| number = ML20003A707
| number = ML20003A707
| issue date = 10/28/1980
| issue date = 10/28/1980
| title = Responds to NRC 801003 Ltr Re Violations Noted in IE Insp Rept 50-333/80-12.Corrective Actions:Operating Procedure Manuals Reviewed & Review Will Be Continued
| title = Responds to NRC Re Violations Noted in IE Insp Rept 50-333/80-12.Corrective Actions:Operating Procedure Manuals Reviewed & Review Will Be Continued
| author name = Pasternak R
| author name = Pasternak R
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = JAFP-80-838, NUDOCS 8102050476
| document report number = JAFP-80-838, NUDOCS 8102050476
| title reference date = 10-03-1980
| package number = ML20003A706
| package number = ML20003A706
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 18: Line 19:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
i POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FIT 2 patrick NUCLEAR POWER PLANT RAYMOND J. PAsTERNAK
i POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FIT 2 patrick NUCLEAR POWER PLANT RAYMOND J. PAsTERNAK P.O. Box 41 Resident Meneger Lycoming, N York 13093 315-342-3840 October 28, 1980 SERIAL: JAFP 80-838 Boyce H. Griar, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA.
                                                      -                                      P.O. Box 41 Resident Meneger                                                             Lycoming, N   York 13093 315-342-3840 October 28, 1980 SERIAL: JAFP 80-838 Boyce H. Griar, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA. 19406
19406


==REFERENCE:==
==REFERENCE:==
DOCKET N0. 50-333     I&E INSPECTION N0. 80-12
DOCKET N0. 50-333 I&E INSPECTION N0. 80-12


==Dear Mr. Grier:==
==Dear Mr. Grier:==
 
With reference to the inspection conductad by W. Baunack and J. Linville of your office commencing July 1,1980 and ending August 29, 1980 at the James A. FitzPatrick Nuclear Power Plant, and in accordance with the provisions of Section 2.201 of Part II of Title 10 of the Code of Federal Regulations, we are submitting our response to Appendix A Notice of Violation transmitted by {{letter dated|date=October 3, 1980|text=letter dated October 3, 1980}} as received Ey the undersigned on October 9, 1980.
With reference to the inspection conductad by W. Baunack and J. Linville of your office commencing July 1,1980 and ending August 29, 1980 at the James A. FitzPatrick Nuclear Power Plant, and in accordance with the provisions of Section 2.201 of Part II of Title 10 of the Code of Federal Regulations, we are submitting our response to Appendix A Notice of Violation transmitted by letter dated October 3, 1980 as received Ey the undersigned on October 9, 1980.
APPENDIX A NOTICE OF VIOLATION Based on the results of an NRC inspection conducted on July 1-August 29, 1980, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Facility License No. DPR-59, as indicated below. This item is a deficiency.
APPENDIX A NOTICE OF VIOLATION
;                Based on the results of an NRC inspection conducted on July 1-August 29, 1980, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Facility License No. DPR-59, as
!                  indicated below. This item is a deficiency.
l Technical Specification 6.8(A), states in part, " Written procedures and administrative policies shall be established, implemented and maintained..".
l Technical Specification 6.8(A), states in part, " Written procedures and administrative policies shall be established, implemented and maintained..".
Administrative Procedure No.1.4, Control of Plant Procedures, Revision 3, November 1979 establishes the management controls for distribution of pro-cedures. AP 1.4 states in part under the following paragraphs:
Administrative Procedure No.1.4, Control of Plant Procedures, Revision 3, November 1979 establishes the management controls for distribution of pro-cedures. AP 1.4 states in part under the following paragraphs:
7.6.1, "The department superintendent shall insure that procedures and revisions are distributed to the authorized manual holders...".
7.6.1, "The department superintendent shall insure that procedures and revisions are distributed to the authorized manual holders...".
7.6.2, " Current, effective copies of the following procedures shall be maintained in the control room.
7.6.2, " Current, effective copies of the following procedures shall be maintained in the control room.
: a. Operating Procedures."
a.
8102050 g                                                                   .
Operating Procedures."
8102050 g


t . .  .
t Boyce H. Grier, Director Octob:r 28, 1980 United States Nuclear Regulatory Comission JAFP 80-838
Boyce H. Grier, Director                                   Octob:r 28, 1980 United States Nuclear Regulatory Comission                 JAFP 80-838


