{{#Wiki_filter:*.'               a.                                                                             -
{{#Wiki_filter:*.'
                  , , ,-                                                                                                                .l 3 , j. - W         J
a.
* Y'             Q\
.l 3, j. - W J
MNew Hampshire                                                                           Ted C. Feigenbaum               .
Y' Q\\
                ' ' , YQ- - - -                                                                     . Senior Vice President and Chief Operating Officer j
MNew Hampshire Ted C. Feigenbaum
' ', YQ- - - -
Chief Operating Officer
. Senior Vice President and j
1 i
1 i
NYN- 89140 November 6, 1989                           -[
NYN-89140 November 6, 1989
United States Nuclear Regulatory Commission Washington, DC 20555                                                                                           '
-[
Attention: Document Control Desk                                                                               ,
United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk


==References:==
==References:==
-Facility Operating License NPF-67 Docket No. 50-443                                               '
-Facility Operating License NPF-67 Docket No. 50-443


==Subject:==
==Subject:==
NHY Power Ascension Test Pregram, FSAR Chapter 14 Revisions Gentlemen:                                                                                                     -
NHY Power Ascension Test Pregram, FSAR Chapter 14 Revisions Gentlemen:
New Hampshire Yankee's (NHY) current plans for-power ascension testing
New Hampshire Yankee's (NHY) current plans for-power ascension testing necessitate various revisions to Chapter 14 of the Final Safety Analysis-i
* necessitate various revisions to Chapter 14 of the Final Safety Analysis-                                     i
' Report (FSAR). : These revisions to FSAR Chapter 14, in the form of annotated i
                          ' Report (FSAR). : These revisions to FSAR Chapter 14, in the form of annotated                                 i pages, are enclosed (Enclosure A). The substantive (non-editorial) FSAR Chapter.14 revisions are summarized as follows:
pages, are enclosed (Enclosure A).
ST-47 Main Steam Line Isolation Valve Closure Test                                                     ;
The substantive (non-editorial) FSAR Chapter.14 revisions are summarized as follows:
This test will not be performed.           The objectives of ST-47 are met             in             l another test and in typelqualification testing of the Main Steam Isolation Valves (MSIVs) as discussed belcv. The non-performance of
ST-47 Main Steam Line Isolation Valve Closure Test This test will not be performed.
                                  'ST-47 eliminates a deliberate transient on the plant. As indicated previously in FSAR Amendment 48, the dynamic response of the plant to a MSIV closure is bounded by the response of the plant to a turbine trip.                                 l In ST-38, the unit will be tripped from 100 porcent power, and the plant
The objectives of ST-47 are met in l
',                                response will be measured.
another test and in typelqualification testing of the Main Steam Isolation Valves (MSIVs) as discussed belcv. The non-performance of
s   '
'ST-47 eliminates a deliberate transient on the plant. As indicated previously in FSAR Amendment 48, the dynamic response of the plant to a MSIV closure is bounded by the response of the plant to a turbine trip.
Type / qualification teste performed by Rockwell International on valves 1
l In ST-38, the unit will be tripped from 100 porcent power, and the plant response will be measured.
4      4 similar to the Seabrook MSIVs demonstrate that the Seabrook MSIVs are capable of closing under design flow conditions within the required time.
s Type / qualification teste performed by Rockwell International on valves 1
l             Ability of Neutton Flux Instrumentation to Detect Control Rod Misalignments q                                 This test will not be performed.           The Digital Rod Position Indication (DRPI) System provides accurate and sensitive indication of control rod
similar to the Seabrook MSIVs demonstrate that the Seabrook MSIVs are 4
    "    C                        position.     The DRPI has been previously tested. Incore flux instru-mentation may be used as an alternative means to detect control rod position. The Seabrook incore flux instrumentation is identical to instrumentation utilized in all Westinghouse four loop plants since Indian Point 2. The capability and sensitivity of this instrumentation p                             has been demonstrated numerous times.
4 capable of closing under design flow conditions within the required time.
8911250199 891106 PDR P
l Ability of Neutton Flux Instrumentation to Detect Control Rod Misalignments q
ADOCK 05000443 PDC
This test will not be performed.
                                                                                                                                /k         ,
The Digital Rod Position Indication (DRPI) System provides accurate and sensitive indication of control rod C
New Hampshire Yankee Division of Public Service Company of New Hampshire                     g P.O. Box 300
position.
The DRPI has been previously tested. Incore flux instru-mentation may be used as an alternative means to detect control rod position.
The Seabrook incore flux instrumentation is identical to instrumentation utilized in all Westinghouse four loop plants since Indian Point 2.
The capability and sensitivity of this instrumentation p
has been demonstrated numerous times.
8911250199 891106 PDR ADOCK 05000443
/k P
PDC New Hampshire Yankee Division of Public Service Company of New Hampshire g
P.O. Box 300
* Seabrook, NH 03874
* Seabrook, NH 03874
* Telephone (603) 474 9521                         1
* Telephone (603) 474 9521 1


v.
v.
t l
t l
United States Nuclesr Regulatory Commission           November 6,.1989 Attention:     Document Control Desk                 Page 2
United States Nuclesr Regulatory Commission November 6,.1989 Attention:
* ST-22 Natural Circulation Testing                                         ,
Document Control Desk Page 2 ST-22 Natural Circulation Testing This test will be performed in HODE 3 utilizing decay heat to demonstrate natural circulation. The performance of this test using decay heat instead of heat generated by a critical reactor provides more stable plant conditions during testing. Additionally, this test will not include primary system depressurization rate measurements, charging and steam flow variations to determinr. subcooling effects or primary system pressure reductions to verify subcooling monitor performance. The above changes to ST-22 eliminates the potential for esetain transients on the plant.
This test will be performed in HODE 3 utilizing decay heat to
Enclosure B to this letter provides further discussion and justification for the revisions to the FSAR Chapter 14.
:                  demonstrate natural circulation. The performance of this test using       ,
The revisions to the initial test program have been evaluated pursuant to 10CFR50.59. The evaluation determined that the initial test program revisions do not introduce an unreviewed safety question.:
decay heat instead of heat generated by a critical reactor provides more   '
I The enclosed (Enclosure AS FSAR Chapter 14 revisions will be included in the next FSAR amendment.
stable plant conditions during testing. Additionally, this test will not   ;
include primary system depressurization rate measurements, charging and   '
steam flow variations to determinr. subcooling effects or primary system pressure reductions to verify subcooling monitor performance. The above changes to ST-22 eliminates the potential for esetain transients on the   ;
plant.
Enclosure B to this letter provides further discussion and justification   ;
for the revisions to the FSAR Chapter 14.     The revisions to the initial test program have been evaluated pursuant to 10CFR50.59. The evaluation determined that the initial test program revisions do not introduce an unreviewed safety I              question.:
The enclosed (Enclosure AS FSAR Chapter 14 revisions will be included in the next FSAR amendment.                                                         ,
Should you have any questions.regarding the NHY Power Ascension Test Program. FSAR Chapter 14 Revisions, please contact Mr. Robert E. Sweeney in our.Bethesda Office, at (301) 656-5100.
Should you have any questions.regarding the NHY Power Ascension Test Program. FSAR Chapter 14 Revisions, please contact Mr. Robert E. Sweeney in our.Bethesda Office, at (301) 656-5100.
Very truly yours,           '
Very truly yours, b
b TedC.Feig[enbaum           ,
TedC.Feig[enbaum r
r Enclosures                                                                       ,
Enclosures l
l l
l l
l t
t s
s b
b 1
1 e
e


    .i
.i United States Nuclear Regulatory Commission Novembcr 6, 1989 Attention: Document Control Desk Page 3 cci Mr. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road C
* United States Nuclear Regulatory Commission     Novembcr 6, 1989 Attention: Document Control Desk                 Page 3 cci Mr. William T. Russell Regional Administrator United States Nuclear Regulatory Commission                 ,
King of Prussia, PA' 19406 Mr. Vjctor Nerses, Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission l
Region I                                                     !
Division of Reactor Projects Washington, DC-20555 l
475 Allendale Road                                           C King of Prussia, PA' 19406 Mr. Vjctor Nerses, Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission l
Mr. Antone C. Cerne NRC Senior Resident Inspector p
Division of Reactor Projects Washington, DC- 20555 l                   Mr. Antone C. Cerne p                    NRC Senior Resident Inspector i
i P.O. Box 1149' Seabrook, NH. 03874 l
P.O. Box 1149' Seabrook, NH. 03874                                         .
t l
l t
l' 1
l l'
I l
1 I
l i
1 i
l l
l l
i 1
i l
l


ci             ..c,                 .
ci
                                      ,  i
..c, i
          ..,.s, .
..,.s,
                                -e .    ,
- e f
f y
; - 1;<.<>
    ; - 1;<.<>
y l,
l,      .,
New Hampshire Yankee c.
New Hampshire Yankee
. November 6, 1989
: c.                     < ,                                            . November 6, 1989           ;
-r e
    -r                                                                                               :
i I
e i
1.
I 1.
4 t,
4                   t, i
i
(
(
    ;v. :       ,,                                                                                    ,
;v. :
i
i
        '(                                                                                           .
' (
t
.t
                                                                                                  -t
- t l
  ! '' '
ENCLOSURE A TO NYN-89140 4
* l ENCLOSURE A TO NYN-89140 4
j.
j.
t r ll t
t r ll t
                                                                                                      ?
?
6 s
6 s
i
i
                                                                                                  ' f, i
' f, i
h 1
h 1
t l
t l
l l
l l
\
\\
l l
l l
l l.
l l.


