ML20056G976: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ _.
{{#Wiki_filter:_ _.
                                                                                              b
b
  .
.
l
l
                                                                  AUG 311993
AUG 311993
      Docket Nos. 50-317
Docket Nos. 50-317
                      50-318
50-318
                                                                                                              1
1
Mr. Robert E. Denton
j
.
.
      Mr. Robert E. Denton                                                                                  j
Vice President - Nuclear Energy
      Vice President - Nuclear Energy                                                                       i
i
      Baltimore Gas and Electric Company                                                                     ;
Baltimore Gas and Electric Company
i     Calvert Cliffs Nuclear Power Plant
;
      1650 Calvert Cliffs Parkway
i
      Lusby, Maryland 20657 - 4702                                                                           ;
Calvert Cliffs Nuclear Power Plant
                                                                                                              i
1650 Calvert Cliffs Parkway
      Dear Mr. Denton:
Lusby, Maryland 20657 - 4702
      SUBJECT: SPECIAL INSPECTION REPORT NOS. 50-317/93-23 AND 50-318/93-23
;
      During the period of July 6 through 9,1993, a special inspection was conducted at the
i
      Calvert Cliffs Power Plant, Units 1 and 2. Subsequent to the on site inspection, an in-office
Dear Mr. Denton:
l      review of the gathered information was performed between July 12 and July 30,1993. The
SUBJECT: SPECIAL INSPECTION REPORT NOS. 50-317/93-23 AND 50-318/93-23
l      onsite inspection and subsequent review was conducted to address Region I concerns that a
During the period of July 6 through 9,1993, a special inspection was conducted at the
!      number of recent operational events represented an adverse trend in performance and a
Calvert Cliffs Power Plant, Units 1 and 2. Subsequent to the on site inspection, an in-office
!      decline in your ability to address and correct problems within your operational activities.
      Specifically, between June 8 and July 1,1993, four Reactor Protection System (RPS)
      actuations occurred, and one event involving improper restoration of a service water heat
      exchanger almost resulted in a complete loss of the service water system. Based on this
      inspection, we have concluded that there was no common root cause for these events and that
      your reviews and proposed corrective actions are appropriate. We do note that one primary
        root cause, inadequate job preparation, was a strong contributor in three of the five evente.
        We will continue to review your operational activities; however, we do not believe that              !
                                                                                                              l
l      increased NRC inspection emphasis is needed at this time.
l
l
        The inspection was conducted using the guidance contained in NUREG/CR-5455 Volumes 1
review of the gathered information was performed between July 12 and July 30,1993. The
        and II, Human Performance Investigation Process (HPIP). To limit the scope of the
l
l
        inspection, the last two events - a reactor trip due to low steam generator later level and
onsite inspection and subsequent review was conducted to address Region I concerns that a
!      improper restoration of a service water (SRW) heat exchanger - were reviewed i.7 <iepth.
!
l      The NRC review detennined the root cause(s) and contributing factors of tnese ments
number of recent operational events represented an adverse trend in performance and a
i      independent of the facility review. NRC results were then compared with the results of the
!
        facility review. The results of the facility and NRC reviews closely paralleled each other.
decline in your ability to address and correct problems within your operational activities.
                                                                                                  i
Specifically, between June 8 and July 1,1993, four Reactor Protection System (RPS)
I                                        OFFICIAL RECORD COPY              G:CC932323. INS
actuations occurred, and one event involving improper restoration of a service water heat
exchanger almost resulted in a complete loss of the service water system. Based on this
inspection, we have concluded that there was no common root cause for these events and that
your reviews and proposed corrective actions are appropriate. We do note that one primary
root cause, inadequate job preparation, was a strong contributor in three of the five evente.
We will continue to review your operational activities; however, we do not believe that
l
l
    9309080023 930831                                                                       \   \
increased NRC inspection emphasis is needed at this time.
    {DR ADOCK 05000317-
l
                          PDR                                                         /
The inspection was conducted using the guidance contained in NUREG/CR-5455 Volumes 1
                                                                                            \        g
and II, Human Performance Investigation Process (HPIP). To limit the scope of the
                                ~
l
                                                                                                    I
inspection, the last two events - a reactor trip due to low steam generator later level and
                                                                                        f
!
improper restoration of a service water (SRW) heat exchanger - were reviewed i.7 <iepth.
l
The NRC review detennined the root cause(s) and contributing factors of tnese ments
i
independent of the facility review. NRC results were then compared with the results of the
facility review. The results of the facility and NRC reviews closely paralleled each other.
i
I
OFFICIAL RECORD COPY
G:CC932323. INS
l
9309080023 930831
\\
\\
{DR
ADOCK 05000317-
\\
g
PDR
/
~
f
I
,
,
                                                                          _   ___ .
_
___
.


