ML20066D382: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20066D382
| number = ML20066D382
| issue date = 01/08/1982
| issue date = 01/08/1982
| title = to Monthly Operating Rept for June 1981
| title = To Monthly Operating Rept for June 1981
| author name = Sarsour B
| author name = Sarsour B
| author affiliation = TOLEDO EDISON CO.
| author affiliation = TOLEDO EDISON CO.
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
      **                                                                                                    Revision s
Revision 1 - 1/8/82 s
1 - 1/8/82     . .
OPERATING DATA REPORT DOCKET NO. _50-346 DATE.lanuary_8,1982 COSIPLETED BY Bilal Sntsour TELEPHONE (419) 259-5000 Ext. 251
OPERATING DATA REPORT DOCKET NO. _50-346 DATE .lanuary_8,1982 COSIPLETED BY     Bilal Sntsour TELEPHONE     (419) 259-5000 Ext. 251
_ OPERATING STATUS Davis-Besse Unit #1 Notes
_ OPERATING STATUS Notes
: 1. Unit Name:
: 1. Unit Name:         Davis-Besse Unit #1                                                                                ,
June, 19S1
June, 19S1
: 2. Reporting Period:
: 2. Reporting Period:
2772
2772
: 3. Licensed Thermal Power (51Wt):
: 3. Licensed Thermal Power (51Wt):
: 4. Nameplate Rating (Gross 31We):               925 906
925
: 4. Nameplate Rating (Gross 31We):
906
: 5. Design Electrical Rating (Net 31We):
: 5. Design Electrical Rating (Net 31We):
: 6. h!aximum Dependable Capacity (Gross S!We):             918 1
918 1
: 6. h!aximum Dependable Capacity (Gross S!We):
874
: 7. 51aximum Dependable Capacity (Net 51We):
: 7. 51aximum Dependable Capacity (Net 51We):
874
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To which Restricted. If Any (Net 31We):
: 9. Power Level To which Restricted. If Any (Net 31We):
: 10. Reasons For Restrictions.If Any:
: 10. Reasons For Restrictions.If Any:
This alonth                 Yr.-to-Date         Cumulative 720                           4,343               25.584
This alonth Yr.-to-Date Cumulative 720 4,343 25.584 l
: 11. Hours in Reporting Period l                                                              565.4                         3.025.6             11.108.2
: 11. Hours in Reporting Period 565.4 3.025.6 11.108.2
                                                                                                                                          ~
~
: 12. Number Of Hours Reactor Was Critical 0                                34.8             2,513.4
: 12. Number Of Hours Reactor Was Critical 34.8 2,513.4
: 13. Reactor Resene Shutdown Hours
: 13. Reactor Resene Shutdown Hours 0
: 14. Hours Generator On-Line                             565.4                         2,879.0             12.221.3
: 14. Hours Generator On-Line 565.4 2,879.0 12.221.3
: 15. Unit Reserve Shutdown Hours                             0                                   0'           i _733 _ g 1,146,943                         6,392,283             ?7.480.785
: 15. Unit Reserve Shutdown Hours 0
: 16. Gross Thermal Energy Generated (31WH) 383.055                       2,138,383             9.165.536 1        17. Gross Electrical Energy Generated ( A!Wil)                        _ _ ,
0' i _733 _ g
: 18. Net Electrical Energy Generated (31WH)         359.837                       2,002.585             8.536.434 78.5                               66.3               47.8
: 16. Gross Thermal Energy Generated (31WH) 1,146,943 6,392,283
: 19. Unit Senice Factor
?7.480.785 1
: 20. Unit Availability Factor                              78.5                               66.3               54.5
: 17. Gross Electrical Energy Generated ( A!Wil) 383.055 2,138,383 9.165.536
: 21. Unit Capacity Factor IUsing 31DC Net) -               56.2                               51.8               38.2 55.2                               50.9               36.8
: 18. Net Electrical Energy Generated (31WH) 359.837 2,002.585 8.536.434 78.5 66.3 47.8
: 22. Unit Capacity Factor IUsing DER Net)           ,
: 19. Unit Senice Factor 78.5 66.3 54.5
: 23. Unit Forced Outage Rate                                21.5                               25.9               25.3
: 20. Unit Availability Factor
: 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht:                       .
: 21. Unit Capacity Factor IUsing 31DC Net) -
56.2 51.8 38.2 55.2 50.9 36.8
: 22. Unit Capacity Factor IUsing DER Net) 21.5 25.9 25.3
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht:
2
2
: 25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operationi:                           Forecast             Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\1NIERCIAL OPER ATION 8211110310 820108                                                                 '
: 26. Units in Test Status (Prior to Commercial Operationi:
PDR ADOCK 05000346 R
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\1NIERCIAL OPER ATION 8211110310 820108 PDR ADOCK 05000346 PDR
                ,                    PDR                                                                                    ("/778
("/778 R
                                                                                                          ~ e                     .'}}
~
e}}

Latest revision as of 18:34, 16 December 2024

To Monthly Operating Rept for June 1981
ML20066D382
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110310
Download: ML20066D382 (1)


Text

.

Revision 1 - 1/8/82 s

OPERATING DATA REPORT DOCKET NO. _50-346 DATE.lanuary_8,1982 COSIPLETED BY Bilal Sntsour TELEPHONE (419) 259-5000 Ext. 251

_ OPERATING STATUS Davis-Besse Unit #1 Notes

1. Unit Name:

June, 19S1

2. Reporting Period:

2772

3. Licensed Thermal Power (51Wt):

925

4. Nameplate Rating (Gross 31We):

906

5. Design Electrical Rating (Net 31We):

918 1

6. h!aximum Dependable Capacity (Gross S!We):

874

7. 51aximum Dependable Capacity (Net 51We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted. If Any (Net 31We):
10. Reasons For Restrictions.If Any:

This alonth Yr.-to-Date Cumulative 720 4,343 25.584 l

11. Hours in Reporting Period 565.4 3.025.6 11.108.2

~

12. Number Of Hours Reactor Was Critical 34.8 2,513.4
13. Reactor Resene Shutdown Hours 0
14. Hours Generator On-Line 565.4 2,879.0 12.221.3
15. Unit Reserve Shutdown Hours 0

0' i _733 _ g

16. Gross Thermal Energy Generated (31WH) 1,146,943 6,392,283

?7.480.785 1

17. Gross Electrical Energy Generated ( A!Wil) 383.055 2,138,383 9.165.536
18. Net Electrical Energy Generated (31WH) 359.837 2,002.585 8.536.434 78.5 66.3 47.8
19. Unit Senice Factor 78.5 66.3 54.5
20. Unit Availability Factor
21. Unit Capacity Factor IUsing 31DC Net) -

56.2 51.8 38.2 55.2 50.9 36.8

22. Unit Capacity Factor IUsing DER Net) 21.5 25.9 25.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date,and Duration of Eacht:

2

25. If Shut Down At Eni! Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operationi:

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY CO\\1NIERCIAL OPER ATION 8211110310 820108 PDR ADOCK 05000346 PDR

("/778 R

~

e