1:( d si v, 7 #1, [ p *, k gM
1:( d si v, 7 #1, [ p *, k gM 2 16 2 uenament
                      ",                                            2 16 2                         uenament s .'                                                                                                             !. 9 FSAR                             .May ~ (983 Reculatorv Guide 1.11. Re v . O                                                                   ,
!. 9 s.'
Preoperat tonal Testing o f Redundsat Electric Power Systems to Verify Proper Load Group Asseenments Seaorack Station coaforms with the recommend.ations of Regulatory Guice 1.LI.
FSAR
~ (983
.May Reculatorv Guide 1.11. Re v. O Preoperat tonal Testing o f Redundsat Electric Power Systems to Verify Proper Load Group Asseenments Seaorack Station coaforms with the recommend.ations of Regulatory Guice 1.LI.
J:
J:
Regulatora Guide 1.52. Rev. 2 Destgn, Testing and Maintenance Criteria for Engineered Safety Feature Almosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuciaar Power Plants A detailed discussion on the degree of conformance to Regulatory Guide 1.52 is found in Section 6.5.1.
Regulatora Guide 1.52. Rev. 2 Destgn, Testing and Maintenance Criteria for Engineered Safety Feature Almosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuciaar Power Plants A detailed discussion on the degree of conformance to Regulatory Guide 1.52 is found in Section 6.5.1.
Regulatorv Guide 1.68. Rev. 2 Initial Test Programs for Water-Cooled Nuclear Power Plants The initial test program for the Seabrook Station will be conducted in accordance with the intant o f Regulatory Guide 1.68 except for the items specified below:
Regulatorv Guide 1.68. Rev. 2 Initial Test Programs for Water-Cooled Nuclear Power Plants The initial test program for the Seabrook Station will be conducted in accordance with the intant o f Regulatory Guide 1.68 except for the items specified below:
: 1. During the preoperational test program. no practical method exists to vary system voltage to ob: sin maximum and minimum design voltages.
1.
The intent of the requirement to demonstrate that the emergency                       .
During the preoperational test program. no practical method exists to vary system voltage to ob: sin maximum and minimum design voltages.
loads can start and operate with the maximum and minimum design voltage available will be met by testing the emergency loads under plant light load conditions to simulate the maximum practically                     ,
The intent of the requirement to demonstrate that the emergency loads can start and operate with the maximum and minimum design voltage available will be met by testing the emergency loads under plant light load conditions to simulate the maximum practically obtainable voltage and under plant heavy 1 ad conditions to simulate h
obtainable voltage and under plant heavy 1 ad conditions to simulate               h the minimum practically obtainable voltage. The results of this testing will be compared to the station "oltage study to verify the adequacy of the analytical model.           ( Appendix A, Cection 1.g.2) .
the minimum practically obtainable voltage. The results of this testing will be compared to the station "oltage study to verify the adequacy of the analytical model.
4r
( Appendix A, Cection 1.g.2).
: 2. During the power ascunsior, testing phase, tests will be scheduled
4r 2.
'                                    such that the safety of the plant will not be dependent on the performance of an untested system or feature. Power ascension testing will be performed at power plateaus of ap,roximately 30%,
During the power ascunsior, testing phase, tests will be scheduled such that the safety of the plant will not be dependent on the performance of an untested system or feature.
50%, 75% and 100%. It is required that testing be performed at 30% rather than 25% because individual system stability is increased at 30% (e.g. feedwater system), this allows comparison steady-state conditions with the design at low power. Westinghouse-supplied plants have historically conducted tests at 30% and, therefore, genetic data is available for review and comparison.
Power ascension testing will be performed at power plateaus of ap,roximately 30%,
: 3. Throughout core loading and precritical tests,                 utdown margin will be verified by periodic sampling of core coolant and verification that boron concentration is maintained at or above the Technical Specification concentration limit for re fueling conditions.
50%, 75% and 100%.
(.*.ppe nd i x A , Seetion 2.a)
It is required that testing be performed at 30% rather than 25% because individual system stability is increased at 30% (e.g. feedwater system), this allows comparison steady-state conditions with the design at low power. Westinghouse-supplied plants have historically conducted tests at 30% and, therefore, genetic data is available for review and comparison.
: 4. Control rod runback and partial scram featares are not used in the Seabrook Station design and, therefore, will not be tested during power escalation.       (Appendix A, Section 5.j.)
3.
: 5. A demonsLration of the capability of systems and components to j~                                     remove residual heat or decay heat from the Reactor Coolant System will be performed during power ascension testing only if not performed 14.2-6
Throughout core loading and precritical tests, utdown margin will be verified by periodic sampling of core coolant and verification that boron concentration is maintained at or above the Technical Specification concentration limit for re fueling conditions.
(.*.ppe nd i x A, Seetion 2.a) 4.
Control rod runback and partial scram featares are not used in the Seabrook Station design and, therefore, will not be tested during power escalation.
(Appendix A, Section 5.j.)
5.
A demonsLration of the capability of systems and components to j~
remove residual heat or decay heat from the Reactor Coolant System will be performed during power ascension testing only if not performed 14.2-6


A.
A.
t VLd%*M" *1/O         ./ 5 l e      +4 SB 1 6, 2                         Amendment 5B
t VLd%*M" *1/O
              ,                                                                        FSAR                                 April 1986 during hot functional or low power tests.     (Appendix A, Section                           '
./ 5 l SB 1 6, 2 Amendment 5B e
5.1.)                                                                                     '
+4 FSAR April 1986 during hot functional or low power tests.
: 6. . The failed fuel detection system is not applicable to the Seabrook design and, therefore, will not be tested during power escalacion.                         *
(Appendix A, Section 5.1.)
: 6.. The failed fuel detection system is not applicable to the Seabrook design and, therefore, will not be tested during power escalacion.
(Appendix A, Section 5.q.)
(Appendix A, Section 5.q.)
  ^
7.
s                                        7.         The integrated control system and the reactor coolant flow control system are not applitable to the Seabrook Station design and there-fore, will not be tested during power escalation. The Startup and                         ,
The integrated control system and the reactor coolant flow control s^
Emergency Feedwater Control Systems and the Steam Pressure Control Systems are only used in the hot shutdown, hot standby or low power operating modes. These systems can not be tested during power ascension. (Appendix A, Section 5.s.)                                                       '
system are not applitable to the Seabrook Station design and there-fore, will not be tested during power escalation.
O.         A demonstration of the dynamic response of the plant to a loss of or bypassing 'of a feedwater heater (s) will not be performed. As shown in Section 15.1.1, the transient resulting from the most severe case of feedwater temperature reduction initiated by a single failure or operator error is similar to, but of a lesser magnitude than the excessive load increase (load swing). The                               f load swing test will be performed at several major plateaus.                               4
The Startup and Emergency Feedwater Control Systems and the Steam Pressure Control Systems are only used in the hot shutdown, hot standby or low power operating modes.
: 9.         As shown in Subsection 15.2.3 and 15.2.4, dynamic response of the plant to a MSIV closure is bounded by the response of the plant to the turbine trip event. Plant response to a turbine trip will be demonstrated durine cerformance of ST-38, unit trin from 100 M percent  po g The ability of the MSIVs to close under steam flow will be demonstrated by automatic closure of all main steam line                         -
These systems can not be tested during power ascension.
isolation valves at 30 percent power during the performance of s
(Appendix A, Section 5.s.)
Si -4 7 . Apperdix A. Section 5.m.m.)
O.
ndt be performed.                 , ,
A demonstration of the dynamic response of the plant to a loss of or bypassing 'of a feedwater heater (s) will not be performed.
i 1
As shown in Section 15.1.1, the transient resulting from the severe case of feedwater temperature reduction initiated by a most single failure or operator error is similar to, but of a lesser magnitude than the excessive load increase (load swing).
: 10.         The ability of the movable incore neut on flux instrumentation to l
The f
detect control rod misalignments will (tte demonstrated at 50'. power) 4 M The excore neutron flux instrumentation ts not                   designed to                       ,
load swing test will be performed at several major plateaus.
detect a local condition such as a misaligned RCCA but rather a
4 9.
[             more global anomalous core condition. The movable incere flux
As shown in Subsection 15.2.3 and 15.2.4, dynamic response of the plant to a MSIV closure is bounded by the response of the plant to the turbine trip event.
[                                                       instrumentation is not intended to specifically detect a misaligned y               control rod, but may be able to confirm an RCCA misalignment initially detected by the rod position indication system. The individual
Plant response to a turbine trip will be demonstrated durine cerformance of ST-38, unit trin from 100 M po g The ability of the MSIVs to close under steam flow percent will be demonstrated by automatic closure of all main steam line isolation valves at 30 percent power during the performance of Si -4 7.
(               rod position indication system is the primary means for detecting I
Apperdix A.
g               RCCA misalignments. Since at 100% power the control rods are
Section 5.m.m.)
;                                      y              ersentially withdrawn, individual rod worth is such that the ability h                 of the movable incore instrumentation to detect a control rod misalignment is limite_sl./Therefote, data on the movablo incere instrumentatinn characraristics over a range cf control rod
s ndt be performed.
    '                                                  insertion will be obtained during a control rod misalignment test at 50% power.J( Appendix A, ~Sec . 5. L ) .                                 "
10.
: 11.         Since Units 1 & 2 are essentially identical, the below listed tests, which will be performed on Unit I solely to verify the adequacy of calculational models, will either not be performed or reduced in scope during the Unit 2 inicial startup program.
The ability of the movable incore neut on flux instrumentation to 1
i detect control rod misalignments will (tte demonstrated at 50'. power) 4 l
M The excore neutron flux instrumentation ts not designed to detect a local condition such as a misaligned RCCA but rather a
[
more global anomalous core condition. The movable incere flux
[
instrumentation is not intended to specifically detect a misaligned y
control rod, but may be able to confirm an RCCA misalignment initially detected by the rod position indication system. The individual
(
rod position indication system is the primary means for detecting I
g RCCA misalignments. Since at 100% power the control rods are y
ersentially withdrawn, individual rod worth is such that the ability h
of the movable incore instrumentation to detect a control rod misalignment is limite_sl./Therefote, data on the movablo incere instrumentatinn characraristics over a range cf control rod insertion will be obtained during a control rod misalignment test at 50% power.J( Appendix A, ~Sec. 5. L ).
11.
Since Units 1 & 2 are essentially identical, the below listed tests, which will be performed on Unit I solely to verify the adequacy of calculational models, will either not be performed or reduced in scope during the Unit 2 inicial startup program.
14.2-7
14.2-7