  .
.
  .
.
1
1
    Mr. Robert E. Denton                             2                 AUG 311993
Mr. Robert E. Denton
                                                                                                    '
2
    The results of the facility reviews of the other three events were also reviewed by the NRC
AUG 311993
    subsequent to the site inspection to evaluate the level of detail, facility assignment of root '
The results of the facility reviews of the other three events were also reviewed by the NRC
    cause(s), and any commonality between all five of the events. Based on our review, three of
'
                                                                                                    ;
subsequent to the site inspection to evaluate the level of detail, facility assignment of root
    the five events had a primary root cause of failure to prepare adequately, either by thorough
'
    preevolution briefings or a questioning attitude of personnel involved, for the evolutions that
cause(s), and any commonality between all five of the events. Based on our review, three of
    were to take place during the operations shift.
the five events had a primary root cause of failure to prepare adequately, either by thorough
    The inspectors briefed the plant general manager and other plant personnel on July 9,1993,
;
    on the status of the inspection. During the briefing, the inspectors presented preliminary
preevolution briefings or a questioning attitude of personnel involved, for the evolutions that
    information gathered during the inspection and discussed further NRC evaluation to be
were to take place during the operations shift.
    conducted prior to discussion of final inspection results.
The inspectors briefed the plant general manager and other plant personnel on July 9,1993,
      On July 30,1993, a final exit meeting was conducted by Mr. Briggs with Mr. Cruse and
on the status of the inspection. During the briefing, the inspectors presented preliminary
    other members of your staff identified in Attachment 3. During the meeting, the details and
information gathered during the inspection and discussed further NRC evaluation to be
      findings of the inspection were discussed and compared with those from your staff's analysis.
conducted prior to discussion of final inspection results.
      In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and     ,
On July 30,1993, a final exit meeting was conducted by Mr. Briggs with Mr. Cruse and
                                                                                                    !
other members of your staff identified in Attachment 3. During the meeting, the details and
      its enclosure will be placed in the NRC Public Document Room.
findings of the inspection were discussed and compared with those from your staff's analysis.
-    No reply to this letter is required; but, should you have any questions regarding this
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and
      examination, please contact the undersigned.
,
                                                                                                      ,
!
its enclosure will be placed in the NRC Public Document Room.
No reply to this letter is required; but, should you have any questions regarding this
-
examination, please contact the undersigned.
,
Sincerely,
i
;
;
                                                          Sincerely,                                i
l
                                                                                                      l
g(iginal SIEUBd OY
                                                                                                    ,
,
                                                            g(iginal SIEUBd OY
Lee H. ggeham
                                                            Lee H. ggeham                           l
Im H. Bettenhausen, Chief
                                                          Im H. Bettenhausen, Chief                 l
i
                                                                                                      i
Operations Branch
                                                          Operations Branch
Division of Reactor Safety
                                                          Division of Reactor Safety
Enclosure:
      Enclosure:
Special Inspection Report Nos. 50-317/93-23 and 50-318/93-23
      Special Inspection Report Nos. 50-317/93-23 and 50-318/93-23
with Attachments 1,2, and 3
        with Attachments 1,2, and 3
Attachments:
      Attachments:
1. HPIP Events and Casual Factor (E&CF) Chart,
      1. HPIP Events and Casual Factor (E&CF) Chart,
Low Steam Generator Level Reactor trip
              Low Steam Generator Level Reactor trip
2. HPIP E&CF Chart, SRW Heat Exchanger Return to Service
      2. HPIP E&CF Chart, SRW Heat Exchanger Return to Service
3. Partial Listing of Personnel Contacted
      3. Partial Listing of Personnel Contacted
4
                                                                                                    4
OFFICIAL RECORD COPY
                                        OFFICIAL RECORD COPY             G:CC932323. INS
G:CC932323. INS


