ML20003A385: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~ | {{#Wiki_filter:7 | ||
~ | |||
~ | |||
0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO. 50-346 DATE | 0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO. | ||
OPERATING STATUS | 50-346 DATE December 8, 1980 COMPLETED BY Bilal Sarsour TELEPHONE A14-754-5000, Ext. | ||
: 1. Unit Name: | OPERATING STATUS Davis-Besse Unit 1 Notes | ||
: 2. Reporting Period: | : 1. Unit Name: | ||
: 3. Licensed Thermal Power (MWt): | : 2. Reporting Period: | ||
: 4. Nameplate Rating (Gross MWe): | November, 1980 | ||
: 5. Design Electrical Rating (Net MWe): | : 3. Licensed Thermal Power (MWt): | ||
: 6. Maximum Dependable Capacity (Gross MWe): | 2772 925 | ||
: 7. Maximum Dependable Capacity (Net MWe): | : 4. Nameplate Rating (Gross MWe): | ||
: 5. Design Electrical Rating (Net MWe): | |||
906 934 | |||
: 6. Maximum Dependable Capacity (Gross MWe): | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
890 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
: 9. Power Level To which Restricted,If Any (Net MWe): | : 9. Power Level To which Restricted,If Any (Net MWe): | ||
: 10. Reasons For Restrictions.If Any: | : 10. Reasons For Restrictions.If Any: | ||
This Month | This Month Yr to.Date Cumulative | ||
: 11. Hours in Reporting Period | : 11. Hours in Reporting Period 720 8,040 28,565 | ||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 684.7 2,762.7 13,726.7 1l | ||
: 13. Reactor Reserve Shutdown flours | : 13. Reactor Reserve Shutdown flours | ||
: 15. Unit Reserve Shutdown Hours | '6.3 6.3 2,882.1 | ||
: 16. Gruss Thermal Energy Generated (MWH) | : 14. Hours Generator On Line 530.8 2,539.5 12,413.8 | ||
: 17. Gross Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Hours 3.42 3.42 1,731.42 | ||
1,922,601 | : 16. Gruss Thermal Energy Generated (MWH) 1.012.290 5.699.595 25,899,102 | ||
: 18. Net Electrical Energy Generated (MWH) | : 17. Gross Electrical Energy Generated (MWH) 339.042 1,922,601 8,646,11T | ||
: 19. Unit Service Factor | : 18. Net Electrical Energy Generated (MWH) 309.064 1,792,851 7,963,429 | ||
: 20. Unit Availability Factor | : 19. Unit Service Factor 73.7 31.6 44.1 | ||
: 21. Unii Capacity Factor iUsing MDC Net) | : 20. Unit Availability Factor 74.2 31.6-50.6 | ||
: 22. Unit Capacity Factor IUsing DER Net) | : 21. Unii Capacity Factor iUsing MDC Net) 48.2 25.1 33.3 | ||
: 23. Unit Forced Outage Rate | : 22. Unit Capacity Factor IUsing DER Net) 47.4 24.6 32.7 | ||
: 23. Unit Forced Outage Rate 10.7 13.6 25.0 y | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): | : 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each): | ||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | ||
: | : 26. Units in Test Status IPrior to Commercial Operation): | ||
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10 | |||
..}} | |||
Latest revision as of 15:03, 23 December 2024
| ML20003A385 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/22/1981 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20003A329 | List: |
| References | |
| NUDOCS 8102030590 | |
| Download: ML20003A385 (1) | |
Text
7
~
~
0 Rev. 1 - 1/22/81 OPERATLNG DATA REPORT DOCKET NO.
50-346 DATE December 8, 1980 COMPLETED BY Bilal Sarsour TELEPHONE A14-754-5000, Ext.
OPERATING STATUS Davis-Besse Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period:
November, 1980
- 3. Licensed Thermal Power (MWt):
2772 925
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
906 934
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
890
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr to.Date Cumulative
- 11. Hours in Reporting Period 720 8,040 28,565
- 12. Number Of Hours Reactor Was Critical 684.7 2,762.7 13,726.7 1l
- 13. Reactor Reserve Shutdown flours
'6.3 6.3 2,882.1
- 14. Hours Generator On Line 530.8 2,539.5 12,413.8
- 15. Unit Reserve Shutdown Hours 3.42 3.42 1,731.42
- 16. Gruss Thermal Energy Generated (MWH) 1.012.290 5.699.595 25,899,102
- 17. Gross Electrical Energy Generated (MWH) 339.042 1,922,601 8,646,11T
- 18. Net Electrical Energy Generated (MWH) 309.064 1,792,851 7,963,429
- 19. Unit Service Factor 73.7 31.6 44.1
- 20. Unit Availability Factor 74.2 31.6-50.6
- 21. Unii Capacity Factor iUsing MDC Net) 48.2 25.1 33.3
- 22. Unit Capacity Factor IUsing DER Net) 47.4 24.6 32.7
- 23. Unit Forced Outage Rate 10.7 13.6 25.0 y
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 810203o5'10
..