ML20044H516: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20044H516
| number = ML20044H516
| issue date = 05/05/1993
| issue date = 05/05/1993
| title = 1993 Graded Exercise.
| title = 1993 Graded Exercise
| author name =  
| author name =  
| author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE
| author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:}}
t
                                                                                  ,.,.g .y3.gmes .e.ws:L x .-:>wwe>'ax^*:eMwn%x 3.                            , .
:4 ~. ..,. s .w. 3 f. : 3..g q , ;3 . 3 ..,
* c?*.pl p
                                                                                                                                                                          ,,, ,.,i,,,
                                                                                                                                                                    'Ak~j,..,  , %.
c
                  ~ % NN_OIN_EamEW~NT_RE.- ,ENERfAF                    ._              .
                                                                                                                  - - ~ ~                                              -
e  a        . v ggggggg5ggggggwamygg;;q;*        -              .. -          -            - ,    -- n                                            ,
                                                                                                                                                                              '~jz,
                      ,o, , + . s#SEWBROOESTAGIONDM.                                                                                                  w,%,                    ' J,!'
            .-                                                                                                                                                    w
                                                                                                                .~
a m ,,                            u l1                                    .nm                                                                                                                    ,^
k;
                                                                                          'u(@                            II$.9$li    N kiOjhf $ '
                                                    *          )
                                                                %%._;w;
                                                                                            ;&%a                ass n,1W: l \ Q 42 .%"
f gp                  :
w p    _
W...,. sy ) D.?'' :: @ l
                                                                                                      $,...J.^d993[                      msGRADED?E_                        ma                    X_ E_R 1
s!
L i
z ~~J
_                          . ==-,i,RyW          .n-1 N
                                                                                                - - = -
4          ),
l 4                        nn t                                                                '
I                l
__r_ n nN                s ei P
WEDNESDAY, AfAY 5,1993 i
Jy 9306090139 930505                                                                                                                                                                  y PDR  ADOCK 05000443                                                                                                                                                                    Qy P                            PDR                                                                                                                                        ,.              ,
s
 
g-                                                        m
    -.n  NORTH ATLANTIC ENERGY SERVICE CORPORATION
    !  )
SEABROOK STATION 1997, GRADED EXERCISE (93-03-030EX)
MAY 5, 1993 TABLE OF CONTENTS 1.0  PLANNING ELEMENTS 2.0  EXERCISE OBJECTIVES AND GUIDELINES 3.0  CONTROLLER INSTRUCTIONS 4.0  DETAILED SCENARIO DESCRIPTION 5.0  ERO MESSAGES 6.0  MINI-SCENARIOS 7.O  PLANT PARAMETERS 8.0  RADIOLOGICAL DATA 9.0  REFERENCE MATERIAL l
I t
l i
I i
 
P O
1 4
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK BTATION                    l i
1993 GRADED EXERCISE l
l 1.O  PLANNING ELEMENTS i
O l
l l
l i
v                                                                    3/17/93 l
l l
l
 
1993 GRADED EXERCISE PLANNING ELEMENTS DATE AND TIME May 5,  1992 Selected offsite objective demonstrations in NH and MA 0800 - 1200          (see Section 2.1 for details)
ASSIGNED PLAYERS NHY Emergency Response Organization A. Control Room / Simulator
: 1. Shift Superintendent
: 2. Unit Shif t Supervisor
: 3. Supervisory Control Room Operator
: 4. Control Room Operator B. TSC Staff per Procedure ER 3.1 C. OSC Staff per Procedure ER 3.2 D. EOF Staff per Procedure ER 3.3 E. Joint Telephone Information Center (JTIC) Staff per Procedure ER 3.5 F. Media Center Staff per Procedure ER 3.5 G. YAEC TSC Response Staff H. YAEC Engineering Support Center Staff per YNSD Emergency Support Plan t
State of New Hampshire Participating State and local Emergency Response Facilities are listed in Attachment 1 to this section.
Commonwealth of Massachusetto Participating State and local Emergency Response Facilities are listed in Attachment 1 to this section.
L 1.0-1                            3/16/93
 
1993 GRADED EXERCISE PLANNING ELEMENTS NH STATE PACILJTIES Level of Facility                              Location            Activation New Hampshire State Warning Point    NH State Police    Commo only Headquarters NH State Emergency Operations        NHOEM Headquarters  Commo only Center                                Concord, NH New Hampshire Incident Field          Gosling Rd          Both NHOEM Office                                Newington, NH      and DPHS will report Media Center                          Newington Town Hall A NHOEM PIO Newington, NH      will report Joint Telephone Information          Newington Station  None                                                  ;
Center                                Newington, NH i
MASS STATE FACILITIES Level of Facility                              Location            Activation Massachusetts State 24-Hour          MSP Troop A        Commo only Warning Point                        Framingham, Mass.
Massachusetts Emergency              MEMA HDQS          Commo only Operations Center                    400 Worcester Rd Framingham, Mass.
Media Center                          Newington Town Hall A MEMA PIO Newington, NH      will report Emergency Operations Facility        Gosling Rd          Both MDPH Newington, NH        and MEMA staff Will report No local community involvement in either State.
Attachment 1                          1.1-2                                                            3/16/93 e
 
l NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 2.0  EXERCISE OBJECTIVES AND GUIDELINES bi V
l l
l l
r
    /                                          3/17/93 l
1
 
I i
1993 GRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY                                ,
L Objective I.1:      Demonstrate the ability to recognize station conditions and parameter trends as emergency plan initiating conditions, and to develop potential solutions for placing the station in a safe, stable condition.
Extent of Plav                                                                                ,
k Initial accident recognition and plan activation will occur in the control Room. Control Room activities will be conducted from the Station Simulator lccated in the Seabrook Training Center.
The TSC will demonstrate the ability to analyze station. conditions and parameter trends, and develop potential solutions for placing the station in a safe, stable condition.      The Yankee Atomic Electric Company (YAEC) Engineering Support Center (ESC) will assist the TSC with accident assessment and core damage analysis, as needed.                                                                    ;
Objective I.2:      Demonstrate the ability to assess Emergency Action Level (EAL) parameters and correctly classify the emergency.
Extent of Play The Simulator Control Room staff and the TSC staf f will identify, assess and classify emergency conditions in accordance with SSER Procedure ER 1.1, Classification of Emergencies.
Objective I.3:      Demonstrate the ability to notify onsite and offsite emergency response organizationu of the emergency and related information.
Extent of Play The Control Room, Technical Support Center, Guard Island and Emergency Operations Facility staffs will demonstrate this objective by notifying                      ,
onsite, offsite, NRC and YAEC personnel and in accordance with appropriate procedures.
i Notification actions and forms initiated by the Exercise Shift Superintendent                ]
in the Simulator will be relayed by a Simulator Controller to a Control Room                  l Controller. The Control Room Controller will duplicate tre actions associated                l with notifications (e.g., forms completion) and direct notifications through                  i I
the Drill control Room Communicator.
i i
2.0-1                                    4/26/93
 
1993 GRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY i
i Initial notification of New Hampshire and the Commonwealth of Massachusetts via Nuclear Alert System contact of the State Police Warning Point will initiate a limited mobilization of the State offsite response organizations sufficient only to support emergency communication interfaces with the utility. The State of New Hampshire will assign representatives from NHOEM and DPHS to report to the EOF.      The Commonwealth of Massachusetts will also assign representatives from MEMA and MDPH to report to the EOF. Both States will establish a communication link with their respective EOCs.      Media Center representation may be demonstrated through Controller simulation of the State PIO role if State representatives are unavailable. Communiccil'ns with the Commonwealth of Massachusetts Nuclear Engineer will be demonstrated.
The NRC Headquarters Operations Of ficer will be contacted following the initial classification and again once the exercise has terminated. These contacts will serve to demonstrate Emergency Notification System (ENS) capabilities from the TSC.      The Emergency Operations Manager will make both notifications indicating that they are exercise-related contacts. A Control Cell Controller will be assigned to simulate the NRC for all other exercise-related ENS contacts. A control cell number will be issued to appropriate players.
The Health Physics Network (HPN) Communicator will be simulated by a Control Cell Controller. A control cell number will be issued to appropriate players.
Objective I.4:    Demonstrate the ability to gather, assess, coordinate, and O
disseminate information regarding station emergency conditions and emergency response activities using primary communication means.
Extent of Play The Nuclear Alert System (NAS), ENS and HPN lines will be utilized as well as all facility phone communications (e.g., microwave, commercial and ringdown circuits). The stat ion Gai-Tronics system will be used to issue plant announcements.        3 Security, Operations and Maintenance, and Radiological Monitoring radio frequencies will be used to support emergency response efforts.
A controller data link between the Simulator Control Room, TSC and EOF will be maintained for the purpose of providing selected Main Plant Computer System (MPCS) and Safety Parameter Display System (SPDS) data to the players.
Selected MPCS logger trend sheets and operational data will be issued every 15 minutes provided the actual MPCS logger trend feature is accessed.
Radiological data generated by the simulator will not be used.      Controllers in the simulator and OSC will issue selected Radiation Data Management System (RDMS) data to the players upon request.
2.0-2                            4/26/93 O  <
i
 
t 1993 GRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY The Security and Fully Integrated Nuclear Information System'(FINIS) computer systems will be accessed as needed by appropriate response personnel.
Objective I.5    Demonstrate the ability to formulate and implement a radiological exposure control program.
Extent of Play The TSC will monitor and authorize protective actions for site personnel.
Security personnel will implement site access control measures. The OSC will implement appropriate actions associated with protective equipment, and exposure and contamination control. Offsite personnel protective measures will be controlled from the EOF.
(
Onsite emergency response personnel shall don appropriate protective clothing.
The ability to properly utilize respiratory protection equipment will be demonstrated for inplant teams when such equipment use is warranted.
Response personnel exposures will be monitored by personal dosimetry and facility surveys. Actual personnel exposure summary reports will be available to facilitate dose planning.
The TSC may direct the OSC to dispatch one Onsite Monitoring Team for the purpose of monitoring and sampling. Sample material may be routed to the OSC O for analysis.
Objective I.62  Demonstrate the ability to formulate Protective Action Recommendations.
Extent of Play Protective action decision making will be demonstrated in accordance with the Station Emergency Response Manual as appropriate to the development of the exercise scenario and the responses of the players.
The EOF will evaluate potential and/or actual offsite radiological conditions using the METPAC dose projection system and WSI weather service. Additionally, selected reactor coolant and/or field sample analysis data will be available to support discussions with offsite authorities.
i O                                        2.0-3                            4/26/93 l
i
 
1993 GRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY Objective I.7      Demonstrate the ability to mobilize the station emergency response organization and activate station emergency response facilities in a timely manner. An actual shift turnover should be demonstrated at least once every 5 years.
Extent of Plav NAESCO emergency response facilities will be activated in accordance with the Station Emergency Response Manual as appropriate to the development of the exercise scenario. Except as otherwise noted, no pre-staging will be allowed.
The onsite Assembly Area will support staffing of emergency response facilities; however, in the interest of minimizing the impact to normal station operation a limited response will be scheduled. Additional responders beyond those scheduled will be called out from their normal work locations and requested to report to their normally assigned facility without first reporting to the Assembly Area.      The Assembly Area Coordinator will be provided with a list of additional responders to contact.        See Objective II.6 for more details concerning the use of the scheduled Assembly Area staff.
There will not be an actual shift turnover; however, formulation of a 24 hour ERO shift roster will be demonstrated.
objective I.B:    Demonstrate the ability of onshift personnel to implement the station emergency plan and to transfer appropriate emergency-related functions      l to other emergency response organization personnel.
Extent of Play This objective will be demonstrated by onshift and TSC personnel in accordance with the Station Emergency Response Manual.
Objective II.1:    Demonstrate the ability to mobilize the station emergency response organization and to activate station emergency response facilities during off normal work hours (6:00 pm to 4:00 am). An unannounced mobilization should be demonstrated at least once every 5 years.
This objective will be demonstrated the week of 14th of November, 1993 in an unannounced /offhours drill.
l l
l 2.0-4                              4/26/93
 
1993 GRADED EXERCISE                                ,
ERO OBJECTIVES AND EXTENT OF PLAY Objective II.2      Demonstrate the ability to coordinate the preparation, review            ,
and release of public information, and to provide timely and accurate information to the media and general public.
1 Extent of Plav The Control Room and/or TSC will demonstrate the review and approval of press                  f releases, if any, which are prepared prior to EOF activation. The EOF will demonstrate preparation, review, and approval of press releases, and their subsequent transmittal to the Media Center.
t The Media Center will demonstrate the ability to coordinate the release of public information. The NAESCO Media Relations Assistants will be periodically contacted by a controller to determine their responses to various questions related to the accident. Members of the local media will be invited                  ;
to participate in press briefings.                                                            ;
Objective II.3: Demonstrate the use of the station fire brigade in responding to a station fire.
This objective will not be demonstrated during the exercise. This objective demonstration will be scheduled as part of the 1993 Appendix R drill program.
Objective II.4:    Demonstrate the ability of onsite personnel to respond to a contaminated medical emergency in an effective and timely manner.
This objective will be demonstrated during the Annual HP/ Medical Drill echeduled for Nov. 17th, 1993.
Objective II.5:    Demonstrate the ability of offsite support organizations-to respond to a contaminated medical emergency in an effective and timely manner.
This objective will be demonstrated during the Annual HP/ Medical Drill scheduled for Nov. 17th, 1993.                                                                ,
Objective II.6:    Demonstrate the ability to assemble and monitor station evacuees.
Extent of Play This objective may be demonstrated out of sequence in order to minimize the impact to normal station operations. This function will be established and demonstrated at the Remote Monitoring Area located at PSNH's Schiller Station.
After it has been determined that the onsite staffing is adequate and second shift assignments are made, the onsite Assembly Area will release the remaining backup emergency response personnel. The remaining backup responders will be used to demonstrate operations at Schiller Station.
l O                                                                  2. ~                      .iui9, I
l I
1 I
i
        ~
n                      -                , , - ., - .-
 
i l
l l
I s
1993 GRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY objective II.7:    Demonstrate the ability of station security to provide prompt  ,
station ingress and egress for emergency response equipment and support.          l This objective will not be demonstrated during the exercise. This objective demonstration will be scheduled in conjunction with the 1993 Annual HP/ Medical Drill.
Objective II.8:    Demonstrate the ability to gather, assess, coordinate, and disseminate information regarding station emergency conditions and emergency response activities using backup means of communications.
Extent of Play Through use of Controller injects, facility staff will be requested to            j demonstrate use of backup communications links.                                  j objective II.9: Demonstrate the ability to establish an effective rumor control program.
Extent of Plav This function will be established and demonstrated at the Joint Telephone Information Center (JTIC). The NAESCO Rumor Control Assistants will be periodically contacted by a controller to determine their responses to various questions related to the accident. Updates for information lines at the JTIC will be prepared in accordance with appropriate procedures; however, actual recording will be simulated.
Objective II.10      Demonstrate use of emergency power where it is not considered a part of station safety systems.                                      l This objective will not be demonstrated.
objective II.11:    Demonstrate decision making and planning capabilities to    ,
support an evacuation of primary station emergency response facilities and 1
relocation to backup facilities.
This objective will not be demonstrated.
I objective II.12: Demonstrate the ability to implement an ingestion exposure      j pathway sampling and analysis program, and to formulate associated Protective Action Recommendations for this exposure pathway.                                I This objective will not be demonstrated.
2.0-6                            4/26/93 l
 
._      .    .  . _  -_    .    --~ ..          .
1 1993 CRADED EXERCISE ERO OBJECTIVES AND EXTENT OF PLAY objective II.13: Demonstrate the ability to mobilize and direct field monitoring teams. A review of collection and processing techniques for liquid and air samples shall be included.
Extent of Plav                                                                                ,
At least three (3) Offsite Monitoring Teams may be dispatched from the EOF for tha purpose of monitoring and sampling. Offsite Monitoring Teams will not be required to demonstrate protective clothing or respiratory protection use.
The EOF will establish appropriate contamination control measures for team access and egress.
The EOF will establish a field sample analysis program. Depending upon player decisions,    sampling and analysis-related activities may be performed out-of-sequence from the main scenario timeline. Sample analysis personnel will be provided with filter samples to process while the Field Monitoring Teams are conducting surveys.
Objective II.14: Demonstrate the capability for determining the magnitude and impact of the particular components of a release.
Extent of Play The TSC, EOF and YAEC ESC will demonstrate this objective.                                      l Objective II.15:    Demonstrate the ability to obtain and analyze post-accident coolant samplea.
This objective will not be demonstrated.
Objective II.16: Demonstrate decision making capabilities related to the issuance of potassium iodide and, if warranted by scenario conditions and player decisions, subsequent distribution.
Emergency responders will evaluate KI usage in accordance with appropriate procedures and, if required to support selected response actions, authorize                  ;
and implement distribution actions as required.
Objective II.17: Demonstrate the ability to account for all Protected Area individuals within 30 minutes of the emergency declaration and account for all Protected Area individuals continually thereafter.                                            j This objective will be demonstrated by Security using a drill participant list                f to simulate the process.                                                                      j Objective II.18: Demonstrate the ability of the station to develop reentry                    j and recovery plans.
This objective will not be demonstrated.
2.0-7                            4/26/93
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 3.0  CONTROLLER INSTRUCTIONS O
O                                          3/17/93
 
GENERAL REOUIREMENTS AND GUIDANCE 1.
Controllers should become familiar with the scenario, appropriate implementing procedures, exercise documentation requirements and any special conditions prior to the exercise.
: 2.      Controllers should be at their assigned locations as follows:
Simulator: 0700 All other facilities: 0730 3.
Prior to the exercise start time, all communications will be tested to ensure satisfactory communications between the Exercise Manager, the Facility Lead Controllers, and the Control Cell.
: 4. All controllers will comply with instructions from the Exercise Manager and the Facility Lead Controllers.
: 5.      The Exercise Manager is the only individual who may authorize scenario modifications as the need arises.
: 6.      Controllers should synchronize their watches as directed by the Exercise Manager to ensure that messages and time-related information are delivered on time. The governing clock is the        -
actual Main Plant Computer System time display.
: 7.      Each Facility Lead Controller will ensure that players and controllers sign an attendance sheet prior to leaving the facility. A master copy is provided as an attachment to this section; please make additional required copies.
: 8. Controllers will be issued appropriate messages and data controlling the progress of the exercise scenario.
: 9. Unless otherwise instructed by the Exercise Manager or Facility Lead Controllers, all messages and data should be issued at their designated times and/or as described in the              '
scenario package. All controllers should review their message and mini-scenario implementation responsibilities delineated in Sections 5 and 6, respectively. Those controllers assigned Main Plant Computer System (MPCS) simulation responsibilities in the Simulator, TSC and EOF should refer to Section 7.0 for a master copy of each MPCS simulation form.
Additional copies should be made before the start of the exercise.
: 10. Unless authorized by the Exercise Manager or Facility Lead Controller, Controllers may not discuss the proper use of scenario data or expected responses with players.
l 3.0-1                                          4/26/93
                                                                                                                  )
 
GENERAL REOUIREMENTS AND GUIDANCE continued:
: 11. Contineency Messaces - These messages are designated by the letter "c". Contingency O
messages will be used if a participant fails to take a major expected action. The Controller will give the contingency message to the designated participant and explain in as much detail as necessary what actions the participant is expected to perform. Contingency messages are used to keep the drill on schedule. If there is a necessity to use a contingency message, the situation should be discussed with the Facility Lead Controller prior to issuance.
: 12. Controllers should ensure that contact between participants and observers (visitors)is minimized. This may include the establishment of visitor areas in the emergency response facilities. Additionally, the OSC Lead Controller should clearly identify the OSC " play" area within the Health Physics Access Control Point.
: 13. Some exercise players may insist that certain parts of the scenario are unrealistic. Facility Lead Controllers will clarify any questions that may arise during the exercise.
: 14. Any inquiries originating from the general public or news media as a result of exercise activities should be immediately passed to the Exercise Manager who will notify the appropriate public information personnel.
: 15. Each controller should take detailed notes regarding the progress of the exercise and the responses of the players. These notes should be recorded on EPDE Form B, Drill / Exercise Controller Log. A master copy is provided as an attachment to this section; please make additional required copies. Controllers should refrain from including unsupported opinions or conjecture in drill notes.
: 16. Exercise participants and controllers will comply with all Federal, State and local laws. More specifically, traf6c laws, such as speed limits, will be observed.
: 17. Exercise participants and visitors will avoid endangering public or private property, members of the general public, or the environment. It is the responsibility of all players, controllers and evaluators to correct any unsafe conditions that arise during the exercise.
: 18. Controllers, evaluators, observers and visitors will be required to wear appropriate identincation badges. These badges will be provided either prior to the exercise, or upon entry to a facility.
: 19. The Lead Controllers will be required to issue EPDE Form C, ERO Player Comment Forms, to those players who express an interest in submitting formal comments concerning problems observed with either the emergency response facilities and/or the procedures used to implement the program. Each Lead Controller is responsible for the collection of these forms prior to the submittal of their exercise documentation to the Exercise Manager.
3.0-2                                          4/26/93  '
 
EXERCISE SUSPENSION AND TERMINATION POLICY O  1.      The exercise may be terminated under any of the following conditions:
: a.        All objectives are demonstrated to the satisfaction of all drill evaluation groups present (e.g., NRC and NAESCO);
: b.        An actual plant emergency develops that terminates onsite play;
: c.        An actual offsite emergency (including weather emergencies) develops which adversely impacts response organizations; and/or
: d.        Available time has expired.
: 2.      A joint decision by the following personnel is required to authorize the temporary suspension or termination of the exercise:
: a.        Exercise Manager; and
: o.        NRC Lead Evaluator.
: 3.      Any of the following personnel can authorize temporary suspension or termination of the onsite portion of the exercise:
: a.        On-duty Shift Superintendent;
: b.        Station Manager;                                                                            -
: c.        NAESCO Response Manager; or
: d.        NRC Lead Evaluator.                                                                        ;
: 4.      Any of the following personnel can authorize temporary suspension or termination of the scheduled offsite portion of the exercise:
: a.        NHOEM or MEMA, and
: b.        DPHS or MDPH.
If the offsite exercise play is suspended and/or terminated, then the Exercise Manager will          t substitute controllers to maintain the interfaces supported by the Offsite organizations terminating plays.
SUBSEOUENT EXERCISE ACTIVITIES Following termination of the exercise, players will be directed to restore facilities to their original state of readiness. Controllers should use this time to summarize major concerns and provide these to the Facility Lead Controller. Facility Lead Controllers will then lead a critique of drill activities at their assigned emergency response facility.
l I
3.0-3                                            4/26/93
 
SlJ3_SEOUENT EXERCISE ACTIVITIES continued:
This critique should last a maximum of 30 minutes and attempt to disposition as many player and O
controller comments as possible, but avoid commitments that are beyond the authority of the controller organization.
Facility Lead Controllers should collect all player-generated documents, including any player comment forms (i.e., EPDE Form C) issued, all Drill / Exercise Controller Logs, and attendance sheets for their facility. All original material must be provided to the Exercise hianager prior to close of business on May 7,1993.
Following the exercise, each Facility Lead Controller shall prepare a written report of activities at his or her assigned facility. This report should be based on controller logs and player-generated documents, and consist of the following sections:
: a.      Executive Summary This section identifies major issues and basic outcome of the exercise.
: b.      Objectives Evaluation and Analysis This section should list each objective number and a statement conmning it's demonstration, i.e., demonstrated, not demonstrated, demonstrated with issue, not c      4 or not applicable.
Additionally, a brief summary of exercise actions supporting the findu.g should be included.
: c.        Valid Player and Controller Comments This section must list the player or controller's name making the comment.
All summary facility reports should be provided to the Exercise hfanager by the close of business on May 10,1993.
CONTROL CELL For this exercise, the Control Cell will exist in multiple locations as follows:
: 1.      NRC ENS and HPN - Located in the Incident Field Office.
: 2.        Rumor Control - hiedia Center press work area.
: 2.        All other procedural contacts - Assigned controller normal work locations.
Controllers assigned to these functions should refer to hiini Scenario 6.1.7 for further information.
The telephone extensions for each position are provided in the following ERO Controller Telephone Directory.
3.04                                          4/26/93
 
l q                                  1993 GRADED EXERCISE
.h                              ERO CONTROLLER ORGANIZATION Simulator / Control Room Command and Control                      D. L. Young Operations / Control Room                K. Wilson MPCS Simulation                          A. M. Chesno RDMS Simulation                          S. T. Westin Simulator Operator                        M. P. Boyle Technical Support Center Command and Control                      W. B. Leland Technical Assessment                      R. Cyr Radiological Assessment                  J. J. Rafalowski MPCS Simulation                          K. A. Whitney Onerational Support Center Command and Control                      D. S. Kelsey HP Support                                TBD RDMS Simulation                          P. A. Morse Emergency Repair Team                    R. W. Savage Emergency Repair Team                    G. Lavigne Emergency Repair Team                      P. E. Labbe Emergency Repair Team                    T. D. Street PASS Team                                  R. Michaud O(/ Chemistry Hot Lab                        J. C. Gallagher Inprocessine Center Command and Control                        R. G. Lizotte Guard Island Command and Control                        S. J. Kulback Emercency Operations Facility Drill Manager                              P. D. Casey Command and Control                        J. J. Warnock Technical Assessment                      L. W. Rau Radiological Assessment                    11111 Offsite Monitoring / Sample Analysis      P. J. Harvey Support Functions                          R. H. Streeter ECCC Function                            B. A. DuBois MPCS Simulation                          C. J. Howard Field Team No.1                          C. Berry Field Team No. 2                          J. E. Fralick Field Team No. 3                          R. F. Logue O                                                3.0-5                4/26/93
 
1993 GRADED EXERCISE ERO CONTROLLER ORGANIZATION Control Cgil NRC ENS and HPN                            R. Thompson All others                                J. Giarrusso Media CenterCommand and Control            D. Bart MR/RC Callers & Media                      W. Jones /J.Baer Representatives                            R. Hills C. Catarius B. F. Aquizap K. M. Lewis J. McKee Joint relenhone Information Center Command and Control                        S. Baldacci O
3.04          4/26/93
 
1993 GRADED EXERCISE
  'O                            SUGGESTED ERO CONTROLLER READING Control Room Simulator Command and Control                          SSREP and NPER Operations                                    ER 1.1,1.2, 3.1 and 3.2 MPCS Simulation                              None RDMS Simulation                              None Simulator Operator                            None Technical Sunnort Center Command and Control                          ER 1.1 and 3.1 Accident Assessment                          ER 3.1 Radiological Assessment                      ER 3.1, 5.4 and 5.7 MPCS Simulation                              None Operational Sunnort Center Command and Control                          ER 3.2 and 4.3 RDMS Simulation                              None Emergency Repair Team                        ER 3.2 PASS Team                                    ER 3.2 Chemistry Hot Lab                            ER 3.2 Innrocessine Center /Schiller Station Command and Control                          ER 3.3, ER 3.6                        ,
Guard Island Command and Control                          ER 2.1 and 4.1, and GD1332.00 Emerzency Operations Facility Command and Control                          ER 3.3 Accident Assessment                          ER 3.3 Radiological Assessment                      ER 3.3,5.2 and 5.4 Support Functions                            ER 3.3 ECCC Function                                ER 3.3 MPCS Simulation                              None Field Teams                                  ER 3.3 and ER 5.2 Media Center Command and Control                          ER 3.4 and 3.5 Media Relations / Briefings                  ER 3.5 MR/RC Caller                                  ER 3.5 0                                                    3.0-7                    4/26/93  i i
l l
l
 
1993 GR ADED EXERCISE SUGGESTED ERO CONTROLLER READING Joint Telephone information Center Command and Control                        ER 3.5 Control Cell NRC ENS and HPN                            ER 2.0,3.1 and 3.3 All other procedural contacts              ER 3.3 0
l l
l l
l 3.0-8                            4/26/93 l
1
 
1993 DRESS RElIEARSAL ERO CONTROLLER TELEPIIONE DIRECTORY SIMULATOR CONTROL ROOM Dave Young - x 2994 Ann Marie Chesno- MPCS Simulation - x 2993 l                              CONTROL ROOM                                            l Ken Wilson - x 4086 Telecopier - x 4087 l                  TECIINICAL SUPPORT CENTER Win Leland - x 3959(Communicator)                                              ,
Kevin Whitney - MPCS Smulation - x 3960 Telecopier - x 4090                                                l l                OPERATIONAL SUPPORT CENTER                                            l Dan Kelsey/ Bill Cash - x 3968                                          i Jeff Gallagher - x 3417 INPROCESSING CENTER'                                      'l Bob Lizzotte - x 3875 l                                GUARD ISLAND                                          _l Steve Kulback - x 4008                                              i EMERGENCY OPERATIONS FACILITY                                            l Pat Casey - x 4197 or 433-5747 Chris Howard - MPCS Simulation - x 4198 NRC ENS /HPN Control Cell - 433-1430 and -1427, respectively                                !
J.Giarrusso - 433-1430 (IFO Rm),433-1438 telecopier                                      l l                              MEDIA CENTER                                            l Dave Barr - 433-0485 (NRC)
John Baer - 433-0449 (Auditorium)                                          j l        JOINT TELEPITONE INFORM ATION CENTER                                          l Steve Baldacci - 433-5715 (Briet' Rm)                                        [
3.0 9                                    4/26/93 t
 
1993 DRESS RETIEARSAL -
ERO PLAYER TELEPIlONE DIRECTORY American Nuclear Insurers                                    433-1434 American Nuclear Society                                    433-1434 INPO (except Nuclear Network)                                  433-1419 Emergency Notification System (ENS)                                433-1430 IIealth Physics Network (IIPN)                                433-1427 PSNil Control Center                                      433-1434 Westinghouse                                          433-1419 Other Vendor Contacts                                      433-1419 Simulator Control Room                              Shift Superintendent (603) 474-9521 x 2608                  i l
Unit Shift Supervisor (603) 474-9521 x 2992 SCRO (3 way link to TSC/OSC)
(603) 474-9521 x 2991                  l State Notifications                        Nil State Police    (800) 852-3411          i from Control Room                          Mass State Police (508) 879-6762              i Group Call NAS 555 State Notifications from EOF                                  NII EOC NAS 311 or (603) 271-2231 51assachusetts State EOC response WILL BE SI51ULATED by calling (603) 433-5747 All exercise event-related NRC communications should be made to the above Control Cell number using a standard station phone.
Contacts related to emergency declaration and specific information requests concerning scenario          l events should be directed to the above number.
i 3.0-10                                          4/26/93 Gi J
 
l l
l 1993 GRADED EXERCISE O
EXERCISE PLAYER ASSIGNMENTS Control Room Simulator Shift Superintendent                            D. Bemis                ,
Unit Shift Supervisor                            R. O'Connor              l Supervisory Control Room Operator                H. Hawkins Control Room Operator                            P. C. Leary              l 1
Control Room                                                              j Control Room Communicators                      J. Hawes J. Savoid Technical Support Center                                                  !
Site Emergency Director                          L. A. Walsh Technical Services Coordinator                  R. B. Thompson Emergency Operations Manager                    G. F. St. Pierre        j Operations Technician                            R. Strickland Maintenance Coordinator                          N. T. Levesque i
I&C Coordinator                                  R. J. Godbout Chemistry Coordinator                            R. Litman Health Physics Coordinator                      R. C. Sterritt          l Reactor Engineer                                M. Lindquist            ;
Design Engineer                                  1. C. Watters            )
Engineering Coordinator                          R. H. Lieder            j O    Computer Engineer TSC Support Staff H. O. Whitney B. Waldo l                                                  J. E. Veilleux l TSC Admin Staff                                  V. Ashbury
  ;                                                  K. M. Dwyer G. LeClere Operational Sunoort Center OSC Coordinator                                  M. Arsenault Work Control Coordinator                        S. Morrissey Radiological Controls Coordinator                M. L. Campbell PASS Coordinator                                D. F. Geaghan Technical Specialist Coordinator                  E. J. Sovetsky Storekeeper                                      B. Skofield Fire Brigade /EMT Personnel              D.C. Tyrell/ R. Carter Computer Technician                              G.Dow Radwaste Supervisor                              M. Bianco Radwaste Technician                              K. Alexander Supervisory Control Room Operator                S. Howard Control Room Operator                            M. Kiley O                                              3.0-11                  4/26/93
 
1993 EXERCISE                                  ,
PLAY.ER_ ASSIGNMENTS Operational Support Center Continued:                                                i 4 Auxiliary Operators                              G. Kim R. Palmieri K. Purington G. Spaide 5 Health Physics Technicians              D. Bossfr. Wheeler /A. Rios C. Holdsworth/M. Degasprei 3 Chemistry Technicians                            B. Mooers S. Anderson M. Gillespie 2 Mechanical Maintenance Personnel                W. W. Holman D. G. Wallace 2 Electrical Maintenance Personnel                M. R. Heon T. B. Manning 2 I&C Personnel                                    C. Wachowiak M. Lundquist Emercency Operations Facility                                                        l Response Manager                                  R. J. Hanley EOF Coordinator                                    J. M. Kwasnik                      i Technical Assistant                                L. S. Carlsen                      :
Corporate Support Manager                          J. Tefft                          .
Administrative Services Coord                      E. S. Lentz                        l Security Coordinator                              B. R. Seymour Licensing Coordinator                              R. R. Belanger Industry Liaison                                  M. Roberts                        j Health and Safety Coordinator                      M. J. Yergeau                      !
Dose Assessment Specialist                        R. M. Thurlow                      l Emergency Communications Coord                    R. W. Romer                        l Technical Advisor                                  D. G. Roj                          j C. Deeck                          l D. Willson                        j Training Center Staff                              K. J. Thibodeau J. Kimball Offsite Monitoring Coordinator                    B. F. Clark                        ,
Offsite Monitoring Communicators (2)      W.Blaisdellff.Sorrentino                  l Radiological Assistant                            D. J. Pachulski Material / Logistics Coordinator                  K. C. Gilman                      ,
ECCC Writer / Communicator                        A. L. Kelley                      l T. Dectedico                      l Dose Assessment Personnel                        T. M. Rose                        i Dosimetry Records Personnel                      J. Dean Dosimetry Analysis Personnel                      D. S. Chorlian Sample Analysis Personnel                        J. C. Deshon Document Control Center Coordinator              R. Snyder 3.0-12                            4/26/93
 
.                                        1993 EXERCISE PLAYER ASSIGNMENTS Emereency Operations Facility Continued:                                      '
Administrative Staff (5)                            A. C. Tibbetts M. M. Shearer V. S. Robertson J. M. Krol '
S. L. MacDonald M. E. Lefave ECCC Clerk                                          J. L. MacDougall Offsite Monitoring Team - Driver                    R. D. Isom H. D. McIntyre J. Wilson Offsite Monitoring Team - HP Tech                  L. Rundlett R. Finch G. Flanders                :
Metpac Operator                                    P. Plazeski 5 Security Officers                                P. Hagan E. Moore W. Colby R. Blake J. Dempsey ERO Technical Liaison                              T. F. Grew O
O                                            3.0-13                    4/26/93
 
S. M. Gilb Joint Owner Liaison                      J. B. Harl P. T. Welch Media Center Emergency News Manager                            R. O. Williams Assistant News Manager                            S. Perkins-Grew Spokesperson                                      E. W. Desmarais Health Physics Advisor                            F. P. Straccia Media Relations Floor Liaison                    D. D. Schwab MR/RC Liaison                                    C. Molis Technical Advisor                                M. O'Keefe T. A. Schulz Registrar                                        A. K. McNamara S. M. Suffridge Administrative Staff                              D. J. Ralm F. A. Haniffy C. F. Parent Emergency Services Supervisor                    R. H. Wheeler Media Center Mechanic                            K. Schoff A. Angel S. Hoyt R. J. Hunt MC Writer / Communicator                        D. L. Anderson C. Brown 3 Security Officers                              W. Anderson G. Henry B. Beckley Joint Telephone Information Center MR/RC Supervisor                                P. Upson Media Relations Assistant                        L. B. Young J. T. Felix R. Bilodeau Rumor Control Assistant                          C. Rivers              j M. J. Makowicz          i Administrative Staff                            B. W. Coble K. B. Zito R. Strange              I I
1 3.0-14                        4/26/93
 
DRILL / EXERCISE CONTROLLER LOG Page _1 _ of Controller's Name:                                                      Drill / Exercise Date: May 5.1993 Location of Observation:
Drill / Exercise
 
==Title:==
1993 Graded Exercise Time Drill Commenced:                                  Time Drill Terminated:
Observations should include the proper and effective use of procedures, equipment and personnel. Comments concerning drill performance should document: the time of observation, personnel or equipment involved, procedures involved, and the impact that '.he condition had on the ability of the player organization to meet its objectives.
TIME                                        OBSERVATION -
O Signature:
 
==Title:==
EPDE FORM B Rev. 2      i Page 1 of 2 l
 
DRILUEXERCISE CONTROLLER LOG                                      1 (Continuation Sheet)                                    l 1
Page        of        l TDIE              OBSERVATION 1
l I
I O:
Signature:
 
==Title:==
EPDE FORM B Rev.2 Page 2 of 2 1
3.0-16                            4/26/93
                                                                            ]
l
 
DRILUEXERCISE ATTENDANCE ROSTER O
: 1. Attendance for: [ X ] Players [ ] Controllers
: 2. Facility / Location:
: 3. Drill / Exercise Name:
: 4. Drill Date:      /  /                    5. Page of NAME                  SSN          JOBCODE    ASSIGNMENT SIGNATURE O
I h
EPDE FORM C l Rev. 2 O
 
VISITOR OBSERVATION RULES
: 1. The visitor should request, in writing, access to a facility at least one week prior to the exercise.
Access requests for NAESCO ERO facilities should be directed to the Emergency Preparedness Department.
: 2. The visitor is the responsibility of an assigned escort while on the premises. The visitor shall comply with these instructions and any direction from the escort or Facility Lead Controller.                    ,
: 3. Visitors must comply with security requirements at the facility during the exercise, including sign-in and sign-out requirements. Violation or infraction of security requirements, or any other visitor rules, may result in the visitor's expulsion from the facility.
: 4. Visitors will be required to wear proper identification badges at all times.                              .
: 5. Unless approved in writing in advance, no photography or taping of exercise events by visitors will be permitted. Note taking is acceptable. Visitors may not take any exercise-related documentation (or copies thereof).
: 6. Visitors may not question, interrupt or disturb participants during the course of the exercise. Visitors should not block hallways or use any equipment (including telephones) without permission. This requirement is best summarized as " Stay out of the way"
: 7. The number of visitors to a facility may be limited, or in some cases visitation will be prohibited, due  '
to facility size or other constraints.
: 8. Visitors will not be allowed to travel in any exercise-related vehicle or other transportation device used ;
during the exercise.
: 9. The Exercise Manager has final authority regarding visitor access, conduct and expulsion.
I I
 
O e
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 4.0  DETAILED SCENARIO DESCRIPTION 4
O O                                          3/17/93
 
REAL ELAPSED                                                  MESSAGE TIME  TIME        DETAILED SCENARIO DESCRIPTION                NUMBER A. Initial Station conditions The exercise date is assumed to be May 5, 1993.
Onsito personnel are limited to the normal weekday complement. The station is operating at 100 percent power with rod control in the " automatic" mode. The station has been at or above 90 percent l power for 180 days and at mid-cycle 3 core life. All plant parameters are normal and stable except as noted below.
The Newington offsite power circuit has been removed from service by PSNH to facilitate scheduled insulator replacement maintenance.
Wcrk commenced on May 4th in the late afternoon. No estimate of outage duration has been provided at this time. The system has been removed from the grid at the l Newington end.
Startup Feedwater Pump P-113 was tagged out
'T                  at 0700 for replacement of the pre-lube oil pump. Work on the pump has not yet commenced. Refer to Mini-Scenario 6.1.1 for further information.
Residual Heat Removal (RHR) Pump P-8A has been tagged out to investigate high pump vibration and low flow rate recorded during a recent surveillance test. The investigation commenced at 0400 on May 3 and is expected to be completed sometime before noon. Refer to Mini-Scenario 6.1.2 for further information.
RCS gross activity has been trending upwards l over the past week.      The May 5th primary chemistry report indicated a gross activity of 7.8 E-01 uci/gm and a dose equivalent iodine of 2.45E-1 uCi/gm.
RM-11 No 1 computer has been removed from service for maintenance. RM-11 No 2 is polling all RDMS monitors instead of sharing the normal load with RM-11 No 1 computer.
In order to allow station management players 4.0-1                          5/4/93
 
REAL  ELAPSED                                                MESSAGE DETAILED SCENARIO DESCRIPTION                NUMBER TIME  TIME                                                            l adequate time to assimilate and discuss this information, a mock, exercise-related Station Manager meeting will be conducted on May 4, 1991. This meeting will follow the normal Station Manager meeting and will be led by selected controllers. The controllers will present the initial station conditions, answer related questions, and attempt to ensure that station management's understanding of plant conditions accurately reflects actual awareness.
Initial Condition briefing of key Osc and EOF responders will be conducted the day before the exercise at locations to be determined.
SIMULATOR: The Simulator Operator should turn off the simulator local Radiation Data Management System (RDMS) alarm buzzer.
B. Initial Meteoroloolcal Conditions The day is initially overcast with winds coming from a direction of 100-120 0 at wind velocities varying from 2-5 mph.      It is raining but it is expected to clear by afternoon. Prescripted meteorological conditions will be issued periodically throughout the exercise by controllers.
C. Detailed Scenario Timeline 0700  H-Ol:00  Initial Conditions are provided to Simulator EROl players.
Message ERO2 will transmit initial conditions to non-control Room Emergency Response Organization personnel. This message should be passed to players as they respond to their assigned facilities.
NOTE: As appropriate, controllers may inform players of the following initial core parameters when requested:
I 4.0-2                          5/4/93 OY i J
f
                                                  ?
 