pc tr i '
pc tr i '
i '.    .
F~a?. 'E - 60 '? it /e 6 ''y. p '
4  #34
4 #34 i '.
: j. . -                      ,                                    F~a?. 'E - 60 '? it /e   6 ''y . p ' ' jo7( f t
: j.. -
  ?     .
' jo7( f t
l'         .
?
f
l' f
:\
:\\
A a
A a
8, c                                                           The basis for this deletion is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting,a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for accurate and sensitive alternative indications has been essentially eliminated. In any case, the distribution and number of the incore and execre flux instrumentation has not been
8, c
'L                             changed and is identical to all Westinghouse four loop plants since Indian Point 2. Since that time, the capability and sensitivity of of the excore and incore flux instrumentation has been demonstrated numarous times.
The basis for this deletion is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting,a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for accurate and sensitive alternative indications has been essentially eliminated.
In any case, the distribution and number of the incore and execre flux instrumentation has not been
'L changed and is identical to all Westinghouse four loop plants since Indian Point 2.
Since that time, the capability and sensitivity of of the excore and incore flux instrumentation has been demonstrated numarous times.
l 1
l 1
i l
i l
i
i
      +
(
(
+


U.Tm                   ,. p
U.Tm
                            ~
,. p k K..
k K. .                                                                                                                       4           j O                            ,        .#
~
y ,;*f,   ( ? , - p f, ~. IT /, . pg #7 ,g,nt/l
4 j
            "                              t n                        .
y,;*f,
i i .              .
( ?, - p f, ~.
SB 1 & 2                               Amendment 53             ;
IT /,. pg #7,g,nt/l O
if '       <
t i
FSAR                                   hpril 1986           1 in                                                                                                                                       l a
n SB 1 & 2 Amendment 53 i.
L TABLE !!. 2-5                                                       )
if '
FSAR hpril 1986 1
in l
a L
TABLE !!. 2-5
)
(Sheet 2 of 53)
(Sheet 2 of 53)
Index.
Index.
Title                                                       Sheet i,<'                                                                                                                     -
Title i,<'
V                     22. Natural Circulation Test                                                               25                 ,
Sheet V
a
22.
: 23. . Dynamic Automatic Steam Dump Control                                                       26 H.                   24       Automatic Reactor Control                                                               27 f 25. Automatic Steam Generator Level Control                                                       28 2 6 .- *hermal Power Measurement and Statepoint Data Collection                                 29 jk,                     27.     Startup Adjustments of Reactor Control System                                           30               -
Natural Circulation Test 25 a
7-'
: 23.. Dynamic Automatic Steam Dump Control 26 H.
                      -28.     Calibration ~ of Steam and Feedwater Flow Instrumentation                             31
24 Automatic Reactor Control 27 f 25. Automatic Steam Generator Level Control 28 2 6.- *hermal Power Measurement and Statepoint Data Collection 29 jk, 27.
: 29. Core Performance Evatuation                                                                 32               i
Startup Adjustments of Reactor Control System 30 7-
                                                                                      ''                                                  e
-28.
: 30.     Power Coef ficient Measurement                                                         33
Calibration ~ of Steam and Feedwater Flow Instrumentation 31
: 31.     (Deleted in Amendment                                                                 34 l
: 29. Core Performance Evatuation 32 i
U
e 30.
: 32.     , , _ _ _
Power Coef ficient Measurement 33 31.
(Deleted in Amendment 34 l
..., (_9 4 xtc4,~ b e u s h U
32.
n.6.
n.6.
                                                    ...y . .. , (_9 4 xtc4 ,~ b e u s h 35
35
: 33.      Shutdown from Outside the Control P.com                                               36
...y 33.
: 34.     Load Swing Test                                                                       37
Shutdown from Outside the Control P.com 36 34.
: 35.       (De:h:AJ in ^-- ":::: 57} 4 Ly LN hb b                                               38   b            <
Load Swing Test 37
                      '36. , Axial Flux Difference Instrumentation Calibration                                                   -
: 35. (De:h:AJ in ^-- ":::: 57} 4 Ly LN hb b b
55
38 55
        ,                                                                                                              39                 t
'36., Axial Flux Difference Instrumentation Calibration 39 t
: 37. . Steam Generator Moistura Carryover Measurement                                           40
: 37.. Steam Generator Moistura Carryover Measurement 40 38.
: 38.     Ur.i t Trip from 100 Percent Power                                                     41
Ur.i t Trip from 100 Percent Power 41
:39r                   31ackout Te         LW         O             -
:39r 31ackout Te LW O
                                                                                              #W44 M                   42
#W44 M 42
!$A                     40.     NSSS Acceptance Test                                                                   43
!$A 40.
: 41.     Radiation Survey                                                                       44 1~     '
NSSS Acceptance Test 43 41.
j              -
Radiation Survey 44 1~
: 42.     Water Chemistry Control                                                               45 l
42.
ll'                     43.     Process Computer                                                                       46 l-                                                                                                                                 4e I
Water Chemistry Control 45 j
l ll' 43.
Process Computer 46 l-4e l,.
I


l -          .. s-ft d     U$ ' '!? ' .d l'?
ft d U$ ' '!? '
.d l'?
* 3 $f(2 dl '
* 3 $f(2 dl '
                        ~
l -
f'                                   .
s-f'
..                                                                    SB 1 & 2                       Amendment 48 f                                                                       FSAR                       January 1983 TABLE 14.2-5
~
                                                                  -(Sheet 3 of 53)
SB 1 & 2 Amendment 48
Index Title                                         Sheet
..f FSAR January 1983 TABLE 14.2-5
        ,i                                                                                                               ,
-(Sheet 3 of 53)
                    '      ~
Index Title Sheet
4'4 . Vibration and'1.oose Parts Monitor                                 47
,i
                            - 45.     Process and Efflueet Radiation Monitoring System                   48
~
: 46. Ventilation System Operability Test                                 49
4'.
                            .47.               eam Line Isolation Valve Closure Tes     (D M 6           50 o                        48. ' Turbine Generator Startup Test a m a s/h             51             '
Vibration and'1.oose Parts Monitor 47 4
: 49. Circulating Water System Thermal-Hydraulic Test                     52             e
- 45.
                              - 50.c Mova' ble Incore Detector System                                     53 96
Process and Efflueet Radiation Monitoring System 48 46.
                                                                                                                          ?
Ventilation System Operability Test 49
.47.
eam Line Isolation Valve Closure Tes (D M 6 50
: 48. ' Turbine Generator Startup Test a m a s/h o
51 49.
Circulating Water System Thermal-Hydraulic Test 52 e
- 50.c Mova' ble Incore Detector System 53 96
?
s 4
s 4
I
I
                                                                                                                          \
\\
f a
f a
4 6
4 6
1
f e-et----*
-,7


