Attachment 1 SERI shall complete the following requirements on the schedule noted below:
9 -
Emeroency Response Facilities (Generic letter 82-33. NUREG 0737                       5 5uDDlement 1. 55ER #5)
NOVEMBER 1,1984 SERI shall complete the following requirements on the schedule noted below:
SERI shall implement the specific items below, in the manner described in             !'
Emeroency Response Facilities (Generic letter 82-33. NUREG 0737 5
  +
5uDDlement 1. 55ER #5)
MP&L letter (AECM-83/0232) dat'ed April 15, 1983, as modified in Mr&L letter (AECM-83/0446) dated August 22, 1983, no later than the following               i specified dates:                                                                       '
SERI shall implement the specific items below, in the manner described in MP&L letter (AECM-83/0232) dat'ed April 15, 1983, as modified in Mr&L
+
letter (AECM-83/0446) dated August 22, 1983, no later than the following i
specified dates:
(a) Safety Parameter Display System (SPDS)
(a) Safety Parameter Display System (SPDS)
(1) Submit a safety analysis and implementation         July 1985 plan to the NRC (2) SPDS fully operational and operator trained         Prior to startup         j following first         ;
(1) Submit a safety analysis and implementation July 1985 plan to the NRC (2) SPDS fully operational and operator trained Prior to startup j
refueling outage,         i (b) Detailed Control Room Design Review (DCROR)                                       I (1) Submit a program plan to the NRC                   December 1984           !
following first refueling outage, i
q (2) Submit a summary report to the NRC including       July 1986 a proposed schedule for implementation 4
(b) Detailed Control Room Design Review (DCROR)
(c) Regulatory Guide 1.97 - Application to Emergency Response Facilities (1) Submit a report to the NRC describing how the       February 1985             i requirements of Supplement I to NUREG-0737                                   ,
I (1) Submit a program plan to the NRC December 1984
have been or will be met.                                                     l (2) Implement (installation or upgrade)                 Prior to startup.
!q (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation (c) Regulatory Guide 1.97 - Application to Emergency Response Facilities 4
requirements of R.G. 1.97 with exception         following first             1 of flux sonitoring and coolant level monitoring, refueling outage.     -!
(1) Submit a report to the NRC describing how the February 1985 i
(3) laplement(installationorupgrade)                     Prior'to startup requirements of R.G. 1.97 for coolant level       following second monitoring,                                       refueling outage.
requirements of Supplement I to NUREG-0737 have been or will be met.
(4) Implement (installation or upgrade)                 Prior to startup_     ,l requirements of R.G. 1.97 for flux monitoring,   following m... -        1 refueling outa e
(2) Implement (installation or upgrade)
                                                                                                    ~
Prior to startup.
j (d) Upgrade Emergency Operating Procedures (EOP's) g.
requirements of R.G. 1.97 with exception following first
(1) Submit a Procedures Generation Package to the       April 1985 l                                   NRC.
.1 of flux sonitoring and coolant level monitoring, refueling outage.
hamat * "             i
(3) laplement(installationorupgrade)
              ;gg2273gggtegggj6 P
Prior'to startup requirements of R.G. 1.97 for coolant level following second monitoring, refueling outage.
h l
(4) Implement (installation or upgrade)
  .}}
Prior to startup_
,l requirements of R.G. 1.97 for flux monitoring, following m...
1 refueling outa e j
~
(d) Upgrade Emergency Operating Procedures (EOP's) g.
(1) Submit a Procedures Generation Package to the April 1985 l
NRC.
;gg2273gggtegggj6 h hamat * "
i P
.}}

Latest revision as of 03:35, 23 December 2024

Proposed Tech Specs Re Emergency Response Facilities,Per Generic Ltr 82-33,Suppl 1 to NUREG-0737 & Reg Guide 1.97
ML20006F319
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/16/1990
From:
SYSTEM ENERGY RESOURCES, INC.
To:
Shared Package
ML20006F315 List:
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 9002270386
Download: ML20006F319 (1)


Text

'

18

-h O,*

9 -

NOVEMBER 1,1984 SERI shall complete the following requirements on the schedule noted below:

Emeroency Response Facilities (Generic letter 82-33. NUREG 0737 5

5uDDlement 1. 55ER #5)

SERI shall implement the specific items below, in the manner described in MP&L letter (AECM-83/0232) dat'ed April 15, 1983, as modified in Mr&L

+

letter (AECM-83/0446) dated August 22, 1983, no later than the following i

specified dates:

(a) Safety Parameter Display System (SPDS)

(1) Submit a safety analysis and implementation July 1985 plan to the NRC (2) SPDS fully operational and operator trained Prior to startup j

following first refueling outage, i

(b) Detailed Control Room Design Review (DCROR)

I (1) Submit a program plan to the NRC December 1984

!q (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation (c) Regulatory Guide 1.97 - Application to Emergency Response Facilities 4

(1) Submit a report to the NRC describing how the February 1985 i

requirements of Supplement I to NUREG-0737 have been or will be met.

(2) Implement (installation or upgrade)

Prior to startup.

requirements of R.G. 1.97 with exception following first

.1 of flux sonitoring and coolant level monitoring, refueling outage.

(3) laplement(installationorupgrade)

Prior'to startup requirements of R.G. 1.97 for coolant level following second monitoring, refueling outage.

(4) Implement (installation or upgrade)

Prior to startup_

,l requirements of R.G. 1.97 for flux monitoring, following m...

1 refueling outa e j

~

(d) Upgrade Emergency Operating Procedures (EOP's) g.

(1) Submit a Procedures Generation Package to the April 1985 l

NRC.

gg2273gggtegggj6 h hamat * "

i P

.