REAL  ELAPSED TIKE    TIME                                                    MESSAGE DETAILED SCENARIO DESCRIPTION                  NUMBER Average Core Burnup = 16,000 MW days / tonne Effective Full Power Days = 420 0800  H+00:00    Initial Conditions established; exercise      ER02g begins. Simulator Lead Controller shall                ,*
verbally inform the players that the exercise has begun.
0805  H+00:05 Steam Generator RC-E-11D suffers a tube        ERO3g rupture resulting in a 350 gpm primary to      ERO4g      1 secondary leak rate. The control Room receives indications of decreasing pressurizer level and pressure with corresponding increases in Steam Generator D level. High radiation alarms are received on the D main steam line and condenser offgas monitors as well as Alert radiation alarms on adjacent steam line.
Depending upon operator responses, the reactor will be either manually or automatically tripped; a Safety Injection actuation will follow.
                    #lliVLATOR: Malfunction 164, ramp = 30%/ min Size = as required.
SIKULATOR: Malfunction      , ramp =  RCS activity increases from 0.78 uci/gm to 5 uCi/gm within 30 minutes of the plant trip.
SIMULATOR: The Simulator Operator should enter the necessary I/O overrides to obtain an R Yellow Critical Safety Function Status Tree (CSFST). The Yellow path is obtained from a Hi Condenser Offgas Monitor Alarm.
0810    H+00:10 Operators will initially enter Emergency Operating Procedure E-O based on LOCA recognition. Upon entering Emergency Operating Procedure E-3, Steam Generator Tube Ruoture, an Alert declaration will be warranted in accordance with Procedure ER 1.1, Classification of Emeroencies,                          :
Initiating Condition 7b.                                      l I
O                                  4.0-3 5/4/93 i
l
 
i l
REAL  ELAPSED TIME    TIME                                                            MESSAGE          I
_ DETAILED SCENARIO DESCRIPTION NUMBER _
The Shift Superintendent will assess plant conditions, declare an Alert and assume the                    j role of Short Term Emergency Director                          '
l (STED).      Subsequent Alert Control Room j Actions are specified in Procedure ER 1.2.
The STED will turn over Command and Control responsibilities to Site Emergency Director.
15 mins after                    If not already accomplished, the Shift        ERO4e entry                    Superintendent will be directed to declare into E3                  an Alert in accordance with Procedure ER 1.1,  Initiating Condition 7b.
The Technical Support Center will activate and perform subsequent duties in accordance with Procedure ER 3.1, TSC Operations. The Site Emergency Director maintains control of onsite response actions from the TSC.
Station non-essential personnel are evacuated (simulated) and accountability is conducted. These activities will be controlled primarily from Guard Island in accordance with Security Procedure GD1332.00, Station Emeroenev/ Evacuation.
                    ]
l The onsite Assembly Area at the Inprocessing Center will not be activate inaccordance I with ER 3.6, Assembly Area Operations. The l process will be simulated by a single i
controller playing the role of the Assembly l    Area Coordinator. This individual will l interface with the TSC and EOF obtaining l
both long-term and short-term manpower i requests. The controller will contact
                ! emergency responders requested by either i
facility to fulfill short-term facility l    manpower needs. These responders will 1 report directly to their assigned emergency l    center upon being called.
The Operational Support Center will activate and perform subsequent duties in accordance with Procedure ER 3.2, OSC Operations.
The Emergency Operations Facility will activate and perform subsequent duties in accordance with Procedure ER 3.3, EQE Operations. The Response Manager assumes 4.0-4 5/4/93
 
REAL  ELAPSED                                                  MESSAGE DETAILED SCENARIO DESCRIPTION                    NUMBER
(  TIME    TIME overall NHY Command and Control responsibility.
The Media Center and Joint Telephone Information Center will activate and perform subsequent duties in accordance with Procedure ER 3.5, Media Center / Joint Telechone Information Center. An initial press release from the General Office Building may be issued using Procedure ER 3.4, Seabrook Station News Services Ope rat ion.
0840  H=00:40 Within approximately 40 minutes of the tube      ERO5c rupture, the ASDV opens due to pressure      l ERO6g control and remains open for a period of 5    l ERO7g minutes. A release occurs. Subsequant        l ERO8 evaluation of its impact is initially        l ERO10c undertaken by the TSC with more formal        l EROllc evaluation establiohed at the EOF once activated.
Following the Alert declaration, assigned controllers should refer to Mini-Scenario Oh              6.1.4 for simulation and play instructions regarding Non-State ERO interfaces.
0915  H+01:15 RM-11 NO 2 computer suffers a power failure. l ERO9g (75)  The Control Room and OSC RDMS consoles go blank. (See mini-scenario 6.1.5 for details.)
Following Media Center and Joint Telephone Information Center activation, a series of media relations and rumor control messages is provided for controller use during the duration of the exercise.
0930 H+01:30 Both Scoobia and Tewksbury offsite power      l ERO12g    -)
(90)  circuits suffer a common catastrophic                        ,
failure resulting in a loss of offsite power                I to Seabrook Station. Refer to Mini-Scenario 6.1.6. Subsequent discussions with PSNH concerning restoration of the Newington circuit indicate that it can be restored.
SIh0LATOR: Malfunction 114 O                              4.0-5                                5/4/93 1
i
 
REAL      ELAPSED TIME        TIME                                                                MESSAGE DETAILE9 SCENARIO DESCRIPTION                        ITUMBER Both Emergency Diesel Generators, DC-DG-1A and IB, automatically start. Following obtainment of rated voltages and frequencies, the generators will begin supplying power to appropriate station loads.
Controllers should refer to Mini-Scenario 6.1.6 to determine station equipment affected by the loss of offsite power. *ost equipment indications should be passed along to players as appropriate to their attempts to use the equipment.
Upon recognizing that a loss of offsite power exists concurrently with the ongoing Steam Generator Tube Rupture, a Site Area Emergency declaration will be warranted in accordance with Procedure ER 1.1,    Initiating Conditions 6a and 7b.
The Site Emergency Director will assess plant conditions and declare a Site Area Emergency.
Based on current plant and radiological conditions, and associated procedural l requirements, NAESCO will not issue any evacuation or sheltering Protective Action Recommendations (PARS) at this time.
0950      H+01:50        If not already accomplished, the Site              l ERO13e (110)        Emergency Director will be directed to declare a Site Area Emergency in accordance with Procedure ER 1.1, Initiating Conditions                            !
6a and 7b.
1000      H+02:00        Motor Driven Emergency Feedwater Pump P-37B                              I (120)          fails due to pump shaft seizure. Refer to                                ;
Mini-Scenario 6.1.7 for further information.                            i l 1035      H+02:35        SIMULATOR: The Simulator Operator should                                  I (155)                                                                N/A enter the necessary I/O overrides to obtain an R Green CSFST.      The Green path results i from the clearing of all Hi alarms on the D main steam line and condenser offgas monitors.                                                                '
l i
4.0-6 5/4/93    Gi 1
W          __
                                --                                            --  y      r-a--  r T-
 
REAL    ELAPSED TIME    TIME                                                    MESSAGE l'                          DETAILED SCENARIO DESCRIPTION                  NUMBER l 1115    H+03:15  Newington offsite power restored to the (185)    station.
l ERol5g l EROl6g j 1200    H+04:00 Exercise play is terminated as directed by  l ERO17g (240)    the Exercise Manager. Emergency response facility managers are now directed to begin deactivation and restoration of their respective f-scilities.
l 1230    H+4:30    Mini scenario 6.1.3 will be implemented to (270)    initiate a demonstration of the Remote Monitoring Area capability. HP Technicians /Radwaste Technicians will be dispatched to setup facilities at Schiller Station.
l 1230    H+04:30  Controllers commence critiques at each (270)    emergency response facility and among field team personnel.
l 1300    H+05:00    Exercise critique ends; participants (300)    dismissed.
I 1315    H+05:15    Simulated evacuees from the Assembly Area (315)
O                          will be released to be monitored at the Schiller Station Remote Monitoring and Decontamination facilities.
1430  H+06:30    Mini Scenario 6.1.3 terminates (370)
  )                                    4.0-7 s/4/93 I
 
O V
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 5,O MESSAGES 5.1        ERO CONTROLLER MESSAGES 5.2        MEDIA RELATIONS MESSAGES 5.3        RUMOR CONTROL MESSAGES O
O'                                                  3/17/93
 
NORTH ATLANTIC ENERGY BERVICE CORPORATION SEABROOK BTATION 1993 GRADED EXERCISE 5.1  ERO CONTROLLER MESSAGES O
O                                          3/17/93
 
ERO MESSAGE IMPLEMENTATION KEY 1993 GRADED EXERCISE l  MESSAGE TIME      RESPONSIBILITY l  ERO1    0700      D. Young l  ERO2    0805+      All Lead Controllers l  ERO3g  0805        D. Young l  ERO4g  0805        A.M. Chesno l  ERO5c  0820+      D. Young l  ER06c  0840+      D. Young l  ERO7    0850        D. Kelsey / P. Morse l  ERO8    9000        S. Kulback l  ERO9g  0915        D. Young l  ERO10c  1000        D. Kelsey / P. Morse l  ERO11c  1000        J. Gallagher l ERO12  1030        D. Young / M. Boyle l ERO13c  1030        W. Leland ERO14c  1030        W. Leland / P. Casey / D. Kelsey l
l ERO15  1030        S. Westin l EROl6g  1100        D. Young l ERO17g  1200+      All exercise lead controllers O
l
 
SEABROOK STATION O                                EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:      ERol                                              TIME:    0700 TO:              Control Room Personnel FROM:            Station Logs and Instrumentation LOCATION:        SLmulator Control Room
    ******************************* THIS IS A DRILL            **************************A*****
The exercise date is assumed to be May 5, 1993.
Onsite personnel are limited to the normal weekday complement. The station is operating at 100 percent power with rod control in the " automatic" mode. The l station has been at or above 90 percent power for 180 days and is mid-cycle 3 core life. All plant parameters are normal and stable except as noted below (also refer to the attached Daily Operating Report).
Startup Feedwater Pump P-ll3 was tagged out at 0700 this morning for replacement of the pre-lube oil pump. Work on the pump has not yet commenced.
Residual Heat Removal Pump P-8A was tagged out at 0430 on May 4 to investigate high pump vibration and low flow rate recorded during a surveillance test.
Subsequent inspection revealed a loose impeller lock nut. The lock nut has been raplaced and ef forts continue to return the pump to service. Repair activities are expected to be completed this afternoon.
By direction of the PSNH Electric System Control Center, the Newington line was deenergized at 0600 on May 3 for scheduled insulator replacement.
The Control Room was notified at 0700 that RDMS is scheduled for routine maintenance. Service will not be lost. RDMS computer No 2 will poll all RDMS monitors until the redundant RDMS computer No 1 has been serviced.
RCS activity has been trending upwards over the past week.
I 9 96969 64 99999 e99ee99999 9999 e9        9. 999999 999999999994 *99999999999999999999 THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION
      .............#......e**********      ...... *******............. ** 9* ******ee...**                '
5.1-2                                          5/4/93
 
SEAERDOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:    ERO2                                      TIME: When Needed            i l
TO:              Exercise Players FROM:            All Exercise Lead Controllers LOCATION:        Where Needed
  ******************************* THIS IS A DRILL ********************************
l The exercise date is assumed to be May 5, 1993.                                          ;
Onsite personnel are limited to the normal weekday complement. The station is operating at 100 percent power with rod control in the " automatic" mode. The l station has been at or above 90 percent power for 180 days and is near mid-cycle 3 core life. All plant parameters are normal and stable except as noted below.
Residual Heat Removal Pump P-8A is tagged out of service due to high pump vibration recorded during a surveillance test.
Newington 345 kV power removed fros service for maintenance.
  ....e************************ Exercise    Control Notes *************************
Notification of the State of New Hampshire / Commonwealth of Massachusetts State        ;
Police Warning Points will be completed by the Control Room using the NAS Group          j Call number. Health Department callback will occur. State Health and Emergency          l Management representatives will respond to the EOF and Media Center. Normal NAS          l communications are anticipated.                                                          ,
1 I
NRC contact via FTS will be initiated by the Control Room at the beginning of the exercise and upon termination. HPN contact will be through a control cell interface.
i Staffing of the Assembly Area is limited. Additional support staff can be requested but availability may be restricted.
l 1
l I
l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION
    **ee................ **ee............................................e***        e****
5.1-3                                  5/4/93  ,
i i
l l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM                                                                          ,
MESSAGE No.:                ERO3g                                                                  TIME:        0805                                ;
TO:                        Control Room Personnel                                                                                                  ,
t FROM:                      Control Room Instrumentation                                                                                            ,
L Simulator Control Room LOCATION:                                                                                                                                            ,
        ........e99********************                          THIS IS A DRILL ********************************                                            ,
The following annunciators are received:
PZR LEVEL DEVIAT1vN LO                                                                                                                      ,
MASTER PRESS CTLR OUTPUT LO                                                                                                                ,
concurrently with the following VAS alarm:
4327 PZR PRESSURE LO AND BU HTRS ON f
                                                                                                                                                            ?
h i
                                                                                                                                                            ?
I i
i
                                    **e99999  9999 9999999 ee 9999999.e9999.e.                                999. 993.eeeeeeeeeeeeeeet                  [
        .ee.9          99      9*e THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION e * *
* e t e . . . . e e e e e e . e . e t
* e e . . . ... . . . . e e e e e e e t 9 e e . . . . e e . .. . . . e  e e t e e t . . . . . e e 5.1-4                                                        5/4/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO4g                                                  TIME: 0806 TO:          Control Room Personnel FROM:        MPCS Controller LOCATION:    RDMS Control Panel
      .........********************** THIS IS A DRILL ********************************
The following alarms are received:
ALM 1GM810 HIGH ALARM LIMIT Following staus acknowledgment by the attending operator, the following additional alarms are received:
ALM 1GM801 ALERT ALARM LIMIT ALM 1GM802 HIGH ALARM LIMIT As the operations crew isolates Letdown, the following alarms are received:
ALM ILM242 LOSS OF SAMPLE FLOW ALM ILM241 LOSS OF SAMPLE FLOW ALM 1LM240 LOSS OF PROCESS FLOW
}
i THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION 5.1-5                                                            5/4/93
                ..              -__                                                                                      .i
 
1 l
SEABROOK STATION
-O                        EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO5c                                      TIME:    15 minutes after entry into E-3 TO:          Shift Superintendent FROM:        Control Room Lead Controller LOCATION:    Simulator Control Room
  ******************************* THIS IS A DRILL ********************************
Events warrant that an ALERT be declared in accordance with Procedure ER 1.1, Classification of Emergencies, Initiating Condition 7b.
t eeeeeeeeemenesseeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeman THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION eee. e  een  e*****ee......e***  ..e ......eeeeee. ee....  ***een  .eeeeemenneen      e C                                          5.1-6                                  5/4/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ER06c                                    TIME:  10 minutes after the ASDV lifts on the D S/G TO:          Shift Superintendent FROM:        Control Room Lead Controller LOCATION:    Simulator Control Room
******************************* THIS IS A DRILL ********************************
Events have caused the  "D" S/G generator to lift. A release is in progress.
O l
THIS IS A DRILL                                  ,
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                  f 5.1-7                              5/4/93 l
 
SEABROOK STATIOtt p]
l                        EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO7                                      TIME: 8:50 TO:          Radiological Controls Coordinator FROM:        OSC Controller LOCATION:    OSC
  ******************************* THIS IS A DRILL ********************************
The HP CONTROL POINT IPM's are alarming.
OPERATING E-140/HP210 AND RM-14/HP210 are alarming.
(
l i
i THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION 5.1-8                              5/4/93 i
i 1
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM.
MESSAGE NO.:    ERO8 TIE 2:  9:00 TO:            Security Controller FROM:          Guard Island Security LOCATION:      Guard Island
  ******************************* THIS IS A DRILL ********************************
At this time all three of the Gamma 10 are alarming.
O  ,
l I
l l
l 1
l I
e****ee***eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeen seen...e    eeeeeeeeeeeeeeee .,  ;
1 THIS IS A DRILL 00 NOT INITIATE ACTIONS AFFECTING STATION OPERATION
*ee****.....eeeeeeeeeeeeeeeeee...eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 5.1-9 5/4/93
 
  ,            .        -          _ -      ~        . _ . _ _ . -            -      . . .      .- .      _ . .
i SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM i
MESSAGE NO.          ERO9g                                                                            i TIME: At 0915 or upon operator action to make an RDMS        !
request              i TO:                    Shift Superintendent                                                            ;
FROM:                  Control Room Lead Controller LOCATION:              Simulator Control Room
                    ******************************* THIS IS A DRILL ********************************                        !
Inform the operator that the RDMS screen has gone blank.
T b
t THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING
                .............................. .................. STATION ...............................
OPERATION 5.1-10                                      5/4/93
    . . - . ,    r      y , ,, , -      -
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.      ERO10c                                      TIME: 0845 TO:              Radiological Controls Coordinator FROM:            OSC Controller LOCATION:        OSC
    ******************************* THIS IS A DRILL ********************************
If a Health Physics technician is dispatched to do a survey to the North Gate, the results will be:
TIME    WAI5T OPEN  WAIST    GROUND  GROUND  EDCE OPEN  EDGE  AIR SAM AIR SAM  SMEARS    15 MIN    ,
9:00      MR/HR    CLOSED OPEN MR/HR CLOSED    MR/HR  CLOSED    PART  10 DINE  CPN/    EXP. MR MR/HR              MR/HR            MR/HR    NCPM    NCPM  100CM'
  .8 mi        4.8      2.8      7.0      5.3        .4      .2      16      40      Sk        <1 l
  .9 mi        3.5      2.2      6.5      4.7      .3      .2      10      to    1.2k        <1 l
If dispatched to the South Gate, all meters read Bkg. If contaLmination surveys are conducted, no detectabla level will be found.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION 5.1-11                                    5/4/93 1
 
l i
1 SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM i
MESSAGE NO.:  ERO11c                                    TIME: 0930 TO:            Chemistry Lab Personnel FROM:          PASS Controller LOCATION:      OSC
    ******************************* THIS IS A DRILL ********************************
If using the Gamma Spec. Analysis unit at this time, the technician will begin to see gamma count peaks developing for the following energies:
81 key XE-133      150 key KR-85"    191 key KR-88      233 key XE-133" 250 key XE-135      305 key KR-85"      403 key KR-87      850 key KR-87/88 1550 key KR-88      2190 key KR-88      2400 key KR-88    2570 key KR-87 THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION qy 7-~x  ................................................................................
5.1-12                              5/4/93
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.      ERO12                                      TIME:  0930 TO:              Control Room Personnel FROM:              Control Room Instrumentation LOCATION:          Simulator Control Room
............. ***************** THIS IS A DRILL ********************************
The following annunciators are received:
4160V BUS 5 VOLTS LO                  PCCW TRAIN A FLOW LO 4160V BUS 6 VOLTS LO                  PCCW TRAIN B FLOW LO 480V BUS 51/52/53 VOLTS LO            PCCW RCP COOLERS FLOW LO 480V BUS 61/62/63 VOLTS LO CIRC WATER PUMP A TRIP                SW TRAIN A PRESS LO CIRC WATER PUMP B TRIP                SW TRAIN B PRESS LO Concurrently with the following VAS alarms:
6266 BUS 1 UNDERVOLTAGE TRIP 6286 BUS 2 UNDERVOLTAGE TRIP 6306 BUS 3 UNDERVOLTAGE TRIP 6316 BUS 4 UNDERVOLTAGE TRIP 6337 BUS E5 RAT INCOMING LINE VOLT LOW 6360 BUS E6 RAT INCOMING LINE VOLT LOW 7330 BUS E6 UAT INCOMING LN BKR TRIP 7343 BUS E5 UAT INCOFInG LN BAP TRIP Shortly thereafter, the following VAS aiarus are received:
6555 DG A AUTO START 6605 DG B AUTO START
.............e*** .......      *******e***e  **** e******************eme*************
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION
**eeeeeee=***ee ****ee      **eeeeeee.******* e***emene***eeeeeeeeeeeeeeeeeeeeee**e .
5.1-13                              5/4/93 i
_ _~      _.  - -
 
s                                    SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO13c                                      TIME: 0950            l TO:            Site Emergency Director FROM          TSC Lead controller                                                l LOCATION:      Technical support Center
    ******************************* THIS IS A DRILL ********************************
Events warrant that a SITE AREA EMERGENCY be declared in accordance with Procedure ER 1.1, Classification of Emergencies, Initiating Conditions 6a and 7b.
f THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION 5.1-14                            5/4/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM KESSAGE NO.            ERO14c TIME: Upon SAE declaration TO:
Site Emergency Director / Response Manager FROM:
ERF Lead Controllers LOCATION:                TSC/OSC/ EOF
  ******************************* THIS IS A DRILL ************************ *******
Discuss the Area Monitoring          evacuation at Schillerof theStation.
Assembly Area staff to the Remote Assembly Do not implement this action at this time.
Continue play assuming that the action has been completed. A separate out-of-sequence demonstration of this capability will be conducted following exercise termination.
l l
i l
O!  l i
I l
i l
l IEts IS A DRILL DO NOT INITIATE ACTIONS A
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * *FFECTING STATION OPERATION 5.1-15 S/4/93
 
  .  -. -    .. .      . ~ .  .      -    .- - . .~            =. ..-
i SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.      ERO15                                      TIME: Upon RDMS                  ,
restoration TO:              Shift Superintendent i
FROM:            RDMS Instrumentation l
LOCATION:        Simulator Control Room                                                    1
    ******************************* THIS IS A DRILL ********************************
Inform the operations' crew that the RDMS screen has been restored.                        l
[
1 THIS IS A DRILL                                          ,
I l
l DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION
      ...e............................................................................
5.1                              5/4/93
 
SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ER0l6g                                    TIKE:  Newington power available-1100 TO:            Shift Superintendent FROM:          ESCC Controller - PSNH LOCATION:      Simulator Control Room
******************************* THIS IS A DRILL ********************************
Inform the operations crew that the Newington 345 kV line will be restored to service.
O THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION 5.1-17                                5/4/93
 
s                                                SEABROOK STATION EMERGENCY PREPAREDNESS MESSACE FORM                                                                                  ?
MESSAGE NO.          EROl79                                                        TIME:        1200 TO:                Exercise Players FROM:              All Exercise Lead Controllers                                                                                                  .I LOCATION:          All ERFs and Field Teams
      ******************************* THIS IS A DRILL ********************************
Exercise play is terminated. Direct the deactivation and restoration of your emergency response facility.
A f acility critique will conunence following lunch. - Discuss your response effort during lunch.            Please complete any player comment forma during lunch and-provide to the Facility Lead Controller prior to departure.
I i
r p
5 I
r THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                                                                        f
        ................................................................................                                                                  I 5.1-18                                                                  5/4/93
                                                                                                                                                          .s I
i
                                                                                                                    **-aw=y-*yq-$    r wy %-- yy+fs  W
        -e    w'-      mp -          *--9aw -- e  y y      *a- ti. g r > er r --g-g-+-e  y-.,--y9  g  s=7vt ym
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 5.2  MEDIA RELATIONS MESSAGES O
W O                                                            3/17/93 1
 
1993 GRADED EXERCISE ERO MEDIA RELATIONS MESSAGE IMPLEMENTATION KEY MESSAGE          TIME ERO-MR-1  After  first  Alert press release ERO-MR-2  After  first  Alert press release ERO-MR-3  After  first  Alert press release ERO-MR-4  After  first  Alert press release                                  ,
ERO-MR-5  After  first  Alert press release ERO-MR-6  After  first  SAE press release ERO-MR-7  After  first  SAE press release ERO-MR-8  After  first  SAE press release ERO-MR-9  After  first  SAE press release ERO-MR-10 After  first  SAE press release ERO-MR-11 Use only if Rad release mentioned in press release ERO-MR-12 Use only if Rad release mentioned in press release ERO-MR-13 Use only is Rad release mentioned in press release ERO-MR-14 Optional  after 3rd press releaso ERO-MR-15 Optional  after 3rd press release ERO-MR-16 Optional  after let press release ERO-MR-17 Use only  if station evacuation mentioned-ERO-MR-18 After PAR mentioned ERO-MR-19 Optional ERO-MR-20 Optional O
'    ERO-MR-21 ERO-MR-22 ERO-MR-23 Optional Optional Optional ERO-MR-24 Optional ERO-MR-25 Optional ERO-MR-26 Optional ERO-MR-27 Use if KI mentioned ERO-MR-28 Optional Resporusibility          MessagelNumbers Baer                174,7{10713,16 22k25,28 Hilis'                2l5i8/11J14217 20,23!26 Aquisa'p              376?9712115?18 21,24l27 1
l O                                          5.2-2                        4/26/93
 
GENERAL INSTRUCTIONS FOR USE OF O                              PRE-SCRIPTED and FREE PLAY MEDIA RELATIONS MESSAGES The pre-scripted messages contained in this section provide a basis for a minimum number of calls to be made during the drill. It is intended, however, that the Control Cell controllers responsible for implementing these messages create some of their own as the drill progresses, so called " free-play" messages. Many sources of information for the formulation of free-play messages are not available at the time of scenario development and can only be utilized by controllers during the drill. Examples include:
: 1. The content of press releases
: 2. The content of EBS messages
: 3. Information disseminated during news briefings
: 4. Responses from media relations and rumor control assistants to the pre-scripted messages contained in this section Additionally, since many controllers are assigned to monitor the function to which they are normally assigned as a responder, they are able to devise reasonable and likely messages that did not occur to the scenario developers.
With this in mind, please observe the following guidelines for use of the pre-scripted messages, and formulation and use of free-play messages:
PRE-SCRIPTED
: 1. Divide these messages evenly among the available controllers.
: 2. Messages may be used verbatim more than once provided that they are directed to different players.
: 3. Messages can be modified to ask for different information related to the message topic.
: 4. Some messages can be used more than once by simply changing the home town or location of the caller. Remember, some callers should be from Massachusetts, some from New Hampshire, some in the EPZ, some outside the EPZ, some residents of towns that have been evacuated, some sheltered, etc.
: 5. Even though messages marked as " Optional anytime" may be generally used as such, controllers should read all message content prior to placing a call to ensure that it is appropriate to the then current scenario conditions.
5.2-2                              3/5/93 l
 
FREE-PLAY
: 1. Use copies of the " Media Relations / Rumor Control Free-Play Call Information" form to document these types of calls. A master copy of the form is provided in this section of the scenario package. Make copies prior to the drill.
: 2. Use the following guidelines for form completion:
: a. CONTROLLER - Your name,
: b. RESPONDING ORG - Organization to whom your call will be directed.
: c. CALL FOR - Check one as appropriate.
: d. CALLER'S NAME - Make up a name,
: e. CALLER'S NEWS ORG - Make up for calls to Media Relations personnel. Examples are WMUR-TV, Manchester, NH, WBUR radio, Boston, MA, Foster's Daily Democrat, Dover, NH.
: f. CALLER'S LOCATION - Make up as appropriate.
: g. CALLER'S HOHE TOWN - Make up for calls to Rumor Control personnel.
: 3. A trend involves similar rumor content in at least 3 messages. Recognition of a trend will prompt certain actions on the part of public information personnel to use the media to correct the erroneous information. Obtain Control Cell Lead Controller approval before initiating any trends.
: 4. Controllers should exercie s discretion when creating new messages; keep them realistic, credible and within the context of the scenario. When in doubt, check with your Control cell Lead controller.
l 5.2-3                            3/5/93  ,
l 1
1
 
w                              MEDIA RELATIONS / RUMOR CONTROL FREE-PLAY CALL INFORMATION CONTROLLER:                                DRILL /EX: 1993 GRADED EXERCISE RESPONDING ORG:        ERO          NH          ORO CALL FOR:      Media Relations                  Rumor Control CALLER'S NAME:
CALLER'S NEWS ORG:
CALLER'S LOCATION:
CALLER'S HOME TOWN:
MESSAGE / QUESTION / REQUEST:
O PLAYER RESPONSE:
TIME CALL COMPLETED:                AM/PM Call length:          minutes.
Responding player IS PLAYER CALLBACK REQUIRED:          NO          YES WAS A CALLBACK RECEIVED:          NO          YES      TIME:        AM/PM The player's responses:          were acceptable          need improvement. Use the responses provided by a player as the basis for additional questions and calls.
5.2-4                                3/5/93 1
1 1
 
1 l
l SEAEROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM Os                                                                                          l l
MESSAGE NO.:    ERO-MR-1                                    TIME: After First Alert Press Release TO:            Media Relations Assistant                                                j FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the        6 Aest Alert press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What does an Alert mean?
Where does this definition that you provided come from?
''}
a What caused the Alert to be declared?
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-5                                  3/5/93
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-MR-2                                    TIME: After First Alert Press Release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the first Alert press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
When was the Alert declared?
Who makes the determination that an Alert should be declared?
What and where is the criteria for declaring an Alert?
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls..
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ igi, 5.2-6                              3/5/93
 
SEAEROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-3                                    TIME: After First Alert Press Release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the first Alert press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Has the State of NH and the Commonwealth been notified?
Has the NRC been notified?
Do entire State or Federal agencies mobilize for an Alert?
Thank the assistant and hang up.      Time call completed:              AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls..
THIS IS A DRILL l
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY r                        DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                      1 g_,)  ................................................................................      j 5.2-7                                3/5/93 !
l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM i
MESSAGE NO.:  ERO-MR-4                                    TIME: After First Alert Press Release            f TO:          Media Relations Assistant                                                    )
FROM:                          /                                                          1 LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
l l
NOTE TO CONTROLLER: This message may be used after the first Alert press                  ,
release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Does the entire station organization become involved with the response effort?
Who is the company spokes person? The response Manager? or Rob Williams?
When does an Alert response end? Will the Media Center be open for the                    ,
duration?
Thank the assistant and hang up.      Time call completed:            AM/PH Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the          .
responses provided by a player as the basis for additional questions and calls..          I i
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ qq;,
5.2-8                                3/8/93
 
f-                                      SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE No.:  ERO-MR-5                                  TIME: After First Alert Press Release TO:            Media Relations Assistant FROM:                        /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the first Alert press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What capability does the Media Center have to support the Media?
How often will press briefings be held?
g Will AP / UPI be notified of news updates?
Thank the assistant and hang up. Time call completed:            AM/PM Call lengths        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.. l THIS IS A DRILL                                  !
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                    ;
(-
\
5.2-9                                3/8/93 l
1 1
I
 
I l
1 SEABROOK STATION                                  l EMERGENCY PREPAREDNESS MESSAGE FORM l
MESSAGE NO.:  ERO-MR-6                                    TIME:  After First SAE Press Release To:          Media Relations Assistant FROM:                        /
LOCATION:    JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the first Alert press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What does a Site Area Emergency mean?
Where does this definition that you provided come from?
What caused the Sito Area Emergency to be declarsd?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls..
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-10                              3/8/93
 
1 i
/                                      SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-7                                    TIME: After First SAE Press Release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used after the first Site Area Emergency press release has been issued. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
When was the Site Area Emergency declared?
Who makes the determination that a Site Area Emergency should be declared?
/~~ What and where is the criteria for declaring a Site Area Emergency?
km Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
1 THIS IS A DRILL                                  i DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
\.
5.2-11                              3/5/93 l
1
 
SKABROOK STATION EMEPGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-KR-8                                    TIME:  After first SAE press release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER:    This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Has this type of accident (or event) occurred anywhere else?
What were the consequences and ramifications?
What inadequacies in the plant's design, construction or maintenance allowed this type of accident (or event) to occur?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-12                              3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-9                                    TIME: After first SAE press release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTRO'.LER:  This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What type of accident investigations will be conducted following the event and by whom?
Will a preliminary report be issued to the public on the cause of the accident?
\      Can NAESCO or any of it's employees be held liable for damages?
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:          minutes. Responding player Use the space below to summarize the player's responses.
1 l
The player's responses          were acceptable        need improvement. Use the      l responses provided by a player as the basis for additional questions and calls.      ,
i I
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY g-                        DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
(      ................**..................****...........**......**...........**...**
  ~'
S.2-13                                3/5/93 l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:                            ERO-MR-10                                                TIME: After first SAE press release TO:                                    Media Relations Assistant FROM:                                                                /
LOCATION:                              JTIC
                                ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet n e player and ask the following questions:
Are any specialist being brought in to deal with the acaident?
How long will Seabrook be off line before it operates at its full capacity?
Thank the assistant and hang up.                                            Time call completed:                AM/PM Call length:                                            minutes. Responding player:
Use the space below to summarize the player's responses.
1 The player's responses:                                              were acceptable      need improvement.      Use the responses provided by a player as the basis for additional questions and calls.
j THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW g
5.2-14                                  3/5/93 l
 
SEAEROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-11                                    TIME:  Use only if a Rad release was mentioned in press release TO:          Media Relations Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO OONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
A release of radioactivity occurred. Can long term health effects to the public can be expected?
Will NAESCO or NRC commission any studies to detect the long term effect of this j'" release on the NH public?
\
Should the general public in the immediate vicinity of the plant be directed to take any precautions?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
i The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW c;  ................................................................................
5.2-15                              3/8/93
 
f SKARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MEESAGE NO.:  ERO-MR-12                                  TIME: Use only if a Rad release was mentioned in press release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
How much radiation is being released?
Is this amount more or less than that being released daily?
How far will the radioactivity travel?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-16                              3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-13                                  TIME: Use only if Rad release was mentioned in the press release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
How is radioactivity tracked once it leaves the plant?
What organizations are involved in tracking the spread of the contamination?
Will the station staff be able to return to evacuated plant areas?
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY f-s                    DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW (J  ................................................................................
5.2-17                                3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE No.:  ERO-MR-14                                  TIME:  After 3rd press release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Who is directing the emergency response for NAESCO7 What is his background / credentials?
Where is he located?                                                                  ;
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player Use the space below to summarize the player's responses.
l 1
l j
l l
1 i
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-18                                3/5/93
 
  .                                      SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM
%J MESSAGE No.:  ERO-MR-15                                  TIME: After 3rd press release TO:          Media Relations Assistant FROM:                        /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What is the State of New Harpshire doing in response to this event?
What about the Commonwealth of Massachusetts?
f'~    Do they have a media contact and how can I reach them?
\
Thank the assistant and hang up. Tine call completed:            AM/PM Call lengths        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
    'g  ................................................................................
5.2-19                              3/5/93
 
l SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-16                                  TIME:  After let press briefing TO:            Media Relations Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Has a press briefing been held?
Is a second press conference scheduled to discuss the events at Seabrook Station?
Where and when is the next conference?
What identification is required to attend?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the sp'ce below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-20                              3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-MR-17                                  TIME:  If Station evacuation has been discussed in release TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
: a. If the situation gets worse, will remaining station personnel be evacuated?
: b. Have there been any injuries or deaths?
Thank the assistant and hang up.      Time call completed:              AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-21                                3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:    ERO-MR-18                                      TIME:  After PAR mentioned TO:              Media Relations Assistant FROM:                            /
LOCATION:        JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Have any towns been evacuated?
Who makes the decision to evacuate a town?
What is that decision based on and how does that process work?
Thank the assistant and hang up.        Time call completed:                  AM/PM Call lengths            minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:            were acceptable          need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                                          4 5.2-22                                        3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM ~
MESSAGE NO.:    ERO-MR-19                                  TIME:  Optional TO:              Media Relations Assistant FROM:                            /
LOCATION:        JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO OONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Is it possible to do a telephone interview with the NAESCO spokesman? Who is that?
What arrangements can be made to interview some of the plant personnel such as the Control Room operators?
O k,
s Thank the assistant and hang up.        Time call completed:            AM/PM Call lengths            minutes. Responding player Use the space below to summarize the player's responses.                                >
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                    l l
DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW O  .......................**......... ****......................****....****.......
5.2-23                              3/5/93 l
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-20                                    TIME:    Optional TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
MOTE TO CONTROLLER: This message may be used anytime.          Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
How do I get to the Media Center?
Does NAESCO video tape their press conferences?
Is it possible to film the press conferences?
Who is available to question if I arrive?                                              f Thank the assistant and hang up.      Time call completed:                AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player *s responses          were acceptable      n9ad improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-24                                3/5/93
 
SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM KESSAGE No.:  ERO-MR-21                                  TIMES Optional TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Is it safe to do a tly-over of the plant to get some film footage?
Will interviewe be allowed with plant emergency workers?
Thank the assistant and hang up.      Time call completed:              AM/PM          !
l Call lengths          mir sea. Responding players Use the space below to oummarize the player's responses.
The player's responses:          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l THIS IS A DRILL l
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                      I DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW c--
5.2-25                              3/5/93 i
l l
l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-22                                  TIME: Optional              ,
TO:            Media Relations Assistant i
FROM:                        /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What are the plans for correcting the situation at the plant and putting it back to normal operation?
How much will it cost?
Who will pay for it?
Thank the assistant and hang up. Time call completed:              AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION r            DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-26                                3/5/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-MR-23                                    TIME: Optional TO:            Media Relations Assistant FROM                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NCYrE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What radio stations should people be listening to for emergency information?
What TV stations should people be listening to for emergency information?
How will people know what to do if they don't have access to either?
Thank the assistant and hang up.      Time call completed:                AM/PM Call lengths          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement.' Use the responses provided by a player as the basis for additional questions and calls.
  .............................. 3................................................
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAF1.ZY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                        ,
5.2-27                                  3/5/93 i
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM KESSAGE NO.:  ERO-MR-24                                  TIME: Optional TO:            Media Relations Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Will the NRC send any of their people to Seabrook?
What is their relationship to NAESCO during the accident, for example, are they directing NAESCO's actions?
Is there an NRC spokesman and how can I reach him or her?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ gig, 5.2-28                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:                                              ERO-MR-25                                                  TIME: Optional TO:                                                      Hedia Relations Assistant FROM:                                                                    /
LOCATION:                                                JTIC
                                                  ******************************* THIS IS A DRILL ********************************
l l
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
What risks or hazards are plant workers being exposed to right now?
What is being done to protect them and who is responsible for their safety?
Will they be subject to any follow up studies to determine long term health problems?
Thank the assistant and hang up.                                                              Time call completed:                                        AM/PH Call lengths                                                  minutes. Responding player Use the space below to summarize the player's responses.
The player's responses                                                  were acceptable                      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l l
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-29                                                          3/5/93
 
l l
l f
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-26                                  TIME: Optional TO:            Media Relations Assistant FROM:                        /
LOCATION:      JTIC
.......************************ THIS IS A DRILL ********************************
NOTE TO OONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
Could you give me a briefing on the events at the plant so far?
How long will someone be available at this number if I have additional questions?
Can the public call this number for information?
Thank the assistant and hang up. Time call completed:            AM/PM Call lengths        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-30                              3/5/93
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM F
MESSAGE NO.:  ERO-MR-27                                  TIME: Use only if KI is discussed TO:            Media Relations Assistant FROM:          ___
                                    /
LOCATION:      JTIC
    ...............**************** THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
I seem to recall that the Russians and Poles passed out some radiation protection pills after Chernobyl. Could you tell me something about them?
Will plans be made to distribute these thyroid pills to people in the effected accident areas?
(''N Could you tell me the basis for that decision (s)?
NOTE TO CONTROLLER:    The above questions refer to potassium iodine (KI).
Thank the assistant and hang up. Time call completed:                AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUSLIC HEALTH AND SAFETY                  j DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                      i O
I 5.2-31                            3/5/93 i
 
SKARROOK STATION EMERCENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-MR-28                                  TIME:  Optional TO:            Media Relations Assistant FROM:                          1 LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: Use this message may be used anytime.        Prior to placing the call, you should make up your caller's name and news organization.
Greet the player and ask the following questions:
How do plant operators know what to do during an accident of this type?
Are workers still at the plant volunteers or are they required to be there?
Will you work there again after this accident?
Thank the assistant and hang up.      Time call completed:              AM/PM Call lengths          minutes. Responding player: _
Use the space below to summarize the player's respcnses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a pla)er as the basis for additional questions and calls.        -
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ArTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.2-32                              3/5/93
 