[W;,               '
[W;,
j g ;'   y. '4 . p e , G! [. O '. N ') .p. ,g               j E .'         .,
j g ;'
                        *                                                                                                                            )
: y. '4. p e, G! [.
( ,.       .k'
O '. N ').p.,g j
* e I
E.'
s..                                                                     SB ! 5 :                             . Amendment 61
.k'
: f. '                                                                       TSAR                             Movember 1986                           l 1
)
i t.
(,.
TA B t.E II. 2-5                                                           )
e I
(Sheet 25 of $3)
s..
: 22. NATURAL CIRCULATION TEST                                                                                   j objeeeive                                                                                                                   ,
SB ! 5 :
To' verify the ability of the reactor coolant system to remove heat by means                                               i of natural circulation.
. Amendment 61
l Plant Conditions /Prereouisites                                                                                             '
: f. '
The plant is         tical,hlowpow,                     del J,                         Q f gg-[Q                         '
TSAR Movember 1986 i
i: -
t.
Test Method                                              M          CdAb h 7 N .                                           l t
TA B t.E II. 2-5
                                                                                                                          }                         ;
)
(Sheet 25 of $3) 22.
NATURAL CIRCULATION TEST j
objeeeive To' verify the ability of the reactor coolant system to remove heat by means i
of natural circulation.
l Plant Conditions /Prereouisites The plant is tical,hlowpow, del J, Q f gg-[Q M
CdAb h 7 N.
l i:
Test Method t
}
At. hot no-flow conditions the prwssurizer hesters will be turned off and) data will be collected to determine a depressurization rate.
At. hot no-flow conditions the prwssurizer hesters will be turned off and) data will be collected to determine a depressurization rate.
                                                                                                                    ./
./
                        - With the plant at (teady state low oweg                               hpproximately3" the                               .
- With the plant at (teady state low oweg hpproximately3" the teactor coolant pumps will be tripped. This test will determine the length of l
teactor coolant pumps will be tripped. This test will determine the length of                                             l time necessary to stabilize natural circulation ar.d will demonstrate the                                                 ~
time necessary to stabilize natural circulation ar.d will demonstrate the
teactor coolant flow distribution by obtaini'ng in-core _.hermocouple maps.                                   O           l Auxiliary spray will be used to partially depressurize -he primary plant, and                                             ;
~
the depressurization rate will be detetsined. At reduced pressure the effect                                   u         '
teactor coolant flow distribution by obtaini'ng in-core _.hermocouple maps.
                        -of changes in charging flow and steam flow on subraalhe will be verified.                                                 -
O l
Data will be collected during the test to verify simulator modeling.                                                     ;
Auxiliary spray will be used to partially depressurize -he primary plant, and the depressurization rate will be detetsined. At reduced pressure the effect u
Acceptance criteria                                                                                                       ;
-of changes in charging flow and steam flow on subraalhe will be verified.
Natural' circulation is established and. maintained as indicated by stable                                               '
Data will be collected during the test to verify simulator modeling.
temperature indication.                                                                                           {
Acceptance criteria Natural' circulation is established and. maintained as indicated by stable
{
temperature indication.
y t
y t
,4 p                                                                                                                                                   .
,4 p
I' O
I' O
l
l


0 ,I ,                                                                                                                                 f
0,I,
* FC.L 79 r 06 7               A' /.-           83 dde5lg'sc cil O    ,+
f 3 dde FC.L 79 r 06 7 A' /.-
            -
8 c
* SB 1 & 2                                           Amendment 56             '
O 5lg's cil
c:                                                           PSAR                                           November 1985 i
,+
SB 1 & 2 Amendment 56 c:
PSAR November 1985 i
TABLE 14.2-5 (Sheet 42 of 53)
TABLE 14.2-5 (Sheet 42 of 53)
: 39. k ATION BLACKOUT TEST     4.05S             M 4MSM #dMR 27
: 39. k ATION BLACKOUT TEST 4.05S M 4MSM #dMR 27
: Objective To demonstrate starting of emergency diesels and proper sequencing of loads following a main generator trip without an available source of offsite power.                                       ,
: Objective To demonstrate starting of emergency diesels and proper sequencing of loads following a main generator trip without an available source of offsite power.
Plant Conditions / Prerequisites                                                                                   '
Plant Conditions / Prerequisites The plant is at a stable power level of equal to or greater than 10% power.
The plant is at a stable power level of equal to or greater than 10% power.
Test Method Generator output breakers will be tripped resulting in a reactor trip with no offsite power available. The starting of the emergency diesel generators.
Test Method Generator output breakers will be tripped resulting in a reactor trip with no offsite power available. The starting of the emergency diesel generators .
and overall plant response trill be monitored.
and overall plant response trill be monitored.
The loss of offsite power will be maintained long ennugh for plant systems to stabilize (at least 30 minutes or longer).
The loss of offsite power will be maintained long ennugh for plant systems to stabilize (at least 30 minutes or longer).
Acceptance criteria The diesel generators reach rated voltage and frequency within the limits specified in Technical Specifications 4.8.1.1.2.a.           The Emergency Power                             l Sequencers function as described in FSAR Section 8.3.                                                         46 56 l-4
Acceptance criteria The diesel generators reach rated voltage and frequency within the limits specified in Technical Specifications 4.8.1.1.2.a.
                                      ,        --    --              . - . - , - ~   +--  , - , . . . - , . -
The Emergency Power l
Sequencers function as described in FSAR Section 8.3.
46 56 l-4
. -. -, - ~
+--


f.r .
f.r.
      ;e ,         .<.
ft d \\'# - M '
d /ha-
[' M// w,n T1
;e,
4 i
4 i
ft d \'# - M '  d /ha-  ['vM// wen,,s
v en,,s
                                                                                                                    ,n T1
,h 4
,h 4
              .
53 1 0 ;
* 53 1 0 ; '
Amencment a5 FSAR January 1983
Amencment a5 FSAR                       January 1983
.c TABLE 14.2-5 (Sheet 50 of 53) 47.
      .c TABLE 14.2-5 (Sheet 50 of 53)
MAIN STEAM LINE ISOLATION VALVE Cl.0SURE TEST Objective To demonstrate the ability of each main steam isolation valve (MSIV) to close under steam flow.
: 47. MAIN STEAM LINE ISOLATION VALVE Cl.0SURE TEST Objective To demonstrate the ability of each main steam isolation valve (MSIV) to             ,
j Plant. Conditions /Prerecuisites This test will be initiated from steady state conditions at the 30%. power plateau.
close under steam flow.                                                             j Plant. Conditions /Prerecuisites This test will be initiated from steady state conditions at the 30%. power plateau.
Test Method All MSIV's will be closed simultaneously while the plant response is observed.
Test Method All MSIV's will be closed simultaneously while the plant response is observed. Selected plant parameters will be recorded including MSIV response
Selected plant parameters will be recorded including MSIV response
                                - times..
- times..
Acceptance Criteria MSIV closure times are consistent with the requireme.,s contained in Technical Specification 4.7.1.5.
Acceptance Criteria MSIV closure times are consistent with the requireme.,s contained in Technical Specification 4.7.1.5.
l 45 l
l 45 l
D6L61&b         10     A H EdD H EUT           bS                                     '
D6L61&b 10 A H EdD H EUT bS i
i i
i i
i i
i i
i i
i I
I, l
l


    .\ . .
Q1....
Q1..    ,:;. i r             a t_<,
.\\
.c     .. .
,:;. i r
                            ,                                  New Hampshir.; Yankee
a t_<,
                                                              . November 6, 1989
.c New Hampshir.; Yankee
?1 b
. November 6, 1989
?1 b
(
(
i l
i l
Line 333: Line 399:
4 l
4 l


