ML19347A898: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
{{#Wiki_filter:h* | {{#Wiki_filter:h* | ||
C | C | ||
{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Docket No. 50-293 License DPR-35 | { gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C. | ||
20555 Docket No. 50-293 License DPR-35 | |||
==Subject:== | ==Subject:== | ||
| Line 25: | Line 26: | ||
==Dear Sir:== | ==Dear Sir:== | ||
In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning. | In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning. | ||
This revision changes information on the Major Safety Related Maintenance Sheet. | This revision changes information on the Major Safety Related Maintenance Sheet. | ||
The "cause" section of the battery charger and the "D" | The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed. | ||
Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 | Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C. | ||
20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue COh King of Prussia, PA 19406 5 | |||
// | |||
1 "UO9300$9 o}} | |||
1 "UO9300$9 | |||
Latest revision as of 06:41, 24 December 2024
| ML19347A898 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/23/1980 |
| From: | Machon R BOSTON EDISON CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19347A899 | List: |
| References | |
| 80-232, NUDOCS 8009300500 | |
| Download: ML19347A898 (1) | |
Text
h*
C
{ gg(){} crapaw P!LGRIM NUCLtAR PCwcR start N A FC **1 RCCKY NiwL R C AG ALYMCUTd. MA33 AC *w 3rTT3 C 33 S O September 23, 1980 BECo Ltr. #80-232 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Docket No. 50-293 License DPR-35
Subject:
August, 1980 Monthly Report (REVISED)
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a revised copy of the Operational Status Sumary for Pilgrim Nuclear Power Station is attached for your infor=acion and planning.
This revision changes information on the Major Safety Related Maintenance Sheet.
The "cause" section of the battery charger and the "D" Relief Valve were in-advertently reversed.
Respectfully submitted, NJ R. D. Machon Nuclear Operations Manager Pilgrim Station GGW:ep pection and Enforcement Office of Nuclear Regulatory Comission U. S. Nuclear Regulatory Comission Washington, D.C.
20555 Director of Region I Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 631 Park Avenue COh King of Prussia, PA 19406 5
//
1 "UO9300$9 o