NORTH ATLANTIC ENERGY SERVICE CORPORATION                  i SEABROOK STATION 1993 GRADED EXERCISE t
5.3  RUMOR CONTROL MESSAGES O
O                                          3/17/93
 
1993 GRADED EXERCISE ERO RUMOR CONTROL MESSAGE IMPLEMENTATION KEY MESSAGE  TIME ERO-RC-1  After  Alert ERO-RC-2  After  mention of release ERO-RC-3  After  mention of release ERO-RC-4  After  Alert ERO-RC-5  After  SAE ERO-RC-6  After  Alert ERO-RC-7  After  SAE ERO-RC-8  After  mention of release ERO-RC-9  After  Alert ERO-RC-10 After  mention of release ERO-RC-11 After  mention of release ERO-RC-12 After  Alert ERO-RC-13 After  SAE ERO-RC-14 Optional ERO-RC-15 Optional ERO-RC-16 Optional ERO-RC-17 Optional ERO-RC-18 Optional ERO-RC-19 Optional ERO-RC-20 After SAE
  /'    ERO-RC-21 Optional ERO-RC-22 Optional ERO-RC-23 After Alert ERO-RC-24 After SAE ERO-RC-25 After SAE ERO-RC-26 After SAE ERO-RC-27 Optional ERO-RC-28 Optional ERO-RC-29 After Alert ERO-RC-30 Optional ERO-RC-31 Optional ERO-RC-32 Optional ERO-RC-33 Optional ERO-RC-34 Optional ERO-RC-35 After SAE ERO-RC-36 After SAE ERO-RC-37 After SAE ERO-RC-38 After SAE ERO-RC-39 Optional ERO-RC-40 Optional ERO-RC-41 After Alert ERO-RC-42 After SAE ERO-RC-43 After SAE ERO-RC-44 After SAE ERO-RC-45 Optional ERO-RC-46 After SAE
 
1993 CRADED EIERCISE ERO RUMOR CONTROL MESSAGE IMPLEMENTATION KEY MESSAGE      TIME ERO-RC-1    After Alert ERO-RC-2 After mention of release ERO-RC-3 ERO-RC-4 After mention of release After Alert ERO-RC-5      After SAE ERO-RC-6    After Alert ERO-RC-7    After SAE ERO-RC-B ERO-EC-9 After mention of release After Alert ERO-RC-10    After mention of release ERO-RC-ll    After mention of release ERO-RC-12    After Alert ERO-RC-13    After SAE ERO-RC-14    Optional ERO-RC-15    Optional ERO-RC-16    Optional ERO-RC-17    Optional ERO-RC-18    Optional ERO-RC-19    Optional ERO-RC-20    After SAE ERO-RC-21    Optional ERO-RC-22    Optional ERO-RC-23    After Alert ERO-RC-24    After SAE ERO-RC-25    After SAE ERO-RC-26    After SAE ERO-RC-27    Optional ERO-RC-28    Optional
'ERO-RC-29    After Alert ERO-RC-30    Optional ERO-RC-31    Optional ERO-RC-32    Optional ERO-RC-33    Optional ERO-RC-34    Optional ERO-RC-35    After SAE ERO-RC-36    After SAE ERO-RC-37    After SAE ERO-RC-38    After SAE ERO-RC-39    Optional ERO-RC-40    Optional ERO-RC-41    After Alert ERO-RC-42    After SAE ERO-RC-43    After SAE ERO-RC-44    After SAE ERO-RC-45    Optional ERO-RC-46    After SAE 5.3-1 4/26/93
 
1993 CRADED EIERCISE ERO RUMOR CONTROL MESSAGE IMPLEMENTATION KEY (Continued)
MESSAGE  'I.DLG ERO-RC-47 After SAE Respodsibility              MessageLNumisFs Jones          1,4;7;10;13716:19l22?2SI28
                                              ,31,34,37,40;43(47 CAtariiss        2 j 5j8!11",14I17 J20j23,[26l,#29 32;35;38i41'e44 McKees          3(6;9712s15;18721724727730 33;36j39,_42,4Si46 O
O                                        5.3-2                            4/26/93
 
GENERAL INSTRUCTIONS FOR USE OF PRE-SCRIPTED and FREE PLAY MEDIA RELATIONS MESSAGES                                w The pre-scripted n.easages contained in this section provide a basis for a minimum number of calls to be made during the exercise. It is intended, however, that the Control Cell controllers responsible for implementing these messages create some of their own as the exercise progresses, so called " free-play" messages. Many sources of information for the formulation of free-play messages are not available at tbs time of scenario development and can only be utilized by controllers during the exercise. Examples include:
: 1. The content of press releases
: 2. The content of EBS messages
: 3. Information disseminated during news briefings
: 4. Responses from media relations and rumor control assistants to the pre-scripted messages contained in this section Additionally, since many controllers are assigned to monitor the function to which they are normally assigned as a responder, they are able to devise reasonable and likely messages that did not occur to the scenario developers.
With this in mind, please observe the following guidelines for use of the pre-scripted messages, and formulation and use of free-play messages:
PRE-SCRIPTED
: 1. Divide tnese messages evenly among the available controllers.
: 2. Messages may be used verbatim more than once provided that they are directed to different players.
: 3. Messages can be modified to ask for different information related to the message topic.
: 4. Some messages can be used more than once by simply changing the home town or location of the caller. Remember, some callers should be from Massachusetts, some from New Hampshire, some in the EPZ, some outside the EPZ, some residents of towns that have been evacuated, some sheltered, etc.
: 5. Even though messages marked as " Optional anytime" may be generally used as such, controllers should read all message content prior to placing a call to ensure that it is appropriate to the then current scenario conditions.
5.3-3                                  3/8/93
 
FREE-PLAY
: 1. Use copies of the " Media Relations / Rumor Control Free-Play Call Information" form to document these types of calls. A master copy of the form is provided in this section of the scenario package. Make copies prior to the exercise.
: 2. Use the following guidelines for form completions
: a. CONTROLLER - Your name,
: b. RESPONDING ORG - Organization to whom your call will be directed.            ,
: c. CALL FOR - Check one as appropriate,
: d. CALLER'S NAME - Make up a name.
: e. CALLER'S NEWS ORG - Make up for calls to Media Relations personnel.
Examples are WMUR-TV, Manchester, NH, WBUR radio, Boston, MA, Foster's      '
Daily Democrat, Dover, NH.
: f. CALLER'S LOCATION - Make up as appropriate.
: g. CALLER'S HOME TOWN - Make up for calls to Rumor Control personnel.
: 3. A trend involves similar rumor content in at least 3 messages. Recognition of a trend will prompt certain actions on the part of public information personnel to use the media to correct the erroneous information. Obtain Control Cell Lead Controller approval before initiating any trends.
: 4. Controllers should exercise discretion when creating new messages; keep them realistic, credible and within the context of the scenario. When in doubt, check with your Control Cell Lead Controller.
5.3-4                                3/8/93
 
i j
MEDIA RELATIONS / RUMOR CONTROL FREE-PLAY CALL INFORMATION 1
CONTROLLER:                                DRILL /EX: 1993 GRADED EXERCISE i
l l
RESPONDING ORG:        ZRO          NH          MASS l
CALL FOR:      Media Relations                  Rumor Control                              l l
CALLER'S NAME:                                                                              j CALLER'S NEWS ORG:                                                                          !
CALLER'S LOCATION:
CALLER'S HOME TOWN:
MESSAGE / QUESTION / REQUEST:
O PLAYER RESPONSE:
TIME CALL COMPLETED:                AM/PM Call length:            minutes.
Responding player:
IS PLAYER CALLBACK REQUIRED:          NO          YES WAS A CALLBACK RECEIVED:          NO          YES      TIME:          AM/PM The player's responses            were acceptable          need improvement. Use the responses provided by a player as the basis for additional questions and calls.
5.3-5                                  3/8/93 1
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-1                                  TIME: After Alert TO:            Rumor Control Assistant FROM:                            /
LOCATION:      JTIC
******************************* THIS IS A DRILL *************************~******
NOTE TO CONTROLLER: This message may be used anytime.      Prior to plac_og the call, you should make up your caller's name and location and/or home town.
Great the player and ask the following questions:
I heard that this accident was caused by disgruntled NAESCO employees. Is this true?
Thank the assistant and hang up. Time call completed:            AM/PM Call lengths        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses        were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-6                              3/8/93
 
i l
i
  ,                                      SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM HESSAGE NO. ERO-RC-2                                  TIME:  After mention of release TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and 1rcation and/or home town.
Greet the player and ask the following questions:
I heard that the steam clouds released from the station are radioactive. Is this true?
Thank the assistant and hang up. Time call completed:            AM/PM
("
Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW c::)                                          5.3-7                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-RC-3                                      TIME: After mention of release TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.          Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I'm a journalism student at UNH and I live with a former Seabrook HP Technician.
He tells me that the details about the levels of radioactivity being released are bogus. He claims that there much higher but we don't want to panic people.
Can you tell me if this is true?                                                        ;
Thank the assistant and hang up.      Time call completed:                AM/PM Call lengths          minutes. Reeponding player:
Use the space below to summarite the player's responses.
The player's responses:          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-8                                  3/8/93 '
 
l 1
l l
i i
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-4                                    TIME:  After Alert TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE 'ID CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I'm a corn grower in (Stratham).      I have just planted my spring crop. I was wondering if I should have someone test my soil for radiation. My neighbor told me that I would not be able to harvest the crop and sell it because it will be radioactive. Is this true?
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable  _
need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIA'A7 ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW ON                                          5.3-9                                3/8/93
 
SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE No.:  ERO-RC-5                                  TIME:  After SAE TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
l NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions                                      ,
l My father told me that this accident is not anything like Chernobyl. He says portions of state of New Hampshire, and of Massachusetts have to be evacuated.
How can this be true, unless the accident is worse than everyone is making it out to be?                                                                            l l
1 Thank the assistant and hang up. Time call completed:              AM/PM          j Call lengths        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
.....***.*****... ***..***** .. ***. ..... ***e *****.**************************
5.3-10                                3/8/93
 
SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE No.:  ERO-RC-6                                    TIME: After Alert TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: Thio message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
My neighbor told me that this accident happened because of operator error. Can that be right?
Thank the assistant and hang up.      Time call completed:            AM/PM
- Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW g-5.3-11                              3/8/93
                                                                    '" -    T        _m-_- + -m_
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-7                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I raise chickens in Seabrook. Your company activated sirens earlier today. My wife tells me that none of our hens have laid eggs today. If I don't get any eggs, who do I charge for the loss. She says that I send your company a bill.
Is this true?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
l The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l i
l THIS IS A DRILL                                l DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                l DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ j 5.3-12                              3/8/93 1
I
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM
(
MESSAGE NO. ERO-RC-8                                  TIME: After mention of release TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I live in Seabrook. My son tells me that the rain causes all the radioactivity to deposit out quickly in the down wind locations. Am I at greater risk because its raining?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
i THIS TS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                )
DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY              l DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                    f A                                          5.3-13                              3/9/93 1
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-9                                    TIME: After Alert TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I was told that all the Station Staff left the plant at the first sign of trouble and that only a handful of people are controlling the situation.            Is this true?
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
IRIS IS A DRILL                                          !
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY                      l DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                            !
i 5.3-14                                      3/8/93 ,
1 i
l,
 
SKADROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-lO                                  TIME: After mention of release TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
My sister says that all the people who have been evacuated because of the accident are being held in special buildings until they're not radioactive anymore. My cousin Vinny works at the plant. His wife called me to see if I had      ,
seen him. She called the plant but no one answers. Can I find out if he is being held up in a Station building like my sister says.
Thank the assistant and hang up. Time call completed:              AM/PM Call lengths        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement. Use the.
responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-15                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-RC-11                                    TIME:  After mention of    j release TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I was listening to one of the Boston radio stations and they said that clouds of radioactivity were released from the plant earlier today.      Is this true?
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player                                  __
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a playec as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-16                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:    ERO-RC-12                                    TIME: After Alert TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I have been told that recent problems in the plant has been found to be due to disgruntled em'loyees. Was this accident caused by an employee?
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
l The player's responses:          were acceptable        need improvement. Use the    j responses provided by a player as the basis for additional questions and calls.
1 THIS IS A DRILL                                  j DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE' ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY              j DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                      j 5.3-17                              3/8/93 )
r-
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-13                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
          ..........********************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I heard that North Atlantic Energy Service Corporation will pay for all damages caused by the accident. I would like to file a claim. I spilled coffee all over my white suit when I heard the siren. I was told that I can send my cl'a ing bill to Community Relations.      Is that true?
Thank the assistant and hang up. Time call completed:              AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-18                                3/8/93 i
i i
1 1
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-RC-14                                  TIME: Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I just heard you guys were having problems at the plant. What's going on?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
/~  ..............................................................................**
l
%                                          5.3-19                              3/8/93
                                                                                        ]
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE No.:  ERO-RC-15                                  TIME: Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
; Greet the player and ask the following questions l The media says that the plant had lost all offsite power. My lights are working. Is this just a mistake?
Can it get any worse?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-20                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:    ERO-RC-16                                  TIME:  Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
**.**************************** THIS IS A DRILL ********************************
NOTE TO OONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
My friend said that it might be days before you guys get things under control at the nuke. Is that right?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.                                    ,
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY                      l DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
..********.......**** ....    ***....*************e.e*******ee *******.************        j 5.3-21                              3/8/93 1
l
 
I l
l SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-17                                          TIME: Optional TO:            Rumor Control Assistant FROM:                                /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
My friend tells me that no one can enter the Station because of the radiation levels. He told me that almost every employee left the plant. Is this true?
Thank the assistant and hang up.            Time call completed:            AM/PM Call length:          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:                were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-22                              3/9/93
 
SEABROOK STATION g                        EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-18                                  TIME: Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I've heard there are massive amounts of radiation blowing towards Hampton.
Should I call my son and warn him?
Thank the assistant and hang up. Time call completod              AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-23                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-19                                  TIME: Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I heard the feds have been called in to investigate this accident.      Does this mean someone at the plant tampered with the safety systems?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-24                              3/8/93 qqi,i i
 
n                                    SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-RC-20                                  TIME:  After SAE TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
    .**..... *.**...............*** THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I just heard the sirens. My police Chief tells me not to worry that its just a false alarm. He is been known to be wrong in the past. Is it true that I don't need to evacuate?
Thank the assistant and hang up. Time call completed:            AM/PM Call lengths        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l I
1 THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY f.
DO NOT INITIATE ACTIONS WHICH VIOLATE THE L*d 5.3-25                              3/8/93 l 1
l l
l l
 
SEABROOK STATION EMERGENCY PREPAREDNESS ?itSSAGE FORM MESSAGE NO.:  ERO-RC-21                                  TIME:  Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This messa;,e may be used anytime.      Prior to placing the call, you should make up your calier's name and location and/or home town.
Greet the player and ask the following questions:
I have been told that you won't be operating the plant for quite along time.
Could this accident close down the plant forever?
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding nlayer:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS ~WHICH VIOLATE THE LAW 5.3-26                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-22                                  TIME: Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
1 Word around here is that everybody has left the nuke and that its basically out of control. Any truth to that?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
(
3/8/93 5.3-27
 
1 1
I i
SEARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-23                                  TIME: After Alert TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
Nobody from my town has told me what to do. I heard about a radioactive steam release. If this is true, don't I have to evacuate?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l l
................. ** .................................. ........................      l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                    l DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ qqi, 5.3-28                            3/8/93 i
l l
l
 
g                                      SEABROOK STATION
(                          EMERGENCY PREPAREDNESS MESSAGE FORM v
MESSAGE No.:  ERO-RC-24                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
My aunt said that everybody in (caller's home town) should be packing up and heading for Salem, New Hampshire to some evacuation center. Can you give me directions to where we're supposed to be going?
Thank the assistant and hang up. Time call completed:            AM/PM
/
(s, Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls, i
l l
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAIETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW O''                                          5.3-29                              3/8/93 A ,
l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-25                                  TIME:  After SAE TO:          Rumor Control Assistant FROM:                        /
LOCATION:    JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
How and when will I be told to evacuate?
Has that order already gone out?
Thank the assistant and hang up. Time call completed:            AH/PM Call length:        minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
I l
l l
THIS IS A DRILL                                      !
i DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ qqi, 5.3-30                              3/8/93 i
i I
1
 
A                                    SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-26                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
Somebody down at the store said everybody within 10 miles of the plant should be evacuating. Where do people in (caller's home town) go to?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
O. Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
(]                                          5.3-31                              3/8/93 s
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FOPJi MESSAGE NO.:  ERO-RC-27                                  TIME: Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I heard some people have been seriously contaminated at the plant. How will they be decontaminated? Will these people be monitored for radiation sickness?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improveeent. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
    ................................................................................ qqi, 5.3-32                              3/8/93
                                                                                            /
 
    ,_ _ -. _                        _      ,_.      ,_      m    .    .                . _      .. _    ._ _ _ . .
SEARROOK STATION                                                  !
EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:            ERO-RC-28                                            TIME: Optional                        i TO:                    Rumor Control Assistant FROM:                                    /                                                                        ,
LOCATION:              JTIC f
8
;          ******************************* THIS IS A DRILL ********************************~                                '
NOTE TO CONTROLLER: This message may be used anytime.                        Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:                                                                i I was told that the problem at the plant was created by a employee.                            Is this true?
Thank the assistant and hang up.                  Time call completed:                                          i AM/PM
:l Call lengths                  minutes.      Responding player                                                .f' Use the space below to summarize the player's responses.
:b I
i i
The player's responses                    were acceptable              need improvement.. Use the responses provided by a player as the basis for additional questions and calls.
s meneeeeeeeeeeeeee........            eeeeee...................e***ee.....ee..              .. ...... ...
THIS IS A DRILL                                                  ,
l DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH.AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
* eneeemene......          ** .......e*      ....  ******eeeeee***ee***    e**    eeee***********e****
5.3-33                                          3/8/93 k
I w          , - - - .  , _ - -      ,
 
1 l
SEABROOK STATION                                    ,
EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-29                                  TIME: After Alert TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
Is the plant still operating?
IF ANSWERED YES: With all that's happening there, don't you think it should be shut down?
IF ANSWERED NO: When it supposed to start back up again?
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW qqi, 5.3-34                            3/8/93      ,
l
 
m                                    SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM HESSAGE NO.:  ERO-RC-30                                  TIME:  Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
How much is it going to cost to fix the mess at Seabrook and who's going to pay for it? I have been told that unless the Governor declares a State of Emergency all the local business people will have to pay?
Thank the assistant and hang up. Time call completed:            AM/PM
\  Call length:          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
  #                                          5.3-35                              3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-31                                    TIME: Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I own a business here in (caller's home town).      I shutting the place down and getting out of here because of what's happening in Seabrook. I want to know if North Atlantic Energy Service Corporation will compensate me for my lost business revenue.
Thank the assistant and hang up.      Time call completed:              AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-36                                3/8/93
 
m                                      SEABROOK STATION
(                          EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-32                                    TIME:  Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I am over here in Seabrook and what I need to know is should I wash my two dogs, they were outside earlier this morning?      I noticed that both are very tired do they have radiation sickness?
Thank the assistant and hang up.      Time call completed:              AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.              l l
i l
1 l
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
'-                                          5.3-37                              3/8/93 1
l i
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:                ERO-RC-33                                                                        TIME: Optional TO:                        Rumor Control Assistant FROM:                                                    /
LOCnTION:                  JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I live on a farm here in Stratham and my neighbor is herding all his cows into the barn. Should I be doing the same thing to my cows?
Thank the assistant and hang up.                                    Time call completed:                                              AM/PM Call lengths                            minutes.            Responding player:
Use the space below to summarize the player's responses.
i l
The player's responses:                                    were acceptable                            need improvement. Use the responses provided by a player as the basis for additional questions and calls.
I 1
I l
1 l
l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-38                                                                    3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-34                                  TIME: Optional TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER:    This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I raise goats. My family and I drink goat milk regularly.      Should I be putting my goats in the barn? Can I use their milk?
Thank the assistant and hang up.      Time call completed:              AM/PM
/    Call lengths          minutes. Responding players
(,  Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additio-al questions and calls.
1 THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
/~'T  ................................................................................
O                                              5.3-39                              3/9/93 l
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE PORM MESSAGE NO.:  ERO-RC-35                                  TIME:  After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I remember from reading the calendar that you guys sent me that I was supposed to be listening to some TV or radio station during an emergency.      Now I can't find the blasted calendar. Could you tell me?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 1
5.3-40                              3/8/93
 
l l
l SEABROOK STATION g
l  4                          EMERGENCY PREPAREDNESS MESSAGE FORM                          i V
MESSAGE NO. ERO-RC-36                                  TIME: After SAE TO:            Rumor Control Assistant FROM                          /
LOCATION:      JTIC
      ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.        Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I've been listening to WBCN in Boston but they haven't said anything about any evacuation being started. I haven't missed any news on this, have I?
Thank the assistant and hang up.      Time call completed:              AM/PM
/'"g  call lengths          minutes. Responding players
(_)  Use the space below to summarize the player's responses.
The player's responses:        were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY
  -                      DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
('s                                            5.3-41                                3/8/93
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM KESSAGE NO.:  ERO-RC-37                                  TIME:  After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
          ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
i I thought I just heard some sirens going off but its hard to tell from where I live. Did they go off and what should I be doing? Are my kids going to be sent home?
Thank the assistant and hang up.      Time call completed:            AM/PM Call length:          minutes. Responding player:
Use the space below to summarize the player's responses.
1 I
1 1
1 i
l l
l l
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-42                              3/8/93
 
l 1
l 1
^                                      SEABROOK STATION                                i EMERGENCY PREPAREDNESS MESSAGE FORM                        l 1
i I
MESSAGE NO.:  ERO-RC-38                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                          /                                                    I LOCATION:      JTIC 1
1
    ******************************* THIS IS A DRILL ********************************
I NOTE TO CONTROLLER: This message tuay be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
1 Greet the player and ask the following questions:
I was taking a nap and just woke up and heard there's a problem at Seabrook.      I don't know if I missed it while I was asleep but I haven't heard the siren down      ,
the street go off yet. If is isn't working, call me back and tell me so I can go warn the rest of my neighbors.
[  Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
1 i
i i
I I
l The player's responses:          vere acceptable      need improvement. Use the    j responses provided by a player as the basis for additional questions and calls.
    ***...............**....................................................***..... l THIS IS A DRILL                                !
I DO NOT INITIATE ACTIONS AFFECTING STATION OPEPATION                  j DO NOT INITIATE ACfIONS AFFECTING PUBLIC HEALTH AND SAFETY
~~                    DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                    ;
g    .........*****..........................................***... ** ..............    )
5.3-43                              3/8/93 j
 
SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-39                                  TIME: Optional                l TO:            Rumor Control Assistant i
FROM:                        /
LOCATION:      JTIC
                                      ......**.......*+************** THIS IS A DRILL ********************************        !
1 NOTE TO OONTRvLLER: This message may be used anytime. Prior to placing the              !
call, you should make up your caller's name and location and/or home town.              j i
J Greet the player and ask the following questions:
l I heard I can call this number to get some anti-radiation pills. How do I go            l about getting some?                                                                    !
NOTE TO CONTROLLER: This above question refers to potassium iodine.                    ;
1 Thank the assistant and hang up. Time call completed:            AM/PM            i Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the        i responses provided by a player as the basis for additional questions and calls.
l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY                  )
DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
                                      ................................................................................ qqip 5.3-44                            3/8/93 l
 
i l
,                                      SEABROOK STATION
(                            EMERGENCY PREPAREDNESS MESSAGE FORM l
MESSAGE NO.:  ERO-RC-40                                  TIME:  Optional TO:            Rumor control Assistant FROM:                        /
LOCATION:      JTIC
    ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
About a year ago I bought some iodine pills that are supposed to protect a person from radiation. Now I can't seem to find the instructions that came with the pills. Can you tell me how many I should take?
NOTE TO CONTROLLER: This above question refers to potassium iodine.
Thank the assistant and hang up. Time call completed:            AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
(,,)  ................................................................................
5.3-45                              3/8/93
 
SKABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM KESSAGE NO.        ERO-RC-41                                                                                    TIME: After Alert        <
j 1
TO:                Rumor Control Assistant FROM:                                                                                /
I LOCATION:          JTIC                                                                                                                  f
                                                                                                                                          )
....*************************** THIS IS A DRILL ********************************
l NOTE TO CONTROLLER: This message may be used anytime after 1:30 p.m.                                                            Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
i l
I was driving by Seabrook about (pick a time approximately 20 - 30 minutes after                                                            l' the Alert was declared) and it looked like everybody at the plant was leaving in a big hurry. What was everybody running from?
NOTE TO CONTROLLER: The above question pertaxas to the evacuation of non-essential station personnel.
Thank the assistant and hang up.                                                            Time call completed:            AM/PM Call lengths                                                                minutes. Responding player:
Use the space below to summarize the player's responses.                                                                                    l l
l l
l The player's responses:                                                              were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.                                                            l THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-46                              3/8/93
 
SEABROOK STATION
(
t                                EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:      ERO-RC-42                                                        TIME: After SAE TO:              Rumor Control Assistant FROM:                                /
LOCATION:        JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I have been told that North Atlantic Energy Service Corporation plans to broadcast a public apology statement from someplace in Newington NH.                                                          Is this true? Can I get tickets?
NOTE TO CONTROLLER: This caller is not a member of the news media.
Thank the assistant and hang up.            Time call completed:                                                          AM/PM Call lengths              minutes. Responding player:
Use the space below to summarize the player's responses.                                                                                    ;
The player's responses:                were acceptable              need improvement. Use the                                              !
responses provided by a player as the basis for additional questions and calls.
seeeeeeeeeeeeeeeeeeeeee***eeeeeeeemenetteeeeeeeeeeeeeeeeeeeeeeeeeeeeeentene**ee.
THIS IS A DRILL                                                                                  ,
DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
  *  ..teet....e    e  eet 9 9    e.ee*******  ee.......**emetee**e                                          . *9ete****eeten*****
C                                                5.3-47                                                                              3/8/93
 
i SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM                              ,
MESSAGE NO.:  ERO-RC-43                                    TIME:  After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
I live in Hampton but I work in Manchester. My day care center called me and told me that they were directed to close and to come pickup my kids.      Can I pick them up at the school?
NOTE TO CONTROLLER:    If the town you select as the caller's home town has been evacuated, use the following questions:
My family was home when I left this morning.      If they've been evacuated, where and how can I find them?
Thank the assistant and hang up.      Time call completed:              AM/PM Call lengths          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses          were acceptable        need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ qqi, 5.3-48                              3/9/93
 
i
                                                                                        )
i I
g"                                    SKARROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO. ERO-RC-44                                  TIME:  After SAE          J To:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL *******************=************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player in a belligerent manner and maintain that tone as you ask the following questions:
Well I hope you people are damn proud of yourselves. Electricity for one million homes my foot! All you've done is ruin what little seacoast New Hampshire had. Who's going to clean up the coast? We certainly cannot trust your company.
Following the assistant's answer, hang up on them. Time call completed:
AM/PM Call length:          minutes. Responding player Use the space below to summarize the player's responses.
The player's responses:        were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
e994e49444e49999999694e****W.996tet**teettetete*Wettete****ttetWete*****WW999999 THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
    ....**........***.............**..**.............*****..***....****e*****
5.3-49                            3/8/93 i
 
SEABROOK STATION EMERCENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-45                                TIME: Optional TO:            Rumor Control Assistant FROM:                        /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE 'IO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player in a belligerent manner and maintain that tone as you say the following:
I belong to several groups that have been fighting your nuke for years. I just called to say "we told you so"! All those lies and propaganda that Seabrook put out have been exposed for exactly what they were. We'll have an easy time now making sure you never operate again. Make sure you pass this message on to your media puppets, Williams and Martin. Maybe we'll see them and you on the unemployment line.
Following the assistant's answer, hang up on them. Time call completed:
AM/PM Call length:        minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW
................................................................................ qqi, 5.3-50                            3/8/93
 
s                                    SEABROOK STATION EMERGENCY PREPAREDNESS MESSAGE FORM MESSAGE NO.:  ERO-RC-46                                  TIKE: After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
  ******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime.      Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
(My wife is/I'm) 6 months pregnant.      I remember they evacuated pregnant women after Three Mile Island blew up. What should (she/I) be doing right now to protect our unborn child?
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses:          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION                  j DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW 5.3-51                              3/9/93
 
SEABROOK STATION EMERGENCY TREPAREDNESS MESSAGE FORM                              .
MESSAGE NO.:  ERO-RC-47                                  TIME: After SAE TO:            Rumor Control Assistant FROM:                          /
LOCATION:      JTIC
******************************* THIS IS A DRILL ********************************
NOTE TO CONTROLLER: This message may be used anytime. Prior to placing the call, you should make up your caller's name and location and/or home town.
Greet the player and ask the following questions:
Our neighbor just told me that pregnant women are being evacuated to Manchester and that medical exams are available if you want one.      (My wife is/I'm) 5 months pregnant and I need to know where to go and who to talk with.
Thank the assistant and hang up.      Time call completed:            AM/PM Call lengths          minutes. Responding player:
Use the space below to summarize the player's responses.
The player's responses          were acceptable      need improvement. Use the responses provided by a player as the basis for additional questions and calls.
THIS IS A DRILL DO NOT INITIATE ACTIONS AFFECTING STATION OPERATION DO NOT INITIATE ACTIONS AFFECTING PUBLIC HEALTH AND SAFETY DO NOT INITIATE ACTIONS WHICH VIOLATE THE LAW                      _
................................................................................ qq;>
5.3-52                              3/8/93
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 6.0  MINI-SCENARIOS O
O                                              2, m ,,3
 
e ERO MINI-SCENARIO IMPLEMENTATION KEY j                                              1993 GRADED EXERCISE l
l l  TIME  MINI-SCENARIO                              TITLE                                          RESPONSIBILITY MM l  0805      6.1.0                  NEWINGTON OFFSITE POWER                                  D. Young D. Kelsey LOSS                                    W. Leland P. Casey l
l    0805      6.1.1                  STARTUP FEEDWATER PUMP P                                        R. Savage l                                                    1-113 l  0805      6.1.2                    RESIDUAL HEAT REMOVAL                                          P. Labbe l                                                PUMP P-8A l  0900      6.1.3                          ASSEMBLY AREA                                    P. Morse / C. Berry l                                          SCHILLER STATION l    TBD      6.1.4                            CONTROL CELL                                        R. Thompson          _
l    TBD      6.1.5                    RDMS COMPUTER FAILURES                                  S. Westin/ P. Morse l  TBD      6.1.6                    EQUIPMENT LOST - LOP                                        G. Lavigne l  TBD      6.1.7                    MOTOR DRIVEN - P-37B                                          T. Street l                                                FAILURE O
l l
l 1
l i
6.1                                    4/26/93 l
 
l O
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 CADED EXERCISE 6.1.0  NL'WINGTON OFFSITE POWER LOSS O
O
 
MINI-SCENARIO 6.1.0 EQUIPMENT LOST DUE TO LOP Timeline OCC                        A News 12 Helicopter crashed into the Scoobie/Tewksbury transmission at a location in Seabrook. The location was on five mile stretch where both lines parallel. The helicopter exploded after impact and the pilot was killed instantly.
0940                      Seabrook Fire Department and Police Department on the scene.
1000                      PSNH called on the scene after contact by Seabrook Station.
PSNH line crews investigating damage - appears to be damage to transmission tower structures.
          .y c              -
1
                                                              -                                                                                                                                s      . . .-
    ~, H' . '.' V ' '. '. - , . p.L .. ,.:;.
g',~/                                                                ...,<
* 5\.. s . c,i"              .'
                                                                                                                                ;/,')~s~  t-tp.              ._,          \
: s. ,-  , ,,( ~. , ,,  .
                                                                                                                                                                                                        "y*p        ,
              . v: <.m.                                                                                                                                                                                        , .
j . .. .-
                                                  .', ^
                                                                        ^^
ne.
                                                                                                                                                                                          /
v, , ~-
    <        .uN      .
5 - 7f - %.                        -
                                                                                                                            ,.  's ,s *. ~~1
                                                                                                                                              ~ / *.' .w's., , @A. /~*
                                                                                                                                                                                        .x.~
                                                                                                                                                  / :.
                                                                                                            .''y.. u. q .. ..'
                                                                                                                                                    .                                  s            s ,e ,,.
u ',. A; l ... ' '% G. ." . <' l-Q p'e . (
                                            *                  =                  w                                        -
    ,.2. , <,;                  ;
                                                                                                            ~~                                                                  . .-              ~m                        ,
                                                                                                                                      . w- r . ..
f-r-
                ,, x
            .,g..                .
e,
                                                            .swe.
                                                            -Y..  .    -
2.,,, -
                                                                                                            ..- .ss. ,            .
7
                                                                                                                                            . - it-
                                                                                                                                                                .."..,.2.,,
m
:Q ,
p>s . ...-    ,',, . =.
            .: . .      w :-x.
                        .          .        4./,.
                                                  - - b> : r, -
f.
                                                                                                      ,_Q.'.e        m 9                                -
                                                                                                                                                                                                  -a P ,
q..Q
        . # '.                        4 :. -                                                      NN
        .,~                                                        .c Y..  .      gL                                  .
    .; .br.;
h l
I y
h 7-8 ;-
I i
8 l#
s ,s .
                                                                                                                -        ,F'
                                                                                                                                                                      '.[' '
                                                                                                                                                                                . .N * , -
4-1
                                                                                                                    =                                                        -                            -
                                                                      !..                                                                                            M
            --J I
      '.*~'                  ''                        7I                    g g-                                        ,,
                                                                                                                                            .',.                          [ * , , ,*    ,.**                                  j war
                                                                                                                            #          sp*
                                                                                                                                                            .s
        # *yy "                                      ISI                                                    ey                                      *
                                                                                                                                ?.
    .v4                                              #EW 4/w                                                                '
M * ' *.E u ah54                                        e e e e n As , ,                                                    ',y                                            - '7
                                                                                                                .'a
                                                                                                                                                          ,-                                                        ~
    *\ . . .'e = =d '.. .' is is
        '~pk'".$1.                                                                                                                                                6L        ^ **? t                            ~
                                                                                                                                                        \.
                .      .,                        .                  , _ . ,            ~ ly ' [. ,
l f . .. .* .
* a
* v. , , .
                                                                                    '%          .%                                          P                                                              ,,-                I
                                                                                                                                  ., - ) '$                                                                                      j y;-_                      _' J e..... m                                              . . .
y              .,,,.
                                                                                                                                  '                                      '                              ~
                                                    "k8""",                                  .
3.. . '.. k. . . . s :-). ''''..                  . .'' , /* / ' d*18 **
    .Mc.Q,%9.'-                                  ~
                                                                                      .              s y-ww e ?., s q.-
                                                                                                                                          . b%e A8 5 00K i
l r%' .%w&<.
                                                    ~ L,                                .
6.1.0-1                                                                                            04/27/93 1
1
 
O NORTH ATLANTIC ENERGY BERVICE CORPORATION SEABROOK BTATION 1993 GRADED EXERCISE 6.1.1  STARTUP FEEDWATER PUMP P-113 O
l
;                                            3/17/93 4
!                                                        1 I
I l
1
 
MINI-SCENARIO 6.1.1 STARTUP FEEDWATER PUMP P-113 This pump was tagged out at 0700 on May 5 to investigate problems identified during a monthly surveillance test. During the test, the pump failed to start due to low lube oil pressure. Preliminary assessments indicated that the motor driven pre-lube oil pump (1-FW-P-161) was faulty and in need of replacement.
At the time of exercise commencement, no work has been done to the pump other than tagging it out. No components, tools, prints, etc. have yet been brought to the pump.
An Emergency Repair Team may be dispatched from the OSC to perform pump repairs. The assigned controller should note what measures are taken to assure the safety of the repair team.
Work required to restore the pump to service includes:
: 1. Selection and procurement of appropriate manuals, procedures, prints and tools.
: 2. Obtain a new pre-lube oil pump from Stores.
: 3. Remove old pump and install new one.
: 4. Check oil levels and add oil as required.
: 5. Lift tags, remove ground truck and install breaker (Bus 4, Node A47).
The above actions should require 3 to 4 hours to complete. The assigned controller is free to adjust the elapsed time for each activity as appropriate to the decisions of the players. Repair of this pump is not critical to the overall scenario timeline, v
6.1.1-1                            3/13/93
 
UCRE REQUEST SECTION I            INITIATION
                                                                                              .                                          93    V    qjo7 9    e}  g PLANT EQUIPMENT TAG NO.
l - F Q- P- l \ 3.
COMPONENT C\#uoEdoehrPm~n                                                                                                        y O
UNIT                LOCATION          SYSTEM      TRAIN            INIT. DOC.
l            TG le t- F cd                  M/ A                  o r F 'T A c                        es s T m'                                                i BRIEF DESCRIPTION plt.~tP ?~ 1 t L E n ~T~o        CT A ttT* M g \ t[ G f.agnrn_t.-Ay c g qgx ;--*
PAILURE/WORI RIQUESTED 'g wgs y v 7g- c g u e g-e p-              Pu.,ue F~ntetue, , t. c. o. A. % g                            ,
c, s i        Pa g e. . r rti s    tH o sc.nT e: b . Ra t*A s e} gs ta n t t o .n eo tw KT5 o45 Marf M A " Y .
CRIG. om , g y e u g g,                            DATE 6/6~/ $ 2                DISCOVERY STATUS                                    6    EFFECT ON PLANT      Cy
* DEPT. c go s                  EFFECT ON SYSTEM                                    A    FAILURE DETECTION C, EITENSION                  T%7o SECTION II - APPROVAL SCH. IMPACT CODE                      SHIFT                                                          DATE/ C/C/ oj~g PRIORITY                M.E.R.                                          SUPERINTENDENT F @ E DAV O TIME j                Wjp              g n ._, g g SECTION III - EVALUATION / PLANNING TECHNICAL REQUIREMENTS LEAD DEPT. p g SAFETY RELATED              f    SECURITY                                              Q ASME SECTION II g ASSIST.
DEPT.                                                                                                                                          1E ASSOCIATED        bj FIRE PROTECTION              g EQUIP. QUALIFICATION y WR$                                                  SEISMIC                      W INSERVICE TESTING                                      d  531.1 UPGRADE      N
'I FROGRAM REQUIRZMENTS WELD SPEC /TRAV. N      ,
!    PROCEDURES / DRAWINGS NDE REQ'D          b[
f                                                                                                                                                MA3.5 RETEST        y DESCRIPTION OF WORK / PRECAUTIONS                                                                                                          '#            "'    "''
h t w e .d i c.ck c_et v.sc D
                                                                                                  '^                I'                  f5 O 'E ^~ * * # '" Y ^
                                                                                                                                                                  "l" h {pw c kc cbu u c. N'                                            C
* L '"~~ ^
P
                @, a% + u pL u. p A                                                  o^"*                                        ''/
(i ', R e 3 s e              k    4 TE Ya UNIT /cnancE NUMBER QC RETIEV                /                                                                                                            g    i f G      7  ?~  j    l DATE: -(/(/ 9 3 l "L ENGINu a                  t ihy    ys CONFINED SPACE            r TAGGING No.:c;3 cgf 7 Y IGN. SOURCE PERMIT d                                              COMBUSTIBLE ENTRY PERKIT EVP NO.:                                  d MAT'L PRESTAGED                    f( MAT'L PEIMIT
                                                                                                                                                /  FME LEQTS FORM        k IEMP. EQUIP. REQ'D                        d ALARA                              N HK CLOSE00T FORM EST. TIME OUT OF SERVICE                      l3                  EST.MANBOURS                      '$ Q H.P. PLANNER SIGNATURE                        M/ p.                          DATE:                    K /,4
                                                                                                                                              /      BOLD POINTS        /
QC SIGNATURE g (4 f ff                                  f 30 TIFT QC PRIOR TO START RESPONSIBLE PLANNER                            N              /      ,
DATE                    6/f/$ 3 MA 3.IA O                                                      [-
m Ret 19 I
                                                                                              . _ . _ . - , .        . _ - . - , , _ , .                --y
                                          .    .__    _          - . - .          ,-      y,      ___
 
i l
l O
i NORTH ATLANTIC ENERGY SERVICE COPRORATION SEABROOK STATION 1993 GRADED EXERCISE 6.1.2 RHR PUMP P-8A REPAIR O
4 j                                                                        3/17/93
 
