems required to achieve and maintain safe

and stable plant conditions, including the electrical aspects of the nuclear safety capability

assessment, reactor plant fire protection systems and features, and the stations fire protection

program and its implementation.

This letter does not contain new or amended information collections that are subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and

Budget (OMB) approved these information collections (approval number 3150-0011). The NRC

may not conduct nor sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection teams information or logistical needs, please

contact John Mateychick, the team lead inspector, in the Region IV office at (817) 200-1560 or

John.Mateychick@nrc.gov.

Sincerely,

/RA/

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Enclosure:

Triennial Fire Protection Inspection Document Request

cc w/enclosure: Electronic Distribution for South Texas Project

ML19295C482

SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: JMM Yes No

Publicly Available Sensitive NRC-002

OFFICE

SRI:EB2

C:EB2

NAME

JMateychick

NTaylor

SIGNATURE

/RA per NHT/

/RA/

DATE

10/21/2019

10/21/2019

Enclosure

Triennial Fire Protection Inspection Document Request

The documents and information requested below should generally be made available to the

inspection team prior to the inspection. Electronic format is the preferred format, except where

specifically noted. If electronic files are made available via a secure document management

service, then the remote document access must allow inspectors to download, save, and print

the documents in the NRCs regional office.

If a secure document management service is utilized, it is recommended that a separate folder

be used corresponding to each item listed below. Multiple documents within each folder be

individually entered and also combined into a ZIP file which is uploading in the same folder.

Documents should be identified by both document number and noun name. Electronic media

on compact disc or paper records (hard copy) are also acceptable.

To allow review before the onsite information gathering visit, the documents requested in

items A.1 thru A.8 should be made available to the team in the regional office no later than

December 27, 2019.

Based on a review of the above eight items, team lead should identify a preliminary list of fire

areas being considered for inspection prior to the onsite information gathering visit. During the

information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant-specific document titles may vary.

To allow review before the onsite inspection weeks, the documents listed in the attachment

should be made available to the team in the regional office no later than January 10, 2020.

2

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

The current version of the Fire Protection Program and Fire Hazards Analysis.

A.2

Post-fire safe shutdown analysis and the supporting calculations that

demonstrate acceptable plant response.

A.3

The fire probabilistic risk assessment or portions of the plants individual plant

examination for external events (IPEEE) report addressing fire events. Also,

include the results of any post-IPEEE reviews and listings of actions taken/plant

modifications conducted in response to IPEEE information that relate to fire risk.

A.4

Licensing basis documents for fire protection (safety evaluation reports, pertinent

sections of the final safety analysis report, exemptions, deviations, letters to/from

the NRC regarding fire protection/fire safe shutdown, etc.).

A.5

List of post-fire safe shutdown systems and components (i.e., safe shutdown

equipment list).

A.6

List of fire areas with automatic fire suppression systems.

A.7

A list, with descriptions, of design change packages performed since the last fire

protection team inspection associated with fire protection or post-fire safe

shutdown systems.

A.8

A list, with descriptions, of any fire protection program changes and evaluations

(not limited to Generic Letter 86-10 evaluations) performed since the last fire

protection team inspection.

A.9

Fire Protection System(s) Design Basis Document.

A.10

List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.11

A list or document identifying any deviations from the NFPA codes of record.

A.12

Facility Operating License.

A.13

Technical Specifications (electronic format only).

A.14

Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for components

used to achieve and maintain post-fire safe shutdown. These should include the

systems used for reactor coolant system makeup, reactor coolant system

pressure control, decay heat removal, and reactivity control, including the

essential support systems.

3

B.2

Piping and instrumentation diagrams and legend list for fire protection systems,

including the fire water supply; water suppression sprinklers; and deluge, CO2,

and Halon systems (electronic format and C-size paper drawings).

B.3

Yard layout drawings for underground fire protection buried piping (electronic

format and C-size paper drawings).

B.4

AC and DC electrical system single line diagrams, from off-site power down to

the highest safety-related bus level (typically 4kV, EDG bus) (electronic format

and C-size paper drawings).