E
E ; (
          ;(
U New Hampshire Yankee November 6, 1989 c
U           ' , .'                                                  New Hampshire Yankee November 6, 1989 c
e FSAT " action 14.2 has been annotated to reflect revisions to the initial ter' predram and includes a notation in the form of a numbered triangle which correlates to the following numbered basis for each change:
e FSAT " action 14.2 has been annotated to reflect revisions to the initial ter' predram and includes a notation in the form of a numbered triangle which correlates to the following numbered basis for each change:
: 1. Page 14.2-6, correction of a typographical error.
1.
: 2. Page 14.2-7, Item 9, delete the requirement to demonstrate the ability of the MSIV to close under steam flow.
Page 14.2-6, correction of a typographical error.
Requirements for stroke testing main steam isolation valves under steam flow conditions were originally established in USNRC Regulatory Guide 1.68. Revision 2, Initial Test Program for Water-Cooled Nuclear Power Plants. Stroke testing under flow conditions is required at 25Z power and dynamic response testing for the case of closure of all main steam isolation valves is required at 100%
2.
Page 14.2-7, Item 9, delete the requirement to demonstrate the ability of the MSIV to close under steam flow.
Requirements for stroke testing main steam isolation valves under steam flow conditions were originally established in USNRC Regulatory Guide 1.68. Revision 2, Initial Test Program for Water-Cooled Nuclear Power Plants.
Stroke testing under flow conditions is required at 25Z power and dynamic response testing for the case of closure of all main steam isolation valves is required at 100%
power.
power.
i Acceptable stroke testing of the MSIV's has been demonstrated during hot functional testing in pre-operational test PT-13. Regulatory Guide 1.68 allowed this stroke testing to be performed at less than l
i Acceptable stroke testing of the MSIV's has been demonstrated during hot functional testing in pre-operational test PT-13.
L 25% power.
Regulatory l
I Reflecting the response to RAI-640.49, FSAR Amendment 48 included an     .
Guide 1.68 allowed this stroke testing to be performed at less than L
exception to Regulatory Guide 1.68 stating, ' dynamic response of the   I plant to a MSIV closure is bounded by the response of the plant to the turbine trip event". This is tested under ST-38, Unit Trip from 100% Power. It is noted that the MS1V's do not close during ST-38.
25% power.
l                         It is the turbine stop valves which close during ST-38, yielding a l                         plant dynamic response similar to the closure of the MSIV's at 100%       !
I Reflecting the response to RAI-640.49, FSAR Amendment 48 included an I
l                         power.
exception to Regulatory Guide 1.68 stating, ' dynamic response of the plant to a MSIV closure is bounded by the response of the plant to the turbine trip event".
l                         Although not required by Regulatory Guide 1.68, type / qualification     !
This is tested under ST-38, Unit Trip from 100% Power. It is noted that the MS1V's do not close during ST-38.
l                        tests were performed by Rockwell International on similar valves,       l
l It is the turbine stop valves which close during ST-38, yielding a l
          ,              and demonstrate that the valves are capable of closing under design     i flow conditions within the required time. The report which     provides the results of these tests is filed at NHY as foreign print FP-23676, " Report RAL 7068 Generic Qualification Report for size 30 x 24 x 30 Figure 1911 (WCC) BGaddPQTY". RAL 7068 includes a calculation and comparison of maximum stresses between the Seabrook HSIVs and the tested valves, confirming that stresses on the Seabrook valves are less than the stresses on the generic valves.
plant dynamic response similar to the closure of the MSIV's at 100%
Isolation capability and response time were demonstrated for higher differential pressure than Seabrook would experience while             ',
l power.
simultaneously subjected to pipe and earthquake loadings. After demonstrating isolation capability and response times, seat leakage tests were performe:d demonstrating acceptable seating.
l Although not required by Regulatory Guide 1.68, type / qualification l
tests were performed by Rockwell International on similar valves, l
i and demonstrate that the valves are capable of closing under design flow conditions within the required time.
The report which provides the results of these tests is filed at NHY as foreign print FP-23676, " Report RAL 7068 Generic Qualification Report for size 30 x 24 x 30 Figure 1911 (WCC) BGaddPQTY".
RAL 7068 includes a calculation and comparison of maximum stresses between the Seabrook HSIVs and the tested valves, confirming that stresses on the Seabrook valves are less than the stresses on the generic valves.
Isolation capability and response time were demonstrated for higher differential pressure than Seabrook would experience while simultaneously subjected to pipe and earthquake loadings. After demonstrating isolation capability and response times, seat leakage tests were performe:d demonstrating acceptable seating.
1
1


                                                                                                  'l ic,* . 'f'       ,
'l ic,*.
        *~j   ,                                                      New Hampshire Yankee November 6, 1989             ,
'f' New Hampshire Yankee
The differences between the Seabrook valve and the tested valves are listed in RAL-7068. The significant difference is the actuator           s size. The Seabrook actuator is 182 smaller than the generic valve       1 actuator because the design differential pressure is 232 lower for       '
*~j November 6, 1989 The differences between the Seabrook valve and the tested valves are listed in RAL-7068.
Seabrook than the generic case. Dimensional factors determining         '
The significant difference is the actuator s
closing forces are virtually identical.                                 l
size.
: 3. Page 14.2-7, Item 10, delete the requirement to demonstrate the ability of the movable incore neutron flux instrumentation to detect control rod misalignment at 50% powar.
The Seabrook actuator is 182 smaller than the generic valve 1
actuator because the design differential pressure is 232 lower for Seabrook than the generic case. Dimensional factors determining closing forces are virtually identical.
l 3.
Page 14.2-7, Item 10, delete the requirement to demonstrate the ability of the movable incore neutron flux instrumentation to detect control rod misalignment at 50% powar.
The basis for the deletion of this test is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for' accurate and sensitive alternative indications has been eliminated.
The basis for the deletion of this test is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for' accurate and sensitive alternative indications has been eliminated.
In addition, the distribution and number of the incore and excore       ,
In addition, the distribution and number of the incore and excore flux instrumentation is identical to all Westinghouse four loop plants since Indian Point 2 and the capability and sensitivity of the excore and incore flux instrumentation has been demonstrated numerous times.
flux instrumentation is identical to all Westinghouse four loop plants since Indian Point 2 and the capability and sensitivity of the excore and incore flux instrumentation has been demonstrated numerous times. Insert A was added to FSAR Section 14.2.7, Item 10 to provide a basisifor exceptions to Regulatory Guide 1.68.
Insert A was added to FSAR Section 14.2.7, Item 10 to provide a basisifor exceptions to Regulatory Guide 1.68.
: 4. Table 14.2-5, Sheet 2. Item 31, correction for a typographical error.
4.
: 5. Table 14.2-5. Sheet 2, Item 37., this test was eliminated in Amendment 58, however, the index was not amended.
Table 14.2-5, Sheet 2. Item 31, correction for a typographical error.
: 6. Table 14.2-5     Sheet 2. Item 35, this test title was incorrectly eliminated from the index.
5.
: 7. Table 14.2-5, Sheet 2, Item 39, change of test title to reflect         ;
Table 14.2-5. Sheet 2, Item 37., this test was eliminated in Amendment 58, however, the index was not amended.
current test procedure title.
6.
: 8. Table 14.2-5. Sheet 3. Item 47, deletion of Main Steam Isolation Valve Closure Test. See paragraph 4.B.2 above.
Table 14.2-5 Sheet 2. Item 35, this test title was incorrectly eliminated from the index.
: 9. Table 14.2-5. Sheet 25, revisions to ST-22, Natural Circulation Test.
7.
Table 14.2-5, Sheet 2, Item 39, change of test title to reflect current test procedure title.
8.
Table 14.2-5. Sheet 3. Item 47, deletion of Main Steam Isolation Valve Closure Test.
See paragraph 4.B.2 above.
9.
Table 14.2-5. Sheet 25, revisions to ST-22, Natural Circulation Test.
The test abstract for ST-22, Natural Circulation Test, has been revised to reflect the following changes in the manner in which this test will be performed.
The test abstract for ST-22, Natural Circulation Test, has been revised to reflect the following changes in the manner in which this test will be performed.
ST-22 will be performed in MODE 3 utilizing decay heat instead of heat generated by a critical reactor at low power. Recent natural circulation testing at Vogtle utilizing decay heat provided sufficient data to confirm natural circulation flow and heat removal capability.
ST-22 will be performed in MODE 3 utilizing decay heat instead of heat generated by a critical reactor at low power. Recent natural circulation testing at Vogtle utilizing decay heat provided sufficient data to confirm natural circulation flow and heat removal capability.
2
2


