TENNESSEE VALLEY AUTHORITY CHATTANOOG A, TENNESSd of f | |||
400 Chestnut Street Tower II "vfTFr1'h' 88 : 01 | 400 Chestnut Street Tower II "vfTFr1'h' 88 : 01 BLRD-50-438/82-70 4 | ||
BLRD-50-438/82-70 BLRD-50-439/82-64 U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Administratoc 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 | BLRD-50-439/82-64 U.S. Nuclear Regulatory Commission Region II Attn: | ||
Mr. James P. O'Reilly, Regional Administratoc 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - INSTALLATION OF MISCELLANEOUS STRUCTURAL STEEL - BLRD-50-438/82-70 BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on October 8, 1982 in accordance with 10 CFR 50.55(e) as Construction QA Audit BN-C-82-04, Deficiency #2. | |||
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - INSTALLATION OF MISCELLANEOUS STRUCTURAL STEEL - BLRD-50-438/82-70 BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on October 8, 1982 in accordance with 10 CFR 50.55(e) as Construction QA Audit BN-C-82-04, Deficiency #2. Enclosed is our first interim report. We expect to submit our next report by February 21, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at 'TS 858-2688. | Enclosed is our first interim report. We expect to submit our next report by February 21, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at 'TS 858-2688. | ||
Very truly yours, TENNESSEE VALLEY AUTHORITY s | Very truly yours, TENNESSEE VALLEY AUTHORITY s | ||
L. M. Mills, Manager Nuclear Licensing Enclosure oc: Mr. Richard C. DeYoung, Director (Enclosure) | L. M. Mills, Manager Nuclear Licensing Enclosure oc: | ||
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ggt'lCDD | Mr. Richard C. DeYoung, Director (Enclosure) | ||
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. | |||
8211100421 821105 PDR ADOCK 05000438 S | 20555 ggt'lCDD | ||
An Equal Opportunity Employer | / | ||
f& | |||
8211100421 821105 PDR ADOCK 05000438 S | |||
pop An Equal Opportunity Employer | |||
J MGMME BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 INSTALLATION OF MISCELLANEGUS STRUCTURAL STEEL | J MGMME BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 INSTALLATION OF MISCELLANEGUS STRUCTURAL STEEL l | ||
CONSTRUCTION QA AUDIT BN-C-82-04, DEFICIENCY #2 BLRD-50-438/82-70, BLRD-50-439/82-64 j | |||
10 CFR 50.55(e) | 10 CFR 50.55(e) | ||
FIRST INTERIM PSPORT i | FIRST INTERIM PSPORT i | ||
Description of Deficiency The subject deficiency deals with the inadequate fabrication / installation of miscellaneous structural steel. The examples cited in the audit are typical of work performed in earlier stages of the project. These deficiencies have come to light based on recent QC inspection of these installations. Earlier QC inspections were not performed because the | Description of Deficiency The subject deficiency deals with the inadequate fabrication / installation of miscellaneous structural steel. The examples cited in the audit are typical of work performed in earlier stages of the project. These deficiencies have come to light based on recent QC inspection of these installations. Earlier QC inspections were not performed because the installations were not complete. During the period of time that most of l | ||
this structural steel was incorrectly fabricated / installed, indications are that appropriate procedures were not followed in obtaining TVA's Division of Engineering Design (EN DES) approval to deviate from the design drawings. Several rehsons could be cited for the causes of this inadequate fabrication / installation. These include: | |||
1 | 1 1. | ||
Lack of craft training emphasizing fabrication / installation in accordance with approved drawings. | |||
2. | |||
Lack of craft training emphasizing appropriate steps to be taken when deviations from design drawings are required. | |||
i It should also be noted that the majority of the miscellaneous steel has not been inspected and approved by QC inspectors. All of the cited j | 3. | ||
Lack of commitment for a quality fabrication / installation. | |||
Interim Progress Several specific items have changed within approximately the past | 4. | ||
three years to minimize future occurrences of this problem: | Lack of follow-through by the QC inspectors (field engineer) to coordinate necessary changes with EN DES after discussion of problems with the fabricating / installing craft. | ||
l | i It should also be noted that the majority of the miscellaneous steel has not been inspected and approved by QC inspectors. All of the cited j | ||
implemented. | examples were documented by QCIRs that QC inspectors initiated after finding the deficiency during their inspection. | ||
l 1 | Interim Progress Several specific items have changed within approximately the past three years to minimize future occurrences of this problem: | ||
3 | i l | ||
1. | |||
An extensive craft training program has been developed and l | |||
implemented. | |||
l 1 | |||
2. | |||
The field engineering section of the Office and Civil Engineering Unit (0&CEU) has been separated from the QC section. | |||
i 3 | |||