B.5

Single line diagrams for motor control centers (MCCs) that supply post-fire

nuclear safety component loads (only for selected fire areas) (electronic format

and C-size paper drawings).

B.6

Equipment location drawings which identify the physical plant locations of post-

fire safe shutdown equipment (electronic format and C-size paper drawings).

B.7

Plant layout drawings which identify: (electronic format and C-size paper

drawings)

Plant fire area boundaries

Combustible control zone drawings

Areas protected by automatic fire suppression and detection

Locations of fire protection equipment

C.

CLASSIC FIRE PROTECTION

C.1

Copy of the fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, and fire brigade).

C.2

List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3

Last two completed surveillances of fire protection features in the selected fire

areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.4

List of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.5

Last two completed annual fire pump pressure and flow tests.

C.6

Last two completed monthly and/or quarterly fire pump tests.

C.7

Last two completed fire loop flow tests and loop flushes.

C.8

Last five hot work permits (at power).

C.9

Last five transient combustible permits (at power).

4

C.10

For Fire Brigade Drills, provide the following:

Last five fire brigade drill critiques

Last drill critique for a drill with off-site fire department support

Last unannounced drill critique

Last back-shift drill critique

Dates, shifts, and locations of unannounced drills for last three years

Summary of any unsatisfactory drill performance items for last three years

Last unannounced drill critique by a qualified individual independent of

the licensees staff

C.11

For fire brigade equipment provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

C.12

Fire Brigade Qualifications, including self-contained breathing apparatus, (SCBA)

and training lesson plans.

C.13

Copy of the mutual aid agreement for the first-due local fire department that is

currently in effect.

C.14

Copy of the evaluation or analysis of the effects of fire suppression activities on

the ability to achieve the nuclear safety performance criteria (only for selected fire

areas) demonstrating:

The automatic or manually actuation of a suppression system, due to a

fire in a single location, will not indirectly cause damage to the success

path

The inadvertent actuation or rupture of a suppression system will not

indirectly cause damage to the success path

Adequate drainage for areas protected by water suppression systems

The hydrostatic rating of any floor penetration seals installed within the

fire areas that are credited with keeping water from leaking into fire areas

below

C.15

Pre-fire plans for all fire areas.

C.16

Impairment Log (at start of inspection) for fire protection features that are out of

service.

5

C.17

List of penetration seal work, re-work, or installation activities, in the last

three years.

C.18

List of fire wrap work, re-work, or installation activities, in the last three years.

C.19

Fire protection system health reports for the two most recent quarters.

C.20

Fire protection program health reports for the two most recent quarters.

C.21

Emergency lighting system health reports for the two most recent quarters.

C.22

List of fire protection system design changes completed in the last three years.

C.23

List of fire protection system engineering equivalency evaluations completed in

the last three years.

C.24

Licensee evaluations of industry operating experience concerning fire protection

issues completed in the last three years.

C.25

List of fire event analysis reports for the last three years.

C.26

Fire protection program requirements (e.g., limiting conditions for operation,

surveillance test requirements) covered by technical specifications, the technical

requirements manual, the updated final safety analysis report, procedures, or

similar documents.

C.27

Organization charts of site personnel down to the level of fire protection staff

personnel.

C.28

A contact list of key site personnel who will be supporting this inspection, giving

the office location and phone number onsite.

C.29

The team would like to observe an unannounced fire brigade drill in the plant, if

possible, during the week of February 10, 2020. Please put us in contact with

the appropriate personnel for planning fire brigade drills during the onsite

information gathering trip.

D.

ELECTRICAL

D.1

Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures).

D.2

Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional for post-fire nuclear safety capability

components.

D.3

Electrical system health reports for the two most recent quarters.

D.4

Surveillance procedures and last surveillance demonstrating operability of

components required for alternative shutdown.

6

D.5

Schematic or elementary diagrams for circuits to be reviewed (samples to be

identified by the inspector) (C-size paper drawings).