O,     :
O,
                                                                                            };;
};;
      ^
New Hampshire Yankee
          ,. :                                                        New Hampshire Yankee November 6, 1989
, ^
                  -      The primary system depressurization rate with the pressuriser heaters turned off will not be determined.       Instead, the         i pressurizer heat loss rate has been calculated for Seabrook ..
November 6, 1989 The primary system depressurization rate with the pressuriser heaters turned off will not be determined.
Instead, the i
pressurizer heat loss rate has been calculated for Seabrook..
Station. ' The calculated value is' comparable to the calculated value for Diablo Canyon as discussed below.
Station. ' The calculated value is' comparable to the calculated value for Diablo Canyon as discussed below.
The depressurization rate'of the pressuriser is known to be dependent on ambient heat losses and for Seabrook it was
The depressurization rate'of the pressuriser is known to be dependent on ambient heat losses and for Seabrook it was
                      ' determined by Calculation 4.4.13.F-19 Revision 1 that the pressuriser heat loss rate is 2.7'F/hr. The pressurizer ambient heat loss for a similar plant, Diablo Canyon was calculated'to be approximately (7'F/hr) as described in a final post-test report by the Westinghouse Owners Group. WCAP-11086, dated March 1986.       *
' determined by Calculation 4.4.13.F-19 Revision 1 that the pressuriser heat loss rate is 2.7'F/hr.
                  -      The depressurization rate with auxiliary pressurizer sprays will not be determined. This is not required by RG1.68 Rev. 2 and         ,
The pressurizer ambient heat loss for a similar plant, Diablo Canyon was calculated'to be approximately (7'F/hr) as described in a final post-test report by the Westinghouse Owners Group. WCAP-11086, dated March 1986.
is consistent with natural circulation tests performed en plants     !
The depressurization rate with auxiliary pressurizer sprays will not be determined. This is not required by RG1.68 Rev. 2 and is consistent with natural circulation tests performed en plants similar to'Seabrook. The auxiliary pressurizer sprays will be used to control primary system pressure during the revised test.
similar to'Seabrook. The auxiliary pressurizer sprays will be used to control primary system pressure during the revised test.
4 The effects of variations of charging flow and steam flow on subcooling will not be determined.
4
This is not required by Regulatory Guide 1.68 Rev. 2 and is consistent with natural circulation tests performed on plants similar to Seabrook.
                  -      The effects of variations of charging flow and steam flow on subcooling will not be determined. This is not required by Regulatory Guide 1.68 Rev. 2 and is consistent with natural circulation tests performed on plants similar to Seabrook.
In addition, certain commitments made in response to RAI 640.51 Item i
In addition, certain commitments made in response to RAI 640.51 Item         i 4.t. are effected as follows:                                               ,
4.t. are effected as follows:
                  -      Fixed incore flux detectors will not be utilized in this test because the reactor will remain ouberitical.
Fixed incore flux detectors will not be utilized in this test because the reactor will remain ouberitical.
                  -      Reduced pressure will not be experienced in this test as discussed   i above, however, the subcooling monitor will be utilized and its       ,
Reduced pressure will not be experienced in this test as discussed i
performance verified under the natural circulation conditions of this test.                                                           ,
above, however, the subcooling monitor will be utilized and its performance verified under the natural circulation conditions of this test.
                  -      Fifty percent of the available licensed operators will not be         L witnessing the test. Current Operator reque.lification training includes extensive coverage of natural circulation events in accordance with Emergency Operating Procedures. Data obtained during this test will be used to evaluate simulator modeling.
Fifty percent of the available licensed operators will not be L
: 10. Table 14.2-5, Sheet 42, change of test title to reflect current test procedure title.
witnessing the test. Current Operator reque.lification training includes extensive coverage of natural circulation events in accordance with Emergency Operating Procedures. Data obtained during this test will be used to evaluate simulator modeling.
: 11. Table 14.2-5, Sheet 50, deletion of Main Steam Isolation Valve Closure Test.     See paragraph 4.B.2 above.
10.
Table 14.2-5, Sheet 42, change of test title to reflect current test procedure title.
11.
Table 14.2-5, Sheet 50, deletion of Main Steam Isolation Valve Closure Test.
See paragraph 4.B.2 above.
3
3
                      .                  .                .    .-    -      -.      .-.}}
.-.}}

Latest revision as of 07:24, 31 December 2024

Forwards Revs to Chapter 14 of FSAR Re Power Ascension Test Program
ML19327C067
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/06/1989
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-89140, NUDOCS 8911150199
Download: ML19327C067 (16)


Text

  • .'

a.

.l 3, j. - W J

Y' Q\\

MNew Hampshire Ted C. Feigenbaum

' ', YQ- - - -

Chief Operating Officer

. Senior Vice President and j

1 i

NYN-89140 November 6, 1989

-[

United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

References:

-Facility Operating License NPF-67 Docket No. 50-443

Subject:

NHY Power Ascension Test Pregram, FSAR Chapter 14 Revisions Gentlemen:

New Hampshire Yankee's (NHY) current plans for-power ascension testing necessitate various revisions to Chapter 14 of the Final Safety Analysis-i

' Report (FSAR). : These revisions to FSAR Chapter 14, in the form of annotated i

pages, are enclosed (Enclosure A).

The substantive (non-editorial) FSAR Chapter.14 revisions are summarized as follows:

ST-47 Main Steam Line Isolation Valve Closure Test This test will not be performed.

The objectives of ST-47 are met in l

another test and in typelqualification testing of the Main Steam Isolation Valves (MSIVs) as discussed belcv. The non-performance of

'ST-47 eliminates a deliberate transient on the plant. As indicated previously in FSAR Amendment 48, the dynamic response of the plant to a MSIV closure is bounded by the response of the plant to a turbine trip.

l In ST-38, the unit will be tripped from 100 porcent power, and the plant response will be measured.

s Type / qualification teste performed by Rockwell International on valves 1

similar to the Seabrook MSIVs demonstrate that the Seabrook MSIVs are 4

4 capable of closing under design flow conditions within the required time.

l Ability of Neutton Flux Instrumentation to Detect Control Rod Misalignments q

This test will not be performed.

The Digital Rod Position Indication (DRPI) System provides accurate and sensitive indication of control rod C

position.

The DRPI has been previously tested. Incore flux instru-mentation may be used as an alternative means to detect control rod position.

The Seabrook incore flux instrumentation is identical to instrumentation utilized in all Westinghouse four loop plants since Indian Point 2.

The capability and sensitivity of this instrumentation p

has been demonstrated numerous times.

8911250199 891106 PDR ADOCK 05000443

/k P

PDC New Hampshire Yankee Division of Public Service Company of New Hampshire g

P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474 9521 1

v.

t l

United States Nuclesr Regulatory Commission November 6,.1989 Attention:

Document Control Desk Page 2 ST-22 Natural Circulation Testing This test will be performed in HODE 3 utilizing decay heat to demonstrate natural circulation. The performance of this test using decay heat instead of heat generated by a critical reactor provides more stable plant conditions during testing. Additionally, this test will not include primary system depressurization rate measurements, charging and steam flow variations to determinr. subcooling effects or primary system pressure reductions to verify subcooling monitor performance. The above changes to ST-22 eliminates the potential for esetain transients on the plant.

Enclosure B to this letter provides further discussion and justification for the revisions to the FSAR Chapter 14.

The revisions to the initial test program have been evaluated pursuant to 10CFR50.59. The evaluation determined that the initial test program revisions do not introduce an unreviewed safety question.:

I The enclosed (Enclosure AS FSAR Chapter 14 revisions will be included in the next FSAR amendment.

Should you have any questions.regarding the NHY Power Ascension Test Program. FSAR Chapter 14 Revisions, please contact Mr. Robert E. Sweeney in our.Bethesda Office, at (301) 656-5100.

Very truly yours, b

TedC.Feig[enbaum r

Enclosures l

l l

t s

b 1

e

.i United States Nuclear Regulatory Commission Novembcr 6, 1989 Attention: Document Control Desk Page 3 cci Mr. William T. Russell Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road C

King of Prussia, PA' 19406 Mr. Vjctor Nerses, Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission l

Division of Reactor Projects Washington, DC-20555 l

Mr. Antone C. Cerne NRC Senior Resident Inspector p

i P.O. Box 1149' Seabrook, NH. 03874 l

t l

l' 1

I l

l i

1 i

l l

ci

..c, i

..,.s,

- e f

- 1;<.<>

y l,

New Hampshire Yankee c.

. November 6, 1989

-r e

i I

1.

4 t,

i

(

v.

i

' (

.t

- t l

ENCLOSURE A TO NYN-89140 4

j.

t r ll t

?

6 s

i

' f, i

h 1

t l

l l

\\

l l

l l.

1:( d si v, 7 #1, [ p *, k gM 2 16 2 uenament

!. 9 s.'

FSAR

~ (983

.May Reculatorv Guide 1.11. Re v. O Preoperat tonal Testing o f Redundsat Electric Power Systems to Verify Proper Load Group Asseenments Seaorack Station coaforms with the recommend.ations of Regulatory Guice 1.LI.

J:

Regulatora Guide 1.52. Rev. 2 Destgn, Testing and Maintenance Criteria for Engineered Safety Feature Almosphere Cleanup System Air Filtration and Absorption Units of Light Water Cooled Nuciaar Power Plants A detailed discussion on the degree of conformance to Regulatory Guide 1.52 is found in Section 6.5.1.