Greater emphasis in following quality control procedures and approved design documents has been placed on Craft and O&CEU personnel. | |||
l | l | ||
~ | |||
~ | |||
Page 2 In order to correct the existing problems, the following program has been initiated: | Page 2 In order to correct the existing problems, the following program has been initiated: | ||
1. | |||
The Civil Engineering Supervisor and the Ironworker's Superintendent are jointly identifying areas of the plant in order to emphasize completion of all miscellaneous steel in these areas within a specific time frame. This work will include identification by O&CEU of all miscellaneous steel in the area to be worked. | |||
3 | 2. | ||
Ironworker personnel will review / work / rework these features to ensure that they are installed per the design drawings. | |||
3 Inspection of these features by QC personnel will follow and all deficiencies will be documented. | |||
4. | |||
A trend analysis is being maintained by O&CEU to keep track of possible trends adverse to quality. | |||
m. | |||
_ _ _.}} | |||
Latest revision as of 21:01, 20 December 2024
| ML20027D943 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 11/05/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8211100421 | |
| Download: ML20027D943 (3) | |
Text
TENNESSEE VALLEY AUTHORITY CHATTANOOG A, TENNESSd of f
400 Chestnut Street Tower II "vfTFr1'h' 88 : 01 BLRD-50-438/82-70 4
BLRD-50-439/82-64 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administratoc 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - INSTALLATION OF MISCELLANEOUS STRUCTURAL STEEL - BLRD-50-438/82-70 BLRD-50-439/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on October 8, 1982 in accordance with 10 CFR 50.55(e) as Construction QA Audit BN-C-82-04, Deficiency #2.
Enclosed is our first interim report. We expect to submit our next report by February 21, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at 'TS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY s
L. M. Mills, Manager Nuclear Licensing Enclosure oc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ggt'lCDD
/
f&
8211100421 821105 PDR ADOCK 05000438 S
pop An Equal Opportunity Employer
J MGMME BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 INSTALLATION OF MISCELLANEGUS STRUCTURAL STEEL l
CONSTRUCTION QA AUDIT BN-C-82-04, DEFICIENCY #2 BLRD-50-438/82-70, BLRD-50-439/82-64 j
FIRST INTERIM PSPORT i
Description of Deficiency The subject deficiency deals with the inadequate fabrication / installation of miscellaneous structural steel. The examples cited in the audit are typical of work performed in earlier stages of the project. These deficiencies have come to light based on recent QC inspection of these installations. Earlier QC inspections were not performed because the installations were not complete. During the period of time that most of l
this structural steel was incorrectly fabricated / installed, indications are that appropriate procedures were not followed in obtaining TVA's Division of Engineering Design (EN DES) approval to deviate from the design drawings. Several rehsons could be cited for the causes of this inadequate fabrication / installation. These include:
1 1.
Lack of craft training emphasizing fabrication / installation in accordance with approved drawings.
2.
Lack of craft training emphasizing appropriate steps to be taken when deviations from design drawings are required.
3.
Lack of commitment for a quality fabrication / installation.
4.
Lack of follow-through by the QC inspectors (field engineer) to coordinate necessary changes with EN DES after discussion of problems with the fabricating / installing craft.
i It should also be noted that the majority of the miscellaneous steel has not been inspected and approved by QC inspectors. All of the cited j
examples were documented by QCIRs that QC inspectors initiated after finding the deficiency during their inspection.
Interim Progress Several specific items have changed within approximately the past three years to minimize future occurrences of this problem:
i l
1.
An extensive craft training program has been developed and l
implemented.
l 1
2.
The field engineering section of the Office and Civil Engineering Unit (0&CEU) has been separated from the QC section.
i 3
Greater emphasis in following quality control procedures and approved design documents has been placed on Craft and O&CEU personnel.
l
~
~
Page 2 In order to correct the existing problems, the following program has been initiated:
1.
The Civil Engineering Supervisor and the Ironworker's Superintendent are jointly identifying areas of the plant in order to emphasize completion of all miscellaneous steel in these areas within a specific time frame. This work will include identification by O&CEU of all miscellaneous steel in the area to be worked.
2.
Ironworker personnel will review / work / rework these features to ensure that they are installed per the design drawings.
3 Inspection of these features by QC personnel will follow and all deficiencies will be documented.
4.
A trend analysis is being maintained by O&CEU to keep track of possible trends adverse to quality.
m.
_ _ _.