I l
l l
l MINI-SCENARIO 6.1.2 RESIDUAL HEAT REMOVAL PUMP P-8A This pump was tagged out at 0430 on May 3 to investigate problems identified      i during a quarterly surveillance test. During the test, the pump exhibited high vibration and low flow rate. Operators secured the pump and generated a Priority 1 Work Request (attached).
Following pump tagout, the power leads were de-terminated and the upper half of the pump was removed to inspect the impeller. The inspection revealed that      ,
a loose impeller lock nut was causing the pump vibration and operating inefficiency. The impeller lock nut was replaced and minor cleanup of the impeller and wear ring performed. Pump reassembly was completed without incident. At 0800 on May 5, the pump is assembled and in the final stages of    I re-termination. The 4160V leads have already been terminated.
An Emergency Repair Team may be dispatched from the OSC to complete pump repairs. The assigned controller should note what measures are taken to assure the safety of the repair team.
Work remaining to restore the pump to service includes:
: 1. Meggaring of 4160V power leads.
: 2. Connection of pump instrumentation and 120V motor heaters.
: 3. Lift tags, remove ground truck and install breaker (Bus 5).                O
: 4. Fill and vent Train A RHR System.
The above actions should require approximately 3 hours to complete. The assigned controller is free to adjust the elapsed time for each activity as appropriate to the decisions of the players. Repair of this pump is not critical to the overall scenario timeline.
6.1.2-1                            3/17/93
 
SECTION I - INITIATION 4              9 3    V      o &    9  $
c 7k TAG NO.                          COMPONINT                                                      PLANT EQUIPMENT 8.- 4 H    P M                            R. H (?- Put n e              ( cc. ; s A                                          /
O UNIT        LOCATION SV SYSTEM
                                      /d H TRAIN N
INIT. DOC.
O Y /41% Ol                                                    ._
BRIEF DESCRIPTION
              & H /E O t .~t. P c y /1 P. O I N L, t                                        Hl G fl  NtSta/T(M 4        WMQ 4cv F40( l FAILURE / WORK REQUESTED                C,*    pg g 5. t i            <<  6,1 e d %Ia (o 2 s              , .s  R HiR Q It [
e t s c(    L : . t a e-t k    .t  ,u. ~ . ~ . s      yikrm si 4            kmh        y D DISCOVERY STATUS      [3    EFFECT ON PLANT          g ORIG.        Q      4.( c_.-      e,            DATE "T'/s/cr 3 DEPT. w ,                EFFECT ON SYSYEM    Q      FAILURE DETECTION c_
EITENSION          T c. .f g SECTION II - APPROVAL M.E.1.                SCH. IMPACT CODE                      SNIFT                                DATE/ S'/ 3/53 PRIORITY SUPERINTENDENT M      O,. g TIME                c3 ty h a I        Nb /                    D O C) {
SECTION III - EVALUATION / PLANNING TECHNICAL REQUIRIMENTS LEAD DEPT.          74 A ASSIST.              gg                            SAFETY RZLATED          y  SECURITY                '
y ASME SECTION II. N DEPT.
FIRE PROTECTION        g  EQUIP. QUALIFICATION      g 1E ASSOCIATED g WRf SEISMIC                y  INSERVICE TESTING          j    B31.1 UPGRADE            N PROGRAM REQUI12MENTS PROCEDURES /DRAVINGS Pt5of(4,o/                                fy5 c 5 // / . O? /*15 O G3 21 VELD SPEC /TRAV.                    g
                                                              ~1/o? G ~) T N Af 7                              NDE REQ'D              [(
M Jvc9.O o/                        J- @f MA3.S RETEST          \/
DESCRIPTION OF WORK / PRECAUTIONS                        g M ,%                g;                ([ [ l _ p /-f 7
      ^ ce<c          r [c- a c.c_ u $ k /M S eq ,,2 3 ] y h                                          n r+1 A /[. C c Q k it X c m              T .s ll l % ( c i ;df,J . J t e(i, A , All %A he. s TJ          (cc    n                                      ;
                                            ,. c c o d m - to4L rw sorpf. c Mc- we var e
L[s c.p)c.bCu & c c 3 %-e    J  k,x                                    "C" kr e e n k & ~ ts k                            s a      J .y n . ud , yk & ~% c-~h 7w mdu-ggr                                                                                  a      '
l UNIT / CHARGE NUMBER QC RE7IEW y                      p ENGINEER            NkM, DATES {/ 3 /9 3    )    1  C      D  g    (  i    % Y"2--
CONFINED SPACE TAGGING NO.:              f y    IGN. SOURCE PERMIT          p CGGUSTIBLE g mT t rExxIT                    E m r PE MIT                  ;
RvP NO.,            y                  9    mT t r1ESTAGED TEMP. EQUIP. REQ'D                      g    ALARA                        $ EK CLOSEOUT FORM              PME REQTS FotM            } l EST. TIME OUT OF SERVICE                      y ,;L              EST. MANE 0015    jQ H.P. PLANNER SIGNATUEF p                          K g (4 2                DATE:      f/$/y 3
                                            #                                                            y      BOLD POINTS          y QC SIGNATutE          ]%                                    ' NOTIFY QC FEIOR TO START
                                                                                                      /r,fg3 RESPONSIBLE PLANNER                _
                                          \ M h,                                        DATE                                                  l 0                                          /
MA 3.tA Rev 19 t-
 
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE                          .
6.1.3  ASSEMBLY AREA /SCHILLER STATION DEMONSTRATION O
3/17/93
 
MINI-SERARIO 6.1.3 SCHILLER STATION REMOTE MONITORING AREA DDutSTRATION (An out of-Sequenee demonstration ecrineneing at 1230)
At 08:40, a release occurred through the "D" ASOV. The release occurred before the TSC and the EOF had determined if facility staffing was adequate. As a result the assently area staff had not been directed to evacuate the plant prior to the release. Section 8.3.3 defines the site contamination levels resulting from the release. Having ensured that BufflClent personnel were assigned to support facility activation, the Site Emergency Director would direct site evacuation. The personnel exposure condition resulting from the plune would not pose a health threat; therefore, insnediate evacuation would not be required. However, the site contamination conditions would require that the Assembly Area staff be monitored for contamination prior to being released. The station can choose from many alternative methods to accomplish this function.
For the purposes of this exercise, the method chosen requires activation of the Remote Assembly Area at Schiller Station; and release of the Assently Area staf f to this location for monitoring and decontamination activities. Having been directed to coordinate activation of this facility by the Health Physics Coordinator, the Radiological Cor.trols Coordinator would assign available Assently Area HP and Radwaste technicians to set up the Remote Monitoring Area and Decontamination Facility at Schiller Station.
Additionally, a request would be made to dispatch any available Assenbly Area security staff to assist in coordinating traffic control at the Remote Monitoring Area.
The following actions will be demonstrated out of sequence to the normal timeline:
: 1.        The Radiological Controls Coordinator briefs HP and Radweste technicians on radiological conditions and deploys them to the EOF to obtain the monitoring and decontamination equipment from the first floor of the JTIC building in Newington. (T=00:00 hours)
: 2.        The HP and Radwaste technicians arrive at the EOF, obtain the equipment from the JTIC building, perform response / battery checks on the radios and monitoring instrunents, conduct a radio check with the Of fsite Monitoring Coordinator, and take the equipnent to the Remote Monitoring Area. (T=01:00 hours)
: 3.        The Remote Monitoring Area monitoring stations and decontamination f acility are set-w in accordance with ER 4.6, ard a predesignated representative sanple of Assently Area staf f will be directed to relocate to Schitter Station. The staf f will be dispatched from the EOF rather than the Onsite        '
Assembly Area in order to eliminate the travel delay. (T=01:30 hours)
: 4.        The sanple group (approx.10 people and a minimum of 5 vehicles) begin arriving at the Remote Monitoring Area, and the HP technicians begin monitoring the vehicles and personnel. Qualified radiation workers once monitored and decontaminated would be assigned to assist with monitoring anci decontamination activities. The group will have a representative sanple of qualified radiation workers assigned.
: s.        Six persomet are assigned to form three monitoring teams per procedure. One team will be established f or the demonstration.
: b.        Two personnel are assigned to shuttle contaminated persomet to the decontamination f acility and decontaminated persomel back to their cars. One person will be assigned to this function for the demonstration.
: c.        One male is assigned to the mate decontamination f acility and one female is assigned to the female decontamination facility. Only mate decontamination facility will be established. i
: 5.      A minimum of five vehicles will be monitored. The Controller will regulate the the contamination status of the vehicle. Not all vehicles will be contaminated. Postulated vehicle contamination levels are shown in Table 6.1.3 1. The contaminated vehicles will be directed to designated parking areas. One vehicle decontamination will be demonstrated as personnel availability allows.
: 6.        A mixture of men and women will be monitored. Postulated persomel contamination levels are she..sn in Table 6.1.3-2. Contaminated persomet are referred to the designated decontamination areas designated where appropriate personnel decontamination measures will be discussed (Actual personnel decontamination will not be demonstrated).
The demonstration is terminated when the last contaminated person is simulated to be decontaminated.
O
 
l l
TABLE 6.1.3-1                                                    !
VEHICLE MONITORING DATA I
i NAME      VEM.        LICENSE NO.      FRONT              REAR        RIGHT        LEFT              l NO.
TYPE                        READING          READING      READING      READING            l 1    Jim Smith    Private      BEW 001 (NH)        400            223          260          350              !
Jan Jones                                                                                                    ,
1 2    Jack Earl    Private      E67898 (MA)          285            290          260          260 June Cord 3    Ed Warren    Private      AEW 823 (NH)        1000          1200          1725        1200 4      Tom Carr    Private      BMW 739 (NH)          660            380          140        750 Edna Nord                                                                                                  1 Doris See    Truck        CNY 102 (NH)        1500          1000          1200        1450 5
Joe Irwin ALL READINGS ARE MEASUREMENTS MADE WITH AN E-140 SURVEY METER                                                        j l
i ALL READINGS ARE IN CPM                                                                                              i AREA BACKGROUND READING = 200 CPM TABLE 6.1.3-2 PERSONNEL MONITCRING DATA 9;
i GENDER      HEAD SURVEY    ARMS / HANDS  LEGS / FEET NASAL / FACE    BODY NO.        WAME 1    J. SMITH      M            375          350 ($-H)    200 (C-F)      0 (N)      200 (C-FR)              j 2      J. JONES        F            200          280 (C A)    150 (C F)      0 (N)      280 (C FR)              j 3      J. EARL      M            200          250 (C A)    280 (C-L)      0 (W)      250 (C-8K) 4      J. CORD        F            400          350 (S H)    300 (C-L)    150 (FC)    200 (C BK) 5    E. WARREN        N            550          500 (S H)    600 (C-F)    200 (FC)    550 (C BC) 6      T. CARR        M            200          350 (C-A)    400 (C-L)      0 (N)      350 (C-FR) 7      E. NORD        F            300          290 (S M)    375 (C F)      0 (N)      320 (C-FR) 8      D. SEE        F            600        350 ($-A)    550 (C-F)      0 (N)      320 (C FR) 9    J. IRWIN        M            200        400 (C-A)    600 (C F)    200 (FC)    380 (C BK)
ALL READINGS ARE MEASUREMENTS MADE WITH AN E-140 SURVEY METER ALL READINGS ARE IN CPM 1
AREA BACKGROUND READING = 100 CPM LEGEND: As ARM              C e CL0fMING F = FEET          H = HANDS L = LEG            N = NASAL Sa SKIN            BK = BACK l
FC = FACE          FR = FRONT ALL READINGS AFTER IST DECON ARE <100 CCPM 6.1.3 2                                          04/26/93 l
1
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 6.1.4  CONTROL CELL INSTRUCTIONS O
O                                                    3/17/93 1
f
                                              ,_my,
 
  ,.                              MINI-SCENARIO 6.1.4 CONTROL CELL INSTRUCTIONS FOR
(                        EXTERNAL ERO INTERFACE SIMULATIONS I. General Instructions and r'r-nants A. The following information should be used as a basis for simulating responses.
B. Controllers may add to, delete from or otherwise modify any of the following information in response to player actions as deemed appropriate.
C. Controllers should thoroughly acquaint themselves with any referenced documents and forms prior to the drill.
D. Controllers should obtain a copy of the Emergency Response Telephone Directory prior to drill commencement.
II. American Nuclear Insurers A. Start Time: As initiated by players.
B. ERO
 
==Contact:==
Health and Safety Coordinator C. Contact Location    EOF D. Topic (s) Discussed:
: 1. Initiating events
: 2. Current situation and accident prognosis
('
i 3.
4.
Status of actual or potential radiological releases Protective actions recommended and/or implemented
: 5. Known offsite damages or injuries
: 6. Establishment of exclusion or restricted areas III. American Nuclear Society A. Start Times As initiated by players B. ERO
 
==Contact:==
Industry Liaison C. Contact Location: EOF D. Topic (s) Discussed:
: 1. General accident status
: 2. Transmittal of approved news releases E. Information to Provides
: 1. Telecopy number for press releases 6.1.4-1                            3/17/93
 
IV. Institute of Nuclear Power Operations A. Start Time: As initiated by players B. ERO
 
==Contact:==
Industry Liaison C. Contact Location    EOF D. Topic (s) Discussed:
: 1. General accident information and response status
: 2. EOF switchboard number
: 3. EOF DCC telecopy number
: 4. Resources available through INPO Emergency Resources Manual
: 5. DO NOT provide any response cuidance or recommendations.
E. Information to Provides
: 1. Telecopy number V. NRC Emergency Notification System While the Alert declaration is in effect, request that NAESCO call back every 30 minutes with an update until the event is terminated. After declaration of a Site Area Emergency, request that the ENS line be continually manned.
A. Start Time: As initiated by players B. ERO Contacts STED and Emergency Operations Manager C. Contact Location    Control Room and TSC D. Topic (s) Discussed:                                                    ;
: 1. Information contained on Form ER 2.0D
: 2. Any other questions related to the accident or associated        ;
response actions
: 3. DO NOT provide any cuidance, recommendations or directions.      !
l E. Information to Provide:                                                l l
: 1. 5 minutes after declaration of a Site Area Emergency
: a. Initial Activation Team will be dispatched to EOF        i
: b. Estimated arrival time at the EOF: 1330 on 5/5/93          I
: c. Team members:
Site Team Leader                                          l Reactor Safety coordinator                                l l
Safeguards / Security Coordinator Emergency Response Coordinator Public Affairs Coordinator Government Liaison Coordinator                            l Protective Measures Coordinator 6.1.4-2                                3/17/93
: d. Team will fly to Pease AFB
: e. Ground transportation to the EOF and Media Center has been arranged.
: f. The Public Affairs Coordinator will be proceeding directly to the Media Center.
: 2. 10 minutes after Site Area Emergency declaration, inform your contact that the NRC wants the HPN line established by NAESCO. Provide the drill HPN number to the contact.
VI. NRC Health Physica Network A.      Start Time: As initiated by players; should be approximately 0950. If the contact has not been initiated by 1000, establish the HPN and identify yourself as the NRC HPN Communicator.
B.      ERO
 
==Contact:==
Health and Safety Coordinator C.      Contact Location:    EOF D.      Topic (s) Discussed:
: 1. Information contained on Form ER 2.0G (obtain copies prior to drill)
: 2. Any other questions related to radiological aspects of the accident or associated response actions including Protective Action Recommendations.
: 3. DO NOT provide any cuidance, recommendations or directions.
E.      Information to Provides
: 1. Telecopy number for HPN forms VII. PSNH Control Center A.      Start Time    As initiated by players B.      ERO
 
==Contact:==
Corporate Support Manager C.      Contact Location: EOF D.      Topic (s) Discussed:                                                7
: 1. Information contained on Form ER 3.3P
: 2. The offsite power loss is being investigated. A restoration time is not yet known.
: 3. See Mini-Scenario 6.1.0 for details q
6.1.4-3                            3/17/93
 
VIII. Westinghouse A. Start Time: As initiated by players                                    O B. ERO
 
==Contact:==
Industry Liaison C. Contact Location      EOF                                                  l D. Topic (s) Discussed:
: 1. Availability of Westinghouse resources i
: a. Accident and transient analysis                            '
: 2. DO NOT provide any response cuidance or recommendations.
E. Information to Provide:                                                  !
: 1. 5 minutes after EOF contact: No team will be dispatched due to the nature of the accident.
: a. A open line can be established for consultation, if needed.
: b. Team composition to be requested by NAESCO.
O' i
1 l
1 1
I l
1 6.1.4-4                              3/17/93 l
l i
I b
 
                .=#.
l 1
I i
NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 6.1.5 RADIATION DATA MANAGEMENT SYSTEM (RM-11) FAILURE O
n V                                                    3/17/93
 
-                                  MINI-SCENARIO 6.1.5 RADIATION DATA MANAGEMENT SYSTEM (RM-ll) l The following information provides a basis for simulating the loss of the Radiation Data Management System (RDMS) in the Control Room and OSC.                  !
The RDMS uses redundant control and display computers (RM-11 No. 1 and RM-ll No. 2) to obtain data from station radiation monitors for display on the Control Room and OSC consoles. Each computer normally polls half of the monitors and then shares the data with the other computer.        If either computer should fail, the other picks up the entire load with no degradation in system capabilities.
The RM-ll No. 1 computer was removed from service at 0700 this morning for routine maintenance and is scheduled to be back in service by 1000.        Rm-ll No.
2 is polling for all monitors.
When the Alert is declared, the panels of RM-11 No. 1 are open, and various circuit boards have been removed for cleaning and inspection.
At 0915, RM-ll No.2 suffers a power supply failure.      Control Room and OSC RDMS consoles go blank and the Control Room receives appropriate alarm indications.
An emergency repair team should be dispatched from the OSC to the
/''N Administration Building computer room to investigate the failure and effect Efforts should then be made to perform a system reboot on either
(    repairs.
computer.
Computer RM-11 No.1 Requires 45 minutes to reassemble and reboot. The initial reboot efforts fail due to a loose circuit board in the computer.      It will then take an additional 60 minutes to disassemble the computer, check all circuit boards, reassemble and reset, and successfully reboot the system.
Computer RM-11 No.2 Requires I hour and 45 minutes to disassemble, troubleshoot, obtain and install new power supply, reassemble and successfully reboot the system.
Either computer may be repaired and placed back in service.      The assigned controller must contact the OSC Lead Controller prior to final reboot of either computer system.
                                                                                          \
l 6.1.5-1                                3/17/93 l
l
 
l l
1 O
                                                    \
l NORTH ATLANTIC ENERGY BERVICE CORPORATION SEABROOK BTATION                    :
1 1993 GRADED EXERCISE 6.1.6        EQUIPMENT LOST - LOP O
O 3/17/93
 
I MINI-SCENARIO 6.1.6
[                              EQUIPMENT I4ST DUE TO IDP A summary of the event leading to the catatrophic failure of the Scoobie and Tewksbury 345 kV transmission lines follows the station equipment loss summary.
l I. General Conments and Notes                                                  l l
A. Unless otherwise specified, all equipment will be lost at 0930 B. Reference documents
: 1. Final Safety Analysis Report, Chapter 8.3, Onsite Power Systems
: 2. Engineering Evaluation 89-016, Power Failure Analysis for Emergency Response Facilities
: 3. Some equipment listed below as lost may be restored to service if the power source is changed to a receptacle supplied by a Bus 5 or 6.
II. TSC Equi}xnent A. Normal lighting in all areas B. Telecopier (if plugged into south wall of Room CB307)
C. FINIS Terminal and Printer (if plugged into south wall of Room CB307)
D. Copy Machine (if plugged into south wal) ' ' Room CB307)
III. OSC Equipment at HP Control Point (Room 156)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. Internal OSC Public Address system D. HVAC (Administration Building Air Handling System) 6.1.6-1                              3/19/93
 
V.      OSC Equipment at OSC Office Area (HP Count Room - Room 157)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. Automatic counters and printers D. Alpha / beta counters, analyzer and printer E. Clock F. HVAC (Administration Building Air Handling System)
VI.      OSC Equipment at Adjacent OSC Area (HP Supply Room - Room 158)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. HVAC (Administration Building Air Handling System)
VII.      OSC Equipnent at Adjacent OSC Area (Room 143)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. Canberra computer printer D. HVAC (Administration Building Air Handling System)
VIII. OSC Equipment at HP Computer Room (Room 140)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. Clock D. Canberra computer and accessories E. HVAC (Administration Building Air Handling System) 6.1.6-2                            3/19/93
 
l 1
IX. OSC Equipment in Corridore Adjacent to OSC (Rooms 138, 159 & 160)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. Radiation monitors and equipment D. HVAC (Administration Building Air Handling System)
X. Chemistry Hot Lab Equipment (Room 133)
A. Normal lighting B. Emergency lighting on walls - lost after 1100 unless Newington 345kV is restored-C. Canberra units and spares D. Counter titration units E. Glassware equipment and drying unite F. Fume Hoods 2 and 3 G. Refrigerator H. HVAC (Administration Building Air Handling System)
XI. Chemistry Hot Lab Computer Room Equipment (Room 131)
A. Normal lighting B. Emergency lighting - lost after 1100 unless Newington 345kV is restored C. HVAC (Administration Building Air Handling System)
D. Computer - Following start of diesel generators, this computer is returned to service after manual efforts are made to re-boot it.
E. Count Room Air Conditioner Unit 6.1.6-3                            3/19/93
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 6.1.7 MOTOR DRIVEN EMERGENCY FEEDWATER PUMP P-37B O
3 0                                                  3/17/93
 
MINI-SCENARIO 6.1.7                                  *
[
MOTOR DRIVEN EMERGENCY FEEDWATER PUMP P-37B This pump will auto-start following the station trip caused by the SGTR, and functions properly until 1000. At that time, pump trips due to impeller shaf t seizure resulting from a loss of lube oil to the out-board bearings. The seizure leads to a motor high current trip. Emergency Repair Team (s) should be dispatched from the OSC to investigate the pump failure. The assigned controller should note what measures are taken to assure the safety of the repair team.
A team should proceed to Bus E6, breaker node 1-A80. Upon arrival and initial inspection of breaker indications, the team should be informed of the followings
: a. Orange flag on 86 device handswitch
: b. White light near 86 device handswitch is not lit
: c. Orange TIME TRIP flag on the 50-51 relay Electricians may check the motor circuitry for short circuits and grounds.
This will involve pulling the breaker, installing a ground truck, and meggering and bridging the motor. Upon completion of these activities (should require approximately 20 minutes), they should be informed that no faults are evident.
If pump operation is attempted, inform the players that the breaker trips (The indications are the same as initially noted).
Either following or in parallel with the above activities, a team should be dispatched to the pump. Upon arrival at and initial inspection of the pump, the team should be informed that a large puddle of oil has collected in the catch basin under the pump. Upon closer inspection, the oil appears to be leaking from the out-board bearing oil reservoir at the drain plug.
Mechanics may uncouple the pump and motor and attempt to rotate the shaft of each. They should be informed that the pump shaft will not rotate.
To return the pump to service, the outboard bearings must be replaced. This activity will not be completed during the exercise. Repair of this pump is not critical to the overall scenario timeline.
6.1.7-1                              3/17/93 l
i
 
MINI-SCENARIO 6.1.8 SAMPLE OFFSITE NEWS RELEASES DELETED PER I
l                                                                                NRC 1
O l
6.1.8-1          SEC6.18_ NEWS i
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION        ,
SEABROOK BTATION 1993 GRADED EXERCISE 7.O  PLANT PARAMETERS r
O                                                    ,
3/17/93
 
O North Atlantic Energy Service Corporation Baabrook Station 1993 Graded Exercise Section 7.1 Daily Operating Report O
l l
O                    7.1-1                  SEC7.1_PD_ OPS l
I
 
                                                                                                            .m l
SEABROOK STATION l
DAILY OPERATING REPORT j                    Date:    5/5/93          Time:  5:00            Mode:    1 Ig,, j CONTINUOUS DAYS ON LINE:                  Reactor    180      days Torbine      180      days Reactor      333    days    Turbine    324      days l RECORD DAYS ON LINE:
s 3411 MWt MWeGROSS(inst.)          1199    MWeNET(inst.)    1153 l Power Level:
l Power Levels                100 %      Gen 24 HrGross 28768.8        GEN 24 HrNet 2767.8 l RCS Boron:                  440    ppm Primary Temp:          587    F Primary Press: 2235 psic l S/G Status:          SG Blowdown 240 com        SY Status:        Normal 28.75  in.Hg. Cond  Backpressure  1.12  in.Ab. Inleakage    22 SCFM l Cond Vacuum:
l RCS Ident: 0.02 com                RCS Unindent O.49 nom _        WRGM: 142nci/ seconds j RMW          25.3      DMW      88%/85%    CST    392743 cal n'
ACCUM C 6330 cal      ACCUM D    6330 cal l ACCUM A 6330 cal ACCUM B 6340 cal l
l l
l      MAJOR EQUIPMENT PROBLEMS AND PRIORITY E & 1 WORK REQUESTS:
i l
Priority System              Recuest #                                Remarks l
s' 1            RH          93 WOO 9990                RHR Pump Train A l
Exhibitina Hiah Vibration 1            FW          93 WOO 9991                Investicate Startup l
l Feedwater Pump. P-113 l
I Problem.
l!'
i                ___
l    TECH SPEC ACTION STATEMENTS IN EFFECT:
l TS/TR#                        System        Time-DateLimit            Remarks l
l i
l l
l l
l  TODAYS EVOLUTIONS:
s' l
RM-11 No. I computer removed from service at 0700 am for routine maintenance n'
l  Jewinaton 345 kV line removed from service at 6tn on May 3th. PSNH notified l
NAESCO of their of their intent to re-eneraire the line by late afternoon.
\        !
l COMMENTS:
l l
7.1-2                            SEC7.1_PD,0PS
 
l                          OPERATING EQUIPMENT (CIRCLED ITEMS RUNNING)
COMPONENT / SYSTEM                          TRAIN" A"                    TRAIN  "B" l
CHARGING SYSTEM                      CS-P-2A                    CS-P-2B j  PRIMARY COMPONENT COOLING            CC-P-11    CC-P-11C    Q -P-11B) CC-P-11D SERVICE WATER                        SW-P-41A                  SW-P-41B  @-P-41T]
l SW-P-110A Q P-41C}        SW-P-110B l  SERVICE WATER COOLING TOWER l
l  COMPONENT / SYSTEM                                    NON-TRAIN l
l  HEATER DRAINS                            -31A          HD-P-318 l  CONDENSATE                          CO-P-30A          CO-P-30B    CO-P-30C l  FEEDWATER                          FW-P-32A          FW-P-32B    SUFP l  SEC. COMPONENT COOLING              SCC-P-34A          SCC-P-34B  SCC-P-34C l  CIRCULATING WATER                  M P-39A )          CW-P-39B    cw-P-3 @
l  SERVICE AIR                        SA-C-1A_          SA-C-1B    SA-C-1C      CENTAC COND. AIR REMOVAL                                                  AR-P-50C j
Q-P-SO O
l 1
O 7.1-3                              SEC7.1_PD_ OPS l
_= -  _    _.            _ _ .
                                                                                                        )
 
North Atlantic Energy Service Corneration Seabrook Station 1993 Graded Exercise Section 7.2 Station Chemistry Data n
a i
O                                                  7.2-1 SEC7.2_PD,CIIDI
 
CH-L88 SEABROOK STATION SECONDARY SAMPLE REPORT 1.
CONDENSATE /FEEDWATER                                                                            l
\                                      ACTION LEVEL PARAAfETERS ACTION  ACTION    ACTION LEVEL    LEVEL                                                  ACTION LEVEL PARAMETER                  1        2                                                  LEVEL 3      CONDENSATE      FEEDWATER        EXPIRATION Date &
Time                                                5/5/93            5/5/93 6:00              6:00 Cation Conductivity pmhos/cm                  > 0.3    > 0.5    > 1.0        0.08 Strong Acid Cation conductivity        > 0.15  > 0.30 > 0.501 pmhos/em 0.1 Condensate Dissolved Oxygen        ppb          > 10    > 30      N/A            3.0 Feedwater Dissolved Oxygen        ppb          >5        N/A      N/A                        <2 Hydrazine ppb              < 20      N/A      N/A                            28 Iron          ppb        > 20      N/A      N/A                            N/A copper        ppb          >2        N/A      N/A                  .        N/A O  pH @ 25 C
                                > 9.2
                                < 8.8      N/A      N/A                            9.3 See Note 3 II.      STEAM GENERATOR ACTION LEVEL PARASfETERS ACTION  ACTION    ACTION LEVEL                                                          ACTION LEVEL    LEVEL    S/G      S/G PARAMETER                    1 S/G      S/G      LEVEL 2        3      A        B      C        D      EXPIRATION Date &
Time                                                5/93 6:00 Cation Conductivity pmhos/cm                    > 0.8    > 2.0    > 7.0      0.2  ,  0.2    0.2  '
O.2
                              > 9.2 pH @ 25 C                  < 8.5                                                              See N/A      N/A    9.2      9.2    9.2      9.2        Note 3 Chloride        ppb        > 20    > 100      N/A      1.3      1.6    2.2      1.0 Sulfate          ppb        > 20    > 100      N/A    2.9      2.9    3.0      2.1 Sodium          ppb        > 20    > 100    > 500    0.6 )    0.6    0.6      0.6 Silica          ppb        > 300    N/A      N/A    53      52    58        54 1.
O 2.
All Action Levellimits apply only in Mode 1 and 2.
Circle all parameters which exceed Action Levellimits.
7.2-2                                  SFf7.2 PD CIIENf
 
SEABROOK STATION SECONDARY SAMPLE REPORT lil.      MAIN STEAM:
              "NON" ACTION LEVEL PARAAfETERS                                                            '
Abnormal    Emergency    Maximum      Main Limit        Limit      Limit        Steam                        i PARAMETERS                    (1)          (1) l (1)        Value l
Date &
Time                                                          '
5/5/93                        I 6:00                          l l    Cation Conductivity pmhos/cm                        > 0.2      > 0.5      > 1.0        0.11    i 1
Sodium            ppb          >3          >6          > 10          0.5    i
: 1.        Limits have no immediate corrective actions                                                  1 IV.      SECONDARY COOLANT ACTIVITY:
              "NON" ACTION LEVEL PARAAfETERS                    REMARKS / RECOMMENDED ACTIONS:
S/G              NOTd 3 : The Chem Dept , has becun the l Limit        Composite PARAMETER              (2)          Value            Secondary Plant Elevated DH Procram Der Date &                                  5/5/93              CN91-1-4, Elevated Arrmonia Procram and Time                                      6:00 CHSTD 91-022, Elevated Secondary Svetem Gross Activity          1.0 E-3 pCi/gm                pC1/gm            ND              DH. The Secondarv Plant DH is presently
: 2.        Limit is 1.0 E-3 Cilgm per procedure                beino maintained at 9.4, CXO901.20. Notify Chemistry and H.P.
Supervisors if greater then 1.0 E-6 Ci/gm.
V.        OTHER PARAMETERS:
            "NON" ACTION LEVEL PARA 31ETERS Alarm      Present PARAMETER                Setpoint        Value Date &                                    5/5/93 Time                                        6:00 Heater Drain Cation Conductivity            0.3        .16 pmhos/cm Feedwater Cation Conductivity            0.3        .11 pmhos/cm Technician        Salam Daaher                        Date/ Time May 5/6:00 Chem Supvr          John Linville                    Daterrime May 5/8:00 Original To: Chemistry Department File Copy To:                  Chem /HP Manager 7.2-3                              SEC7.2_PD_CHD1
 
CP 3.1 Figura 5.19 SAMPLE PRIMARY CHEMISTRY REPORT MODES 1 AND 2 (NOTE 1)
O  PARAMETER            MODE            MODES      MODES 1 AND 2 REACTOR COOLANT                  PRESSURIZER                                    ANALYSIS 1 AND 2        1 AND 2 AL1            AL11        ALL lli      SYSTEM                      LIQUID                                        DATE/ TIME CHLORIDE              N/A        > 0.15        > 1.50        < 0.001                                                                    515/9 3 PPM                                                                                                                                        08:35, FLUORIDE              N/A        > 0.15        > 1.50        0.0014                                                                    5/5/93 PPM                                                                                                                                        08:35" DISSOLVED              N/A        > 0.10        > 1.00        < 0.001                                                                    5/5/93 OXYGEN PPM                                                                                                                                08:35' (2)
HYDROGEN              < 25      1 15          15            33.3                                                                        5/5/93 CC (STP) /kg          > 50                                                                                                                08:35'~
BORON                  N/A            N/A        N/A          440                                                                        5/5/93 PPM                                                                                                                                        08:35' DOSE EQUIVALENT IODINE                                                                                                                    5/5/93 UCI / gm (3)                                      1.0        2.45E-01                                                                    08i35' GROSS ACTIVITY, uCilgm (4)                                                                                                                5/5/93 DATE CALC.: 11/18/92 / 305                        100/E      7.80E-01                                                                    08:35"      ,
NOTE. (1)        For parameters exceeding action level specifications, refer to Procedure CP 3.1, Section 4.2.7.3 for recommended actions.
(2)      refer to Technical Specification 3.4.7.
(3)      Applicable in Mode 1 only. Refer to Technical Specification 3.4.8 and Table 4.4-3.                                              i (4)      Refer to Technical Specification 3.4.8.
RECOMMENDED ACTIONS:
REMARKS:
TECHNICIAN:
COPY:(included Radionuclide Gamma spectrum report)
Chemistry and Health Physics Manager Health Physics Operations Supervisor                                                                                                      '
Reactor and Computer Engineering Department Manager l
O 7.2-4                                                  SEC7.2,PD_CIIDI
 
North Atlantic Energy Service Corporation Beabrook Station 1993 Graded Exercise Table of Contents Section 7.2.1 Station Chemistry Sample Data Pg 7.2-6 thru 7.2-8        - RCS Letdown Sample  (Predrill)
Pg 7.2-9 thru 7.2-11      - Potential Accident Sample Results O
O 7.2-5                    SEC7.2fD,CIIDi
 
      'l 5 - May - 1993 7:29:16 NORTH-ATLANTIC ENERGY SERVICE COMPANY
* SEABROOK STATION SAMPLE TITLE : U1 - LETDOWN FILE IDENT          : CAS$ DISK: [SNS. SAMPLE. CHEM.NEW)9303101001.CNF;l SAMPLE ID            : 930310        .
* OPERATOR                    : CAS                        ,
j SAMLE TIME            : 5 - MAY - 1993 04:00
* SAMPLE GEOMERTY : 20LSV
* SHELF HEIGHT                  : 1
* EFFICIENCY FILE : 20LSV1                                  ?
SAMPLE TYPE        : LIQUID
* SAMPLE QUANTITY : 4.98000E+00ML
              ***************************************************************e***********
: 5-MAY-1993 05:22
* DEATIME (%)              :  9.2%
l ACQ DATE & TIME
* SENSITIVITY                :  4.66000 PRESET LIVE TIME              : 0 00:25:00 ELASPED REAL TIME            : 0 00:26:39
* GAUSSIAN SEN              :  10.00000 ELAPSED LIVE TIME            : 0 00:25:00
* NBR ITERATIONS            :  10                  -
              ***s***********************************************************************
DETECTOR                      : Detector #699
* LIBRARY                    : RCS EFFIC CAL DATE : 31-April-1993 08:03
* EFFIC CERT DATE            : 31/4/93 08:03 l DCAL DATE & TIME                : 5-May-1993 18:36
* ENERGY TOLER                  : 1.00
            -KEV /CHAN                      : 4.99909E-01
* HALF LIFE RATIO              : 8.00000 OFFSET                        : -3.75757E-02 kev
* ABUNDANCE LIMIT              : 70.0%
Q COEFFICIENT                : -4.81872E-08
* CORRECTION FACTOR : 1.00000E+00 PEAK START CHAN              : 3
* PEAK END CHAN                : 4096 ANALYSES : PEAK V16.3 NID V2.6 MINACT V2.3 WTMEAN / KEY V1.6 COUNTED ON            : NHY1 COLLECTED BY          : MAG-COUNTED BY            : CAS                                                                                ,
d I
i l
7.2-6                                    SEC7.2fD.CIIEM
 
SAMPLE TITLE : U1 - LETDOWN Post-NID Peak Search Report Sample ID    : 930310                      Acquistion date: 5-May-1993 05:22 It  Energy  Area      Bkgnd FWHM  Channel Left    Pw  % Err  Fit      Nuclides 0  80.97  1675      22967 0.78 162.04 160          6  27.9 0  150.99  6211      24749 1.19  302.13  300      7  43.0 0  249.85  850      25724 1.43  499.89 496        9    9.2 0  463.00  4250      5389 1.88  926.33 923        9  31.5            CS-138 0  511.05  66123452 13098      2.77    1022.47  1014        20        0.2      F-18 CO-58 ANN-511 0  522.88  4400      1418  1.62  1046.12 1043      8  30.4            I-132 0  529.55  176250    2795  1.58  1059.48 1051    19  11.2            I-133 0  546.62  20505    1367  1.36  1093.64 1088    12  23.9            I-135 CS-138 I-132 0  621.97  2950      747  1.42  1244.38 1241      9  33.4            I-132 I-134 0  629.95  2980      934  1.44  1260.35  1256    11  39.0            I-132 0  667.66  20110    1073  1.55  1335.82  1329    14    7.4            I-132 0  677.11  9645      643  1.34  1354.71  1351    9  43.9            I-134 0  685.56  2050      1106  1.68  1371.63  1366    13  34.4            W-187 0  772.73  13610    482  1.87  1546.05  1541    11    7.3            I-132 W-187 0  811.04  1169      563  1.89  1622.71  1616    17    5.5            CO-58 0  847.12  7215      481  1.85  1694.90  1680    16    5.0            I-134 0  884.24  5070      338  1.85  1769.17  1765    11    7.1            I-134 0  954.84  3030      308  2.43  1910.46  1905    13  23.9            I-132 0  1009.83 1860      451  1.97  2020.49  2014    14  25.4            CS-138 0  1072.77 4785      319  1.02  2146.44  2140    13  21.4            I-134 0  1131.38 2490      166  2.34  2263.75  2260    10  22.8            I-135 0  1136.31 1720      360  1.22  2273.60  2270    9  38.6            I-132 I-134 0  1260.18 21150    141  2.25  2521.50  2515    14  12.1 0  1293.55 3360      224  1.96  2588.29  2578    18  10.8 0  1368.70 2835      189  2.22  2738.69  2729    19    2.2            NA-24 0  1435.59 3300      180  1.76  2872.58  2863    20  11.4            CS-138 0  1677.36 945        63  1.89  3356.49  3348    16  23.5            I-135 0  1732.17 5200      180  2.74  3466.20  3454    24    8.1            NA-24 i
l l
l j
I l
l I
7.2-7                      SEC7.2 PD CIID1 1
 
Summary l Sample  ID :of 9303101001 Nuclida Activity Acquisition date : 5-May-1993 05:22 Total number of lines in spectrum                              28 Number of unidentified lines                                    1 Number of lines tentatively indentified by NID                                27            96.43%
f''s  Nuclide Type    : AP Lj                            (Activation Wtd Mean Products)
Wtd Mean                            1-Sigma Nuclide Hlife                    Uncorrected              Decay Corr Decay Corr Decay uCi/ML                      uCi/ML                              % Error F-18 I-Sigma Error Flags 109.74M      1.355 9.61E-02 NA-24      15.00H                                        1.30E-01          0.002E-01 CO-58      70.80D 1.038 3.82E-03                  3.96E-03          0.087E-03 0.16 W-187      23.83H 1.000 2.62E-04                  8.62E-04            0.477E-04 2.19 1.024 4.23E-04                  4.33E-04            1.492E-04 5.53 34.44 Total Activity:        1.01E-01              1.35E-01 Nuclide Type : HFP (Halogen Fission Product)
Wtd Mean              Wtd Mean Uncorrected                                                  1-Sigma Nuclide Hlife          Decay uCi/ML                  Decay Corr Decay Corr                  % Error uCi/ML              1-Sigma Error Flags I-132        2.30H I-133      20.80H 1.273 9.18E-01                1.17E-01            0.575E-04 I-134      52.60M 1.027 9.03E-02                9.28E-02            0.691E-04 7.40 I-135      6.61H 1.880 1.14E-01                  2.15E-01            0.101E-03 11.23 1.088 1.56E-01                  1.70E-01            1.136E-03 7.07
________                              12.08 Total Activity:        4.53E-01              5.98E-01 Nuclide Type
: HFP (Fission Product)
Wtd Mean              Wtd Mean Uncorrected                                                    1-Sigma Nuclide Hlife          Decay uCi/ML                  Decay Corr Decay Corr                  % Error uC1/ML              1-Sigma Error Flags
  )CS-138    32.20M        2.789 2.58E-03 7.18E-03            0.192E-03          11.39 Total Activity :              2.58E-03      7.18E-03 Nuclide Type    : NP Wtd Mean                Wtd Mean Uncorrected                                                    1-Sigma Nuclide Hlife          Decay uCi/ML                    Decay Corr Decay Corr                  % Error uCi/ML              1-Sigma Error Flags ANN-511 1000.00Y      1.000 0.000E+00                0.000E+00            0.000E+00            0.00 Total Activity:      0.000E+00              0.000E+00 Grand Total Activity:          5.48E-01              7.38E-01 Flags:  "K" = Keyline not found "E" = Manaully edited                        "M"        r Manually accepted "A" = Nuclide specific abn. limit l Reviewed By:        Jeff Gallacher Date:05 /05 /93 l Approved By:        John Linville Date:05 /05 /93 O
7.2-8 SEC7.2fD_CliD1
 