    .- --         .- - - -                       - . . . .         . --       -
.- --
  .
.- - - -
- . . . .
.
--
-
.
1
1
i
i
\'                                                                                                             I
\\'
          Mr. Robert E. Denton                              3                    Aug 3 y
j
j
                                                                                                              '
Mr. Robert E. Denton
!          cc w/ encl and attachments:
                                                                                                              I
l          G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
                                                                                                              i
!          R. McIzan, Administrator, Nuclear Evaluations                                                '
          J. Walter, Engineering Division, Public Service Commission of Maryland                              l
l                                                                                                              j
          K. Burger, Esquire, Maryland People's Counsel
:          R. Ochs, Maryland Safe Energy Coalition                                                            l
J          K. Abraham, PAO (2)                                                                                  ;
                                                                                                              i
4          Public Document Room (PDR)
3
3
          I_ocal Public Document Room (LPDR)                                                                  l
Aug 3 y
          Nuclear Safety Information Center (NSIC)
'
                                                                                                              j
!
          NRC Resident Inspector
cc w/ encl and attachments:
4          State of Maryland (2)                                                                              l
I
                                                                                                                l
l
1          bec w/ encl and attachments
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
                                                                                                              !
i
          Region I Docket Room (with concurrences)
!
          C. Cowgill, DRP                                                                                    1
R. McIzan, Administrator, Nuclear Evaluations
,
            L. Nicholson, DRP                                                                                  ;
'
'
            D. Weaver, DRP                                                                                     ,
l
                                                                                                              l
l
            P. Wilson - Calvert Cliffs                                                                         )
J. Walter, Engineering Division, Public Service Commission of Maryland
            V. McCree, OEDO                                                                                   :
K. Burger, Esquire, Maryland People's Counsel
j
R. Ochs, Maryland Safe Energy Coalition
:
J
K. Abraham, PAO (2)
;
i
4
Public Document Room (PDR)
3
I_ocal Public Document Room (LPDR)
l
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
j
State of Maryland (2)
l
4
l
1
bec w/ encl and attachments
!
Region I Docket Room (with concurrences)
C. Cowgill, DRP
1
L. Nicholson, DRP
;
l
,
D. Weaver, DRP
,
'
P. Wilson - Calvert Cliffs
)
V. McCree, OEDO
:
R. Capra, NRR
l
"
"
            R. Capra, NRR                                                                                     l
i
                                                                                                              i
D. Mcdonald, NRR
i
*
*
            D. Mcdonald, NRR                                                                                  i
-
            L. Briggs, DRS                                                                                   -l,
L. Briggs, DRS
            Greg S. Galletti, HFAB/NRR                                                                         j
,
                                                                                                              !
Greg S. Galletti, HFAB/NRR
                                                                                                              i
j
!           NOTIFY VIA E-MAIL AND NO ATTACIIED FILE:
!
            L. Bettenhausen, DRS                                                                               f
i
l                                                                                                              i
!
            G. Meyer, DRS                                                                                     !
NOTIFY VIA E-MAIL AND NO ATTACIIED FILE:
f
l
L. Bettenhausen, DRS
i
G. Meyer, DRS
!
i
i
;
;
l                                                                                                           -i
l
- i
:
:
                                                                                                                 1
                                                                                                                 1
1
1
,
,
j           RI:DRS               RI:DRS                     RI:DRS
j
;           Briggs               Meyer                           ausen
RI:DRS
j           08/26/93             08/}#93)                   089y/93
RI:DRS
                                            OFFICIAL RECORD COPY            G:CC9323. INS
RI:DRS
;
Briggs
Meyer
ausen
j
08/26/93
08/}#93)
089y/93
l
l
OFFICIAL RECORD COPY
G:CC9323. INS
:
:
l
l
                                                                            . - _     - - . . . . . . . . . .
-.
- .
.-
- - - - .
- - - - . - . .
- . .
- .
. - _
- - . .
. .
.
. . . . .
}}
}}

Latest revision as of 12:48, 17 December 2024

Forwards Insp Repts 50-317/93-23 & 50-318/93-23 on 930706-09.No Common Root Cause for Events That Occurred During 930608 & 0701 & Util Reviews & Proposed Corrective Actions Appropriate
ML20056G976
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/31/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20056G977 List:
References
NUDOCS 9309080023
Download: ML20056G976 (3)


See also: IR 05000317/1993023

Text

_ _.

b

.

l

AUG 311993

Docket Nos. 50-317

50-318

1

Mr. Robert E. Denton

j

.

Vice President - Nuclear Energy

i

Baltimore Gas and Electric Company

i

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657 - 4702

i

Dear Mr. Denton:

SUBJECT: SPECIAL INSPECTION REPORT NOS. 50-317/93-23 AND 50-318/93-23

During the period of July 6 through 9,1993, a special inspection was conducted at the

Calvert Cliffs Power Plant, Units 1 and 2. Subsequent to the on site inspection, an in-office

l

review of the gathered information was performed between July 12 and July 30,1993. The

l

onsite inspection and subsequent review was conducted to address Region I concerns that a

!

number of recent operational events represented an adverse trend in performance and a

!

decline in your ability to address and correct problems within your operational activities.