==Subject:==
==Subject:==
Docket No. 50-333 I&E Inspection No. 80-12         Page                       --    7.8, "An index shall be maintained to provide a guide for procedures authorized for use at the plant."
Docket No. 50-333 I&E Inspection No. 80-12 Page 7.8, "An index shall be maintained to provide a guide for procedures authorized for use at the plant."
Contrary to the above, a review of control room and shif t supervisors' copies of controlled procedures performed on August 9, and 10,1980 revealed the following:
Contrary to the above, a review of control room and shif t supervisors' copies of controlled procedures performed on August 9, and 10,1980 revealed the following:
                      --    Form II, Final Prestart Check-off, a part of procedure F-0P-65, Startup and Shutdown Procedure in use during the preparation for startup was Revision 3 when a later Revision 4 had been issued.
Form II, Final Prestart Check-off, a part of procedure F-0P-65, Startup and Shutdown Procedure in use during the preparation for startup was Revision 3 when a later Revision 4 had been issued.
The shift supervisors' operating procedures manual contained a superseded revision of Procedure F-0P-18, Reactor Protection System.
The shift supervisors' operating procedures manual contained a superseded revision of Procedure F-0P-18, Reactor Protection System.
                      --    The shift supervisors' operating procedures manual contained an outdated index to operating procedures.
The shift supervisors' operating procedures manual contained an outdated index to operating procedures.
                      --    Procedure F-0P-25, Control Rod Drive Hydraulic System, was missing from the shif t supervisors' operating procedures manual.
Procedure F-0P-25, Control Rod Drive Hydraulic System, was missing from the shif t supervisors' operating procedures manual.
                      --    The shift supervisors' procedures manual copy of Procedure F-0P-13, Residual Heat Removal System, had been superseded by three revisions.
The shift supervisors' procedures manual copy of Procedure F-0P-13, Residual Heat Removal System, had been superseded by three revisions.
                      --    Both the control room and shif t supervisors' operating procedures manual contained superseded copies of Procedure F-0P-30, Fuel Pool Cooling and Clean-up System.
Both the control room and shif t supervisors' operating procedures manual contained superseded copies of Procedure F-0P-30, Fuel Pool Cooling and Clean-up System.
RESPONSE TO VIOLATION The Operations Department reviewed the shif t supervisors' and control room operating procedures manuals following the inspection to correct the deficiencies noted above and verified that other procedures in both sets of manuals were up to date. This action resulted in the FitzPatrick Plant being in full compliance.
RESPONSE TO VIOLATION The Operations Department reviewed the shif t supervisors' and control room operating procedures manuals following the inspection to correct the deficiencies noted above and verified that other procedures in both sets of manuals were up to date. This action resulted in the FitzPatrick Plant being in full compliance.
l               To prevent recurrence in the future, the Operatirns Department-Superintendent, or his designated alternate, will review the procedure manuals noted, as well
l To prevent recurrence in the future, the Operatirns Department-Superintendent, or his designated alternate, will review the procedure manuals noted, as well as other procedure manuals of importance, on a quarterly basis. This quarterly review of the manual contents will be continued until the results indicate that the interval between reviews may be increased.
!                as other procedure manuals of importance, on a quarterly basis. This quarterly review of the manual contents will be continued until the results indicate that the interval between reviews may be increased.
Very truly yours, M b JW RJP:VC:brp RAYM0ND J. PASTERNAK CC: George T. Berry, PASNY, NY0 RESIDENT MANAGER-G. M. Wilverding, PASNY, NY0 J. P. Bayne, PASNY, NY0 M. C. Cosgrove, PASNY, JAF D. E. Tall, PASNY, JAF R. J. Converse, PASNY, JAF Document Control Center i.}}
Very truly yours, M b           JW RJP:VC:brp                                           RAYM0ND J. PASTERNAK CC: George T. Berry, PASNY, NY0                       RESIDENT MANAGER-G. M. Wilverding, PASNY, NY0 J. P. Bayne, PASNY, NY0 M. C. Cosgrove, PASNY, JAF D. E. Tall, PASNY, JAF R. J. Converse, PASNY, JAF Document Control Center i.}}