POST ACCIDENT CHEMISTRY BAMPLE RESULTS RCS BAMPLE (uci/ml)
Sample size 1000 ml Contact Dose Rate _2_g_0__m_rLh 0
Nuclide Type : AP (Activation Products)      Dose Rate @ 18" ___10-1 mr Wtd Mean Corr Nuclide                  Concentration F-18                      1.30E-01 NA-24                    3.96E-03 CO-58                    8.62E-04 W-157                    4.33E-04 Total:                    1.35E-01 uci/ml Nuclide Type : HFP (Halogen Fission Product)
Wtd Mean Corr Nuclide                  Concentration RB-88                    4.2E-01 I-132                    8.19E-01 I-133                    6.49E-01 I-134                    1.50E+00                                                    ,
I-135                    1.15E+00 Total:                    4.85E+00 uci/ml Nuclide Type : FP (Fission Product)
Wtd Mean Corr Nuclide                  Concentration CS-138                    7.18E-03 Total:                    7.18E-03 uci/ml Grand Total Activity:    5.0E+00 uci/ml Dose Equivalent Iodine:  2.0E+00 uci/ml NOTE:  Fission Gas Sample Activity: 6.2E+00 uci/ml (XE, KR)
NOTE:  Low sample dose rate may have OSC draw sample from normal sample sink rather than PASS panel.                                                    ,
G 7.2-9                      SEC7.2_PD_CilDi
 
                                                                                                  -i POST ACCIDENT. CHEMISTRY SAMPLE RESULTS "D"  s/G Blowdown scaple (uci/ml)
Sample ~ size 1000 ml    .)
Nuclide Type : AP (Activation Products)                    Contact Dose Rate      80 mr/hr Dose Rate @ 18"            2  mr/hr
)                              Wtd Mean D Corr Nuclide                    Concentration F-18                        XXXXXXXXX NA-24                      XXXXXXXXX CO-58                      XXXXXXXXX W-157                      XXXXXXXXX Total:
5.23E-02 uci/ml Nuclide Type : HFP (Halogen Fission Product)
Wtd Mean D Corr                                                    '
Euclide                      concentration RB-88 I-132                      3.2E    I-133                      2.54E-02 I-134                      5.87E-01                                                            '
I-135                      4.5E-01 Total:                      1.9E+00 uci/ml                                                      -
Nuclide Type : FP (Fission Product)                                                              !
Wtd Mean D Corr Nuclide                      Concentration                                                        .
Total:
2.58E-03 uci/ml Grand Total Activity:        1.94E+00 uci/ml Dose Equivalent Iodine:      7.76E-01 uci/ml f' Chemistry the samplewould drawnnot  immediately would                initiate action to not be representative        of reestablish blowdown the generator    conditionssince g until the sample line had been purged. If actions were taken to obtain a                          ,
! sample,    the results results provided    dowould  be representaive not correlate      with the of conditions existing    2 hours accident      earlier. The condition.
l
                                                                                                      \
7.2-10 SEC7.2fD CIIIM l
                                                                                                  -l
                                                                                                  .1
 
O NORTH ATLANTIC ENERGY SERVICE CORPORATION SEABROOK STATION 1993 GRADED EXERCISE 7.3 PLANT PARAMETERS O                                          .
O
 
1993 taercise - Section 7.3 TM                  l            8:00      l l
l ex Power                              (%)                      100                                                                            tcs $4 cooling                                              (des F)    31        '!
100 It                                    (mc apps)                307                                                                            tytts Futt aange                                            (%)                      )
Source tange                          (cos)                        O Pet Pressure                                                (psig)    2              l f
Core Thermal                          (Mw?)                    3394                                                                                                                                                                l Power                                                                                                                                          Accwutators Avg Pressure                                                (psig)      625 ACs Loop Fio,                          (%)                                                                                                    Average Levet                                              (gal)    6330 Loop a          101 Loop 8          101                                                                            Totat CMG Flow                                            (es:m)    102 toop C          101                                                                            58 Train A Flow                                            ( op= >      0 Loop D          101                                                                            SI Train 8 Ftow                                            (spn)        0 thR Trala A Flow                                          (spn)        0 RNa Train B Flow                                          ( grus)      0 PZR Level                              (%)                      61 RCs WR Pressure                        (psig)                  2185 lLetdownflow                                                        (gps)    76 Mottest incore f /C                    (deg F)                616 Avg Not Leg ter@                        (deg F)                618                                                                            A CSS Dit press                                            (pai g)  O ave Cold teg teev                      (deg F)                558                                                                            8 cas Dis Press                                            (psig)    0 nWsT tevel                          l(kgel)                  l482,860                              l                                            Bus 1                                                    (volts)  14015 Bus 2                                                    (volts)  14024 cant Pressure                      lrpsig)                  l0                                    l                                          Sus 3                                                    (volts)    4402 Sum 4                                                    (votts)    4388
{
Cont swo A Levet                      (in)                    0                                                                                Sus 5                                                    (votts)    4400 Cont Supp 8 Levet                      (in)                    O                                                                                tus 6                                                      (votts)    4410 sectic Sep Level                      (ft)                    0 0/G 1A                                (kW)                    0 D/G it                                (kW)                    0                                                                    l Totet EFW Flow                                                    feet)  l0          l S/G A                                                                                                                                            S/G C morrow Range Levet                      (%)                    50                                                                              Narrow Range Levet                                        (%)        50 Wide aange Levet                        (%)                    78                                                                              Wide Range Levet                                          (%)        78 pressure                                (ps i g)                970                                                                              Pressure                                                  (psi g)  970
    $/G B                                                                                                                                            5/G D harrow aange Level                      (%)                    50                                                                                barrow tange Levet                                      (%)        50 Wide Range Levet                        (%)                    7S                                                                                Wide tange Level                                        (%)        78 pressure                              (psig)                  97D                                                                              Pressure                                                (psig)    970
    $Jcriticality                          Green                  Green Core Gooting                          Green                  Green Neat link                              Green                  Green RCS Integrity                          Green                  Green Cont Integrity                        Green                  Green
    #C$ inventory                          Green                    Green tecirculat i on                        Green                    Green Radiation                              Green                  Green 4/7/93                                                                        7.3 1                                                                                                                                  sec7 o,oes
 
1993 Emertise - Sectlan P.3 TIsE t  l            8:05 II Power              (1)              100                    #CS SJcooling          (deg F)        31 It                    (ac ason)        307                    evt ts Fut t sange      (t)          100 Source Rarge          (cos)              0 IP.,r-s,.              I mi.)      I2              l Core Thermat          (pdf)            3394 Power                                                          AccJut ators Avg Pressure            (psig)      625 RCS Loop Flow        (1)                                      Averese Levet          (9st)        6330 Low A  101 Low 5  101                    Totst CMG Flow          (gas)        102 Loop C  101                    $1 Train A Ftow        (osm)        0 L oop D 101                    $1 frein B Ftow        ( ggst)      0 RNA Train A Flow        (Dom)        0
*ZR Levet            (%)                53                    awe Train a flow        (scm)        0 at$ Ji Pressure      (psi g)          2185 Leth Flow              (sta)          76 Mottest incere 1/C    (des F)        616 Avg #ct Leg f ase      (des F)        618                    A CBS Ols Press        (pois)      0 AvT Coto tee teso      (aes F)        558                    s Cas 046 Press        (psig)      O ewsf Levet            (kpal)          482,860        l      Bus 1                  (volts)      14015 Se 2                    (votts)      14024 Cant Pressure        tosis)          0              l      De 3                    (votte)        4402 Sm 4                    (volts)        4388 Cont $Jp A Levet      (in)            0                      Bus 5                  (volts)        4400 Cont SJqs e tevet    (in)            O                      cus 6                  (volts)        4410 Recric SJu) Level    (ft)            D D/G 14                (kW)            0 0/s 13                (kw)            0                    l Tetel (FW Flow        l(pal)      l0 t/G A                                                        S/G C unrrow Ranee Levet    (1)              50                    morrow Renee Levet      (%)            50 Wise tange Level      (1)              79                    Wide Range Levet        (1)            75 Pressure              (psig )          970                    Pressure                (psig)      970 l
t/G 8                                                          S/G D                                              l marrow tanee Level    (1)              50                  marrow tanee Level      (1)            50 WIas aarge Levet      (1)              78                  W1ee 8arve Leve1        (t)            78 Pressure              (psi g)        970                    Pressure                (psig)      070 SJzriticality          Green          Green Core Cooting          Green          Green West Sht              Green          Green RCS Integrity        Green          Green Cont integelty        Green          Green aCS !nventory        Gr een          Green Recirculation        Green          Green radiation            Creon          Green 4/7/93                                            7,32                                              sect 0 0 5
 
1993 Exercise - section 7.3                                          i flKs                  8:10                                                                      ]
an Power              (1)              0                        80* SJacooling      (deg f)      80 la                    (acamps)        0.75                      RVL tl Fut t Range  (t)        100 tource Range          (cos)            0 Ptf Pressure        (psig)    2 Core Thernist          (wWT)            mA Power                                                            AcetsaJt eters Avg Pressure        (psig)    625 Averece Level      (tal)      6330 aCs Loop Flow        (1)
Loop A  102 Loop 8  102                      fotat CMG Flou      ( gpm)    260 Loop C  IC2                      $1 frein A Flow    (gpm)      O Loop D  102                      St Train 8 Flow    (spml      0 RMA train A Flow    (gpa)      0 PZR Level              (1)                22                    441 f rain 8 Flow  f orm)    0 ats Wa Pressure        (psig)          2011 Letdown Flow        (gam)      0 Hottest incore f/C    (des F)        558 ave not Leg f eee      toeg F)        558                      A Cas Die Press    (pois)    O 556                      8 Cat Of s Press    (psig)    0          j avg Cotd teg fece      (deg F) h avst Levet          l(kost)            681,710        l        Bus 1              (volts)    14015 Bus 2                (volta)    14024 Cet pressure          (osig)          0              l        Sun 3                (volts)    4402 aus 4                (vol t n)  4388 Bus 5              (volts)    4400 Cont SJw A Levet      (in)            0 Cont $Je S Levet      (in)            0                        tus 6              (votes)    4410 tecric SJe Level      (ft)            0 0/G 1A                (tW)            0 0/C it                (tW)            0                      l Total (FW Flow      (gal)      1600
    $/G A                                                            $/G C marrow sange Level    (%)              O                      terrow tempo Level  (%)          0 Wide Range Level      (1)              63                      Wide tanee Level    (1)        63 (pe lg)          1045                    Pressure            (psig)    1045 Pressure
    $/C 3                                                            5/G D harrow Range Levet    (%)              O                      terrow Range Level  (t)        0 Wide Range Level      (1)              63                      Wide manee Level    (1)        65 eressure                (psig)          1065                      Pressure            (ps is)  1076 Subtriticality        Green            Green Core Cooling          Green          Green West Sink              Green          Yellow RCS Integrity          Green          Green Cont integrity        Gregn          Green RCS leventory          Green          Green Recirculation          Green          Green endistion              Green          Yellow 417/93                                            7.33                                          sic?o. ors
 
1973 Ecercise - section T.3 flue f              Bits f as Power                  (1)                O                        acs $drooting        (oeg F)        91 0.001                                        (t)          100 It                      (stants)                                    avLt3 Fut t ear 9e tource ne%e              (cos)              0 Paf pressure        ( ps ig)      3 Core inernel              (M)                mA 8over                                                                  Acewut aters Avg Pressure        (psig)        625 Averese Levet        (gat)        6330 ets Loop Flow            (1)
Loco A    102 Loop 8    102                      fetal CMG Flow      ( gpe)        220 L oop C    102                    51 Train A Flow      (gen)        O t oop D    102                    $1 f rein s flow    (ope)        0 ene Train A flow    (gpe)        O RMS Train 8 flow    (gan)        0 PZa Levet                (1)                  24 BCS We Pressure          (psig)              2111 I tet - ,iow          I(-,        IC            l Not t es t incore 7/C    (deg F)            555 Avg not Les tese          (oes f)            555                    A CBS Dis Press      (psig)        O avg Cold Leg tese        (deg F)            553                    8 Cet Ois Press      (psi g)      0 ewsf Levet            l(agal)            l 680,290          l        Bus 1                (volta)      14015 Se 2                (vot t s)    14024 Cont Pressure            (peit)          l0                          Bus 3                (votts)        4402 Sus 4                ( volt s )      4388 Cont $Jqp A Level        (in)                0                        Bus 5                (votts)        6400 0                        Sus 6                (volts)        4410    g Cont SJo 5 Levet          (in) toeric $Jo Level          (ft)              0 (kW)              0 I D/G 1A t/G 't                    (tW)                0                    l foret gFw flow        (pal)      f 734        l S/G A                                                                $/G C userow tanee Levet    (t)            0 morrow earge Level        (1)                  0 (1)                67                      Wide Range Level      (1)          67 Wi::le tense Level Pressure              (ceig)        1080 Pressure                  (psig )            1080 5/G B                                                                $/G 0 morrow aanse tevet        (1)                  O                    sacrow tense Level    (1)            0 Wide sange Level          (1)                67                      Wide gange Level      (T)          72 Pressure              (psig)        1D95 pressure                  (psi g)            1080 SJer t t ic ali t y      Green              Green Core Coot irg            Green              Green poet $1nt                Green              tellow eCS Integrity            Green              Green Cont letegrity            Green              Green act Inventory            Green              Gr een
    .~.ti.                    G,.e,              G-e nd 8 st i on            Green              t et l ow 4 N #93                                                    7.34                                          Ef C? Q DP$
 
1973 Exercise
* Section 7.3 T!iE s f                8:20 l 0                        RCb S A celing      (des F)      95 ex Power                  (t)
(mcago)                0                        avtts Futt aanoe    (1)        100 13 Source Rarge              (cos)                  1103 PRT Pressure        (psig)    3 Core Therm L              (WT )                  4A Accuttators                              j Power                                                                                                                1 Avg Pressure        (psig)    625      ;
l Average Level      (gal)      6330      ;
RC$ Loop Flow              (1)
Loop A        102 Loop 8        102                    total CNG Flou      (spm)      320 Loop C        102                    $1 Train A Flow    (gpa)      106 Loop 0        102                    St Train 8 Flou    (gps)      106 RMt Train A Flow    (spn)      0 f ut train 8 Flou  (gca)      0 PZR Levet                (1)                        29 RCS WR Pressure          (psig)                  2195 Letdown Flou        (gca)      0 (deg F)                557 557                    A CBS Dis Press    (psis)    0 I nottest incore f/c ave not teg Tem            (deg F)
Avg Cold Leg Teg          (des F)                555                    e Ces Dis press    (peig)    0 eusi tevet                (kget)                  478,980        f      sus 1                (volt s)  14015 Bus 2              (vol t s)  14024 l (paig)              l0                  l      Bus 3                (volts)    4402 l Cont Pressure aus 4                (votts)    4385 Bus S              (volts)    4400 Cont SJe A Level          (in)                    0 Bus 6              (vot t s)  4410 Cont SJ9 8 Level          (in)                    0 Recric Se Level            (ft)                  0 D/G 1 A                    (kW)                    0 l Total (FW Flow      (get)      700 D/G it                      (kW)                    0 t/G A                                                                      $/G C marrow aanse Level        (1)                      0                    terrow Range Levet  (1)          0 Wide Range Levet          (%)                    68                      Wide Range Level    (1)        70 Pressure                  (psig)                  1063                    Pressure            (psig)    1070
    $/G B                                                                      3/G 0 uscrow aanse Levet          (1)                      0                    marrou tenge Level  (1)        0 Wide Range Levet            (t)                    69                      Wide Range Levet    (1)      78 Pressure                    (ps t g )              1063                    Pressure            (pelt)    1110
    $ beriticality            Green                  Green Core Cooting              Green                  Green nest Sint                  Green                  Yellow RCS Integrity              Green                  Green Cont Integrity            Green                  Green pCS Inventory              Green                  Green Recirculation              Green                  Green R adi a tion              Green                  veltou 4/7/g3                                                          7.3 $                                      SEC70 OP$
 
1993 tacecise - Sectlers 7.3 T I8E:                $ 25 at Power              (t)                  0                      eCs saaccolig          (deg p)            39 (w apsm)              O                      tyt t s f ut t t ange  (t)              100 It Source Re-se          (eps)              37 Ptf Pressure            ( pei g)        3          l Core Therent          (sWT)              mA Dover                                                              Acc a lators Avg Pressure            (psig)          625 l
Averese Levet          (gel)            6330 aCS Loop flo.          (1)
Loop A    102 L oop 6  102                    totst CuG Flow          (sm)              361          l l
Loco C    102                      $1 Train A flow        ( gm)            255 L oco 0  102                      11 Train 5 Flow        ( pp)            255          f tut Treln A flow      (gpe)            0 I
                                                                          #*t train 8 Flou        (ge)            0 PZR Level              (1)                32 aCS we seessure        (ps ig)            2278 J
l l Let          ,io. I  (g->          lo          I vottest trcore 1/C    (des 7)            558 Avg not Les feue      (deo f)            558                      A Ces 01 Press          (seis)          0 (seg 8)            556                      8 CA$ Dis Press        (pa i g)        O Avg Cold Leg Tom tW57 Levet              (kpet)          l4T7.470                  SW 1                    (volts)          14C15 tJs 2                  ( vot t s)      14024 Cont Pressure      l(paig)                0                        aus 3                  (volts)            4402      l l
\'
Sus 6                  (vult s )          4388 Sus 5                  (volts)            4400 Cet SJap A Level      (in)                O cont SJap B Level                          0                        sue 6                  (vetts)            h10 (in)
(ft)              0
{tecaic S m Level c/G 1A                  (W)                0 (W)                0                    lYetal(FWFlow            (gal)            700 l D/G 's 5/G A                                                              $/G C marrow tense Level    (1)                  0                      terrou tense Level      (1)              0 Wide tense Level        (%)              T3 Wide lange Level      (1)                68 1%)                      Dressure                (psig)          1066 pressure              (pelg) 5/G S                                                              S/G D marrow tange Level      (1)                  0                      herrow lange tevet      (1)              20 wide tage Levet        (1)                69                      Wide Range Level        (1)              64 Pre .wre                (p.I,)          tito l      aree.ure                (psis)              1063 Green                    sete 450U A, 8, C
      $Jrri t ical i ty      Green open to inittste Coot @en Core Cooting          Green              Green nest Sira              Green              Yellow
        #C3 integrity          Green              Green Cont lategetty        Green              Green 8C3 Inventory          Green              Green t eci rculation        Green              Green radiation              r,r een            Yellow l
l 4 t rig 3                                              7.3 6                                                sf c? 0 MS
 
19V3 Exercise - section 7.3 I
fire s          8:30 ats secooling        (deg f)              10,2 RI Power            (1)              0 II                  (mt ag)          0                      SVL18 Ful t tage      (1)                  130 Source Range        (cos)          15 Pat pressure          (psi g)              3 Core thennst        (wWT)          NA Power                                                      accumJt ators Avg Pressure          (psis)                625 Average Levet        (get)                6330 RCS Loop flow      (3)
Loop 4 102 Loop 8 192                      fetal CMG Flow        (gpm)                322 Loop C 102                      $1 frein A ftow      (gpe)                  106 Loop D 102                      $1 frain 9 flow      (gy)                  106
                                                                            #NR frain A Flow      (gpm)                O pgg Levet          (t)            4                        tua frein a Fiow      (gy)                  O act We Pressure    (pei g)        2024 Letdom flow          (gum)                0 Hottest incore f/C  (deg F)        533 Avg Hot Leg f eng  (deg F)        534                      A C83 Die Press      (psig)                0              l avg Cold Leg f enp  'deg 73        530                      4 Ctt Ois Press      (psig)                0 arti Levet          (kget)        476,230        l        Bus 1                (volts)                14015 Bus 2                (volts)                14024 cont pressure        (psis)        0              l        Bus 3                (votts)                  4402        i l
sus 4                (votts)                  4388 Cont 5tsup A Levet  (in)          0                        Bus 5                (volts)                  4400 Cont Swp 8 Level    (in)          O                        tus 6                (volts)                  4410 tecrie SJnp Level  #:f t)        0 D/G 1 A              (kw)          0 D/G it              (kW)          0                    lfeestEFwFlow        l(get)            l676
                  $/G A                                                      l/G C sarrow Range Level  (1)              O                    aerrow sange Levet    (1)                      0 Wide 'enwe tevet    (1)            66                      Wide tange Levet      (%)                  68 pressure            (pe lg)        850                    Pressure              (esig)                818 1/G S                                                      $/G 0 marrow Range Levet  (%)            0                      Warrow Range Level    (1)                  45
                                                                                                                                        )
Wi    sange tevet    (s>          64                      Wi    .an.e tevet    (s)                  er Pressure            (psig)        g20                      Pressure              (poig)                1115          l
                  $ 4critteelity      Green          Green l
Core Cooting        Green          Green                                                                              ;
Meet Sint          Green          Yellow RCS Integrity        Green        Green Cont Integrity      Green        Green O                  RC5 Inventory Recirculation Green Green Green Green tediation          Green          fellow e r e , * * *=
c v +ct                                        7,3 7
 
1993 Emercise - Section 7.3
                ?!8E            8:35 RI Power              (1)              0                    att smooting        (des F)  '00 O                    evils Fut t sange  (1)      130 14                    (mc ams )
Source Range          (cost          14 eRT Pressure        (psig)  3 Core Thereal          (wWT)          kA Power                                                        AccJsJtators Avg Pressure        (psig)  625 Average Level      (gat)    6330 aC5 Loop Flow        (%)
Loop A 103 Looo e 103                    Total CMG Flow      (grze)  322 Loop C 103                    51 Train A Flow    (sca)    106 Loop 0 103                    51 frein a Flow    (gpm)    106 eMR frein 4 Flow    ( gren)  0 awa Train 9 Flow    ( gam)    0 FZe Level              (%)            O RCS WR Pressure      (ps ig)        1490 totdown Flow        (pssa)    0 Mottest incore f/C    (deg F)        496 ave pot Leg Teg      (deg F)        496                    A CBS Dis Press    (psig)    0 s Css Die press    (psig)    0 avg Cold Leg feno    (deg F)        493 WWST Levet            (kgal)          474,000                am 1              (volts)  14015 BA 2              (volts)  14024 Cont pressure          (psig)        0                      Bus 3              (volts)    4402 Sus 4              (volts)    4388 Cont $Jp A Levet      (in)          0                      Bus 5              (volts)    4400 Bus 6              (volts)    4410 Cont Sep 8 Levet      (in)          0 tecric $Jo Level      (ft)          0 D/G 1A                (kW)          0 D/G 1s                (tW)          0                    l fotet f rW 5,ow      (gel)    793 5/G A                                                        $/G C morrow aange Levet    (1)              0                    marrow aanse Levet  (1)        0 wide tange Levet      (1)            61                    Wide tange Level    (1)      63 Pressure              (peig)          850                    Pressure            (psie>  850 S/G B                                                        5/G D
  . arrow .ange tevet    (u              0                    ..rm .ange tevet    tu        48 W$de tange Levet    (t)      89 Wide Range Levet      (1)            59 Pressure              (po ig)        880                    Pressure            (psig)  1115 SJzriticality        Green          Green Core Cooling          Green          Green mest Sint            Green          Yellow
  #C5 tategrity        Green          Green Cont Int egrity      Green          Green RCS Inventory        Green          Green t eci rcul ot t on    Green          Green Radiation            Green          'eitow 7,3-8                                      %FC7 0 0p9 4 '71C1
 
                  ~.
I 1993 Exercise - Section 7.3 ftHE  l            8:40 RE Power                (1)              O                    ats saacooling        toeg v)      sa It                      (me anos)        O                    avtts Fut t aange    (t)        100      l Source fange            (cts)              14 I ..t ,r-su,e        I ( ,g)    l4          i Core therent            (nwf)            mA R Power                                                          Acewulators Avg Pressure          ( ig)      625 aCs Loop stow                                                  Average Levet        tgat)      6330 (t)
Loop 4  103 Loco S  103                    Total CWG Flow        (scm)      361 Loop C  103                    St Train A flow        (scm)      25 0 Loop D  103          ,
                                                                  $( frein s flow        (orm)      25 0 RNR Train A Flow      (ggn)      O GMA f rein 8 Flow      (6pm)      0 PZg Levet              (1)              14 ACS WR Pressure        (psi g)          1185 Letdnun Flow          ( ppm)    0 nottest tecore T/C      (seg f)        480 Avg not Leg Teno        (oeg 7)        480                    A C8l Die Press        (psig)    O avg Cold Leg Tene      (deg f)        479                    8 C81 Of s Press      (psi g)    O evst Levet              (kgel)          470,960        l      Bus 1                (volts)    14015 Bus 2                (volts)    14024 t oel g)      l0                      Sus 3                (volts)      4402 l Cont eressure Bus 4                (volts)      4388 Cont Sap A Levet        (in)            0                      Sw 5                  (volts)      4400 0                      sw 6                  (veits)      4410 Cont tuno e Levet      (in) secete Esp Levet        (ft)            0 D/G 14                  (tv)            0 0,G i .                  (m              0                    I,ot,ii,..ow          I(..)      I.4          I
  $/G A                                                          $/G C
  .., row ..n.e Le.et      (i)              0                    ..r,. . ~ evet        (t)        0 wi.e ..,e Le.e.          (t)            o                      . . .. ,e tevei        (t)      .5
  ,,_e                    (,.ig)          m                      ,r. re              ( 4g)      m S/G 8                                                          S/G D eorron tange Level                        0                    sterow tonee Level    (t)        50 (t) 60                    Wide Range Level      (t)        92 wide senee Levet        (t) pressure                (psig)          763                    ,reneure              (peig)    1150 SJrriticality          Green            Green                Notes ASDV 0 apen.
Core Cooling            Green            Green Meat $lr*              Green            Yellow ACS Integrity            Green          Green Cont integrity          Green          Green RCS Inventory            Green          Green R eci rcut e t t on      Creen          Green todistion                Green          Yellow 7,3 9                                        RFC70 OPS 4 r?rol
 
1993 Eaercise - Sectian 7.3 TisEt                              8:$0 l (2)                  0                      BCs sacooling        (deg r)      77 avtts Fut t teMe      (1)        100 l#IPower It                                                                                  (mt enos)            0 Source Range                                                                        (cos)              11 ptY Pressure          (peig)    4 (WWT)              aA I Core theemal Power                                                                                                                            AccamJt et ors 625 Avg Pressure          (psig)
                                                                                                      #C5 Loop Flow                                                                        (1)                                          Average Level        (gal)      6330 Loop A      103 Loop 8      103                      Totet CMG Flow        (som:      0 Loop C      103                      $1 Train A flow      (gpm)      0 t one 0    1C3                      Il Train 8 Flow      (gm)      0 RMS Train A flow      (gps)      O 50                      RNR Train 3 Flow      (gem)      0 PZe Levet                                                                          (1)
RCS WR Pressure                                                                    (ps ig)            1126 l le,~ ,iow          l (g-)      15.        I Hottest tecore 7/C                                                                  (des F)            485 Avg not Leg Tese                                                                    (deg f)            485                      A ces Ols Press      (pois)    0 483                      0 Cl3 Dis Press      (psig)    0 Avg Cold Leg Temp                                                                  (deg f)
RW57 Level                                                                      l(tpal)            l468,350          l      Bus 1                (votts)    14015 (votts)    14024 Bus 2 Cont pressure                                                                      (psig)            O                        Sus 3                (volts)      4402 Bus 4                (vot t s)    4388 1
Cont Sg A Level                                                                    (in)                O                      sus 5                (vot ts)    &&OO      l tus 6                (votes)      4410 Cont SJun 8 Levet                                                                  (in)                O tecric $JHp Level                                                                  (ft)                0 D/G 1A                                                                            (kW)                0 D/G is                                                                            (kw)                0                    l Toget EFW Flow        (gal)      840 t
S/G A                                                                                                                          $/G C (1)                                        horrow Range Levet    (1)        0 marrow tar.de Levet                                                                                    O Wide tange Levet                                                                  (1)                69                      Wide tange Levet      (1)        72 765                      Pressure              (psig)    770        j Pressure                                                                          (psig) t/G B                                                                                                                          1/G 0 worrow aange Level                                                                (t)                  0                      marrow aange Level    (%)        53 Wide sange Levet                                                                  (1)                66                      Wide tange Levet      (1)        95 1128      I Pressure                                                                          (gelg)              75 6                    Pressure            (psig)
                                                                                                          $Jrriticality                                                                    Green              Green                                                              ]
j Core Cocting                                                                      Green              Gream
                                                                                                          #est l'nk                                                                        Green              fellow RCS Integrity                                                                    Green              Groes Comt integrity                                                                  Green              Groes RCS Inventory                                                                    Green              Green t ec t reut s t ion                                                              Green              Green 8adiation                                                                        Green              velIou i
1 4 r7 'ot                                                                                                              f.3 11                                        srcie DPs
 
1993 Esercise - Section T,3 Ti8E                8:55 l 0                        RC5 $Acot tng        (deg F)      73 as Pnwer                  (t) avt ts Fut i dange    (t)        100 18                        (s ams)            0 tource tange              (cos)            11 pet Pressure          (psig)    4 Core thermal              (wdT)            sA Power                                                                  AccJeal e t ors Avg Pressure          (psi g)    625 Averste Level        (est)      6330 RCS L oop 8 t ow          (1)
Loop A  102 Loop B  1C2                        Total CMG Flow        ( gp >    0 Loop C  102                        51 frein A Flow      (gy)      0 Loop 0  102                        $1 frein B Flow      ( pp)      O ant Train A Flow      (gp)      D ant Train a Flow      (gy)      0 P2R Levet                  (t)              55 RCS We Pressure            (psig)            1150 Let&wn Flow          ( grum)    66 Mottest incore T/C        (deg F)          489 (deg F)          489                        A CBS Ole Press      (psig)    0 Avg not Leg tog 9 Ctl Dis Press      fosig)    0 avg Cold Leg Teac          (deg F)          489 m
twsf tevet                (kgal)            468,350                    sus 1                (volts)    14015 Bus 2                (volts)    14024 Cont Pressure          lfpsig)              0                          Sus 3                (votts)      4402 1
Sus 6                (votts)      4388 t
Cont $s, A Levet          (in)              O                          eus 5                (volts)      4400 sue 6                fvolts)    4410 Cont $so B Levet          (in)              0 Recric $m Level            (ft)            0 0/G 14                    (tW)            0 0/G is                    (kW)            0                      l fotst fFw Flow      l(gel)    l850 1/G A                                                                  $/G C sorrow tonee Level        (1)                0                        marrow Range Levet    (1)        0 Wide Range Level      (t)        75 wise fence Levet          (1)              66 Pressure              (psis)    760 Pressure                  (psi g)          763                                                                  ,i h
5/G S                                                                  5/G 0 marrow aanse Level    (t)        53 sorrow lange Level          (1)                O Wioe Range Level            (1)              66                        Wide tenge Level      (t)        95 75 3                      Pressure            (ps ig)    1128 Pressure                    (psig)
S h riticality            Green            Gree Core Cooting              Green            Green West link                  Green            Yellow RC$ integetty              Green            Green Cont Integrity            Green            Gr een RCS laventory              Green            Green
                      #ecircul ation            Green            Green endiation                  Green            Yell ow l
l l
7.3 12                                        $FC? o oes A r7/93
 
1993 Esercise - SectIan 7.3 fisE:                g:00 tu Power                (%)                o                    aCs smooting        (oeg F)      33 (tance)            0                    RVLt1 Futt eenge    (t)        '00 10
  ,_,, e .e ge            aos)              11 Pe? eressu r e      (peig)    4 Lore f*ecent            (aWT)            sA Power                                                              Accuml a t or s Avg Pressure        (ps i g)    625 Aversge Level      (gal)      6330 aCl Loop Flow            (%)
Loop A  103 Loop 5  103                    Total CMG Flow      ( ops)      0 Loop C  103                    si train A Flow    ( spn)      0 L oop D  103                    $1 train 8 Flow    ( spn)      0 AMR Train A Flou    (spn)      O 74                      RMt frein 3 Flow    (gtsn)      0 PZa Level                (%)
RC3 WR Pressure          (psig)            1196 tetoo.e Flow        ( gcs)    96 wettest incore T/C      (oeg F)          531 A CBS Die Press      (psig)      0 Avg not teg Tene        (see F)          531 Avg Cold teg fesp        foeg F)          530                    0 C35 Die Press      (ps i g)    0 RwST tevet              (kget)          468,350                Bm 1                (volts)    16015 Sus 2                (volts)    14024
. Cont P ressur e        lfpsig)            l0                      Bus 3                (volts)      4402 Bus 4                (volts)      4488 0                      Sus 5                (volts)      4400 Cont SJo A Level        (in)
Sus 6                            4410 Cant $J42 9 Levet        (in)            0                                          (volts) tecric tse Level          (ft)            0 D/G 1 A                  (kW)            0 0/G 18                  (W)              0                    l Total EFW Flow      (gel)    l855
    $/G A                                                            t/G C sacrow Range Level      (1)                0                    marrow tange Levet  (%)          0 (1)              66                      Wiae tange Level    (%)        66 Wloe tones Levet pressure                (psig)            713                    Pressure            (psig)    716 S/G B                                                            S/G D Narrow Range Levet      (1)                O                    terrow Range Level  (%)        65 Wfoe Range Level                          68                    Wlos Range Levet    (%)        94 (1)
Pres sure                (ps ig)          716                    Pressure            (paig)      1120 52 criticality          Green            Green Core Cooling            Green            Green heat link                Green            vettow 20$ integrity            Green            Grees C ont int egr i t y      Green            Green RCS Inventory            Green            Green RfCircul at f ort        Green            Green Radiation                Gr een            f el I ou tr r
* 9 nog s e ' 'o1                                              7.3 93
 
1993 Esercise - section 7.3 flaE l            0:10 ex Power                (t)                0                      RCS SJeocling          (ceg F)          18 le                    (ac anes)          0                      SVLtl Futt eenge        (t)            100
$wrce tage              (cos)            11 l.1,ress,e              I      ,,      I.          l  ,
Core Thermet            Osw T)            aA Power                                                              Acc a lators Avg Pressure            (psig)        625 acs Loop Flow          (2)                                        Avecoge Level          (gal)          6330 f.oop A    103 Loop 3    103                      total CNG Flow      I (sm)            O Loop C    103                      si Train A Flow        ( gm >        0 Looo D    103                      St Train 8 Flow        ( gm >        0 Apt frein A Flow        (spr0          0 PIE Levet              (t)              63                        tua Train 8 Flow        (gm)          0 ACS we Pressure        (psig)            1102 Leth Flow              ( em)          88 Mottest incore T/C    (seg F)          541 Avg not Leg Teco      (des F)            541                      A CSS Dis Press        (psis)        O avg Cold leg Teee    (seg F)            540                      8 CBS Die Press        (psig)        0 aws? tevet            Ogal)          l 468,350          l        tus 1                  (votts)        14015 Sus 2                  (volts)        14C24 cont Pressure          (psig)        fa                          sus 3                  (vol ts)        4A02 Bus 4                  (volts)          4383 Cant $m A Levet        (in)              0                        sus 5                  (volts)          4400 eus 6                  (vol t s)        4410 Cont Sm 8 tevel        (in)              0 Recric le Level        (ft)              0 D/G 1 A                (kW)              0 0/G it                (tw)              0                      l foget trw Flow        l(get)        l1320      !
1                                                                  $/G C rrow aange Level    (t)                0                      usrr.nr aange Level    (1)              0 Ima/GA wide tange Levet Pressure (t)
(psig) 71 686 wfoe longe Level pressure (t)
(psig) 74 686
  $/G S                                                              $/C D sacrow eenge Level    (t)                0                      terrow aange Level      (t)            71 wide Range Level                      g4 wide Range Level        (1)              68                                              (t)
Pressure              (ps ig)          686                      Pressure              (psig)        1920 SAcriticsL!ty        Green              Green                    "0"  Lone RCS wR Not Leg f amp a 540 Core (ooting          Green            Green
* eat tird            Green            Yellow act lategrity          Green            Green Cont Integrity        Green            Green
  #C$ inventory          Green            Green t eci rculat i on      Green            Green sadietten              Green            Yellow                                                                      i l
l
* at                                              t 1.tg                                                ee-** *rc
                                                                                                                      +
 
1973 Esercise - Section F.3 TIsE                0:20 il RCS SJ:cooting              (deg f)          71 as Pewer              (t)              0                                                                                                                                ,
0                                                                    RVL il F ut t S eqe        it)            930            a le                    (mcams) source serge          (cos)            11 Ptf Pressu r e              (ps ig)        4 i
Core Imermet          tuWT)            mA Power                                                                                                          accwulators Avg Pressure              (psig)          625 Average Level              (gel)          6333 ACS Loop Flow          (1)
Loop A 103 I
Loop B 103                                                                      totat CMG Flow            (ggn)          0              j Looo C 103                                                                      si train A flow          ( a:ss)          0              f i
Loop D 133                                                                      si train 8 flow            ( spn >        0              l RWR train A Flow          (gpa)          O ENG Train $ Flow          (gen)          0 PZR Level              (%)            36 RCS WR Pressure        (ps i g)        1008 Letdown Flow              (gpe)          74 Not t es t incore T/C  (oeg F)        480 Avg not Leg Teg        (deg f )        480                                                                      A C s Ols Press          (psi g)        o (deg F )        476                                                                      9 CSS Of t Press          f psi g)        0 Avg Cold Leg Tc9 BWSt Level              (kget)          468,350                    f                                            Sus 1                    (volts)        14015 Sus 2                    (voltn)        14024 Cont Pressure          ( psi g)        0                                                                        lus 3                    (volts)          4402 Sus 4                    (volts)          4188 Sus 5                    ( vol t a)      4400 Cant SJo A Levet        (in)            O Bus 6                    ( vot ts)        4410 Cont $sp 5 tevet        (in)            0 secric EJe Level      (ft)            0 I
D/G 1 A                (kW)            0 D/G 18                (W)              0                                                              l Total (FW 8 tow              l(gal)          l1200        l 5/G A                                                                                                              $/G C terrow aange Level      (1)              0                                                                        marrow aarge Level      (1)            20 Wide tar 9e Level      (1)            63                                                                        Wide targe Level        (%)            75 eressure                (psigi          623                                                                        Presse e                (pulg)        621 1/G 8                                                                                                              $/G D hoerow Range Level      (t)              0                                                                        aarrow aange Levet      (1)            63 Wios penge Levet        (%)            92 Wise Range Levet        (1)            70 Dressse                fpsig)          621                                                                        Pressure              f psi g)        9055 SJe ri ti cali ty      Green            Green                                                                      "D' Loop RCS WR Mot Leg Teeqs e 431 Core Cooling          Gr een          Green Feat $1nk              Green          Yellow
  #C1 Integrity          Green          Green Coet lategrity          Green          Green RC5 Irientory          Green          Green
  . ~ .t i .              G r .-          G,-
ladiation              Green          vellow yet0 mpg 6/7 f G3                                            7.] . t $
 
                                                                                                              -          -_          =    -
1993 Esercise - Sectlan 7.3 T!sE s f            g:33 l Ru power                (1)                  0                    ACs sacocting          (deg 7)    63 (w arps )            0                      evtts put t aange      (t)        M0 it Source Range            (cps)              11 I .., ress,e            ! mig,      I.          I Core thermat            (WT)                44 Power                                                              Ac cLput ators Avg Pressure            (psig)    625 Average tevet          (get)      6330 ats Loop flow          (1)
Loop A    0 Loop 6    0                      Totst CMG Flow          (sm)      O Loop C    0                      $1 f rain A Flow        (om)      O Loop D    0                        $1 frein 8 Flow        (spm)      0 RMR f rain A Flow      (gm)      0              ,
PZa Levet                (1)                61                      RNA frein B flow      (om)      0 BCS WE Pressure          (psi s)            1001 Letdoom Flow          (gm)      73 nottest incore T/C      (org F)            484 Avg Not Leg Tag        (deg F)            484                      A Cg3 gis press        (paig)    Q avg cold Leg Yo o      (deg 8 )          468                      5 CSS Die Press        (psig)    0          !
eW57 Level            (kest)              468,350                Sus 1                  (volts)    0 Bus 2                  (votts)  0 Cont pressure          (patg)              0                      Bus 3                  (volts)  0 Bus 4                  (volts)  O Cont le A Level        (in)              0                      Sus 5                  (volts)  0 sus 6                  (votes)  0 Cont le 3 Levet        (in)              0 tecric le levet        (ft)              0 0/G 1A                  (kW)              0 C/G it                  (kW)              0                    l toget ErW Flow        l test)      Boo l
S/G A                                                              $/G C kerrow Range tevet      (%)        50 toerow penge Level      (t)                  0 wide Range Level        (%)                64                      Wide tange Levet        (1)        90 Pressure                (psig)            ??O                    Pressure                (psig)    500 t/G S                                                              1/G 0 marrow aanse tevet      (%)      50 terrow Range Level      (%)              34 Wide sange Levet        (t)                80                    Wide Range Levet        (t)      93 Pressure                (psig)    1013 Pressure                (peig)            590
                          $Jxr t tic ality        Green              Green                  "D* Loop RCS We not Leg fem e 480 Core Cooling            Green              Green Nest link              Green              Yettow RCS Integrity          Green              Green Cont Int egel t y      Green              Green RCs inventory          Green              Green tec t rewistion        Green              Green
                            #adiation              Green              vettow gre' $ ^>4
                        ,  9371                                              7394
 