Regulatorv Guide 1.68. Rev. 2 Initial Test Programs for Water-Cooled Nuclear Power Plants The initial test program for the Seabrook Station will be conducted in accordance with the intant o f Regulatory Guide 1.68 except for the items specified below:

1.

During the preoperational test program. no practical method exists to vary system voltage to ob: sin maximum and minimum design voltages.

The intent of the requirement to demonstrate that the emergency loads can start and operate with the maximum and minimum design voltage available will be met by testing the emergency loads under plant light load conditions to simulate the maximum practically obtainable voltage and under plant heavy 1 ad conditions to simulate h

the minimum practically obtainable voltage. The results of this testing will be compared to the station "oltage study to verify the adequacy of the analytical model.

( Appendix A, Cection 1.g.2).

4r 2.

During the power ascunsior, testing phase, tests will be scheduled such that the safety of the plant will not be dependent on the performance of an untested system or feature.

Power ascension testing will be performed at power plateaus of ap,roximately 30%,

50%, 75% and 100%.

It is required that testing be performed at 30% rather than 25% because individual system stability is increased at 30% (e.g. feedwater system), this allows comparison steady-state conditions with the design at low power. Westinghouse-supplied plants have historically conducted tests at 30% and, therefore, genetic data is available for review and comparison.

3.

Throughout core loading and precritical tests, utdown margin will be verified by periodic sampling of core coolant and verification that boron concentration is maintained at or above the Technical Specification concentration limit for re fueling conditions.

(.*.ppe nd i x A, Seetion 2.a) 4.

Control rod runback and partial scram featares are not used in the Seabrook Station design and, therefore, will not be tested during power escalation.

(Appendix A, Section 5.j.)

5.

A demonsLration of the capability of systems and components to j~

remove residual heat or decay heat from the Reactor Coolant System will be performed during power ascension testing only if not performed 14.2-6

A.

t VLd%*M" *1/O

./ 5 l SB 1 6, 2 Amendment 5B e

+4 FSAR April 1986 during hot functional or low power tests.

(Appendix A, Section 5.1.)

6.. The failed fuel detection system is not applicable to the Seabrook design and, therefore, will not be tested during power escalacion.

(Appendix A, Section 5.q.)

7.

The integrated control system and the reactor coolant flow control s^

system are not applitable to the Seabrook Station design and there-fore, will not be tested during power escalation.

The Startup and Emergency Feedwater Control Systems and the Steam Pressure Control Systems are only used in the hot shutdown, hot standby or low power operating modes.

These systems can not be tested during power ascension.

(Appendix A, Section 5.s.)

O.

A demonstration of the dynamic response of the plant to a loss of or bypassing 'of a feedwater heater (s) will not be performed.

As shown in Section 15.1.1, the transient resulting from the severe case of feedwater temperature reduction initiated by a most single failure or operator error is similar to, but of a lesser magnitude than the excessive load increase (load swing).

The f

load swing test will be performed at several major plateaus.

4 9.

As shown in Subsection 15.2.3 and 15.2.4, dynamic response of the plant to a MSIV closure is bounded by the response of the plant to the turbine trip event.

Plant response to a turbine trip will be demonstrated durine cerformance of ST-38, unit trin from 100 M po g The ability of the MSIVs to close under steam flow percent will be demonstrated by automatic closure of all main steam line isolation valves at 30 percent power during the performance of Si -4 7.

Apperdix A.

Section 5.m.m.)

s ndt be performed.

10.

The ability of the movable incore neut on flux instrumentation to 1

i detect control rod misalignments will (tte demonstrated at 50'. power) 4 l

M The excore neutron flux instrumentation ts not designed to detect a local condition such as a misaligned RCCA but rather a

[

more global anomalous core condition. The movable incere flux

[

instrumentation is not intended to specifically detect a misaligned y

control rod, but may be able to confirm an RCCA misalignment initially detected by the rod position indication system. The individual

(

rod position indication system is the primary means for detecting I

g RCCA misalignments. Since at 100% power the control rods are y

ersentially withdrawn, individual rod worth is such that the ability h

of the movable incore instrumentation to detect a control rod misalignment is limite_sl./Therefote, data on the movablo incere instrumentatinn characraristics over a range cf control rod insertion will be obtained during a control rod misalignment test at 50% power.J( Appendix A, ~Sec. 5. L ).

11.

Since Units 1 & 2 are essentially identical, the below listed tests, which will be performed on Unit I solely to verify the adequacy of calculational models, will either not be performed or reduced in scope during the Unit 2 inicial startup program.

14.2-7

pc tr i '

F~a?. 'E - 60 '? it /e 6 y. p '

4 #34 i '.

j.. -

' jo7( f t

?

l' f

\\

A a

8, c

The basis for this deletion is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting,a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for accurate and sensitive alternative indications has been essentially eliminated.

In any case, the distribution and number of the incore and execre flux instrumentation has not been

'L changed and is identical to all Westinghouse four loop plants since Indian Point 2.

Since that time, the capability and sensitivity of of the excore and incore flux instrumentation has been demonstrated numarous times.

l 1

i l

i

(

+

U.Tm

,. p k K..

~

4 j

y,;*f,

( ?, - p f, ~.

IT /,. pg #7,g,nt/l O

t i

n SB 1 & 2 Amendment 53 i.

if '

FSAR hpril 1986 1

in l

a L

TABLE !!. 2-5

)

(Sheet 2 of 53)

Index.

Title i,<'

Sheet V

22.

Natural Circulation Test 25 a

23.. Dynamic Automatic Steam Dump Control 26 H.

24 Automatic Reactor Control 27 f 25. Automatic Steam Generator Level Control 28 2 6.- *hermal Power Measurement and Statepoint Data Collection 29 jk, 27.

Startup Adjustments of Reactor Control System 30 7-

-28.

Calibration ~ of Steam and Feedwater Flow Instrumentation 31

29. Core Performance Evatuation 32 i

e 30.

Power Coef ficient Measurement 33 31.

(Deleted in Amendment 34 l

..., (_9 4 xtc4,~ b e u s h U

32.

n.6.

35

...y 33.

Shutdown from Outside the Control P.com 36 34.

Load Swing Test 37

35. (De:h:AJ in ^-- ":::: 57} 4 Ly LN hb b b

38 55

'36., Axial Flux Difference Instrumentation Calibration 39 t

37.. Steam Generator Moistura Carryover Measurement 40 38.

Ur.i t Trip from 100 Percent Power 41

39r 31ackout Te LW O
  1. W44 M 42

!$A 40.

NSSS Acceptance Test 43 41.

Radiation Survey 44 1~

42.

Water Chemistry Control 45 j

l ll' 43.

Process Computer 46 l-4e l,.

I

ft d U$ ' '!? '

.d l'?

  • 3 $f(2 dl '

l -

s-f'

~

SB 1 & 2 Amendment 48

..f FSAR January 1983 TABLE 14.2-5

-(Sheet 3 of 53)

Index Title Sheet

,i

~

4'.

Vibration and'1.oose Parts Monitor 47 4

- 45.

Process and Efflueet Radiation Monitoring System 48 46.

Ventilation System Operability Test 49

.47.

eam Line Isolation Valve Closure Tes (D M 6 50

48. ' Turbine Generator Startup Test a m a s/h o

51 49.

Circulating Water System Thermal-Hydraulic Test 52 e

- 50.c Mova' ble Incore Detector System 53 96

?

s 4

I

\\

f a

4 6

f e-et----*

-,7

[W;,

j g ;'

y. '4. p e, G! [.

O '. N ').p.,g j

E.'

.k'

)

(,.

e I

s..

SB ! 5 :

. Amendment 61

f. '

TSAR Movember 1986 i

t.

TA B t.E II. 2-5

)

(Sheet 25 of $3) 22.

NATURAL CIRCULATION TEST j

objeeeive To' verify the ability of the reactor coolant system to remove heat by means i

of natural circulation.

l Plant Conditions /Prereouisites The plant is tical,hlowpow, del J, Q f gg-[Q M

CdAb h 7 N.

l i:

Test Method t

}

At. hot no-flow conditions the prwssurizer hesters will be turned off and) data will be collected to determine a depressurization rate.

./

- With the plant at (teady state low oweg hpproximately3" the teactor coolant pumps will be tripped. This test will determine the length of l

time necessary to stabilize natural circulation ar.d will demonstrate the

~

teactor coolant flow distribution by obtaini'ng in-core _.hermocouple maps.

O l

Auxiliary spray will be used to partially depressurize -he primary plant, and the depressurization rate will be detetsined. At reduced pressure the effect u

-of changes in charging flow and steam flow on subraalhe will be verified.