Latest revision as of 14:58, 23 December 2024

Responds to NRC Re Violations Noted in IE Insp Rept 50-333/80-12.Corrective Actions:Operating Procedure Manuals Reviewed & Review Will Be Continued
ML20003A707
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/28/1980
From: Pasternak R
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003A706 List:
References
JAFP-80-838, NUDOCS 8102050476
Download: ML20003A707 (2)


Text

i POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FIT 2 patrick NUCLEAR POWER PLANT RAYMOND J. PAsTERNAK P.O. Box 41 Resident Meneger Lycoming, N York 13093 315-342-3840 October 28, 1980 SERIAL: JAFP 80-838 Boyce H. Griar, Director United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA.

19406

REFERENCE:

DOCKET N0. 50-333 I&E INSPECTION N0. 80-12

Dear Mr. Grier:

With reference to the inspection conductad by W. Baunack and J. Linville of your office commencing July 1,1980 and ending August 29, 1980 at the James A. FitzPatrick Nuclear Power Plant, and in accordance with the provisions of Section 2.201 of Part II of Title 10 of the Code of Federal Regulations, we are submitting our response to Appendix A Notice of Violation transmitted by letter dated October 3, 1980 as received Ey the undersigned on October 9, 1980.

APPENDIX A NOTICE OF VIOLATION Based on the results of an NRC inspection conducted on July 1-August 29, 1980, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Facility License No. DPR-59, as indicated below. This item is a deficiency.

l Technical Specification 6.8(A), states in part, " Written procedures and administrative policies shall be established, implemented and maintained..".

Administrative Procedure No.1.4, Control of Plant Procedures, Revision 3, November 1979 establishes the management controls for distribution of pro-cedures. AP 1.4 states in part under the following paragraphs:

7.6.1, "The department superintendent shall insure that procedures and revisions are distributed to the authorized manual holders...".

7.6.2, " Current, effective copies of the following procedures shall be maintained in the control room.

a.

Operating Procedures."

8102050 g

t Boyce H. Grier, Director Octob:r 28, 1980 United States Nuclear Regulatory Comission JAFP 80-838

Subject:

Docket No. 50-333 I&E Inspection No. 80-12 Page 7.8, "An index shall be maintained to provide a guide for procedures authorized for use at the plant."

Contrary to the above, a review of control room and shif t supervisors' copies of controlled procedures performed on August 9, and 10,1980 revealed the following:

Form II, Final Prestart Check-off, a part of procedure F-0P-65, Startup and Shutdown Procedure in use during the preparation for startup was Revision 3 when a later Revision 4 had been issued.

The shift supervisors' operating procedures manual contained a superseded revision of Procedure F-0P-18, Reactor Protection System.

The shift supervisors' operating procedures manual contained an outdated index to operating procedures.

Procedure F-0P-25, Control Rod Drive Hydraulic System, was missing from the shif t supervisors' operating procedures manual.

The shift supervisors' procedures manual copy of Procedure F-0P-13, Residual Heat Removal System, had been superseded by three revisions.

Both the control room and shif t supervisors' operating procedures manual contained superseded copies of Procedure F-0P-30, Fuel Pool Cooling and Clean-up System.

RESPONSE TO VIOLATION The Operations Department reviewed the shif t supervisors' and control room operating procedures manuals following the inspection to correct the deficiencies noted above and verified that other procedures in both sets of manuals were up to date. This action resulted in the FitzPatrick Plant being in full compliance.

l To prevent recurrence in the future, the Operatirns Department-Superintendent, or his designated alternate, will review the procedure manuals noted, as well as other procedure manuals of importance, on a quarterly basis. This quarterly review of the manual contents will be continued until the results indicate that the interval between reviews may be increased.

Very truly yours, M b JW RJP:VC:brp RAYM0ND J. PASTERNAK CC: George T. Berry, PASNY, NY0 RESIDENT MANAGER-G. M. Wilverding, PASNY, NY0 J. P. Bayne, PASNY, NY0 M. C. Cosgrove, PASNY, JAF D. E. Tall, PASNY, JAF R. J. Converse, PASNY, JAF Document Control Center i.