1993 Esercise
* Sectim 7.3 flue s l            9:40 l Ru Powee                (1)                  0                    #Cs $Jrooting        (seg F)          51 (mcams)              0                    avt ts Fut t sange    (t)            100 It
$ource Range            (cos)              11 PRT Peessure          (ps i g)      4 Core Thermat            (wWT)              4A power                                                              AcciJm;L at ors Avg Pressure          (psig)        625 average Levet        (get)          6330 ecs Loop Flow          (1)
Loop A    0 Loop 8    0                      Total CMG Flow        ( gm)          O Loop C    0                      51 Train A Flow      (opm)          0 Looo 0    0                      $1 Train 8 Flow      ( psm)        0 AMA frein A Flow      ( ggsa)        O Pig Level                (1)                  48                    RNR train 3 Flow      (gtse          0 RCs we Pressure          (psig)            924 Letsome FIou          (gpm)          80 Mottest Incore 7/C      ($ ) F)            487 Avg Not Leg f epp        (des F)            487                    A CSS dis Press      (psig )        O avg cold Les Tag        (oeg F)            44 7                    4 CSS Die press      (psi g)        0 468,100                Sus 1                (volts)        0 ewSf Level              (kget)
Sus 2                (vot t s)      0 cant pressure        l (paig)          l0                  l      Sus 3                  (volts)      0 Bus 4                  (volts)      O Bus 5                  (volts)      4400 Cont le A Levet          (in)              0 sus 6                  (vol t s)    4610 Cont SwT 8 Levet        (in)              0 secric sJe Level        (ft)                0 0/G 1A                  (kW)                5560 DfG 18                  (kW)                5419                l Totst EFW Flow        (get)        690      h 5/G A                                                              $/G C
* arrow eenge Level      (t)                  0                    warrow Range Level    (1)          58 Wioe aanse Level        (t)                73                      wien aange Level      (t)            87 Pressure                (psig)          , 521                      Pressure              (ps i g)      522 5/G S                                                              S/G B marrow Range tevel    (1)            47 aarrow Range Level      (1)                51
  ' wide Range Level      (%)                86                      Wide Range Level      (%)            95 (ps i g)          522                    Pressure              (psig)        905 Pressure
  $Jrriticality          Green              Green                  "D* Loop aC4 We Not Leg f epp a 488 Core Coot ing          Green              Green west link              Green              vettow 8CS Integrity          Green              Green Cont Integrity          Green              Green ACS Inventory          Green              Green
  .....ti.                .,                .n endistion              creen              vellow crete naq
& /? 'o1                                                f,3 17
 
1993 Esectise - Section 7.3 fisE s    l            9:50 l ax Powee                    (t)                  O                      at$ secooling        (deg F)        68 ft                          (ar ams )            0                      avtts Fut t eenge      (t)          100 Source f ame                (cos)              11 ee? Pressure          (pa ig)      4 3
Core theramt                (WWT)              mA
      'o***                                                                    Accumalators Avg Pressure        (psig)        625 Aversee le et        (get)        6330 RCS Loop Flow              (1)
Loop A      0 Loop 8      0                        total CNG Flow        (spm)        0 Loop C      0                        si train A Flow      (g;:m)      O t oop D    0                        $1 frain 9 Flow      (gnm)        0 RNA Train A Flow      (em)        O 41                      RNR Trgin $ Flow      (osm)        0 P2a Level                  (t)
      #CS wt Pressure            (psig)              895 Letdown Flow          (gpn)        62 Mottest incore f/C          (deg F)            465 Avg Wot Leg f ew            (des F)            445                      A CSS fis Press      (psi g)      0 avg Cold Leg Yeg            (deg F)            426                      8 CSS Die Press      (psig)        0 ew1f tevet              lOgal)            l447,230            l        Bus 1                (volts)      0 Sus 2                (volts)      0 tont pressure              sgaig)              0                        Sus 3                (volts)      0 Sus 4                (volts)      0 Cont $wrp A Level          (in)                0                        8us 5                (votts)      4400 Cont $wp 8 Levet          (in)                0                        tus 6                (volts)      4410 escric $so tevet            (ft)              0 D/G 1A                      (kW)              5560 D/G 19                      OW)                5419                  l fotsi s W5 Flow    l feet)      l610        l S/G A                                                                    S/G C marrow tange Levet          (1)                21                        unrrow aanse Levet    (1)            19 wide tange Levet            (t)                84                        Wide tanee Level      (1)            85 Pressure                    (psig)            435                      Pressure              (poi g)      435
        $/G 8                                                                    S/G 0                                          i marrow eenge Levet          (%)                68                      #errow tenge Level    (%)          40 wide sange Level            (t)                88                        Wlas Aange Level      (1)          89 Pressure                    (ps ig)            436                      Pressure              (psi g)      962 8.bcri t icali t y          Green            ' Green                    1* Loop RCS WR not Leg Tag a 484 Core Cooting                Green              Green mest Sink                  Green              fellow aC$ Integrity              Green              Green Cont Integrity              Green              Green RCS Inventory              Green              Green R ec i rcula ti on          Green              Green
        #ediation                    Green              feitov 7, $.18                                          487* $ net 4/ 9/93
 
1993 Esercise - Section 7.3 flEt  l                10:00 In Power                  (t)                  0                      RCs subcoolias      (des F)            !$
l it                        (mcappe)            0                      evtts Fut t name    (t)              *03 l
' Source Range              (cos)              11 Pit Pressure        (psig)          4 l
Core f%ermat              (wWT )              4A Power                                                                  Acewulators Avg Pressure          (psig)          62$
Average Levet        (gat)          6330 RCS Loop flow            (1)
Loop 4  0 Loop 8  0                      Total CMG Ftow        (ppm)          O Loop C  0                      St Train A Flow      (spm)          0 L oop D  0                      51 f rein 8 Flow      (gpm)          0            f RNR Tr$4m A Flow      (gpm)          0 RNA frein 3 Flow      (gue)          O PZR Levet                (1)                39 805 wt Pressure            (psig)            879 Leth Flow            ( pos)          il Mottest incore T/C        (deg F)            444 Avg Mot Leg Tepp          (beg F)            444                    A C3$ Dig Press      (Deig)          O (aeg F1            407                    5 CBS Ofs Press      (ps i g )        O avg Cold leg f ece sws7 tevet            l(kost)                466,210                gus 1                (volts)          0 Sue 2                (volts)          O Cont Pressure            (pai g)            O                      Bus 3                (volts)          0 Sus 4                (vot t s)        O Cont Se A Levet          (in)                0                      Sus S                (volts)        4400 gue 6                                6413 Cont tg 6 Level            (in)              0                                            (volts)
Recric fu o Levet s            (ft)              0 D/G 1A                    (kW)              $$60 D/G it                    (tW)              5419                l f ot et E FW Fl ow l(get)          l 425 t/G A                                                                $/G C ksfrow lange Level        (t)                  36                    Marrow Eartge Levet  (1)              60 wios tange Level          (1)                  64                    Wide Range Level      (t)              56 Peessure                  (ps i g)          416                    Pr es sur e          (psig)          416 5/G S                                                                S/G 0 norrow songe Levet        (t)                57                    morrow eenge Levet    (t)              31 wide targe Levet          (1)                85                    Wise tange tevet      (1)              E8 Pressure                  (ps i g )        416                      Pressure            (psi g)        930
    $Jxrtticality            Green              Green                  "D" Loop #C5 We Mot Leg f en, a 488 Core Cooling              Green              Green West lire                  Green              Yellow GC1 Integrity              Green              Green Cont Integrity            Gr een            Green dC5 Invectory              Green              Green R ec i rcula t i on        Green              Green Radiation                  Green              Yellow cr e a og T eot                                                7,j 90
 
1993 tseccise - Section 7.3 TIE:  l            10:10 l es Power              (1)                  0                      sta sazooling        (deg F)          95 la                    (ne anos )            O                      evlis Fut t Range    (t)            100 Source Range          (cce)              11 Ie.,Presse,e          I,ig,          l4          i Core Thermel          (WWT)              4A Power                                                              Accalators Avg Pressure          (psig)          625 Average Levet        (gat)          6330 eC5 Loop Flow        (1)
Loop A    0 Loop B    0                        f otst CNG Flow      (gpn)          0 Loop C    0                        $1 frein A Flow      (eps)          0 L oop D    0                        $1 Train 8 Flow      (gam)          O twR train A Flow      (gpu)          O 43                    ama train 8 Flow      (gan)          O P2a Level            (%)
att WW Pressure      (psi s)            852 Letdown Flow          ( Ocen)        $0 Wottest incore f/C    (oeg F)            432 Avg Hot Leg Teap      (aeg F)            432                      A CBS Die Press        (psig)        0 (deg F)            302                      8 C85 Die Press      (psig)          0 avg Cold Leg f eep
  #WST Levet            (kgal)            463,240                  Bus 1                (vot ts)        O Bus 2                (vol t s)      O cont Pressure        (psig)            0                  l      Bus 3                (volts)        0 Bus 4                (vol t s)      O Cont Swa A Level      (in)              0                        sus 5                (volts)        4400 Bus 6                                4410 Coet $so 5 Level      (in)                0                                              (volts) tecric $we Level      (7t)                0 0/G 1 A              (kW)                5560 D/J it                (kW)                5419                  l fotel EFW Flow        (gel)          3?6
    $/G A                                                              $/G C l
marrow eenge Level    (%)                  36                    escrow eenge Level    (t)              65                i 84                    Wios sense Level      (t)              82 Wios aanee Level      (t)                                                                                                  l Pressure              (psi g)            335                      Pressure              (psi g)        333
    $/G B                                                              $/G D sorrow Range Level    (1)                  45                    uscrow Range Levet    (1)              24 Wide tange Levet      (1)                  83                    Wide Range Levet      (%)              86 Pressure              (ps i g)          334                      Pressure              (psi g)        OC5 t h riticality        Green              Green                    "D* Loop RC5 WR Hot Leg f eep
* 488 Core Cooling          Green              Green Heat link            Green              Vettom ett inte0rity        Green              Green l
4 Cont Integrity        Green              Green ACS teventory        Green              Green Recirculation        Green              Green todistion            Green              feitow 7.3 20                                          SEC7o OPS 4/7/g3                                                                                                                        1
 
1973 Esercise - Section 7.3 TIsE s l              10:20 l RI Power              (%)                  0                    ACs shooting          (oeg F)      101 (alc arps )          0                      evt ts sult sange    (%)            100 1R source aange          (cos)                11 PRT Pressure          (peig)        4 Core the N L          (MWT)                ha Po=#r                                                              ACctatl e t ors Avg Pressure          (psig)        625 Averste Level        (Oat)        6330 aC5 Loop flow          (%)
Loop A    0 Loop 8    0                      Total CMG flow        (gp )        0 Loop C    0                      $1 frein A flow      (gam)        O t oop D    0                      $1 frein 8 Flow      (ops)        0 ant Train A Flow      (gm)          0 PZR Level              (%)                  41                    WNR train 8 Flow      (em)          0
#C5 We Pressure        (psi e )            831 Leth flow              ( gem)      50 nottest incore T/C    (org F)            420 Avg not Leg feng      (deg F)            420                    A Ces Ois Press        (psig)      0 Avg Cold leg Yew      (seg f)            182                      B CBS Die Press      (psig)      0 eW57 Level            (kgel)              465,240        l        Bus 1                (vol t s)    0 Sue 2                (volts)      0 tent Pressure          fpsig)              0                      Bus 3                (volts)      O Bus 4                (volts)      O Sus 5                (vot t s )  4400 Cont $so A Level        (in)                0 Coet sep 8 Level                            0                      Sus e                (vol t a )  4410 (in) tecrf c turc Levet      (ft)                0 0/G 1A                  (kW)                5510 0/G te                  (kW)                5410                l total trW ttow      l(gat)          204      h S/G A                                                              S/G C i
narrow sense Leret      (%)                  50                    marrow tange Levet    (%)          50 wide Range Level        (%)                  82                    wide tarige Level      (%)          83 Pressure                (psi g)            ???                    Pressure              (paig)      2 73
  $/G S                                                              t/G 0 marrow eenge Level      (%)                  50                  marrow Range Level    (%)            16 Wtoe tange Level        (%)                  82                  Wide tange Level      (1)            64 (psig)              272                    Pressure              (psig)      882 P res sur e
  $mriticality            Green              Green                  "D' Loop RC5 WR Not leg f em
* 484 Core Cooling            Green              Green heat $14                Green              Green RCS Integrity          Green              Green Cont integrity          Green              Green RCS Inveetory          Green              Green Recirculation          Green              Green ladiation              Green              ve(Low r~+* ~re
  **e                                                s 9.99
 
1993 Esercise - Section 7.3 flalE s l              10:30 at Power                  (1)                  0                    RCS Subcocting          (deg r)    107 evt ts futi eenge        (t)        100 it                      (w ams)              0 Source Range              (cos)              11 I..,,ressu,e            I <-g,    I.          #
Core Thermal              (uWT)              44 Power                                                                Accunulators Avg Pressure            (psig)    625 Aversee Level            (gel)    6330 RCS Loop Flow            (1)
Loop A  0 Loop e  0                      f atet CNG Flow          (gem)      0 Loop C  0                      $1 Train A Flow          (gpm)      O L oop 0  0                      St Train p Flow          (gpm)      0 Rpt Tra6m A Flow        (gem)      O 47                    RNG Trein 9 Flow        (gy)      0 PZe Level                (%)
ecs we Pressure          (psig)            811 Let h Flow            l (ggso)  l 50 pottest incore T/C      (des F)            417 avg not Leg Tepp          (see F)          414                    A CSS Die Press          (psig)    0 f deg F )        374                    8 Cat Ois Press          (psig)    0 avg Cold Leg Tenus RW$t Levet                (kgal)            465,240        l      Bus 1                    (volts)    0 Bus 2                    (volts)    O cont Pressure              (psig)          0              l      Sus 3                    (volts)    0 Sus 4                    (volts)    O Cont Sog A Level          (in)            0                      Sus 5                    (volts)  4400
                                                                                                              &&to Cont SJ, s Levet          (in)            0                      tus 6                    (votts) decric Surp Level          (ft)            0 0/G 1 A                    (kW)            5510 0/G 18                    (kW)            5410                l Total (FW Flow        l test)    l100        l s/G A                                                              $/G C harrow aange Level        (t)                50                    terrow Range Levet      (t)          50 Wide Range Level                              82                    Wide Range Levet        (t)        82
(%)
Pressure                  (ps ig)          213                    pressure                fosto)    212 S/G B                                                              S/G D harrow aanse Levet        (t)                50                    marrow Range Levet      (1)
I Wide sange Level          (%)                82                    Wide tange Level        (1)        82 Preesure                (paig)    862 Pressure                  (psig)          212
      $dcriticality              Green            Green                  "D" RCI WR tiot les Tenp e 476 Core Cooling              Green            Green West $1nk                  Green          Green aCS Integrity              Green          Green Cant Integrity            Green            Green ACS Inventory              Green            Green s ec t reviation          Green            Green Radiation                  Green            Yellow 7 3,??                                          +t*** act
    & a* ret
 
1993 Esercise - Section 7.3 TisE            10:40 RX eover            (1)                  0                    #C$ $secooling          (oeg F)  113 (w oms)              0                    avtis Fut t eenge      (t)      100            ..
18 Sou r ce Range      (:ps)              11 Paf pressure            (ps i g)  4 Core Themal        (wwf)              mA power                                                          Accunul a t or s Avg Pressure            (psis)    625 Avere)e Level          (gal)    6330 aCs Loop Flow      (1)
Loop A    0 Loop 8    0                      Total CNG Flow          ( gy)    O Loop C    0                      $1 frein A Flow        (gem)    O Loop D    0                      51 frein 3 Flow        (gpu)    0 Ran f rein A Flow      (spna    0 RNR frein B Flow        (gun)    0
#24 Levet          (1)                  41 RCS WR Pressure    (ps i e)          791 L etdo.es F low        (gan)    53 Nottest Ircore f/C  (deg F)            404 Avg Not leg f em    (deg F)            404                    A CBS Die Press          (psig)  O (seg F)            366                    8 CSS Ols Press        (psig)    0 avg Cold Leg f em Rwst Level          (kget)          i665,240          l      Bus 1                  (votts)  O tus 2                    (volts)  O Bus 3                            0 cont peessure      (ps i g)          0              l                                (volts) eus 4                    (volt s) 0 Coet Saro A Levet  ( irt)            0                      sus 5                    (volts)  4400 Coet Surgs B Level  (in)              0                        Bus 6                  (volen)  4410 secric $Je Levet    (ft)              0 0/G 1A              (kW)              5510 0/G 18              (kW)              5410                lfototEFWFlow              (gat)    100            h
  $/G A                                                          S/G C horrow songe Levet  (%)                50                    marrow Range Level      (%)        50 wide aange Level    (1)                82                    Wide Range Level        (%)        82 Pressure            (psi g)          205                    Pres sur e              (psi g)  205 5/G $                                                          S/G 0 herrow Range Levet  (1)                50                    morrow Range tevet      (1)        0 Wide tange Level    (t)                12                    Wide tange Level        (%)        50 Pres sur e          (ps ig)          207                    Pressure                (psig)    !%2 1
Sderiticality      Green            Green                  ''0" tCs WR Het Leg f eep a 460                    i Core Cooling        Green            Green Heat $lnk          Green              Green RC5 letegelty      Green              Green Coet Ir:tegrity    Green              Green aCl Inventory      Green              Green Becirculation      Green              Green Radiation            Green            Y ell ow 7.3 23                                        U C 9 0 nP%
& /7 /03
 
1993 Esertise Section 7.3 TIE s .              10:50 8I Power                (%)                O                    acs secooting        (deg F)      Itg 11                      (ar a@s)          0                    9VLit f ait aange      (1)          100 sou,,e .e.,e            ( ,-              ,,
I,.,,,essu,e          I (~g)        l.          I Core theemet            (uWT)            #A Power                                                            Accat ators Avg Pressure          (psig)      625 Average level          (gal)        6330 ett Loop Flow          (1)
Loop A  0 Loop B  0                      Totet CMG Flow        (som>        0 Loop C  0                      $1 Train A Flow        ( gy)        0 Loop 0  0                      $1 frein 8 Flow        (gpn)        0 IMA Train A Flow      (gpm)        0
        #28 Level              (%)                39                  DNR Train 3 Flow        ( 9CN)      O scs wt pressure          (ps i s)        771 Leetsnwn F t ou        (gra)        50 Hottest incore T/C      (deg F)          396 Avg Mot Leg Tene        (deg F)          396                    A Cat ols Press        (psig)      0 (deg F)          358                    8 CBS Of s Press      (psig)      0 Avg Cold Leg Teap awst Level              (kgat)          465,240        l      Bus 1                  (vot t s )  O Bus 2                  (volts)      0 Sus 3                  (volts)    0 Cont Pressure          (pol g)          0
  >-                                                                      Sus 4                  (vul t s)  O
(                                                                        Sus 5                  (volt s)    4400 Cont Sg A Level        (in)            0 Cont sep 8 Level        (in)              0                      Rus 6                  (vol t s)  4410 Recric S.mo Level      (ft)              0 0/G 1 A                  (kW)            5510 3 0/G it                    (kW)            5410                l Total FsW flow      l(gal)      l190        l 5/G A                                                            $/C C marrow Range Levet      (%)                50                  marrow tange Levet    (1)          50 wide sange Levet        (%)                62                  Wide f ange Level      (1)          82 Pressure                (psi g)          201                    Pressure                (psig)      200 l
S/G $                                                            1/G 0 kerrow Range Level      (1)                50                  horrow Range Level      (1)          0 Wide Range Level          (1)                82                  Wide Range Level        (1)          TS Pressure                  (psig)          200                  Pressure                (psi g)    822 S@criticellty            Green            Green Core Cooling            Green            Green nest link                Green            Green att Integrity            Green            Green Cont integrity          Green            Green l
RCS Inventory            Green            Green l
socircutstlan            Green            Green f
I          Radiation                Green            Vet t aw r,1* re t                                            7 1,76                                          tret e 903
 
1993 Excccise - Sectim 7,3 118E: l            11:00
#1 Power                  (1)                0                      #Cs Subcoottne        (des F)    121 (s ams )          0                      fvt ts Fwit eenge      (t)        tSo        l le Source tange              (cos)            11                                                                    )
I  ,e, ,,e,se,e        I ,-g,      l.          H !
Core Thermet              (wWT)            hA N ec                                                                Ac etslut a t ors Avg Pressure          (psig)    625 8C5 Loop Flow            (t)
Average Level          (est)      6330 Loop A  0 Loop B  0                        Total CMG Flow        (gan)      O Loop C  0                        Il Train A Flow        (gpm)      O Loop D  0                        $1 frain 8 Flow        ( opn)    0          I twa frein A Flow      ( spn)    0
                                                                                                                  \
: 4)                    EMt Trein 5 Flow      (spe)      0 PZR Level                (t)
RCS We Pressure          (psig)          751                                                                    )
L etdown F l ow        (gpn>      $0 Hottest incore t/C      (des F)        390 Avg Mot Leg Tem          (deg F)        390                      A CSS Dis Press        (psig)    0 Avg Cold teg Tene        (deg 8)        352                      8 Cts Dis press        (psig)    O e47 levet                (kgel)          465,240                  sus 1                  (volts)    0 Sus 2                  (volts)    0          l cont Pressure            (psig)          0                      Sus 3                  (volts)    0 l
Bus 4                (volts)    0 Bus 5                (volts)    4400 Cont se A Levet          (in)            0 tus 6                            4410 Cont Sum O Level        (in)            O                                              (volts) tecric SJe level        (ft)            0 D/G 1A                    (kW)            5510 D/G is                    (kW)            5410                  l Total (FW Flow      l(gat)    I190        l 1, G A                                                            $/G C herrow Range tevet        (1)              50                    terrow Range Level    (t)        50 Wide f ange Level        (t)              82                    Wide tange Level      (1)        83 Pr es sure                instg)          193                    Pressure              (psig)    193
  $/G S                                                              S/G D harrow Range Level      (1)              50                    worrow Range Level    (t)        0 Wide range Levet        (t)                83                    Wide tange Levet      (1)        75 Pressure                (ps i g)        195                    Pressure              (psig)    SC2
  $
* riticality          Green            Green                  "Da RCS WR mot Les f onp = 454 Core Cooline            Green            Green keet Stak                Green          Green RCS Integrity            Green          Green Cont letegrity            Green          Green RCS Inventory            Green          Green t ec ir cul a t ion      Green          Gr een endiation                Green          Yetlow 7.3 25                                        sect 0 fM 4/7/93
 
1993 Esercise + Section F.3 flEs                  11 10 au Power              (1)                0                      RCt $Jxooting          (des F)      123 te                    (memaps)            0                      eVL fl Full eenge      (1)          too Source AsNe            (cos)              11 lPafpressure          l (psig)      i  6        h Core Thermel          (MWT)              NA Power                                                              Acetmiut at ors Avg Pressure          (psig)        625 Average Levet          (gal)        6330 f t$ Loop Flow        (t)
Loop A    0 Loop 8    0                        Total CMG Flow        (gpm)        0 Loop C    0                        $1 f rain A Flow      (gam)        Q t oop D  0                        St frein 9 Flow        (gssa)        0 Rua frein A Flow        (spn)        O ant Train 8 Flow        (grun)      0 PZn Level              (1)                41 RCS WR pressure        (cele)            731 Letdown Flow            (grun)    l41 Hottest Incore f /C    (deg F)          384 Avg not Leg f eng      (deg F)          384                      A C35 Dls Press        (pal 0)      0 Avg Cold Leg Teco      (deg f )          346                      8 Ces Dis Press        (ps ig)      0 BWST Levet            (kgat)            665,240        f        Bus 1                  (volts)      0          ,
Sus 2                  (volts)      0 Coat Pressure      lfpaig)            f0                        Bus 3                  (vot t s)    0 Bus 4                  (volts)      O Coct le A Level        (in)              O                        aus 5                  (volts)      4400 Cont $g 8 Level        (in)              0                        Bus 6                  (votts)      4410 secric se Level        (ft)              0 D/G 1 A                (kW)              5410 0/G it                  (tw)              5360                  l Totat Erw flow      l(gal)        l190        l
        $/G A                                                              $/G C unrrow Range Levet      (t)                50                    narrow Range Levet      (1)            50 side tange Level        (4)                53                    wide Range Levet        (t)            83 Pressure              (psig)            187                    Pressure                (pe lg)      '86
        $/G S                                                            $/G D marrow eenge tevet                      0 ustrow Range Level    (1)                50                                            (t) wide aanse Level        (t)            73 wide tange Level        (t)                13 Pressure                Ipsig)      782 Pressure                (psig)            186
        $Jxriticality          Green            Green Core Cooling            Green            Green meat Sir
* Creen            Green RCS Integrity          Green            Green Cent Integrity          Green            Green aCl Inventory          Green            Green Recirculation          Green            Green Radiation              Green            fellow 7.3 26                                            $fC7o OPS 4/7/93
 
1973 Esenise - Section 7.3 fist s                11:20 as sewer                  (1)                  0                    tta 5Jacootleg        (seg F)      126 It                        (ar ams )            0                    8vtil fut t Esage      (t)          '00        _
  . m e .enge                n.)                ,,
I  ,e, eress,e        I<-,,        I.            1 Core Thernet              ( 88wt )          hA Power                                                                Ac egwt a t ors Avg Pressure          (psig)      625 eC5 Loop Flow                                                        Average Level          (gal)        6330 (t)
Loop A  0 L oco 8  0                      Total CMG Flow        ( scm)      O Loop C  0                      St Train & Flow        ( gcm)      0 Loop C  0                      Si frein S Flow        (gtm)        0 But f rein a Flow      ( g;sn)      O p;t Levet                  (t)                  48                    But f rein 8 Flow      (gesa)      O eCS wt Pressp e            (psi g)          711 L etoown Flow          ( ges= )    45 dettest incore t/C          (oeg F)          3 75 ave not Les Te-o            t oeg F )        378                    a cas Of s Press      (psig)      O avg Cold Leg T eap          (seg F)          340                    8 Ctl Die Press        (ps ig)      0
  #wst Levet              l(kgell              465,240                Bus 1                  ( vot t s)    14015 Bus 2                  (vol t s )    14024 (psi 9)          0              l        Bus 3                  (volt )        4402 Cont Presswee Bus 4                  (vo L t s)    4338 Coet 5se a Levet          (in)              O                      Bus 5                  (votts)        .400 Cart 1sp 8 Level          (fa)              0                      Aus 6                  (volts)      4410 secrie see Level          (ft)              0 D/G 14                    (tw)              0 g 0/G te                      (rw)              0                    l Total tFw Flow      l(gel)      l190            h 5/G A                                                                S/G C morrow songe Levet          (1)                50                    userow aange Levet    (t)          50 wios tange tevet            (1)                63                    wioe enrge tevet      (t)          83 pres sure                  ( ps i g)        175                    Pressure              (osig)      i'8 S/G S                                                                1/G 0 narrow serve Level          (t)                50                    marrow Range Level    (1)            0 (1)                83                    Wioe earse Level      (t)            72
  ' loe w      Isr9e Level Press #9                    (ps i g)          179                    Pressure              (ps i g)    762 SJacelticality            Green            Green                  "D* RCS WR Mot Leg f ew e 442 Core Cooling              Green            Green meet Stat                  Green            Gr een RCS letegrity              Green            Green Cont integrity            Green              Green RCS Inventory              Green            Green R ec i revl e t i on        Green            Green mediation                  Green            vettow 4 / ?/93                                                7.3-27                                            SFc t C r*S
 
1993 Dsetime - Section 7.3 TIE:            11:30 4* Power              (5)                      0                    RC4 sacoctig            (deg f)        '29          1 1R                    (mcarps)                  0                    evtls Fut t ee *ge      (t)            100 Source Range          (cos)                  11 le.,,ressu,e            I.I.,          I.          I Core The N L          (wWT)                  NA Poner                                                                  Accalators avg Pressure          (ps i g) '    625 BCS Loop flow        (1)                                            Average Levet          (get)          6330 Loop A        0 Loop B        0                        Total CMG Flow        (em)          O toco C        0                        $1 Train A Flow        (sm)          0 Loop D        0                        51 f rein 8 Flow      (gm)          O tut Train A Flow      (pp)          O
(%)                      41                    AMA Train 5 Flow      (gm)          0 PZR Level RCS WR Pressure      (esig)                  691 Letttown flow          (gm)          45 Mottest Incore 7/C    (oeg F)                372 Avg #ot Leg Teap      (deg F)                372                      A CSS Dis Press        (psi g)        0 Avg Cold leg Tone    (deg F)                334                      8 Cet Die Press        (psig)        0 ews? Levet            (eget)                  465,240        l        Bus 1                  (volts)        14015        f Sus 2                  (volts)        14024        ,
to 3                  (volts)          4402 Coat cressure          (psig)                O Bus 4                  (vol t s)        4388 Cont $sp A Level      (in)                  0                        sus 5                  (volts)          4400 Cont Sep 6 Levet      (In)                  O                        aus 6                  (volts)          4410 tecric tse Level      (ft)                  0 D/G 1 A                (kW)                  0 D/G 1s                (kW)                  0                    l fotst EFW Flow        l(sat)          190        h 1/G A                                                                l/G C terrow Range Levet    (3)                      $0                    terrow tange Levet    (%)              $0 Wlos Range Level      (%)                      83                    Wide tange Levet      (%)              83 Pressure              (psig)                  174                    Pressure              (ps i g)      1 74 S/G 8                                                                t/G 0 verrow Rege Levet    (t)                      50                    marrow Range Levet    (%)              0 Wlos Range Level      (%)                      83                    Wide tange Level      (1)              69 Pressure              (ps i g)                1 74                    Pressure              (ps i g)      742 SJA:riticality      Green                  Green Core Conting          Green                  Green heet $lna            Green                  Green eC1 Integrity        Green                  Green Cont Integrity      Green                  Green RCS Inventory        Green                  Green R eci rcut et t on  Green                  Green tedletion            Green                  fellow r
4/7/93                                                    7.3 28                                            s(C 7 0 C*5
 
1993 taercise - Section 7.3 11 4 : l          11:40 l IN Power              (%)                0                          RCs smooting                              toeg F)      131 ft                    (mcarps)            0                          evt ts Futi aange                        (t)          too      O'T Source asage          (cos)            11 l Pei pressure                                  (ps i g)    4 Core thermat          (wwY)            mA Pow *r                                                              Acceletors Avg Pressure                              (psis)      625 act Loop Flow        (1)                                            Average Levet                            (gal)        6330 Loop A    0 Loop 8    0                            Total CnG Flow                            (arm)        0 Loop C    0                            si Train A Flow                          (gps)        O L oop D    0                            $1 Train 8 Flow                          (g;zn)      O ant Train A Flow                          ( g;sa)      O 3,                        two Train a Flow                          (g:nn)      0 PZa Level            (1)
RC5 we Pressure      (psig)            671 Leth Flow                                (g:se)      45 Hottest incore f/C    (seg F)          366 Avg Not Leg Teap      (deg F)          366                          A CBS Die Press                          (psig)      0 Avg Cold leg f eno    (deg F)          329                          8 Cas Ois press                          (psig)      0 twST Levet            (kgal)            465,240                      Sus 1                                    (votts)      14015 Bus 2                                    (volts)      14024 Cont eressure        (psig)            0                            Sus 3                                    (volts)        44C2 Sun 4                                    (volts)        4388 (In)                                          Sus 5                                    (volts)        4600 Cont se A Level                        0 Cont $g B Levet      (in)              O                            sus 6                                    (vol t a )    4410 secric se Levet      (ft)              0 D/G 1 A                (kW)            0 D/G it              (kW)              0                            total trv st ow                        l test)      l190 t/G A                                                              t/G C sorrow aange Levet    (1)                50                        marrow tenge Level                        (t)            50 wide sange Levet      (1)                E3                        wide Range Level                          (%)            62 Pressure              (psig)          171                          Pressure                                  (psig)        170 5/G 8                                                                $/G D harrow aanse Level    (%)                50                          marrow eenge Level                      (%)            0 13                          wide aanse Levet                        (t)            68 wios sense Level      (t)
Pres sure            (psig)            170                          Pressure                                (esig)      722
                                  $leriticality        Green            Green Core Cooling          Green            Green Heat $4nt            Green            Green RCS Integrity        Green            Green Cont Integrity        Green            Green RCS Inventory        Green            Green Recirculation        Green            Green sediation            Green            vettow 4/7/03                                              7,3 29                                                                  RfC70 OPS
 
1993 Ezerclae
* Sectlam T.3                                                l TisE t            11:50 l as Power              (1)                  0                      aCs sJcooling            (seg F )    133 It                  (mcanos)            0                      avLis rut t sange        (t)          100 Source tange        (cos)              11 l Pef Pressure              (peig)      4 Core thermal        (wWT)              #A Power                                                            Acetmat ators Avg Pressure            (psig)      625 Average Level            (gel)        6330 ACS Loop Flow        (t)
Loop A    0 Loop 8    0                        Total CHG Flow          (spe)        0 Loop C    0                        SI frein A Flow          (gan)        0 Loop D    0                        SI Train 8 Plow          (gam)        O aun Train A Flow        topm)        0 43                      Rwe train 9 Flow        (grm)        0 PZR Level            (t)
RCs Wit pressure    (psig)            651 Lettk>msi Flow          (gpm)        45 Mottest incore T/C    (oeg F)          362 Avg not Leg Tepp      (oeg F)          362                      A CBS O f s press        (psis)      O 324                      5 CSS Ols Press          (psig)      0 avg Cold Leg Tepp    (deg F) 445,240                  se 1                    (vol t s)    14015 Reist tevel          (kget)
Se 2                    (volts)      14024 Cont Pressure        (psig)            0                        Sus 3                    (volts)        4402 Bus 4                    (volts)        4388 Cont sm A Levet      (in)              O                        em 5                    (volts)        4400 (in)                                        tus 6                    (vol t s)    4410 Cont Se 3 Levet                        O tecric Sm Level      (ft)              0 0/G 1A              (kW)              0 0/G is              (W)                0                      l Totst EFW Flow        l(gal)      l190 S/G A                                                            $/G C 50                      marrow tante Level      (t)          50 harrow tarve tevet    (t)
Wide Renee Levet      (1)                83                      Wlae Range Level        (1)          82 Pressure              (psi s)          165                      pressure                (psig)      165
                    $/G S                                                            t/G 0 marrow tense Level                      0 sorrow tense Levet  (1)                50                                              (t)
Wide tanee Levet    (1)                83                      Wide tante Level        (1)          65 Pressure            fpeig)            165                      Pressure                (psig)      702 54 criticality      Green            Green Core Cooling        Green              Green i
heet $$ng            Grgen              Gregn RCS Integrity        Green              Green Cont integrity      Green              Green RCS inventory        Green              Green tecirculation        Green            Green Radiation            Green            Vel (ou 1
1 I
7.3 30                                              SEC7 0 OPS 4/7/93 e
 
1993 Dercise - Section 7.3 TisE  l            12:00]
RN Power                (1)                  0                    RCS SJxooting            (deg F)                            134 (sc appe )          0                    evt t$ Fut t eeMe        (t)                                100 It Source Range            (e ps )            11 Ptf pressure            (celg)                            4 Core Thermat            (NVT)              mA Power                                                              Acc a lators Avg Pressure            (pets)                            625 Average Levet            (gst)                              6330 RCs Loop Flow          (1) tooo 4    0 Loop 8    0                      Totst CMG Flow          (gsm)                              O Loop C    0                      El Train A Flow          (gpm)                              O L oop D    0                      $1 Train s Flow          (scn)                              0 ant trotn a Flow        (gpm)                              0 41                  aut frein 8 Flow          (gren)                            0              I PZ4 Levet                (t) l ACS WR Pressure          (psig)            631 L etdown Flow            (gam)                            45 Mottest incere f/C      (oeg F)            362 362                    4 C s Die Press          (psis)                            0 Avg Wot Leg f eno        (oeg F) 9 Cts Die Prese          (poig)                            0 i  avg Cold teg Tepp      (seg F)            324 (kgat)          l465,240          l      Be 1                    (volts)                            14015        f avsf tevet                                                                                                                                  i Bus 2                    (volts)                            14024 Bus 3                    ( vot t s)                          4402 Cont Pressure          (poig)              0              l Bus 4                    (volts)                            4388 tus 5                    (vot t s)                          4400        l Cont sump A Level        (in)              0 Cont $Je 4 Level        (in)              O                      tus 6                    (vot t s)                          4410        f I
secric SJe Levet        (ft)              0 D/G 1A                  (kW)              0 (tW)              0                  lfotalfrW8 tow              (gal)                            100            l 0/G is S/G A                                                              $/G C 50                  marrow eenge Levet        (t)                                50          l marrow tange Levet      (t) wios sense Levet        (1)                  83                  wide eenge Levet          (1)                                62 Pressure                  (psig)                            162 pressure                (psi g)            162
    $/G S                                                              1/G D karrow Range Levet      (1)                  50                  marrow Range Levet      (1)                                  0 53                  heide tange Level        (t)                                63 wide Range Level        (t)
Pr es sure              (psis)                            6!L2 Pressure                (ps ig)            162
    $Jxri ticality          Green              Green Core Cooling            Green              Green mest $ird                Green              Green RCS Integrity            Green              Green Cont tetegrity          Green              Green eCS 1pventory          Green              Green t ec ircut et t on      Green              Green tedletion              Green              fellow 7,3-31                                                                  SEC 7 0 DPS 4/7/93
 
TI8E s              12:10 Rt Power              (1)                  0              RCS SJacoclies          (des F)    135 19                    (mc apps )          0              avtts Futt sense        (t)        100        i Source tange          (cca)              11 l,e,,res.u,e          I ,.ig)      l.        ll Core thermal          (WWT)              4A eower                                                      AccJsalators Avg Pressure            (psig)      625 RCS Loop Flow          (1)                                Average Level          (gat)      6330 Loop A      0 Loop B      0                Total CMG Flow        (spm)      O toop C      0                51 Train A Flow        (gpp)      0 Loop D      0                El Train 8 Flow        (sm)        O tut Train A Flow      (gpm)      O ENS Train 9 Flow      (gpe)      0 P2R Levet              (1)                  48 RCS We Pressure        (psig)            611
                                                                      '.ttoown Flow      l (gent      l45      l Nottest incore 1/C    (oeg F)            358 Avg not Leg Tese      (deg F)            358            f A C33 Ols Press        (psig)      0 ave Cold Leg Team    (des F)            320            l 8 Cat bis Press        (psi g)    0 l ewst tevet          l(kaal)            l465,740      l    Bus 1                  (volts)    14015 Bus 2                  (volts)    14024 Cont pressure      lfpsis)            l0                  Bus 3                  (volts)      4402 Bus 4                  (volts)      4388 Cont SJp A Levet      (in)              0                sus 5                  (vot t s)    4400 Cont SJo 8 Level      (in)              O                tus 6                  (vol t s)    4410 Decric Swo Level      (ft)              0 D/G 1 A                (tw)              0 D/G is                (kw)              0              l total tFW Flov      l test)      l100      l 5/G A                                                      S/G C terrow Range Level    (1)                50              marrow tange Level    (1)          50 Wide tage Levet        (%)                82              Wide tange Level      (3)          83 pressure              (peig)            158              pres sure              (psig)      158 5/G B                                                      5/G D harrow Range Level    (t)                  50              sorrow Range Level    (t)            0 Wlos Range Level      (%)                  83            Wloe tange Levet      (1)          61 Pressure              (psig)            158              Pressure              (psig)      662 luberiticality        Green              Green Core CootIng          Green              Green J
Meet link            Green              Green 1
RCS Integrity        Green              Green                                                          i l
Cont Integrity        Green              Green                                                          i 1
BCS inventory        Green              Green Decircut stion        Green              Green Radiatlan            Green              Yellow
        .,,,,,                                            r.,.,2                                      su, .r.
l l
i
 
O North Atlantic Energy Services Corporation Seabrook Station 1993 Graded Exercise s
Section 7.4  Meterological Data Reports
]
I u
O                              > 4-1
                                    .                            Sec 2.4_Mt1 P
                                +                  wwa+ e-pp->-            -  r
 