Data will be collected during the test to verify simulator modeling.

Acceptance criteria Natural' circulation is established and. maintained as indicated by stable

{

temperature indication.

y t

,4 p

I' O

l

0,I,

f 3 dde FC.L 79 r 06 7 A' /.-

8 c

O 5lg's cil

,+

SB 1 & 2 Amendment 56 c:

PSAR November 1985 i

TABLE 14.2-5 (Sheet 42 of 53)

39. k ATION BLACKOUT TEST 4.05S M 4MSM #dMR 27
Objective To demonstrate starting of emergency diesels and proper sequencing of loads following a main generator trip without an available source of offsite power.

Plant Conditions / Prerequisites The plant is at a stable power level of equal to or greater than 10% power.

Test Method Generator output breakers will be tripped resulting in a reactor trip with no offsite power available. The starting of the emergency diesel generators.

and overall plant response trill be monitored.

The loss of offsite power will be maintained long ennugh for plant systems to stabilize (at least 30 minutes or longer).

Acceptance criteria The diesel generators reach rated voltage and frequency within the limits specified in Technical Specifications 4.8.1.1.2.a.

The Emergency Power l

Sequencers function as described in FSAR Section 8.3.

46 56 l-4

. -. -, - ~

+--

f.r.

ft d \\'# - M '

d /ha-

[' M// w,n T1

e,

4 i

v en,,s

,h 4

53 1 0 ;

Amencment a5 FSAR January 1983

.c TABLE 14.2-5 (Sheet 50 of 53) 47.

MAIN STEAM LINE ISOLATION VALVE Cl.0SURE TEST Objective To demonstrate the ability of each main steam isolation valve (MSIV) to close under steam flow.

j Plant. Conditions /Prerecuisites This test will be initiated from steady state conditions at the 30%. power plateau.

Test Method All MSIV's will be closed simultaneously while the plant response is observed.

Selected plant parameters will be recorded including MSIV response

- times..

Acceptance Criteria MSIV closure times are consistent with the requireme.,s contained in Technical Specification 4.7.1.5.

l 45 l

D6L61&b 10 A H EdD H EUT bS i

i i

i i

i I

l

Q1....

.\\

,:;. i r

a t_<,

.c New Hampshir.; Yankee

. November 6, 1989

?1 b

(

i l

ENCLOSURE B TO NYN-89140

(

b e

4 l

E ; (

U New Hampshire Yankee November 6, 1989 c

e FSAT " action 14.2 has been annotated to reflect revisions to the initial ter' predram and includes a notation in the form of a numbered triangle which correlates to the following numbered basis for each change:

1.

Page 14.2-6, correction of a typographical error.

2.

Page 14.2-7, Item 9, delete the requirement to demonstrate the ability of the MSIV to close under steam flow.

Requirements for stroke testing main steam isolation valves under steam flow conditions were originally established in USNRC Regulatory Guide 1.68. Revision 2, Initial Test Program for Water-Cooled Nuclear Power Plants.

Stroke testing under flow conditions is required at 25Z power and dynamic response testing for the case of closure of all main steam isolation valves is required at 100%

power.

i Acceptable stroke testing of the MSIV's has been demonstrated during hot functional testing in pre-operational test PT-13.

Regulatory l

Guide 1.68 allowed this stroke testing to be performed at less than L

25% power.

I Reflecting the response to RAI-640.49, FSAR Amendment 48 included an I

exception to Regulatory Guide 1.68 stating, ' dynamic response of the plant to a MSIV closure is bounded by the response of the plant to the turbine trip event".

This is tested under ST-38, Unit Trip from 100% Power. It is noted that the MS1V's do not close during ST-38.

l It is the turbine stop valves which close during ST-38, yielding a l

plant dynamic response similar to the closure of the MSIV's at 100%

l power.

l Although not required by Regulatory Guide 1.68, type / qualification l

tests were performed by Rockwell International on similar valves, l

i and demonstrate that the valves are capable of closing under design flow conditions within the required time.

The report which provides the results of these tests is filed at NHY as foreign print FP-23676, " Report RAL 7068 Generic Qualification Report for size 30 x 24 x 30 Figure 1911 (WCC) BGaddPQTY".

RAL 7068 includes a calculation and comparison of maximum stresses between the Seabrook HSIVs and the tested valves, confirming that stresses on the Seabrook valves are less than the stresses on the generic valves.

Isolation capability and response time were demonstrated for higher differential pressure than Seabrook would experience while simultaneously subjected to pipe and earthquake loadings. After demonstrating isolation capability and response times, seat leakage tests were performe:d demonstrating acceptable seating.

1

'l ic,*.

'f' New Hampshire Yankee

  • ~j November 6, 1989 The differences between the Seabrook valve and the tested valves are listed in RAL-7068.

The significant difference is the actuator s

size.

The Seabrook actuator is 182 smaller than the generic valve 1

actuator because the design differential pressure is 232 lower for Seabrook than the generic case. Dimensional factors determining closing forces are virtually identical.

l 3.

Page 14.2-7, Item 10, delete the requirement to demonstrate the ability of the movable incore neutron flux instrumentation to detect control rod misalignment at 50% powar.

The basis for the deletion of this test is that the original requirement was imposed to demonstrate alternative instrumentation capabilities in detecting a misaligned control rod. With the advent of the Digital Rod Position Indication (DRPI) system, the need for' accurate and sensitive alternative indications has been eliminated.

In addition, the distribution and number of the incore and excore flux instrumentation is identical to all Westinghouse four loop plants since Indian Point 2 and the capability and sensitivity of the excore and incore flux instrumentation has been demonstrated numerous times.

Insert A was added to FSAR Section 14.2.7, Item 10 to provide a basisifor exceptions to Regulatory Guide 1.68.

4.

Table 14.2-5, Sheet 2. Item 31, correction for a typographical error.

5.

Table 14.2-5. Sheet 2, Item 37., this test was eliminated in Amendment 58, however, the index was not amended.

6.

Table 14.2-5 Sheet 2. Item 35, this test title was incorrectly eliminated from the index.

7.

Table 14.2-5, Sheet 2, Item 39, change of test title to reflect current test procedure title.

8.

Table 14.2-5. Sheet 3. Item 47, deletion of Main Steam Isolation Valve Closure Test.

See paragraph 4.B.2 above.

9.

Table 14.2-5. Sheet 25, revisions to ST-22, Natural Circulation Test.

The test abstract for ST-22, Natural Circulation Test, has been revised to reflect the following changes in the manner in which this test will be performed.

ST-22 will be performed in MODE 3 utilizing decay heat instead of heat generated by a critical reactor at low power. Recent natural circulation testing at Vogtle utilizing decay heat provided sufficient data to confirm natural circulation flow and heat removal capability.

2

O,

};;

New Hampshire Yankee

, ^

November 6, 1989 The primary system depressurization rate with the pressuriser heaters turned off will not be determined.

Instead, the i

pressurizer heat loss rate has been calculated for Seabrook..

Station. ' The calculated value is' comparable to the calculated value for Diablo Canyon as discussed below.

The depressurization rate'of the pressuriser is known to be dependent on ambient heat losses and for Seabrook it was

' determined by Calculation 4.4.13.F-19 Revision 1 that the pressuriser heat loss rate is 2.7'F/hr.

The pressurizer ambient heat loss for a similar plant, Diablo Canyon was calculated'to be approximately (7'F/hr) as described in a final post-test report by the Westinghouse Owners Group. WCAP-11086, dated March 1986.

The depressurization rate with auxiliary pressurizer sprays will not be determined. This is not required by RG1.68 Rev. 2 and is consistent with natural circulation tests performed en plants similar to'Seabrook. The auxiliary pressurizer sprays will be used to control primary system pressure during the revised test.

4 The effects of variations of charging flow and steam flow on subcooling will not be determined.

This is not required by Regulatory Guide 1.68 Rev. 2 and is consistent with natural circulation tests performed on plants similar to Seabrook.

In addition, certain commitments made in response to RAI 640.51 Item i

4.t. are effected as follows:

Fixed incore flux detectors will not be utilized in this test because the reactor will remain ouberitical.

Reduced pressure will not be experienced in this test as discussed i

above, however, the subcooling monitor will be utilized and its performance verified under the natural circulation conditions of this test.

Fifty percent of the available licensed operators will not be L

witnessing the test. Current Operator reque.lification training includes extensive coverage of natural circulation events in accordance with Emergency Operating Procedures. Data obtained during this test will be used to evaluate simulator modeling.

10.

Table 14.2-5, Sheet 42, change of test title to reflect current test procedure title.

11.

Table 14.2-5, Sheet 50, deletion of Main Steam Isolation Valve Closure Test.

See paragraph 4.B.2 above.

3

.-.