ML19347A898: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:h*
{{#Wiki_filter:h*
C
C
{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Docket No. 50-293 License DPR-35
{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Docket No. 50-293 License DPR-35


==Subject:==
==Subject:==
Line 25: Line 26:


==Dear Sir:==
==Dear Sir:==
In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.
In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.
This revision changes information on the Major Safety Related Maintenance Sheet.
This revision changes information on the Major Safety Related Maintenance Sheet.
The "cause" section of the battery charger and the "D"           Relief Valve were in-advertently reversed.
The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed.
Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 COh 5
Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C.
                                                                                      //   ;
20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue COh King of Prussia, PA 19406 5
1 1
//
1 1
1 "UO9300$9 o}}
1 "UO9300$9       o}}

Latest revision as of 06:41, 24 December 2024

Forwards Revision to Monthly Operating Rept for Aug 1980
ML19347A898
Person / Time
Site: Pilgrim
Issue date: 09/23/1980
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19347A899 List:
References
80-232, NUDOCS 8009300500
Download: ML19347A898 (1)


Text

h*

C

{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C.

20555 Docket No. 50-293 License DPR-35

Subject:

August, 1980 Monthly Report (REVISED)

Dear Sir:

In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.

This revision changes information on the Major Safety Related Maintenance Sheet.

The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed.

Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C.

20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue COh King of Prussia, PA 19406 5

//

1 "UO9300$9 o