O METEOROLOGICAL DATA TABLE SECTION 7.4 Lower      Upper                          Lower            Upper        Lower  Upper  Wet    Ancient Dew Wind Speed Wind Speed                    Wind Dir          Wind Oir    Delta T Delta T Bulb    Tenp    Point  Prec!p  Solar Red sph                            deg from          deg from    deg (F) deg (F) Deg (F) deg (F) deg (F) inigt hr Langley TIME            sph 08:00          3.0        5.8                            96                130          -0.95  -1.6    46      52      45      .15      .21 08:15          2.5        4.9                            1 04              119          -0.92  -1.58  46      52      45      .15      .21 08:30          2.0        4.8                            108              122          -0.74  -1.48  46      52      45      .08      .24 08:45          2.0        4.6                            101              111          -0.45  -1.39  46      52      45      .05      .29 09:00          3.1        5.6                            104              115            .25    0.75  47      56      46      .03      .41 09:15          5.1        5.5                            115              1128          .25  -0.65  47      56      46      0        .52 09:30          5.6        5.8                            .25              139          -0.45  -0.95  47      56      47      0        .52 09:45          6.2        6.7                            137              150          -0.55  -1.05  48      59      47      0        .52 10:00          6.0        6.3                            129              151          -0.74  -1.12  48      59      47      0        .58 10:15          6.7        6.6                            140              159          -0.85  -1.30  48      59      47      0        .58 10:30          6.0        7.0                            145              171          -0.9    -1.38  48      59      47      0        .58 10:45          5.4        7.7                            162              181          -0.92  -1.41  48      59      47      0        .58 11:00          4.8        6.2                            180              193          -0.95  -1.46  51      61      50      0        .64 11:15          4.1        6.2                            193              198          -0.92  -1.49  51      61      50      0        .75 11:30          3.4        6.0                            205              202          -1.02  -1.5    51      61      50      0        .80 11:45          3.2        6.9                            198              207          -1.1    -1.58  51      61      50      0        .80 12:00          3.0        7.4                            215              210          -1.1  -1.7    51      61      50      0        .80 7.4 - 2                                        SEC 7.4_ MET
 
WSI WEATHER REPORT SECTION 7.4 9:00 Report Station: Portsmouth/ Pease, NH                                                                  Today's Date:  5 May 93 TIME DATE      TEMP WIND GUST VIS    WEATHEl 9PM 4 MAY      38              30        P CLDY 10PM 4 MAY      38              30          P LDY 11PM 4 MAY      38              30        P CLDY 12PM 5 MAY      38              30          P CLDY 01AM 5 MAY      42              10          FOG 02AM 5 MAY      42              10          FOG 03AM S MAY      42              10          FOG 04AM S MAY      42              10          FOG 05AM 5 MAY      44              25          RAIN 06AM 5 MAY      50              25          RAIN 07AM 5 MAY      51              25          RAIN 08AM S MAY      52              25          RAIN 09AM 5 MAY      55              25          RAIN O                                7.4 - 3                                                        SEC 7.4 MET l
l l
l l
l
 
l l
l WSI WEATHER REPORT lO I
SECTION 7.4 STATE WEATHER
 
==SUMMARY==
 
NATIONAL WEATHER SERVICE CONCORD, NH j
0716 AM EST THRU MAY 5,    1993 Durino the evenino, the low pressure system that provided the New Encland recion with two days of rain slowly moved Northeast.
A hich pressure system movino southerly from Canada will provide New Encland with sunny skies becinnino this afternoon...
Althouch a few clouds will remain in the northern recion as the low pressure system moves out.
Temperature will climb to the sixties durine the day, droppinq off to forties in the eveninc.
A low off the North Carolina coast will track Northeast over the next couple of days causina the New Encland Recion a return to wet weather by Friday.
NEW HAMPSHIRE SONE FORECASTS O NATIONAL WEATHER SERVICE, PORTLAND, MAINE N3007-070100 0710 AM EST THRU MAY 5, 1993 This morninc... partiv cloudv.      Rain diminishinq by noon. Hichs expected in the upper fifties with on shore breezes of 2-3 mph.
This afternoon...mostly sunny skies and clear. Area dryinq out.
Winds shiftinc from the South to the East as the day procross.
Winds increasino to 5-7 mph.
Thursday... sunny most of the day with conditions cloudinc up as the low moves in.
7.4 - 4                  SEC 7.4_ MET
 
WSI WEATHER REPORT BECTION 7.4 MASSACHUSETTS 2ONE FORECASTS NATIONAL WEATHER SERVICE BOSTON MA MA2001-004-061700 0348 AM EST THRU MAY 5 1993 This mornina.. sunny. Hichs in the sixties. h nich pressure system is rapidly movinc into the area. The recion should be cuaranteed at least 2 days of cood weather.
Friday could brina us more rain as a low pressure front moves in.
MAINE 20NE FORECAST NATIONAL WEATHER SERVICE PORTLAND MR ME2014-070100 0710 AM EST THRU MAY 5 1993 Today...cloudv. Rain clearina. As the day procresses the recion should see skies clearina late afternoon or early eveninc.
Tomorrow and Friday will provide us with cood weather. Richs expected in the upper forties or low fifties.
1 1
1 7.4 -5                  SEC 7.4_ MET I
l
 
O                                          l North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise o
Section 8.0 Radiological Data O
t O
 
O 1
l North Atlantic Energy Service Corporation f                            Seabrook Station l
1993 Graded Exercise Table of Contents section 8.1                  Pre-drill data 8.1.1        RMDS Trends                                                                                                                                    l 8.1.2        RCA Survey Data                                                                                                                                j I
Section 8.2                  Accident Data 8.2.1        RDMS Accident Data 8.2.2        RCA Survey Data                                                                                                                                ;
8.2.3        MPCS Logger Trends I
section 8.3                  Field Survey Data                                                                                                                              l 8.3.1        Plume Maps B.3.2        Station Contamination Survey                                                                                                                  )
8.3.3        oDPS Calculation                                                                                                                              l 8.3.4        METPAC Evaluation l
l 8.0-2                                                                                              SEC8.O_ RAD
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Section 8.1.1 RDMS HISTORICAL TRENDS O
f
(                    8.1.1-1              SECB.O_ RAD l
 
AREA MONITOR TRENDS APRIL 28TH THRU MAY 4TH CHANNEL MON.        READING      UNIT    STATUS  COMMENTS DESCRIPTION 1AM102  MANIP CRANE      O      MR/HR    OFFLINE 1AM103  MANIP CRANE      O      MR/HR    OFFLINE 1AM104  PER HATCH  5.27E-01      MR/HR    G 1AM105  PER HATCH  3.4E+02      MR/HR    G 1AM106  POST-LOCA  1.89E+00      R/HR    G 1AM107  POST-LOCA  9.3E-01      R/HR    G 1AM108  RX-CAV            O      MR/HR    OFFLINE 1AM109  SEAL TBL    1.07E+00      MR/HR    G 1AM204  PAB 7'N LO  7.25E-01      MR/HR    G 1AM211  PAB 7'N HI  3.07E+00      MR/HR    G 1AM233  PAB 7'S LO  5.65E-01      MR/HR    G 1AM234  PAB 7'S HI        -
MR/HR    00S 1AM205  PAB 25'S LO 3.25E-01      MR/HR    G 1AM235  PAB 25'S HI      -
MR/HR    OOS                              .
1AM206  PAB-6'N LO  2.68E-01      MR/HR    G 1AM207  CSP 2A      1.03E+00      MR/HR    G      MINOR INCREASE 1AM207  CSP 2B      8.88E-01      MR/HR    G 1AM209  P128        5.7E-01        MR/HR  G 1AM229  SAMP RM    2.36E-01      MR/HR  G      MINOR INCREASE 1AM232  VCT        5.7E+00        MR/HR  G      MINOR INCREASE 1AM301  VAULT A LO  2.08E+00      MR/HR  G 1AM303  VAULT A HI  1.23E+01      MR/HR  G 1AM302  VAULT B LO  6.44E+00      MR/HR  G 8.1.1-2                      SEC8.0_ RAD
 
AREA MONITOR TRENDS APRIL 28TH THRU MAY 4TH CMANNEL MON.        READING      UNIT    STATUS COMMENTS DESCRIPTION 1AM304  VAULT B HI  2.15E+01    MR/HR    G 1AM401  FSB HI      3.77E+00              G                          l MR/HR 1AM402  FSB LO      1.84E-01    MR/HR    G 1AM501  MCR        9.0E-02      MR/HR    G 1AM601  WG PROCESS  1.24E-01    MR/HR    G 1AM602  TRUCK DOCK  1.32E-01    MR/HR    G 1AM603  RADW CTRL  1.58E-01    MR/HR    G 1AM604  WPB CTRL    1.3E-01      MR/HR    G 1AM605  EXTRUDER    2.4E-01      MR/HR    G 1AM606  COMP WASTE  2.09E-01    MR/HR    G 1AM701  CHEM LAB    3.62E-01    MR/HR    G 1AM702  DECON RM    1.73E-01    MR/HR    G                            !
1AM703  RCA SHOP    1.24E-01    MR/HR    G 1AM704  MEN LKER    9.4E-02      MR/HR    G 1AM705  WOM.LKER    1.24E-01    MR/HR    G 8.1.1-3                  SEC8.0_ RAD
 
1 i
PROCESS MONITOR TRENDS SPRIL 28TH THRU MAY 4TH 1
CHANNEL  MON.        READING    UNIT      STATUS  COMMENTS DESCRIPTION IGM 801  STM LNA    5.1E-01    MR/HR    G
! 1GM802  STM LNB    3.69E-01    MR/HR    G l
1GM803  STM LNC    3.6E-01    MR/HR    G IGF804  STM LND    4.2E-01    MR/HR    G 1LM820  AUX COND    1.63E-07    UCI/ML    G ILM230  STOR TK          -
CPM      G 1LM231  TEST TK    1.05E-05    UCI/ML    G 1GM630  CAR BT.D      0.00    UCI/ML    OFFLINE 1GM631  WG COMP IN    0.00    UCI/ML    OFFLINE 1GM632  WG COMP OUT 4.54E-04    UCI/ML    G 1CC634  WG COMP EFF 2.1E-01    CPM      OOS 1GM810  COND AIR        -
CPM      OSS ILM621  WTT DISCH  2.07E-05    UCI/ML    G 1CC622  WT*1 EFFL      0.00    CPM      OFFLINE ILM216  SBDWN 1    1.38E-07    UCI/ML    G 1LM212  SBDWN 2    1.56E-07    UCI/ML    G 1LM213  SBDWN 3    1,3BE-07    UCI/ML    G      SLIGHT INCREASE ILM214  SBDWN 4    1.56E-07    UCI/ML    G 1LM215  FLASH TK    1.5E-07    MR/HR    G 1LM220  PCCW A      1.OE-06    UCI/ML    G ILM221  PCCW B      6.74E-07    UCI/ML    G ILM620  WTT INLET  1.28LE-03    UCI/ML  G 1LM240  RCS LO      8.10E-01    UCI/ML  G      SX INCREASE IN WK 1LM241  RCS HI      7.80E-01    UCI/ML  G      SX INCREASE IN WK ILM242 RCS AUTO    8.02E-01    UCI/ML  G      SX INCREASE IN WK ILM805 T/B SUMP    O            UCI/ML  G 8.1.1-4                        SEC8.0_ RAD
 
AIRBORNE MONITOR TRENDS APRIL 28TH THRU MAY 4TH CMANNEL  MON.        READING    UNIT      STATUS  COMMENTS 1CC732    ADMIN EFFL  2.79E+00    CPM      G 1GA720    FLUME HOOD  2.54E+01    CPM      G IGA 721  FLUME HOOD  2.09E+01    CPM      G 1GA722    FLUME HOOD  2.10E+01    CPM      G 1AP111    CONT PART    2.38E-10    UCI/ML    G ING101    CONT CAS    8.27E-06    UCI/ML    G ING110    CONT ALT GAS 1.18E-05    UCI/ML    G 1GA201    COP          3.0E+01    CPM      G 1GA202    COP          2.6E+01    CPM      G ING222    WRGM LO      1.46E-06    UCI/ML  G ING223    WRGM MID    3.2E-04      UCI/ML  G IING224  WRGM HI      1.04E-01    UCI/ML  G 1CC225    WRGM EFFL    1.42E+02    UCI/SEC  G ING217    SPEC CORR LO 1.46E-01    MR/HR    OOS ING218    SPEC CORR HI 4.18E+01    MR/HR    00S ING611    WPB GAS      2.5E-06      UCI/ML  G 1AP610    WPB PART    3.6E-10      UCI/ML  G ICC612    WPB EFFL    1.94E+-1    CPM      G ING271  PAB GAS      1.26E-06    UCI/ML  G 1AP270  PAB PART    7.4E-11      UCI/ML  G 1CC272  PAB EFFL    9.8E+00      CPM      G 1GA410  FSB VENT    2.15E+01    CPM      G                                        ;
I 1GA112  ENCLO EM EXH 1.62E+01    CM      G 1GA274  PAB VENT    1.69E+01    CPM      G IGA 273  ENCL VENT    1.87E+01    CPM      G
,  1M.I2 69 PAB IOD          0      CPM      OFFLINE 1hI613  WPB IOD          0      CPM      OFFLINE 8.1.1-5                        SEC8.0_ RAD
 
I AIRBORNE MONITOR TRENDS APRIL 28TH THRU MAY 4TH CRANNEL  MON.      READING      UNIT    STATUS  COMMENTS IMI733  ADMIN IOD      0      CPM      OFFLINE PCAM6486 PAB 25'    3.0E+02      CPM      G PCAM6486 PAB 25'    5.27E-06    UCI/ML  G PCAM6488 WPB 25'    2.36E+01    CPM      G PCAM6488 WPB 25'    2.05E-06    UCI/ML  G O
O 8.1.1-6                      SEC8.0_ RAD
 
O                                                            .
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Section 8.1.2 RCA Survey Data                        ,
O O                  8.1.2_1                SEC8.0_STA_ SURVEY  j i
I
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise PRE _ DRILL DATA RCA LOCATION              MAX. DOSE RATE      CONT. CONCERNS /          AIRBORNE CONCERNS
                                                          / GENERAL AREA                  POSTINGS
,                                      PAB -6'          <2 mr/hr outside    MDA reported all                No immediate existing HRA              areas. HRA by          concern.
Demin. area PAB 7'          <2 mr/hr outside    Posted CA/RMA by                No immediate LHRA. 2-5 mr/hr    S. end of PAB- 2K                concern.
in overhead by S. swipe reported in end of PAB                    area PAB 25'            Sample sinks    CA posted sample              Fitting leak on 30mr/hr @ 18"    area.            120K swipe  letdown monitor.
from Ltdn piping. reported on Ltdn
,                                                        - 0.2-10 mr/hr      monitor piping.
general area.
PAB 53'          VCT area 15-30            <MDA detected.          No immediate mr/hr @lB". <2                                        concern.
mr/hr elsewhere.
PAB 81'                < 2mr/hr                < KDA detected      No immediate concern.
MECH PEN -                "as reported"              "as reported"        "as reported" 26','4 CB 75'          Not measurable      All samples BKGD            No detectable airborne              j TB 75'          Not measurable      All samples BKGD            No detectable airborne TB 50'          Not measurable      All samples BKGD            No detectable airborne TB 21'          Not measurable      All samples BKGD              Fo detectable            :
airborne ADM BLDG 21'              Not measurable      All samples BKGD              No detectable airborne              i ADM BLDG 43'              Not measurable      All samples BKGD              No detectable airborne i
l l
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise PRE _ DRILL DATA 1
I RCA LOCATION      MAX. DOSE RATE      CONT. CONCERNS /  AIRBORNE
                        / GENERAL AREA        POSTINGS        CONCERNS E. FW PIPE            < 2mr/hr        MDA all areas  No immediate CHASE 21'                                                concern RCA TUNNEL            < 2mr/hr      All samples BKGD  No detectable airborne CTB 25'            5-10 R/hr          Posted Ch.    "as reported" General area swipe reported 1K CTB O'            .5-1 R/hr          Posted ca.    "as reported" General area swipe reported 1K CTB -26'            l-5 R/hr          Posted CA.    "as reported" General area swipe reported 1K O .
The following conditions exist unless otherwise noted:
All dose rates are in mR/hr.
All cont. smears are reported in epm per 100 cm2 0
 
                                                                                  .T O
North Atlantic Energy Service Corporation seabrook Station 1993 Graded Exercise 4
l Section 8.2.1 RDMS ACCIDENT DATA O                                                                              ;
l O
8.2.1-1              SEC8.0_RMDS
  .-- ~,      .
 
AREA MONITOR ACCIDENT RESPONSES MAY STH THE FOLLOWING AREA MONITORS ARE NOT AFFECTED BY THE POSTULATED ACCIDENT SEQUENCE:
CHANNEL    MON. DESCRIPTION              COMMENTS AM102      MANIP CRANE          USE SECT. 8.1.1 VALUE AM103      MANIP CRANE          USE SECT. 8.1.1 VALUE AM104        PER HATCH          USE SECT. 8.1.1 VALUE AM105        PER HATCH          USE SECT. 8.1.1 VALUE AM106      POST-LOCA A              SLIGHT INCREASE AM107      POST-LOCA B              SLIGHT INCREASE AM108          RX-CAV            USE SECT. 8.1.1 VALUE AM109      SEAL TABLE              SLIGHT INCREASE AM204        PAB 7'N LO          USE SECT. 8.1.1 VALUE AM211        PAB 7'N HI          USE SECT. 8.1.1 VALUE AM233      PAB 7'S LO          USE SECT. 8.1.1 VALUE AM234      PAB 7' S HI          USE SECT. 8.1.1 VALUE AM205      PAB 25' S LO          USE SECT. 8.1.1 VALUE AM235      PAB 25' S HI          USE SECT. 8.1.1 VALUE AM206      PAB -6'N LO          USE SECT. 8.1.1 VALUE AM210      PAB -6'N HI          USE SECT. 8.1.1 VALUE AM207          CSP 2A          SLIGHT INCREASED DUE RCS AM208          CSP 2B          USE SECT. 8.1.1 VALUE AM209            P128            USE SECT. 8.1.1 VALUE AM229      SAMPLE ROOM        SLIGHT INCREASED DUE RCS AM232            VCT            SLIGHT INCREASED DUE RCS AM301        VAULT A LO          USE SECT. 8.1.1 VALUE AM303        VAULT A HI          USE SECT. 8.1.1 VALUE AM302        VAULT B LO          USE SECT. 8.1.1 VALUE
                                                                                      \
:                                                                                    l 8.2.1-2                          SEC8.0_RMDS 9 i 1
 
AREA MONITOR ACCIDENT RESPONSES MAY STH (CONT.)
CHANNEL MON. DESCRIPTION            COMMENTS AM304    VAULT B HI        USE SECT. 8.1.1 VALUE AM401        FSB HI          USE SECT. 8.1.1 VALUE AM402        FSB LO          USE SECT. 8.1.1 VALUE AM501        MCR            USE SECT. 8.1.1 VALUE AM601    WG PROCESS          SLIGHT INCREASE AM602      TRUCK DOCK        USE SECT. 8.1.1 VALUE AM603    RADWST CTRL        USE SECT. 8.1.1 VALUE AM604    WPB CTRL PNL        USE SECT. 8.1.1 VALUE AM605    EXTRUD/EVAP        USE SECT. 8.1.1 VALUE AM606    COMPACT WASTE      i'SE SECT. 8.1.1 VALUE AM710      CHEM LAB        USE SECT. 8.1.1 VALUE AM702      DECON RM        USE SECT. 8.1.1 VALUE AM703      RCA SHOP        USE SECT. 8.1.1 VALUE AM704    MEN LOCKER        USE SECT. 8.1.1 VALUE AM705  WOMEN LOCKER        USE SECT. 8.1.1 VALUE O                      8.2.1-3                        SEC8.0_RMDS
 
PROCESS MONITOR ACCIDENT RESPONSES MAY STH THE FOLLOWING PROCESS MONITORS ARE AFFECTED BY THE POSTULATED ACCIDENT SEQUENCE:
TIME  STM LN A  STM LN B  STM LN C    STM LN D  COND AIR  S/G 4 BD MR/HR    MR/HR      MR/HR      MR/HR        CPM      UCI/ML 0800  5.1E-01    3.6E-01    4.1E-01    3.7E-01    7.8E+01    3.9E-07 0806  5.1E-01    3.6E-01    4.1E-01    2.2E+00A  5.4E+02H  2.0E-06A 0810  6.0E-01    3.6E-01    4.1E-01    3.3E+00A  6.7E+02H  3.8E-06A 0815  7.1E-01    3.6E-01    4.1E-01    4.9E+00A  7.0E+02H  4.6E-06A 0820  1.5E+00    3.6E-01    4.1E-01    9.3E+00H  7.3E+02H  5.1E-06A 0825  2.9E+00    3.6E-01    4.1E-01    1.2E+01H  7.1E+02H  4.7E-06A 0830  3.1E+00A  3.6E-01    4.1E-01    1.4E+01H  6.9E+02H  4.1E-06A 0835  3.3E+00A  3.6E-01    4.1E-01    1.7E+01H  5.6E+02H  3.6E-06A 0840  3.4E+00A  3.6E-01    4.1E-01    1.7E+01H  4.2E+02H  2.8E-06A 0845  3.5E+00A  3.6E-01    4.1E-01    1.9E+01H  3.1E+02H  1.9E-06A                  l I
0850  3.6E+00A  3.6E-01    4.1E-01    2.2E+01H  1.3E+02H  1.1E-06A 0855  3.6E+00A  3.6E-01    4.1E-01    2.3E+01H  9.5E+01A  7.4E-07 0900  3.6E+00A  3.6E-01    4.1E-01    2.3E+01H  8.4E+01    4.5E-07 i
0915  3.6E+00A  3.6E-01    4.1E-01    2.3E+01H  8.4E+01    4.5E-07 l
0930  3.6E+00A  3.5E-01    4.0E-01    2.3E+01H  8.3E+01    4.4E-07 0945  3.5E+00A  3.5E-01    4.0E-01    2.2E+01H  8.3E+01    4.4E-07                  l 1
1000  3.4E+00A  3.5E-01    4.0E-01    2.2E+01H  8.3E+01    4.4E-07 1015  3.4E+00A  3.4E-01    3.9E-01    2.1E+01H  8.2E+01    4.3E-07                  !
1030  3.3E+00A  3.4E-01    3.9E-01    2.0E+01H  8.2E+01    4.3E-07 1045  3.3E+00A  3.4E-01    3.9E-01    1.9E+01H  8.2E+01    4.3E-07                  .
1100 3.3E+00A  3.3E-01    3.8E-01    1.7E+01H  8.1E+01    4.2E-07 1115  3.3E+00A  3.3E-01    3.8E-01    1.6E+01H  8.1E+01    4.2E-07 1130 3.2E+00A  3.3E-01    3.8E-01    1.5E+01H  8.1E+01    4.2E-07 l
1145 3.2E+00A  3.1E-01    4.1E-01    1.4E+01H  8.0E+01    4.0E-07 1200  3.2E+00A  3.1E-01    4.1E-01    1.4E+01H  8.0E+01    4.0E-07 8.2.1-4                        SEC8.0_RMDS            Oi
 
A                      PROCESS MONITOR ACCIDENT RESPONSES _
MAY STH
(
THE FOLLOWING PROCESS MONITORS ARE NOT AFFECTED BY THE POSTULATED ACCIDENT SEQUENCE:
CHANNEL  MON. DESCRIPTION            COMMENTS LM820        AUX COND        USE SECT. 8.1.1 VALUE LM230          STOR TK        USE SECT. 8.1.1 VALUE LM231        TEST TK          USE SECT. 8.1.1 VALUE GM630      CARB BED IN        USE SECT. 8.1.1 VALUE GM631      WG COMP IN        USE SECT. 8.1.1 VALUE GM632      WG COMP OUT        USE SECT. 8.1.1 VALUE CC634      WG COMP EFFL        USE SECT. 8.1.1 VALUE LM 621    WTT DISC OUT        USE SECT. 8.1.1 VALUE CC622        WTT EFFL        USE SECT. 8.1.1 VALUE LM216      S/G BDOWN 1        USE SECT. 8.1.1 VALUE LM212      S/G BDOWN 2        USE SECT. 8.1.1 VALUE LM213      S/G BDOWN 3        USE SECT. 8.1.1 VALUE LM215      FLASH TNK            SLIGHT INCREASE LM220          PCCW A        USE SECT. 8.1.1 VALUE I
LM221          PCCW B        USE SECT. 8.1.1 VALUE LM620      WTT INLET        USE SECT. 8.1.1 VALUE LM240          RCS LO        LTDN ISO-VALUE DECAYS LM241          RCS HI        LTDN ISO-VALUE DECAYS LM242        RCS AUTO        LTDN ISO-VALUE DECAYS LM805        T/B SUMP        USE SECT. 8.1.1 VALUE                ,
l l
8.2.1-5                        SEC8.0_RMDS I
 
AIRBORNE MONITOR ACCIDENT RESPONSES MAY STH THE FOLLOWING AIRBORNE MONITORS ARE NOT AFFECTED BY THE POSTULATED ACCIDENT SEQUENCE:
COMMENTS  MON. DESCRIPTION                  COMMENTS GA510    E. AIR INTAKE A        USE SECT. 8.1.1 VALUE GA520    E. AIR IHTAKE B          USE SECT. 8.1.1 VALUE CA511    W. AIR INTAKE A            PLUME IMPACT l              GA521    W. AIR INTAKE B            PLUME IMPACT l              1NG731          ADMIN CAS                PLUME IMPACT j              1AP730        ADMIN PART          USE SECT. 8.1.1 VALUE l              CC732        ADMIN EFFL                PLUME IMPACT CA720          FUME HOOD            PLUME & CHEM SAMPLE GA721          FUME HOOD            PLUME & CHEM SAMPLE GA722          FUME HOOD            PLUME & CHEM SAMPLE AP111          CONT PART          SLIGHT INCREASE - RCS NG101          CONT GAS          SLIGHT INCREASE - RCS NG110        CONT ALT CAS          SLIGHT INCREASE - RCS GA201              COP            USE SECT. 8.1.1 VALUE CA202              COP            USE SECT. 8.1.1 VALUE NG222          WPGM LO            USE SECT. 8.1.1 VALUE NG223          WPGM MID                    OFFLINE I
NG224          WRGM HI                      OFFLINE                        )
I CC225          WRGM EFFL          USE SECT. 8.1.1 VALUE NG217        SPEC CORR LO          USE SECT. 8.1.1 VALUE                    l NG218        SPEC CORR HI          USE SECT. 8.1.1 VALUE NG611            WPB CAS          USE SECT. 8.1.1 VALUE AP610          WPB PART          USE SECT. 8.1.1 VALUE CC612          WPB EFFL          USE SECT. 8.1.1 VALUE NG271            PAB GAS          USE SECT. 8.1.1 VALUE AP270          PAB PART          USE SECT. 8.1.1 VALUE CC272          PAB EFFL          USE SECT. 8.1.1 VALUE GA410          FSB VENT          USE SECT. 8.1.1 VALUE GA112        ENCL EM EXH          USE SECT. 8.1.1 VALUE GA274          PAB VENT          USE SECT. 8.1.1 VALUE m ,,3          rum , rr u-        ner c r e.-  o 3  $ m trn-8.2.1-6                            SEC8.O_RMDS  j i
 
AIRBORNE MONITOR ACCIDENT RESPONSES MAY STH CHANNEL        MON. DESCRIPTION              COMMENTS menemm MI163            WPB IOD FLT          USE SECT. 8.1.1 VALUE MI733          ADMIN IOD FLT          USE SECT. 8.1.1 VALUE PCAM6486            PAB 25'            USE SECT. 8.1.1 VALUE PCAM6486            PAB 25'            USE SECT. 8.1.1 VALUE PCAM6488            WPB 25'            USE SECT. 8.1.1 VALUE PCAM6488            WPB 25'            USE SECT. 8.1.1 VALUE  ,
Note: The W. Intake will be isolated due to monitor response when the delease occurs. Additionally as the plume passes over the Guard Island Ag approximately 0850, the portal monitors will alarm requiring alar m acknowledgment and reset.
                                                                                  \
O 1
l l
O                                        8.2.1-7                          SEC8.O_RMDS
 
l J
O North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise F
Section 8.2.2 RCA Survey Data O                                                          i 8.2.2_1              SEC8.O_ACC_ SURVEY
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise ACCIDENT SEOUENCE DATA 1
RCA LOCATION            AREA DOSE RATE        AREA CONT. LEVEL      AIRBORNE CONC.
CHANGES / TIMES            CHANGES          LEVEL CHANGES PAB -6'                No change to            No change to        No change to section 8.1.2          section 8.1.2        section 8.1.2 data                    data                data PAB 7'                Slightly elevated      slightly elevated    Slightly elevated        ;
levels due to the      levels due to the    levels due to the increased RCS          increased RCS        increased RCS            l activity levels        activity levels      activity levels PAB 25'                Sample sink 150        40 mrad swipe        No change to mR/hr 0 18" from        reported on Ltdn    section 8.1.2 Ltdn piping.            monitor piping.      data                    j Initially Ltdn isolated-can be reset following                                                      ,
return of power                                                      l after tube leak PAB 53'                VCT area                No change to        No change to radiation levels        section 8.1.2        section 8.1.2 increase 2 times      data                data section 8.1.2 data CB 75'                No change to            Bldg cont. levels    System isolated section 8.1.2          will be dependant data                    upon the rad ctris established by the oSC following the                                !
release.                                      l l
TB 75'                No change to            Bldg cont. levels    Elevated airborne        i section 8.1.2          will be dependant    levels were not        l data                  upon the rad        postulated for          l ctris established    this level of the by the OSC          TB.
following the release.
8.2.2-2                      SEC8.O_ACC_ SURVEY
 
l  TB 50'      No change to        Bldg cont. levels Elevated airborne l              section 8.1.2        will be dependant levels were not l              data                upon the rad      postulated for
!                                    ctris established this level of the by the OSC        TB, l
l                                    following the
!                                    release.
l  TB 21'      No change to        Bldg cont. levels Elevated airborne j              section 8.1.2        will be dependant levels were
!              data                upon the rad      produced due l                                    ctris established release.
l by the OSC        Postulate NG l
following the    cone. = 1E-09 l
release.          uci/cc 08:45-9:00 l ADM BLDG 21' No change to        Bldg cont. levels Elevated airborne j              section 8.1.2        will be dependant levels were l              data                upon the rad      produced due ctris established release, l
j                                  by the OSC        Postulate NG l
following the    conc. = 1E-09 l
release,          uci/cc 98:45-9:00 ADM BLDG 43' No change to        Bldg cent. levels Elevated airborne section 8.1.2        will be dependant levels were not data                upon the rad      postulated due to ctris established the type of              .
Note: 10mr/hr as    by the OSC        release                    l plume passes over    folicwing the                              !
Adm bldg roof        release.                                    i l
E. FW PIPE  The "D" steam        No change to      No change to CHASE 21'    line contact dose    section 8.1.2    section 8.1.2 rates increase by  data              data a factor of 15 RCA TUNNEL  No change to        No change to    No change to section 8.1.2        section 8.1.2    section 8.1.2 data                data              data CTB 25'      Slight change to    Slight change to  Slight change to section 8.1.2        section 8.1.2    section 8.1.2 data                data              data CTB O'      Slight change to    Slight change to  slight change to section 8.1.2        section 8.1.2    section 8.1.2              l data                data              data                      I CTB -26'    Slight change to    Slight change to  Slight change to section 8.1.2        section 3.1.2    section 8.1.2 data                data              data I
8.2.2-3                  SECB.0_ACC_ SURVEY
 
O                                                                .
i North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Section 8.2.3 Logger Trends O
O                          8.2.3-1                SEc8.23_ Loc
 
k DOSE ASSESSMENT DATA POINTS REPORT AT    0800    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                  VALUE        UNIT CO 783    LOWER WIND (15 MIN AV)                        3.0          MPH CO 784    UPPER WIND SPEED (15 MIN AV)                  5.8          MPH CO 785    LOWER WIND DIR (15 MIN AV)                    96            DEG CO 786    UPPER WIND DIR (15 MIN AV)                  130            DEG CO 787    LOWER DELTA - T (15 MIN AV)                -0.95            F CO 788    UPPER DELTA - T                            -1.6              F CO 789    WET BULB                                      46            F CO 790    AMBIENT TEMP                                  52              F CO 791    DEW POINT                                    45              F CO 797    PRECIPITATION                              0.15      IN/QTR HR CO 790    SOLAR RADIATION                              0.21      LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1            R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1            R/RR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1          MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2          MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6          UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4          UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1          UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2          UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                5.1E-1          MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.7E-1          MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.14E-1          MR/HR 1GM804    MAIN STEAM LINE LOOP #4                3.7E-1          MR/HR ING217    PLANT VENT LO RANGE GAS                  1.46E-1          MR/HR 1NG21825F PLANT VENT HI RANGE GAS                  4.18E+1          MR/HR ING 2225F SF PLANT VENT LO RANGE GAS              1.80E+0          SCFM 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+5          SCFM 8.2.3-2                    SEc8.23_ Loc
 
DOSE ASSESSMENT DATA POINTS 0815 O                      REPORT AT            5/5/1993~
EMERGENCY RESPONSE WORKSTATION: TBC OR EOF POINT ID          POINT DESCRIPTION                VALUE            UNIT CO 783    LOWER WIND (15 MIN AV)                    2.5                MPH CO 784    UPPER WIND SPEED (15 MIN AV)              4.9                MPH CO 785    LOWER WIND DIR                            104                DEG CO 786    UPPER WIND DIR                            119                DEG CO 787    LOWER DELTA - T                          -0.92                F CO 788    UPPER DELTA - T                          -1.58                F CO 789    WET BULB                                    46                  F CO 790    AMBIENT TEMP                                52                  F CO 791    DEW POINT                                  45                  F CO 797    PRECIPITATION                              0.10          IN/QTR HR CO 798    SOLAR RADIATION                            0.21          LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1            MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2            MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6            UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4            UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1            UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2            UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                7.1E-1              MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E+1              MR/HR 1GM804    MAIN STEAM LINE LOOP #4                4.9E+0  AL        MR/HR ING217    PLANT VENT LO RANGE GAS                1.46E-1            MR/HR 1NG21825F PLANT VENT HI RANGE GAS                4.18E+1            MR/HR ING 2225F SF PLANT VENT LO RANGE GAS              1.80E+0            SCFM 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+5            SCFM O.                                  8.2.3-3                      SEC8.23_ LOG
 
i DOSE ASSESSMENT DATA POINTS REPORT AT    0830    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TBC OR EOF l
POINT ID          POINT DESCRIPTION                VALUE            UNIT CO 783    LOWER WIND (15 MIN AV)                    2.0                  MPH CO 784    UPPER WIND SPEED (15 MIN AV)              4.8                  MPH CO 785    LOWER WIND DIR                            108                  DEG CO 786    UPPER WIND DIR                            122                  DEG CO 787    LOWER DELTA - T                          -0.74                  F CO 788    UPPER DELTA - T                          -1.48                  F CO 789    WET BULB                                  46                  F CO 790    AMBIENT TEMP                              52                  F CO 791    DEW POINT                                  45                  F CO 797    PRECIPITATION                            0.08            IN/QTR HR CO 798    SOLAR RADIATION                          0.24            LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1            MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2            MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6            UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4            UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1            UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2            UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                3.1E+0  AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E-1              MR/HR 1GM804    MAIN STEAM LINE LOOP #4                1.4E+1  HI        MR/HR ING217    PLANT VENT LO RANGE GAS                1.46E-1            MR/HR ING21825F PLANT VENT HI RANGE GAS                4.18E+1            MR/HR ING 2225F SF PLANT VENT LO RANGE GAS              1.80E+0            SCFM ICC 225PF PF PLANT VENT DISCH FLOW                2.77E+5            SCFM 8.2.3-4                      SEC8.23_ LOG
 
DOSE ASSESSMENT DATA POINTS O                    REPORT AT    0845    5/5/1993~
EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                VALUE              UNIT CO 783    LOWER WIND (15 MIN AV)                    2.0                    MPH CO 784    UPPER WIND SPEED (15 MIN AV)              4.6                    MPH CO 785    LOWER WIND DIR                            101                    DEG CO 786    UPPER WIND DIR                            111                    DEG CO 787    LOWER DELTA - T                          -0.45                    F CO 788    UPPER DELTA - T                          -1.39                    F CO 789    WET BULB                                  46                      F CO 790    AMBIENT TEMP                              52                      F CO 791    DEW POINT                                  45                      F CO 797    PRECIPITATION                            0.05            IN/QTR HR CO 798    SOLAR RADIATION                          0.29              LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1                R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1                R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1              MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2              MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6              UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4              UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1              UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2              UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                3.5E+0    AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1                MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E-1                MR/HR 1GM804    MAIN STEAM LINE LOOP #4                1.9E+1    HI        MR/HR 1NG217    PLANT VENT LO RANGE GAS                1.46E-1              MR/HR ING21825F PLANT VENT HI RANGE GAS                4.18E+1              MR/HR 1NG 2225F SF PLANT VENT LO RANGE GAS              1.80E+0              SCFM ICC 225PF PF PLANT VENT DISCH FLOW                2.77E+5              SCFM O                                  8.2.3-5                        SEC8.23_ LOG
 
T DOSE ASSESSMENT DATA POINTS REPORT AT    0900    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                  VALUE            UNIT CO 783    LOWER WIND (15 MIN AV)                    3.1                  MPH CO 784    UPPER WIND SPEED (15 MIN AV)              5.6                  MPH CO 785    LOWER WIND DIR                            104                  DEG CO 786    UPPER WIND DIR                            115                  DEG CO 787    LOWER DELTA - T                          -0.25                  F CO 788    UPPER DELTA - T                          -0.75                  F CO 789    WET BULB                                    47                  F CO 790    AMBIENT TEMP                                56                  F CO 791    DEW POINT                                  46                  F CO 797    PRECIPITATION                              O.03          IN/QTR HR CO 798    SOLAR RADIATION                            0.41            LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1                R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1                R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1            MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2            MR/HR ING222    PLANT VENT LO RANGE GAS                1.46E-6            UCI/CC        l 1NG223    PLANT VENT MID RANGE GAS                1.20E-4            UCI/CC ING224    PLANT VENT HI RANGE GAS                1.04E-1            UCI/CC        j 1CC225    PLANT VENT DISCH RATE                  1.42E+2            UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                3.6E+0    AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR        !
1GM803    MAIN STEAM LINE LOOP #3                4.1E-1              MR/HR 1GM804    MAIN STEAM LINE LOOP #4                2.3E+1    HI        MR/HR ING217    PLANT VENT LO RANGE GAS                1.46E-1            MR/HR        l 1NG21825F PLANT VENT HI RANGE GAS                4.18E+1            MR/HR ING 2225F SF PLANT VENT LO RANGE GAS              1.80E+00            SCFM 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+05            SCFM i
l l 8.2.3-6                      SEC8.23 LOG
                                                                      ~
i l
1 l
1
 
DOSE ASSESSMENT DATA POINTS REPORT AT      0915  5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                  VALUE            UNIT CO 783    LOWER WIND (15 MIN AV)                    5.1                MPH-CO 784    UPPER WIND SPEED (15 MIN AV)              5.5                MPH-CO 785    LOWER WIND DIR                            115                DEG CO 786    UPPER WIND DIR                            128                DEG CO 787    LOWER DELTA - T                          -0.25                F CO 788    UPPER DELTA - T                          -0.65                F-CO 789    WET BULB                                    47                  F CO 790    AMBIENT TEMP                                56                  F CO 791    DEW POINT                                  46                  F CO 797    PRECIPITATION                              0.0            IN/QTR HR CO 798    SOLAR RADIATION                            0.52            LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR O- 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1            MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2            MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6            UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4              UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1              UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2              UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                3.6E+0 AL            MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E-1              MR/HR 1GM804    MAIN STEAM LINE LOOP #4                  2.3E+1  HI        MR/HR ING23    PLANT VENT LO RANGE GAS                  1.46E-1            MR/HR ING21825F PLANT VENT HI RANGE GAS                  4.18E+1            MR/HR 1NG 2225F SF PLANT VENT LO RANGE GAS              1.80E+00            SCFM 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+05            SCFM O                                  8.2.3-7                      SEC8.23_ LOG
 
DOSE ASSESSMENT DATA POINTS                        '
REPORT AT 9:15-11:15  5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF 1.) Due to loss of the RDMS computers (ie, No. 1 and No. 2) the data normally available by accessing the Dose Assessment Data Point screen cannot be polled. The screen will go blank creating a purple screen. This indicates system input failure. Loss of this screen will last until approximately 11:15 until one computer is restored.
2.) The Meteorological data normally collected via this computer screen is still available by either direct communications with the Control Room, (ie, it can be retrieved from the Control Room instrumentation) or by accessing the Meteorological Data MPCS Point IDS directly. Refer to Section 7.4-2 for data during the period 9:15 - 11:00 am i
8.2.3-8                  SEC8.23_ LOG
 