Specifically, between June 8 and July 1,1993, four Reactor Protection System (RPS)

actuations occurred, and one event involving improper restoration of a service water heat

exchanger almost resulted in a complete loss of the service water system. Based on this

inspection, we have concluded that there was no common root cause for these events and that

your reviews and proposed corrective actions are appropriate. We do note that one primary

root cause, inadequate job preparation, was a strong contributor in three of the five evente.

We will continue to review your operational activities; however, we do not believe that

l

increased NRC inspection emphasis is needed at this time.

l

The inspection was conducted using the guidance contained in NUREG/CR-5455 Volumes 1

and II, Human Performance Investigation Process (HPIP). To limit the scope of the

l

inspection, the last two events - a reactor trip due to low steam generator later level and

!

improper restoration of a service water (SRW) heat exchanger - were reviewed i.7 <iepth.

l

The NRC review detennined the root cause(s) and contributing factors of tnese ments

i

independent of the facility review. NRC results were then compared with the results of the

facility review. The results of the facility and NRC reviews closely paralleled each other.

i

I

OFFICIAL RECORD COPY

G:CC932323. INS

l

9309080023 930831

\\

\\

{DR

ADOCK 05000317-

\\

g

PDR

/

~

f

I

,

_

___

.

.

.

1

Mr. Robert E. Denton

2

AUG 311993

The results of the facility reviews of the other three events were also reviewed by the NRC

'

subsequent to the site inspection to evaluate the level of detail, facility assignment of root

'

cause(s), and any commonality between all five of the events. Based on our review, three of

the five events had a primary root cause of failure to prepare adequately, either by thorough

preevolution briefings or a questioning attitude of personnel involved, for the evolutions that

were to take place during the operations shift.

The inspectors briefed the plant general manager and other plant personnel on July 9,1993,

on the status of the inspection. During the briefing, the inspectors presented preliminary

information gathered during the inspection and discussed further NRC evaluation to be

conducted prior to discussion of final inspection results.

On July 30,1993, a final exit meeting was conducted by Mr. Briggs with Mr. Cruse and

other members of your staff identified in Attachment 3. During the meeting, the details and

findings of the inspection were discussed and compared with those from your staff's analysis.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and

,

!

its enclosure will be placed in the NRC Public Document Room.

No reply to this letter is required; but, should you have any questions regarding this

-

examination, please contact the undersigned.

,

Sincerely,

i

l

g(iginal SIEUBd OY

,

Lee H. ggeham

Im H. Bettenhausen, Chief

i

Operations Branch

Division of Reactor Safety

Enclosure:

Special Inspection Report Nos. 50-317/93-23 and 50-318/93-23

with Attachments 1,2, and 3

Attachments:

1. HPIP Events and Casual Factor (E&CF) Chart,

Low Steam Generator Level Reactor trip

2. HPIP E&CF Chart, SRW Heat Exchanger Return to Service

3. Partial Listing of Personnel Contacted

4

OFFICIAL RECORD COPY

G:CC932323. INS

.- --

.- - - -

- . . . .

.

--

-

.

1

i

\\'

j

Mr. Robert E. Denton

3

Aug 3 y

'

!

cc w/ encl and attachments:

I

l

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

i

!

R. McIzan, Administrator, Nuclear Evaluations

'

l

l

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel

j

R. Ochs, Maryland Safe Energy Coalition

J

K. Abraham, PAO (2)

i

4

Public Document Room (PDR)

3

I_ocal Public Document Room (LPDR)

l

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

j

State of Maryland (2)

l

4

l

1

bec w/ encl and attachments

!

Region I Docket Room (with concurrences)

C. Cowgill, DRP

1

L. Nicholson, DRP

l

,

D. Weaver, DRP

,

'

P. Wilson - Calvert Cliffs

)

V. McCree, OEDO

R. Capra, NRR

l

"

i

D. Mcdonald, NRR

i

-

L. Briggs, DRS

,

Greg S. Galletti, HFAB/NRR

j

!

i

!

NOTIFY VIA E-MAIL AND NO ATTACIIED FILE:

f

l

L. Bettenhausen, DRS

i

G. Meyer, DRS

!

i

l

- i

1

1

,

j

RI:DRS

RI:DRS

RI:DRS

Briggs

Meyer

ausen

j

08/26/93

08/}#93)

089y/93

l

OFFICIAL RECORD COPY

G:CC9323. INS

l

-.

- .

.-

- - - - .

- - - - . - . .

- . .

- .

. - _

- - . .

. .

.

. . . . .