ML20066D382: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20066D382 | | number = ML20066D382 | ||
| issue date = 01/08/1982 | | issue date = 01/08/1982 | ||
| title = | | title = To Monthly Operating Rept for June 1981 | ||
| author name = Sarsour B | | author name = Sarsour B | ||
| author affiliation = TOLEDO EDISON CO. | | author affiliation = TOLEDO EDISON CO. | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
Revision 1 - 1/8/82 s | |||
1 - 1/8/82 | OPERATING DATA REPORT DOCKET NO. _50-346 DATE.lanuary_8,1982 COSIPLETED BY Bilal Sntsour TELEPHONE (419) 259-5000 Ext. 251 | ||
OPERATING DATA REPORT DOCKET NO. _50-346 DATE .lanuary_8,1982 COSIPLETED BY | _ OPERATING STATUS Davis-Besse Unit #1 Notes | ||
_ OPERATING STATUS Notes | : 1. Unit Name: | ||
: 1. Unit Name: | |||
June, 19S1 | June, 19S1 | ||
: 2. Reporting Period: | : 2. Reporting Period: | ||
2772 | 2772 | ||
: 3. Licensed Thermal Power (51Wt): | : 3. Licensed Thermal Power (51Wt): | ||
: 4. Nameplate Rating (Gross 31We): | 925 | ||
: 4. Nameplate Rating (Gross 31We): | |||
906 | |||
: 5. Design Electrical Rating (Net 31We): | : 5. Design Electrical Rating (Net 31We): | ||
: 6. h!aximum Dependable Capacity (Gross S!We): | 918 1 | ||
: 6. h!aximum Dependable Capacity (Gross S!We): | |||
874 | |||
: 7. 51aximum Dependable Capacity (Net 51We): | : 7. 51aximum Dependable Capacity (Net 51We): | ||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons: | ||
: 9. Power Level To which Restricted. If Any (Net 31We): | : 9. Power Level To which Restricted. If Any (Net 31We): | ||
: 10. Reasons For Restrictions.If Any: | : 10. Reasons For Restrictions.If Any: | ||
This alonth | This alonth Yr.-to-Date Cumulative 720 4,343 25.584 l | ||
: 11. Hours in Reporting Period | : 11. Hours in Reporting Period 565.4 3.025.6 11.108.2 | ||
~ | |||
: 12. Number Of Hours Reactor Was Critical | : 12. Number Of Hours Reactor Was Critical 34.8 2,513.4 | ||
: 13. Reactor Resene Shutdown Hours | : 13. Reactor Resene Shutdown Hours 0 | ||
: 14. Hours Generator On-Line | : 14. Hours Generator On-Line 565.4 2,879.0 12.221.3 | ||
: 15. Unit Reserve Shutdown Hours | : 15. Unit Reserve Shutdown Hours 0 | ||
: | 0' i _733 _ g | ||
: 18. Net Electrical Energy Generated (31WH) | : 16. Gross Thermal Energy Generated (31WH) 1,146,943 6,392,283 | ||
: 19. Unit Senice Factor | ?7.480.785 1 | ||
: 17. Gross Electrical Energy Generated ( A!Wil) 383.055 2,138,383 9.165.536 | |||
: 21. Unit Capacity Factor IUsing 31DC Net) - | : 18. Net Electrical Energy Generated (31WH) 359.837 2,002.585 8.536.434 78.5 66.3 47.8 | ||
: 22. Unit Capacity Factor IUsing DER Net) | : 19. Unit Senice Factor 78.5 66.3 54.5 | ||
: 20. Unit Availability Factor | |||
: 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht: | : 21. Unit Capacity Factor IUsing 31DC Net) - | ||
56.2 51.8 38.2 55.2 50.9 36.8 | |||
: 22. Unit Capacity Factor IUsing DER Net) 21.5 25.9 25.3 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht: | |||
2 | 2 | ||
: 25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup: | : 25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup: | ||
: 26. Units in Test Status (Prior to Commercial Operationi: | : 26. Units in Test Status (Prior to Commercial Operationi: | ||
PDR ADOCK 05000346 | Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\1NIERCIAL OPER ATION 8211110310 820108 PDR ADOCK 05000346 PDR | ||
("/778 R | |||
~ | |||
e}} | |||
Latest revision as of 18:34, 16 December 2024
| ML20066D382 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/08/1982 |
| From: | Sarsour B TOLEDO EDISON CO. |
| To: | |
| Shared Package | |
| ML20066D281 | List: |
| References | |
| NUDOCS 8211110310 | |
| Download: ML20066D382 (1) | |
Text
.
Revision 1 - 1/8/82 s
OPERATING DATA REPORT DOCKET NO. _50-346 DATE.lanuary_8,1982 COSIPLETED BY Bilal Sntsour TELEPHONE (419) 259-5000 Ext. 251
_ OPERATING STATUS Davis-Besse Unit #1 Notes
- 1. Unit Name:
June, 19S1
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power (51Wt):
925
- 4. Nameplate Rating (Gross 31We):
906
- 5. Design Electrical Rating (Net 31We):
918 1
- 6. h!aximum Dependable Capacity (Gross S!We):
874
- 7. 51aximum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To which Restricted. If Any (Net 31We):
- 10. Reasons For Restrictions.If Any:
This alonth Yr.-to-Date Cumulative 720 4,343 25.584 l
- 11. Hours in Reporting Period 565.4 3.025.6 11.108.2
~
- 12. Number Of Hours Reactor Was Critical 34.8 2,513.4
- 13. Reactor Resene Shutdown Hours 0
- 14. Hours Generator On-Line 565.4 2,879.0 12.221.3
- 15. Unit Reserve Shutdown Hours 0
0' i _733 _ g
- 16. Gross Thermal Energy Generated (31WH) 1,146,943 6,392,283
?7.480.785 1
- 17. Gross Electrical Energy Generated ( A!Wil) 383.055 2,138,383 9.165.536
- 18. Net Electrical Energy Generated (31WH) 359.837 2,002.585 8.536.434 78.5 66.3 47.8
- 19. Unit Senice Factor 78.5 66.3 54.5
- 20. Unit Availability Factor
- 21. Unit Capacity Factor IUsing 31DC Net) -
56.2 51.8 38.2 55.2 50.9 36.8
- 22. Unit Capacity Factor IUsing DER Net) 21.5 25.9 25.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht:
2
- 25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\1NIERCIAL OPER ATION 8211110310 820108 PDR ADOCK 05000346 PDR
("/778 R
~
e