DOSE ASSESSMENT DATA POINTS REPORT AT    1115    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT DESCRIPTION                VALUE            UNIT POINT ID CO 783    LOWER WIND (15 MIN AV)                      4.1                MPH CO 784    UPPER WIND SPEED (15 MIN AV)                6.2                MPH CO 785    LOWER WIND DIR                              193                DEG CO 786    UPPER WIND DIR                              198                DEG CO 787    LOWER DELTA - T                            -0.92                F CO 788    UPPER DELTA - T                            -1.49                F CO 789    WET BULB                                    51                  F CO 790    AMBIENT TEMP                                61                  F CO 791    DEW POINT                                    50                  F CO 797    PRECIPITATION                              0.0          IN/QTR HR CO 798    SOLAR RADIATION                            0.75          LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH              5.27E-1            MR/HR 1AM105    CA HI RI.NGE PERSONNEL HATCH            3.40E+2            MR/HR 1NG222    PLANT VENT LO RANGE GAS                  1.46E-6            UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4            UCI/CC 1NG224    PLANT VENT HI RANGE GAS                  1.04E-1            UCI/CC
,  1CC225    PLANT VENT DISCH RATE                    1.42E+2            UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                  3.3E+0  AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                  3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                  4.1E-1              MR/HR 1GM804    MAIN STEAM LIHE LOOP #4                  1.6E+1  HI        MR/HR ING217    PLANT VENT LO RANGE GAS                  1.46E-1            MR/HR 1NG21825F PLANT VENT HI RANGE GAS                  4.18E+1            MR/HR  ;
1NG 2225F SF PLANT VENT LO RANGE GAS              1.80E+0            SCFM    j 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+5            SCFM O
8.2.3-9                      SEC8.23_ LOG
 
l DOSE ASSESSMENT DATA POINTS REPORT AT    1130    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TBC OR EOF POINT ID            POINT DESCRIPTION                VALUE            UNIT  l l CO 783    LOWER WIND (15 MIN AV)                      3.4                MPH CO 784    UPPER WIND SPEED (15 MIN AV)                6.0                MPH CO 785    LOWER WIND DIR                              205                DEG CO 786    UPPER WIND DIR                              202                DEG CO 787    LOWER DELTA - T                            -1.02                F CO 788    UPPER DELTA - T                            -1.5                  F CO 789    WET BULB                                      51                F CO 790    AMBIENT TEMP                                  61                F CO 791    DEW POINT                                    50                F CO 797    PRECIPITATION                                0.0          IN/QTR HR CO 798    SOLAR RADIATION                              0.80          LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1            MR/HR 1AM105    CA HI RANGE PERSONNEL HATCP            3.40E+2              MR/HR I  I 1NG222    PLANT VENT LO RANGE GAS                1.46E-6              UCI/CC      !
1NG223    PLANT VENT MID RANGE GAS                1.20E-4              UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1              UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2              UCI/SEC      )
1GM801    MAIN STEAM LINE LOOP #1                3.2E+0    AL        MR/HP _
1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E-1              MR/HR l
1GM804    MAIN STEAM LINE LOOP #4                  1.5E+1  HI        MR/HR 1NG217    PLANT VENT LO RANGE GAS                  1.46E-1            MR/HR 1NG21825F  PLANT VENT HI RANGE GAS                4.18E+1              MR/HR ING 2225F  SF PLANT VENT LO RANGE GAS              1.80E+00            SCFM 1CC 225PF  PF PLANT VENT DISCH FLOW                2.77E+05            SCFM O
8.2.3-10                      SEC8.23_ LOG
 
DOSE ASSESSMENT DATA POINTS REPORT AT    1145      5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                  VALUE            UNIT CO 783    LOWER WIND (15 MIN AV)                    3.2                    MPH CO 784    UPPER WIND SPEED (15 MIN AV)              6.9                    MPH CO 785    LOWER WIND DIR                            198                    DEG CO 786    UPPER WIND DIR                            207                    DEG CO 787    LOWER DELTA - T                          -1.1                    F CO 788    UPPER DELTA - T                          -1.58                    F CO 789    WET BULB                                    51                    F      l l
CO 790    AMBIENT TEMP                                61                    F CO 791    DEW POINT                                  50                    F CO 797    PRECIPITATION                              0.0            IN/QTR HR CO 798    SOLAR RADIATION                            0.8-            LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1                R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1                R/HR 1AM104    CA LO RANGE PERSONNEL HATCH              5.27E-1              MR/HR O  1AM105    CA HI RANGE PERSONNEL HATCH              3.40E+2              MR/HR      l 1NG222    PLANT VENT LO RANGE GAS                  1.46E-6              UCI/CC 1NG223    PLANT VENT MID RANGE GAS                1.20E-4              UCI/CC 1
1NG224    PLANT VENT HI RANGE GAS                  1.04E-1              UCI/CC 1CC225    PLANT VENT DISCH RATE                    1.42E+2              UCI/SEC 1GM801    MAIN STEAM LINE LOOP #1                  3.2E+0    AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                  3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                  4.1E-1              MR/HR 1GM804    MAIN STEAM LINE LOOP /4                  1.4E+1    HI        MR/HR ING217    PLANT VENT LO RANGE GAS                  1.46E-1              MR/HR ING21825F PLANT VENT HI RANGE GAS                  4.18E+1              MR/HR ING 2225F SF PLANT VENT LO RANGE GAS              1.80E+00            SCFM 1CC 225PF PF PLANT VENT DISCH FLOW                2.77E+05            SCFM O
8.2.3-11                      SEC8.23_ LOG
 
DOGE ASSESSMENT DATA POINTS REPORT AT    1200    5/5/1993 EMERGENCY RESPONSE WORKSTATION: TSC OR EOF POINT ID          POINT DESCRIPTION                  VALUE            UNIT LOWER WIND (15 MIN AV)                      3.0                MPH CO 783                                                                            ]
CO 784    UPPER WIND SPEED (15 MIN AV)                7.4                MPH CO 785    LOWER WIND DIR                              215                DEG UPPER WIND DIR                              210              DEG CO 786 LOWER DELTA - T                            -1.1                  F CO 787 UPPER DELTA - T                            -1.7                  F CO 788 WET BULB                                      51                F CO 789 AMBIENT TEMP                                  61                F CO 790 DEW POINT                                      U                F CO 791 CO 797    PRECIPITATION                                0.0          IN/QTR HR CO 798    SOLAR RADIATION                              0.80          LANGLEY 1AM106    CA CONTM POST LOCA TRN A                1.89E+1              R/HR 1AM107    CA CONTM POST LOCA TRN B                9.03E-1              R/HR 1AM104    CA LO RANGE PERSONNEL HATCH            5.27E-1              MR/HR 1AM105    CA HI RANGE PERSONNEL HATCH            3.40E+2              MR/HR 1NG222    PLANT VENT LO RANGE GAS                1.46E-6              UCI/CC ING223    PLANT VENT MID RANGE GAS                1.20E-4              UCI/CC 1NG224    PLANT VENT HI RANGE GAS                1.04E-1              UCI/CC 1CC225    PLANT VENT DISCH RATE                  1.42E+2              UCI/SEC 1GM801    MAIN STEAM LINE LOOP /1                3.2E+0    AL        MR/HR 1GM802    MAIN STEAM LINE LOOP #2                3.6E-1              MR/HR 1GM803    MAIN STEAM LINE LOOP #3                4.1E-1              MR/HR 1GM804    MAIN STEAM LINE LOOP #4                1.4E+1  HI        MR/HR ING217    PLANT VENT LO RANGE GAS                1.46E-1            MR/HR ING21825F  PLANT VENT HI RANGE GAS                4.18E+1            MR/HR ING 2225F  SF PLANT VENT LO RANGE GAS              1.80E+00            SCFM 1CC 225PF  PF PLANT VENT DISCH FLOW                2.77E+05            SCFM O
8.2.3-12                      SEC8.23_ LOG
 
O                                                                        .
North Atlantic Energy Service Corporation seabrook Station 1993 Graded Exercise Section 8.3.1 Plume Data O
l 8.3.1-1              SEC8.0 PLUME    !
1
 
1 O
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Table of Contents Section 8.3.1.1  Onsite Plume Survey Results Section 8.3.1.2  Offsite Plume Survey Results O
8.3.1-2                SEC8.0_ PLUME I
 
                                                                                                                                                                                                \
                                                                                    /                                                              ~
                                                                              /                                                                        N
                                                                        /                                                                                  N
                                                                  /                                                                                              %
                                                              /                                                                      E. cn DtTAIR c /
w                                                                                        O                                  \
                                                                                                                                                                          \
                      ~-
rr-                        : % .,,m ns \
sr. .
M;                                                                                                                                                                \
                          ,'      [m                                                                                                                                              g 9          O'* 'N                  . g'
* ins p.. t.              d$              sep        '
3        s g                                                                          \
sd ,i:b                  't ~'d%.                                                                                                            Ou
[t ty #M q g
I f}W                  .ek' %}N.
7J ;J .. .        7Qw -        .,
                                                                        ~'-                                                                                    "5 me \
4            "'t ;yg;y ; "q,.-                                                              '
y;/ cff sgpi* '"" j] . ?-Q                                                                                                  sc
                                                                                                                    ~
                                                                                              '5t I$ b                  if                  :    Ql&4,              *
                                                                                            'W                          h      _.,
                                                                                                                                                                                    /
                                                                                                                                                                                        /
              ~h?gf,;;fD*
g.
e                    s k.- _
Nik s-      $l*'
                                                                                        *        /; t .nr:cv            .
[:[. b:t          .
                                                    . -q 96E. .g;IfI    +Y          f ,,          ^ kk!$
                                                                                                    ~;
m
                                                                                                                                                                            /
f*                      p-                                                                /
w a g n y- g $g g$
                          %dysMt@g;.                                ;~- h ) 5;O.          , ,'' ,-7t                                                                  ,
Yhhbh.hk    '%'$ddhfl; [x*%          & e 4 ('
ym,
                                                                                                                      ';                                /
                                                                                                                                                            /
                                                                                                                                                                                      % 10l
* rm.
n                          ,._.    <-
                                                                                            \                                                  /
                                                                                                  \                                      p I                              /
I                        /
                                                                                                                        /
                                                                                          /                        /
                                                                                    /                      /
                                                                                                      /
                                                                                                /
                                                                      \                  /
                                                                        \          /
TIME          WAIST                  WAIST                GROUND                GROUND                      EDGE              EDGE        AIR SAM        AIR SAM      SMEARS      15 MIN OPEN                  CLOSED                    OPEN              CLOSED                      OPEN            CLOSED            PART          IODINE      NCPM/      EXP.
MR/HR                  MR/HR                  MR/HR              MR/HR            NCPM            PCPM      100CM r        MR 8:45          MR/HR                  MR/HR
  .1 mi          18.0                      17.0                  19.0                  18.0                      2.0              2.0            122          2178        300k        4.5 8.0                      7.0                    9.0                    8.0                      0.8              0.8            20            336          45k        2.0
  .2 mi 8.3.1-3                                                            SEC8.O_ PLUME
 
h                                                                          $
ua            '/
                                                                                                                                                            ,s um
: s.                        O y          /      -
m.
                                                                                                                                                                                                            -        ~
                                                                                                                                                                                                                ,~na. .e N4 wg                                                                      's s      '
95                                                            a                                                            NE
                                                                                -                                                          m                                                                      ,,              %
[                              l                                                                        .6 MIL WNW                                -{'s                                                                  .
ENE
                                                                                          -                                            ~.s                                                          ..-
p                                                                s s
                                                                                                                                                          ~
                                                                                                                                                    -        \        -
                                                                                                                                                                      ~
E e
8                  {            f                                                                                              ,    :
                                                                                                                                                                                                '\                        ~,
retro                    .      .I W
                                                                                                                                                                                                        \                l    x%
                                                                                                          .s e                                                                                ffQ
                                                                                                                                                                                                            \-            , '* "
EM          .
s                                            =~                                                  V i
                                                              \
KSE 1  WSW                          _                                                                                        is
                                                                                        \                                                                                                    , . . - -M ' '
                                                      \          95                                  _                                                                                    ,
                                                                                                                                                                                            ~.t.'
                                                                                                                                                                                                              -s;!sl, 1
t
                                                                                  %- y                                    ,
                                                                                                                                    /
                                                                                                                                                                                          ..>                              v
                                                                                                                                                                                  .          ../                          .-
sw
                                                                                                                    ~
                                                                                                                      \
                                                                                                                                                                          '/* '      '
SE      *
                                                                                                                                                                                                                          /
                                                                                                                                                                                                                                  /
                                                                                                                                                                    !J l                              n
                                                                                                                                                                                            ,.. ,                  l            l e'
1                                                              g y ,,, -                .-                SSE                            e'
                                                          ..}g                                                                                        .                                              :            ,e' TIME        WAIST          WAIST            GROUND          GROUND            EDGE        EDGE            AIR SAM              AIR SAM                SMEARS          15 MIN OPEN          CLOSED              OPEN          CLOSED,          OPEN      CLOSED              PART                IODINE                CPM /          EXP.
9:00        MR/HR          MR/HR              MR/HR            MR/HR          MR/HR        MR/HR              NCPM                  NCPM                100CM2              MR
                                                        .8 mL        3.0            2.8                3.0              2.8          .3            .3                16                    40                  5k              <1
                                                        .9 mL          2.5          2.4                2.5              2.4          . 2'          .2                10                    10                1.2k              <1 s
8.3.1-4                                        SEC8.O_ PLUME
 
                                                                            '                      j O                                                                    '          h N
I M    .R 1
1
              -                                                                                PM            <    <
                          -v                                  [
5X 1 E
                /
                    \    \)                                  l S      2
                \                                                                        R      M          g    g
                                                              , t_sIOU
                                                                                              /  C A
          ,\                                                                              E M 0 M P 0 L
b k
b
      \
_s                                          S C 1 (4
C      R LN EE PI            k g
k g
9                                                                  I MD
                                                          %                              A SIAO            b    b t
o
                        \
s,                                                              E
                              ~
                                          -            -                                  R LT I
A MA E
P R          k g
k g
M U
L Q-                                              ga                                      AP S
b    b    P_
O.
8
          .A                      #                                                                                    C E
eM S
l s          EE D R GS /H 1    1
                                                        #''g/,'w,              u.        DCR EL
                                                          ~                  i                C M 4
O
              .f            $
[                .
                                                        . ~
i EN GE      /
R H
1    1
                                                                "                          DP EO        R      <    <
                                                                ""                                  M X
m .e J
3 l
l a.
DD N E US OO RL GC M
                                                                                                    /
R H
R 1
1 5
1 3
D 4/                          R b
_.                                NN                          8
                                                                                  ?                  H      1    1 UE
_                                  OP      R
                                                                                                      /      <    <
RO M s
s
                    *\ '6 2g g      G T N R S E H            1    1 Co, N y,                            ,
                                                                                .          I A P R W OM
                                                                                                      /      <    <
          .                        $                  s' s
u        ~                                                  T N R Ne
                                                      -                                    S E H f'
t                                                                                1    1
          .                    ,                                                          I A P
                                                                                                      /      <    <
O R
      $        B                      -              -                                  W        M C
Do                                '                                                i i
                                    &                                    !f                E        5        m    m O                    A                                  s,"0 M        4
            .            (                                                                  I        :      0    2 T        9      2    2 I                                                                                                          ,
 
I i
O 1
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Section 8.3.3 ODPS Calculation O
o
 
North itlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise Initia.1 Dose Assessment related to the accident sequence will be implemented in either the Control Room or the TSC. Either organization will use assigned laptops, programmed with an Offsite Dose Projection System computer model, to evaluate the release condition. Within minutes of the. tube rupture, the staff will receive a High alarm on the "D" steam line and an Alert alarm on the "A" steam line. Dose assessment will be implemented upon receipt of an ASDV OPEN VAS alarm. The staff may also evaluate the impact of ASDV openings in the unaffected generators, adding the results. The only significant contaminating event results from lifting the "D" ASDV. The following calculation summarizes the results of that evaluation.
ODP8 INPUT BELECTIONS:
TIME AFTER SHUTDOWN (HRS)              =    .50 SHUTDOWN AT 05/05/93 08:08 RELEASE AT 05/05/93 08:40 O-                ANALYSIS AT 05/05/93 08:45 RELEASE PATH                            =    STEAM STEAMLINE DOSE RATE (MR/HR)            =    17 MR/HR STEAMLINE PATHWAY    (2)                =    ASDV PROJECTED RELEASE DURATION              =    .25
                                                    =    2 LOWER WIND SPEED (MPH)
LOWER WIND DIRECTION (DEG FROM)        =    101 LOWER DELTA TEMPERATURE (DEG F)        =    -0.45 SOLAR RADIATION (LY/ MIN)              =    0.24 THE ABOVE ENTRIES ASSUME THAT OPERAMR RESPONSE TO THE ACCIDENT SEQUENCE MIMICS THE SIMULATOR TRIAL RESPONSE AND THAT THE "D" ASDV LIFTS AT 0840. REFER TO SECTIONS 7.4 AND 8.2.4 FOR METEOROLOGICAL AND MONITOR DATA, IF SIMULA%R OPERATOR ACTION MODIFIES THE ACCIDENT SEQUENCE.
O                                    8.3.3-2                SEC8.O_ODPS
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise PROGRAM OUTPUT Seabrook Station Off-Site Dose Projection System, Version 1.2 DISTANCE        WHOLE BODY    WHOLE BODY    INFANT          INFANT (MILES)    DOSE RATE      DOSE          THYROID        THYROID (MR/HR)      (MREM)        DOSE RATE      DOSE (MR/HR)        (MREM) 0.60          2.74          .68            30.70          7.67 2.00          1.03          .26            7.05          1.76 5.00          .38          .09            1.87            .47 10.00            .16          .04              .63            .16 NOBLE GAS RELEASE RATE (UCI/SEC)                      = 3.68E+05 IODINE I-131 D.E. RELEASE RATE (UCI/SEC)              = 3.13E+02
*********** EMERGENCY CLASSIFICATION LEVEL        (ECL)****************
ALERT ******* ALERT ********** ALERT ********* ALERT
*********** PROTECTIVE ACTION RECOMMENDATION          (PAR)**************      1 l
NO OFFSITE DOSE PARS 8.3.3-3                        SEC8.0_ODPS
 
O
                                          ~
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise l
l l
Section 8.3.2 Station Contamination Survey i
O l
1 i
l l
l 0,                      8.3.2-1                  SEC8.0_ CONT
 
North Atlantic Energy Service Corporation Seabrook Station 1993 Graded Exercise                                                                  ;
Il                                                          !
II            s                                              I
                                                                        /
                                                                      /      '
estnesotsusta vesse 4                g
                                                                                  \\g        v N                        j T\%\ '/            -_
j kn*5 U ,, y u l''  l PARKING                                                  ,,,,      ,
                                                                                                        ,~~~,,
_,, - -                                            \
4                  ',
83
                            /    PARK                                              's      ,                          ,,
y
                                                                                ,    ye              -          . .
ss e                  s s'
  ~ ~ -
N
                                                                                                ./
o                                ,[)                                it s                        _#                        m-                                .
se(
g                51        ${,di LOCATION      SMEARS      GROUND OPEN              GROUND CLOSED              WAIST OPEN            WAIST CPM /100CM 2
mr/hr                        mr/hr                  mr/hr            CLOSED mr/hr A        50-300k              1-5                        1-4                      .5-1              .5-1 B            1-5k                <1                        <1                      <.1              <.1 C          100-1k            <.1                        < .1                      ND                ND 8.3.2-2                                            SEC8.0_ CONT
 
O North Atlancic Energy Service Corporation Seabrook Station 1993 Graded Exercise Section 8.3.4 METPAC Evaluation O
o                      ..>.. 1                sec .e_ _ c
 
North Atlantic Enercy Service Corporation Beabrook Station 1993 Graded Exercise ASSUMPTIONS
: 1. LOCA 1 condition since steamline release pathway and shutdown less than 100 hours post reactor trip.
: 2.    "D" ASDV lifts at 8:40 for a period of 5 minutes.
: 3. It is raining with 2 mph easterly winds.
l NOTE: This section provides the evaluator with a sample calculation based on the excepted accident conditions. The actual release time,                  l meteorological parameters, and radiation levels may vary according to operator response.
O a
1 i
8.3.4-2                      SEC8.0_METPAC  ;
l
 
North Atlantic Enercy Service Corporation fm                                                                      Seabrook Station Q                                                                  1993 Graded Exercise INPUT / PROGRAM OUTPUT
              *ETFAC V4.0 -- PLUME TFACKINS AND DOSE ASSESSMENT FR0ERAM                                                              03/17/93 12:30 CATE 3 D TIME OF:                90/DA/YR HR "4      90/[A/YR HR;MN                  SEABROOK STATION PLUME POSITION AT 08:45 SHUTDCWN                        05/05/93 08:05                                      RELEASE CONTINUING STEAM LINE RELEASE 05/05/93 09:40 ANALYSIS                        05/05/93 08:45 05/05/93 08:45
_M_ETEOROLOGY:                            (FROM 05/05/93                          . 08:30 TO 05/05/93                      . 08:45)
T0hER LEVEL WIND SPEED WIND DIR !FROM)                            DELTA TEMPERATURE              PRECIPITATION SDLAR RADIATION (MPH) (M/S)        DES        SECTOR    DE6 F/DH DES C/100M STAB              IN/15 MIN      LANBLEY/ MIN
_      __        =
GROUND      2.0      0.89 101.              E        -0.4            -0.8        0          0.08          0.24 RADIOLOGICAL:                            (FROM 05/05/93                          . 08:30 TO 05/05/93                      . 08:45)
LOCA =            1 STEAM LINE MONITOR              1.7000E+01 mR/hr STEAM LINE PRESSURE                1.1500E+03 PS16 STEAM LINE PATHWAY ATMOSPHERIC REllEF VAL 9 STEAMLINE MCNITOR FEADIN65 USED IN CALCULAIION SITE BOUNDARY INFORMATION AT 08:45                                                                GROUND RELEASE 1000 M RADIUS                                  EAL LIMIT -- ALERT TOTAL ACCUMULATED SAMMA DOSE              7.10E-01 aR          TOTAL ACCUMULATED THYRDID DOSE 6.54E-03 R TOTAL CURIES FELEASED 3.43E+02 Ci                                TOTAL CURIES 10 DINE RELEASED 2.92E-01 Ci WWOLE BCDY D0!E 8 ATE INFCEMATION                    INFANT THYROID DOSE RATE INFORMATION                DISPERSION FACT 0FS FLUME DIST ANS          MZEL FIELD CDR w!DTH REL RATE 150                          MODEL FIELD CDR WIDTH REL RATE ISO SAMMA I/0 DEP. X/0 DEPOSITION h3    M1 DES          (aR/hr)      (eR/hr) MI tuci/sec) USE                      (R/hr)      (R/hr)    MI (uC1/sec) USE      (s/Mt:3) (s/Mit3) (1/MII2) 0    0.6 281.        2.24E+00          -
0.7 3.82E+05              2.61E-02            -
0.5 3.24E+02          3.36E-05 4.97E-05 5.6Z-07 PLUME POINT INFORMATION AT 08: 45                                                            GROUND RELEASE                    PLUME NO.            1 WHOLE BODY DOSE RATE INFORMATION                    INFANT THYROID DOSE RATE INFORMATION                  DISPERSION FACTORS PLUME DIST AWS          MBEL FIELD 00R W1DTH REL RATE 150                          MODEL FIELD CDR WIDTH REL RATE 150 BAMMA II0 DEP. I/Q DEPOSITION ND    MI DES          (sR/hr)      (eR/hr)      M1      (uti/sec) USE            (R/hr)    (R/hr)    MI (uCl/sec) USE      (s/Mit3) (s/ Mil 3) (1/Mit2) 2    0.2 281.        7.94E+00          -
0.4 3.82E+05              1.93E-01          -
0.2 3.24E+02          9.39E-05 3.4BE-04      2.47E-06 ,
1    0.1 281.        1.99E+0!          -
0.3 3.82E+05              1.16E+00          -
0.1 3.24E+02          2.35E-04 2.21E-03 9.92E-06      1 8.3.4-3                                          SEC8.O_METPAC
 
Forth Atlantic Enerov Service Corporation Seabrook Station 1993 Graded Exercise INPUT / PROGRAM OUTPUT METFAC v4.0 - 'LUME TRAttlN3 A C DDSE ASSESSMENT FROGRAM                                                                              03/!7/93 12:30 GROUND RELEASE                                      PLUME PROJECTION FROM                                            8:30 STRAIGHT LINE PLUME PROJECTION INFORMATION DIST ANS A9P! VAL 11ME                    EAMMA D.R, INF THY LR                              SAMMA I/Q DEPLETED t/Q DEF0Sli10N M1) RESI            N:MNI                    (sR/HR)      (R/hR)                            (SEC/Mit3) (SEC/Mit3)            (1/Mll2) 0.60 :31.            02:48                  2.941E+00 2.614E-02                                3.363E-05      4.974E-05 5.625E-07 1.00 281.            09:00                  1.974E+00 1.:99E-02                                2.337E-05      2.452E-05 3.412E-07
                        .00 291.            09:30                  1.06BE+00 3.7EN 03                                1.264E-05      7.20SE-06 1.379E-07
:.00 :St.            10:00                  7.017E-01 1.581E-03                                B.306E-06      2.933E-06 6.835E-08 4.00 231.            10:30                  5.082E-01 7.27BE-04                                6.015E-06      1.385E-06 3.724E-08 5.00 :81.            :1:00                  3.907E-01 3.745E-04                                4.625E-06      7.126E-07 2.144E-00 t.0; :S1,            11:30                  3.12SE-01 2.03BE-04                                !.703E-06      3.872E-07 1.279E-08 7J0 :81.            12:00                  2.520E-01 1.154E-04                                3.054E-06      2.196E-07 7.233E-09 B.00 221.            12:30                  2.177E-01 6.72EE-05                                2.577E-06      1.280E-07 4.889E-09 9.00 281.            13:00                  1.870E-01 4.0!!E-05                                2.213E-06      7.637E-00 3.097E-09 10.00 :31.            13:30                  1.629E-01 2.432E-05                                1.928E-06      4.639E-0B 1.986E-09 PROTECTIVE ACT3ON RECOMMENDATIONS
: PR EVAC : HF SHEL 2 HR EVAC 2 HR SHEL                                                        4 HR EVAC 4 HR SHEL 4 HR EVAC 4 HR SHEL DIST ANS          SAMMA DOSE SAMMA DDSE thF THY DO ]NF THY DO
:!ST MS          Sa"MA DDEE S W A CDSE lhF THY DO INF THY E0 (aR)        (aR)              (R)            (R)
  *1) KES)              leR)            (aR)            (R)            (R)                    (Mll (DES) 0.60 291.          5.69:E+00 5.115E+00 5.229E-02 3.921E-02                                    0.60 281.            1.137E+0! 1.023E+01 1.046E-01 9.150E-02                                    '
  !.00 281.          3.949E+00 3.554E+00 2.577E-02 1.933E-02                                    1.00 281.          7.897E+00 7.107E+00 5.155E-02 4.510E-02
:.00 :91.          2.136E+00 1.92:E+00 7.576E-03 5.692E-03                                    2.00 291.          4.272E+00 3.845E+00 1.515E-02 1.326E-02 3.00 :B1.          1.403E+00 1.263E+00 3.083E-03 2.312E-03                                    3.00 291.          2.807E+00 2.526E+00 6.166E-03 5.395E-03 4.00 291.          1.016E+00 9.14BE-01 1.456E-03 1.092E-03                                    4.00 291.          2.03!E+00 1.830E+00 2.911E-03 2.547E-03 5.00 :81.          7.815E-01 7.033E-01 7.490E-04 5.617E-04                                    5.00 281.            1.400E+00 1.407E+00 1.342E-03 1.311E-03 e.00 291.          6.257E-01 5.631E-01 4.076E-04 3.057E-04                                    6.00 291.          9.646E-01 1.126E+00 6.284E-04 7.!!3E-04 7.00 291.          5.161E-01 4.645E-01 2.30SE-04 1.731E-04                                    7.00 281.            6.666E-01 9.289E-01 2.981E-04 4.038E-04 2.00 281.          4.354E-01 3.91SE-01 1.346E-04 1.009E-04                                    B.00 291.            4.535E-01 7.837E-01 1.402E-04 2.355E-04 9.00 281.          2.960E-01 3.36!E-01 6.355E-05 6.020E-05                                    9.00 291.          2.960E-01 6.731E-01 6.355E-05 1.40$E-04 10.00 :St.            1.765E-01 2.932E-01 2.641E-05 3.657E-05                                  10.00 281.            1.765E-01 5.865E-01 2.641E-05 8.533E-05 i s ti t t t t t t t t t t t t t t t t t t t t t t t t i s t ali ti s ts t a tit t t t ti t i t t t t t t t t t t t s tisi s t a t t tt t t t t t t t!!s tit t t t t titit ti s t illsi t a ti s t I
11111111:18:111181:1881:311:1111: stlif titttttttttttistittttttttttttttttttttttttttttttttttttittitistittistilititstiliittistittlil 6 HR EVAC 6 HR SHEL 6 HR EVAC 6 HR SHEL                                                        9 HR EVAC 3 HR SHEL B HR EVAC B HR SHEL BAMMA DOSE SAMMA DOSE INF THY 00 INF THY D0                                  DIST ANB          6AMMA DDSE BAMMA DOSE INF THY 00 INF THY 00 215T ANB                                                                                                                                            (R)            (R)
(R)            (R)                    (MI) (DES)              (aR)        (aR) ml) QES)              (sR)            (sR) 0.60 :01.          1.524E+01 1.534E+0! 1.402E-01 1.43BE-01                                    0.60 281.            1.524E+0! 2.046E+01 1.402E-01 1.961E-01 1.019E+01 1.066E+01 6.654E-02 7.0BBE-02                                    1.00 291.            1.019E+0! 1.421E+01 6.654E-02 9.665E 02 1.00 231.                                                                                                        5.429E400 7.6B9E+00 1.926E-02 2.841E-02
:.00 291.          5.429E+00 5.767E+00 1.926E-02 2.083E-02                                    2.00 291.
3.00 281.            3.216E+00 5.052E+00 7.065E-03 1.156E-02
:.00 :Bl.          3.216E+00 3.789E+00 7.065E-03 8.47BE-03 4.00 291.            2.075E+00 3.659E+00 2.972E-03 5.459E-03 4.00 :Bl.        2.075E+00 2.744E+00 2.972E-03 4.003E-03 1.400E+00 2.813E+00 1.342E-03 2.809E-03 5.00 291.          1.400E400 2.110E+00 1.342E-03 2.060E-03                                    5.00 281.
9.646E-01 1.629E+00 6.284E-04 1.121E-03                                    6.00 281.            9.646E-01 2.252E+00 6.284E-04 1.52BE-03 6.00 231.                                                                                                        6.666E-01 1.858E400 2.991E-04 8.654E-04 7.00 2B1.        6.666E-01 1.393E+00 2.981E-04 6.346E-04                                    7.00 291.
4.535E-01 1.17bE+00 1.402E-04 3.700E-04                                    8.00 281.            4.535E-01 1.567E+00 1.402E-04 5.046E-04 5.00 261.                                                                                                        2.960E-01 1.346E+00 6.355E-05 3.010E-04 9.00 2B1.          2.960E-01 1.010E+00 6.355E-05 2.207E-04                                    9.00 281.
1.765E-01 8.797E-01 2.641E-05 1.341E-04                                  10.00 281.            1.765E-01 1.173E+00 2.641E-05 1.829E-04 10.00 :Bl.
118:188888 Il8111888:11:188111111ttstillititttttttttttistilitittistiltlittistiliitttistittistilistsliittttttttttttttttttistilitti I
18 :1818 :1818 8888 188888888 t t !! 88 l t a t il f li t t t t ilii t t i t i t t ill s t ill:18 8 81118888888 181881111:1883 1138 8.3.4-4                                                    SEC8.0_METPAC
 
North Atlantic Enerev Service Corporation Seabrook Station O                                                        1993 Graded Exercise INPUT / PROGRAM OUTPUT FUNCTION Nt                                  -
                                                                                                  .                                              ;                        ggyg L.,
: A'                  1-RADIUS 1.-                                      - .                            2-ROADS
                                                    '..                                                  .                                  ;                        3-PUBLIC 4-LABELS
                    .                                            .                                            ...                        :                  .:      5-goon 6-REDRAM
                                                                                                                                                              ~
y_
8-LT PEN
                                                                                      .                            '.            L,                      .
i
                                                                                                                                    ^                  -
1  9-PRINT
: N..J'u 10-EXIT O                                                                .
  ............,,_...g...-.
2
                                                                                      .. 4 :;;..'                                          .. ..                    GRD GAM
  .,'-                                                                                                                                                                T=08:45 e                                i                            /            ...                      '? .::2, ..'
2,g mph
                                                                                                                                                      ..:.              101 DEG D STAB
    .....                                                                                              .-                      .              .                  e.
                                                                                                                                                                      <-+ 3 . 9 3 M I t
                                                    .J                                    .
l            .                  .                      STATE E            TOWNS RIUER
                                    .-                                                                            l
            '~
ROADS O                                                                                    8.3.4-s                                                                        srcs.o_xzrrac
 
North Atlantic Enerav Service Corporation Seabrook Station 1993 Graded Exercise INPUT / PROGRAM vv1 rut M.ETPAC V4.0 -- PLUME TRACKINS AND 00SE ASSESSMENT PROGRAM                                                      03/17/93 12:!9 DATE AND 11ME OF:        M0/DA/YR HR MN M0/DA/YR HR:MN                      SEABROOK STATION PLUME POSITION AT 09:00 SHUTDOWN                  05/05/93 08:05                                      RELEASE TERMINATED STEAM LINE RELEASE 05/05/93 08:40 05/05/93 08:45 ANALYSIS                  05/05/93 08:45 05/05/93 09:00 METEOROLOGY:                        (FROM 05/05/93                    . 08: 45 TO 05/05/93                      . 09:00)
TDWER LEVEL WIND SPEED WIND DIR (FROM)                      DELTA TEMPERATURE          PRECIPITAT!DN SOLAR RADIAT!DN (MPH) (M/S)        DES    SECTOR    DES F/DH DE6 C/100M STAB          IN/15 MIN        LANSLEY/ MIN
                ...........                == ..._- -
GROUND      3.1  1.39 104.              ESE      -0.2        -0.4        E              0.03          0.41 RADIOLOGICAL:                        (FROM 05/05/93                    . 08:45 TO 05/05/93                        . 09:00)
O              LOCA =          1 STEAM LINE MONITOR        1.7000E+0! mR/hr STEAM LINE          PRESSURE 1.1500E+03 PS!6 STEAM LINE PATHWAY ATMOSPHERIC REllEF V
                                                                                                                                                            ]
STEAFLINE MCNITOR READINGS USED IN CALCULATIDM PLUME POINT INFORMATION AT 09:00                                                      GROUND RELEASE                    PLUME NO . - 1 WHOLE BODY DOSE RATE INFORMATION                INFANT THYR 010 DOSE RATE INFORMATION              DISPERSION FACTORS PLUME DIST ANS          MDDEL FIELD CDR ulDTH REL RATE 150                MODEL FIELD CDR WIDTH REL RATE 150 SA*!MA I/D DEP. 1/0 DEPOSIT 10n NO    M! DES          teR/hr)    (aR/nt) M1          tutilsec) USE      tR/hr)      (R/hr)  M! tucilsec: USE        (s/ Mat 3) is/Mst3) (1/ Mil 2)  .
2    0.9 283.        2.43E+00      -
0.8 !.82E+05          2.17E-02        -
0.6 3.24E+02            2.BBE-05 4.14E-05 2.B5E-07 1    0.B 224.        2.83E+00      -
0.7 3.82E+05          2.94E-02        -
0.6 3.24E+02            3.35E-05 5.60E-05 3.60E-07 l
l 8.3.4-6                                        SEC8.O_METPAC
 
s I
North Atlantic Enercy Service Corcoration Seabrook Station 1993 Graded Etercise                                                                                                                i INPUT /PROCRAM OUTPUT FUNCTION Nt          .                          !                          .
                                                                                                        \
                                                                                                                                                                                    )'              KEYS J
I
                                                                        ;/I'.\.
d- 1-RADIUS
                                                                                                                                        ~
L.,
i                        1                    \            \v'-[ :                                                                            2-ROADS            :
l                                                  .-        3-PUBLIC
                                                            ' u<
4-LABELS' 5-ZOOM
                                          '.                            L,                                                  -
6-REDRAW;j
                                                                                    . n,-
                                                                                                                                                                  .-                          ?_
                                                                                      '"'                              l                                  .
8-LT PEN 9-PRINTm
            .                                                                                                                                                      ~
                                                      ~                              -
l
                                                                                                        's l ig-EXI W            .
l.s
                                        .                                                                          r
                                            .                                                .                    n                      .
                                                                                                                        ' y '1
                                                                                            ..      ... l            -
                                                                                                                                                      > n. -                                                      ;
                                                                                                                                              ,  . iqa                                      GRD GAM 00 l l
              .....,;-                                          . r.;. ..._.                      .;,                .
_;g.;,              _
L T-09
                                                    ..                                  . . . . .                    .-            ',,,...                                                      3.1      MPHl x '~ls,\.            104      DEG!
                                                                    . .            -u.:-: 3g:li: p: ,                                                                                                g  g3gy
                                                                              .-            . . . . , :, ; ,-Q
                                                                                                                                                ,t. 5,. . ..t ..,.                  /. o 4., .+ 4,gggg
                                                                                      .' : '.                                                            l STATE
                                                                                                                                                                              '' l.
                                                            ..                                              ..                                    ,-                                    '                        }
TOHNS        :
                                                                                                                                      .                    ,    1., .                              RIUER        I goggs
                                                                                                                                                              ..}.              .
a.3.4-2                                                                            seca.o_xz m c  g    l l
1 l
 
Eqrth Atlantic Enerav 8ervice Cornoration Seabrook Station 1993 Graded Exercise INPUT / PROGRAM OUTPUT                                                                                                      ,
4 METFAC V4.0 -- PLUME TRACKING AND DOSE ASSESSMENT PRDSRAM                                            03/17/93 12:43 DATE AND TIME OF:        M0/DA/YR HR:MN N0/DA/YR HR:MN                  SEABROOK STATION                                    .
PLUME POSITION AT 09:15 SHUTD0tN                05/05/93 09:05                                RELEASE TERMINATED STEAM LINE RELEASE 05/05/93 08:40 05/05/93 08:45 ANALYSIS                05/05/93 03:45 05/05/93 09:15 METEOROLOGY:                      (FROM 05/05/93                  . 09:00 TO 05/05/93                  . 09:15)
TOWER LEVEL WIND SPEED WIND DIR (FROM)                DELTA TEMPERATURE        PREC!PITATION SOLAR RADIAT!0N (MPH) (M/S)    DE6    SECTOR    DES F/DH DE6 C/100M STAB        IN/15 MIN    LANGLEY / MIN BROUND      5.1  2.28 115.          ESE      -0.3        -0.6      D          0.00        0.52 RADIOLOGICAL:                    (FROM 05/05/93                  . 09:00 TO 05/05/93                  . 09: 15)
LOCA =          1 STEAM LINE MONITOR        !.7000E+01 aR/hr STEAM LINE  PRESSURE 1.1500E+03 PS16 STEAM LINE PATHWAY ATMDSPHERICREllEFVALV2 STEAMLINE MONITOR READINSS USED IN CALCULATION PLUME POINT INFORMATION AT 09: 15                                              GROUND RELEASE                PLUME NO.            1 WHOLE BODY DOSE RATE INFORMATION            INFANT THYROID DOSE PATE INFORMAT10N          DISPERSION FACTORS.
CLUME DIST ANG        MDDEL FIELD CDR WIDTH REL RATE 150              MODEL FIELD CDR WIDTH REL RATE 150 BAMMA t/0 DEP. 1/0DEP0$1T!0N NO    M1 DES        (aR/hrt    (aR/hri M1      (utilsec) USE      (R/hr)    _R/hr)
(      M1 (utilsec) USE    (s/Mt:3) (s/Mll3) (1/Mtf2) 2    2.2 290.      1.03E+00      -
1.2 3.82E+05          6.llE-03        -
1.1 3.24E+02        1.22E-05 1.16E-05 7.95E-08 1    2.0 291.      1.11E+00      -
1.2 3.62E+05          7.17E-03        -
1.1 3.24E+02        1.32E-05 1.36E-05 9.33E-08 O                                                                                                                " " ' " "
 
O NORTH ATLANTIC ENERGY BERVICE CORPORATION SEABROOK BTATION 1993 GRADED EXERCISE l
9.0  REFERENCE MATERIAL O
l l
l l
                                                                                                                                                                                                            )
3/17/93 s}}

Latest revision as of 12:31, 19 December 2024

1993 Graded Exercise
ML20044H516
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/05/1993
From:
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
References
NUDOCS 9306090138
Download: ML20044H516 (139)


Text