D.6

Cable routing for components and equipment credited for post-fire safe shutdown

systems and components (samples to be identified by the inspector).

D.7

For emergency lighting units, provide the following:

List of Preventive Maintenance tasks, frequencies, and bases

Most recently performed monthly or quarterly functional test

Most recently performed battery discharge performance test or

conductance measurement test

Emergency lighting unit battery loading analysis

Vendor manual(s) for onsite inspector use

Results of black-out testing (if performed)

Maintenance Rule program information related to the emergency lighting

system

Compensatory measures taken when emergency lighting units are out of

service

Drawings showing emergency light locations and lamp orientation

E.

OPERATIONS

E.1

The team would like to perform a walkthrough of a sample of post-fire safe

shutdown procedures with qualified operators in the plant during the week of

January 27, 2020. Please put us in contact with the appropriate personnel for

planning the walkthroughs during the onsite information gathering trip.

E.2

List of licensed operator Job Performance Measures (JPMs) for operator actions

required to achieve and maintain post-fire safe shutdown.

E.3

List of non-licensed operator training associated with non-licensed operator

actions to achieve and maintain post-fire nuclear safe shutdown (including JPMs,

in-field training walkdowns, simulations, or initial qualification).

E.4

Lesson plans for post-fire safe shutdown training for licensed and non-licensed

operators.

E.5

For local manual operator actions, provide the following:

Manual Action Feasibility Study

7

Operator Time Critical Action Program

Time lines for time-critical manual actions

Time line validations

E.6

Thermal hydraulic calculation or analysis that determines the time requirements

for time-critical manual operator actions.

E.7

Operating procedures to achieve and maintain post-fire safe shutdown with a

postulated fire in the selected fire areas.

E.8

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection

Most recent inspection and inventory results

E.9

List of procedures that implement cold shutdown repairs.

E.10

For cold shutdown repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.)

Most recent inspection and inventory results

E.11

For radio communications, provide the following:

Communications Plan for firefighting and post-fire safe shutdown manual

actions

Repeater locations

Cable routing for repeater power supply cables

Radio coverage test results

Radio Dead Spot locations in the plant

E.12

For telephone, plant pager or sound powered phone systems, if relied upon to

achieve and maintain post-fire safe shutdown, provide the following:

Communications Plan for firefighting and post-fire safe shutdown manual

actions

Locations of phone, pager units, sound powered phone jacks, and sound

powered phone headsets

Cable routing including power supply cables

E.13

Environmental and habitability evaluations for post-fire safe shutdown operator

actions (temperature, smoke, humidity, SCBAs, etc.).

8

F.

ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION

PROGRAMS

F.1

Copies of procedures that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design. Also,

copies of procedures that govern the implementation of plant modifications,

maintenance, and special operations and their impact on fire protection.

F.2

List of open and closed condition reports for the fire protection systems for the

last three years.

F.3

List of open and closed condition reports associated with the post-fire safe

shutdown analysis for the last three years.

F.4

List of open and closed condition reports associated with operator actions to

achieve and maintain post-fire safe shutdown for the last three years.

F.5

List of open and closed condition reports associated with the fire protection

program including plant change evaluations, post-fire operating procedures

and/or training, timeline evaluations for operator actions, and supporting

engineering evaluations, analysis, or calculations for the last three years.

F.6

List of open and closed condition reports for emergency lighting units for the last

three years.

F.7

Self-assessments, peer assessments, and audits of fire protection activities for

the last three years.

F.8

Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last three years.

G.

AGING MANAGEMENT PROGRAM

G.1

Copies of the aging management programs applicable to fire protection including

but not limited to the following:

Fire Protection

Fire Water System

Aboveground Metallic Tanks

Buried and Underground Piping and Tanks

G.2

Copies of procedures, work orders, preventive maintenance tasks, or other

documents which implement the commitments made as part of the license

extension related to fire protection.

G.3

List of aging management activities related to fire protection performed to date.